Public Information Meeting Information Packet: Childress Drive Bridge over South Utoy Creek June 29, 2016

Size: px
Start display at page:

Download "Public Information Meeting Information Packet: Childress Drive Bridge over South Utoy Creek June 29, 2016"

Transcription

1 Public Information Meeting Information Packet: Childress Drive Bridge over South Utoy Creek June 29, 2016 Welcome to the Public Information Meeting for the proposed replacement of the Childress Drive Bridge over South Utoy Creek. In this handout you will find a description of the project, project location/detour map, project typical section, and a project statistics sheet. As you enter the room, please take a seat for a formal presentation of the project. You will notice multiple displays of layouts as well as the proposed detour route, and we encourage you to remain and view these displays following the presentation question and answer session. Renew Atlanta representatives are available to discuss the project and answer your questions. We request that you first learn about the project and then provide your opinions. The comment card is an excellent way to have your comments recorded. PROJECT DESCRIPTION The Childress Drive Bridge over South Utoy Creek was constructed in Design and construction methods at that time were based on smaller loading requirements. Since then, the bridge has undergone significant deterioration. There have been efforts to extend the life of the bridge through routine inspection and periodic maintenance. However, the bridge has neared the end of its life expectancy. In an effort to improve safety for all users of this bridge, we are proposing to replace the existing bridge with a new concrete bridge structure that would clear-span South Utoy Creek. The bridge would have two 12-foot travel lanes (one in each direction) with 2- foot shoulders. Sidewalks would be provided on both sides and would be approximately 6 feet wide. Traffic would be detoured during construction to reduce the construction schedule, reduce construction costs, and ensure motorist and pedestrian safety. CLOSING Thank you for attending this Public Information Meeting and providing your comments. Your input is an important part of this concept development process. For additional information, please visit or us at RenewAtlanta@AtlantaGa.gov.

2 PROJECT LOCATION/DETOUR MAP

3

4 PROJECT STATISTICS Project Length: 525 feet Roadway Typical Section Existing: One 11-foot lane in each direction West side: 3-foot grassed shoulder East side: 6-inch curb, 5-foot sidewalk Proposed: One 12-foot lane in each direction West side: 2 feet from edge line to curb, 6-inch curb, 6.5-foot grass shoulder East side: 2 feet from edge line to curb, 6-inch curb, 5-foot sidewalk Posted Speed: Design Speed: Major Structures: Existing: Proposed: Construction Costs 35 MPH 35 MPH Childress Drive Bridge over South Utoy Creek 23-5 wide by 42 long West side: post and rail barrier East side: post and rail barrier 42-0 wide by 65 long West side: 6-foot sidewalk, parapet with aluminum rail East side: 6-foot sidewalk, parapet with aluminum rail $1.5 million (engineer s opinion of probable costs) Number of Impacted Parcels: 6 (estimated) Displacements: 0 Target Start Date: 2 nd quarter 2017 Estimated Construction Time: 12 months Traffic Control During Construction: Traffic will be detoured during construction to Adams Drive. Detour route is approximately 1.6 miles in length.

5 PUBLIC MEETING CHILDRESS DRIVE BRIDGE OVER SOUTH UTOY CREEK

6 Welcome and Introductions

7 Agenda 1 Project Purpose and Need 2 Plan Development 3 What s Next? 4 Real Estate Information 5 Questions/Additional Information

8 1Project Purpose and Need

9 Project Location

10 Purpose and Need To improve public safety Currently no sidewalk on bridge Bridge is 78 years old and showing major deterioration Functionally obsolete Unsafe guardrail To bring bridge up to current Georgia DOT design standards

11 Existing Conditions Sidewalk ends before bridge creating unsafe conditions

12 Existing Conditions Cracking

13 Existing Conditions Scour and undermining to existing abutment walls

14 Existing Conditions Deterioration and paint failure to beams and utility supports

15 Existing Conditions

16 Renew Atlanta $250 million infrastructure bond Approved by voters on March 17, 2015 Over 80% of voters approved Childress Drive Bridge over South Utoy Creek was identified as high-priority for replacement because of safety issues, bridge age, and maintenance costs.

17 2 Plan Development

18 Bridge Typical Section

19 Design Criteria Improve safety Replacement bridge will have sidewalks on both sides Replace guardrail Satisfy current Georgia DOT design standards Improve aesthetics

20 Develop Conceptual Plan

21 3 What s Next?

22 Detour Route

23 Project Schedule Design - 6 Months Procurement/ Real Estate Negotiation - 6 Months Construction - 12 Months Currently in design phase. Planned opening date second quarter 2018.

24 Feedback

25 4 Real Estate Information

26 5 Questions/ Additional Information

27 For more information visit Renew Atlanta at:

Clear Creek Road (PM 1.82 & 0.25) Bridge Replacement Projects. Public Meeting, Wednesday, November 20, 2013 Pleasant Valley Middle School

Clear Creek Road (PM 1.82 & 0.25) Bridge Replacement Projects. Public Meeting, Wednesday, November 20, 2013 Pleasant Valley Middle School Clear Creek Road (PM 1.82 & 0.25) Bridge Replacement Projects Public Meeting, Wednesday, November 20, 2013 Pleasant Valley Middle School Presented By: County of El Dorado Community Development Agency Transportation

More information

Alder Drive / Blair Road Bridge Replacement Projects

Alder Drive / Blair Road Bridge Replacement Projects Alder Drive / Blair Road Bridge Replacement Projects Presented By: County of El Dorado Community Development Agency Transportation Division Matthew Smeltzer, P.E. Deputy Director of Engineering Paul Hom,

More information

Cochran Mill Road Bridge over Tuscarora Creek

Cochran Mill Road Bridge over Tuscarora Creek Cochran Mill Road Bridge over Tuscarora Creek July 15, 2014 Brian Morrison, P.E. NOVA District Senior Structural Engineer (703) 259-2606 brian.morrison@vdot.virginia.gov Purpose & Need Purpose Update project

More information

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199))

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199)) 11060 White Rock Road, Suite 200 Rancho Cordova, CA 95670 Phone: (916) 363-4210 Fax: (916) 363-4230 M e m o r a n d u m To: Reena Gohil, Environmental Planner Date: May 30, 2017 California Department of

More information

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016 Rehabilitation of West Main Street Culvert and Shirley Street Bridge Town of Ayer November 22, 2016 Agenda Outline Introductions Project Goals and Objectives Existing Conditions Review Design Considerations

More information

Mn/DOT BRIDGE INSPECTION REPORT

Mn/DOT BRIDGE INSPECTION REPORT 08/13/2007 Page 1 of 5 County: City: Township: WINONA DRESBACH Section: 33 Township: 105N Range: 04W Span Type: NBI Deck: 5 Super: 6 Sub: 6 Chan: 8 Culv: N Location: Route: Control Section: AT MINN/WISC

More information

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure. Route 15/29 SBL Bridge Superstructure Replacement & Widening Existing Structure Scope Accelerated Procedure Staging (Superstructure) Preparatory Work (Substructure) NOVA District Questions EXISTING STRUCTURE

More information

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction Chapter 1 Bridge Design Manual General Design Information Section 1.02 Selection and Geometry Introduction Selection or Rehabilitation Report This section of the design manual provides guidance on the

More information

PUBLIC NOTICE MEDINA COUNTY HIGHWAY ENGINEER SHAW ROAD BRIDGE REPLACEMENT - DESIGN REQUEST FOR STATEMENT OF QUALIFICATIONS (RFQ)

PUBLIC NOTICE MEDINA COUNTY HIGHWAY ENGINEER SHAW ROAD BRIDGE REPLACEMENT - DESIGN REQUEST FOR STATEMENT OF QUALIFICATIONS (RFQ) PUBLIC NOTICE MEDINA COUNTY HIGHWAY ENGINEER SHAW ROAD BRIDGE REPLACEMENT - DESIGN REQUEST FOR STATEMENT OF QUALIFICATIONS (RFQ) The Medina County Highway Engineer is soliciting statement of qualifications

More information

Austin Avenue Bridges Project Walking Tour Agenda

Austin Avenue Bridges Project Walking Tour Agenda Agenda Event Start End Introductions and Overview 9:00 Environmental Process Section 106 and Consulting Parties Historic Significance of Bridges Project Background Bridge Components Bridge Conditions 9:30

More information

6 th STREET VIADUCT SIESMIC IMPROVEMENT PROJECT

6 th STREET VIADUCT SIESMIC IMPROVEMENT PROJECT 6 th STREET VIADUCT SIESMIC IMPROVEMENT PROJECT Project Location The 6 th Street Viaduct (Bridge No. 53C-1880) and Sixth Street Overcrossing (Bridge No. 53-0595) comprise a single structure, which spans

More information

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25

JANUARY 4, 2017 AT 2:00 P.M. (EASTERN. (Estimated Cost: $4,600,000) Bids J D WILLIAMSON CONSTRUCTION CO INC $3,799,476.25 General Info Number: PROJECT NO. 43-17-03 Description: BRIDGE DECK REPAIR AND REHABILITATION, ARLINGTON ROAD OVER OHIO TURNPIKE M.P. 122.3, JOPPA ROAD OVER OHIO TURNPIKE M.P. 128.5, DEAN ROAD OVER OHIO

More information

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures

Cumberland Viaduct Rehabilitation Project Contract No. AL R Presenter Bob Bofinger MDSHA Office of Structures Cumberland Viaduct Rehabilitation Project Contract No. AL4095180R Presenter Bob Bofinger MDSHA Office of Structures Project Justification & Improvements Condition State The deck, superstructure and substructure

More information

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening March 5, 2009 Nicholas J. Roper NOVA District Bridge Engineer Robert F. Price Resident Administrator of Loudoun/ Prince William Construction

More information

ATTACHMENT 50-1: PERFORMANCE AND MEASUREMENT TABLE

ATTACHMENT 50-1: PERFORMANCE AND MEASUREMENT TABLE 1) PAVEMENT 1.1 Ride quality All roadways have a smooth surface course (including bridge deck approaches, covers, gratings, frames and boxes). 24 hours 28 days 6 months a. Measurement of International

More information

Maintenance Assessment Program (MAP) Manual. Produced By South Carolina Department of Transportation

Maintenance Assessment Program (MAP) Manual. Produced By South Carolina Department of Transportation Maintenance Assessment Program (MAP) Manual Produced By South Carolina Department of Transportation March 1, 2014 South Carolina Maintenance Assessment Program Manual CHAPTER 1... 3 Introduction... 3 CHAPTER

More information

40TH AVENUE NE BRIDGE REPLACEMENT

40TH AVENUE NE BRIDGE REPLACEMENT Is this Project funded? The City plans to use approximately $22 million of Penny for Pinellas funds to rebuild this and other bridges in the near future. The Federal Department of Transportation (FDOT)

More information

Section 13. Guidelines for the Design of Ground Mounted Sign Supports

Section 13. Guidelines for the Design of Ground Mounted Sign Supports Section 13 BDC11MR-04 13.1 Introduction Highway signs fall into two main categories, which are subdivided as follows: 1. Overhead Signs a. Sign Bridge Structures (GO) b. Sign Cantilever Structures (GO)

More information

PROJECT SCOPING PHASE ~ SCOPE OF SERVICES MAIN STREET BRIDGE OVER WINOOSKI RIVER CITIES OF BURLINGTON & WINOOSKI VERMONT

PROJECT SCOPING PHASE ~ SCOPE OF SERVICES MAIN STREET BRIDGE OVER WINOOSKI RIVER CITIES OF BURLINGTON & WINOOSKI VERMONT PROJECT SCOPING PHASE ~ SCOPE OF SERVICES MAIN STREET BRIDGE OVER WINOOSKI RIVER CITIES OF BURLINGTON & WINOOSKI VERMONT PROJECT DESCRIPTION McFarland-Johnson, Inc. (MJ) has prepared this proposal to perform

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION STR 6947 MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY INSPECTION REPORT Facility Latitude / Longitude MDOT Structure ID Structure Condition 9 MILE ROAD 43.5362 / -84.4294 56200055000B010 Fair Condition(6)

More information

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects SEPTEMBER 1989 Arkansas State Highway and Transportation Department GEOMETRIC DESIGN CRITERIA for Non-freeway

More information

Final Air Quality Report

Final Air Quality Report Florida Department of TRANSPORTATION Final Air Quality Report PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida Financial Project ID: 430136-1-22-01 ETDM Project Number: 13026

More information

Roadway Surfaces and Traffic Control Elements

Roadway Surfaces and Traffic Control Elements Roadway Surfaces and Traffic Control Elements Lines of Business: General Liability, Public Officials Liability www.tridentinsurance.net Risk Control Strategy/Key Issues: To establish and document a program

More information

2010 STATE BRIDGE ENGINEERS QUESTIONNAIRE

2010 STATE BRIDGE ENGINEERS QUESTIONNAIRE Gusset Plates 2010 STATE BRIDGE ENGINEERS QUESTIONNAIRE (50 Responses) Page 1 of 11 1) How many trusses are in your state? 2302 trusses owned by the state 8202 trusses owned by local agencies 2) What percentage

More information

Clinton Street Bridge over the Maumee River. ODOT Project DEF December 2, 2014 Stakeholder s Meeting

Clinton Street Bridge over the Maumee River. ODOT Project DEF December 2, 2014 Stakeholder s Meeting Clinton Street Bridge over the Maumee River ODOT Project DEF-15-14.77 December 2, 2014 Stakeholder s Meeting Purpose of Stakeholder Meeting Discuss the project and why it s happening Describe the process

More information

Chapter 4 Bridge Program Drawings

Chapter 4 Bridge Program Drawings Chapter 4 Bridge Program Drawings Section 4.10-Bridge Railing Introduction Steel bridge railing and concrete bridge barrier rail are installed along the edge of the bridge roadway to keep errant vehicles

More information

Grade Separation Inspection and Rating

Grade Separation Inspection and Rating Grade Separation Form Grade Separation Inspection and Rating Applies to structures which have traffic going over and under Applies to Wildlife/Cattlepass or Pedestrian Underpass structures Replaces channel

More information

Fairfax Bridge Rehabilitation Program - Bridge Preventive Maintenance Program. January 29, 2014

Fairfax Bridge Rehabilitation Program - Bridge Preventive Maintenance Program. January 29, 2014 Fairfax Bridge Rehabilitation Program - Bridge Preventive Maintenance Program - Creek Road Bridge Presented by the Team of January 29, 2014 Bridge Design Process Project team explores both repair and replace

More information

THE COMMONWEALTH OF MASSACHUSETTS NON-NHS BRIDGE R&R POLICY

THE COMMONWEALTH OF MASSACHUSETTS NON-NHS BRIDGE R&R POLICY THE COMMONWEALTH OF MASSACHUSETTS Number: P-92-010 Date: 10-08-92 - ) HIGHWAY DEPARTMENT FROM: NON-NHS BRIDGE R&R POLICY The purpose of this Engineering Directive is to formally notify Department Personnel

More information

General Info. Number: PROJECT NO

General Info. Number: PROJECT NO General Info Number: PROJECT NO. 43-16-04 Description: BRIDGE DECK REPLACEMENT AND REHABILITATION, RAKER-BARDEN ROAD (CR. 7-2) OVER OHIO TURNPIKE M.P. 41.9, DELTA-SANTEE ROAD (CR. 7) OVER OHIO TURNPIKE

More information

CITY COUNCIL AGENDA Workshop Meeting: Tuesday, October 24, 2017

CITY COUNCIL AGENDA Workshop Meeting: Tuesday, October 24, 2017 1 2 CITY COUNCIL AGENDA Workshop Meeting: Tuesday, October 24, 2017 AGENDA ITEM: 2 Hear and deliberate on handrail, lighting, and walkway replacement options for Key Allegro Bridge on Bayshore Drive. SUBMITTED

More information

APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) RFP QUESTIONS AND ANSWERS-REVISION 2

APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) RFP QUESTIONS AND ANSWERS-REVISION 2 Project: APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) PROJECT: 0029-005-130, C501, B645 RFP QUESTIONS AND ANSWERS-REVISION 2 Date: 12/04/09 Approaches and Bridge over Tye River (Rte. 29 NBL) Subject:

More information

Berkshire Region TIP Project Data Form

Berkshire Region TIP Project Data Form BASIC INFORMATION: 1. TIP ID #: 2. MUNICIPALITY: 3. ROUTE# AND/OR NAME: Berkshire Region TIP Project Data Form 4. PROJECT TYPE (CHECK BEST DEFINITION OF PROJECT): Intersection Improvement Road Resurfacing

More information

Grade Separation Inspection and Rating

Grade Separation Inspection and Rating Grade Separation Form Grade Separation Inspection and Rating Applies to structures which have traffic going over and under Applies to Wildlife/Cattlepass or Pedestrian Underpass structures Replaces channel

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION STR 7004 MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY INSPECTION REPORT Facility Latitude / Longitude MDOT Structure ID Structure Condition 4 3/4 MILE RD 43.5688 / -84.3455 56314H00009B010 Good

More information

Rapid City, SD HDR Project No RE: Replacement of Existing I-190 Twin Bridges at I-190/Silver Street Interchange, Rapid City, SD

Rapid City, SD HDR Project No RE: Replacement of Existing I-190 Twin Bridges at I-190/Silver Street Interchange, Rapid City, SD To: Steve Gramm, SDDOT Memo From: HDR Project: SDDOT I-190 Silver Street Interchange Study Rapid City, SD HDR Project No. 000000000137390 Date: December 27, 2011 RE: Replacement of Existing I-190 Twin

More information

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 1 Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project. 2 During this public meeting, we will explain the 75 th Street Corridor Improvement

More information

Preserva on Assessment

Preserva on Assessment Preserva on Assessment For Seidersville Road Bridge over Saucon Creek BMS # 48 7301 0000 9019 Northampton County PennDOT Engineering District 5 0 Final Report June 2016 Prepared by TranSystems for the

More information

DESIGN PUBLIC HEARING APRIL 3, 2017 THE LEE MEMORIAL (TOWN) HALL LEE, MASSACHUSETTS :00 PM FOR THE PROPOSED

DESIGN PUBLIC HEARING APRIL 3, 2017 THE LEE MEMORIAL (TOWN) HALL LEE, MASSACHUSETTS :00 PM FOR THE PROPOSED DESIGN PUBLIC HEARING APRIL 3, 2017 AT THE LEE MEMORIAL (TOWN) HALL LEE, MASSACHUSETTS 01238 7:00 PM FOR THE PROPOSED SUPERSTRUCTURE REPLACEMENT PROJECT CHAPEL STREET OVER GREENWATER BROOK Project No.

More information

INSPECTION AND REPAIR OF THE DETERIORATED RT.72 MANAHAWKIN BAY BRIDGE

INSPECTION AND REPAIR OF THE DETERIORATED RT.72 MANAHAWKIN BAY BRIDGE INSPECTION AND REPAIR OF THE DETERIORATED RT.72 MANAHAWKIN BAY BRIDGE Xiaohua H. Cheng 1, Gregory Renman 1 and Richard Dunne 1 Abstract The superstructure of Rt.72 over Manakawkin Bay Bridge consists of

More information

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016 Cleveland Opportunity Corridor Project Section 3 Subcontractor Informational Meeting August 12, 2016 Agenda Welcome and Opening Remarks Project Overview Prequalifications & Work Types Procurement Overview

More information

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION ADDENDUM NO. 1 PROJECT NO ANSWERS TO QUESTIONS RECEIVED THROUGH 12:00 PM ON DECEMBER 29, 2015

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION ADDENDUM NO. 1 PROJECT NO ANSWERS TO QUESTIONS RECEIVED THROUGH 12:00 PM ON DECEMBER 29, 2015 OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION ADDENDUM NO. 1 PROJECT NO. 43-16-05 ANSWERS TO QUESTIONS RECEIVED THROUGH 12:00 PM ON DECEMBER 29, 2015 Q#1 Can Asbury Road (MP 197.8) & State Route 700 (MP

More information

DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc.

DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA. Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc. DESIGN OF CAMPBELL ROAD OVERPASS IN KELOWNA Yulin Gao, M.A.Sc., P.Eng., SNC-Lavalin Inc. Samson Chan, M.Eng., P. Eng., SNC-Lavalin Inc. Paper prepared for presentation at the Bridges in a Climate of Change

More information

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate any information received as a result of the public information meeting. The comment sheet in this brochure is provided to assist in making your

More information

Sidewalk Repair Program. Charter Township of Canton Engineering Services

Sidewalk Repair Program. Charter Township of Canton Engineering Services Sidewalk Repair Program Charter Township of Canton Engineering Services Sidewalk Repair Program History Canton lost a landmark case at the Michigan Supreme Court level in 1997. The Supreme Court has determined

More information

WILL ROGERS TURNPIKE

WILL ROGERS TURNPIKE INDEX OF SHEETS SHEET No. DESCRIPTION PAVEMENT REHABILITATION Mile 298.2 to 302.4, Length 4.11 Miles CONTRACT NO. WR-MC-113B OTTAWA COUNTY LOCATION MAP BEGIN PROJECT WR-MC-113B MILE NO. 298.2 PREPARED

More information

CHEF MENTEUR BRIDGE REPLACEMENT

CHEF MENTEUR BRIDGE REPLACEMENT CHEF MENTEUR BRIDGE REPLACEMENT Gumbo Engineers, Inc. Lucy Farrar, Travis Honore, Jeremy Vezina, Thomas Harrison PRELIMINARY DESIGN Fall 2016 Semester CE 4750 Professional Issues Mr. Miles Williams INTRODUCTION

More information

Golden Rule #3: Vehicles & Mobile Equipment

Golden Rule #3: Vehicles & Mobile Equipment Golden Rule #3: Vehicles & Mobile Always use mobile equipment and light vehicles for the purpose they were designed and adhere to site pedestrian / vehicle traffic rules. Skill / Experience to Operate

More information

Field Guide on. Safe Maintenance and. Work Zone Operations

Field Guide on. Safe Maintenance and. Work Zone Operations Field Guide on Installation and Removal of Temporary Traffic Control for Safe Maintenance and Work Zone Operations August 2008 Introduction This field guide provides field personnel with introductory guidance

More information

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000) General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER

More information

Curb Ramps [ 4.7.3] [ 4.7.2; 4.8.2; 4.1.6(3)(a)] [ 4.3.7] ADA Accessibility Survey Instructions Curb Ramps Page 1 of 6

Curb Ramps [ 4.7.3] [ 4.7.2; 4.8.2; 4.1.6(3)(a)] [ 4.3.7] ADA Accessibility Survey Instructions Curb Ramps Page 1 of 6 : Curb Ramps 1 [ 4.7.3] Only measure the width of the ramp section of the curb ramp (labeled ramp to the right). The ramp section of a curb ramp is also known as the ramp run. If the curb ramp has flared

More information

MEASURES TO MINIMIZE EFFECTS TO KIRKS MILLS HISTORIC DISTRICT

MEASURES TO MINIMIZE EFFECTS TO KIRKS MILLS HISTORIC DISTRICT S.R. 2002, SECTION 000 OVER REYNOLDS RUN BRIDGE REPLACEMENT PROJECT,, PENNSYLVANIA MINIMIZATION MEASURES PROPOSED FOR THE KIRKS MILLS HISTORIC DISTRICT INTRODUCTION This is a supplemental document to the

More information

MAINTAINING CHARACTER, IMPROVING SAFETY OREGON S STEALTH RAIL PROGRAM

MAINTAINING CHARACTER, IMPROVING SAFETY OREGON S STEALTH RAIL PROGRAM 0 MAINTAINING CHARACTER, IMPROVING SAFETY OREGON S STEALTH RAIL PROGRAM Rebecca Burrow, PE Oregon Department of Transportation 00 Fairview Industrial Dr SE. MS # Salem, OR 0 Phone (0) -00; Fax (0) -0;

More information

CHAPTER 3 SCOPE SUMMARY

CHAPTER 3 SCOPE SUMMARY CHAPTER 3 SCOPE SUMMARY GENERAL The SDDOT is an active member of AASHTO to share common national design standards for the state highway system. The AASHTO Task Force on Geometric Design has completed the

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION NBI INSPECTION DWCJ Inspector Name Agency / Company Name Insp. Freq. Insp. Date Evan Currie Great Lakes Engineering Group 12 07/31/2017 GENERAL NOTES Posting Signs in Place DECK 1. Surface (SIA-58A) 2.

More information

Feasibility Assessment Study

Feasibility Assessment Study August 19, 2010 Feasibility Assessment Study Historic Sites Council Meeting Today s Agenda Historic Overview Project Overview Barrier Issues Concrete Parapet Recommendations Steel Parapet Recommendations

More information

NEW JERSEY DEPARTMENT OF TRANSPORTATION MEMORANDUM

NEW JERSEY DEPARTMENT OF TRANSPORTATION MEMORANDUM NEW JERSEY DEPARTMENT OF TRANSPORTATION MEMORANDUM TO: FROM: All Engineering & Support Staff Structural Evaluation James Lane, Manager Structural Evaluation DATE: January 2, 2008 PHONE: 530-3572 SUBJECT:

More information

CHOOSING THE CORRECT BARRIER FOR THE WORK ZONE

CHOOSING THE CORRECT BARRIER FOR THE WORK ZONE CHOOSING THE CORRECT BARRIER FOR THE WORK ZONE Minnesota Statewide Work Zone Safety Committee March 31, 2015 Factors for a Work zone Duration of Time Length of Time Work zone will be Present Length of

More information

BRIDGE INSPECTION REPORT

BRIDGE INSPECTION REPORT NC DEPARTMENT OF TRANSPORTATION ATTENTION DIVISION OF HIGHWAYS BRIDGE MANAGEMENT UNIT BRIDGE INSPECTION REPORT INSPECTION TYPE: Routine Inspection COUNTY IREDELL BRIDGE NUMBER 480596 INSPECTION CYCLE 2

More information

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center

Traffic Management Guide to Concrete Overlay Solutions. Dale S. Harrington P.E. Representing CP Tech Center Traffic Management Guide to Concrete Overlay Solutions December 5, 2014 ACPA Annual Meeting Dale S. Harrington P.E. Representing CP Tech Center Traffic Management- Concrete Overlays Traffic Management

More information

Jobs & Transportation Ramping it Up Roadway and Traffic Dan Groh, P.E.

Jobs & Transportation Ramping it Up Roadway and Traffic Dan Groh, P.E. Jobs & Transportation Ramping it Up Roadway and Traffic Dan Groh, P.E. Ohio DOT Work Zone Process Review Ohio DOT Work Zone Process Review This review was conducted by the Ohio Department of Transportation

More information

Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options

Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options Structural Design of Dam Sluice Gate Walkway Slabs: Retrofit and Replacement Options A local utility company issued a Request for Proposal to our university s capstone design class for structural improvements

More information

Conceptual Design Report

Conceptual Design Report Conceptual Design Report I-244/Arkansas River Multimodal Bridge Tulsa, Oklahoma Prepared for the Oklahoma Department of Transportation Prepared by: August 2009 I-244 / ARKANSAS RIVER MULTIMODAL BRIDGE

More information

Road M3 Chisinau Giurgiulesti/ Romanian Border Extension and Rehabilitation Project Draft Feasibility Study (December 2008)

Road M3 Chisinau Giurgiulesti/ Romanian Border Extension and Rehabilitation Project Draft Feasibility Study (December 2008) BRIDGE INSPECTION MANUAL Preface The aim of the bridge inspection is to produce a report of the structure which gives a clear and accurate description of its condition at the time for comparison with earlier

More information

Beckett Bridge PD& E Study Elected Officials Kick-Off Meeting

Beckett Bridge PD& E Study Elected Officials Kick-Off Meeting Beckett Bridge PD& E Study Elected Officials Kick-Off Meeting March 2012 Project Location Beckett Bridge US 19 Tarpon Ave Alt US 19 Project Limits Chesapeake Drive Begin Project Beckett Bridge End Project

More information

Preliminary Design Report Portal Road Bridge over the North Inlet Structure No.: CDOT Project No. BRO M , Code 20096

Preliminary Design Report Portal Road Bridge over the North Inlet Structure No.: CDOT Project No. BRO M , Code 20096 Preliminary Design Report Portal Road Bridge over the North Inlet Structure No.: 0506.01 CDOT Project No. BRO M 560 003, Code 20096 PREPARED FOR Town of Grand Lake P.O. Box 99 Grand Lake, CO 80447 October

More information

S.R. 0070, Section T20. Engineering District ASHE National Project of the Year Award

S.R. 0070, Section T20. Engineering District ASHE National Project of the Year Award S.R. 0070, Section T20 Engineering District 12-0 ASHE National Project of the Year Award AMERICAN SOCIETY OF HIGHWAY ENGINEERS National Project of the Year Award OFFICIAL ENTRY FORM AWARD CATEGORY (Check

More information

Preventive Maintenance Project & Treatment Selection

Preventive Maintenance Project & Treatment Selection Preventive Maintenance Project & Treatment Selection 19 th Annual TERRA Pavement Conference February 12, 2015, St. Paul, MN Mark Watson, MnDOT Maintenance Outline Introduction Network Level Project Level

More information

5.0 Plan Development. 5.1 Introduction. 5.2 Design References

5.0 Plan Development. 5.1 Introduction. 5.2 Design References 5.0 Plan Development 5.1 Introduction The plan development section of this manual is intended to assist the LPA and the designer through the preliminary engineering phase of project development. Information

More information

Pinellas Bayway Bridge Replacement

Pinellas Bayway Bridge Replacement PT-13: Coastal and Ocean Engineering ENGI.8751 Undergraduate Student Forum Faculty of Engineering and Applied Science, Memorial University, St. john s, NL, Canada MARCH, 2013 Paper Code. (PT-13 - Wadden)

More information

SAN ANTONIO STREET BRIDGE AT COMAL RIVER. Open House

SAN ANTONIO STREET BRIDGE AT COMAL RIVER. Open House SAN ANTONIO STREET BRIDGE AT COMAL RIVER Open House May 1, 2018 SAN ANTONIO STREET BRIDGE AT COMAL RIVER, NEW BRAUNFELS COMAL COUNTY OPEN HOUSE MAY 1, 2018 5:00 P.M 7:00 P.M. New Braunfels Civic/Convention

More information

SECTION 6. ROAD CONSTRUCTION STANDARDS

SECTION 6. ROAD CONSTRUCTION STANDARDS SECTION 6. ROAD CONSTRUCTION STANDARDS Construction of new roads or reconstruction of existing roads proposed for dedication to the County shall conform to the standards set forth in this section. Roads

More information

SIDEWALK CONSTRUCTION AND REPAIR

SIDEWALK CONSTRUCTION AND REPAIR SIDEWALK CONSTRUCTION AND REPAIR Q: Why all the concern over sidewalks? A: Sidewalks are the avenues and streets of pedestrian traffic. Residents should maintain the sidewalks as best as they can. The

More information

April 19, 2017 Vicente Valeza, P.E. NOVA District Senior Structural Engineer (703)

April 19, 2017 Vicente Valeza, P.E. NOVA District Senior Structural Engineer (703) UPC 110498 Rehabilitation of John G. Lewis Memorial Bridge on Route 673 (Featherbed Lane) over Catoctin Creek Loudoun County, VA 5th Stakeholder Meeting April 19, 2017 Vicente Valeza, P.E. NOVA District

More information

MISENER DAM. Site Number LYNN STREET, PORT DOVER km N of Highway 6

MISENER DAM. Site Number LYNN STREET, PORT DOVER km N of Highway 6 NORFOLK COUNTY MISENER DAM Site Number 980501 LYNN STREET, PORT DOVER 0.65 km N of Highway 6 Ontario Structure Inspection Manual - Inspection Form Site Number: 980501 Inventory Structure Name Misener Dam

More information

Maine Turnpike Authority

Maine Turnpike Authority PAVEMENT REHABILITATION & CLEAR ZONE IMPROVEMENTS MM 80.7 TO MM 88.6 202.121 Removing Existing Concrete (6CY) 1.00 LS 202.127 Removing of Existing Bituminous Pavement (470 SY) 1.00 LS 202.202 Removing

More information

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017 VT 14 East Montpelier Bridge Project Informational Meeting February 22, 2017 Welcome & Introductions VTrans Mark Sargent, Project Manager Wayne Symonds, Structures Program Manager Chris Barker, Resident

More information

Wall Asset Management Implementation at Colorado Department of Transportation. Bryant Walters, Collins Engineers Mark Vessely, Shannon & Wilson

Wall Asset Management Implementation at Colorado Department of Transportation. Bryant Walters, Collins Engineers Mark Vessely, Shannon & Wilson Wall Asset Management Implementation at Colorado Department of Transportation Bryant Walters, Collins Engineers Mark Vessely, Shannon & Wilson Colorado DOT Wall Asset Management Program Development Coding

More information

2.0 ACCESS OBJECTIVES, PRINCIPLES AND STRATEGIES

2.0 ACCESS OBJECTIVES, PRINCIPLES AND STRATEGIES 2.0 ACCESS OBJECTIVES, PRINCIPLES AND STRATEGIES Early in the development of the Access Control Plan update project, it was important for the project team to develop initial objectives of what access management

More information

TYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA

TYPICAL SECTIONS TYPICAL NO. 1 (MAINLINE) STA TO STA STA TO STA FILL SECTION TYPICAL NO. 1 (MAINLINE) STA. 2290. TO STA. 229619.89 STA. 229868.39 TO STA. 230725. CUT SECTION ROUNDING DETAIL FILL SECTION TYPICAL NO. 3 (DETOUR) STA. 228495. TO STA. 231302. CUT SECTION

More information

Lehigh Valley Transportation Study

Lehigh Valley Transportation Study ITEM: IV-A Lehigh Valley Transportation Study SUBJECT: PA 33 Preservation SR 22-Belfast COUNTY... Northampton FED.-AID SYSTEM... On-NHS S.R./SEC.... 33/07M DECADE OF INVESTMENT... No A.D.T.... 25,463 CAPITAL

More information

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION

AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION CECIL COUNTY 2018 TRANSPORTATION IMPROVEMENT PROGRAM AREAWIDE BRIDGE REPLACEMENT AND REHABILITATION DESCRIPTION: On-going program to provide major upgrades to state owned bridges that are structurally

More information

How Loads Are Distributed

How Loads Are Distributed LOAD DISTRIBUTION 1 LOAD DISTRIBUTION This section illustrate how load will transmit from the deck to the stringers. Determining the fraction of load carried by a loaded member and the remainder distributed

More information

Exhibit A Scope of Work. 0.0 Separation of work Types and Cost Estimate

Exhibit A Scope of Work. 0.0 Separation of work Types and Cost Estimate 0.0 Separation of work Types and Cost Estimate Exhibit A Scope of Work 0.1 Prepare scope of work and cost estimate for MnDOT efforts relating to all items numbered less than 20.0. 0.2 Prepare scope of

More information

WELCOME IL 47. Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016

WELCOME IL 47. Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016 WELCOME IL 47 Community Advisory Group Meeting #4 Waubonsee Community College Tuesday, November 15, 2016 MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Range of Alternatives

More information

ABC, FHWA SHRP2 R04: Project update, lessons learned. Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead

ABC, FHWA SHRP2 R04: Project update, lessons learned. Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead ABC, FHWA SHRP2 R04: Project update, lessons learned Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead January 11, 2015 Goals for ABC Enhanced Mobility Safety Reduced Costs***

More information

Bridge Asset Management City of Battle Creek Planning and Projects

Bridge Asset Management City of Battle Creek Planning and Projects Bridge Asset Management City of Battle Creek Planning and Projects Michigan Bridge Conference, March 20, 2013 Gregory B. Rickmar P.E., Public Works Department, City of Battle Creek Alan Halbeisen, P.E.

More information

DECEMBER 2017 LRFD BRIDGE DESIGN 2-1

DECEMBER 2017 LRFD BRIDGE DESIGN 2-1 DECEMBER 2017 LRFD BRIDGE DESIGN 2-1 2. GENERAL DESIGN AND LOCATION FEATURES The design of a bridge typically takes place in two major phases of work: preliminary design and final design. During preliminary

More information

Road Maintenance Visual Guide: Introduction

Road Maintenance Visual Guide: Introduction Road Maintenance Visual Guide: Introduction The One Network Road Classification (ONRC) was born from the opportunity for a better and more transparent way to plan and invest in maintaining and operating

More information

Sandstone Curb Replacement Standards

Sandstone Curb Replacement Standards Sandstone Curb Replacement Standards Division of Infrastructure Management SCOPE OF CURB REPLACEMENT (Funding Dependent) Sandstone Curb Section I - Purpose: Sandstone curb may be replaced only if existing

More information

Barriers, Parapets, and Railings

Barriers, Parapets, and Railings Barriers, Parapets, and Railings Arielle Ehrlich State Bridge Design Engineer May 17, 2017 Bridge Office mndot.gov/bridge MnDOT Vocabulary Is it a barrier, a parapet or a railing? BARRIER. It is concrete

More information

Bridge Replacement Study (Phase 1)

Bridge Replacement Study (Phase 1) Bridge Replacement Study (Phase 1) San Martin Boulevard over Riviera Bay Bridge Project Number 154371 Prepared For: Engineering & Technical Support Division Department of Environment & Infrastructure,

More information

General Info Number: PROJECT NO Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST TRUMBULL COUNTY, OHIO

General Info Number: PROJECT NO Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST TRUMBULL COUNTY, OHIO General Info Number: PROJECT NO. 59-18-03 Description: REPAIRS AND RESURFACING INTERCHANGE 209 MILEPOST 209.20 TRUMBULL COUNTY, OHIO Deadline: April 25, 2018 at 2:00 P.M. (Eastern) (Estimated Cost: $3,100,000.00)

More information

NEW MEXICO LAND OF ENCHANTMENT

NEW MEXICO LAND OF ENCHANTMENT Bridges CENTENNIAL 1912-2012 NM C - NEW MEXICO LAND OF ENCHANTMENT Las Cruces viaduct; finishing floor. Source: NM Department of Transportation New Mexico Infrastructure Report Card 2012: 34 Overview:

More information

on the eastbound side of Route 29). identified in the table.

on the eastbound side of Route 29). identified in the table. To: Jeannie Swim, Memo From: Ken Demmons, P.E. Project: Route 29 Bridge Replacement over Little Rocky Run Per plans received on January 23, 2012 CC: File Date: February 21, 2012 Job No: P2464 RE: Review

More information

BRIDGE PREVENTIVE MAINTENANCE STRATEGY FOR ERIE-NIAGARA LOCAL BRIDGE OWNERS

BRIDGE PREVENTIVE MAINTENANCE STRATEGY FOR ERIE-NIAGARA LOCAL BRIDGE OWNERS BRIDGE PREVENTIVE MAINTENANCE STRATEGY Approved January 3, 2007 BLANK Purpose To maximize the non-deficient service life of local bridges in the Erie-Niagara region, members of the Greater Buffalo-Niagara

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update January 1, 2016 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Project Overview The Ironton Russell Bridge Project entails

More information

Sweet Creek Road Retaining Wall Replacement. Mapleton, OR

Sweet Creek Road Retaining Wall Replacement. Mapleton, OR Sweet Creek Road Retaining Wall Replacement Mapleton, OR Technical Information Project Completion Date: April 30, 2013 Project Location: Mapleton, OR Size of Project: 15,000 SF, 870 CY Concrete Strength

More information

FEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96

FEBRUARY 13, 2019 AT 2:00 P.M. (EASTERN) (Estimated Cost: $9,000,000.00) Bids. Kokosing Construction Company, Inc. $8,623,609.96 General Info Number: PROJECT NO. 43-19-02 Description: BRIDGE DECK REPAIR AND REHABILITATION OHIO TURNPIKE OVER ABANDONED RAILROAD M.P. 34.2, OHIO TURNPIKE OVER STATE ROUTE 108 M.P. 34.5, COUNTY ROUTE

More information

Chester Bridge Environmental Assessment (EA) CAG Meeting #2. October 12, 2017

Chester Bridge Environmental Assessment (EA) CAG Meeting #2. October 12, 2017 Chester Bridge Environmental Assessment (EA) CAG Meeting #2 October 12, 2017 Agenda Introductions Purpose & Need review and Merger Approval Review of the Conceptual Alternatives Recap of the Public Meeting

More information