1 Traffic Noise Technical Report Loop 1604 (From SH 16 to IH 35) CSJs: , , , , and Bexar County, Texas San Antonio District March 2016 The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 16, 2014, and executed by FHWA and TxDOT.

2 Table of Contents 1.0 Introduction Modeling Assumptions Background Noise Analysis Summary Mitigation Noise Planning Contours Construction Noise Local Coordination List of Exhibits Exhibit 1: Project Location Map... 2 Exhibit 2: Year 2015 and 2045 Design Hour Traffic Volumes Exhibit 3: Modeled Noise Receivers.30 List of Tables Table 1: FHWA Noise Abatement Criteria... 5 Table 2: Traffic Noise Levels (dba Leq)... 7 Table 3: Noise Barrier Proposal (Preliminary) Table 4: Traffic Noise Contours [db(a) Leq] i Page

3 1.0 Introduction The Federal Highway Administration (FHWA), the Texas Department of Transportation (TxDOT), and the Alamo Regional Mobility Authority (Alamo RMA) propose to improve Loop 1604 from State Highway (SH) 16 (Bandera Road) to Interstate Highway (IH) 35 North in Bexar County, Texas for a distance of approximately 22.8 miles. Improvements would include the addition of two 12-ft buffer separated express lanes in each direction along Loop 1604 and modifying exit and entrance ramps along Loop 1604 and IH 10. The existing facility primarily consists of two 12-foot wide general purpose lanes in each direction, with 4-foot inside and 10-foot outside shoulders, separated by a 36- to 64-foot grass ditch median. These lanes operate as a controlled access facility with mainline access gained through ramps from the frontage roads between cross streets. The Build Alternative would involve the addition of two buffer separated express lanes added in each direction along Loop The additional lanes would each be 12-feet wide, separated from the general purpose lanes by a 4-foot buffer. The inside shoulder would be increased from 4-feet to 10-feet wide. The additional lanes would be added by widening the existing pavement to the inside (toward the center median), converting the existing median ditch. Widening to the outside of the existing pavement would be limited to the areas that do not have enough median width for proposed improvements. All existing mainline pavement would be milled, overlaid and restriped. The existing centerline alignment would remain unchanged. Due to the widening and restriping, 81 existing ramps would need to be modified along Loop 1604 as well as 16 ramps along IH 10. A total of 25 of the ramps are proposed to be reversed in order to convert diamond intersections into X-style intersections. X-style intersections make a larger portion of the frontage road more accessible as well as greatly increasing cross street approaches for a ramp exiting to the frontage road. Incorporating these ramp changes with the addition of the express lanes ensures that the access points to the express lanes are placed where they will function safely and with an acceptable LOS. The Build Alternative includes improvements to bicycle and pedestrian facilities throughout the limits of the project. Gaps in sidewalks and worn foot paths indicate a need for new 6-foot sidewalks in these areas. Bicycle access was deemed sufficient due to the existence of 4-foot or wider shoulders along the frontage roads throughout the project limits. No additional ROW would be required for the proposed project. This traffic noise analysis, prepared in accordance with TxDOT s Federal Highway Administration (FHWA) approved 2011 Guidelines for Analysis and Abatement of Roadway Traffic Noise, supports the environmental documentation that evaluates the social, economic, and environmental impacts resulting from the proposed project. The traffic noise analysis was performed using the latest available FHWA approved traffic noise model version (TNM 2.5). Exhibit 1 shows the Project Location Map. 1 Page

4 Exhibit 1: Project Location Map 2 Page

5 1.1 Modeling Assumptions Details of the modeling assumptions included an analysis of the existing year 2015 and design year Design Hourly Volume (DHV) traffic data for the noise analysis was developed by Michael Baker International. A posted speed of 70 mph was used on the Loop 1604 mainline. Frontage road, cross-street and most ramp speeds were modeled at 45 mph, high speed off-on ramps were modeled with 55 mph speeds and U-turn roads underneath Loop 1604 were modeled with 25 mph speeds. Acceleration was also modeled (on-ramps, signals), but deceleration was not to provide a more conservative result. If there was no posted speed found for a local road/cross-street near Loop 1604, then a 45 mph speed was assumed. The proposed facility configuration construction primarily included the addition of the managed lanes and the new or modified on and off ramps to and from the managed lanes, the general purposes lanes, the frontage roads and the cross street interchanges, as applicable. Please note that there are long sections of the roadway project where there are/were no noise sensitive receivers, either existing or proposed. Consequently, these areas were not modeled. The percent cars, medium trucks and heavy trucks (X, X, X%, respectively) that were used in the analysis were provided by TXDOT, San Antonio District, as follows: Loop 1604 from SH 16 to Redland Road (97.8, 1.3, 0.9%) and from Redland Road to IH 35 (96.2, 1.2, 2.6%). These percentages were also applied to all frontage roads, ramps and cross-streets within these two areas. Specific road/ramp traffic data used in the analysis is included in the TNM files provided to TxDOT. Exhibit 2, located near the end of this report, shows a schematic linediagram of the traffic volumes for the Existing Year 2015 and the Design Year 2045 Build Alternative. 3 Page

6 2.0 Background Sound from highway traffic is generated primarily from a vehicle s tires, engine and exhaust. It is commonly measured in decibels and is expressed as "db." Sound occurs over a wide range of frequencies. However, not all frequencies are detectable by the human ear; therefore, an adjustment is made to the high and low frequencies to approximate the way an average person hears traffic sounds. This adjustment is called A- weighting and is expressed as "db(a)." Also, because traffic sound levels are never constant due to the changing number, type and speed of vehicles, a single value is used to represent the average or equivalent sound level and is expressed as "Leq." The traffic noise analysis typically includes the following elements: Identification of land use activity areas that might be impacted by traffic noise. Determination of existing noise levels. Prediction of future noise levels. Identification of possible noise impacts. Consideration and evaluation of measures to reduce noise impacts. The FHWA has established the following Noise Abatement Criteria (NAC) for various land use activity areas that are used as one of two means to determine when a traffic noise impact will occur. These criteria are outlined in Table 1. 4 Page

7 Activity Category A B C D FHWA (dba Leq) 57 (exterior) 67 (exterior) 67 (exterior) 52 (interior) Table 1: FHWA Noise Abatement Criteria Description of Land Use Activity Areas Lands on which serenity and quiet are of extraordinary significance and serve an important public need and where the preservation of those qualities is essential if the area is to continue to serve its intended purpose. Residential. Active sport areas, amphitheaters, auditoriums, campgrounds, cemeteries, day care centers, hospitals, libraries, medical facilities, parks, picnic areas, places of worship, playgrounds, public meeting rooms, public or nonprofit institutional structures, radio studios, recording studios, recreation areas, Section 4(f) sites, schools, television studios, trails, and trail crossings Auditoriums, day care centers, hospitals, libraries, medical facilities, places of worship, public meeting rooms, public or nonprofit institutional structures, radio studios, recording studios, schools, and television studios. 72 E (exterior) F - Hotels, motels, offices, restaurants/bars, and other developed lands, properties, or activities not included in A-D or F. Agricultural, airports, bus yards, emergency services, industrial, logging, maintenance facilities, manufacturing, mining, rail yards, retail facilities, shipyards, utilities (water resources, water treatment, electrical), and warehousing. G - Undeveloped lands that are not permitted. Source: TXDOT Guidelines for Analysis and Abatement of Highway Traffic Noise (2011), 23CFR772. A noise impact occurs when either the absolute or relative criterion is met: Absolute criterion: the predicted noise level at a receiver approaches, equals or exceeds the NAC. Approach is defined as one db(a) below the NAC. For example: a noise impact would occur at a Category B residence if the noise level is predicted to be 66 db(a) or above. Relative criterion: the predicted noise level substantially exceeds the existing noise level at a receiver even though the predicted noise level does not approach, equal or exceed the NAC. Substantially exceeds is defined as more than 10 db(a). For example: a noise impact would occur at a Category B residence if the existing level is 54 db(a) and the predicted level is 65 db(a). When a traffic noise impact occurs, noise abatement measures must be considered. A noise abatement measure is any positive reasonable and feasible action taken to reduce the impact of traffic noise on an activity area. 5 Page

8 3.0 Noise Analysis Summary The FHWA traffic noise modeling software (TNM2.5) was used to calculate existing and predicted traffic noise levels. The model primarily considers the number, type and speed of vehicles; highway alignment and grade; cuts, fills, surrounding terrain features; building shielding, existing noise barriers, privacy walls, concrete traffic barriers and the locations of activity areas likely to be impacted by the associated traffic noise. Existing and predicted traffic noise levels were modeled at receiver locations (see Table 2 and Exhibit 3, located at the end of the report) that represent the land use activity areas adjacent to the proposed project that might be impacted by traffic noise and potentially benefit from feasible and reasonable noise abatement. As indicated in Table 2, the proposed project would result in traffic noise impacts and the following noise abatement measures were considered: traffic management, alteration of horizontal and/or vertical alignments, acquisition of undeveloped property to act as a buffer zone, and the construction of noise barriers. (The No Build Alternative would not directly result in impacts to noise receivers throughout the study area; however, as projected traffic on Loop 1604 increases, noise levels would also increase.) 6 Page

9 Table 2: Traffic Noise Levels (dba Leq) Modeled Results Receiver NAC NAC Description Number Category Level Existing Predicted Change Noise [-] Impact R1 Motel Pool E N R1A Single Family Residential B N R1B Single Family Residential B N R1C Single Family Residential B N R2 Restaurant (exterior seating) E N R3 Multi-Family Residential B Y R4 Multi-Family Residential Pool Area C N R5 Multi-Family Residential B Y R6 Multi-Family Residential B Y R7 Multi-Family Residential B Y R8 Multi-Family Residential B Y R9 Multi-Family Residential B N R10 Multi-Family Residential B Y R11 Multi-Family Residential B Y R12 Multi-Family Residential B Y R13 Athletic Complex C N R14 Recreation Area C N R15 Multi-Family Residential B Y R16 Multi-Family Residential B Y R16A Restaurant (exterior seating) E N R16B Hospital (interior) D N R17 Single Family Residential B N R17A Single Family Residential B N R17B Single Family Residential B Y R17C Single Family Residential B Y R17D Single Family Residential B N R17E Single Family Residential B N R17F Single Family Residential B N R18 Single Family Residential B N R19 Single Family Residential B N R20 Single Family Residential B Y R21 Single Family Residential B Y R22 Multi-Family Residential B Y R23 Multi-Family Residential B Y R24 Multi-Family Residential B Y R25 Single Family Residential B Y R26B UTSA Recreation Area C N R27 Hotel Pool E N R28 Hotel Pool E N R29 Office (exterior activity) E N R29A Hotel Pool E N R29B Multi-Family Residential B N R29C Restaurant (exterior seating) E N R29D Place of Worship (exterior) C N R29E Multi-Family Residential B Y R30 Single Family Residential B N R30A Medical Center (interior) D N R30B Place of Worship (exterior) C Y R31 Place of Worship (interior) D N R32 Athletic Club (exterior) C Y 7 Page

10 Modeled Results Receiver NAC NAC Description Number Category Level Existing Predicted Change Noise [-] Impact R33 Multi-Family Residential B N R34 Multi-Family Residential B N R35 Multi-Family Residential B N R36 Restaurant (exterior seating) E N R37 Multi-Family Residential B Y R38 Multi-Family Residential B Y R39 Multi-Family Residential B Y R40 Multi-Family Residential B Y R41 Restaurant (exterior seating) E Y R42 School (interior) D N R43 Multi-Family Residential B N R44 Multi-Family Residential B Y R45 Multi-Family Residential B Y R46 Multi-Family Residential B N R47 Athletic Club Pool C N R48 Single Family Residential B N R48A Athletic Field C N R49 Place of Worship (interior) D N R49A Athletic Field C N R50 Single Family Residential B N R51 Single Family Residential B Y R52 Single Family Residential B N R53 Single Family Residential B N R54 Single Family Residential B N R55 Athletic Field C N R56 Multi-Family Residential B N R57 Multi-Family Residential B N R58 Multi-Family Residential B N R59 Multi-Family Residential B N R60 Multi-Family Residential B N R60A Restaurant (exterior seating) E N R60B Restaurant (exterior seating) E N R61 Multi-Family Residential B N R62 Golf Course C Y R63 Place of Worship (interior) D N R64 Multi-Family Residential B N R65 Place of Worship (interior) D N R66 Single Family Residential B N R67 Multi-Family Residential B N R70 Single Family Residential B N R71 Single Family Residential B N R72 Place of Worship (interior) D N R73 Place of Worship and School (interior) D N R74 Hotel Pool E N R75 Place of Worship (interior) D N R76 Single Family Residential B N R77 Single Family Residential B N R78 Single Family Residential B N R79 Single Family Residential B N R80 Single Family Residential B N R81 Single Family Residential B N R82 Single Family Residential B N 8 Page

11 Modeled Results Receiver NAC NAC Description Number Category Level Existing Predicted Change Noise [-] Impact R83 Single Family Residential B N R84 Single Family Residential B N R85 Single Family Residential B N R86 Single Family Residential B Y R87 Single Family Residential B N R88 Single Family Residential B Y R89 Single Family Residential B N R90 Single Family Residential B N R91 Single Family Residential B N R92 Single Family Residential B N R93 Single Family Residential B N R94 Single Family Residential B N R95 Single Family Residential B N R96 Single Family Residential B N R97 Multi-Family Residential B N R98 Multi-Family Residential B N R99 Single Family Residential B N R100 Single Family Residential B N R101 Single Family Residential B N R102 Single Family Residential B N R103 Single Family Residential B N R104 Medical Treatment Center C N R105 Medical Treatment Center C N R106 Medical Treatment Center C N R107 Medical Treatment Center C N R108 Place of Worship (exterior) C N R109 Place of Worship (exterior) C N R110 Place of Worship (interior) D N R111 Single Family Residential B N R112 Multi-Family Residential B Y R113 Multi-Family Residential B Y R114 Multi-Family Residential B Y R115 Multi-Family Residential Pool C N R116 Multi-Family Residential B Y R117 Multi-Family Residential B N R118 Place of Worship (interior) D N R119 Single Family Residential B N R120 Single Family Residential B N R121 Single Family Residential B Y R122 Single Family Residential B Y R123 Single Family Residential B N R124 Single Family Residential B N R125 Single Family Residential B N R126 Single Family Residential B N R127 Single Family Residential B N R128 Single Family Residential B N Note1: The values marked in red and yellow are locations that approach or exceed the FHWA NAC criteria are considered to be impacted. Note2: As part of the analysis process, receivers were added and deleted, accounting for omitted numbers and numbers with letter designations in the Receiver Number column. The receivers were not renumbered in order to maintain continuity with the initial analysis. 9 Page

12 4.0 Mitigation Before any abatement measure can be proposed for incorporation into the project, it must be both feasible and reasonable. In order to be "feasible," the abatement measure must be able to reduce the noise level at greater than 50% of impacted, first row receivers by at least five db(a); and to be "reasonable," it must not exceed the cost-effectiveness criterion of $25,000 for each receiver that would benefit by a reduction of at least five db(a). Additionally, the abatement measure must be able to reduce the noise level for at least one impacted, first row receiver by at least seven db(a). In accordance with TxDOT guidance, impacted Category C and D receivers receive a determination of the equivalent number of residences to assess cost effectiveness. There were two (2) impacted locations that fall under NAC C (R32, the Shavano Tennis Club and R62, the Sonterra Golf Course). Mitigation for both receiver sites is discussed later in this report. There were no impacted NAC D locations. Traffic management: control devices could be used to reduce the speed of the traffic; however, the minor benefit of one db(a) per five mph reduction in speed does not outweigh the associated increase in congestion and air pollution. Other measures such as time or use restrictions for certain vehicles are prohibited on state highways. Alteration of horizontal and/or vertical alignments: any alteration of the existing alignment would displace existing businesses and residences, require additional right of way and not be cost effective/reasonable. Buffer zone: the acquisition of undeveloped property to act as a buffer zone is designed to avoid rather than abate traffic noise impacts and, therefore, is not feasible. Noise barriers: this is the most commonly used noise abatement measure. Noise barriers were evaluated for each of the impacted receiver locations. Noise barriers would not be feasible and reasonable for any of the following impacted receivers and, therefore, are not proposed for incorporation into the project: Receivers R10-R12 represent seven impacted single-family residences within The Enclave at Hausman subdivision located on the southbound side of Loop 1604 north of Bandera Road. Barriers were placed along both the frontage road (no direct access) and along the Loop 1604 mainline because it is higher in elevation than the frontage road. The frontage road barrier did not achieve the minimum 5 dba reduction. For the mainline barrier, an 8-14 foot high barrier approximately 2,214 feet long was modeled, benefiting all eleven receivers in the first row and achieving the 7 dba design goal for at least one impacted front-row receiver. The cost of the barrier was $514,223. The cost per benefited receptor was $46,748. The noise barrier that would achieve the minimum 10 Page

13 feasible reduction of 5 dba for these receivers would exceed the reasonable, costeffectiveness criterion of $25,000. Receivers R15-R16 represent approximately 20 multi-family units at the Montecito Apartments located on the northbound side of Loop 1604 south of West Hausman Road. A noise barrier was placed along the Loop 1604 mainline. A barrier was not analyzed along the frontage road since the mainline is high enough in elevation that a barrier along the frontage road would not be able to mitigate noise from the dominant source. Additionally, there are several direct access driveways along the frontage road. A noise barrier at 20 feet high could not achieve either the 5 dba minimum goal nor the 7 dba design goal. Therefore, a barrier is not considered reasonable or feasible. Receivers R17B and 17C represent 13 impacted single-family residences on Prairie Lace and Blue Flax Cove within the College Park area located on the northbound side of Loop 1604 south of Babcock Road. The barrier was placed along the frontage road since there is no direct access to these homes from the frontage road. An 18 foot high barrier approximately 1,489 feet long was modeled, benefiting nine receivers and achieving the 7 dba design goal for one impacted front-row receiver. The cost of the barrier was $482,331. The cost per benefited receptor was $53,592. The noise barrier that would achieve the minimum feasible reduction of 5 dba for these receivers would exceed the reasonable, cost-effectiveness criterion of $25,000. Receivers R20-R21 represent 12 single family residences along Green Glen Drive, located on the southbound side of Loop 1604 east of Babcock Road. A barrier was analyzed along the Loop 1604 mainline since the mainline is high enough in elevation that a barrier along the frontage road would not be able to mitigate noise from the dominant source. Additionally, there are several direct access driveways and cross-streets along the frontage road. A set of two overlapping barriers, ranging from 8-15 feet high approximately 539 and 2,564 feet long from south to north, respectively, were modeled, benefiting twelve receivers and achieving the 7 dba design goal for at least one impacted front-row receiver. The cost of the barrier set was $634,826. The cost per benefited receptor was $52,902. The noise barrier that would achieve the minimum feasible reduction of 5 dba for these receivers would exceed the reasonable, cost-effectiveness criterion of $25,000. Furthermore, a barrier placed between Loop 1604 and the frontage road would block the Loop 1604 visibility of the numerous adjacent businesses. Receivers R22-R25 represent 13 multi-family units with balconies/patios in the Tetro Student Village and the Maverick Creek Villas, located on the southbound side of Loop 1604 east of Babcock Road. A barrier was analyzed along the Loop 1604 mainline since the mainline is high enough in elevation that a barrier along the frontage road would not be able to mitigate noise from the dominant source. Additionally, there are several direct access driveways and cross-streets along the frontage road, including several driveways that individually access the Staybridge Suites Hotel, a gas station, a shopping mall and several restaurants. A 12 foot high barrier approximately 1,689 feet was modeled, 11 Page

14 benefiting 13 receivers and achieving the 7 dba design goal for at least one impacted front-row receiver. The cost of the barrier was $364,818. The cost per benefited receptor was $28,063. The noise barrier that would achieve the minimum feasible reduction of 5 dba for these receivers would exceed the reasonable, cost-effectiveness criterion of $25,000. Furthermore, a barrier placed between Loop 1604 and the frontage road would block the Loop 1604 visibility of the numerous adjacent businesses. Receiver R29E represents 10 multi-family units with balconies at the Pecan Springs Apartments south of Loop 1604 on the northbound side of IH10 at the intersection of Pecan Springs Road. Noise barriers were modeled along both the frontage road and the IH10. A noise barrier at 20 feet high could not achieve either the 5 dba minimum goal nor the 7 dba design goal. Therefore, a barrier is not considered reasonable or feasible. Receiver R30B represents the playground in front of the Bochasanwasi Shri Akshar Purushottam Swaminarayan Sanstha Temple located on the northbound side of Loop 1604 at Bacon Road. Noise barriers were modeled along both the frontage road and the Loop 1604 mainline. A noise barrier at 20 feet high could not achieve the 7 dba design goal. Therefore, a barrier is not considered reasonable or feasible. Receiver R32 is the Shavano Tennis Club located on the northbound side of Loop 1604 west of NW Military Highway. A noise barrier was placed along the Loop 1604 mainline. A noise barrier at 20 feet high could not achieve either the 5 dba minimum goal nor the 7 dba design goal. A noise barrier was also placed along the frontage road. A 20 foot high noise barrier in this location could not achieve the 7 dba design goal for one impacted front-row receiver. Therefore, a barrier is not considered reasonable or feasible. Receivers R37-R40 represent approximately 50 multi-family units with balconies/patios at the Ranch at Shavano Park, located on the southbound side of Loop 1604 east of NW Military Highway. The barrier was placed along the frontage road since there is no direct access to these homes from the frontage road. The receivers are located considerably higher in elevation than the roadway. A foot high barrier approximately 1,812 feet long was modeled, benefiting sixteen receivers and achieving the 7 dba design goal for one impacted front-row receiver. The cost of the barrier was $575,802. The cost per benefited receptor was $35,987. The noise barrier that would achieve the minimum feasible reduction of 5 dba for these receivers would exceed the reasonable, costeffectiveness criterion of $25,000. Receiver R41 represents an exterior seating area at Paesano s Restaurant that is in a commercial land use area with no other exterior noise receiver sites. It is located on the northbound side of Loop 1604 east of NW Military Highway. A barrier placed along the frontage road would require driveway breaks in order to provide access to the restaurant and adjacent businesses. Therefore, a barrier was placed along the mainline. A noise barrier at 20 feet high could not achieve the 7 dba design goal. Therefore, a barrier is not considered reasonable or feasible. 12 Page

15 Receivers R44-R45 represent approximately 10 multi-family units with balconies/patios at the Ranch at Shavano Park, located on the southbound side of Loop 1604 west of Rogers Ranch Road. The barrier was placed along the frontage road since there is no direct access to these homes from the frontage road. A foot high barrier approximately 1,331 feet long was modeled, benefiting ten receivers and achieving the 7 dba design goal for one impacted front-row receiver. The cost of the barrier was $424,085. The cost per benefited receptor was $42,409. The noise barrier that would achieve the minimum feasible reduction of 5 dba for these receivers would exceed the reasonable, cost-effectiveness criterion of $25,000. Receiver R51 represents nine single-family residences at The Fountains at Deerfield nearest to Loop 1604, located on the northbound side of Loop 1604 west of Huebner Road. The residences are partially surrounded by a 6 foot high stone masonry privacy wall from Loop The barrier was placed along the frontage road since there is no direct access to these homes from the frontage road. The barrier length was limited between the Centurion Storage and Aziz Oriental Rugs buildings so as to not visibly block the businesses from the road. A 20 foot high barrier approximately 638 feet long was modeled, benefiting three receivers and did not achieve the 7 dba design goal for one impacted front-row receiver. The cost of the barrier was $114,836. The cost per benefited receptor was $38,278. The noise barrier that would achieve the minimum feasible reduction of 5 dba for these receivers would exceed the reasonable, costeffectiveness criterion of $25,000. Receiver R62 is the Sonterra Golf Course located on the northbound side of Loop 1604 east of Blanco Road. The barrier was placed along the frontage road since the mainline of Loop 1604 is below grade. The barrier length was limited between the driveway entrance/exit to Starbucks shopping plaza and the Canyon Creek shopping plaza building so as to not physically and/or visibly block the businesses from the road. A 20 foot high barrier approximately 401 feet long was modeled, but did not achieve the 7 dba design goal for the one impacted front-row receiver. Therefore, a barrier is not considered reasonable or feasible at this location. Receivers R86 and R88 represent 14 single family residences at the Canyon View/Redland Estates, located on the northbound side of Loop 1604 west of Redland Road. There is an existing barrier in this location that was constructed as a result of a separate project. Therefore, the existing barrier was modified for the analysis by adding additional length in an attempt to adequately mitigate the impacted homes. A noise barrier at 20 feet high could not achieve either the 5 dba minimum goal or the 7 dba design goal for the impacted sites. Therefore, adding additional barrier is not considered reasonable or feasible and is not proposed for incorporation into the project. Noise barriers would be feasible and reasonable for the following impacted receivers and, therefore, are proposed for incorporation into the project: 13 Page

16 (Barrier 1) Receivers R3, R5-R8 represent 16 multi-family residences with balconies/patios and one pool at the Springs at Bandera, located on the southbound side of Loop 1604 north of Bandera Road. The barrier was placed along the frontage road. There are two entrances with direct access to the frontage road (one is a gated emergency access). A set of three barriers, ranging from feet high approximately 386, 464 and 523 feet long from south to north, respectively, were modeled, benefiting fourteen receivers and achieving the 7 dba design goal for at least one impacted front-row receiver. The cost of the barrier set was $322,134. The cost per benefited receptor was $23,010. The noise barrier that would achieve the design goal of 7 dba and the minimum feasible reduction of 5 dba for these receivers would achieve the reasonable, cost-effectiveness criterion of $25,000. (Barrier 2) Receivers R112-R114 and R116 represent 12 multi-family residences with balconies/patios and one pool at The Vintage Apartments, located on the northbound side of Loop 1604 just south of Judson Road. The barrier was placed along the frontage road since there is no direct access immediately in front of most of these units. A foot high barrier approximately 806 feet long was modeled, benefiting eight receivers and achieving the 7 dba design goal for at least one impacted front-row receiver. The cost of the barrier was $149,962. The cost per benefited receptor was $18,745. The noise barrier that would achieve the design goal of 7 dba and the minimum feasible reduction of 5 dba for these receivers would achieve the reasonable, cost-effectiveness criterion of $25,000. (Barrier 3) Receivers R121 and 122 represent 11 single-family residences in the Vista Subdivision, located on the northbound side of Loop 1604 just south of Mountain Vista Drive. The barrier was placed along the frontage road since there is no direct access to these homes from the frontage road. A 10 foot high barrier approximately 789 feet long was modeled, benefiting seven receivers and achieving the 7 dba design goal for at least one impacted front-row receiver. The cost of the barrier was $142,100. The cost per benefited receptor was $20,300. The noise barrier that would achieve the design goal of 7 dba and the minimum feasible reduction of 5 dba for these receivers would achieve the reasonable, cost-effectiveness criterion of $25,000. Table 3 shows the preliminary noise barrier proposal. Any subsequent project design changes may require a reevaluation of this preliminary noise barrier proposal. The final decision to construct the proposed noise barrier will not be made until completion of the project design, utility evaluation and polling of adjacent property owners. 14 Page

17 Table 3: Noise Barrier Proposal (Preliminary) Barrier Representative Receivers (Impacted) Total # Benefited Length (feet) Average Height (feet) Total Cost $/Benefited Receiver 1 R3, R5-R8 14 1, $322,134 $23,010 2 R112-R114, R $149,962 $18,745 3 R121, R $142,100 $20, Noise Planning Contours To avoid noise impacts that may result from future development of properties adjacent to the proposed project, local officials responsible for land use control programs should ensure, to the maximum extent possible, that no new activities are planned or constructed along or within the following predicted (2045) noise impact contours in Table 4. Table 4: Traffic Noise Contours [db(a) Leq] Roadway Section Land Use NAC Categories B, C and E Sound Level Criteria Approximate Distances to Contour (feet)* Loop 1604 between SH16 and IH10 Loop 1604 between IH 10 and Blanco Road Loop 1604 between Blanco Road and US281 Loop 1604 between US281 and Green Mountain Road Loop 1604 between Lookout Road and IH 35 NAC Category B & C 66 db(a) 310 NAC Category E 71 db(a) 120 NAC Category B & C 66 db(a) 450 NAC Category E 71 db(a) 160 NAC Category B & C 66 db(a) 285 NAC Category E 71 db(a) 145 NAC Category B & C 66 db(a) 340 NAC Category E 71 db(a) 150 NAC Category B & C 66 db(a) 270 NAC Category E 71 db(a) 85 *Distance from Right of Way. The table values do not represent predicted levels at every location. Sound levels vary with changes in terrain and will be affected by the shielding of objects such as buildings. This information is being included to make local officials and planners aware of anticipated highway noise levels so that future development will be compatible with these levels. 6.0 Construction Noise Noise associated with the construction of the project is difficult to predict. Heavy machinery, the major source of noise in construction, is constantly moving in unpredictable patterns. However, construction normally occurs during daylight hours when occasional loud noises are 15 Page

18 more tolerable. None of the receivers is expected to be exposed to construction noise for a long duration; therefore, any extended disruption of normal activities is not expected. Provisions will be included in the plans and specifications that require the contractor to make every reasonable effort to minimize construction noise through abatement measures such as work-hour controls and proper maintenance of muffler systems. 7.0 Local Coordination A copy of this traffic noise analysis will be available to local officials. On the date of approval of this document (Date of Public Knowledge), FHWA and TxDOT are no longer responsible for providing noise abatement for new development adjacent to the project. 16 Page

19 Exhibit 2: Year 2015 and 2045 Design Hour Traffic Volumes (Year 2015 Existing - Figures 1.1 through 1.6) (Year 2045 No-Build - Figures 2.1 through 2.6, not used for the analysis, not included) (Year 2045 Build Alternative Figures 3.1 through 3.6) 17 Page

20 18 Page

21 19 Page

22 20 Page

23 21 Page

24 22 Page

25 23 Page

26 24 Page

27 25 Page

28 26 Page

29 27 Page

30 28 Page

31 29 Page

32 Exhibit 3: Modeled Noise Receivers 30 Page

33 31 Page

34 32 Page

35 33 Page

36 34 Page

37 35 Page

38 36 Page

39 37 Page

40 38 Page

41 39 Page

42 40 Page

43 41 Page

44 42 Page

45 43 Page

1. Introduction Noise Analysis Results Figures. List of Tables

1. Introduction Noise Analysis Results Figures. List of Tables Traffic Noise Technical Report FM 2218 Widening (From US 59 to SH 36) Fort Bend County Prepared by: Houston District Date: July 2017 CSJ: 2093-01-010 The environmental review, consultation, and other actions

More information

Examples of Recommended Text for Documenting Traffic Noise Analyses

Examples of Recommended Text for Documenting Traffic Noise Analyses Examples of Recommended Text for Documenting Traffic Noise Analyses Examples of recommended text to be used when preparing NEPA documents specific to traffic noise. TxDOT Environmental Affairs Division

More information

Traffic Noise Technical Report. LP 336 Widening (From IH45 to FM 1314) Montgomery County

Traffic Noise Technical Report. LP 336 Widening (From IH45 to FM 1314) Montgomery County Traffic Noise Technical Report LP 336 Widening (From IH45 to FM 1314) Montgomery County Prepared by: Houston District Date: April 2017 CSJ: 0338-11-056 The environmental review, consultation, and other

More information

Noise Impact Analysis Technical Report

Noise Impact Analysis Technical Report Noise Impact Analysis Technical Report Interstate Highway 20 at Center Point Road From 0.55 mile west of East Bankhead Highway to Lakeshore Drive Parker County CSJ: 0314-07-051, 0314-07-052, 0314-07-046

More information

ENV125. Basics of Noise and Policy. Date. Date. Footer Text

ENV125. Basics of Noise and Policy. Date. Date. Footer Text ENV125 Basics of Noise and Policy Agenda Introduction and Overview Traffic Noise Toolkit Fundamentals of Noise Traffic Noise Analysis Process Regulations and Guidance The major objectives of a traffic

More information

TH 100 Interchange & Auxiliary Lane from 36 th Street to Cedar Lake Road

TH 100 Interchange & Auxiliary Lane from 36 th Street to Cedar Lake Road TH 100 Interchange & Auxiliary Lane from 36 th Street to Cedar Lake Road Noise Advisory Committee Meeting Thursday October 27, 2011 6:00 7:30 p.m. Saint Louis Park City Hall 5005 Minnetonka Boulevard Saint

More information

FORT WORTH. Photo by Liam Frederick. November 17, 2015

FORT WORTH. Photo by Liam Frederick. November 17, 2015 FORT WORTH Photo by Liam Frederick 1 November 17, 2015 IH 30/SH 360 INTERCHANGE PROJECT NOISE WORKSHOP Castillian Condominiums City of Grand Prairie, Tarrant County November 17, 2015 2 CSJs: 1068-02-076,

More information

Why does MnDOT build noise barriers? What is a Type I project?

Why does MnDOT build noise barriers? What is a Type I project? Why does MnDOT build noise barriers? Noise barriers generally prove to be quite effective in providing noise reduction at receptors near transportation facilities. In 1972, the U.S. Congress passed legislation

More information

MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM

MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM 7 November 2017 MINNESOTA S EXPERIENCE WITH HIGHWAY NOISE MITIGATION The Minnesota Department of Transportation (MnDOT) has been constructing noise walls

More information

PennDOTDistrict 8 I-83 East Shore Section 1 Improvements Project. Final Design Noise Analysis & Mitigation Recommendations

PennDOTDistrict 8 I-83 East Shore Section 1 Improvements Project. Final Design Noise Analysis & Mitigation Recommendations PennDOTDistrict 8 I-83 East Shore Section 1 Improvements Project Final Design Noise Analysis & Mitigation Recommendations Open House Formal Presentation Project Overview/Schedule Definitions of Common

More information

Why does MnDOT build noise barriers? What is a Type I project? What is an impacted location?

Why does MnDOT build noise barriers? What is a Type I project? What is an impacted location? Why does MnDOT build noise barriers? Noise barriers generally prove to be quite effective in providing noise reduction at receptors near transportation facilities. In 1972, the U.S. Congress passed legislation

More information

T.H. 100 Reconstruction in St. Louis Park Environmental Assessment. Appendix C Traffic Noise Analysis Report

T.H. 100 Reconstruction in St. Louis Park Environmental Assessment. Appendix C Traffic Noise Analysis Report T.H. 100 Reconstruction in St. Louis Park Environmental Assessment Appendix C Traffic Noise Analysis Report Highway 100 Reconstruction (State Project Number: 2734-33) July 2012 Prepared For: Minnesota

More information

APPENDIX F. Noise Impact Analysis

APPENDIX F. Noise Impact Analysis APPENDIX F Noise Impact Analysis NOISE IMPACT ANALYSIS U.S. 17 WIDENING EA AND PERMITTING JASPER COUNTY, SOUTH CAROLINA November, 2016 Prepared For: South Carolina Department of Transportation and Jasper

More information

Appendix E I-73 North Noise Report

Appendix E I-73 North Noise Report Appendix E I-73 North Noise Report NOISE IMPACT ASSESSMENT I-73 North Section: From Future I-74 in Richmond County, NC to I-95 in Dillon County, SC (Conceptual Design) SCDOT PIN No.: 36358 RD01 NCDOT TIP

More information

3. Existing Conditions and 3.6 Environmental Noise Consequences

3. Existing Conditions and 3.6 Environmental Noise Consequences 3.6 Environmental Consequences 3.5 3.5.1 WHAT IS NOISE AND HOW COULD NOISE IMPACT PEOPLE? is typically defined as any sound that is undesired or interferes with one s hearing of something. 1 The basic

More information

Dulles Toll Road Highway Traffic Noise Policy. February 2, 2011

Dulles Toll Road Highway Traffic Noise Policy. February 2, 2011 Dulles Toll Road Highway Traffic Noise Policy February 2, 2011 as revised February 1, 2012 Table of Contents 1. Purpose... 1 2. Definitions... 1 3. Applicability... 5 4. Sound Fundamentals... 6 5. Highway

More information

Draft Preliminary Design -- Traffic Noise Report

Draft Preliminary Design -- Traffic Noise Report Draft Preliminary Design -- Traffic Noise Report Pennsylvania Turnpike Commission Milepost 28 to Milepost 31 Roadway and Bridge Reconstruction Allegheny and Butler Counties Project Number T-028.45T001-2

More information

NOISE REPORT ADDENDUM July 2003

NOISE REPORT ADDENDUM July 2003 Coalfields Expressway Section A Buchanan County, Virginia NOISE REPORT ADDENDUM July 2003 Current VDOT Project Number: 0121-013-101, PE101 Former VDOT Project Number: R000-961-101, PE101 Noise Study Addendum

More information

APPENDIX E EAW ITEM 17 NOISE

APPENDIX E EAW ITEM 17 NOISE APPENDIX E EAW ITEM 17 NOISE TH 10 TRAFFIC NOISE STUDY TH 10 (SB I-35W TO CSAH 96) SP 6205-39 ARDEN HILLS, MINNESOTA Prepared for Minnesota Department of Transportation October 2017 Minnesota Department

More information

Island Park U.S. 20. Targhee Pass Environmental Assessment. Traffic Noise Analysis Report

Island Park U.S. 20. Targhee Pass Environmental Assessment. Traffic Noise Analysis Report Island Park U.S. 2 Targhee Pass Environmental Assessment Traffic ise Analysis Report Prepared for Idaho Transportation Department, District 6, Rigby, Idaho Prepared by Horrocks Engineers, Pleasant Grove,

More information

dministrator Wyoming Department of Transportation Federal ighway Administration Wyoming Division

dministrator Wyoming Department of Transportation Federal ighway Administration Wyoming Division NOISE ANAL YSIS AND ABATEMENT POLICY WYOMING DEPARTMENT OF TRANSPORT A TlON (WYDOT) July 13, 2011 John Cox Joe Director dministrator Wyoming Department of Transportation Federal ighway Administration Wyoming

More information

APPENDIX C NOISE STUDY TECHNICAL REPORT

APPENDIX C NOISE STUDY TECHNICAL REPORT APPENDIX C NOISE STUDY TECHNICAL REPORT Noise Study Technical Report Watertown South Connector US 81 to 29 th Street SE Watertown, South Dakota HDR Project No. 39319 Prepared by 6300 So. Old Village Place

More information

content chapter Highway Noise Policy and Regulations 15.1 Purpose 15.2 Definitions 15.3 Applicability

content chapter Highway Noise Policy and Regulations 15.1 Purpose 15.2 Definitions 15.3 Applicability chapter 15 Highway Noise Policy and Regulations content 15.1 Purpose 15.2 Definitions 15.3 Applicability 15.4 Summary of Key Legislation, Regulations, and Guidance 15.5 General Methodology of Evaluation

More information

HIGHWAY NOISE STUDY ANALYSIS

HIGHWAY NOISE STUDY ANALYSIS HIGHWAY NOISE STUDY ANALYSIS Route 58 City of Norfolk Project: 0058-122-104, C501 PPMS#: 17546 From: Jett Street To: Briar Hill Road V IR G IN IA D EPARTMENT OF T RANSPORTATION Prepared By: Lloyd B. Arnold

More information

US 6/19 th Street Interchange Lookout Lid Golden, CO

US 6/19 th Street Interchange Lookout Lid Golden, CO ENVIRONMENTAL NOISE STUDY FOR: US 6/19 th Street Interchange Lookout Lid Golden, CO RGDL Project #: 14-043 PREPARED FOR: City of Golden 1445 10th Street Golden, CO 80401 PREPARED BY: Harold Goldberg, P.E.

More information

APPENDIX D NOISE QUALITY ANALYSIS, PROCEDURES AND RESULTS

APPENDIX D NOISE QUALITY ANALYSIS, PROCEDURES AND RESULTS APPENDIX D NOISE QUALITY ANALYSIS, PROCEDURES AND RESULTS Overview Ambient noise measurements were taken at 24 sites along the proposed project alignment alternatives. These sites were located to represent

More information

How Does NHDOT Address Highway Traffic Noise?

How Does NHDOT Address Highway Traffic Noise? How Does NHDOT Address Highway Traffic Noise? Noise can be a concern for residents living near highways across New Hampshire. This document is intended to inform local officials and the public about highway

More information

Draft Noise Study Report

Draft Noise Study Report Florida Department of TRANSPORTATION PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida FPID: 430136 1 22 01 ETDM: 13026 The environmental review, consultation, and other actions

More information

Traffic Noise Analysis

Traffic Noise Analysis Traffic Noise Analysis For Interstate 10: Las Cruces to Texas State Line AC-GRIP-010-2(108)144; CN G18A1 Submitted to: Taschek Environmental Consulting and New Mexico Department of Transportation Prepared

More information

Virginia Department of Transportation Coalfields Expressway Section II

Virginia Department of Transportation Coalfields Expressway Section II Virginia Department of Transportation Coalfields Expressway Section II State Project: 0121-013-772, PE-101 UPC 85126 From: Pound Bypass at Route 83 (Approximate Station 195+00) To: Route 460 Connector

More information

Appendix D. EAW Item 17: Noise. Traffic Noise Analysis Report

Appendix D. EAW Item 17: Noise. Traffic Noise Analysis Report Appendix D EAW Item 17: Noise Traffic Noise Analysis Report Appendix D Traffic Noise Analysis Report for I-694/494/94 Bridge Preservation and Mobility Improvements In the Cities of Oakdale & Woodbury Washington

More information

A comparison of the Northwest Corridor (NWC) Project Noise Analysis Completed under the 2005 GDOT Noise Policy versus the 2011 FHWA Noise Policy

A comparison of the Northwest Corridor (NWC) Project Noise Analysis Completed under the 2005 GDOT Noise Policy versus the 2011 FHWA Noise Policy A comparison of the Northwest Corridor (NWC) Project Noise Analysis Completed under the 2005 GDOT Noise Policy versus the 2011 FHWA Noise Policy Presented by Keisha Jackson, Georgia Department of Transportation

More information

FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS

FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS Prepared for: City and County of Denver 201 West Colfax Avenue, Department 509 Denver,

More information

NOISE BARRIER ANALYSIS

NOISE BARRIER ANALYSIS NOISE BARRIER ANALYSIS Interstate 26 Port Access Road Interchange Cities of North Charleston and Charleston CHARLESTON COUNTY, SOUTH CAROLINA Prepared For: South Carolina Department of Transportation Prepared

More information

Draft Dulles Toll Road Highway Noise Policy

Draft Dulles Toll Road Highway Noise Policy Draft Dulles Toll Road Highway Noise Policy 1. Purpose The Metropolitan Washington Airports Authority (the Authority) strives to be a good neighbor to adjacent communities and endeavors to address traffic

More information

Standard emission minimization measures for construction activities will be implemented, as indicated above.

Standard emission minimization measures for construction activities will be implemented, as indicated above. The nature of the proposed improvements are such that undue construction emissions should not be a concern; overall emissions should be similar to other projects of this type and magnitude. Construction

More information

PRELIMINARY NOISE ANALYSIS

PRELIMINARY NOISE ANALYSIS PRELIMINARY NOISE ANALYSIS Route 15 Bypass Interchange at Edwards Ferry Road an Fort Evans Road Loudoun County, Virginia PROJECT: 0015-253-306, P101 UPC: 89890 From: 0.2 Miles South of East Market Street

More information

Noise Study Report December 2016

Noise Study Report December 2016 Noise Study Report December 2016 DRAFT Noise Study Report US 92 Project Development and Environment Study from County Line Road to Wabash Avenue Financial Project ID: 433558-1-22-01 Federal Aid Project

More information

APPENDIX C NOISE STUDY TECHNICAL REPORT

APPENDIX C NOISE STUDY TECHNICAL REPORT APPENDIX C NOISE STUDY TECHNICAL REPORT 1) 9/25/06 Noise Study Technical Report; revised 05/08 2) 9/4/09 Memo Regarding Option 3 Noise Impacts to Pelican Lake Game Production Area Noise Study Technical

More information

Appendix D Highway Traffic Noise Assessment

Appendix D Highway Traffic Noise Assessment Appendix D Prepared for: State of Alaska Department of Transportation and Public Facilities Prepared by: HDR Alaska, Inc. 2525 C Street, Suite 305 Anchorage, Alaska 99503 January 2014 This page intentionally

More information

This federal regulation resulted from the Noise Control Act of 1972 and the Federal Aid Highway Act of These regulations state the following:

This federal regulation resulted from the Noise Control Act of 1972 and the Federal Aid Highway Act of These regulations state the following: Mitigation of Traffic Noise on Federal Aid Highways Federal Rule Highway Traffic Noise Analysis & Abatement Policy & Guidance FHWA June 1996 (23 CFR 772) This federal regulation resulted from the Noise

More information

Final Noise Technical Report

Final Noise Technical Report Franklin Blvd: I-5 Bridge to McVay Hwy (Springfield), ODOT Key #:17217 Springfield, Oregon June 2015 Prepared for Prepared for City of Springfield, Oregon Oregon Department of Transportation 225 Fifth

More information

Arkansas Department of Transportation. Policy on Highway Traffic Noise Abatement

Arkansas Department of Transportation. Policy on Highway Traffic Noise Abatement Arkansas Department of Transportation Policy on Highway Traffic Noise Abatement Effective Date: September 13, 2018 Arkansas Department of Transportation Policy on Highway Traffic Noise Abatement Date of

More information

Traffic Noise Technical Report. November 2008

Traffic Noise Technical Report. November 2008 Traffic Noise Technical Report November 2008 I-70 East Draft Environmental Impact Statement Traffic Noise Technical Report Table of Contents 1.0 INTRODUCTION... 1 2.0 RESOURCE DEFINITION... 2 3.0 APPLICABLE

More information

Bow-Concord I-93 Noise Study. Noise Study Informational Meeting

Bow-Concord I-93 Noise Study. Noise Study Informational Meeting Study Informational Meeting December 14, 2010 Presented By: Donald Lyford, PE Project Manger NH Department of Transportation Gene McCarthy, P.E. Project Manager McFarland Johnson Fritz Hust Modeler McFarland

More information

TRAFFIC NOISE IMPACT AND ABATEMENT ANALYSIS TECHNICAL REPORT FOR THE 6TH AVENUE PARKWAY EXTENSION ENVIRONMENTAL ASSESSMENT

TRAFFIC NOISE IMPACT AND ABATEMENT ANALYSIS TECHNICAL REPORT FOR THE 6TH AVENUE PARKWAY EXTENSION ENVIRONMENTAL ASSESSMENT Appendix A17 TRAFFIC NOISE IMPACT AND ABATEMENT ANALYSIS TECHNICAL REPORT FOR THE 6TH AVENUE PARKWAY EXTENSION ENVIRONMENTAL ASSESSMENT Prepared for: City of Aurora 15151 East Alameda Parkway, Suite 3200

More information

Virginia Department Of Transportation. Highway Traffic Noise Impact Analysis Guidance Manual

Virginia Department Of Transportation. Highway Traffic Noise Impact Analysis Guidance Manual Virginia Department Of Transportation Highway Traffic Noise Impact Analysis Guidance Manual FHWA Approval: March 15, 2011 CTB Approval: June 15, 2011 Effective: July 13, 2011 Last Updated: February 20,

More information

Traffic Noise Report. Glenn Highway: MP 53 to 56 Reconstruction Moose Creek Canyon Project DOT&PF Project No: 58013

Traffic Noise Report. Glenn Highway: MP 53 to 56 Reconstruction Moose Creek Canyon Project DOT&PF Project No: 58013 Traffic Noise Report Glenn Highway: MP 53 to 56 Reconstruction Moose Creek Canyon Project DOT&PF Project No: 58013 State of Alaska, Department of Transportation and Public Facilities January 16, 2015 Traffic

More information

INDOT's New Traffic Noise Policy

INDOT's New Traffic Noise Policy INDOT's New Traffic Noise Policy Purdue Road School March 7, 2007 Background Overview Previous policy and the need for change How Noise Studies Are Conducted Identifying impacts Evaluating abatement Design

More information

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV Noise Technical Report 2015 Addendum NOISE TECHNICAL REPORT 2015 Addendum PREPARED FOR: Federal Highway Administration and Georgia Department of Transportation PREPARED BY: Parsons Brinckerhoff Project

More information

MnDOT Noise Policy. Type I Federal-aid Projects

MnDOT Noise Policy. Type I Federal-aid Projects MnDOT Noise Policy for Type I Federal-aid Projects as per 23 CFR 772 Effective Date: June 15, 2015 Mel Roseen, MnDOT Environmental Stewardship, 651.366.5808 Marilyn Jordahl Larson, MnDOT Environmental

More information

PRELIMINARY NOISE IMPACT ANALYSIS REPORT

PRELIMINARY NOISE IMPACT ANALYSIS REPORT PRELIMINARY NOISE IMPACT ANALYSIS REPORT Reconstruction and Widening of the Pennsylvania Turnpike (I-76) from Milepost 298 to Milepost 302.5 Prepared for: Pennsylvania Turnpike Commission P.O. Box 67676

More information

Appendix F: Noise Report

Appendix F: Noise Report Appendix F: Noise Report HIGHWAY 404 HIGHWAY 407 TO GREEN LANE (W.O. 03-20024) REGIONAL MUNICIPALITY OF YORK NOISE REPORT Preliminary Design and Class Environmental Assessment Study Class Environmental

More information

Noise Analysis Study along I Tim Bjorneberg Project Development Program Manager SDDOT

Noise Analysis Study along I Tim Bjorneberg Project Development Program Manager SDDOT Noise Analysis Study along I - 29 Tim Bjorneberg Project Development Program Manager SDDOT Meeting Format Very informal Meeting is not recorded General questions after presentations Specific questions

More information

NOISE GOALS / POLICIES / MEASURES

NOISE GOALS / POLICIES / MEASURES NOISE GOALS / POLICIES GOALS / POLICIES / MEASURES Authority The Government Code (Section 65302(f)) (GC) requires the preparation and adoption of "a Noise Element which shall identify and appraise noise

More information

NOISE GOALS / POLICIES / MEASURES

NOISE GOALS / POLICIES / MEASURES NOISE GOALS / POLICIES GOALS / POLICIES / MEASURES Authority The Government Code (Section 65302(f)) (GC) requires the preparation and adoption of "a Noise Element which shall identify and appraise noise

More information

Traffic Noise Introduction to Traffic Noise Analysis and Abatement

Traffic Noise Introduction to Traffic Noise Analysis and Abatement Traffic Noise Introduction to Traffic Noise Analysis and Abatement NW Bethany Blvd Improvement Project Michael Minor, President Michael Minor & Associates Inc. Introduction to Acoustics What is Noise?

More information

NOISE STUDY REPORT. Interstate 75 / State Road 951 Ultimate Interchange Improvements PD&E Study. Collier County. June 20, 2013

NOISE STUDY REPORT. Interstate 75 / State Road 951 Ultimate Interchange Improvements PD&E Study. Collier County. June 20, 2013 NOISE STUDY REPORT Interstate 75 / State Road 951 Ultimate Interchange Improvements PD&E Study Florida Department of Transportation District One 801 N. Broadway Ave. Bartow, Florida 33830-3809 Collier

More information

NOISE STUDY REPORT DESIGN ADDENDUM

NOISE STUDY REPORT DESIGN ADDENDUM NOISE STUDY REPORT DESIGN ADDENDUM for Wekiva Parkway Segment 8 - Ballantrae Apartments Seminole County, Florida Financial Project ID: 240200-4-32-01 Prepared for: Florida Department of Transportation

More information

The locations of the Common Noise Environments and noise modeling sites are shown in Figure 1.

The locations of the Common Noise Environments and noise modeling sites are shown in Figure 1. CNE A contains one noise modeling site representing one single family residence located north of Route 639 and west of Route 1 which was evaluated under Activity Category B. This residence has direct driveway

More information

Noise Analysis Technical Report Environmental Reevaluation of the Draft Environmental Impact Statement Bi-County Parkway Location Study

Noise Analysis Technical Report Environmental Reevaluation of the Draft Environmental Impact Statement Bi-County Parkway Location Study Noise Analysis Technical Report Environmental Reevaluation of the Draft Environmental Impact Statement Bi-County Parkway Location Study VDOT UPC 52405; Project R000-96A-102, PE-101 Prince William and Loudoun

More information

COMPONENTS OF THE NOISE ELEMENT

COMPONENTS OF THE NOISE ELEMENT COMPONENTS OF THE NOISE ELEMENT Definitions Following is a list of commonly used terms and abbreviations that may be found within this element or when discussing the topic of noise. This is an abbreviated

More information

NOISE TECHNICAL REPORT UPDATE FOR THE VROOMAN ROAD BRIDGE REPLACEMENT PROJECT

NOISE TECHNICAL REPORT UPDATE FOR THE VROOMAN ROAD BRIDGE REPLACEMENT PROJECT NOISE TECHNICAL REPORT UPDATE FOR THE VROOMAN ROAD BRIDGE REPLACEMENT PROJECT PERRY AND LEROY TOWNSHIPS, LAKE COUNTY, OHIO (PID 5669) PREPARED BY: MICHAEL BAKER JR., INC. 1228 EUCLID AVENUE SUITE 1050

More information

DRAFT. Draft Carbon Monoxide (CO) Traffic Air Quality Analysis

DRAFT. Draft Carbon Monoxide (CO) Traffic Air Quality Analysis Draft Carbon Monoxide (CO) Traffic Air Quality Analysis North Houston Highway Improvement Project From US 59/I-69 at Spur 527 To I-45 at Beltway 8 North Harris County TxDOT Houston District CSJ: 0912-00-146

More information

TRAFFIC NOISE Noise and Policy. Date. Date. Footer Text

TRAFFIC NOISE Noise and Policy. Date. Date. Footer Text TRAFFIC NOISE 2016 Noise and Policy O Sound/Noise Noise Analyses V E R V I E W Highway Traffic Sound Source < Propagation Medium > Receiver Decibel A-weighting Equivalent Level PRESSURE micro Pascals LEVEL

More information

Chapter 21. Noise BACKGROUND

Chapter 21. Noise BACKGROUND Chapter 21. Noise BACKGROUND The major noise sources in the Planning Area are: roadway noise from traffic on Interstate 80, Highway 113 and arterial streets; railroad noise from the Union Pacific and California

More information

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m. Welcome Public Meeting August 2, 2017 5:00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m. www.glenwoodsouthbridge.net Welcome to the South Bridge Environmental Assessment Public Meeting Why Are We Here Tonight?

More information

12-1 INTRODUCTION 12-2 REGULATORY REQUIREMENTS

12-1 INTRODUCTION 12-2 REGULATORY REQUIREMENTS Chapter 12: Noise and Vibration 12-1 INTRODUCTION This chapter assesses the potential noise and vibration effects resulting from operation of the Tappan Zee Hudson River Crossing Project. The potential

More information

STATE OF NEVADA DEPARTMENT OF TRANSPORTATION TRAFFIC AND CONSTRUCTION NOISE ANALYSIS AND ABATEMENT POLICY

STATE OF NEVADA DEPARTMENT OF TRANSPORTATION TRAFFIC AND CONSTRUCTION NOISE ANALYSIS AND ABATEMENT POLICY STATE OF NEVADA DEPARTMENT OF TRANSPORTATION TRAFFIC AND CONSTRUCTION NOISE ANALYSIS AND ABATEMENT POLICY Effective July 13, 2011 Last Revised December 1, 2017 INTRODUCTION This document presents the State

More information

Attachment E2 Noise Technical Memorandum SR 520

Attachment E2 Noise Technical Memorandum SR 520 Attachment E2 Noise Technical Memorandum SR 520 Prepared for: Prepared by: Jodi Ketelsen Michael A. Minor Date: November 4, 2012 Subject: Project: Noise Modeling Results: NE 51st Street to NE 65th Street

More information

Harlem Avenue Interchange Design Discussion. August 24, 2015

Harlem Avenue Interchange Design Discussion. August 24, 2015 Harlem Avenue Interchange Design Discussion August 24, 2015 1 Expressway Construction Pre-dates Modern Design Standards Expressway designed and constructed in 1950 s No past experience to base design standards

More information

Traffic Noise Presentation

Traffic Noise Presentation Traffic Noise Presentation 1.- Basic Noise Concepts 2.- The Nature and Measurement of Traffic Noise 3.- Measurement Definition and Noise Units 4.- Acceptable Noise Levels 5.- Variables that Contribute

More information

BRITISH COLUMBIA MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE POLICY FOR ASSESSING AND MITIGATING NOISE IMPACTS

BRITISH COLUMBIA MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE POLICY FOR ASSESSING AND MITIGATING NOISE IMPACTS BRITISH COLUMBIA MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE POLICY FOR ASSESSING AND MITIGATING NOISE IMPACTS FROM NEW AND UPGRADED NUMBERED HIGHWAYS April, 2014 (Revised Oct 27 2016) Prepared for;

More information

Alternatives Evaluation Methodology

Alternatives Evaluation Methodology Alternatives Evaluation Methodology www.vision54 56.com B 1 Phase 2 Alternatives Evaluation Methodology PASCO COUNTY METROPOLITAN PLANNING ORGANIZATION 8731 Citizens Drive New Port Richey, FL 34654 Ph

More information

NOISE TECHNICAL MEMORANDUM. Inland Rail Trail Project Cities of San Marcos and Vista, San Diego County DISTRICT 11 SD CML 5381(003)

NOISE TECHNICAL MEMORANDUM. Inland Rail Trail Project Cities of San Marcos and Vista, San Diego County DISTRICT 11 SD CML 5381(003) NOISE TECHNICAL MEMORANDUM Inland Rail Trail Project Cities of San Marcos and Vista, San Diego County DISTRICT 11 SD CML 5381(003) Attention: Kevin Hovey, Environmental Branch Chief, Caltrans District

More information

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 WELCOME IL 47 Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017 MEETING PURPOSE MEETING AGENDA 1. Welcome/Introduction 2. Review Previous Public Involvement 3. Process/Schedule

More information

NOISE ANALYSIS TECHNICAL REPORT

NOISE ANALYSIS TECHNICAL REPORT NOISE ANALYSIS TECHNICAL REPORT RICHMOND HIGHWAY (ROUTE 1) CORRIDOR IMPROVEMENTS PROJECT BETWEEN JEFF TODD WAY AND NAPPER ROAD, FAIRFAX COUNTY, VIRGINIA Prepared in support of the Draft Environmental Assessment

More information

MOUNTAIN HOUSE SPECIFIC PLAN II

MOUNTAIN HOUSE SPECIFIC PLAN II CHAPTER ELEVEN: NOISE 11.1 INTRODUCTION 11.1 11.2 MOBILE SOURCE NOISE IMPACTS 11.1 11.2.1 Overall Mobile Noise Impacts 11.1 11.2.2 Arterial Roadways 11.3 11.2.3 Railroad 11.4 11.2.4 Byron Airport 11.4

More information

Highway Noise Analysis Using the FHWA Draft TNM 3.0

Highway Noise Analysis Using the FHWA Draft TNM 3.0 Highway Noise Analysis Using the FHWA Draft TNM 3.0 2018 Louisiana Transportation Conference Tuesday, February 27 Advancing transportation innovation for the public good Development of Federally Funded

More information

PUBLIC HEARING LOOP 9

PUBLIC HEARING LOOP 9 PUBLIC HEARING LOOP 9 From Interstate (I)-35E to I-45 Dallas and Ellis Counties, Texas CSJ: Loop 2964-10-005 9: I-35E to I-45 Tuesday, June 20, 20, 2017 2017 Public Hearing Introductions ELECTED & PUBLIC

More information

Noise October 22, Noise Existing Conditions. Noise Characteristics

Noise October 22, Noise Existing Conditions. Noise Characteristics 3.7 3.7.1 Existing Conditions Characteristics The noise analysis contained in this section of the DEIS has been conducted in accordance with the New York State Department of Environmental Conservation

More information

Oklahoma Department of Transportation Environmental Programs Division Office Fax

Oklahoma Department of Transportation Environmental Programs Division Office Fax Oklahoma Department of Transportation Environmental Programs Division Office 521-3050 Fax 522-5193 Documented Categorical Exclusion (DCE) for I-40: Pavement Reconstruction and Added Lanes from the Douglas

More information

Noise Technical Report for the Fore River Bridge Replacement Study

Noise Technical Report for the Fore River Bridge Replacement Study Noise Technical Report for the Fore River Bridge Replacement Study Quincy and Weymouth, MA Prepared for: STV Incorporated 321 Summer Street Boston, MA 02110 Prepared by: 66 Long Wharf Boston, MA 02110

More information

Draft Noise Abatement Guidelines

Draft Noise Abatement Guidelines Document under Separate Cover refer to IMLC01-13 Draft Noise Abatement Guidelines April 2013 Legislative & Planning Services Table of Contents 1.0 Introduction...1 1.1 Key Definitions...1 2.0 Existing

More information

Highway Traffic Noise: Analysis and Abatement Guidance

Highway Traffic Noise: Analysis and Abatement Guidance Highway Traffic Noise: Analysis and Abatement Guidance 1 TABLE OF CONTENTS TABLE OF CONTENTS... 2 THREE-PART APPROACH TO HIGHWAY TRAFFIC NOISE ABATEMENT... 6 Noise Compatible Planning... 6 Source Control...

More information

Hennepin County Public Works

Hennepin County Public Works Hennepin County Public Works Transportation Department James N. Grube P.E., Director 612-596-0300, Phone 1600 Prairie Drive 612-321-3410, Fax Medina, Minnesota 55340 www.hennepin.us/transporta tion January

More information

7.0 NOISE ELEMENT 7.1 INTRODUCTION

7.0 NOISE ELEMENT 7.1 INTRODUCTION 7.0 NOISE ELEMENT 7.1 INTRODUCTION The Noise Element of a general plan is a comprehensive program for including noise control in the planning process. It is a tool for local planners to use in achieving

More information

Proceedings of Meetings on Acoustics

Proceedings of Meetings on Acoustics Proceedings of Meetings on Acoustics Volume 19, 2013 http://acousticalsociety.org/ ICA 2013 Montreal Montreal, Canada 2-7 June 2013 Engineering Acoustics Session 5aEA: Sound Emission from Vehicle and Rotating

More information

County Road 61 (Shady Oak Road): CR 3 (Excelsior Boulevard) WELCOME. November 1, 2012

County Road 61 (Shady Oak Road): CR 3 (Excelsior Boulevard) WELCOME. November 1, 2012 : CR 3 (Excelsior Boulevard) WELCOME November 1, 2012 Highway Traffic Noise Facts & FAQs Why is traffic noise analyzed? In 1972, US Congress passed legislation to provide mitigation for exterior highway

More information

I-70/I-71 SOUTH INNERBELT SECTION 3 I-70/I-71 EAST INTERCHANGE FRA PID Traffic Noise Report

I-70/I-71 SOUTH INNERBELT SECTION 3 I-70/I-71 EAST INTERCHANGE FRA PID Traffic Noise Report I-70/I-71 SOUTH INNERBELT SECTION 3 I-70/I-71 EAST INTERCHANGE FRA-70-14.48 PID 77370 Traffic Noise Report February 2010 FRA-70-14.48 PID 77370 I-70/I-71 South Innerbelt SECTION 3 -- EAST INTERCHANGE Traffic

More information

CREATE. Noise and Vibration Assessment Methodology

CREATE. Noise and Vibration Assessment Methodology CREATE Noise and Assessment Methodology June 2014 TABLE OF CONTENTS 1. INTRODUCTION... 1 2. BACKGROUND... 1 3. OVERALL FTA IMPACT ASSESSMENT METHODOLOGY... 2 4. KEY ELEMENTS OF NOISE ASSESSMENT... 4 4.1

More information

CHAPTER 3 SCOPE SUMMARY

CHAPTER 3 SCOPE SUMMARY CHAPTER 3 SCOPE SUMMARY GENERAL The SDDOT is an active member of AASHTO to share common national design standards for the state highway system. The AASHTO Task Force on Geometric Design has completed the

More information

Virginia Department of Transportation I-66 Tier 2 Environmental Assessment

Virginia Department of Transportation I-66 Tier 2 Environmental Assessment Virginia Department of Transportation I-66 Tier 2 Environmental Assessment VDOT Project 0066-96A-297, UPC #105500 Prince William and Fairfax County, Virginia PRELIMINARY NOISE ANALYSIS Submitted to: Virginia

More information

Traffic Noise Analysis SouthEast Connector

Traffic Noise Analysis SouthEast Connector Report Traffic Noise Analysis SouthEast Connector Prepared for Regional Transportation Commission of Washoe County September 2013 50 W. Liberty Street Reno, NV 89501 Contents Section Page Acronyms and

More information

Clearlake Road (SR 501) PD&E Study: Noise Study Report (NSR)

Clearlake Road (SR 501) PD&E Study: Noise Study Report (NSR) Florida Department of TRANSPORTATION Clearlake Road (SR 501) PD&E Study: Noise Study Report (NSR) From Michigan Avenue to Industry Road FPID: 433605 1 22 01 ETDM #: 13120 January 2016 www.dot.state.fl.us

More information

Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange

Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange I-290 Phase I Study West of US 45 (Mannheim Road) to Racine Avenue Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange Technical Memorandum Prepared By: Huff & Huff, Inc.

More information

A. INTRODUCTION B. NOISE ANALYSIS METHODOLOGY

A. INTRODUCTION B. NOISE ANALYSIS METHODOLOGY Chapter 8: and Vibration A. INTRODUCTION This chapter assesses the potential noise impacts resulting from operation of the proposed Wyandanch Intermodal Transit Facility by comparing existing noise levels

More information

Highway Traffic Noise

Highway Traffic Noise Page 1 of 5 Highway Traffic Noise Noise Barrier Design - Visual Quality Highway Traffic Noise Barriers at a Glance Highway traffic noise barriers: can reduce the loudness of traffic noise by as much as

More information

Federal Highway Administration FINDING OF NO SIGNIFICANT IMPACT Interstate Highway 45 and Loop 197 Direct Connector Galveston County, Texas

Federal Highway Administration FINDING OF NO SIGNIFICANT IMPACT Interstate Highway 45 and Loop 197 Direct Connector Galveston County, Texas Federal Highway Administration FINDING OF NO SIGNIFICANT IMPACT Interstate Highway 45 and Loop 197 Direct Connector Galveston County, Texas Introduction The Federal Highway Administration (FHWA) has determined,

More information