1 Report No. 20C TRP th August 2011 Acoustics Vibration Air Quality Mechanical & Structural Systems Fluid Mechanics Sustainability Building Technologies
2 DOCUMENT CONTROL REPORT NO: LIBRARY CODE: 20C TRP A 39 PREPARED FOR: PREPARED BY: Lanscon Pty Ltd Vipac Engineers & Scientists Ltd Shop 5/21 Regent Street 2 Sirius Rd Redfern NSW 2016 Lane Cove NSW 2066 AUSTRALIA Contact: Les Touma e: Sydney@vipac.com.au Phone: t: Fax : f: AUTHOR: Jimmy Ameli Date: 8 th August 2011 Acoustics Engineer REVIEWED BY: Anthony Cano Date: 8 th August 2011 Project Engineer APPROVED BY: REVISION HISTORY: Fu Siong Hie Date: 8 th August 2011 Consulting Engineer Revision No. Date Issued: Reason/Comments: DISTRIBUTION: th June th June th August 2011 Draft Issue Initial issue, revised drawing list Revised drawings Copy No. 2 Location 1 Project 2 Uncontrolled Copy Client (PDF Format) KEYWORDS: Campsie, Canterbury Road, Acoustic Assessment NOTE: This is a controlled document within the document control system. If revised, it must be marked SUPERSEDED and returned to the VIPAC QA Representative. Ref: 20C TRP th August 2011 Page 2 of 22 Commercial-In-Confidence
3 This document contains commercial, conceptual and engineering information which is proprietary to VIPAC Engineers & Scientists Ltd. We specifically state that inclusion of this information does not grant the Client any license to use the information without VIPAC's written permission. We further require that the information not be divulged to a third party without our written consent. EXECUTIVE SUMMARY Vipac Engineers & Scientists Ltd. (VIPAC) has been commissioned by Lanscon Pty Ltd to assess the acoustic interaction of the proposed development at Canterbury Road, Campsie with the surrounding environment. An acoustic assessment of the proposed development has been carried out in accordance with the recommendations and guidelines set out in Canterbury Council s DCP, Department of Environment, Climate Change and Water (DECCW) Industrial Noise Policy (INP), Australian Standard AS/NZS 2107:2000 and DoP Regulation 102 of the State Environmental Planning Policy (Infrastructure) Noise surveys have been conducted to establish the existing ambient and traffic noise levels in the area. The ingress of traffic noise has been determined. An acoustic glazing schedule for the site is detailed in Section 5.2 and Appendix B. Limiting criteria for mechanical plant/equipment noise emission have been determined based on DECCW INP requirements. The mechanical services consultants should consider these limits when selecting/designing the mechanical plant. Once the plant and equipment selection has been finalised, a separate acoustic assessment should be conducted, such as at Construction Certificate Stage. At this later juncture the design and specification of the necessary treatments may be carried out to control the noise emission and to ensure compliance with the criteria specified. Section 3.5 details the National Construction Code (NCC 2011) requirements for the isolation of walls and floors. Noise within the basement car park is to comply with the recommended internal noise levels as given in Section 5.3. Provided the recommendations in this report are implemented, the proposed mixed use development is predicted to comply with the acoustic requirements of Canterbury Council and/or the relevant Australian standards and guidelines. Ref: 20C TRP th August 2011 Page 3 of 22 Commercial-In-Confidence
4 TABLE OF CONTENTS 1 INTRODUCTION 6 2 SITE DETAILS 6 3 NOISE CRITERIA CANTERBURY COUNCIL DCP STATE ENVIRONMENTAL PLANNING POLICY (INFRASTRUCTURE) REG CRTIERIA FOR INTERNAL NOISE LEVELS NSW DECCW INDUSTRIAL NOISE POLICY NCC SOUND INSULATION PROVISIONS BETWEEN PREMISES Sound Isolation of Pumps Doors ENVIRONMENTAL NOISE SURVEY METHODOLOGY INSTRUMENTATION NOISE MONITORING RESULTS ROAD TRAFFIC NOISE MEASUREMENT RESULTS ACOUSTIC ASSESSMENT AND RECOMMENDATIONS MECHANICAL SERVICES GLAZING REQUIREMENTS External walls Glazing for noise intrusion General Remarks BASEMENT CAR PARK NOISE...13 Ref: 20C TRP th August 2011 Page 4 of 22 Commercial-In-Confidence
5 6 GUIDELINES FOR CONSTRUCTION NOISE 13 7 CONCLUSION 15 APPENDIX A: SITE PLAN 16 APPENDIX B: ARCHITECTURAL DRAWINGS 17 APPENDIX C: GLOSSARY OF ACOUSTIC TERMS 18 APPENDIX D: GLAZING SCHEDULE 20 LIST OF FIGURES & TABLES TABLE 1: AS/NZS 2107: RECOMMENDED DESIGN SOUND LEVELS FOR BUILDING INTERIORS...7 TABLE 2: PART F5 OF NCC REQUIREMENTS...8 TABLE 3: MEASUREMENT RESULTS AND NOISE GOALS...11 TABLE 4: SUMMARY OF TRAFFIC NOISE MEASUREMENT LEVELS...11 TABLE 5: NOISE AT RESIDENCES USING QUANTITATIVE ASSESSMENT...14 Ref: 20C TRP th August 2011 Page 5 of 22 Commercial-In-Confidence
6 1 INTRODUCTION Vipac Engineers & Scientists Ltd. (VIPAC) has been commissioned by Lanscon Pty Ltd to assess the acoustic interaction of the proposed mixed-use commercial/residential development at with the surrounding environment. The proposed mixed-use development will comprise: Basement car parks on 2 levels. Commercial spaces on the lower and upper ground levels. Residential units on five levels. 2 SITE DETAILS The development is located on Canterbury Road. The site is bounded by Canterbury Road on the north, Troy Street on the east, Charlotte Street on the west and residential properties on the south. Site location is shown in Appendix A. The nearest noise sensitive receivers, which have potential for noise impact by this development, are the residential building across the south boundary. 3 NOISE CRITERIA The following standards and guidelines are applicable to this project: City of Canterbury Council DCP 13 on Multiple Unit Development acoustic requirements NSW DECCW Industrial Noise Policy (DECCW INP). NSW DECCW The Interim Construction Noise Guideline. DoP Regulation 102 of the State Environmental Planning Policy (Infrastructure) National Construction Code (NCC) 2011 Australian standard AS/NZS : Acoustics Recommended design sound levels and reverberation times for building interiors. Australian standard AS : Acoustics - Description and measurement of environmental noise - General procedures. The requirements of each are summarised as follows: Ref: 20C TRP th August 2011 Page 6 of 22
7 3.1 CANTERBURY COUNCIL DCP Section 12 of DCP No 13 of Canterbury Council on Multiple Unit Development requirements on noise are mainly on the layout of the buildings and spaces. The DCP does not introduce any specific criteria or standards, therefore we would use the relevant Australian standards/guidelines in the assessment 3.2 STATE ENVIRONMENTAL PLANNING POLICY (INFRASTRUCTURE) REG 102 Where a development is adjacent to a road corridor with an annual average daily traffic volume of more than 40,000 vehicles Regulation 102 of the SEPP requires that the consent authority must not grant consent to the development unless it is satisfied that appropriate measures will be taken to ensure that the following L Aeq levels are not exceeded: In any bedroom in the building-35 db(a) at any time between 10 pm and 7 am, Anywhere else in the building (other than a garage, kitchen, bathroom or hallway), -40 db(a) at any time. 3.3 CRTIERIA FOR INTERNAL NOISE LEVELS In terms of internal noise levels for residential and commercial occupancies subjected to outside noise sources, the recommended indoor design levels specified in Australian Standard 2107:2000 are considered. Table 1 below summarises the relevant internal sound levels. Table 1: AS/NZS 2107: Recommended Design Sound Levels for building interiors Type of occupancy/activity Recommended design sound level L eq db(a) Satisfactory Maximum Houses and apartments near major road Work areas Commercial & shop buildings General office area Small retail stores (general) Public spaces (eg speciality shops) Enclosed car parks Ref: 20C TRP th August 2011 Page 7 of 22
8 3.4 NSW DECCW INDUSTRIAL NOISE POLICY To control noise from plant or equipment at the development the noise emission levels from the site should be restricted to criteria determined through methodology outlined in the NSW Department of Environment, Climate Change and Water (DECCW) Industrial Noise Policy. The procedures detailed in DECCW Industrial Noise Policy has two requirements that must be met, namely: that the noise source not be intrusive ; and also that the amenity of the nearby land be preserved. This policy sets out two separate noise criteria designed to ensure developments meet environmental noise objectives. The first criterion accounts for intrusive noise and the second criterion applies to protection of amenity of particular land uses. The new development is assessed by applying both the amenity and intrusiveness criteria to the situation and adopting the more stringent of the two. This becomes the project specific noise levels. Applying the most stringent requirement as the Project Specific Noise Levels ensures that both intrusive noise is limited and the amenity is protected. 3.5 NCC SOUND INSULATION PROVISIONS BETWEEN PREMISES It is necessary to safeguard future occupants from illness or loss of amenity as a result of undue sound being transmitted between adjoining sole-occupancy premises and also from common spaces into sole-occupancy premises. NCC Deemed to Satisfy sound insulation requirements for intertenancy wall of Volume 1 for Class 2 building are summarised in the following Table 2. A waste pipe or other penetration that is embedded in or passes through a floor, serves or passes through more than one apartment must be separated from the rooms of any sole-occupancy unit by construction of a partition with the Rw+ Ctr ratings specified in Table 2. Table 2: Part F5 of NCC Requirements SEPARATING PARTITIONS Minimum NCC Requirement WALLS AND FLOORS Walls between sole occupancy Rw + Ctr 50 Walls between apartments and stairway, public corridors, public lobby or the like Walls between wet areas (bathrooms, sanitary compartment, laundry or kitchen) and a habitable room (other than kitchen) in adjoining apartments Walls between a plant room or lift shaft and a sole occupancy unit Rw 50 Rw + Ctr 50 & of discontinuous construction Rw 50 & of discontinuous construction Ref: 20C TRP th August 2011 Page 8 of 22
9 SEPARATING PARTITIONS Minimum NCC Requirement Doors assemblies located in a wall between an apartment and a stairway, public corridor, public lobby or the like Floors between sole occupancy units or between a sole occupancy unit and plant room, lift shaft, stairway, public corridor, public lobby or the like. SERVICES (a) a duct, soil, waste or water supply pipe including a duct or pipe that is located in a wall or floor cavity serves or passes through more than one sole occupancy unit (i) if the adjacent room is a habitable room (other than a kitchen); or Rw 30 Rw + Ctr 50 & Ln,w + CI < 62 Rw + Ctr 40 (ii) if the room is a non-habitable room Rw + Ctr 25 (b) a storm water pipe passes through a sole occupancy unit (i) if the adjacent room is a habitable room (other than a kitchen); or Rw + Ctr 40 (ii) if the room is a non-habitable room Rw + Ctr 25 Note, according to the NCC requirements: 1. For the purpose of complying with the NCC 2011 sound insulation requirements, the Rw + Ctr must be determined in accordance with AS/NZS or ISO 717.1, using results from laboratory measurements. 2. Discontinuous construction means a wall system having a minimum 20mm cavity between two separate leaves with: For masonry, where wall ties are required to connect leaves, the ties are of the resilient type; and For other than masonry, there is no mechanical linkage between leaves except at the periphery. A staggered stud wall, which has a common top and bottom plate, is not considered to be discontinuous. Refer to glossary of acoustic terminology in Appendix C for definitions of the sound insulation ratings Sound Isolation of Pumps A flexible coupling must be used at the point of connection between the service pipes in a building and any circulating pump or other pump. Ref: 20C TRP th August 2011 Page 9 of 22
10 3.5.2 Doors Door assemblies located in a wall between an apartment and a stairway, public corridor, public lobby or the like, would require an Rw not less than 30, when tested in the laboratory. 4 ENVIRONMENTAL NOISE SURVEY 4.1 METHODOLOGY Unattended noise monitoring was conducted at the site over a period of 10 days between the 24 th May and 3 rd June The monitor was located at the rear of the existing property next to the south boundary. A second noise monitor was used for 24 hours and was located on the front courtyard on Canterbury Road to measure the traffic noise. The measurement locations are shown on Appendix A. All measurements conducted were in general accordance with the Australian standard AS INSTRUMENTATION Measurements were conducted using the following equipment: Larson Davis Integrating Sound Level analyser Model LD870 B, Serial Number Larson Davis Integrating Sound Level analyser Model LD812, Serial Number 0322 Larson Davis sound analyser 2900, Serial number Larson Davis Sound Level Calibrator Model CA250, Serial Number The instruments were checked for calibration immediately before and after the measurements and there was no adverse deviation between the two. The instruments carry traceable calibration certificates. The sound analysers are Type 1 and comply with the Australian standard AS1259.2: NOISE MONITORING RESULTS For noise monitoring, the noise data where adverse weather conditions prevailed was disregarded. Based on the noise data, Table 3 presents a summary of ambient noise measurements at the site and associated noise goals, which have been analysed in accordance with the DECCW Industrial Noise Policy. Values have been rounded to the nearest db. Full noise survey results are available upon request. Ref: 20C TRP th August 2011 Page 10 of 22
11 Table 3: Measurement Results and Noise Goals All Values in dba Existing Noise levels dba Operational noise goals (dba) Type Period LAeq RBL ANL 1 Amenity L Aeq,(period) Intrusiveness LAeq, (15-,inute) INP Project Specific Level Day Residential Evening Night Hence, noise from mechanical plant and equipment associated with the proposed development should not exceed the Project Specific Level criteria specified above. 4.4 ROAD TRAFFIC NOISE MEASUREMENT RESULTS Traffic noise measurements were made on site by unattended noise monitoring between 24 th and 27 th May The noise monitor was placed in the forecourt of the existing car yard at 15 m setback from the kerb. Table 4 below presents a summary of the noise measurement levels. Values were rounded to the nearest 0.5 db. Table 4: Summary of Traffic Noise measurement Levels All Values in dba Location Day Noisiest L Aeq (1 Hour) Night Noisiest L Aeq (1 Hour) Canterbury Road (15 m setback) Recommended Acceptable Noise Level from table 2.1 in the DECCW Industrial Noise Policy Ref: 20C TRP th August 2011 Page 11 of 22
12 5 ACOUSTIC ASSESSMENT AND RECOMMENDATIONS 5.1 MECHANICAL SERVICES Mechanical noise emission should be controlled in accordance with the Project Specific Noise Level criteria as shown in Table 3. At this stage, the design and selection of the plant required to service the proposed development has not been finalised therefore the possible noise impact cannot be assessed. However, the mechanical services consultant should select plant so that the total mechanical services noise does not exceed the lowest project specific noise level at the common boundary of the receiver. In general, based on previous experience with similar size developments, a number of amelioration measures can be implemented to control the noise emission. Typical amelioration measures are outlined below (not necessarily limited to}: Location of mechanical services equipment away from noise sensitive receivers. Achieving no direct line of sight path between the nearest residence and all the major mechanical equipment or exhaust fans. Installation of low noise condenser units. Installation of barriers and acoustic enclosures where the above measures do not provide sufficient attenuation. 5.2 GLAZING REQUIREMENTS Acoustic glazing is required to reduce noise impacts on occupants and should result in noise levels within such units in accordance with the AS/NZS 2107: External walls The outer walls will be constructed of double brick. This will provide an acoustic performance of R w 55 or better. Some bedrooms facing Canterbury Road have a spandrel wall of brick and glass (examples are bedroom 1 of unit 13 or bedroom 2 of unit 19). We were advised that the minimum brick area in this case is 50 %, which was used for this assessment Glazing for noise intrusion Traffic noise measured for Canterbury Road was adjusted using the CoRTN model (Calculation of Road Traffic Noise) to account for different receiver heights and distance attenuation for various units on different floors. A value of 2.5 db(a) was added to the measured levels to account for façade reflections. Calculations were performed for all Ref: 20C TRP th August 2011 Page 12 of 22
13 glazing on the potentially worst affected façade, in this case on Canterbury Road. It was assumed that all bedrooms and living rooms were carpeted. Appendix D presents the minimum glazing requirements for outer and inner glazing of the façade. This configuration will provide acoustic performance to achieve the recommended internal sound level as specified in AS/NZS 2107: General Remarks Glazing is generally the weakest component of any building façade where it would serve as a major noise transmission path, especially in cases where it has not been installed properly. Sometimes different glass configurations have the same R w ratings but they have different Sound Transmission Loss characteristics at each frequency band. Our glazing recommendations have been based on the glass performance across the octave band frequency spectrum. All Windows/doors should be well sealed (air tight) when closed with good seals such as Q- LON acoustic seals (or equivalent) around the top and bottom sliders. Special attention should be given to the balcony doors and the sliding doors to have good quality acoustic seals around them. Any air gap will significantly reduce the performance of the glazing in terms of the ability to attenuate noise. Mohair seals are not considered to be acoustic seals. All of the above assumed that the glass is properly sealed airtight. In the case of service rooms such as toilets, laundries, kitchens, gallery etc, not included in the glazing table in Appendix D, a 3 to 4mm thick windows/glazing with minimum R w of 28 is considered sufficient. 5.3 BASEMENT CAR PARK NOISE The noise level of the mechanical equipment of the car park should not exceed a level of 65 db(a) as indicated in Table 1. The sound emission of the car park exhaust fans, to the environment should comply with the Project Specific Noise Levels as shown in Table 3. 6 GUIDELINES FOR CONSTRUCTION NOISE The following guidelines for The Interim Construction Noise Guideline developed by the Department of Environment and Climate Change and Water NSW (DECCW). The Guideline presents two ways of assessing construction noise impacts the quantitative method, which is generally suited to longer-term construction, and the qualitative method, which is generally suited to short-term works such as infrastructure maintenance. Using a quantitative as described in the guideline the noise criteria as presented in Table 5 would be adopted. Ref: 20C TRP th August 2011 Page 13 of 22
14 Table 5: Noise at Residences Using Quantitative Assessment Time of day Recommended standard hours Monday to Friday 7am to 6pm Saturday 8am to 1pm No work on Sundays and Public Holidays Outside recommended hours Management level, LAeq(15min) Noise affected RBL+10dB Highly noise affected 75dBA Noise affected RBL+10dB How to apply The noise affected level represents the point above which there may be some community reaction to noise. Where the predicted or measured L Aeq (15 min) is greater than the noise affected level, the proponent should apply all feasible and reasonable work practices to meet the noise affected level. The proponent should also inform all potentially impacted residents of the nature of works to be carried out, the expected noise levels and duration, as well as contact details. The highly noise affected level represents the point above which there may be strong community reaction to noise. Where noise is above this level, the relevant authority (consent, determining or regulatory) may require respite periods by restricting the hours that the very noisy activities can occur, taking into account: 1. times identified by the community when they are less sensitive to noise (such as before and after school for works near schools, or mid-morning or midafternoon for works near residences. 2. if the community is prepared to accept a longer period of construction in exchange for restrictions on construction times. A strong justification would typically be required for works outside the recommended standard hours. The proponent should apply all feasible and reasonable work practices to meet the noise affected level. Where all feasible and reasonable practices have been applied and noise is more than 5 db(a) above the noise affected level, the Ref: 20C TRP th August 2011 Page 14 of 22
15 Time of day Management level, LAeq(15min) How to apply proponent should negotiate with the community. For guidance on negotiating agreements see section of guideline. 7 CONCLUSION An acoustic assessment of the proposed development has been carried out in accordance with the recommendations and guidelines set out in Canterbury Council s DCP, Department of Environment, Climate Change and Water (DECCW) Industrial Noise Policy and Australian Standard AS/NZS 2107:2000. Noise surveys have been conducted to establish the existing ambient and traffic noise levels in the area. The ingress of traffic noise has been determined. An acoustic glazing schedule for the site is detailed in Section 5.2 and Appendix B. Limiting criteria for mechanical plant/equipment noise emission have been determined based on DECCW Industrial Noise Policy requirements. The mechanical services consultants should use these limits when selecting/designing the mechanical plant. Once the plant and equipment selection has been finalised, a separate acoustic assessment should be conducted, such as at Construction Certificate Stage. At this later juncture the design and specification of the necessary treatments may be carried out to control the noise emission and to ensure compliance with the criteria specified. Section 3.5 details the NCC (2011) requirements for the isolation of walls and floors. Noise within the basement car park is to comply with the recommended internal noise levels as given in Section 5.3. Provided the recommendations in this report are implemented, the proposed mixed-use development is predicted to comply with the acoustic requirements of Canterbury Council and/or the relevant Australian standards and guidelines. Ref: 20C TRP th August 2011 Page 15 of 22
16 APPENDIX A: SITE PLAN Traffic Noise measurement location Ambient noise monitor location Figure A-1: Site location and Noise Survey Points Ref: 20C TRP th August 2011 Page 16 of 22
17 APPENDIX B: ARCHITECTURAL DRAWINGS The environmental assessment carried out in this report was based on the following architectural drawings provided by Mackenzie Architects. Drwg No. Date Description SK Car park Level 2 SK Car park Level 1/Lower Ground floor SK Upper ground floor plan SK st floor plan SK nd floor plan SK rd floor plan SK th floor plan SK th floor plan SK Site/roof plan SK Elevations 1 SK Elevations 2 SK Sections 1 SK Sections Ref: 20C TRP th August 2011 Page 17 of 22
18 APPENDIX C: GLOSSARY OF ACOUSTIC TERMS Decibel, db: Unit of acoustic measurement. Measurements of power, pressure and intensity. Expressed in db relative to standard reference levels. db(a): Unit of acoustic measurement weighted to approximate the sensitivity of human hearing to sound frequency.sound Pressure Level, Lp (db), of a sound: 20 times the logarithm to the base 10 of the ratio of the r.m.s. sound pressure to the reference sound pressure of 20 micro Pascals. Sound pressure level is measured using a microphone and a sound level meter, and varies with distance from the source and the environment. Sound Power Level, LW (db), of a source: 10 times the logarithm to the base 10 of the ratio of the sound power of the source to the reference sound power of 1 Pico Watt. Sound power level cannot be directly measured using a microphone. Sound power level does not change with distance. The sound power level of a machine may vary depending on the actual operating load. Ambient Sound: Of an environment: the all-encompassing sound associated with that environment, being a composite of sounds from many sources, near and far. Background noise: The underlying level of noise present in the ambient noise, excluding the noise source under investigation, when extraneous noise is removed. Percentile Level - L 90, L 10, etc: A statistical measurement giving the sound pressure level which is exceeded for the given percentile of an observation period, e.g. L90 is the level which is exceeded for 90% of a measurement period. L 90 is commonly referred to as the "background" sound level. L AEQ,T : Equivalent continuous A-weighted sound pressure level. The value of the A-weighted sound pressure level of a continuous steady sound that, within a measurement time interval T, has the same A-weighted sound energy as the actual time-varying sound. Rating Background Level RBL: Method for determining the existing background noise level which involves calculating the tenth percentile from the LA90 measurements. This value gives the Assessment Background Noise Level (ABL). Rating Background Level is the median of the overall ABL. Ref: 20C TRP th August 2011 Page 18 of 22
19 R w Weighted Sound Reduction Index: A new single number quantity for airborne sound insulation rating which replaces STC. STC has been traditionally used for the classification of partitions and to define acoustical requirements in the Building Code of Australia. For majority of partitions, the value for R w will be similar to the value for STC. Partitions with particularly poor performance at 100Hz may have lower values for R w than for STC. Conversely, partitions with poor performance at 4kHz may have higher values for R w than for STC. Ctr Adaptation factor: Ctr is a spectrum adaptation factor which has been chosen in the NCC to take into account lower frequency level sounds. For an airborne sound insulation, the Ctr factor and the Rw of building element will need to be considered. Ctr is a negative number which means that Rw + Ctr of a building element will be less than the Rw of the building element. For example a wall system may have an Rw of 55 but would have an Rw + Ctr of 50 if the Ctr value was 5. Weighted Standardised Level Difference, DnT,w: A term used in combination with Ctr to describe the airborne sound insulation rating of a building element when tested on site. A higher DnT,w means a higher difference between the sound levels in the originating (source) room and the receiving room and thus a higher standard of insulation. The higher the Dntw + Ctr of a building element, the better the performance of the building element in terms of airborne sound insulation. Weighted Normalised Impact Sound Level, L n,w : A term used to describe the impact sound insulation of the floor. In the NCC, the use of parameter L n,w plus spectrum adaptation term CI will be used to quantify the floor impact sound insulation ratings. The lower the L n,w + CI of a floor, the better the performance of the floor in terms of impact sound insulation. Weighted Standardised Impact Sound Level, LnT,w: A term used in combination with a spectrum adaptation CI to describe the impact sound insulation rating of a floor when tested on site. Similar to the L n,w, it measures adequateness of a floor in controlling impact sound. Ref: 20C TRP th August 2011 Page 19 of 22
20 APPENDIX D: GLAZING SCHEDULE Table D-1: Schedule of Window and Glazing (R w ) - Commercial Glazing recommendations Level Unit Facing Thickness (mm) Rw glass Rw glass+frame Ground Commercial Canterbury/Troy/Charlotte 6.38 lam Table D-2: Schedule of Window and Glazing (R w ) - Residential Block A Glazing recommendations Unit Space Facing 2 Thickness (mm) Rw glass Rw glass+frame A1, A2 A3, A4 A5, A13, A21, A28, A37 A6, A14 Bed 1 & 2 Troy 6.38 lam Living Troy 6 mono Bed 1 & 2 Rear 6 mono Living Rear 4 mono Bed 1 Canterbury/Troy lam Bed 2 Canterbury/Troy lam Living Troy 6 mono Bed 1 &2 Troy 6.38 lam Living Troy 6 mono A7, A8, A15, Bed 1 &2 Rear 6 mono A16, A23 Living Rear 4 mono A9, A17 A10, A18 A11, A12, A19, A20, A26, A27, A32, A33, A35, A36 Bed 1 &2 Internal 6.38 lam Living Internal 6 mono Bed 1 & 2 Internal 6.38 lam Living Canterbury / Internal 6.38 lam Bed1 (setback) Canterbury lam Bed 2 Canterbury lam Living Canterbury 6.38 lam Where Internal is specified, this refers to the façade facing the walkway between both buildings. Ref: 20C TRP th August 2011 Page 20 of 22
21 Glazing recommendations Unit Space Facing 2 Thickness (mm) Rw glass Rw glass+frame A22 A24 Bed1 Rear 6 mono Bed2 Troy 6.38 lam Living Troy 6.38 lam Bed1 Rear 6 mono Bed2 Internal 6.38 lam Living Internal 6.38 lam A25, A31, Bed 1 & 2 Internal 6.38 lam A34 Living Canterbury /Inter 6.38 lam A29, A30 Bed 1 & 2 Rear 6 mono Living Troy/ Internal 6 mono Rear 4 mono Table D-3: Schedule of Window and Glazing (R w ) - Residential Block B Glazing recommendations Unit Space Facing Thickness (mm) Rw glass Rw glass+frame B1, B2 B3, B4 B5 B6, B14 B7, B39 B8, B15, B16, B23, B24, B31, B32 Bed 1 & 2 Charlotte 6.38 lam Living Charlotte 6 mono Bed 1 & 2 Rear/Inter 6 mono Living Rear 4 mono Bed 1 Internal 6.38 lam Bed 2 Canterbury lam Living Canterbury 6.38 lam Bed 1 &2 Internal 6.38 lam Living Internal 6 mono Bed 1 &2 Rear 6 mono Living Rear 4 mono Bed 1 &2 Rear 6 mono Bed 1 Charlotte/ Internal 6.38 lam Living Rear 4 mono Ref: 20C TRP th August 2011 Page 21 of 22
22 Glazing recommendations Unit Space Facing Thickness (mm) Rw glass Rw glass+frame B9, B17, B25, Bed 1 & 2 Charlotte 6.38 lam B33 Living Charlotte 6 mono B10, B18, B26, B34, B41 Living Bed1 &2 Charlotte 6.38 lam Canterbury / Charlotte 6.38 lam B11, B12, Bed1 B19, B20, (setback) Canterbury lam B27, B28, B35, B36, Bed2 Canterbury lam B42, B43 Living Canterbury 6.38 lam B13, B21, Bed1 & 2 Internal 6.38 lam B29, B37 Living Canterbury /Inter 6.38 lam B22, B30, B38 B40 Bed 1 & 2 Internal 6.38 lam Living Internal 6 mono Bed 1 & 2 Rear 6 mono Bed 2 Charlotte 6.38 lam Living Charlotte 6 mono The above glazing thicknesses are the minimum required for acoustic performance. Glazing thicknesses can be increased for the reasons of fire, safety, etc. Ref: 20C TRP th August 2011 Page 22 of 22
HAINE ROAD, RAMSGATE NOISE ASSESSMENT
PROJECT NAME CLIENT PROJECT RECORD HAINE ROAD, RAMSGATE ACTIVE LAND & BUILD LTD. REPORT DETAILS TYPE REFERENCE 1775\AR\12-2017\748 ISSUE DATE DECEMBER 2017 NICHOLAS JONES AUTHOR REVIEWER BEng(Hons) CEng
More informationAcoustic Design Criteria
Apartment Acoustics Apartment Buildings Acoustic Design Criteria Building Code of Australia: - Intertenancy walls and floors - Corridor walls and doors - Floor impact isolation - Lift, stair and core walls
More informationASSESSMENT OF INWARD TRAFFIC NOISE IMPACT AT RESIDENTIAL DEVELOPMENT, WONDERFUL BARN, LEIXLIP, CO. KILDARE
ASSESSMENT OF INWARD TRAFFIC NOISE IMPACT AT RESIDENTIAL DEVELOPMENT, WONDERFUL BARN, LEIXLIP, CO. KILDARE Technical Report Prepared For Ardstone Capital Ltd. 48 Fitzwilliam Square Dublin Technical Report
More informationDesign Standards Brief Section 13 Acoustics
Property Services Design Standards Brief Section 13 Acoustics Issue 6 2009 Section 13 Acoustics 13 CONTENTS 13.1 INTRODUCTION...3 13.2 NOMENCLATURE...3 13.3 APPLICABLE STANDARDS...4 13.4 ARCHITECTURAL
More informationBAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA
Charles M Salter Associates Inc BAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA RESIDENTIAL INTERIOR NOISE ANALYSIS Prepared for: Kim Havens Wilson Meany Sullivan Four Embarcadero Center, Suite 3330
More informationCARRYING OUT NOISE ASSESSMENTS FOR PROPOSED SUPERMARKET DEVELOPMENTS
Acoustics 2008 Geelong, Victoria, Australia 24 to 26 November 2008 Acoustics and Sustainability: How should acoustics adapt to meet future demands? CARRYING OUT NOISE ASSESSMENTS FOR PROPOSED SUPERMARKET
More informationTHE FRAME RESIDENTIAL DEVELOPMENT, SPORTCITY, MANCHESTER THE CONCRETE CENTRE LTD 1.0 INTRODUCTION...2
Concrete Centre Limited The Frame Residential Development, Sport City, Manchester Sound Insulation Test Report 2 August 2005 PROJECT: CLIENT: The Frame Residential Development, Sportcity, Manchester Concrete
More informationTidbury Green Farmhouse, Tidbury Green. Proposed new Public House Report on existing noise climate 08/12/17 Revision 3 ACOUSTICS
08/12/17 Revision 3 ACOUSTICS Tel: +44 (0) 121 450 4800 Audit sheet Hoare Lea Acoustics 6 th Floor West 54 Hagley Road Edgbaston Birmingham B16 8PE REVISION DESCRIPTION DATE ISSUED BY REVIEWED BY 0-DFC
More informationAcoustic Consulting Australia PtyLtd. I Consultants on Noise and Vibration P0 Box 332
Pg 'P. Acoustic Consulting Australia PtyLtd. I Consultants on Noise and Vibration P0 Box 332 Heidelberg i#i..wr. David, u.,0 Victoria 3054 Phone 0412 375 234 Email: acausteblgpond.corn ABN 49 095 932 092
More informationB-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions:
SECTION 46-53.1 B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT A. PURPOSE The B-2 Community Commercial Business District is oriented toward retail, service businesses and multi-family residential development.
More informationNoise measurement and mitigation for urban building foundation excavation
PROCEEDINGS of the 22 nd International Congress on Acoustics Challenges and Solutions in Acoustical Measurement and Design: Paper ICA2016-552 Noise measurement and mitigation for urban building foundation
More informationAustralian Standard. Acoustics Road traffic noise intrusion Building siting and construction AS
AS 3671 1989 Australian Standard Acoustics Road traffic noise intrusion Building siting and construction This Australian Standard was prepared by Committee AV/5, Acoustics Community Noise. It was approved
More informationMCS 020. MCS Planning Standards. For permitted development installations of wind turbines and air source heat pumps on domestic premises
MCS 020 MCS Planning Standards For permitted development installations of wind turbines and air source heat pumps on domestic premises This Standard is the property of Department of Energy and Climate
More informationCASE STUDY OF THE SOUND REDUCTION OF VARIOUS RESIDENTIAL GLAZING TREATMENTS
Abstract CASE STUDY OF THE SOUND REDUCTION OF VARIOUS RESIDENTIAL GLAZING TREATMENTS Greg Barry 1, Darren Jurevicius 2 and Matthew Stead 3 1 Resonate Acoustics, Adelaide SA 5082, Australia Email: greg.barry@resonateacoustics.com
More informationDay Night Day Night Day Night Residential site and amphitheatre Green Non residential site boundary Red
Plant Areas External plant must meet the following noise suppression requirement as adopted by the Landlord: 1. Air handling units 45db measured at 3metres from source. 2. Heat rejection plant 45db measured
More informationAPPENDIX 8. Noise Impact Assessment
APPENDIX 8 Noise Impact Assessment Orica Australia Pty Limited Noise Impact Assessment for Proposed Ammonium Nitrate Emulsion Production Facility and Continued Operation of Orica Mining Services Technology
More informationTechnical Features Sound Construction Design Aid For Office Acoustics
Technical Features Sound Construction Design Aid For Office Acoustics HOW TO DETERMINE COMPOSITE SOUND ISOLATION RATINGS FOR OFFICES BY COMBINING PERFORMANCE OF WALLS, CEILINGS AND FLOORS by Vincent M.
More informationSydney Port Botany Terminal 3 Project Out of Hours Works Protocol
1/11 Terms and Definitions The following terms, abbreviations and definitions are used in this plan: Terms Explanation SPBT3 Sydney Port Botany Terminal 3 CEMP EM EPA ERAP OEH PAH OOHWP EIS MCoA Distribution
More informationNYU Core: Post-EIS Façade Improvement Acoustical Assessment
NYU Core: Post-EIS Façade Improvement Acoustical Assessment Revised Version: September 24, 2012 Prepared by: AKRF, Inc. for New York University DRAFT FOR CLIENT REVIEW Table of Contents Introduction...
More informationProposed Lidl Food Store Muller Road Bristol. Environmental Noise Report for Planning
Proposed Lidl Food Store Muller Road Bristol Environmental Noise Report for Planning Reference: 5772/P/BL/pw October 2014 2 Proposed Lidl Food Store, Muller Road, Bristol Environmental Noise Report for
More informationEnvironmental Noise Assessment
July to September 2014 Rev 0 (Final) Report Details - July to September 2014 Filename: Job #: J0140003 Folder #: F13130 Revision: 0 (Final) Date: Prepared For Clark Potter, Senior Environmental Advisor
More informationPART 7 - NOISE, SIGNS AND ARTIFICIAL LIGHTING
CONTENTS... PAGE NOISE...3 7.1 RESOURCE MANAGEMENT ISSUES...3 7.2 RESOURCE MANAGEMENT OBJECTIVES AND POLICIES...3 7.3 RESOURCE MANAGEMENT STRATEGY...4 7.4 ANTICIPATED ENVIRONMENTAL RESULTS...5 7.5 PLAN
More information9. NOISE AND VIBRATION
9. NOISE AND VIBRATION 9.1 Introduction 9.1.1 This Chapter details the existing baseline noise and vibration levels together with assessments of the suitability of the site for residential and commercial
More informationNOISE AND VIBRATION FEASIBILITY STUDY 316 BLOOR STREET WEST CITY OF TORONTO, ONTARIO
NOISE AND VIBRATION FEASIBILITY STUDY 316 BLOOR STREET WEST CITY OF TORONTO, ONTARIO Prepared for: State Building Group Attn.: John Guanti 27 Dufferin Street, Unit 34 Toronto, Ontario M6B 4J3 Prepared
More informationCorporate Environments
Acoustics and the Impact on Corporate Environments falconproducts.com Achieving High-Quality Acoustics in Corporate Settings Knowledge is power. Here s what you need to know about sound, noise and creating
More informationCOMPONENTS OF THE NOISE ELEMENT
COMPONENTS OF THE NOISE ELEMENT Definitions Following is a list of commonly used terms and abbreviations that may be found within this element or when discussing the topic of noise. This is an abbreviated
More informationWhite Paper. A guide to the acoustic performance of Smarts Systems Products. Building Regulations Document E Resistance to the passage of sound
White Paper. A guide to the acoustic performance of Smarts Systems Products. Building Regulations Document E Smart Systems Ltd. January 2007 Contents Building Regulations...4 Acoustic Performance - Overview...5
More informationAPPENDIX C NOISE STUDY TECHNICAL REPORT
APPENDIX C NOISE STUDY TECHNICAL REPORT Noise Study Technical Report Watertown South Connector US 81 to 29 th Street SE Watertown, South Dakota HDR Project No. 39319 Prepared by 6300 So. Old Village Place
More informationDesign. Boral CinemaZone Fact Sheet. Windows. Acoustic sealants. Sound absorptive panels. Ventilation. Floor coverings. The vision.
Windows Like doorways, windows can be a significant source of sound leakage. For maximum isolation, windows should either be removed or built over internally - leaving the house facade unaffected. If natural
More informationNoise Assessments for Construction Noise Impacts
Noise Assessments for Construction Noise Impacts Weixiong Wu a AKRF, Inc., 440 Park Avenue, 7th floor, New York, NY, 10016, USA. ABSTRACT Construction noise is one of the most disruptive noise sources
More informationSWEDISH STANDARD SS
SWEDISH STANDARD SS 02 52 68 Approved 2001-06-21 Edition 1 Acoustics Sound classification of spaces in buildings Institutional premises, rooms for education, preschools and leisure-time centres, rooms
More informationFlagstone Development - Noise Assessment for Stage 1K and 1U
25 September 2017 620.10512.00900 Flagstone Stage 1K & 1U.docx Peet Flagstone City Pty Ltd Level 2, 167 Eagle Street Brisbane QLD 4000 Attention: Stephanie Clark Dear Stephanie (SLR) has been commissioned
More informationPlace Vanier Édifice AEFO
Place Vanier Édifice AEFO Martineau Architecture Inc. + Smith Carter Architects & Engineers Inc. TRAFFIC NOISE ASSESSMENT 250 Montreal Road Gradient Microclimate Engineering Inc. Prepared by Thomas Couper,
More informationA working acoustician s guide to compliance and the NCC(BCA)
Proceedings of ACOUSTICS 2016 A working acoustician s guide to compliance and the NCC(BCA) Roger Hawkins Palmer Acoustics. (Australia) Pty Ltd, Park Ridge, Queensland, Australia ABSTRACT The Building Code
More informationTimber-framed Systems for External Noise
11 Timber-framed Systems for External Noise Technical Design Guide issued by Forest and Wood Products Australia Technical Design Guide issued by Forest and Wood Products Australia Technical Design Guide
More informationEdition October May (always refer to the latest manual as set out on
LOXO PANEL INTER AND BLOCK TENANCY SYSTEMS WALLS TECHNICAL FIRE AND ACOUSTIC MANUAL REPORT PRODUCT DESCRIPTION AND BUILDING SYSTEM DETAILS Edition October May 2015 2014 (always refer to the latest manual
More informationA special procedure to guarantee sound isolation in dwellings
A special procedure to guarantee sound isolation in dwellings W. Beentjes Lichtveld Buis & Partners, Postbus 1475, 3430 BL Nieuwegein, Netherlands beentjes@lbp.nl 1681 Brochures of newly built dwellings
More informationImportant Notice. QuietRock by PABCO Gypsum Cherry Street Newark, CA
Important Notice In August 1, 2013, PABCO Gypsum, a division of PABCO building products, LLC acquired the QuietRock business and operations from Serious Energy, Inc. Serious Energy, Inc. corporate structure
More information2012 IRC Sections R303 R310 Building Planning II
Study Session 3 2012 IRC Sections R303 R310 Building Planning II OBJECTIVE: To develop an understanding of the health and safety criteria of the code, including light and ventilation; minimum room areas
More informationAPPENDIX 7 - AIRPORT NOISE AND DE VE LOPMENT CONTROL
JUNE 2 016 A7.1 APPENDIX 7 AIRPORT NOISE AND DEVELOPMENT CONTROLS A7.1 INTRODUCTION The Rotorua Airport is an important resource for the Rotorua district and wider Bay of Plenty, East Coast and Central
More informationLABORATORY MEASUREMENTS OF THE SOUND REDUCTION INDEX ROCKWOOL ABLATIVE COATED BATTS
eport No. L/3132 Page 1 of 10 for ockwool UK Limited Pencoed Bridgend CF35 6NY Dated: 30 November 2009 LABOATOY MEASUEMENTS OF THE SOUND EDUCTION INDEX OF OCKWOOL ABLATIVE COATED BATTS eport Author: M
More informationImportant Notice. QuietRock by PABCO Gypsum Cherry Street Newark, CA
Important Notice In August 1, 2013, PABCO Gypsum, a division of PABCO building products, LLC acquired the QuietRock business and operations from Serious Energy, Inc. Serious Energy, Inc. corporate structure
More informationSound Insulation for Glass and Panel
SEMINAR ON TESTING AND CERTIFICATION OF GREEN CONSTRUCTION MATERIALS Sound Insulation for Glass and Panel Ir Dr CHONG Fan HIGHLIGHTS 1. Sound insulation of building construction 2. Sound insulation tests
More informationCertificate number: CM40087 Rev3
Certification Body: ABN: 80 111 217 568 JAS-ANZ Accreditation No. Z4450210AK PO Box 7144, Sippy Downs Qld 4556 +61 (07) 5445 2199 www.certmark.org Certificate Holder: ABN: 22 750 783 065 19 Lowermill Rd,
More informationSydney Metro City and Southwest Sydney Yard Access Bridge Construction Noise and Vibration Management Plan (CNVMP)
SMC&S-C2S: SYAB Sydney Metro City and Southwest Sydney Yard Access Bridge Construction Noise and Vibration Management Plan () 1/74 Sydney Metro City and Southwest Sydney Yard Access Bridge Construction
More informationSpecialists in Acoustic Flooring and House to Flat Conversions
Sound Solution Consultants Ltd Po Box 755 Capel St Mary Ipswich Suffolk IP9 2WF Tel No: 0845 5212096 Fax No: 0845 5212097 Email: mpconsultservice@aol.com Specialists in Acoustic Flooring and House to Flat
More informationSection 10 - Airport Business Zone (Titanium Park)
10.1 Introduction 10.1.1 The Hamilton International Airport (the Airport) is a facility of economic and social importance to the Waikato Region. The Airport Business Zone associated with it (Titanium Park)
More informationAPPLICATIONS HVAC Acoustics and Vibration
APPLICATIONS HVAC Acoustics and Vibration Technical Development Program Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection and application
More informationNEC Acostix. Sound Attenuation Calculations and Design Software. General Information
NEC Acostix Sound Attenuation Calculations and Design Software General Information NEC Acostix TM is an Excel-Based programmable sheets to help engineers and manufacturers design acoustic enclosures, rectangular
More information7 BUSINESS 1, 1A 2, 3, 3A, 4, 5, 6 AND H
7 BUSINESS 1, 1A 2, 3, 3A, 4, 5, 6 AND H (HERITAGE) ZONES 7.1 ZONE STATEMENTS 7.1.1 BUSINESS 1 AND 1A ZONES - (INNER COMMERCIAL) The Business 1 and 1A Zones represent the inner commercial area of Oamaru
More informationThe content of this supplement is based upon the that described in our letter of May 28, 2012.
September 20, 2012 30 Wertheim Court, Unit 25 Richmond Hill, Ontario, Canada L4B 1B9 email solutions@valcoustics.com web www.valcoustics.com telephone 905 764-5223 fax 905 764-6813 Davis Howe Partners
More informationKINETICS NOISE CONTROL TEST REPORT #AT001067
KINETICS NOISE CONTROL TEST REPORT #AT001067 KINETICS NOISE CONTROL PRODUCTS: o FLM- NEOPRENE PAD ACOUSTICAL RATINGS: o STC 69 o IIC 61 TESTING AGENCY & REPORT NUMBER: o NATIONAL RESEARCH COUNCIL OF CANADA
More informationBuilding Codes and Ordinances ARC 227
Building Codes and Ordinances ARC 227 Week 6 Fire Resistive Construction 03.02.10 Instructor: Rick Staub, AIA Email: staub@pointonearchitects.com Phone: 860-434-7707 Fire Resistive Construction Passive
More informationENVIRONMENTAL NOISE ASSESSMENT
ENVIRONMENTAL NOISE ASSESSMENT STONEPAY - PICKERING WEST OF BROCK ROAD AND SOUTH OF DERSAN STREET PART OF LOTS 19 AND 20, CONCESSION 3 PLAN 40R-28764 CITY OF PICKERING PREPARED FOR: STONEPAY 7603860 CANADA
More informationACOUSTICS TESTED WINDOWS & DOORS ACOUSTICS TESTED - CERTIFIED // AWS SOUND INSULATING WINDOW SYSTEMS
1 ACOUSTICS TESTED WINDOWS & DOORS ACOUSTICS TESTED - CERTIFIED // AWS SOUND INSULATING WINDOW SYSTEMS /1 2 AWS ACOUSTICS TESTED WINDOWS & DOORS AWS HAS WINDOW AND DOOR SOLUTIONS TO HELP YOU MANAGE AND
More informationIAC Acoustics Noise-Foil Sound Absorption Panels for Industrial Applications. Dan O Brien
IAC Acoustics Noise-Foil Sound Absorption Panels for Industrial Applications Presented by Dan O Brien Industrial Business Unit Manager IAC Acoustics, A Division of Sound Seal 401 Airport Road North Aurora,
More informationSection Three, Part 5 Commercial Zones RETAILING, OFFICE FUNCTIONS, ENTERTAINMENT FACILITIES, RESIDENTIAL, CENTRAL BUSINESS AREA
PART 5 COMMERCIAL ZONES RETAILING, OFFICE FUNCTIONS, ENTERTAINMENT FACILITIES, RESIDENTIAL, CENTRAL BUSINESS AREA 5.1 INTRODUCTION Commercial development, in different built forms and levels of intensity
More informationAnalysis 4 Acoustical Analysis of Interior Partitions- Breadth
Analysis 4 - Breadth Background Good classroom acoustics are vital when the teaching and learning process relies strongly on verbal communication. Transmission of noise from one learning environment to
More information9.3.9 Industry uses code
9.3.9 Industry uses code 9.3.9.1 Application (1) This code applies to accepted development and assessable development identified as requiring assessment against the Industry uses code by the tables of
More informationBuilding Regulations; Construction 11
Building Regulations; Construction 11 b. Ceilings or roofs shall have a minimum of an "R" factor of 12; and c. Where the roof serves also as the finished ceiling a vent space of two inches shall be required
More informationQuality Inspection 8618 London Heights San Antonio, TX Phone: (210)
Quality Inspection 8618 London Heights San Antonio, TX 78254 Phone: (210) 240-0476 PRE DRYWALL INSPECTION REPORT Prepared For: DELETED (Name of Client) Concerning: DELETED, San Antonio, TX 78258 (Address
More information3.1 Noise Overlay District
3.1 A. Purpose The purpose of this District is to establish a Noise Overlay Zoning District within the. B. Special Definitions As used in this Article only, the following terms shall be defined as set
More informationACOUSTICS TESTED WINDOWS & DOORS ACOUSTICS PERFORMANC E TESTED AWS SOUND INSULATING WINDOW SYSTEMS / 1
1 ACOUSTICS TESTED WINDOWS & DOORS ACOUSTICS PERFORMANC E TESTED // AWS SOUND INSULATING WINDOW SYSTEMS / 1 2 AWS ACOUSTICS TESTED WINDOWS & DOORS AWS HAS WINDOW AND DOOR SOLUTIONS TO HELP YOU MANAGE AND
More informationEnhancing Acoustic Performance through the use of Window Shade Fabric White Paper
Enhancing Acoustic Performance through the use of Window Shade Fabric White Paper As architecture and design evolve, more demand can be seen for obtaining creative solutions for occupancy comfort. In designing
More informationBuilding & Ductwork Airtightness Standards
Building & Ductwork Airtightness Standards Version 1.02, August 2013 Standard Reference Technical Body Title ICS (International Classification for Standards) Scope Door and Windows EN 12207:1999 Windows
More informationDesign for Noise Mitigation Measures for Public Housing Developments in Hong Kong
Design for Noise Mitigation Measures for Public Housing Developments in Hong Kong David Lo 1 ; Stephen Yim 2 ; Kenneth Leung 3 Hong Kong Housing Authority Hong Kong Special Administration Region People
More informationBCA Section J Compliance Report. Alterations & Additions to Cottage at St Johns College 10 Missenden Road Camperdown
BCA Section J Compliance Report Alterations & Additions to Cottage at St Johns College 10 Missenden Road Camperdown Prepared by: Gradwell Consulting ABN 68 872 791 784 Sustainability Consultants PO Box
More informationGARAGE STRUCTURE VIBRATION TRANSMISSION TO HUMAN OCCUPIED SPACES
GARAGE STRUCTURE VIBRATION TRANSMISSION TO HUMAN OCCUPIED SPACES Jack B. Evans* 1 1 JEAcoustics / Engineered Vibration Acoustic & Noise Solutions 175 West Koenig Lane, Austin, Texas 78756, USA Evans(at)JEAcoustics.com
More informationNoise Impact Study for Hyatt House in Davis, California
Noise Impact Study for Hyatt House in Davis, California Prepared for The HR Group Architects 2277 Fair Oaks Boulevard, Studio 220 Sacramento, CA 95825 Prepared by Brian R. Smith, Principal INCE Board Certified
More informationTHE DEVELOPMENT REVIEW BOARD. 1. New construction or relocation of single-family homes, including mobile/modular and manufactured homes.
- I THE DEVELOPMENT REVIEW BOARD The General Plan of the City of Lakewood has been established to guide and promote the orderly growth and development of the community. The goals of the City, specified
More information4-Acoustics: Background
4-Acoustics: Background In the past acoustics for buildings especially concert halls was done by luck. A design would be done that worked well and then it would be mimicked. Other times awful designs emerged
More informationProposed Lidl Food Store West Hendford Yeovil. Environmental Noise Report for Planning
Proposed Lidl Food Store West Hendford Yeovil Environmental Noise Report for Planning Reference: 6087/BL/pw October 2015 2 Proposed Lidl Food Store, West Hendford, Yeovil Environmental Noise Report for
More informationNoise Feasibility Study Proposed Residential Development Old Barber House 5155 Mississauga Road City of Mississauga, Ontario
Noise Feasibility Study Proposed Residential Development Old Barber ouse 5155 Mississauga Road City of Mississauga, Ontario Prepared for: City Park (Old Barber) omes Inc. 950 Nashville Road Kleinburg,
More informationINTERIOR ENVIRONMENT
CHAPTER 12 INTERIOR ENVIRONMENT SECTION 1201 GENERAL 1201.1 Scope. The provisions of this chapter shall govern ventilation, temperature control, lighting, yards and courts, sound transmission, room dimensions,
More informationNoise Mitigation Plan
Noise Mitigation Plan CONTENTS 1. INTRODUCTION... 1 2. PLAN OBJECTIVES... 1 3. RELEVANT STATUTORY DOCUMENTS AND REGULATIONS... 1 4. MITIGATION SUMMARY... 2 5. THE PORT NOISE LIAISON COMMITTEE... 2 6. MITIGATION
More informationRESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST
This list is provided as a guide to help you understand the information that must be contained on the construction drawings. This list is not all-inclusive of all building codes but is used as a general
More informationCentre Buildings Redevelopment Explaining the impact on LSE staff and students
Explaining the impact on LSE staff and students Creating a new LSE landmark building & public square Improving facilities for staff and students Contents: Background & Programme Construction Traffic and
More informationAdvanced Ventilation for Residential applications FBC Res 2010.
Advanced Ventilation for Residential applications FBC Res 2010. Course Description Review of the Residential Ventilation requirements in the Florida Building Code, Residential 2010. I. Introduction Dean
More informationH y a t t C e n t e r Chicago, Illinois (71 South Wacker Drive) Acoustics Study
8.0 Acoustics and Fire Rating Study Introduction An acoustics and fire rating study was performed on the Hyatt Center to establish an acceptable infill wall assembly for use in the proposed braced frame
More informationThe major findings of the study are based on the following recommendations:
SIEBEIN ASSOCIATES, INC. Consultants in Architectural & Environmental Acoustics 625 NW 60 th Street, Suite C Gainesville, Florida 32607 Telephone: (352) 331-5111 Facsimile: (352) 331-0009 Website: www.siebeinacoustic.com
More informationENVIRONMENTAL NOISE CONTROL FOR SEMICONDUCTOR MANUFACTURING FACILITIES
Presented at Inter-Noise 99 The 1999 Congress and Exposition on Noise Control Engineering December 8, 1999, Fort Lauderdale, Florida ENVIRONMENTAL NOISE CONTROL FOR SEMICONDUCTOR MANUFACTURING FACILITIES
More informationNoise Control. Commercial, Industrial, and Environmental Products and Solutions.
Noise Control Commercial, Industrial, and Environmental Products and Solutions www.kineticsnoise.com Commercial Duct Silencers Kinetics Noise Control offers the design and engineering assistance to integrate
More informationKINETICS NOISE CONTROL TEST REPORT #AT001035
KINETICS NOISE CONTROL TEST REPORT #AT001035 KINETICS NOISE CONTROL PRODUCTS: o RIM I-2-16 ACOUSTICAL RATINGS: o STC 66 o IIC 63 TESTING AGENCY & REPORT NUMBER: o NRC-CANADA o B-3140.1 KINETICS DRAWING
More informationLEED v4 Building Design and Construction Quiz #8 EQ
LEED v4 Building Design and Construction Quiz #8 EQ 1. Which of these is considered an unoccupied space? [Choose three] A. School classroom B. Mechanical room C. Meeting room D. Locker room E. Restroom
More informationFire Safety and Performance of Wood in Multi-Residential and Commercial Buildings. Boris Iskra Forest & Wood Products Australia
Fire Safety and Performance of Wood in Multi-Residential and Commercial Buildings Boris Iskra Forest & Wood Products Australia This Presentation 1. Fire Hazard Properties Building Code of Australia Volume
More informationComparison of compliance results obtained from the various wind farm standards used in Australia
Paper Number 50, Proceedings of ACOUSTICS 2011 Comparison of compliance results obtained from the various wind farm standards used in Australia Jonathan Cooper (1), Tom Evans (1) and Luis Najera (2) (1)
More informationCompliance to the IgCC. September 29, 2011
Bringing Outcome-Based Compliance to the IgCC September 29, 2011 Outcome-Based Codes: Any code requirement or code enforcement mechanism based on actual outcomes in buildings after they have been occupied.
More informationModuline. Acoustic Enclosure System. Rugged Noise Control Structures Using Acoustically Rated & Field Proven Demountable Components
Moduline Acoustic Enclosure System Rugged Noise Control Structures Using Acoustically Rated & Field Proven Demountable Components Lab certified acoustic ratings Broad range of performance levels 63 Hz
More informationRenovation of Buildings using Steel Technologies (ROBUST)
Renovation of Buildings using Steel Technologies (ROBUST) RFCS Project RFSR-CT-2007-0043 WP 3.1 Review of modular construction in building renovation Date: 2008 Author: Mark Lawson SCI, Silwood Park, Ascot,
More informationPIP INSA1000 Acoustic Insulation Systems Specification
TECHNICAL REVISION April 2015 Insulation PIP INSA1000 Acoustic Insulation Systems Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,
More informationAcoustic Detailing For Steel Construction
SCI PUBLICATION P372 Acoustic Detailing For Steel Construction A G J Way MEng CEng MICE G H Couchman MA PhD CEng MICE Published by: The Steel Construction Institute Silwood Park Ascot Berkshire SL5 7QN
More informationSection Sound Control
Ministry of Municipal Affairs PROPOSED CHANGE TO THE 2012 BUILDING CODE O. REG. 332/12 AS AMENDED CHANGE NUMBER: SOURCE: B-09-11-01 Ontario-NBC CODE REFERENCE: Division B / 9.11. DESCRIPTION OF THE PROPOSED
More informationBuilding Air Tightness: Consultation Paper. Building Air Tightness Consultation Paper
Building Air Tightness Consultation Paper 1 Instructions We are seeking your written feedback on the proposed updates to Green Star Design & As Built and Green Star - Interiors. Your feedback is important
More informationINTERIOR ENVIRONMENT
CHAPTER 12 INTERIOR ENVIRONMENT > SECTION 1201 GENERAL 1201.1 Scope. The provisions of this chapter shall govern ventilation, temperature control, lighting, yards and courts, sound transmission, room dimensions,
More informationGisborne District Council
11.0 NOISE AND VIBRATION... 1 11.1 STRUCTURE OF THIS CHAPTER... 1 11.2 INTRODUCTION... 1 11.3 ISSUES... 2 11.4 OBJECTIVES (NOISE INCLUDING VIBRATION)... 2 11.5 POLICIES (NOISE INCLUDING VIBRATION)... 2
More informationDraft Policy Review. Use of Shipping Containers
Draft Policy Review Use of Shipping Containers Policy Number: Policy Section: Policy Title: T.01.02 Town Planning Use of Shipping Containers File Reference: OBJECTIVES: 1. To maintain the amenity of the
More informationGENERAL SITING REQUIREMENTS FOR SINGLE DWELLINGS/OUTBUILDINGS
GENERAL SITING REQUIREMENTS FOR SINGLE DWELLINGS/OUTBUILDINGS INTRODUCTION The Building Regulations of Victoria prescribe a number of minimum siting requirements for single dwelling developments on lots
More informationRESIDENTIAL BUILDING PLAN REQUIREMENTS
CITY OF MANSFIELD BUREAU OF BUILDING AND CODES 30 NORTH DIAMOND STREET 3RD FLOOR MANSFIELD, OHIO 44902 Phone (419) 755-9688 Fax (419) 755-9453 www.ci.mansfield.oh.us RESIDENTIAL BUILDING PLAN REQUIREMENTS
More informationJune Residential Refurbishment Separating walls
June 2010 Residential Refurbishment 3.6.1 Separating walls Residential refurbishment 3.0 Residential Refurbishment Separating Walls Contents Introduction find online page Solution optimiser and pathfinder
More informationSOUND SOLUTIONS TO MEET THE APPROVED DOCUMENT E (2003 EDITION) August 2008
SOUND SOLUTIONS TO MEET THE APPROVED DOCUMENT E (2003 EDITION) August 2008 PART E AT A GLANCE The New Approved Document E, (2003 Edition) was implemented on 1st July 2003. This applies to houses, flats,
More information