1 TASK ORDER FOR CONTINUING CONTRACT CONSTRUCTION MANAGEMENT FORM INSTRUCTIONS 1) The task order form including attachments is intended to stand alone as an authorization for construction management work under continuing services agreements. 2) Form includes editable fields. The form is protected to allow editing of the form fields only, except for the schedule exhibit and at the end of the form where free form entry is allowed. The form will automatically expand to multiple pages with the appropriate headers and footers when required. Please note that the headers, footers and signature blocks include fields that will automatically update when the form is printed. 3) To prepare the form, replace the text in each field by double-clicking the field and then typing or pasting the appropriate data. Move from field to field using the Tab key. Drop-down fields require a selection from the available options. Typing an x or clicking in check-box fields toggles between checked and unchecked. 4) Number the authorizations sequentially for each project executed under the master agreement. 5) The exhibits identified in the form must be included with each task order. If additional exhibits are required, they must be listed in the ATTACHMENTS section and inserted in the document. Note: a. At a minimum, the list of key personnel must identify a project manager. b. Master project schedule milestones must be identified in the schedule exhibit. Typically, District staff will provide a schedule for inclusion with the form. A simple list of milestones may be acceptable for studies and reports executed via the form. 6) District staff will complete the form and create a final PDF version for execution. Upon distribution of the final PDF for execution by District staff, construction management firms must print and sign two original copies of the form and return to the District for execution. A fully executed original and a scanned copy will be returned to the construction management firm following execution by the District.
2 TASK ORDER (Construction Management Services) Task Order No. XX In accordance with the agreement for CONSTRUCTION MANAGEMENT SERVICES ON A CONTINUING BASIS dated SELECT DATE between The School Board of Hillsborough County, Florida ("Owner") and ("Construction Contractor"), the Owner hereby contracts with Construction Contractor to perform all work (the "Work") in connection with the management and construction of PROJECT NAME (the "Project"), located in Hillsborough County, Florida, said Work being set forth in the plans and specifications being prepared by DESIGN PROFESSIONAL, Architect and/or Engineer of Record ("Design Professional"), and all other Contract Documents and having an estimated construction cost ("Construction Budget") of CONSTRUCTION BUDGET IN TEXT dollars ($XXX,XXX). SCOPE OF SERVICES: Construction Contractor is to provide Pre-Construction and Construction Phase Services for the Project meeting the requirements of the agreement, with the following modifications and clarifications: Provide any additional description or clarification of the services to be provided here. If none, enter "Not Applicable". Do not use an attachment. COMPENSATION: In consideration of the full and faithful performance by Construction Contractor of the covenants in this Contract, Owner agrees to pay, or cause to be paid, to Construction Contractor the following amounts (herein "Contract Amount"), in accordance with the terms of this Contract: Pre-Construction Phase Services: For all Pre-Construction Phase Services, including, but not limited to, providing value engineering services, reviewing Construction Documents for constructability, assisting and meeting with Design Professional during the various design phases, and preparing cost estimates, Construction Contractor shall receive the fixed amount of PRE-CONSTRUCTION FEE IN TEXT dollars ($X,XXX) as the total lump sum compensation for its services. Construction Phase Services: With respect to the Construction Phase Services to be provided by Construction Contractor hereunder, Owner shall reimburse Construction Contractor for the Cost of the Work (as that term is defined in the agreement), and pay Construction Contractor a Construction Management Fee for the entire Work in the fixed amount of CONSTRUCTION SERVICES FEE IN TEXT dollars ($XX,XXX). LIQUIDATED DAMAGES: Should Construction Contractor fail to substantially complete the Work within the required time period as described in the agreement, Owner shall be entitled to assess, as liquidated damages, but not as a penalty, SUBSTANTIAL COMPLETION LD'S IN TEXT dollars ($X,XXX) for each calendar day thereafter until Substantial Completion is achieved. Should Construction Contractor fail to satisfy all requirements for final acceptance of the Work as described in Paragraph 22.2 of Exhibit A of the agreement within the required time period, Owner shall be entitled to HCPS Design Task Order INITIALS Page 2 of 3
3 assess, as liquidated damages, but not as a penalty, FINAL COMPLETION LD'S IN TEXT dollars ($XXX) for each calendar day thereafter until the final acceptance requirements are met. Construction Contractor hereby expressly waives and relinquishes any right which it may have to seek to characterize the above noted liquidated damages as a penalty, which the parties agree represents a fair and reasonable estimate of Owner's actual damages at the time of contracting if Construction Contractor fails to substantially complete the Work in a timely manner. STAFFING SCHEDULE: Construction Contractor shall provide no less than those personnel during the respective phases of construction that are set forth in Exhibit A to this Task Order. Construction Contractor shall not change any of those persons identified in Exhibit A unless mutually agreed to in writing by Owner and Construction Contractor. In such case, Owner shall have the right to approve the replacement personnel. SCHEDULE: Services shall be provided in accordance with the Master Project Schedule provided at Exhibit B. TRUTH-IN-NEGOTIATIONS: At the time this TASK ORDER is executed, Construction Contractor shall sign and deliver to Owner the Truth-in-Negotiation Certificate attached hereto and made a part hereof as Exhibit C. Construction Contractor's compensation shall be adjusted to exclude any sums by which Owner determines the compensation was increased due to inaccurate, incomplete, or non-current wage rates or other factual unit costs. ATTACHMENTS: EXHIBIT A List of Consultants and Key Personnel EXHIBIT B Master Project Schedule EXHIBIT C Truth-In-Negotiations Certificate List additional exhibits here, or delete this text if none. CONSTRUCTION MANAGER: OWNER: (Signature) NAME TITLE (Date) (Signature) NAME TITLE Hillsborough County Public Schools (Date) HCPS Design Task Order INITIALS Page 3 of 3
4 EXHIBIT A Construction Phase Services: CONSTRUCTION CONTRACTOR'S STAFFING SCHEDULE Name Title/Position Company Affiliation % Assigned to Project EXHIBIT A HCPS Design Task Order INITIALS Page A-1
5 EXHIBIT B MASTER PROJECT SCHEDULE MILESTONES REPLACE THIS TEXT WITH SCHEDULE RESIZED TO FIT EXHIBIT B HCPS Design Task Order INITIALS Page B-1
6 EXHIBIT C TRUTH-IN-NEGOTIATION CERTIFICATE In compliance with the Consultants' Competitive Negotiation Act, Section , Florida Statutes, the undersigned hereby certifies that wage rates and other factual unit costs supporting the compensation for the construction management services of to be provided under this TASK ORDER are accurate, complete and current as of the time of contracting. : By: Print Name: Title: Date: EXHIBIT C HCPS Design Task Order INITIALS Page C-1
7 EXHIBIT D HCPS Design Task Order INITIALS Page D-1
8 EXHIBIT E HCPS Design Task Order INITIALS Page E-1
Sustainable Project Goals Exhibit SAMPLE. Document No. E-SUSWD Second Edition, 2010 Design-Build Institute of America Washington, DC
Sustainable Project Goals Exhibit Document No. E-SUSWD Second Edition, 2010 Design-Build Institute of America Washington, DC TABLE OF CONTENTS Article Name Page Article 1 Project Goals... 1 Article 2 Project
More informationCHARLES COUNTY GOVERNMENT ITB NO WHITE PLAINS FAILING SEPTIC SYSTEM IMPROVEMENTS
CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 July 18, 2017 ITB NO. 18-02 WHITE PLAINS FAILING SEPTIC SYSTEM IMPROVEMENTS ADDENDUM
More informationMEMORANDUM. Taylor Schoel with Walter Schoel Engineering. DATE: August 29, Addendum 1 - Green Drive Culvert Replacement.
MEMORANDUM TO: FROM: Bidders Taylor Schoel with Walter Schoel Engineering DATE: August 29, 2013 SUBJECT: Addendum 1 - Green Drive Culvert Replacement The following is part of Addendum 1 and should be included
More informationAN ORDINANCE ADOPTING AN INTERGOVERNMENTAL AGREEMENT WITH THE CHATHAM LIBRARY DISTRICT
Ordinance No. 93- c/~ AN ORDINANCE ADOPTING AN INTERGOVERNMENTAL AGREEMENT WITH THE CHATHAM LIBRARY DISTRICT BE IT ORDAINED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF CHATHAM, SANGAMON COUNTY,
More informationRequest for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.
Request for Proposals (RFP) Information Technology Independent Verification and Validation ADDENDUM NO. 2 Questions and Answers RFP Amendments September 2015 Contained herein are the responses to the questions
More informationCITY OF PANAMA CITY BEACH WWTF INFLUENT SCREENS REPLACEMENT April 14, 2017
CITY OF PANAMA CITY BEACH WWTF INFLUENT SCREENS REPLACEMENT April 14, 2017 ADDENDUM NO. 1 (This Form Must Be Signed and Submitted With Bid Form) Addendum No. 1 addresses the following issues: QUESTIONS
More informationREQUEST FOR PROPOSALS AUDIT
REQUEST FOR PROPOSALS 2017-18 AUDIT PROFESSIONAL AUDIT SERVICES ANNUAL FINANCIAL STATEMENT PROPOSAL DEADLINE DATE Tuesday, February 6, 2018 at 3:00pm SUBMIT PROPOSAL TO: Ahmad Sheikholeslami Chief Business
More informationDECLARATION OF AUTHORITY. This DECLARATION OF AUTHORITY ( Declaration ) is a declaration and certification made on by and between the following:
DECLARATION OF AUTHORITY This DECLARATION OF AUTHORITY ( Declaration ) is a declaration and certification made on by and between the following: ( Party A ) and Revised ( Party B - a PJM Member ) for the
More informationTOWNSHIP TAX INCENTIVE AGREEMENT
TOWNSHIP TAX INCENTIVE AGREEMENT This TAX INCENTIVE AGREEMENT (the Agreement ), made and entered into as of the day of, 2014, by and between the CITY OF CENTERVILLE, OHIO, a municipal corporation duly
More informationEducational Use Only S A M P L E S A M P L E
CONSENSUSDOCS 240 STANDARD FORM OF AGREEMENT BETWEEN OWNER AND ARCHITECT/ENGINEER This document was developed through a collaborative effort of entities representing a wide cross-section of the construction
More informationINTERGOVERNMENTAL AGREEMENT FOR PAYMENT OF CERTAIN IMPACT FEES AND COSTS BY AND BETWEEN THE CITY OF FARMER CITY, DEWITT COUNTY, ILLINOIS AND
INTERGOVERNMENTAL AGREEMENT FOR PAYMENT OF CERTAIN IMPACT FEES AND COSTS BY AND BETWEEN THE CITY OF FARMER CITY, DEWITT COUNTY, ILLINOIS AND BLUE RIDGE COMMUNITY UNIT SCHOOL DISTRICT NO. 18, DEWITT COUNTY,
More informationInvitation to Negotiate
Invitation to Negotiate Programming, Design, and Consulting Services Lisa Daws 4/3/2012 CLERKS OF COURT OPERATIONS CORPORATION Table of Contents Agency Background... 3 Statement of Purpose... 3 Scope of
More information1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES
TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING
More informationINFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION
INFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION The bid proposal is to be returned to the buyer via the e-mail noted in the solicitation, and will be accepted no later than
More informationINFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION
INFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION The bid proposal is to be returned to the buyer via the e-mail noted in the solicitation, and will be accepted no later than
More informationBusiness / Trade Associations
Invitation to Negotiate (ITN) ITN No. 11-983 For Business / Trade Associations Issued: December 3, 2010 Submittals of Responses are accepted between January 3, 2011 thru TBD Submit Responses to: Tampa
More informationIntroduction. Definitions. The following definitions shall apply to and are used in this Request for Qualifications:
Borough of Park Ridge Request for Qualifications from Engineering Firms Interested in Serving as Borough Engineer to the Borough of Park Ridge For the Period January 1, 2019 through December 31, 2019 Dated:
More informationTHE STATE OF TEXAS CHAPTER 380 PROGRAM AGREEMENT FOR ECONOMIC DEVELOPMENT COUNTY OF TARRANT INCENTIVES THIS AGREEMENT is entered into by and between G
THE STATE OF TEXAS CHAPTER 380 PROGRAM AGREEMENT FOR ECONOMIC DEVELOPMENT COUNTY OF TARRANT INCENTIVES THIS AGREEMENT is entered into by and between GREYSTAR GP II, LLC, a Delaware limited liability company
More informationBID INSTRUCTIONS. Montour County Courthouse Retaining Wall Repair Project
BID INSTRUCTIONS Montour County Courthouse Retaining Wall Repair Project The Montour County Commissioners are receiving bids for the Courthouse Retaining Wall Repair Project. The parking lot is located
More informationINVITATION FOR BIDS (IFB)
P a g e 1 INVITATION FOR BIDS (IFB) Summer Camp T-Shirts IFB #: 17-004 Deadline for Responses: 2:00 PM 04/13/2017 Children s Services Council of Palm Beach County (CSC) 2300 High Ridge Road Boynton Beach,
More informationDocument B101 TM. Standard Form of Agreement Between Owner and Architect
Document B101 TM 2007 Standard Form of Agreement Between Owner and Architect AGREEMENT made as of the day of in the year (In words, indicate day, month and year.) BETWEEN the Architect s client identified
More informationCITY OF MARSHALL, MINNESOTA
Office of the Director of Public Works/City Engineer 344 West Main Street Marshall, MN 56258 507-537-6773 Fax: 507-537-6830 CITY OF MARSHALL, MINNESOTA SPECIFICATION AND BIDDING DOCUMENTS FOR REMOVAL OF
More informationBidding Conditions Attachment C
Bidding Conditions Attachment C REV Date: November 9, 2018 Project Name (Permit Nos. xxx) at the Fresno Chaffee Zoo Project No. xxxx Located at 894 West Belmont Avenue Fresno, CA 93728 Page 1 of 8 DEFINITIONS
More informationEXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT FOR CONSTRUCTION MANGEMENT SERVICES/RFQ #14-Q-009-KR BY AND BETWEEN
EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT FOR CONSTRUCTION MANGEMENT SERVICES/RFQ #14-Q-009-KR BY AND BETWEEN THE SCHOOL BOARD OF BREVARD COUNTY, FLORIDA 2700 Judge Fran Jamieson Way
More informationAurora Public Schools. Modular Placement at Crawford Elementary & CDC Laredo. Project Manual
Aurora Public Schools Modular Placement at Crawford Elementary & CDC Laredo Project Manual Bid Number 2447-13 April 30, 2013 Table of Contents Section Document Title 00020 00100 Invitation to Bid Instructions
More informationRESOLUTION #R
RESOLUTION #R-104-2017 A RESOLUTION OF THE LOVELAND URBAN RENEWAL AUTHORITY APPROVING AN INTERGOVERNMENTAL AGREEMENT REGARDING LOANS TO THE LOVELAND URBAN RENEWAL AUTHORITY FOR THE PURCHASE OF THE 6 TH
More informationIntroduction. Definitions. The following definitions shall apply to and are used in this Request for Qualifications:
Borough of Park Ridge Request for Qualifications From Engineering Firms Interested in Serving as Environmental Engineer to the Borough of Park Ridge Board of Public Works For the Period January 1, 2019
More information2. Clarification: The building address is 801 Henderson Street.
East Energy Structural Steel Painting University of South Carolina Project Number H27-Z037 Addendum One October 19, 2015 NOTE: The following amendments, additions, and deletions shall be made to the Construction
More informationCreative Advertising and Audio Visual - Interactive Production Services Invitation to Qualify (ITQ) Part I Statement of Work
Creative Advertising and Audio Visual - Interactive Production Services Invitation to Qualify (ITQ) Part I Statement of Work OVERVIEW The purpose of the Creative Advertising and Audio Visual - Interactive
More informationAMENDMENT #1 TO AGREEMENT BETWEEN OWNER AND ARCHITECT FOR DESIGN AND CONSTRUCTION ADMINISTRATION SERVICES
AMENDMENT #1 TO AGREEMENT BETWEEN OWNER AND ARCHITECT FOR DESIGN AND CONSTRUCTION ADMINISTRATION SERVICES Fruitville Elementary School Classroom Wing Addition THIS AMENDMENT #1 to Agreement between Owner
More informationNew carrier setup checklist
New carrier setup checklist Signed Contract Carrier Broker Contract with completed Addendum including flat rate agreed upon. Copy of Interstate Authority Certificate of Liability Insurance (CLI) with KCG
More informationADDENDUM NO. 1 CONTRACT NO. TU-191 SALT STORAGE BUILDING FOR THE TOWN OF ULSTER ULSTER COUNTY, NEW YORK. January 25, 2019
DENNIS M. LARIOS, P.E. CHRISTOPHER J. ZELL, L.L.S. Lic. No. 58747 Lic. No. 49629 BRINNIER and LARIOS, P.C. PROFESSIONAL ENGINEERS & LAND SURVEYORS 67 MAIDEN LANE DESIGN KINGSTON, NEW YORK 12401 SUBDIVISIONS
More informationREQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: August 10, DUE DATE: August 23, 2017.
REQUEST FOR QUALIFICATIONS FOR THE PROVISION OF LEGAL SERVICES General Counsel ISSUE DATE: August 10, 2017 DUE DATE: August 23, 2017 Issued by: Trenton Parking Authority NOTE: In the event an interested
More informationNATIONAL NOTARY ASSOCIATION
Review the complete instructions before beginning the process. Retain a copy of these instructions and all items sent for your records, in your local store personnel file. Important Notes: The National
More informationBID PROPOSAL CONTRACT NO. AOPC
BID PROPOSAL CONTRACT NO. AOPC 201801.2 BID PROPOSAL INDEX PAGE NO. GENERAL INFMATION 2 BASE BIDS 3 BIDDER GANIZATION INFMATION 4 CERTIFICATION AND BID SIGNATURE 5 NOTE: Please read all pages of this Bid
More informationADDENDUM #2. Design/Build Contractor RFP Bid # for the. Joint-Use 21 st Century Post-Century Education Center.
ADDENDUM #2 Design/Build Contractor RFP Bid #0606-14 for the Joint-Use 21 st Century Post-Century Education Center SJECCD California July 7, 2014 SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT 4750 San
More informationPage 1 REQUEST FOR WRITTEN PROPOSAL
PARKS AND RECREATION DEPARTMENT 9355 E. Stockton Blvd., Suite 185 Elk Grove, CA 95624 (916) 405-5600 www.yourcsd.com REQUEST FOR WRITTEN PROPOSAL TO: ALL PROSPECTIVE BIDDERS DATE: December 1, 2016 PROJECT
More informationMain Building Auditorium
Main Building Auditorium Theatre and Lighting Upgrade Moberly Area Community College 101 College Avenue Moberly, Missouri This document contains all necessary instructions and specifications to perform
More informationrevisions to project manual Bid Form: Added deduct alternate 07. Refer to written responses below for explanation.
a r c h i t e c t u r e d e s i g n p l a n n i n g m a n a g e m e n t 27 March 2019 27 March 2019 Addendum 01 Sumner County Administration Building Reroof To All Holders of the Contract Documents: The
More informationSAN ANTONIO WATER SYSTEM University Pump Station Improvements Project SAWS Job No Solicitation No. B DD
TO BIDDER OF RECORD: SAN ANTONIO WATER SYSTEM University Pump Station Improvements Project SAWS Job No. 12-6002 Solicitation No. B-14-002-DD ADDENDUM NO. 1 February 17, 2014 The following changes, additions,
More informationElementary School. Chairperson Guidelines. Revised: 2/28/08 1
Elementary School Chairperson Guidelines Revised: 2/28/08 1 a Joya Independent School District Elementary School The following guidelines will be used in the selection and compensation and evaluation of
More informationARTICLE 25 HOURS OF WORK
PSAC Proposal 06/18/16 FB Bargaining ARTICLE 25 HOURS OF WORK General Shift Work ** 25.13 When, because of operational requirements, hours of work are scheduled for employees on a rotating or irregular
More informationIMMEDIATE RESPONSE REQUESTED
DATE: June 1, 2018 IMMEDIATE RESPONSE REQUESTED ADDENDUM NO. 3 Project No. 833450 Owner: City of Dexter Project: 2018 Wastewater Treatment Plant Improvements ADDENDUM ACKNOWLEDGMENT Upon receipt of this
More informationINFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION
INFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION The bid proposal is to be returned to the buyer via e-mail and will be accepted no later than 10:00 AM on Wednesday, January
More informationCONTRACT PROPOSAL/CONTRACT ACCEPTANCE HIGDON LOOP ROAD BRIDGE
CONTRACT PROPOSAL/CONTRACT ACCEPTANCE PROJECT # 2017-NC-001 For Construction of HIGDON LOOP ROAD BRIDGE located in Nelson County Kentucky 09/2017 REQUEST FOR BIDS HIGDON LOOP ROAD BRIDGE REPLACEMENT Nelson
More informationINVITATION TO BID (Request for Proposal)
INVITATION TO BID (Request for Proposal) February 16, 2017 PROJECT Facilities Master Plan - Phase 1 Interior Renovations PROJECT DESCRIPTION The Topeka and Shawnee County Public Library is a 21st-century,
More informationCERTIFICATE OF COMPLIANCE WITH ILLINOIS CONTRACTORS DRUG-FREE WORKPLACE ACT
CERTIFICATE OF COMPLIANCE WITH ILLINOIS CONTRACTORS DRUG-FREE WORKPLACE ACT Pursuant to 30 ILCS 580/1 et seq. (the "Drug Free Workplace Act"), the undersigned Contractor hereby certifies to the Board of
More informationThis Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect.
North Campus Entrance and related work Wallace State Community College ADDENDUM 3 PART 1 - GENERAL Project: North Campus Entrance and related work [B.C. # 2016259] Owner: Wallace State Community College
More informationDocument B105. Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project
TM Document B105 2007 Standard Form of Agreement Between Owner and Architect for a Residential or Small Commercial Project AGREEMENT made as of the in the year (In words, indicate day, month and year.)
More informationGhostwriting Agreement
Ghostwriting Agreement This Packet Includes: 1. General Information 2. Instructions and Checklist 3. Ghostwriting Agreement Ghostwriting Agreement 1 General Information Ghostwriting Agreement This Ghostwriting
More informationDOCUMENT BID PROPOSAL
DOCUMENT 00 41 13 BID PROPOSAL TO: SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT, a California Community College District, acting by and through its Board of Trustees ("the District"). FROM: (Name of
More informationThe Board shall consist of five (5) Directors, each of whom, whether elected or appointed, shall be a registered voter within District.
DIVISION II BOARD OF DIRECTORS Section 2.01 Organization of Board The Board shall consist of five (5) Directors, each of whom, whether elected or appointed, shall be a registered voter within District.
More informationTerminal D South Expansion - Construction Manager-At-Risk (CMAR)
DALLAS/FORT WORTH INTERNATIONAL AIRPORT DESIGN, CODE AND CONSTRUCTION DEPARTMENT ADDENDUM NO. 3 FOR Terminal D South Expansion - Construction Manager-At-Risk (CMAR) CONTRACT NO. 9500647 August 30, 2018
More informationADDENDUM NO. B. TO THE BID DOCUMENTS, dated 1/5/16 FOR THE
ADDENDUM NO. B TO THE BID DOCUMENTS, dated 1/5/16 FOR THE CVUSD M&O/WAREHOUSE/PRINTING SERVICES TENANT IMPROVEMENT 667 Building & 750 Building #DO-15C1024 & #DO-15C1026 CONEJO VALLEY UNIFIED SCHOOL DISTRICT
More informationGarden Banks Gas Pipeline, LLC Original Sheet No. 245 FERC Gas Tariff FIRST REVISED VOLUME NO. 1
Garden Banks Gas Pipeline, LLC Original Sheet No. 245 PARKING AND LENDING SERVICE AGREEMENT SERVICE UNDER RATE SCHEDULE PAL CONTRACT NO. THIS AGREEMENT is made effective as of the day of,, by and between:
More informationSECTION SUPPLEMENTARY GENERAL CONDITIONS
SECTION 00800 SUPPLEMENTARY GENERAL CONDITIONS PART 1 - GENERAL 1.1 SCOPE OF WORK In general, the Work consists of application of a fluid applied membrane, installation of new tapered insulation, installation
More informationNational Transportation Specialists, LLC 1801 S Pennsylvania Avenue, PO Box 299 Morrisville, PA
1801 S Pennsylvania Avenue, PO Box 299 Morrisville, PA 19067-0299 Dear Carrier: Thank you for your interest in, a nationwide Logistics provider. To become a qualified carrier for, we require the following
More informationAGREEMENT FOR ARCHITECTURAL SERVICES
AGREEMENT FOR ARCHITECTURAL SERVICES This Agreement for ( Agreement ) is dated XX XX, 20XX for reference purposes only and is made by and between SANTA MONICA-MALIBU UNIFIED SCHOOL DISTRICT, a California
More informationBID Addenda No. Date Issued Addenda No. Date Issued
BID - 004113 BID TO: THE CITY AND BOROUGH OF JUNEAU 1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with the OWNER in the form included in the Contract
More informationINFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION
INFORMAL BID PROPOSAL FORM STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION The bid proposal is to be returned to the NJDOT buyer via the e-mail noted in the solicitation. Proposals sent to any other e-mail
More informationEXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT FOR CONSTRUCTION MANAGEMENT SERVICES/RFQ #14-Q-009-KR BY AND BETWEEN
EXHIBIT C GUARANTEED MAXIMUM PRICE TO THE CONTINUING CONTRACT FOR CONSTRUCTION MANAGEMENT SERVICES/RFQ #14-Q-009-KR BY AND BETWEEN THE SCHOOL BOARD OF BREVARD COUNTY, FLORIDA 2700 Judge Fran Jamieson Way
More informationAGREEMENT BETWEEN DESIGNING ARCHITECT AND THE DISTRICT BOARD OF TRUSTEES OF PALM BEACH STATE COLLEGE
AGREEMENT BETWEEN DESIGNING ARCHITECT AND THE DISTRICT BOARD OF TRUSTEES OF PALM BEACH STATE COLLEGE THIS AGREEMENT, is made and entered into this day of, between the DISTRICT BOARD OF TRUSTEES OF PALM
More informationCITY OF DE PERE PROJECT HVAC MAINTENANCE RE-BID BID DATE: MAY 5, 1:00 PM
CITY OF DE PERE PROJECT 16-10 HVAC MAINTENANCE RE-BID BID DATE: MAY 5, 2016 @ 1:00 PM Bid documents, including plans and specifications, are available for download at www.questcdn.com. The QuestCDN website
More informationWEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS
WEST VIRGINIA DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS ALL ITEMS MUST BE COMPLETED BY CONTRACTOR CALL NUMBER CONTRACTOR S NAME CONTRACTOR S FEIN BID AMOUNT DBE GOAL (%) WV LICENSE NUMBER CONTRACTOR
More informationMarch 14, 2017, 2:00 P.M.
REQUEST FOR QUALIFICATIONS AND PROPOSALS ARCHITECTURAL SERVICES: SADDLEBACK COLLEGE South Orange County Community College District (SOCCCD) is inviting submittals from qualified firms, partnerships, corporations,
More information2. Provide a revised bid form which includes revised language in Section II, Bidder Responsiveness Section. (attached to this Addendum 1)
Philadelphia Regional Port Authority 3460 North Delaware Ave. 2 nd Floor Philadelphia, PA 19134 October 30, 2018 To: All Bidders From: Kate Bailey Director of Procurement Re: ADDENDUM NO. 1 Project 18-110.1
More informationUTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL
DATE: January 5, 2018 UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL 32170-010 ITB# 04-18 REPLACE 12 WATER MAIN AT TURNBULL BAY (DAMAGED DURING
More informationDepartment of Public Works Division of Engineering. Nassau County, New York
TOWN OF OYSTER BAY Department of Public Works Division of Engineering Nassau County, New York REQUEST FOR PROPOSALS FOR CONSULTANT SERVICES SOLICITATION NO. 2017-12 NOTES: 1. ISSUANCE DATE: Thursday, October
More informationMISO Module E Capacity Transaction Confirmation Version 1.0 October 20, 2008
MISO Module E Capacity Transaction Confirmation Version 1.0 October 20, 2008 NOTE: PARTIES SHOULD SEEK APPROPRIATE LEGAL AND ACCOUNTING ADVICE PRIOR TO USING THIS DOCUMENT. THIS DOCUMENT IS PROVIDED FOR
More informationCOGISTICS TRANSPORTATION LLC CARRIER TERMS AND CONDITIONS OF SERVICE
COGISTICS TRANSPORTATION LLC CARRIER TERMS AND CONDITIONS OF SERVICE Except to the extent superseded by an individually negotiated Carrier contract, the following Terms and Conditions of Service shall
More informationWORKING AGREEMENT. between CITY OF BURLINGTON BOARD OF EDUCATION. and the CUSTODIAL/MAINTENANCE FORCE
WORKING AGREEMENT between CITY OF BURLINGTON BOARD OF EDUCATION and the CUSTODIAL/MAINTENANCE FORCE July 1, 2003 - June 30, 2006 1 PRINCIPLES A. This Agreement is negotiated in order to establish, for
More informationThe bid is being postponed to comply with State rules requiring 4 calendar days for receipt of bids after an addendum.
ADDENDUM NO. FOUR March 5, 2018 NORTH IDAHO COLLABORATIVE EDUCATION BUILDING North Idaho College, Coeur d Alene, ID DPW PROJECT 16251 - H2A PROJECT 1616 This addendum is hereby incorporated into and is
More informationDAKOTA COUNTY COMMUNITY DEVELOPMENT AGENCY SPECIAL BOARD MEETING
DAKOTA COUNTY COMMUNITY DEVELOPMENT AGENCY SPECIAL BOARD MEETING January 5, 2016 11 a.m. or immediately following the Dakota County General Government & Policy Committee Meeting 1. ROLL CALL 2. APPROVAL
More informationEmployee User Guide ivisions Web Portal Tutorial available on home page of web portal.
Employee User Guide ivisions Web Portal Tutorial available on home page of web portal. ACCESSING THE WEB PORTAL: 1) IN THE WEB BROWSER ENTER: https://ivisions.tylertech.com/yumaelementary/ IMPORTANT: PLEASE
More informationPART I PERTAINING TO THE SPECIFICATIONS: Specification section (0.04) o Page 4, The bid form has been revised to include Alternate 4.
Addendum # 1 October 9, 2017 Sarasota Manatee Airport Authority Renovation of SRQ Airport Authority Boardroom, Police Department & Badging Area The following items represent clarifications, additions,
More informationCity of Eagle Point 2017 Paving Instruction to Bidders
City of Eagle Point 2017 Paving Instruction to Bidders Issued: August 2, 2017 Closing Date and Time: Wednesday August 16, 2016 at 2:00 pm Project Summary The City of Eagle Point is requesting bids for
More informationEMPLOYMENT CONTRACT. This Employment Contract (hereinafter referred to as Contract or. Agreement ) made this day of, 2017, by and between BOARD
EMPLOYMENT CONTRACT This Employment Contract (hereinafter referred to as Contract or Agreement ) made this day of, 2017, by and between BOARD OF TRUSTEES OF COMMUNITY COLLEGE DISTRICT NO. 531, COUNTIES
More informationCONTRA COSTA COMMUNITY COLLEGE 500 Court St, Martinez, CA 94553
ADDENDUM #4 CONTRA COSTA COMMUNITY COLLEGE 500 Court St, Martinez, CA 94553 CLASSROOM NOTIFICATION DEVICE INSTALLATION - DISTRICTWIDE Contra Costa College / Diablo College / Los Medanos College Date: May
More informationCUSTOMER NAME Security Awareness Education Request for Proposal. Program Content & Hosting Services Date
CUSTOMER NAME Security Awareness Education Request for Proposal Program Content & Hosting Services Date Contents SAE Project Overview... 3 SAE Vendor Qualifications... 3 Project Milestones... 3 CUSTOMER
More informationThe Employer employs the Employee and the Employee accepts employment upon the terms and conditions hereinafter set forth.
STATE OF NORTH CAROLINA COUNTY OF GUILFORD City of Greensboro EMPLOYMENT AGREEMENT This agreement is effective as of the day of 20 by and between CYCLES DE ORO, INC., a North Carolina corporation with
More informationMemphis Housing Authority Capital Improvements Department 700 Adams Street, Room 107 Memphis, Tennessee
Memphis Housing Authority Capital Improvements Department 700 Adams Street, Room 107 Memphis, Tennessee 38105-5029 ADDENDUM NO. 2 Issued: March 6, 2018 This addendum shall become and form a part of the
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS UTILITY BILLING SOFTWARE DUE DATE: NO LATER THAN 5:00 PM EASTERN TIME, MARCH 11, 2016 QUESTIONS: JESSICA MARTIN-LANE JESSICA@MARTIN-MCGILL.COM NOTE: THE COUNTY OF HARNETT RESERVES
More informationGYMNASIUM RENOVATION WASHINGTON HIGH SCHOOL
PROJECT MANUAL FOR CONSTRUCTION OF GYMNASIUM RENOVATION WASHINGTON HIGH SCHOOL WASHINGTON COMMUNITY SCHOOLS Washington, Indiana PROJECT MANUAL FOR CONSTRUCTION OF GYMNASIUM RENOVATION WASHINGTON HIGH SCHOOL
More informationREQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: December 20, DUE DATE: January 11, 2019.
NOTE: In the event an interested firm has downloaded these specifications from the TPA website, you are responsible for providing the TPA via email at Trentonparkingph@aol.com your contact information,
More informationBidding Conditions. March 22, (Project# 0192) at the. Fresno Chaffee Zoo. Project : Warthog Exhibit. Located at. 894 West Belmont Avenue
Bidding Conditions March 22, 2018 (Project# 0192) at the Fresno Chaffee Zoo Project : Warthog Exhibit Located at 894 West Belmont Avenue Fresno, CA 93728 Page 1 of 8 DEFINITIONS Addendum - A document issued
More informationREQUEST FOR QUALIFICATIONS FOR THE PROVISION OF CLAIMS LITIGATION INVOICE REVIEW SERVICES GSMJIF. ISSUE DATE: October 2, 2017
NOTE: The GSMJIF will consider qualifications only from firms or organizations that have demonstrated the capability and willingness to provide high quality services in the manner described in this Request
More informationExhibit C GAS TECHNOLOGY INSTITUTE IRS FORM W-9, ELECTRONIC FUND TRANSFER FORM, AND PAYMENT REQUISITION FORM
Exhibit C GAS TECHNOLOGY INSTITUTE IRS FORM W-9, ELECTRONIC FUND TRANSFER FORM, AND PAYMENT REQUISITION FORM A. Required IRS Form W-9 (Taxpayer Identification Number Request) and an Electronic Fund Transfer
More informationSAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT DOCUMENT BID PROPOSAL
DOCUMENT 00 41 13 BID PROPOSAL TO: SAN JOSE / EVERGREEN COMMUNITY COLLEGE DISTRICT, a California Community College District, acting by and through its Board of Trustees ("the District"). FROM: (Name of
More informationAppendix D University of Maine System. Supplementary Requirements to AIA Document B Standard Form of Architect s Services
Appendix D University of Maine System Supplementary Requirements to AIA Document B201-2007 Standard Form of Architect s Services This document provides the Architect s scope of services only and must be
More informationREQUEST FOR QUOTES (RFQ) # Horseback Riding Lessons Issue Date: May 1, 2018
Procurement Division Public Services Building 2051 Kaen Road Oregon City, OR 97045 (503) 742-5444 (Office) REQUEST FOR QUOTES (RFQ) #2018-38 Horseback Riding Lessons Issue Date: May 1, 2018 Project Name:
More informationREQUEST FOR QUALIFICATIONS
NOTE: The City of New Brunswick Parking Authority will consider proposals only from firms or organizations that have demonstrated the capability and willingness to provide high quality services in the
More informationNotice to Bidders Page 1 of 6
Page 1 of 6 COYOTE CREEK LEVEE RODENT DAMAGE REPAIR DOWNSTREAM OF SR 237 Project No. 62084001, Task No. 5171 Contract No. C0637 1. Notice. Notice is hereby given that sealed Bids will be accepted by the
More informationPROPOSAL AND BID FORM (Submit in triplicate)
Bidder SECTION 00300 PROPOSAL AND BID FORM (Submit in triplicate) Proposal of: (hereinafter called "Bidder" or "Contractor"), organized and existing under the laws of the State of doing business as a partnership
More informationRequest for Quote Professionalizing Procurement Practices and Procedures February 11, 2014 Florida Department of Children and Families
Request for Quote Professionalizing Procurement Practices and Procedures February 11, 2014 Florida Department of Children and Families Purpose The Florida Department of Children and Families (the Department
More informationADDENDUM NO. 1 Kansas City Area Transportation Authority 1350 E. 17 th Street Kansas City, Missouri 64108
ADDENDUM NO. 1 Kansas City Area Transportation Authority 1350 E. 17 th Street Kansas City, Missouri 64108 REQUEST FOR PROPOSAL (RFP) 18-4016-28A TEMPORARY STAFFING AGENCY SERVICES Issue Date: December
More informationAddendum No. 1. Joliet Junior College 1215 Houbolt Road Joliet, IL DATE: October 11, 2017
Addendum No. 1 DATE: October 11, 2017 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Respondents SUBJECT: Addendum No. 1 PROJECT NAME: Remodel C-Building Restroom JJC PROJECT
More informationODP Validation Checks for Year 3 Cost Report
ODP Validation s for Year 3 Cost Report The process for collecting Year 3 Cost Report data is automated to facilitate the submission and collection of high quality experience data for use in the rate development
More informationCHAPTER 4: PROJECT MANUAL GUIDE
4.01 GENERAL A. The Designer s requirements for preparation of a Project Manual are defined by the Agreement. This chapter provides the Owner s guidance for procedures and use of standard documents in
More informationNOW THEREFORE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF YOUR CITY, AS FOLLOWS:
ORDINANCE A N O R D I N A N C E A P P R O V I N G A N D CREATING A NEW TAX INCREMENT FINANCING DISTRICT IN THE CITY OF XX, XX COUNTY, WEST VIRGINIA TO BE KNOWN AS "THE CITY OF MORGANTOWN R I V E R F R