MINUTES OF THE MEETING SDSU CENTRAL HEATING PLANT BOILER REPLACEMENT AND PLANT UPGRADES June 17, 2011

Size: px
Start display at page:

Download "MINUTES OF THE MEETING SDSU CENTRAL HEATING PLANT BOILER REPLACEMENT AND PLANT UPGRADES June 17, 2011"

Transcription

1 MINUTES OF THE MEETING SDSU CENTRAL HEATING PLANT BOILER REPLACEMENT AND PLANT UPGRADES June 17, 2011 The Building Committee for the SDSU Central Heating Plant Boiler Replacement and Plant Upgrades met on Friday, June 17, 2011 via conference call with the following members participating: Jack Warner, Executive Director and CEO; Dean Krogman, Regent; David Chicoine, President; and Kristi Honeywell, State Engineer. Also participating were Dean Kattelmann, SDSU; Roger Thue, SDSU; Mary Turman and Molly Weisgram, BOR. The purpose of the meeting was to approve the Facility Design Plan for the Central Heating Plant Boiler Replacement and Plant Upgrades. SDSU also requested authorization to complete design development and construction drawings as well as to proceed with bidding the boiler procurement package. Mr. Kattelmann explained that the Facility Design Plan is a result of the schematic design completed by Stanley Consultants, Inc. The project plans to remove two obsolete boilers and replace them with two upsized, multi-fuel burning boilers. This will allow diversity to mix and match boilers depending on need. Total project cost is $37,000 above the bond amount, but the bid alternates are planned to bring the project back within budget. The total budget for this project is $5.8 million. The boilers will not remove the ability to burn coal. This will bring the total number of boilers to a count of five. The State Engineers Office was authorized to negotiate an A/E contract with Stanley Consultants, Inc. and this action was approved in December 2010 by the Board of Regents. Stanley Consultants, Inc. will complete design and construction administration services for the entire project. IT WAS MOVED by David Chicoine, seconded by Dean Krogman to approve the Facility Design Plan for the Central Heating Plant Boiler Replacement and Plant Upgrades and to go out to bid for the boiler procurement. All members voting AYE. The MOTION CARRIED.

2 FACILITY DESIGN PLAN FOR CHP BOILER REPLACEMENT AND PLANT UPGRADES SOUTH DAKOTA STATE UNIVERSITY OSE#R X In accordance with the Board of Regents Capital Improvement Process, South Dakota State University (SDSU) requests approval of this Facility Design Plan for the Central Heating Plant Boiler Replacement and Plant Upgrades project. This submittal is a result of the schematic design completed by Stanley Consultants, Inc. SDSU requests authorization to complete design development and construction drawings. SDSU also requests approval to proceed with bidding the boiler procurement package. A. Architectural, Mechanical & Electrical Schematic Design The justification for the project has not changed from that stated in the previously approved Facility Program Plan. Summary of Architectural Work: 1. Construction of a Control Room to house new workstations for the boiler plant control system. 2. Construction of new supervisor s office that is being demolished to make room for a new exit required for egress. 3. Renovation to building exits and interior stairs, replacing deteriorated stairs, and bringing others exits and stairways into code compliance. 4. Bid alternates will be included for window replacement and exterior tuck-pointing. Description of Mechanical Systems: 1. Fire Protection: No changes planned. The building recently received a new fire alarm panel under a previous project. The building is not sprinkled. 2. Plumbing: Demolition of one shower and installation of a boiler water sample testing station are included. Minor plumbing modifications as required for reconfiguration of office, control break rooms to accommodate relocation of a sink and water cooler. 3. HVAC: Building ventilation upgrades to control combustion air for the boilers will be included. A new boiler combustion air makeup unit will be installed as well as an air handler to provide conditioned ventilation air to the office, control and break rooms.

3 4. Boiler Plant Equipment: a. Removal of Boiler #4 and auxiliary equipment. b. Removal of Boiler #7 and auxiliary equipment. c. Asbestos abatement as required for demolition of boilers, piping and other equipment. d. Installation of two new dual fuel (gas/#2 fuel oil) boilers. One boiler sized at 35,000 pounds per hour capacity and the other at 65,000 pounds per hour capacity. New boilers will water-tube design for long life and will be equipped with flue-gas economizers to reclaim some of the heat normally lost from a boiler stack. Besides being a necessary maintenance replacement, the boilers will increase our firm capacity on natural gas by about 42,000 pounds per hour, bringing our total to 182,000 pounds per hour. This capacity will position us well into the future with boiler capacity. e. Replacement of two (2) existing boiler feedwater pumps with new feedwater pumps including variable speed drives. f. Replacement of one (1) condensate transfer pump with a new condensate transfer pump including a variable speed drive. Installation of variable speed drives on the two (2) remaining condensate transfer pumps. g. Expansion of the existing plant wide control system to interface the new equipment with the existing control system. h. Replacement of the steam pressure reducing station and low pressure steam line that serves Yeager Hall and DePuy Military Hall. This will include asbestos abatement on the existing line. i. Replacement and relocation of the low pressure steam safety relief valve. j. Installation of a bearing cooling water reclamation system on the induced draft fan and stoker bearing cooling water system. This is planned as a bid alternate. k. Installation of an underground fuel oil storage tank monitoring system on the existing fuel oil tank. This is planned as a bid alternate. l. Replace or repair Boiler #5 and #6 stacks based on independent testing of the current stacks condition. This is planned as a bid alternate. Description of Electrical Systems: Project scope includes replacement of building electrical switchgear, motor control centers and major distribution panels. Existing panels that serve coal and ash handling equipment are not included in the scope of this project since coal does not appear to be a viable fuel choice for our plant beyond the next few years.

4 Project Timeline: Design development documents are anticipated to begin July 1, During design development, with bid specifications prepared by Stanley Consultants, SDSU plans to bid and procure the boilers in advance of the remaining construction. The boilers have a very long lead time of approximately nine months. In order for the boilers to arrive in time for installation during the summer of 2012, they need to be procured in advance. They will be provided to the contractor as owner-provided equipment to be installed by the contractor. Other advantages to bidding the boilers ahead of the other construction documents include savings of contractor markup on approximately $2.5 million worth of equipment. It also allows the A/E to design piping and stack connections for the boilers around known dimensions. Design Development documents will be developed while the boiler procurement package is out for bids and are expected to be complete by September 1, Bid documents for the construction package will be completed by November 15, 2011 for final review with Building Committee approval anticipated by mid-december The contractor s construction contract is anticipated to be fully executed by February 6, 2012 with construction to begin at that time. Boilers should be delivered approximately April SDSU plans an annual campus-wide steam outage for early May each year. The contractor will have tie-ins and other work that needs to occur during this outage. This project schedule will allow the contractor to get necessary shop drawings approved and begin construction prior to the May outage. See the project schedule and Figure 1 - Project Timeline, below for more key dates. Other than the annual scheduled steam outage in May, the boiler plant is anticipated to remain in service to provide steam to campus during the entire construction process. Project Schedule: BOR approval of Schematic Design and Facility Design Plan: June 29-30, 2011 Advertisement for Boiler Procurement Package: July 5 22, 2011 Bid Opening for Boiler Procurement Package: July 26, 2011 Advertisement for Construction Package: December 27 January 13, 2012 Bid Opening for Construction Package: January 17, 2012 Construction: April 2012 December 2012 Completion Date: December 2012 Occupancy: Continuous (Plant to remain in operation during all construction except the annual 1-2 week scheduled outage in May) B. Impact to Existing Building or Campus Wide Heating/Cooling/Electrical Systems

5 Electrical Distribution: Electrical distribution loads should not be impacted by this project. The new electrical loads associated with the new boilers #9 and #10 are anticipated to be approximately equal to the electrical equipment loads associated with boilers #4 and #7, which are being demolished. Electrical distribution is adequate to the plant. Impact to Existing Tunnels (and associated utilities): The utility tunnel running north from the Central Heating Plant, past Yeager Hall, will be the only tunnel included in this project s scope of work. The existing low pressure steam service to Yeager Hall and DePuy Military Hall will be abated and demolished. It will be replaced with a new, smaller low pressure line to serve those two facilities. Due to the short proximity to the plant, those two facilities will share the steam pressure reducing station located in the Central Heating Plant that provides low pressure steam to the plant itself. Water: The campus water distribution system will not be directly affected by this project. However, as steam demand on campus is expected to grow along with overall campus growth, the water consumption in the plant will likely increase slightly to accommodate the extra makeup water requirements associated with campus growth. Sanitary Sewer: Impacts to the sanitary sewer are anticipated to be negligible. Storm Sewer: Storm sewer impacts are anticipated to be negligible. Natural Gas: Natural gas service to the campus and to the plant is adequate to support the new equipment. The future plans are to continue to burn coal in existing Boilers #5 and #6 during the winter months until compliance with the new Environmental Protection Agency Hazardous Air Pollutant regulations is required, which is approximately three years away. Therefore natural gas consumption in the plant will be largely unaffected for the short term. Once we stop burning coal, our winter-time gas consumption will increase dramatically in the plant. The main gas lines and service to the building are deemed adequate to support the plant s needs with the new boiler equipment. C. Total Estimated Construction Costs: The total project cost is estimated to be approximately $5,824,000 for the design and construction of the project. This is about $37,000 over the $5,787,000 in bond funds available for the project. As the design development documents evolve and construction costs estimates are updated, additional bid alternates will be included if needed to keep the project within budget. The breakdown is shown in the following table. Preliminary Construction Estimate $4,720,952 Contingency (5%) $236,048 A/E Fees $466,095 OSE Fees $47,210 SDSU Fees and Misc. Expenses $236,048 Testing and Survey $18,000 Abatement $50,000

6 Commissioning $50,000 TOTAL PROJECT COST $5,824,353

7 Figure 1 - Project Timeline

8 The Preliminary Construction Estimate above includes only base bid items. Bid Alternates totaling an additional $242,411 are planned if the bids come in below the current estimate: Bearing Cooling Water Reclamation System Building Exterior Tuckpointing Fuel Oil Tank Monitoring System Boiler #5 & #6 Stack Replacement Window Replacement D. Changes from Cost Estimates for Operation or M&R Expenses SDSU does not anticipate any changes from the estimated operation and maintenance expenses noted in the previously approved Facility Program Plan. Illustrative Plans: Refer to the attached illustrative floor plans prepared by Stanley Consultants indicating the basic scope of work as of the Schematic Design Phase. Figure 1 General Arrangement - Main Floor Demolition Figure 2 General Arrangement - Basement Floor Figure 3 General Arrangement - Main Floor Figure 4 General Arrangement - Mezzanine Floor

9

10

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 SDSU requests approval of this Facility Design Plan for renovation and addition to Harding

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 Y DATE: December 6-8, 2016 ****************************************************************************** SUBJECT: SDSU Student Wellness

More information

FACILITY DESIGN PLAN FOR PHYSICAL EDUCATION COMPLEX FROST ARENA HVAC REPLACEMENT SOUTH DAKOTA STATE UNIVERSITY. May 17, 2013

FACILITY DESIGN PLAN FOR PHYSICAL EDUCATION COMPLEX FROST ARENA HVAC REPLACEMENT SOUTH DAKOTA STATE UNIVERSITY. May 17, 2013 FACILITY DESIGN PLAN FOR PHYSICAL EDUCATION COMPLEX FROST ARENA HVAC REPLACEMENT SOUTH DAKOTA STATE UNIVERSITY May 17, 2013 SDSU requests approval of this Facility Design Plan to continue design and implement

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 X DATE: December 6-8, 2016 ****************************************************************************** SUBJECT: South Dakota State University

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 I DATE: May 9-11, 2017 ****************************************************************************** SUBJECT: SDSU Harding Hall Renovation

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 X DATE: March 27-29, 2018 ****************************************************************************** SUBJECT USD North Commons Renovation

More information

SOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Committee on Budget and Finance AGENDA ITEM: III C DATE: June 19-20, 2013 ****************************************************************************** SUBJECT: SDSU Physical

More information

Moving Toward Greater Sustainability: Oklahoma State University Builds a New Central Plant

Moving Toward Greater Sustainability: Oklahoma State University Builds a New Central Plant Moving Toward Greater Sustainability: Oklahoma State University Builds a New Central Plant June 21, 2016 Introductions James Rosner, PE, CEM (james.rosner@okstate.edu) - Director of Energy Services, Oklahoma

More information

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project

More information

FACILITY DESIGN PLAN

FACILITY DESIGN PLAN FACILITY DESIGN PLAN Sports Performance Enhancement Facility Arena and Outdoor Track and Soccer Complex Introduction: THE UNIVERSITY OF SOUTH DAKOTA The Facility Program Plan for the Sports Performance

More information

IDAHO ARENA CM/GC Presubmittal Conference April 11, 2017

IDAHO ARENA CM/GC Presubmittal Conference April 11, 2017 Background / History 1969 Athletic Study Background / History 1970 Concept Construct Open Air Football Stadium Construct North Towers of New Basketball Pavilion Background / History 1972 Pavilion Plans

More information

FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY

FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY FACILITY DESIGN PLAN FOR INDOOR PRACTICE AND HUMAN PERFORMANCE FACILITY SOUTH DAKOTA STATE UNIVERSITY DATE: November 20, 2012 SDSU requests approval of this Facility Design Plan to continue planning the

More information

TRIAD ENGINEERING CONSULTANTS, INC.

TRIAD ENGINEERING CONSULTANTS, INC. TRIAD ENGINEERING CONSULTANTS, INC. 2638 Willard Dairy Rd Providing High Point, NC Suite 100 Plumbing, Mechanical and 27265 (336) 454-0225 Electrical Engineering Services Since 1984 admin@triadengmep.com

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance Consent ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance Consent ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance Consent AGENDA ITEM: 7 L DATE: June 27-29, 2017 ****************************************************************************** SUBJECT: FY18 HEFF M&R Projects

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 7 V DATE: October 3-5, 2017 ****************************************************************************** SUBJECT: SDSU Precision Ag Classroom

More information

BATCHELOR HALL RENOVATION January 2018

BATCHELOR HALL RENOVATION January 2018 BATCHELOR HALL RENOVATION January 2018 CNAS Presenters: Jon Harvey Principal Planner, Capital Asset Strategies (CAS) Scott Jackson Campus Fire Marshal, Environmental Health and Safety (EH&S) Jocelyne Nguema

More information

Project Scope & Budget Breakdown. Mandatory Scope Recommended Additional Scope Wish List Scope

Project Scope & Budget Breakdown. Mandatory Scope Recommended Additional Scope Wish List Scope Project Scope & Budget Breakdown Mandatory Scope Recommended Additional Scope Wish List Scope Site Plan EXISTING Site Plan PROPOSED First Floor Plan PROPOSED Basement Floor Plan PROPOSED Mandatory Scope

More information

Fairfield Board of Education Proposed Capital Non-Recurring Projects

Fairfield Board of Education Proposed Capital Non-Recurring Projects Fairfield Board of Education Proposed Capital Non-Recurring Projects 2014-2015 Fairfield Public Schools Capital Non-Recurring Project Overview 2014-2015 Location Project Estimated Cost Page Mill Hill

More information

TEXAS A&M ENGINEERING

TEXAS A&M ENGINEERING TEXAS A&M ENGINEERING 312 Jack K. Williams Administration Building I 3126 TAMU I College Station, Texas 77843-3126 M. Katherine Banks, Ph.D., P.E. Vice Chancellor and Dean of Engineering Director, Texas

More information

Administration Building Needs Assessment

Administration Building Needs Assessment Town Hall Meeting with the Habersham County Board of Commissioners Administration Building Needs Assessment JUNE 13, 2016 Detailed Evaluation Performed in 2015 Engineering Evaluation Site/Civil Architectural

More information

Draft Feasibility Study for the Expansion of Southeast Library

Draft Feasibility Study for the Expansion of Southeast Library DC public Library KH KEAST & HOOD METROPOLITAN E N G I N E E R I N G I N C S H A P I RO-O BRIEN Draft Feasibility Study for the Expansion of Southeast Library Draft Submission: November 4, 2016 1 OVERVIEW

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 6 O DATE: December 5-7, 2017 ****************************************************************************** SUBJECT USD Dakota Dome Renovation

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance Consent ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance Consent ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance Consent AGENDA ITEM: 4 P DATE: December 5-7, 2017 ****************************************************************************** SUBJECT FY19 HEFF M&R Projects

More information

DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST

DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Design Development Review Package. Provide a written explanation for any omissions. The following items,

More information

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT

CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT Item No. 6.C.2 Mission Statement We Care for Our Residents by Working Together to Build a Better Community for Today and Tomorrow. CITY OF ROHNERT PARK CITY COUNCIL AGENDA REPORT Meeting Date: March 24,

More information

MIAMI DADE COLLEGE WOLFSON CAMPUS REMODEL & RENOVATION PROJECT FOR THE DAVID W. DYER FEDERAL BUILDING AND UNITED STATES COURTHOUSE MIAMI, FLORIDA

MIAMI DADE COLLEGE WOLFSON CAMPUS REMODEL & RENOVATION PROJECT FOR THE DAVID W. DYER FEDERAL BUILDING AND UNITED STATES COURTHOUSE MIAMI, FLORIDA MIAMI DADE COLLEGE WOLFSON CAMPUS REMODEL & RENOVATION PROJECT FOR THE DAVID W. DYER FEDERAL BUILDING AND UNITED STATES COURTHOUSE MIAMI, FLORIDA General Scope of Work The total approximate area to be

More information

Florida Army National Guard Construction Facilities Management Office. Scope of Work:

Florida Army National Guard Construction Facilities Management Office. Scope of Work: Florida Army National Guard Construction Facilities Management Office Florida Armory Revitalization Program (FARP) Design Guidelines September 2011 Scope of Work: To provide complete design for the renovation/alterations

More information

TRIAD ENGINEERING CONSULTANTS, INC.

TRIAD ENGINEERING CONSULTANTS, INC. TRIAD ENGINEERING CONSULTANTS, INC. 2638 Willard Dairy Rd Providing High Point, NC Suite 100 Plumbing, Mechanical and 27265 (336) 454-0225 Electrical Engineering Services Since 1984 admin@triadengmep.com

More information

BOARD OF TRUSTEES OCTOBER 13, 2014

BOARD OF TRUSTEES OCTOBER 13, 2014 Measure E BOARD OF TRUSTEES OCTOBER 13, 2014 FACILITIES UPDATE Measure Q 1 RECENTLY COMPLETED PROJECTS Santa Ana College Perimeter Site Improvements Building G Renovation Artesia Street Improvements Property

More information

Uniform Construction Code

Uniform Construction Code Uniform Construction Code When the UCC Requires Permits and Inspections (A Zoning Certificate may be required even though the project does not require a UCC Building Permit.) As a general rule, the UCC

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 9 F DATE: June 26-28, 2018 ****************************************************************************** SUBJECT SDSU American Indian Student

More information

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following:

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following: New buildings or renovations to existing buildings for which an application for a permit was made to the Department or a municipality before April 9, 2004. New buildings or renovations to existing buildings

More information

NEW MIDDLE SCHOOL PROJECT

NEW MIDDLE SCHOOL PROJECT Monthly Report May 2017 2 INTRODUCTION P.J. Dick Incorporated is pleased to present to the Chartiers Valley Board of School Directors the following Construction Report for the Chartiers Valley Middle School

More information

RENTAL INSPECTION CHECKLIST. Helpful Definitions: Egress: the free and unobstructed access to the exterior of a habitable space.

RENTAL INSPECTION CHECKLIST. Helpful Definitions: Egress: the free and unobstructed access to the exterior of a habitable space. CITY OF MANASSAS DEPARTMENT OF COMMUNITY DEVELOPMENT DEVELOPMENT SERVICES DIVISION 9027 Center Street, Room 201, Manassas, VA 20110 P.O. Box 560 Manassas, VA 20108 Phone: 703-257-8278 Fax: 703-257-5831

More information

ROD Grant Round 4 Presentation June 9, 2014

ROD Grant Round 4 Presentation June 9, 2014 ROD rant Round 4 Presentation June 9, 2014 713 Creek Road Bellmawr, NJ 08031 Telephone (856) 396-6200 Facsimile (856) 396-6205 Please visit us on the web at www.garrisonarch.com 2 Agenda NJDOE Application

More information

SOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Committee on Budget and Finance AGENDA ITEM: III E DATE: December 4-5, 2013 ****************************************************************************** SUBJECT: FY15 HEFF

More information

SOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Committee on Budget and Finance AGENDA ITEM: II D DATE: December 3-4, 2014 ****************************************************************************** SUBJECT: FY16 HEFF

More information

Florida Army National Guard Construction Facilities Management Office. Scope of Work:

Florida Army National Guard Construction Facilities Management Office. Scope of Work: Florida Army National Guard Construction Facilities Management Office Florida Armory Revitalization Program (FARP) Design Guidelines October 2008 Scope of Work: To provide complete design for the renovation/alterations

More information

NEW MIDDLE SCHOOL PROJECT

NEW MIDDLE SCHOOL PROJECT Monthly Report September 2017 INTRODUCTION P.J. Dick Incorporated is pleased to present to the Chartiers Valley Board of School Directors the following Construction Report for the Chartiers Valley Middle

More information

City of Fairfax, Virginia City Council Regular Meeting. Honorable Mayor and Members of Cfy ;ouncil Robert L. Sisson, City Manager /I.

City of Fairfax, Virginia City Council Regular Meeting. Honorable Mayor and Members of Cfy ;ouncil Robert L. Sisson, City Manager /I. City of Fairfax, Virginia City Council Regular Meeting Agenda Item #..,.,C:::o~Or!---!h~--- city Council Meeting q+----4-j/.-...:cx:l..-.>o?...~-/_,_j-=2=; r 1 TO: FROM: SUBJECT: ISSUE(S): SUMMARY: Honorable

More information

HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014

HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014 HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014 1. Upgrade Video Security and Surveillance Systems - Replace with New a. Existing

More information

Welcome Center, New Student Services, and Career and Employment Services

Welcome Center, New Student Services, and Career and Employment Services Architectural Program Welcome Center, New Student Services, and Career and Employment Services East Memorial Stadium Renovation May 2014 Prepared By Table of Contents Introduction.... 1 Competitive Market....

More information

/ Policy Number: Policy Name: Capital Planning and Development Processes Definitions

/ Policy Number: Policy Name: Capital Planning and Development Processes Definitions Page 1 7-101 Definition A. Alternative Construction Delivery Methods: Building Delivery Processes that vary from the more standard Design-Bid-Build model. These may include Construction Manager-At-Risk

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information Anderson Central 100B, PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

REQUEST FOR ARCHITECTURAL AND ENGINEERING DESIGN SERVICES DRUMLIN DINING HALL RENOVATION. University of Wisconsin-Whitewater.

REQUEST FOR ARCHITECTURAL AND ENGINEERING DESIGN SERVICES DRUMLIN DINING HALL RENOVATION. University of Wisconsin-Whitewater. REQUEST FOR ARCHITECTURAL AND ENGINEERING DESIGN SERVICES DRUMLIN DINING HALL RENOVATION University of Wisconsin-Whitewater March 2008 Project No. 08B21 TABLE OF CONTENTS PAGE Table of Contents... 2 Project

More information

Appendix J - Custom Uniformat for EDU Migration

Appendix J - Custom Uniformat for EDU Migration Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations

More information

Longmeadow High School Section 12.1

Longmeadow High School Section 12.1 Longmeadow High School Section 12.1 Schematic Design 12 Total Project Budget and MSBA Form 3011 The attached Total Project Budget and Form 3011 includes all costs associated with Administrative, Architecture

More information

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ****************************************************************************** SOUTH DAKOTA BOARD OF REGENTS Budget and Finance AGENDA ITEM: 6 I DATE: December 4-6, 2018 ****************************************************************************** SUBJECT SDSU American Indian Student

More information

NORTHEAST IOWA COMMUNITY COLLEGE 2018 FACILITY ASSESSMENT MAY 15, 2018

NORTHEAST IOWA COMMUNITY COLLEGE 2018 FACILITY ASSESSMENT MAY 15, 2018 NORTHEAST IOWA COMMUNITY COLLEGE 2018 FACILITY ASSESSMENT MAY 15, 2018 INTENT The overriding goal of this assessment was to evaluate existing facilities to determine a scope of work that should be done

More information

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...

More information

The following is required for a complete permit submittal for each unit.

The following is required for a complete permit submittal for each unit. P: (847)810-3502 OR (847)810-3503/3521, F: (847)615-4383 MULTI-FAMILY OR COMMERCIAL ADDITION OR ALTERATION PERMIT REQUIREMENTS The following is required for a complete permit submittal for each unit. MULTI-FAMILY

More information

Building Permit Application

Building Permit Application Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: ARCHITECT/ENGINEER ADDRESS:

More information

THE UNIVERSITY OF NORTH CAROLINA Repairs and Renovations Projects

THE UNIVERSITY OF NORTH CAROLINA Repairs and Renovations Projects Appalachian State University 2,311,700 Panhellenic Hall - Renovation for Fermentation Sciences Relocation 675,000 Belk Library Interior Renovations 300,000 Chapel Wilson Hall Exterior Repairs 231,100 Exterior

More information

A PRESENTATION OF THE SCHEMATIC DESIGN FOR THE HILTON COLISEUM IMPROVEMENTS 1999 PROJECT WILL BE MADE AT THE MARCH BOARD MEETING MEMORANDUM

A PRESENTATION OF THE SCHEMATIC DESIGN FOR THE HILTON COLISEUM IMPROVEMENTS 1999 PROJECT WILL BE MADE AT THE MARCH BOARD MEETING MEMORANDUM A PRESENTATION OF THE SCHEMATIC DESIGN FOR THE HILTON COLISEUM IMPROVEMENTS 1999 PROJECT WILL BE MADE AT THE MARCH BOARD MEETING ISU B-1 MEMORANDUM To: From: Subject: Board of Regents Board Office Register

More information

Bronx Community College. Five-Year Capital Plan FY through FY

Bronx Community College. Five-Year Capital Plan FY through FY Five-Year Capital Plan FY 2019-20 through FY 2023-24 Projects in priority order / costs in $ thousands Project Name FY 19-20 FY 20-21 FY 21-22 FY 22-23 FY 23-24 (B) Campus-Wide Fire Alarm Replacement DC

More information

GUIDELINES FOR PREPARING SECTION C: COSTS OF THE PROJECT CAPITAL IMPROVEMENT BUDGET (CIB) (Updated January 2008)

GUIDELINES FOR PREPARING SECTION C: COSTS OF THE PROJECT CAPITAL IMPROVEMENT BUDGET (CIB) (Updated January 2008) GUIDELINES FOR PREPARING SECTION C: COSTS OF THE PROJECT CAPITAL IMPROVEMENT BUDGET (CIB) (Updated January 2008) The following guidelines are to be used in the preparation of Section C: Costs of the project

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Southerly First Stage Final Settling Improvements (SFSS-1)

Southerly First Stage Final Settling Improvements (SFSS-1) Southerly First Stage Final Settling Improvements (SFSS-1) May 30, 2012 1 First Stage Final Settling Facilities 2 Project Objectives Evaluation and replacement of existing equipment Construct SFP OPT1

More information

Project Information. Nominations of Artists. University of Houston

Project Information. Nominations of Artists. University of Houston UNIVERSITY OF HOUSTON SYSTEM SYSTEM WIDE ART ACQUISTION COMMITTEE AGENDA ITEM ITEM: UH University Center Transformation Project Artwork-Artists Nominations DATE PREVIOUSLY SUBMITTED: NA SUMMARY: Nominations

More information

Common Plan Review Rejection Reasons

Common Plan Review Rejection Reasons Common Plan Review Rejection Reasons Submitted plans must contain sufficient information for plan reviewers to be able to verify that the proposed construction complies with the Virginia Uniform Statewide

More information

Cone University Center HVAC Modernization Design and Construction Administration Services Code Item 320

Cone University Center HVAC Modernization Design and Construction Administration Services Code Item 320 The University of North Carolina at Charlotte Capital Projects Facilities Management 9201 University City Blvd. Charlotte, N.C. 28223-0001 TEL: 704/687-0615 PROJECT: UNC Charlotte Cone University Center

More information

An Introduction to Central Heating Plant Planning

An Introduction to Central Heating Plant Planning An Introduction to Central Heating Plant Planning Course No: D02-002 Credit: 2 PDH J. Paul Guyer, P.E., R.A., Fellow ASCE, Fellow AEI Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony

More information

Phased Construction NO TENANT RELATED WORK IS ALLOWED WITH THIS PERMIT.

Phased Construction NO TENANT RELATED WORK IS ALLOWED WITH THIS PERMIT. Phased Construction Very Large projects are allowed to be broken into smaller pieces to assist design and construction needs. Breaking down a project into small logical construction/permit phases allows

More information

COMMERCIAL PROJECT INFORMATION

COMMERCIAL PROJECT INFORMATION Community Development Building and Inspection Services 2100 Ridge Avenue Evanston, Illinois 60201-2798 T 847.448.4311 FAX 847.448.8020 www.cityofevanston.org COMMERCIAL PROJECT INFORMATION The Community

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant

More information

Common Plan Review Rejection Reasons

Common Plan Review Rejection Reasons (CPHD) (ISD) Common Plan Review Rejection Reasons Submitted plans must contain sufficient information for plan reviewers to be able to verify that the proposed construction complies with the Virginia Uniform

More information

Wissahickon School District Natatorium & Central Plant Project. Project Update March 27, 2017

Wissahickon School District Natatorium & Central Plant Project. Project Update March 27, 2017 Wissahickon School District Natatorium & Central Plant Project Project Update March 27, 2017 Project Features 1. New central plant and receiving area to serve current High School and future Master Plan.

More information

WESTERN ILLINOIS UNIVERSITY CONSTRUCTION PROJECT PROCEDURES WESTERN ILLINOIS UNIVERSITY CONSTRUCTION POLICY

WESTERN ILLINOIS UNIVERSITY CONSTRUCTION PROJECT PROCEDURES WESTERN ILLINOIS UNIVERSITY CONSTRUCTION POLICY WESTERN ILLINOIS UNIVERSITY CONSTRUCTION PROJECT PROCEDURES WESTERN ILLINOIS UNIVERSITY CONSTRUCTION POLICY Management of all campus construction projects will be provided exclusively through the Facilities

More information

Architectural Services

Architectural Services Architectural Services 2016 Capital Improvement Program Request for Proposal Number: 18-20 Title of the Projects: Renovations to Weaver Middle School Procurement Department Bibb County School District

More information

City High Middle School pre-design recommendations. March 29, 2017

City High Middle School pre-design recommendations. March 29, 2017 City High Middle School pre-design recommendations March 29, 2017 City High Middle School table of contents 2 3 4 5 6 7 8 9 10 11 12 13 table of contents project description and purpose existing systems

More information

Energy Trigger (A Existing Building Upgrade Mechanism Model)

Energy Trigger (A Existing Building Upgrade Mechanism Model) Trigger (A-11.2.1.2 Existing Building Upgrade Mechanism Model) Applicability All Building Permit applications for projects related to existing buildings are required to follow the energy upgrade trigger

More information

City of Rohnert Park When Permits are Required

City of Rohnert Park When Permits are Required Permits are required as provided below based on the applicable code governing the trades involved in a building project. In some instances more than one trade may be involved in a project so be sure to

More information

C. of O. / P.A. Program bonded. Energy Conservation bonded Science Lab Upgrades bonded Minor Repairs hard dollar

C. of O. / P.A. Program bonded. Energy Conservation bonded Science Lab Upgrades bonded Minor Repairs hard dollar Section Contents Five-Year Capital Plan FY 2018-19 through FY 2022-23 Project Funding Type Five - Year Plan Total ( $ 000 s ) State match to existing City funding bonded $79,200 Critical Maintenance for

More information

City of Roanoke. Commercial Permit Submittal Guidelines

City of Roanoke. Commercial Permit Submittal Guidelines City of Roanoke Commercial Permit Submittal Guidelines These guidelines are for information purposes only. The contractor is obligated to comply with all adopted codes and ordinances BUILDING INSPECTIONS

More information

MCER Study for Little Powder K-8

MCER Study for Little Powder K-8 MCER Study for Little Powder K-8 CCSD #1 Little Powder K-8 Weston, WY Wyoming School Facilities Department Cheyenne, WY TSP, Inc. Sheridan, WY May 16, 2016 Table of Contents Introduction 3 Goals and Objectives

More information

NOTICE TO DESIGNERS. All letters of interest must be received prior to 2:00 PM on TBD, 2014

NOTICE TO DESIGNERS. All letters of interest must be received prior to 2:00 PM on TBD, 2014 NOTICE TO DESIGNERS The University of Southern Maine (USM), a member of the University of Maine System (UMS), is seeking Letters of Interest with accompanying Qualifications Statements from Design Teams

More information

Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION

Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Design and Construction AN ISO 9001:2008 CERTIFIED ORGANIZATION Division of Design, 35 th Floor, Corning Tower The Governor Nelson A. Rockefeller Empire State Plaza Albany, New York 12242 Phone: (518)

More information

A PRESENTATION OF THE SCHEMATIC DESIGN FOR THE CHEMISTRY BUILDING RENOVATION PROJECT WILL TAKE PLACE AT THE MAY MEETING MEMORANDUM

A PRESENTATION OF THE SCHEMATIC DESIGN FOR THE CHEMISTRY BUILDING RENOVATION PROJECT WILL TAKE PLACE AT THE MAY MEETING MEMORANDUM A PRESENTATION OF THE SCHEMATIC DESIGN FOR THE CHEMISTRY BUILDING RENOVATION PROJECT WILL TAKE PLACE AT THE MAY MEETING MEMORANDUM AGENDA ITEM 23a To: From: Subject: Board of Regents Board Office Register

More information

CITY OF CHARLOTTESVILLE DEPARTMENT OF PUBLIC WORKS

CITY OF CHARLOTTESVILLE DEPARTMENT OF PUBLIC WORKS CITY OF CHARLOTTESVILLE DEPARTMENT OF PUBLIC WORKS To: From: Subject: Aubrey Watts Judy Mueller Bill Letteri Mike Mollica Scott Hendrix Facilities Assessment Executive Summary Phase I Date: September 24,

More information

RESIDENTIAL ADDITION OR ALTERATION PERMIT REQUIREMENTS

RESIDENTIAL ADDITION OR ALTERATION PERMIT REQUIREMENTS P: (847)810-3502 OR (847)810-3503/3521, F: (847)615-4383 RESIDENTIAL ADDITION OR ALTERATION PERMIT REQUIREMENTS The following is required for a complete permit submittal. RESIDENTIAL BUILDING PERMIT, ELECTRIC

More information

PARK PLACE CASE STUDY VANCOUVER. Heat reclaim system expected to reduce steam consumption 80%, GHG emissions 68%

PARK PLACE CASE STUDY VANCOUVER. Heat reclaim system expected to reduce steam consumption 80%, GHG emissions 68% Heat reclaim system expected to reduce steam consumption 80%, GHG emissions 68% Address 666 Burrard St, Vancouver Management QuadReal Property Group Type of Building Office Year of Construction 1984 Number

More information

SECTION DESIGN REQUIREMENTS BASIS OF DESIGN GENERAL INFORMATION

SECTION DESIGN REQUIREMENTS BASIS OF DESIGN GENERAL INFORMATION BASIS OF DESIGN GENERAL INFORMATION 1.1 During the Schematic Design phase, the Consultant shall develop a Basis of Design (BOD) Document. This document shall provide a comprehensive description of the

More information

Instructional Science Facility Phase I

Instructional Science Facility Phase I Instructional Science Facility Phase I University of Wisconsin La Crosse Campus August 26, 2015 UWL Science Lab Building Phase 1 1 Project Schedule Timeline July Aug Sept Oct Nov Dec Jan Feb Mar Apr May

More information

RESOLUTION WHEREAS,

RESOLUTION WHEREAS, APPROVAL TO PROCEED WITH CONSTRUCTION FOR ALDEN LIBRARY ROOF REPLACEMENT - CONSTRUCTION PHASE, BACK SOUTH DEMOLITION - CONSTRUCTION PHASE AND BUDGET AMENDMENT, COLLEGE OF FINE ARTS (LIN HALL) INFRASTRUCTURE

More information

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior

More information

Funding Source. Ranking

Funding Source. Ranking Military Affairs Projects Summary ($ in thousands) Project Title Priority Ranking Funding Source Project Requests for State Funds 2016 2018 2020 West St. Paul 1 GO $ 4,500 $ 0 $ 0 St Cloud Facility Batch

More information

Appendix K. Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN ESTIMATING. Version 2.0

Appendix K. Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN ESTIMATING. Version 2.0 Appendix K Clean Water Nashville Overflow Abatement Program GUIDANCE FOR DESIGN ESTIMATING Version 2.0 April 2014 Table of Contents Section 1 Estimating Introduction... 1 1.1 Exception to Designer OPCCs...

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior

More information

NEW MIDDLE SCHOOL PROJECT

NEW MIDDLE SCHOOL PROJECT Monthly Report October 2017 INTRODUCTION P.J. Dick Incorporated is pleased to present to the Chartiers Valley Board of School Directors the following Construction Report for the Chartiers Valley Middle

More information

McDuff WTP High Service Pump Replacement

McDuff WTP High Service Pump Replacement T E C H N I C A L M E M O R A N D U M 642-03 MCDUFF WTP HIGH SERVICE PUMP REPLACEMENT 642-03 McDuff WTP High Service Pump Replacement PREPARED FOR: PREPARED BY: Capital Budget Planning Craig Jones DATE:

More information

2) These Standards are available on the University s website at:

2) These Standards are available on the University s website at: March 2014, rev 00 A) General 1) Definitions a. The University: Northern Illinois University; NIU. b. Prime Professional (s): Architects and Engineers and Contractors. c. EHS: NIU Environmental Health

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 1A-1 Issue date: March 2012 PHASE REPORTS FOR SMALLER PROJECTS 1. This Directive was developed to identify general requirements for the following project types. Review the referenced directives

More information

Major Project Request Biennium

Major Project Request Biennium Agency Institution Major Project Request 217-19 Biennium G16 University of Wisconsin Platteville Project Title Sesquicentennial Hall Project Request The UW System requests enumeration of $55,189, ($54,62,

More information

Combined Heat and Power Plant Twin Cities Campus

Combined Heat and Power Plant Twin Cities Campus Combined Heat and Power Plant Twin Cities Campus Location Map Combined Heat & Power Plant Project Location University of Minnesota Twin Cities East Bank Campus Energy Management Principles Reliable Sustainable

More information

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM GB2 Office of the President TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: For Meeting of May 14, 2014 ACTION ITEM AMENDMENT OF THE BUDGET FOR CAPITAL IMPROVEMENTS AND THE CAPITAL IMPROVEMENT PROGRAM,

More information

DIVISION OF ADMINISTRATION UTILITIES & ENERGY SERVICES. David Payne, P.E Interim Associate Director October 16, 2012

DIVISION OF ADMINISTRATION UTILITIES & ENERGY SERVICES. David Payne, P.E Interim Associate Director October 16, 2012 DIVISION OF ADMINISTRATION UTILITIES & ENERGY SERVICES David Payne, P.E Interim Associate Director October 16, 2012 Agenda - Production System Overview - Distributions Systems Overview - Recently Completed

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 1A-8 Issue date: October 2014 CONSTRUCTABILITY REVIEW 1. The Consultant shall be required to perform a constructability review with the College, Fund s Design Coordinator, Fund s Construction

More information

Brown University Updated March 11, 2013 Facilities Design & Construction Standards

Brown University Updated March 11, 2013 Facilities Design & Construction Standards SECTION 01 17 90 UTILITY & CRITICAL SYSTEM CONNECTIONS AND INTERRUPTIONS PART 1 - GENERAL 1.1 SUMMARY: A. Brown University operates and maintains extensive campus and building utilities and distribution

More information