1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5273 Project Name Water and Irrigation Sector Management Program 2 (WISMP 2) Region EAST ASIA AND PACIFIC Sector Irrigation and drainage (50%); General water, sanitation and flood protection sector (50%) Project ID P Borrower(s) Implementing Agency The Republic of Indonesia DGWR - Ministry of Public Works DG Bangda -Ministry of Home Affairs DGPLA- Ministry of Agriculture Environment Category [ ] A [X] B [ ] C [ ] FI [ ] TBD (to be determined) Date PID Prepared November 16, 2009 Estimated Date of August, 2010 Appraisal Authorization Estimated Date of Board November, 2010 Approval 1. Key development issues and rationale for Bank involvement 1.1 Indonesia s water resources and irrigation sector has gone through a transformation period from a centralized development and investment period to a decentralized system of service delivery in which more efficient use of resources and service quality are emphasized. The Bank played a donor leadership role with its support to the regulatory reform (Water Resources Sector Adjustment Loan (WATSAL, Ln IND) ( ) which led to a new Law on Water Resources (UU7/2004) and government regulations and implementation decrees in the years following. The Government of Indonesia (GoI) embarked in 2003 on implementation of these reforms using among others the Water Resources and Irrigation Management Sector Program (WISMP), a three-tranche adjustable program loan (APL) as a main vehicle. 1.2 The key development issues identified at the time of WISMP APL design in 2003 are: (i) institutional development and strengthening to meet the changing needs of integration, decentralization and governance; (ii) fiscal sustainability of the sector; and (iii) irrigated agriculture development. Although the water resources and irrigation policy environment has seen some changes (see Attachment 1), these issues remain the broad key development issues for the next phase, with sharpened focus as in the following Strengthening of New Water Resources and Irrigation Sector Governance and Management Institutions. Water resources management is becoming increasingly critical for socio-economic development of the country. Though Indonesia is in general a water rich country, the spatial and seasonal variation of water availability poses high risks on water security for domestic, municipal, industrial and agricultural uses. The rapid population growth, economic

2 development, urbanization and the impacts of climate change pose increasingly high pressure on land and water resources, especially on the densely populated islands of Java and Bali. Degradation of catchments results in increasing occurrence and extent of floods. Water scarcity during the dry seasons is leading to overexploitation of groundwater in different provinces. Pollution from urbanized and industrial centers is exacerbating this situation. 1.4 The new Water Law 7/2004 provides a framework for addressing these challenges in the new decentralized government context. In 2006, water resources management was re-organized based on river basin territories (WS) with cross-province basins and basins of strategic importance placed under national authority. In early 2007 the Ministry of Public Works (MPW) established 30 nationally managed, funded and staffed river basin agencies (Balai (Besar) Wilayah Sungai B(B)WS) superimposed on the WS managed then by the Provincial Water Resources Service (Balai PSDA). The remaining river basin territories were kept under the full authority of the Provincial Balai PSDA which was the focus of support under WISMP APL 1(WISMP1). The B(B)WS was given the responsibility for basin planning, development and management, as well as river infrastructure O&M for central basins, except that basin management in these basins is expected to be carried out jointly in collaborations with respective Balai PSDA. However, the institutional and financing mechanisms for the role sharing of the new institutional setup are still yet to be formally established and operationalized. Furthermore, a Multi-stakeholder National Water Council (Dewan Sumber Daya Air- DSDA), several provincial water councils (DSDAP) and basin coordination committees (TKPSDA) have been established. These organizations deserve further capacity building to function effectively as true representatives of their interest groups. 1.5 Similarly, following issuance of the new water and decentralization laws, irrigation management responsibilities have been divided among districts (schemes <1000ha), Provinces ( ha and cross district boundary) and Central Government (>3000 ha and cross province boundary). Main system irrigation management is to be implemented through partnership between the responsible irrigation service and the Water User Association Federations (WUAF). Tertiary canal system management is the sole responsibility of the Water User Association (WUA). The provincial and district (Kabupaten) agencies are becoming more aware of the fact that the WUAF is essential for day-to-day operation and maintenance, particularly because of the overall budget & staffing limitations of government agencies. Effective partnerships of different kinds are developing between the Kabupaten irrigation field staff and the WUAFs. Irrigation Committees composed of an equal number of representatives from Government agencies and WUAFs, are established following the ministerial regulations issued in They have the task to prepare annual and multi-year plans for irrigation management and system improvement which includes receiving, evaluating and prioritizing proposals for physical and non-physical works for funding from the various government sources and WUAF contributions. 1.6 In summary, many of the river basin water resources and irrigation sector governance and management institutions have been established with support from WISMP1. These new institutions need to be consolidated and integrated into routine water resources and irrigation operations. In addition, there are some second generation issues that require urgent attention, e.g.

3 there is a need is to provide necessary legal backing with much more clarity for the roles and responsibilities sharing in basin water resources and irrigation management among various responsible management agencies at central provincial and district levels, to further strengthen their capacity to enable them function effectively. WISMP 1 has mainly focused on provincial basins and smaller provincial and district irrigation schemes. In the next phase, more emphasis would need to be given to the national WS and larger irrigation systems. 1.7 Development of Revenue-Generating River Basin Corporations (BLU). As part of its endeavor to improve cost recovery and fiscal sustainability of river basin management systems, the GOI has established two River Basin Corporations (PJTs) responsible for river and bulk water supply infrastructure maintenance financed from sales of raw water, hydropower, water quality laboratory fees, and recreation fees, etc. These corporations also provide public goods such as flood warning and operation of flood control facilities. However, all infrastructure development and rehabilitation investments are funded from the national budget through MPW s BBWS/BWS agencies. These corporations are partially self-financing corporate state enterprises (Perum) regulated by the Ministry of State Enterprises. 1.8 For basins with a lesser revenue potential, an alternative structure of a not-for-profit public service basin agency or corporation (Badan Layan Umum or BLU) is being considered. The BLU has a semi-independent statute like that of a state hospital, and can receive income both from ministry budget and from fees (e.g. in the case of river management from the bulk water service delivery). The BLU would be under MPW and not subject to the strict positive corporate Balance Sheet requirements of a Perum state enterprise. The BLU is also expected to respond better to the Provincial & Basin Water Councils and Coordinating Committees having non-government stakeholder members. Currently 2-3 river basins have been selected for transition from management by B(B)WS to a BLU structure. Nevertheless, the corporate structure and joint finance (fees & government budget) principles of a river basin BLU have yet to be determined by MPW and sanctioned by the GoI. Furthermore, the detailed operating rules are to be developed, management capacity and service delivery quality as well as physical infrastructure systems remain to be improved. 1.9 Substantial Needs for Infrastructure Improvement. The condition and adequacy of water resources and irrigation infrastructure have degraded considerably after decades of lack of investments in maintenance. Major investments for improvement and new infrastructure are now needed in irrigation systems and river infrastructure to enhance service levels, water use efficiency, and water and food security. Such rehabilitation and improvement need to go hand in hand with the institutional development process including strengthening of an effective, well staffed and well funded O&M organization for the infrastructure. The sustainability of infrastructure is also dependent on timely allocation of sufficient O&M funds from central, provincial and district government budgets and in case of the BLU also from internal revenue generated from service fees. New mechanisms for fund allocation and transfer to executing agencies are being developed, e.g. the deconcentration budget from central government (Tugas Pembantuan - TP) for O&M of infrastructure under central government responsibility. Such a budget system has already been established for the irrigation systems but similar arrangement has yet to be developed for river infrastructure.

4 1.10 Improvement of Irrigated Agriculture Performance. Farmers are still at the lower end of the poverty scale and are most vulnerable to climate and market risks. Farmers adaptive capacity rises with their awareness of the risks and income level. Higher income in turn enables farmers to contribute more to irrigation system management. Therefore, investments in infrastructure and irrigation management institution strengthening need to be accompanied by improvement of irrigated agriculture practices to adapt to climate change, raise agricultural productivity and strengthen the agricultural value chain. This would contribute to increase in farming households income. Pilots have been successfully initiated under WISMP1 using the critical mass created by the WUAFs for integration of water management, raising productivity and farmers income through intensification, diversification, value-addition activities and enhancing extension and credit services credit. These initiatives need to be further advanced and scaled up in other areas Government strategy and commitment: The government s strategy towards strengthening the new sector governance and management institutions is to shift the focus to national/more strategic river basins (territories) and larger irrigation systems, building on the WISMP1 experiences and achievements in institutional development and capacity building with limited investments in infrastructure improvement, to increase the program coverage and impacts. It also calls for increase in investment scale of infrastructure improvement to make up for the deferred maintenance in the last decade or so. For improvement of fiscal sustainability, the government intends to continue building the asset management capacity of basin and irrigation management agencies, and establish good model of cost recovery and need-based infrastructure O&M through a combination of revenue collection by PJT at the basin level, WUAFs contributions to and taking increasing share of responsibilities and expenditures for irrigation system management, as well as earmarked government O&M budget. Finally, the government s strategy for PIM remains unchanged, that is, to empower and strengthen WUAFs as self-sustaining and autonomous groups that can take new initiatives in irrigated agriculture and take advantage of multiplier opportunities (group purchase of agricultural production inputs, group credit and marketing, and village enterprises, etc.) for raising productivity and farmers income, with necessary technical support and extension services from district line agencies. The GOI has demonstrated its strong commitment to continuing with the next phase of WISMP. This is reflected by the fact that preparatory work for WISMP2 has been initiated using bridging funds from WISMP1, and the GOI has earmarked $200 million of Bank loan in the MOU with the Bank WISMP 1 Achievements: The first tranche of WISMP APL (WISMP-1) is coming to a close in December The main achievements of WISMP 1 to date in relation to the program objectives are as follows: (i) Part A BWRM: Under the new Law on Water Resources (Law 7/2004) and its downstream government (PP) and ministerial regulations (PerMen) which form a new institutional framework of the sector for decentralization, stakeholder participation, transparency and accountability, a large number of provincial and national river basin organizations (Balai PSDA and Balai WS respectively) have been established and their capacity strengthened through WISMP1. Following the issuance of an instructive decree in 2008, several provinces and river basins established multi-stakeholder Provincial Water Councils and Basin Coordination Committees. This was followed establishment of an apex organization - the National Water Council by GOI through a presidential decree in 2009.

5 (ii) For Part B PIM: The PP 20/2006 lays out the PIM principles and provides legal basis for empowering farmers through their WUAs/WUAFs in all management processes from planning, design, and construction to operation and maintenance. With most of the facilitating nationalgovernment regulations now issued and most institutions in place, local governments are starting to act upon them. To date, over 1,000 Water User Association Federations (WUAFs) covering some hectares of irrigation command areas have been legally established and strengthened. In most of the participating districts and provinces, Irrigation Committees have been established with WUAF representation. Provincial and district regulations (PERDA) on irrigation have been issued reflecting the participatory irrigation management principles and mode of implementation. In many of the irrigation schemes, water users and especially farmer irrigators, are assuming their new responsibilities through their WUAFs. Preliminary qualitative results of independent surveys show that with the partnerships established between irrigation services and WUAFs and the linking of irrigation management programs with agricultural improvement programs irrigation water use efficiency increased, harvested area increased and crop yields increased. Conflicts among water users reduced and additional income is generated through a higher level of involvement of the WUAFs in the maintenance and rehabilitation works of the irrigation agencies main systems. Nevertheless, for the majority of schemes the participatory process has just started. This development progresses at slow pace as it needs to adjust to the rate at which the local governments, newly empowered by the Regional Autonomy Laws, and civil society-based organizations can develop the requisite local consensus, and absorb the new opportunities. Moreover, the newly formulated tasks, responsibilities and associated activities need to be consolidated and firmly embedded in routine government and users systems and operations Triggers for initiating WISMP2. The four triggers for initiating APL2, as defined in the PAD of WISMP1 have been achieved or exceeded as explained below (see also Attachment 4), which shows that the APL program is ready to the next phase. (i) 4 fully functioning Balai PSDA: (a) 8, instead of 4, Balai PSDA are staffed adequately as determined by work load analysis and have been trained in aspects of management, technical, financial and communication skills; (b) all 16 Balai PSDA in Java are adequately funded up to 50% by provincial APBD funds for all administrative, operational and O&M aspects based on a Need-Based Budget; (c) all Balai PSDA have full planning, budgetary and implementation control as evidenced by designating the Balai PSDA Staff as Project Manager or as Sub-Project Manager with full spending authority; (d) introduction and implementation of asset management and quality assurance programs for managing the river infrastructure asset are implemented in at least two provinces; (e) all core Balai have completed the required data base for basin water resources management and developed an MIS; (f) all Balai implemented the basin activities that are of importance and agreed to by BWRC, in terms of bulk water allocation, water quality monitoring and river infrastructure management as evidenced by the Balai PSDA annual report; and (g) all have obtained a satisfactory rating in the annual Balai PSDA institutional evaluation by the Dinas PUP; (ii) 50 WUAFs legally established and functional: Over 740 WUAFs, far exceeding the target, have been legally established and functional with respect to O&M of lower irrigation systems, and organizing irrigation and agricultural extension services;

6 (iii) Operational Guidelines agreed on river basin management including environmental and social safeguards: This target has virtually been met. The operational guidelines have been developed and agreed on except that the environmental and social safeguards guidelines are being finalized and are expected for full completion by March, 2010; (iv) 50% of external funding disbursed: The loan/credit disbursement is about 60% as of end October, An overview of the level of achievement of the triggers, the DCA performance indicators and the PAD Logframe indicators is presented in Attachments 2 and 3. The Logframe indicators shows that substantial progress has been made in achieving the PDOs and that the outcome targets of each component are largely achieved or exceeded in many cases. The latest report of the WISMP 1 Independent Evaluation & Monitoring Unit (IMEU) indicates that field surveys reveals a perception of increased household income and food security amongst irrigator household beneficiaries. Achievement level of these indicators is high and all targets are likely to be satisfactorily achieved by WISMP1 closure. Rationale for Bank Involvement 1.15 The Bank is in a good position to support the proposed project as it has accumulated knowledge and experience on decentralization issues, local government and water sector reform through its sector work and lending operations. More specifically, the Bank involvement is justified because of the following reasons: (i) this program is in line with the CPS for Indonesia which emphasizes decentralization of civil services, and improvement of governance for natural resources management, as well as the Infrastructure theme for Central and Sub-National Government sector institutions and systems. First, the WISMP aims to strengthen sector institutional accountability through: (a) the social accountability mechanisms of the project/program; (b) promoting external transparency & public access to information via its stakeholder representation & community organization (WUAFs) institutions; and (c) promote efficiency in use of public funds by addressing the problem of deferred maintenance and premature rehabilitation. Second, it promotes sector institutional capacity building via: (a) improved legal & regulatory framework; (b) better operational, technical & administrative policies, procedures & standards; (c) better management organizations with clear roles & responsibilities; (d) better management information & evaluation systems that support policy formation and effective management; and (e) enhanced planning, programming & budgeting capacity; (ii) through the WISMP1 and NTB-WRM, as well as other investment projects supported by the Bank in different sectors, it has been deeply involved in building government capacity at the national, provincial, kabupaten and community levels; (iii) the Bank has developed good channels of communication with central and provincial policy makers through which it can influence debate and policy decisions; (iv) the Bank has also established constructive relations with civil organizations in the water sector through different projects it supported at various levels; and

7 (v) the Bank has been leading the sector reform through a series of reform-oriented engagements in collaborations with other development partners. It is thus logical for the Bank to continue to show leadership in fostering the GoI/Development partnership to improve sector performance. 2. Proposed objective(s) 2.1 The development objectives of the proposed project are to further improve the governance, institutional capacity and infrastructure for basin water resources and irrigation management and service delivery, and increase irrigated agriculture productivity in the target river basins and provinces. 2.2 Achievement of the development objectives would be assessed through the following performance indicators: (i) effective role-sharing and funding mechanism legally established for management of national river basins covered by the Project; (ii) number of BLU basin agencies operational with satisfactory governance structure and adequate resources for sustainable O&M of the river systems; and (iii) increase in agricultural productivity and farmer income in the project irrigation command areas. 3. Preliminary description 3.1 Broadly the Project will cover: (i) further improvement of water resources and irrigation management capacity and effectiveness through investments in institutional strengthening, capacity-building and infrastructure; and (ii) interventions to increase irrigated agriculture productivity and farmers income, likely with the following three components. Component 1. Improvement of basin water resources management and participatory irrigation management (Tentative cost US$145 million) This component supports the consolidation of water sector reforms at national and local government levels, and development of selected service-provision river basin organizations. It will provide funding to further improve BWRM and PIM, in terms of technical capacity, operational effectiveness and physical system performance, and fiscal sustainability. The Component would likely have the following sub-components: A. Basin Water Resources Management A1. Improvement of Basin Management Institutions and Infrastructure: It provides support for further development and strengthening of selected river basin agencies established under WISMP 1 in basin planning, water allocation & water right management, asset management and inter-agency coordination, and for river infrastructure improvement; A2. Development of Sustainable Public-Service River Basin Organizations (BWS-BLU): It would support appropriate governance structure, improvement of management capacity and infrastructure in a number of selected river basins that are earmarked for transition from Balai (Besar)Wilayah Sungai (BBWS river territory management unit under MPW) to a Badan Layanan Umun (BLU). It would likely cover: (i) establishment and capacity building

8 of BWS-BLU, including a set of interventions for institutional development, management strategy, and capacity-building to improve service delivery and fiscal sustainability; and (ii) river and irrigation infrastructure rehabilitation and improvement, possibly including nonstructural measures. A3. National Hydrology Management Program and Information System (NHMP/SISDA): It would support development and implementation of a NHMP that would help improve the availability and quality of critical hydrological information, and enable assessment of water resources potential and utilization for scientific decision-making. B. Participatory Irrigation Management This sub-component will provide continued support to selected irrigation schemes which received supports from WISMP1, and support to larger irrigation systems under central government responsibility (>3000 ha). B1. Institutional strengthening and capacity building for participatory irrigation management: Continued support for empowerment and scaling up of WUA/WUAFs and irrigation committees, and for capacity-building of irrigation management agencies and WUAFs to improve irrigation service delivery, multi-year planning and O&M of irrigation and drainage infrastructure; B2. Irrigation System Improvement at different levels: Rehabilitation and improvement of central, provincial and district government irrigation system infrastructure taking into account climate change impacts; B3. Irrigated agriculture support and climate change adaptation: support for agriculture extension activities, climate change adaption measures incl. replication of technological innovations (e.g. SRI), and other interventions for improving agricultural productivity and raising farmers income. Component 2. Jatiluhur Irrigation System Rehabilitation and Improvement (Tentative cost US$ 90 million) This Component will provide support for the rehabilitation and modernization of the largest irrigation system of the country - Jatiluhur Irrigation System in northern West Java, including the North and East Tarum Canal systems, for management improvement including development/strengthening and capacity building of the WUAFs, the Irrigation Committees and the Kabupaten Irrigation Services, and for measures to increase agricultural productivity. It likely includes three sub-components: J1. Institutional strengthening for Irrigation system management: development and operationalization of an effective inter-agency management scheme involving related management agencies and farmer water user associations and their federations; J2. Infrastructure rehabilitation for I&D, flood and sediment management; and J3. Irrigated agriculture support and climate change adaptation: Agriculture extension activities for productivity improvement, replication of technological innovations (e.g. SRI), and limited post-harvest support, etc. Component 3. Project Management and Technical Assistance (Tentative cost: US$15 million)

9 This Component would support project management, technical assistance for project implementation, independent M&E, investment planning studies and other preparatory activities needed for preparation of future investment interventions. 3.2 Project Costs and Schedule. The total project costs are expected to be around $250 million, including a Bank loan of $200 million. The project would become effective in January, 2011, immediately after the completion of WISMP 1. The project would last for 5 years. 3.3 Implementation Arrangements. Implementation arrangements will build on the experiences of WISMP1 and introduce necessary adjustments based on the results of PIP TA and Jatiluhur Irrigation System Management Improvement Study. It is expected that project implementation units (PIUs) would need to be established at national, provincial and district levels. The central implementing agencies of the project would be MoPW-DGWR, MoA DG PLA and MoHA- DG Bangda, with MoPW and Bappenas as the anchor ministry and crosssector coordination agency respectively. Civil societies would be engaged in project investment identifications and selections, as well as social mobilization and capacity building of irrigation water user community organizations (WUAs and WUAFs). 4. Safeguard policies that might apply [Guideline: Refer to section 4 of the PCN. Which safeguard policies might apply to the project and in what ways? What actions might be needed during project preparation to assess safeguard issues and prepare to mitigate them?] The initial assessment indicates that the following safeguard policies may apply: environmental assessment, pest management (to be confirmed), and dam safety (to be confirmed). A fuller assessment of the policies applicable would be made during project preparation. The implementing agencies are committed to carrying out the necessary assessments and action plans in a participatory manner and information disclosure in accordance with the Bank safeguard policies as mentioned in more detail in the ISDS. 5. Tentative financing Source: ($m.) Borrower 50 Beneficiary Contributions Bilateral Grant International Bank for Reconstruction and Development 200 Total Contact point Contact: Xiaokai Li Title: Senior Water Resources Specialist East Asia and Pacific Region Washington, D. C., USA Tel: (202) xli@worldbank.org

10

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 12/27/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1145 Project Name. Sindh Water Sector Improvement Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1145 Project Name. Sindh Water Sector Improvement Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1145 Project Name Sindh

More information

Indonesia-Lombok Poverty Alleviation and... Environmental Infrastructure Project

Indonesia-Lombok Poverty Alleviation and... Environmental Infrastructure Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency Regional Dev. &

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name. Parent Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name. Parent Project Name. Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan 1.Name of the Project Country: The Republic of Indonesia Project: Upper Citarum Basin Flood Management Sector Loan Loan Agreement: March 28,

More information

Integrated Safeguards Data Sheet (Initial)

Integrated Safeguards Data Sheet (Initial) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Initial) Report No: AC124 Section I - Basic Information

More information

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name Balochistan Small Scale Irrigation Project Region SOUTH ASIA

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sectors Project ID Borrower Responsible Agency Report No. PID6537

More information

Member s Annual Report 2005

Member s Annual Report 2005 Member s Annual Report 2005 Date of preparation: 31 /July/2006 Name of the editor: Herman Idrus, Reni Mayasari, Tenti Utami, Ary Ramayansyah 1. About the organization (1) Name of the organization JASA

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6559 Project Name. Arab World Initiative for Financing Food Security Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6559 Project Name. Arab World Initiative for Financing Food Security Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB6559 Project Name Arab World Initiative for Financing Food Security Region MIDDLE EAST AND NORTH AFRICA Sector General agriculture, fishing

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Parent Project

More information

[Approval by mail] Indonesia: Promoting Sustainable Community Based Natural Resource Management and Institutional Development (World Bank) FIP

[Approval by mail] Indonesia: Promoting Sustainable Community Based Natural Resource Management and Institutional Development (World Bank) FIP October 2, 2015 [Approval by mail] Indonesia: Promoting Sustainable Community Based Natural Resource Management and Institutional Development (World Bank) FIP World Bank Response to Comments Received from

More information

NATIONAL FRAMEWORK FOR ACCELERATING THE UPTAKE OF NATURED-BASED SOLUTIONS

NATIONAL FRAMEWORK FOR ACCELERATING THE UPTAKE OF NATURED-BASED SOLUTIONS NATIONAL FRAMEWORK FOR ACCELERATING THE UPTAKE OF NATURED-BASED SOLUTIONS Abdul Malik Sadat Idris Director of Water Resources and Irrigation Indonesia Ministry of National Development Planning Jakarta,

More information

Regional Experiences on Irrigation Modernization. Joop Stoutjesdijk Lead Irrigation Engineer, World Bank

Regional Experiences on Irrigation Modernization. Joop Stoutjesdijk Lead Irrigation Engineer, World Bank Regional Experiences on Irrigation Modernization Joop Stoutjesdijk Lead Irrigation Engineer, World Bank Why Modernize Few main reasons why to modernize: Rapidly increasing competing uses for water. Irrigation

More information

ETHIOPIA - AGRICULTURAL GROWTH PROJECT (AGP) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5416 Project Name

ETHIOPIA - AGRICULTURAL GROWTH PROJECT (AGP) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB5416 Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ETHIOPIA - AGRICULTURAL GROWTH PROJECT (AGP) PROJECT INFORMATION DOCUMENT (PID) APPRAISAL

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Peru Second Rural Electrification

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Peru Second Rural Electrification Project Name Region Sector Project ID GEF Focal Area Global Supplemental ID Borrower(s) Implementing Agency PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Peru Second Rural Electrification Latin America

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: June 10, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Brazil Project Name: Brasilia Environmentally Sustainable Pro

More information

Sri Lanka: National Water Resources Authority

Sri Lanka: National Water Resources Authority Sri Lanka: National Water Resources Authority I. Description of NWASAB (i) Introduction Sri Lanka s water sector reforms are influenced by number of warning signs related to water and non-availability

More information

BASIN WATER RESOURCES MANAGEMENT AND ORGANIZATION IN INDONESIA

BASIN WATER RESOURCES MANAGEMENT AND ORGANIZATION IN INDONESIA BASIN WATER RESOURCES MANAGEMENT AND ORGANIZATION IN INDONESIA By: Imam Anshori 1 ABSTRACT: This paper introduces basic policy, operational, and institutional aspects of basin water resources management

More information

IRRIGATION MANAGEMENT TO INCREASE AGRICULTURE PRODUCTION ( Indonesian Experiences)

IRRIGATION MANAGEMENT TO INCREASE AGRICULTURE PRODUCTION ( Indonesian Experiences) IRRIGATION MANAGEMENT TO INCREASE AGRICULTURE PRODUCTION ( Indonesian Experiences) Presented by Prasetyo Nuchsin Ministry of Agriculture Republic of Indonesia The First Meeting Of The COMCEC AGRICULTURE

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

Role of Climate Smart Agriculture in achieving Land Degradation Neutrality in Sri Lanka. Champika S Kariyawasam

Role of Climate Smart Agriculture in achieving Land Degradation Neutrality in Sri Lanka. Champika S Kariyawasam Role of Climate Smart Agriculture in achieving Land Degradation Neutrality in Sri Lanka Champika S Kariyawasam Land Degradation Neutrality- Global Developments 2012 - UN Conference on Sustainable Development

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s)

More information

M&E and Special Studies

M&E and Special Studies M&E and Special Studies Quarterly Progress Report: April to June 2016 Summary Information Status Activity Number Task Team Leader(s) Executing Agency(ies) Start date to Closing Date Geographic Coverage

More information

Extract from TAJIKISTAN SPCR October Building Climate Resilience in the Pyani River Basin. Title

Extract from TAJIKISTAN SPCR October Building Climate Resilience in the Pyani River Basin. Title Extract from TAJIKISTAN SPCR October 2010 Title Building Climate Resilience in the Pyani River Basin Government Contact MDB contact Objective of the proposed activity Expected duration Estimated Level

More information

Pernambuco Equity and Inclusive Growth DPL II Region

Pernambuco Equity and Inclusive Growth DPL II Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB7125 (The report

More information

Member s Annual Report 2007

Member s Annual Report 2007 Member s Annual Report 2007 Date of preparation: 4/15/2008 Name of the editor: Herman Idrus, CES 1. About the organization (1) Name of the organization and postal address of the office Jasa Tirta II Public

More information

Pakistan Development Forum. Presentation by

Pakistan Development Forum. Presentation by Pakistan Development Forum Presentation by M. Ali Shah, Country Director, ADB Pakistan Resident Mission Islamabad 18 March 2004 Part 1 - An Overview of Pakistan Part 2 - The Water Perspective Part 3 -

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5158 Project Name

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5158 Project Name PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5158 Project Name Pakistan Skill Development Region SOUTH ASIA Sector Vocational training (100%) Project ID P118177 Borrower(s) GOVERNMENT

More information

Additional Result Areas and Indicators for Adaptation Activities

Additional Result Areas and Indicators for Adaptation Activities Additional Result Areas and Indicators for Adaptation Activities GCF/B.06/03 9 February 2014 Meeting of the Board 19 21 February 2014 Bali, Indonesia Agenda item 7 Page b Recommended action by the Board

More information

Vision for Water for the World Bank

Vision for Water for the World Bank Vision for Water for the World Bank How the Bank will increase its effectiveness to help clients deal with an increasingly urgent and increasingly complex water challenge EAP Water CoP June 2015 The Water

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

Cofinancing (US$M): b.were the project objectives/key associated outcome targets revised during implementation? No

Cofinancing (US$M): b.were the project objectives/key associated outcome targets revised during implementation? No Public Disclosure Authorized IEG ICR Review Independent Evaluation Group Report Number: ICRR14682 1. Project Data: Date Posted: 03/23/2015 Public Disclosure Authorized Public Disclosure Authorized Public

More information

Droughts and floods, crop failures, degradation of natural resources are increasingly linked to, or exacerbated by climate

Droughts and floods, crop failures, degradation of natural resources are increasingly linked to, or exacerbated by climate WFP sees climate change as a multiplier of existing risks to food security, threatening to undermine the gains in eradicating food insecurity and poverty. It is affecting the livelihoods of the vulnerable

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. GZ-Gaza II Emergency Water Project MIDDLE EAST AND NORTH AFRICA PLO FOR THE BENEFIT OF THE PA

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. GZ-Gaza II Emergency Water Project MIDDLE EAST AND NORTH AFRICA PLO FOR THE BENEFIT OF THE PA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE GZ-Gaza II Emergency

More information

STATE WATER POLICY. 1. The Need for a State Water Policy

STATE WATER POLICY. 1. The Need for a State Water Policy STATE WATER POLICY 1. The Need for a State Water Policy Water is a prime natural resource, a basic human need and a precious asset of the State. Planning, development, operation and maintenance of all

More information

Himachal Pradesh Environmentally Sustainable Development DPL Region

Himachal Pradesh Environmentally Sustainable Development DPL Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROGRAM INFORMATION DOCUMENT (PID) CONCEPT STAGE May 30, 2011 Report No.: AB6585 (The

More information

Water Pricing in South Africa incorporating social and environmental elements Sacramento Water Pricing Workshop, February 2016 Barbara Schreiner

Water Pricing in South Africa incorporating social and environmental elements Sacramento Water Pricing Workshop, February 2016 Barbara Schreiner Water Pricing in South Africa incorporating social and environmental elements Sacramento Water Pricing Workshop, February 2016 Barbara Schreiner Background Middle income country Extremely high Gini co-efficient

More information

INTEGRATED WATER RESOURCES MANAGEMENT ROAD MAP

INTEGRATED WATER RESOURCES MANAGEMENT ROAD MAP Karnataka Integrated and Sustainable Water Resources Management Investment Program (RRP IND 43253) INTEGRATED WATER RESOURCES MANAGEMENT ROAD MAP 1. Integrated River Basin Management Activities to improve

More information

Institutionalizing Agricultural Water Management at Local Level in Sri Lanka What have we learn?

Institutionalizing Agricultural Water Management at Local Level in Sri Lanka What have we learn? Institutionalizing Agricultural Water Management at Local Level in Sri Lanka What have we learn? Eng.(Mrs) K.R.S.Perera Ministry of Agriculture Development & Agrarian Services Sri Lanka. Out Line of the

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291. Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291. Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA1291 Project Name

More information

Gender and Financing for Climate Change Mitigation and Adaptation in the Philippines

Gender and Financing for Climate Change Mitigation and Adaptation in the Philippines Gender and Financing for Climate Change Mitigation and Adaptation in the Philippines A Pro-poor and Gendersensitive Perspective By: Athena Peralta Objectives of the Case Study The study aims to critically

More information

Forest Carbon Partnership Facility (FCPF) Participants Committee (PC23) Meeting. March 27-29, 2017, Washington DC

Forest Carbon Partnership Facility (FCPF) Participants Committee (PC23) Meeting. March 27-29, 2017, Washington DC Forest Carbon Partnership Facility (FCPF) Participants Committee (PC23) Meeting Update on Gabon s Readiness progress March 27-29, 2017, Washington DC 1 Agenda I. Characteristics and challenge of Gabon

More information

STRENGTHENING THE ENABLING ENVIRONMENT FOR STBM IN EAST NUSA TENGGARA (NTT) PROVINCE

STRENGTHENING THE ENABLING ENVIRONMENT FOR STBM IN EAST NUSA TENGGARA (NTT) PROVINCE STRENGTHENING THE ENABLING ENVIRONMENT FOR STBM IN EAST NUSA TENGGARA (NTT) PROVINCE Reflections from Final Project Learning Event with Change Agents and Delivery Team June 2016 A more conducive enabling

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5150 Project Name. Indonesia Power Transmission Development Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5150 Project Name. Indonesia Power Transmission Development Project Region PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5150 Project Name Indonesia Power Transmission Development Project Region EAST ASIA AND PACIFIC Sector Power (100%) Project ID P117323 Borrower(s)

More information

MAIN REPORT of SOCIO ECONOMIC BASELINE SURVEY (SEBS) AND PARTICIPATORY RURAL APPRAISAL (PRA)

MAIN REPORT of SOCIO ECONOMIC BASELINE SURVEY (SEBS) AND PARTICIPATORY RURAL APPRAISAL (PRA) FOOD AND AGRICULTURE ORGANIZATION OF THE UNITED NATIONS - ROME Special Programme for Food Security (SPFS Project GCSP/INS/073/JPN) MAIN REPORT of SOCIO ECONOMIC BASELINE SURVEY (SEBS) AND PARTICIPATORY

More information

Terms of Reference - INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

Terms of Reference - INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Terms of Reference - INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Position: Consultants for Waste Management Program Development Closing date: 6 March 2014 GENERAL INFORMATION Title : Consultants for Waste

More information

Summary of Project/Program. Summary - Project Approval Request. Amount (USD):USD 1 1 million Date: June 29 th, 2011

Summary of Project/Program. Summary - Project Approval Request. Amount (USD):USD 1 1 million Date: June 29 th, 2011 Summary of Project/Program PILOT PROGRAM FOR CLIMATE RESILIENCE Summary - Project Approval Request 1. Country/Region: Zambia 2. CIF Project ID#: (Trustee will assign ID) 3. Project/Program Title: Strengthening

More information

COMMUNITY WATER SUPPLY & SANITATION PROJECT SRI LANKA

COMMUNITY WATER SUPPLY & SANITATION PROJECT SRI LANKA COMMUNITY WATER SUPPLY & SANITATION PROJECT SRI LANKA Sri Lanka PROFILE OF SRI LANKA Sri Lanka : An island nation Land Area : 64,740 sq km Total population : 20.9 million Rural population : 16.4 million

More information

MINISTÈRE DES AFFAIRES ÉTRANGÈRES ET EUROPÉENNES 20 December /5 6th World Water Forum Ministerial Process Draft document

MINISTÈRE DES AFFAIRES ÉTRANGÈRES ET EUROPÉENNES 20 December /5 6th World Water Forum Ministerial Process Draft document MINISTÈRE DES AFFAIRES ÉTRANGÈRES ET EUROPÉENNES 20 December 2011 1/5 6th World Water Forum Ministerial Process Draft document 1. We the Ministers and Heads of Delegations assembled in Marseille, France,

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 05-Mar-2014

More information

ASSESSMENT OF PUBLIC SECTOR MANAGEMENT

ASSESSMENT OF PUBLIC SECTOR MANAGEMENT CAPE Tajikistan, Linked Document 11 ASSESSMENT OF PUBLIC SECTOR MANAGEMENT A. Introduction 1. This report presents the findings of the assessment of Asian Development Bank (ADB) support for public sector

More information

The World Bank Pernambuco Rural Economic Inclusion (P120139)

The World Bank Pernambuco Rural Economic Inclusion (P120139) Public Disclosure Authorized Public Disclosure Authorized The World Bank RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING OF PERNAMBUCO RURAL ECONOMIC INCLUSION APPROVED ON MARCH 6, 2012 TO STATE

More information

A paradigm shift for economic growth Republic of Korea s National Strategy for Green Growth and Five-Year Plan

A paradigm shift for economic growth Republic of Korea s National Strategy for Green Growth and Five-Year Plan Low Carbon Green Growth Roadmap for Asia and the Pacific CASE STUDY A paradigm shift for economic growth Republic of Korea s National Strategy for Key point More than a vision, green growth is pursued

More information

CHINA BUILDING INSTITUTIONS FOR SUSTAINABLE URBAN TRANSPORT

CHINA BUILDING INSTITUTIONS FOR SUSTAINABLE URBAN TRANSPORT CHINA BUILDING INSTITUTIONS FOR SUSTAINABLE URBAN TRANSPORT A World Bank Analytical Advisory Activity Collaboration between World Bank China Academy of Urban Planning and Design Institute of Comprehensive

More information

EXPERIENCE IN MANAGING CITARUM RIVER BASIN

EXPERIENCE IN MANAGING CITARUM RIVER BASIN JASA TIRTA II PUBLIC CORPORATION EXPERIENCE IN MANAGING CITARUM RIVER BASIN Bangkok Chiang Mai, Thailand July 26 th August 6 th 2004 Integrated Waetr Resources Management (IWRM) Training Course ORIENTATION

More information

Monitoring and Evaluation: A Logical Frame. Evaluating the Impact of Projects and Programs Beijing, China, April 10-14, 2006 Shahid Khandker, WBI

Monitoring and Evaluation: A Logical Frame. Evaluating the Impact of Projects and Programs Beijing, China, April 10-14, 2006 Shahid Khandker, WBI Monitoring and Evaluation: A Logical Frame Evaluating the Impact of Projects and Programs Beijing, China, April 10-14, 2006 Shahid Khandker, WBI 1 What is M&E? Monitoring and evaluation are tools that

More information

Honduras experience on NAP

Honduras experience on NAP Honduras experience on NAP Climate Change in Honduras Climate vulnerability is composed of three main components: exposure, sensitivity and adaptive capacity. In addition to the climatic conditions and

More information

KINGDOM OF CAMBODIA NATION KING RELIGION

KINGDOM OF CAMBODIA NATION KING RELIGION KINGDOM OF CAMBODIA NATION KING RELIGION ROYAL GOVERNMENT OF CAMBODIA STRATEGIC FRAMEWORK FOR DECENTRALIZATION AND DE-CONCENTRATION REFORMS 17 June 2005 Unofficial translation from the original text in

More information

Exploring Ways to Benchmark River Basin Performance

Exploring Ways to Benchmark River Basin Performance Exploring Ways to Benchmark River Basin Performance Chris Morris, Senior Water Resources Engineer NARBO Third General Meeting, 21 February 2008, Surakarta. Where are we? 2 Citarum River Basin Strategic

More information

ADB in Vietnam. ADB s Climate Change Related Interventions in Vietnam. ADB in Vietnam. Outline

ADB in Vietnam. ADB s Climate Change Related Interventions in Vietnam. ADB in Vietnam. Outline ADB in Vietnam ADB s Climate Change Related Interventions in Vietnam Presentation for Mekong Delta Climate Change Forum Can Tho City, 12-13 November 2009 Ayumi Konishi, ADB Country Director for Vietnam

More information

Workshop Key Messages. German Habitat Forum Berlin, June 1-2, 2016

Workshop Key Messages. German Habitat Forum Berlin, June 1-2, 2016 Workshop Key Messages German Habitat Forum Berlin, June -2, 206 June, 206 A Refugees and Migration in an Urban Context Apply spatial solutions such as allowing modular and flexible approaches, e.g. in

More information

Palestinian Water Sector Capacity Building

Palestinian Water Sector Capacity Building Palestinian Water Sector Capacity Building By Khairy Al-Jamal Senior Infrastructure Specialist World Bank, MNSSD International Conference -Sustainable Development and Management of Water in Palestine-

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Lahendong II Geothermal Power Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Lahendong II Geothermal

More information

The Reform of the Water Sector in Tanzania

The Reform of the Water Sector in Tanzania The Reform of the Water Sector in Tanzania Ernst Doering GTZ - Support to the Tanzanian Water Sector Reform Programme P.O. Box 1519, Dar es Salaam, Tanzania E-mail: mowld.gtz@africaonline.co.tz Abstract

More information

Chapter 13 of Agenda 21

Chapter 13 of Agenda 21 Chapter 13 of Agenda 21 What is Agenda 21? Agenda 21 is the global plan of action that was adopted at the United Nations Conference on Environment and Development (UNCED) held in Rio de Janeiro, Brazil,

More information

(3 rd version to be launched in 2013)

(3 rd version to be launched in 2013) 2013 (3 rd version to be launched in 2013) Message of the President of the Republic Indonesia (extracted from the 2009 FSVA) Food is a basic human necessity, therefore the fulfillment is not only to satisfy

More information

Ancha Srinivasan, Ph.D. Asian Development Bank

Ancha Srinivasan, Ph.D. Asian Development Bank MDB-Country Collaboration, Programmatic Approach and Integration into National REDD+ Agenda: A Few Insights from Preparing the Investment Plan for Indonesia Ancha Srinivasan, Ph.D. Asian Development Bank

More information

Project Name PROJECT INFORMATION DOCUMENT (PID) Nepal Village Micro Hydro Carbon Offset Project. South Asia SASSD P095978

Project Name PROJECT INFORMATION DOCUMENT (PID) Nepal Village Micro Hydro Carbon Offset Project. South Asia SASSD P095978 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) Implementing Agency PROJECT INFORMATION

More information

A FRAMEWORK FOR EMPOWERMENT: SUMMARY

A FRAMEWORK FOR EMPOWERMENT: SUMMARY A FRAMEWORK FOR EMPOWERMENT: SUMMARY Poverty Reduction Group, World Bank, May 2002 Based on Empowerment and Poverty Reduction: A Sourcebook, World Bank, 2002 World Development Report 2000/2001: Attacking

More information

Report on Strategic Partners Workshop CUTS-SDIP Project 1 st May 2015, New Delhi, India

Report on Strategic Partners Workshop CUTS-SDIP Project 1 st May 2015, New Delhi, India Venue: Hotel Metropolitan, New Delhi, India Report on Strategic Partners Workshop CUTS-SDIP Project 1 st May 2015, New Delhi, India Participating organizations: CRRID, CUTS, DFAT, NEFORD, RGVN, SDPI, SNV,

More information

Contracting Out Government Functions and Services: Lessons from Post-Conflict and Fragile Situations. Wendy B. Abramson Washington, DC, 21 June 2011

Contracting Out Government Functions and Services: Lessons from Post-Conflict and Fragile Situations. Wendy B. Abramson Washington, DC, 21 June 2011 Contracting Out Government Functions and Services: Lessons from Post-Conflict and Fragile Situations Wendy B. Abramson Washington, DC, 21 June 2011 13:25 14:00: Background on the Handbook Objectives of

More information

Policy and Strategy for Capacity Development in the Water Sector

Policy and Strategy for Capacity Development in the Water Sector Policy and Strategy for Capacity Development in the Sector Table of contents 1. Introduction 1.1 Capacity Development 1.2 Sector 2. Process of policy formulation and approval 2.1 Composition of Core Group

More information

FAST TRACK BRIEF. Water and Development: World Bank Support,

FAST TRACK BRIEF. Water and Development: World Bank Support, FAST TRACK BRIEF December 16, 2009 The IEG report Water and Development An Evaluation of World Bank Support, 1997-2007, was discussed by CODE on December16, 2009 Water and Development: World Bank Support,

More information

EA Frameworks Case Study

EA Frameworks Case Study EA Frameworks Case Study Tajikistan Community Agriculture & Watershed Management The World Bank Europe & Central Asia Region Biskek,Tblisi March/April 2008 Project Safeguard Policy Process Integrated Safeguards

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

More information

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) IDENTIFICATION/CONCEPT STAGE Report No.: PIDC Project Name. Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA982. Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA982. Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA982 Project Name Electric

More information

1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION)

1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION) 1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION) The national water legislative framework in the Republic of Macedonia is comprehensive and regulates, from different perspectives,

More information

Key Design Principles for Community Water and Sanitation Services

Key Design Principles for Community Water and Sanitation Services Key Design Principles for Community Water and Sanitation Services Thematic Area Problem Definition and Key s Community Water and Sanitation (CWS) Strategy for Rural Areas and Small Towns Policy Environment

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name. EGAT And PEA Advancing Clean Energy Investment - CTF Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name. EGAT And PEA Advancing Clean Energy Investment - CTF Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name EGAT

More information

Participatory rural planning processes

Participatory rural planning processes Rural Transport Training Materials Module 2: Planning, Design, Appraisal and Implementation Participatory rural planning processes Session 2.1 Part 1 Presentation 2.1a The Training Modules Module1. Policies

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47960) ON A LOAN TO THE

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47960) ON A LOAN TO THE Public Disclosure Authorized Document of The World Bank Report No: ICR00001350 Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-47960) ON A LOAN IN THE AMOUNT OF US$325 MILLION

More information

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATA SHEET Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Date ISDS Prepared/Updated:

More information

Middle East and North Africa

Middle East and North Africa IWMI Research Middle East and North Africa Groundwater Revitalizing canal irrigation Sustainability of the Nile Delta and its water and salt balances Reusing saline water and restoring salt-affected land

More information

I. Project Outline. Background. Objectives of the Project. Activities of the project

I. Project Outline. Background. Objectives of the Project. Activities of the project Internal Ex-Post Evaluation for Technical Cooperation Project conducted by Indonesia Office: March 2016 Country Name The Beef Cattle Development Project Utilizing Local Resources in the Eastern Part Republic

More information

BURKINA FASO FOREST INVESTMENT PROGRAMME. GENERAL PRESENTATION FIP/REDD+ Ministry of Environment and Sustainable Development of Burkina Faso

BURKINA FASO FOREST INVESTMENT PROGRAMME. GENERAL PRESENTATION FIP/REDD+ Ministry of Environment and Sustainable Development of Burkina Faso BURKINA FASO FOREST INVESTMENT PROGRAMME GENERAL PRESENTATION FIP/REDD+ Ministry of Environment and Sustainable Development of Burkina Faso CUIABA, 20-25 October 2014 BRAZIL PRESENTATION PLAN RATIONAL

More information

Pro-Poor Interventions in Irrigated Agriculture in Andhra Pradesh

Pro-Poor Interventions in Irrigated Agriculture in Andhra Pradesh Pro-Poor Interventions in Irrigated Agriculture in Andhra Pradesh C. Sithapathi Rao * IRRIGATION IN ANDHRA PRADESH Andhra Pradesh (AP) is the fifth largest State in India with a geographical area of 2.75

More information

Capacity Building on Climate Finance

Capacity Building on Climate Finance Reminder Climate Change does not respect border, it does not respect who you are rich and poor, small and big. Therefore this is what we call global challenges which require Global Solidarity. Ban Ki Moon

More information

PART-III. Present Condition and Pre-F/S level Development Plan for Each Irrigation Scheme

PART-III. Present Condition and Pre-F/S level Development Plan for Each Irrigation Scheme PART-III Present and Pre-F/S level Development Plan for Each Irrigation Scheme Location of District N CENTRAL SULAWESI SINJAI DISTRICT SOUTHEAST SULAWESI Kassi PARE-PARE UJUNG PANDANG SOUTH SULAWESI PROVINCE

More information

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Sep ,000, Original Commitment 550,000,

L/C/TF Number(s) Closing Date (Original) Total Financing (USD) IBRD Sep ,000, Original Commitment 550,000, Public Disclosure Authorized Independent Evaluation Group (IEG) 1. Project Data Report Number : ICRR0020046 Public Disclosure Authorized Operation ID P132768 Country Brazil Operation Name BR-Pernambuco

More information

Community-Driven Development in Local Government Capacity Building Projects: Emerging Approaches in Africa

Community-Driven Development in Local Government Capacity Building Projects: Emerging Approaches in Africa Number 86 /January 2004 Community-Driven Development in Local Government Capacity Building Projects: Emerging Approaches in Africa This note discusses the interface between community-driven development

More information

EXECUTIVE SUMMARY. Capacity Assessment Report of the National Disaster Risk Management System in Namibia. 1 P a g e

EXECUTIVE SUMMARY. Capacity Assessment Report of the National Disaster Risk Management System in Namibia. 1 P a g e EXECUTIVE SUMMARY Capacity Assessment Report of the National Disaster Risk Management System in Namibia 1 P a g e September 2016 Introduction At the request of the Government of Namibia, an inter-agency

More information

Azerbaijan: North-East Development Project

Azerbaijan: North-East Development Project Azerbaijan: North-East Development Project Loan No. 637-AZ Project Id. 1289 Board Date 09 September 200 Effectiveness Date 12 July 2006 Original Closing Date 31 March 2012 Final Closing Date 31 march 2012

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4819 Project Name. Adolescent Girls Initiative - Afghanistan Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4819 Project Name. Adolescent Girls Initiative - Afghanistan Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB4819 Project Name Adolescent

More information

Dr. Sanjay Belsare, Executive Engineer Palkhed Irrigation Division, Water Resources Department, Government of Maharashtra, India

Dr. Sanjay Belsare, Executive Engineer Palkhed Irrigation Division, Water Resources Department, Government of Maharashtra, India IMPROVING IRRIGATION EFFICIENCY UNDER SMALL LAND HOLDING CONDITIONS THROUGH PARTICIPATORY IRRIGATION MANAGEMENT: A SUCCESS STORY OF WAGHAD IRRIGATION PROJECT, INDIA Dr. Sanjay Belsare 1 Mr. S.V. Ahirrao

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5983 Project Name. Flood Prevention and Drainage Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5983 Project Name. Flood Prevention and Drainage Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5983 Project Name Flood

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/28/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

Module 1 (L3) Introduction and Basic Concepts. 3 Watershed Management Policies

Module 1 (L3) Introduction and Basic Concepts. 3 Watershed Management Policies Module 1 (L3) Introduction and Basic Concepts 3 Watershed Management Policies 1 1 L3 Watershed Management Policies Topics Covered Introduction to Water Policy - Legislative framework, Institutional framework,

More information

Mainstreaming Environment for Poverty Reduction (RETA6422) Subproject Proposal

Mainstreaming Environment for Poverty Reduction (RETA6422) Subproject Proposal A. Basic Data Mainstreaming Environment for Poverty Reduction (RETA6422) Subproject Proposal 1. Subproject Title: Calculating Carbon Benefits from Improved Land and Water Resource Management 2. Project

More information