FACILITY DESIGN PLAN
|
|
- Rosalyn Atkins
- 5 years ago
- Views:
Transcription
1 FACILITY DESIGN PLAN Sports Performance Enhancement Facility Arena and Outdoor Track and Soccer Complex Introduction: THE UNIVERSITY OF SOUTH DAKOTA The Facility Program Plan for the Sports Performance Enhancement Facility Arena and Outdoor Track and Soccer Complex was approved by the Board of Regents in October The Building Committee selected Architecture Incorporated/Populous as the design architect for the project. The Sports Performance Facility addition provides competition, practice and training facilities for both basketball and volleyball. The Facility will also address the problems of scheduling all the competitive sports within the limitations of the existing Dakota Dome. In addition, all teams will have the space to practice at optimal times; ensuring that minimal conflicts arise and that student-athletes can maintain a reasonable daily schedule. The Outdoor Track and Soccer Complex project will also serve multiple purposes including a new competition, practice and training facility for both the soccer and track programs. a. Architectural, mechanical, and electrical schematic design: The project is an expansion to the south of the existing Dakota Dome. The Schematic Design Drawings by Architecture Incorporated/Populous showing site plans, floor plans, and elevations are attached. b. Changes from facility program plan: During the design process the estimates provided by the Construction Manager at Risk were higher than the original Facility Program Plan. Adjustments to the layout of the facility and placement of the Arena and its adjacency to the Dakota Dome and the Science, Health and Laboratory Facility were also altered. The facility will now have the main level located above ground with a second story in lieu of original proposed in ground solution. The estimated costs are $5,444,495 higher than the facility program plan. c. Impact to existing building or campus-wide heating/cooling/electrical systems: The Arena portion of the facility project consists of an 118,428 square foot building. The Science, Health and Research Laboratory and the new Arena will share on-site heating, cooling, and electrical systems. For heating, six boilers will be installed on-site. The boilers require a new natural gas service be installed to the building site. A modular, water-cooled chiller along with an exterior induced draft cooling tower will be installed. Two new 4000 amp electrical services with be provided to serve the Arena and the Science, Health and Research Laboratory facilities. All HVAC systems will be central
2 to both facilities. The natural gas cost will be a new cost for USD, but will not affect other facilities at USD. The total impact of utility cost is estimated to be $309,000. d. Total project cost estimates: The project cost estimate is $53,623,380. The following is the breakdown of the project estimate: Sports Performance Enhancement Facility Arena and Outdoor Track/Soccer Complex Total Estimate Of Probable Construction Costs $44,851,465 A/V & IT Allowance/BIT $1,635,526 FF & E Allowance $1,198,737 A & E Fees $3,460,395 LEED $310,000 Testing $373,198 OSE Fees $448,515 Owner's Contingency: $1,345,544 PROJECT TOTAL $53,623,380 Individual Estimate Components Arena $46,291,343 Track $5,562,983 Soccer $1,312,403 Track/Soccer Structure $456,651 SUBTOTAL $53,623,380 Arena Total Estimate Of Probable Construction Costs $38,654,962 A/V & IT Allowance/BIT $1,585,526 FF & E Allowance $998,737 A & E Fees $2,885,919 LEED $310,000 Testing $310,000 OSE Fees $386,550 Owner's Contingency: $1,156,649 PROJECT TOTAL $46,291,343 Track Total Estimate Of Probable Construction Costs $4,888,820 A/V & IT Allowance/BIT $0 FF & E Allowance $150,000 A & E Fees $296,042 LEED $0 Testing $32,568 OSE Fees $48,888 Owner's Contingency: 146,665 PROJECT TOTAL $5,562,983
3 Soccer Total Estimate Of Probable Construction Costs $1,062,526 A/V & IT Allowance/BIT $0 FF & E Allowance $50,000 A & E Fees $141,780 LEED $0 Testing $15,597 OSE Fees $10,625 Owner's Contingency: $31,875 PROJECT TOTAL $1,312,403 Track/Soccer Structure Total Estimate Of Probable Construction Costs $245,157 A/V & IT Allowance/BIT $50,000 FF & E Allowance $0 A & E Fees $136,654 LEED $0 Testing $15,033 OSE Fees $2,452 Owner's Contingency: $7,355 PROJECT TOTAL $456,651 e. Changes from cost estimate for operational or M&R expenses: The utility costs projections have increased from $262,041 a year to $309,000 The operational cost projections have not changed. Conversations are being initiated with student leadership on their possible involvement in supporting operations as authorized under Board action approving the Preliminary Facility Statement in June, 2011.
4 ATTACHMENTS Site Plan
5 Northeast Perspective
6 Event Level Plan
7 Concourse Level Plan
8 Event Level Mechanical Plan
9 Concourse Level Mechanical Plan
10 Event Level Electrical Plan
11 Concourse Level Electrical Plan
12
FACILITY DESIGN PLAN FOR PHYSICAL EDUCATION COMPLEX FROST ARENA HVAC REPLACEMENT SOUTH DAKOTA STATE UNIVERSITY. May 17, 2013
FACILITY DESIGN PLAN FOR PHYSICAL EDUCATION COMPLEX FROST ARENA HVAC REPLACEMENT SOUTH DAKOTA STATE UNIVERSITY May 17, 2013 SDSU requests approval of this Facility Design Plan to continue design and implement
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 6 O DATE: December 5-7, 2017 ****************************************************************************** SUBJECT USD Dakota Dome Renovation
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 X DATE: March 27-29, 2018 ****************************************************************************** SUBJECT USD North Commons Renovation
More informationSOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Committee on Budget and Finance AGENDA ITEM: III C DATE: June 19-20, 2013 ****************************************************************************** SUBJECT: SDSU Physical
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 X DATE: December 6-8, 2016 ****************************************************************************** SUBJECT: South Dakota State University
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 Y DATE: December 6-8, 2016 ****************************************************************************** SUBJECT: SDSU Student Wellness
More informationFACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY
FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY DATE: November 20, 2012 SDSU requests approval of this Facility Design Plan to continue planning the
More informationIDAHO ARENA CM/GC Presubmittal Conference April 11, 2017
Background / History 1969 Athletic Study Background / History 1970 Concept Construct Open Air Football Stadium Construct North Towers of New Basketball Pavilion Background / History 1972 Pavilion Plans
More informationMINUTES OF THE MEETING SDSU CENTRAL HEATING PLANT BOILER REPLACEMENT AND PLANT UPGRADES June 17, 2011
MINUTES OF THE MEETING SDSU CENTRAL HEATING PLANT BOILER REPLACEMENT AND PLANT UPGRADES June 17, 2011 The Building Committee for the SDSU Central Heating Plant Boiler Replacement and Plant Upgrades met
More informationFACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017
FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 SDSU requests approval of this Facility Design Plan for renovation and addition to Harding
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 I DATE: May 9-11, 2017 ****************************************************************************** SUBJECT: SDSU Harding Hall Renovation
More informationSTATE UNIVERSITY CONSTRUCTION FUND
STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant
More informationSTATE UNIVERSITY CONSTRUCTION FUND Concept Phase Checklist
STATE UNIVERSITY CONSTRUCTION FUND Concept Phase Checklist The following checklist shows the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the
More informationAuburn University Construction Project Update March 2010
New Basketball Arena: Construction Cost: $68.5 million. The Arena is currently 91% complete. Contract completion is July 25, 2010, but the project is on schedule to complete by May 2010. Interior finish
More informationTHE PLAZA AT PPL CENTER ALLENTOWN, PA
Building Function and Primary Use The owner of the new Plaza at PPL Center is Liberty Property Trust, but the primary tenant is PPL, which will use the building as the headquarters for its new subsidiaries
More informationBOARD OF TRUSTEES OCTOBER 13, 2014
Measure E BOARD OF TRUSTEES OCTOBER 13, 2014 FACILITIES UPDATE Measure Q 1 RECENTLY COMPLETED PROJECTS Santa Ana College Perimeter Site Improvements Building G Renovation Artesia Street Improvements Property
More informationThesis Proposal December 5, 2003
Executive Summary Thesis Proposal December 5, 2003 Brennan Hall is a five-story office/classroom building. It is located on a slightly sloping site, surrounded by other structures and a small green space.
More informationGrunenwald Science and Technology Building
Grunenwald Science and Technology Building Clarion University- Clarion, PA AE 482 Mechanical Project Proposal: Proposal for Alternative Designs Shane Helm The Pennsylvania State University Architectural
More information101 B. COMMITTEE ON GROUNDS AND BUILDINGS January 18, 2001
COMMITTEE ON 101 B B. CERTIFICATION OF ENVIRONMENTAL IMPACT REPORT AND APPROVAL OF DESIGN, SOUTHWEST CAMPUS HOUSING AND PARKING PHASE 1, LOS ANGELES CAMPUS The President recommends that upon review and
More informationLIFE OF A CAPITAL PROJECT
LIFE OF A CAPITAL PROJECT CAPITAL ASSET STRATEGIES (CAS) ARCHITECTS AND ENGINEERS (A&E) 5/4/2017 EARLY STEPS OF A MAJOR CAPITAL PROJECT (>$750,000) Scoping & Feasibility Project sponsor and campus leadership
More informationEnergy Efficiency & LEED v4 Certification at the O Connell Center. FEFPA Summer 2017
Energy Efficiency & LEED v4 Certification at the O Connell Center FEFPA Summer 2017 Course Number: Credit Designation: TLC Engineering for Architecture Presenters KRISTY M. WALSON PE, LEED AP BD+C, BEMP
More informationFormer Special Needs Facility For Sale 110 Stephen Hands Path, Wainscott Town of East Hampton, NY
Former Special Needs Facility For Sale, Wainscott Town of East Hampton, NY Exclusive Agent EXECUTIVE SUMMARY: JLL has been retained to sell, a 22,204 square foot asset located on 10.4 acres in Wainscott,
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 V DATE: October 3-5, 2017 ****************************************************************************** SUBJECT: SDSU Precision Ag Classroom
More informationLance Nichols Isaiah Patterson Nick Peterson Kyle Sala
Presented by: Lance Nichols Senior / Mechanical Engineering Isaiah Patterson Senior / Electrical Engineering Nick Peterson Senior / Mechanical Engineering Kyle Sala Senior / Mechanical Engineering Preventative
More informationMonroe Community College Louis S. and Molly B. Wolk Center for Excellence in Nursing
Monroe Community College Louis S. and Molly B. Wolk Center for Excellence in Nursing Project Highlights Resource Savings: Energy usage: 18.4% reduction from ASHRAE Standard 90.1, 2004 Edition. Water usage:
More informationThe Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma
LEED Green Building Certification The purpose of the LEED Green Building Rating is to provide a national standard that aims to improve environmental, health and economic performance of buildings using
More informationWest Campus Utilities Distribution Systems and Infrastructure Improvements / Expansion
Request for Qualifications Engineering Services Programming, Planning & Design Phase Architectural & Engineering Services West Campus Utilities Distribution Systems and Infrastructure Improvements / Expansion
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance Consent ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance Consent AGENDA ITEM: 7 L DATE: June 27-29, 2017 ****************************************************************************** SUBJECT: FY18 HEFF M&R Projects
More informationORANGE VISTA HIGH SCHOOL PHASE I
975 W. Morgan Street Perris, CA 92571 ORANGE VISTA HIGH SCHOOL PHASE I Monthly Project Progress Report February 2015 Prepared by: 9339 Feron Blvd. Rancho Cucamonga, CA 91730 I. Project Location and Description
More informationHVAC SYSTEM DESIGN PROCESS
HVAC SYSTEM DESIGN PROCESS Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Summer 2011 Grondzik 1 HVAC System Design Process Establish design intents/criteria (including code/standard compliance) Establish
More informationGeneral Objectives of Phase. Phase Task Checklist Integral Consulting Page 1 Schematic Design Checklist. Action
Project Number: Prepared By: Action General Objectives of Phase Drawings and other documents indicating the scale and relationships of Project components in conformance with program Building areas and
More informationCoos Bay Best Bond Cost Breakdowns
Coos Bay Best Bond Cost Breakdowns Overview [For itemized breakdown by school, see following pages.] Harding: New 7 th /8 th grade school on Harding site, including second gym: $18,440,000 Demotion of
More informationTexas State University System Telephonic Called Board of Regents Meeting
Texas State University System Telephonic Called Board of Regents Meeting Monday, April 6, 2015 2:00 PM 1. Call Meeting to Order 2. Agenda Items 1. SHSU: Design Development Documents for South Dining...
More informationCONSTRUCTION REQUIREMENTS
CONSTRUCTION REQUIREMENTS Note: The buildings on the UCCS campus are divided into two categories: General Fund and Auxiliaries. General Fund Buildings include academic and administrative functions. Auxiliary
More informationHVAC SYSTEM SCHEMATIC DESIGN
HVAC SYSTEM SCHEMATIC DESIGN Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1 HVAC System Design Process Establish HVAC-related owner s project requirements (OPR: design issues/intents/criteria;
More informationEL CAMINO COLLEGE. Facilities Master Plan Report November 2008 PROJECTS IN DESIGN
EL CAMINO COLLEGE Facilities Master Plan Report November 2008 PROJECTS IN DESIGN I. Math, Business & Allied Health Building (MBA) The scope of this building is the construction of a new building at the
More informationHVAC SYSTEM DESIGN PROCESS
HVAC SYSTEM DESIGN PROCESS Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1 HVAC System Design Process Establish design issues/intents/criteria (including code/standard compliance) Establish
More informationExplain key terms, programs, standards ASHRAE 90.1 ENERGY DOE average energy use
INTEGRATING GREEN BUILDING STRATEGIES INTO YOUR PROJECTS Introduction to Key Terms, Programs and Standards Julie Walleisa, AIA, LEED AP Overview Explain key terms, programs, standards ASHRAE 90.1 ENERGY
More informationJune Feedback Form Data Summary
ARLINGTON HIGH SCHOOL BUILDING PROJECT JUNE 19 TH 2018 June Feedback Form Data Summary 1/4/2018 1 Goals Gather community feedback on design concepts as well as specific design attributes Gather feedback
More informationCollege of the Desert Athletics Facilities
College of the Desert Athletics Facilities C13-005-PID-01 The LEED Gold project will include a new gymnasium, new tennis courts, renovation of an existing shower and locker building, and an upgrade of
More informationPLANNING THE 365-DAY VENUE
PLANNING THE 365-DAY VENUE A white paper from L.R. Kimball March 2010 412.201.4900 www.lrkimball.com ARchitecture Engineering Communications technology aviation civil Construction services data systems
More informationSustainable Development at the University of Regina
Sustainable Development at the University of Regina Tom Atkins, P.Eng., LEED AP Vice President - Mechanical Stantec Consulting Jared Larson, P.Eng. Associate MacPherson Engineering Neil Paskewitz, P.Eng.
More informationUniversity of North Florida BOARD OF TRUSTEES. CAMPUS PLANNING, DESIGN & CONSTRUCTION CAPITAL PROJECTS UPDATE January 18, 2011
Projects included in this report: 1. Founders Hall Renovations 2. Student Wellness and Sports Education Center 3. Science and Humanities Building (Biology) 4. Building 1 Renovations 5. Building 15 First
More informationLevel 1 Level 2 Level 3 Level 4 Level 5 Level 6 1 1.1 Construction Schedule of TCS-IT SEZ Park Issue of LOI 1.2 Pre-Construction Stage 1.2.1 Approvals 1.2.1.1 Approval from SWID/HIDCO for borewell 1.2.1.2
More information1733 TW ALEXANDER DRIVE
DURHAM, NC R&D PRODUCTION FACILITY ADJACENT TO RESEARCH TRIANGLE PARK ±97,875 SF FOR SALE OR LEASE 85 PROPERTY OVERVIEW 86 Falls Lake Foundry Commercial is pleased to offer the 1733 TW Alexander Drive
More informationexecutive summary Executive Summary University of Florida, Gymnastics Planning Study Project Description
executive summary University of Florida, Gymnastics Planning Study Executive Summary Project Description University of Florida s Athletics Association (UAA) has begun studying the possibilities of providing
More informationINTUITIVE AND OBJECTIVE APPROACHES TO DAYLIGHTING A NEW ENGLAND ELEMENTARY SCHOOL Michael Rosenfeld 1
Best2 - Daylighting a New England Elementary School - Session EE 7-3 INTUITIVE AND OBJECTIVE APPROACHES TO DAYLIGHTING A NEW ENGLAND ELEMENTARY SCHOOL Michael Rosenfeld 1 ABSTRACT The Town of Concord,
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance Consent ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance Consent AGENDA ITEM: 4 P DATE: December 5-7, 2017 ****************************************************************************** SUBJECT FY19 HEFF M&R Projects
More informationSOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Committee on Budget and Finance AGENDA ITEM: III M DATE: December 12-13, 2012 ****************************************************************************** SUBJECT: SDSU
More informationCampus Energy Plant Tufts University
IDEA CampusEnergy2017 Combined Heat and Power to Provide Energy Efficiency to Medium Size Campus February 20-24, 2017 Campus Energy Plant Tufts University Overview Presentation Overview: Campus Introduction
More informationProject Information. Nominations of Artists. University of Houston
UNIVERSITY OF HOUSTON SYSTEM SYSTEM WIDE ART ACQUISTION COMMITTEE AGENDA ITEM ITEM: UH University Center Transformation Project Artwork-Artists Nominations DATE PREVIOUSLY SUBMITTED: NA SUMMARY: Nominations
More informationPROPOSAL FOR ARCHITECTURAL SERVICES. June 22, 2015
PROPOSAL FOR ARCHITECTURAL SERVICES June 22, 2015 FIRM BACKGROUND Dimension IV Madison Design Group is built on a vision of architecture and professional services that puts the client and users, the building
More informationMechanical Project Proposal. Indoor Multi-Sport Facility. At Pennsylvania State University
At Pennsylvania State University Christopher Van Campen December 05, 2002 Executive summary The proposed thesis is to alleviate the of its only major problem, not enough seating capacity for the spectators
More informationProposals are to be presented in two submissions: a Technical Submission and a Financial Submission, each of which consists of the following packages:
Page 1 of 16 APPENDIX B: PROPOSAL REQUIREMENTS Proposals are to be presented in two submissions: a Technical Submission and a Financial Submission, each of which consists of the following packages: TECHNICAL
More informationGalleria North Tower II Noel Road Dallas, TX 75240
Galleria North Tower II FOR MORE LEASING INFORMATION, CONTACT: CHRIS TAYLOR TREY SMITH LAUREN NAPPER +1 972 692 1752 +1 972 692 1755 +1 972 232 8512 chris.taylor@cushwake.com trey.smith@cushwake.com lauren.napper@cushwake.com
More informationCoppin State University Physical Education Complex - Technical Report 2
Coppin State University Physical Education Complex - Technical Report 2 Building and Plant Energy Analysis Report Kaylee M Damico Advisor: Dr. Jelena Srebric Location: Baltimore, MD Table of Contents Contents
More informationREQUEST FOR QUALIFICATIONS ARCHITECTURAL DESIGN SERVICES
Section I GENERAL NOTICE A. Owner: Metro Parks 1069 W. Main Street Westerville, Ohio 43081 REQUEST FOR QUALIFICATIONS ARCHITECTURAL DESIGN SERVICES B. Project: Highbanks Metro Park: Event Center at the
More informationGlen Burnie High School Glen Burnie, MD. Wade Myers Mechanical Option
I. I n t r o d u c t i o n II. Existing Mechanical System III. Proposed System Alterations IV. CM Breadth V. Conclusion School Background 6 building; campus style high school Located in Construction of
More informationPlanning Commission Staff Report Project Plan Approval Hearing Date: June 24, 2015
Planning Commission Staff Report Project Plan Approval Hearing Date: June 24, 2015 ITEM 4 Provo City s Energy Department requests Final Project Plan approval to rebuild and expand the Energy Department
More informationLOCATION: La Jolla, California. CLIENT: UC San Diego. COMPLETION: June 2014 SIZE: 40,000 SF. PROJECT TYPE: Central Utility Plant
LOCATION: La Jolla, California CLIENT: UC San Diego COMPLETION: June 2014 SIZE: 40,000 SF PROJECT TYPE: Central Utility Plant This LEED GOLD CERTIFIED building is sited in close proximity to both new and
More informationCivil Engineering and Architecture Detailed and Performance Objective Outline
Civil Engineering and Architecture Detailed and Performance Objective Outline Deadlines Unit 1: 11 Blocks 1/20/2015 Unit 2: 27 Blocks 2/27/2015 Unit 3: 28 Blocks 4/15/2015 Unit 4: 17 Blocks 5/8/2015 Unit
More informationUCSD HEALTH SCIENCES NEIGHBORHOOD GRADUATE AND PROFESSIONAL HOUSING
Regents Committee on Grounds and Buildings Preliminary Review of Design November 18, 2008 UCSD HEALTH SCIENCES NEIGHBORHOOD GRADUATE AND PROFESSIONAL HOUSING Project Background 225 (2 bedroom apartment
More informationORANGE VISTA HIGH SCHOOL PHASE I
975 W. Morgan Street Perris, CA 92571 ORANGE VISTA HIGH SCHOOL PHASE I Monthly Project Progress Report January 2015 Prepared by: 9339 Feron Blvd. Rancho Cucamonga, CA 91730 I. Project Location and Description
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 9 F DATE: June 26-28, 2018 ****************************************************************************** SUBJECT SDSU American Indian Student
More informationFRIDLEY SCHOOL DISTRICT West Moore Lake Drive Fridley, MN REVIEW AND COMMENT DOCUMENT
FRIDLEY SCHOOL DISTRICT 14 6000 West Moore Lake Drive Fridley, MN 55432 REVIEW AND COMMENT DOCUMENT For submission to Minnesota Department of Education June 20, 2012 SUMMARY The Fridley Public Schools
More informationLEED BD+C Integrative Process. Lori A. Brown, LEED AP BD+C Power Jam Study! Lorisweb.com 1
LEED BD+C Integrative Process Lori A. Brown, LEED AP BD+C Power Jam Study! Lorisweb.com 1 IP Prerequisite Integrative Project Planning and Design HC Intent Maximize opportunities for integrated, cost-effective
More informationThe Waldinger Corporation Office & Production Building
The Waldinger Corporation Office & Production Building Scout Trail Des Moines, IA 50321 SVPA Project No 18036 U.D.R.B. PROJECT NARRATIVE September 19, 2018 The Waldinger Corporation Office & Production
More informationSOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Committee on Budget and Finance AGENDA ITEM: III E DATE: December 4-5, 2013 ****************************************************************************** SUBJECT: FY15 HEFF
More informationRATIONALE AND REASONING The following information is provided in response to the issues raised by the Board of Regents at the September 2012 meeting:
a contract within the Total Project Cost budget of $123.2 million, and to proceed with project construction not to exceed a Total Project Cost of $62.6 million. This motion is effective September 27, 2012.
More informationMechanical Systems Proposal
Mechanical Systems Proposal Prepared for: Dr. William Bahnfleth, Professor The Pennsylvania State University, Department of Architectural Engineering Prepared by: Chris Nicolais Mechanical Option December
More informationAdvanced Architecture for Self-Storage: Building Styles, Design and Innovation. Presented by: Bruce Jordan, President Jordan Architects
Advanced Architecture for Self-Storage: Building Styles, Design and Innovation Presented by: Bruce Jordan, President Jordan Architects Advanced Design for a Successful Facility: The Big Picture Design
More informationWelcome Center, New Student Services, and Career and Employment Services
Architectural Program Welcome Center, New Student Services, and Career and Employment Services East Memorial Stadium Renovation May 2014 Prepared By Table of Contents Introduction.... 1 Competitive Market....
More informationProject Name: Example Building OFPC Project No.: 12345
Energy Impact Statement Project Name: Example Building OFPC Project : 12345 Building Description and Assumptions: The design professional shall provide a brief narrative describing various building related
More informationDIRECTIVE 1B-7 Issue date: October Energy, Sustainability, LEED and Executive Orders
DIRECTIVE 1B-7 Issue date: October 2017 Energy, Sustainability, LEED and Executive Orders As of December 28, 2012, Executive Order No. 88 (E.O. 88) replaced E.O.111 ( Green and Clean State Buildings and
More informationUSF Intercollegiate Athletic Facility
National Association of Office and Industrial Properties (NAIOP) Special Use Building Award Winner USF Athletic Facility Having recently completed our brand new state-of-the-art athletic training facility,
More informationPROPOSITION R Citizen s Bond Oversight Committee
PROPOSITION R Citizen s Bond Oversight Committee June 15, 2011 Southwestern Community College District 900 Otay Lakes Road, Room L246 Chula Vista, CA 91910 Proposition R AGENDA 1. Call to Order / Roll
More informationMemorandum. Table 1 Trip Generation for Revised Plan. ITE Average A.M. Peak Hour P.M. Peak Hour
Memorandum 2400 Pershing Road Suite 400 Kansas City, MO 64108 Tel 816 329 8600 Fax 816 329 8601 www.transystems.com To: Mr. Scott Buescher Price Brothers Realty 12721 Metcalf Ave., Suite 200 Overland Park,
More informationCONTRACT NO. DOL-ETA-16-C-0043
CONTRACT NO. DOL-ETA-16-C-0043 EXTERIOR FAÇADE WALL BRACING GULFPORT JOB CORPS CENTER GULFPORT, MISSISSIPPI SEPTEMBER 2016 PREPARED FOR: U.S. DEPARTMENT OF LABOR PREPARED BY: September 30, 2016 Maria J.
More informationDesign Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright
Design Process 101 Michael Barnard, AIA, NCARB animalsheltering.org/expo #AnimalCareExpo Copyright 1 Design and Construction Process Needs Assessment Conceptual Design Schematic Design Design Development
More informationResidence Hall Phase XVI Code Item 308 Code Item 312 Advanced Planning
The University of North Carolina at Charlotte Capital Projects Facilities Management 9201 University City Blvd. Charlotte, N.C. 28223-0001 TEL: 704/687-0558 PROJECT: UNC Charlotte Residence Hall Phase
More informationCEE 243:Week 9 Energy Simulation Challenges & Experiences from LBNL and Stanford
:Week 9 Energy Simulation Challenges & Experiences from LBNL and Stanford James O Donnell Ph.D. Material Courtesy of Tobias Maile & Paul Raftery, Natasa Marazovic Agenda 1. Buildings Referenced 2. Primary
More informationDIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS
DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION 02001 Bus Traffic. Separation between bus traffic, regular vehicular flow, service traffic and pedestrian traffic. Bus traffic must have adequate
More informationBOARD OF REGENTS AGENDA ITEM 14 STATE OF IOWA APRIL 29-30, 2009 REGISTER OF UNIVERSITY OF IOWA CAPITAL IMPROVEMENT BUSINESS TRANSACTIONS
BOARD OF REGENTS AGENDA ITEM 14 STATE OF IOWA APRIL 29-30, 2009 Contact: Sheila Doyle REGISTER OF UNIVERSITY OF IOWA CAPITAL IMPROVEMENT BUSINESS TRANSACTIONS Actions Requested: Consider approval of: 1.
More informationLongmeadow High School Section 12.1
Longmeadow High School Section 12.1 Schematic Design 12 Total Project Budget and MSBA Form 3011 The attached Total Project Budget and Form 3011 includes all costs associated with Administrative, Architecture
More informationMay 11, 2016 MEMORANDUM. Utah Valley University Non-State Funded Athletic Dome Project Approval. Issue
State Board of Regents Board of Regents Building, The Gateway 60 South 400 West Salt Lake City, Utah 84101-1284 TAB M Phone 801.321.7101 Fax 801.321.7199 TDD 801.321.7130 www.higheredutah.org May 11, 2016
More informationBuilding Energy Analysis for a Multi-Family Residential Building (Multi V III VRF Heat-Pump System)
Building Energy Analysis for a Multi-Family Residential Building (Multi V III VRF Heat-Pump System) Residential-Building Energy-Modeling Engineering Study VRF-ES-BH-001-US 012E03 Executive Summary Contents
More informationEnergyPro Building Energy Analysis. Nine-story Office Building
EnergyPro Building Energy Analysis Nine-story Office Building EnergyPro Building Energy Analysis for an office building Project Scope The purpose of the EnergyPro energy model was to evaluate the energy
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 6 I DATE: December 4-6, 2018 ****************************************************************************** SUBJECT SDSU American Indian Student
More informationDRAFT Subject to on-going negotiations and value engineering
Cost Estimate Summary GC OF/OI TOTAL 1 Capital Repair and Improvement $13,778,201 $9,516,700 = $23,294,901 GC Costs Include: Mechanical, Electrical & Plumbing $6,924,227 $3,618,000 General Conditions 10.0%
More informationArchitectural and Engineering Basic Services Fee Estimating Guidelines
Architectural and Engineering Basic Services Fee Estimating Guidelines Basic Services is the design work customary on a typical project to take an established building program, site, and budget, and then
More informationCONSTRUCTION UPDATE. April AUM Projects. Client: Housing and Residence Life Construction Cost: $28 million Completion Date: July 2013
April 2013 AUM Projects AU Montgomery New Residence Hall AU Projects AU Recreation and Wellness Center Biggio Drive Parking Facility Biodiversity Learning Center CONSTRUCTION UPDATE AU Montgomery New Residence
More informationDESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST
DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Design Development Review Package. Provide a written explanation for any omissions. The following items,
More informationPrepared. r William. 10 th, Mechanical. Option. Architectural Engineering. Bachelor of. The
Architectural Engineering Mechanical Option 2011 Thesiss Proposal Prepared for: Professor r William Bahnfleth, PhD, PE Date: December 10 th, 20100 Mechanical Option Senior Thesis 2010-2011 The Pennsylvania
More informationVertical Aeroponic Portable Indoor Farms
Vertical Aeroponic Portable Indoor Farms Featuring Automated Rows For Easiest Operation Style: Leafy Green and Herb Grower Farm Specifications and Price List Superior Farm Equipment at Great Prices Contact
More informationBuilding Condition Report. Building Condition
Price Memorial Building #0001 Present Building Use: The Administration building currently houses offices for the President, and Senior Administration. Building History: Built in 1879 Overall Size: 24,922
More informationDYNAMIC PROTOTYPE BIM MANUAL FOR A FITNESS CENTER V1.0 November 21, 2011
DYNAMIC PROTOTYPE BIM MANUAL FOR A FITNESS CENTER V1.0 November 21, 2011 Developed by: Air Force Center for Engineering and the Environment Ralph Rick Sinkfield, YD-03, DAF Project Manager Email: ralph.sinkfield@us.af.mil
More informationLEMAIRE MIDDLE SCHOOL GYMNASIUM & SPORTS COMPLEX NVB17097
LEMAIRE MIDDLE SCHOOL GYMNASIUM & SPORTS COMPLEX LEMAIRE MIDDLE SCHOOL GYMNASIUM & SPORTS COMPLEX project category built architecture // unbuilt architecture // collaborative achievement // academic projects
More information2.3.6 Design Development
2.3 Management of the Project 2.3.6 Design Development Canadian Handbook of Practice for Architects 2.3.6 Introduction Design Development Tasks Engineering Services for Design Development Structural Mechanical
More informationMechanical Project Proposal
Mechanical Project Proposal Miller Children s Hospital Prepared for: Dr. James Freihaut Department of Architectural Engineering The Pennsylvania State University Prepared by: Stephen Haines December 18
More informationBUCKNELL UNIVERSITY PROCEDURES FOR RENOVATIONS AND NEW CONSTRUCTION
I. PURPOSE BUCKNELL UNIVERSITY PROCEDURES FOR RENOVATIONS AND NEW CONSTRUCTION To ensure the proper process to request and obtain approval for all renovation or new construction projects within Bucknell
More information