System Requirements Definition and System Selection
|
|
- Russell Nichols
- 6 years ago
- Views:
Transcription
1 BerryDunn s Presentation to Texas Association of Governmental Information Technology Managers for System Requirements Definition and System Selection Presented in Partnership with the City of College Station Tuesday, April 29, :30 2:30 PM
2 Agenda 1. Introductions 2. Session Objective 3. Presentation 4. Questions and Discussion 2
3 Introductions Chad Snow, PMP BerryDunn Senior Manager Erin Provazek City of College Station Assistant Director of Information Technology Ben Roper CGCIO, MBA City of College Station Director of Information Technology 3
4 Session Objective Discuss the importance of functional and technical requirements in system selection/development/replacement projects. 4
5 Why Document Requirements? Depending on the industry report, anywhere from 25-75% of software implementation projects fail to meet user expectations. One of the most common reason software implementations struggle is a lack of well defined functional or technical requirements. A requirement is a necessary attribute in a system; a statement that identifies a capability, characteristic, or quality factor of a system in order for it to have value and utility to a user. One of the greatest challenges in developing requirements is not documenting what the users want; it is helping users identify what they need. 5
6 The Role of Requirements Document future system needs Document future system wants Used as an input to the process of analyzing current and future business processes A tool to be used in the procurement process to compare vendor products (COTS) Can serve as the basis for demonstration scripts Test cases for custom development Referenced during implementation Requirements traceability matrix Test cases and system validation 6
7 Requirements Gathering Process Understand the Current (and Future) Environment Identify current challenges and unmet business needs Future process vision and application scope Identify key stakeholders Review often and adjust as needed Getting Started Organizational artifacts Policy and procedure manuals Legislative directives and local ordinances End user survey What is working well? What needs to change? 7
8 Requirements Gathering Process (cont.) Getting Started (cont.) Walkthroughs Observe current processes firsthand Collaboration work sessions Discuss current unmet needs and potential future processes Document initial set of requirements Organize them into smaller, manageable components Business area Module Technical Interfaces 8
9 Requirements Gathering Process (cont.) Refine Requirements Requirements workshops Joint Requirements Planning (JRP) Joint Application Design (JAD) Update and re-distribute requirements to stakeholders for review Finalize and document a process for change control 9
10 Requirements Gathering Process (cont.) Requirements Best Practices and Standards: According to the IEEE (Institute of Electrical and Electronics Engineers), Software Requirement Specifications should be: Correct Unambiguous Complete Consistent Ranked for importance Verifiable Traceable 10
11 Case Study: City of College Station Why ERP Now? City business needs have evolved and changed as the City has grown. Departments have identified possible shortcomings in the existing applications, and in some cases, have had to develop workarounds to complete work. Technology has changed and evolved. Is there a better solution? Reporting and data analysis difficult. 11
12 Case Study: City of College Station (cont.) ERP Implementations According to Gartner, nearly 50% of all ERP implementations fail to deliver even one third of their expected business benefits. Lack of software fit. Unrealistic implementation expectations. Lack of executive buy-in and support. Propensity to customize software, rather than leverage standard functionality. Lack of ERP implementation expertise. 12
13 Case Study: City of College Station Initiated project to assess options to upgrade, replace or enhance current enterprise wide applications environment in 2012 Scope of functional areas included: Finance, Procurement, Accounts Payable, Budgeting, Accounts Receivable, Miscellaneous Billing Payroll, Human Resources Utility Billing, Work Orders Community Development (Permitting, Planning and Zoning, Code Enforcement) Integration to other existing and future systems 13
14 Case Study: City of College Station (cont.) Comprehensive Needs Analysis First step in stakeholder identification Identified Challenges and unmet business needs Challenges and unmet business needs was an input to functional and technical requirements Options for future environment Business Case Pros and Cons for future options Justification for moving ahead with competitive procurement 14
15 Case Study: City of College Station (cont.) Requirements Gathering Process: Stakeholder re-validation End user web survey Observations and walkthroughs of processes Fact finding meetings 33 meetings across 26 functional areas Requirements Validation Process: Preliminary Requirements developed and distributed for end user review Joint Requirements Planning (JRP) sessions held to validate, confirm requirements 15
16 Case Study: City of College Station (cont.) Requirements Validation Process: Preliminary Requirements developed and distributed for end user review Joint Requirements Planning (JRP) sessions held to validate and confirm requirements 30 sessions 5,800 individual requirements for 26 functional areas 16
17 Case Study: City of College Station (cont.) Ongoing Role of Requirements: Used during procurement Request for Proposal Demonstrations Implementation Requirements Traceability Matrix Testing 17
18 Key Takeaways Initial planning should include high-level goals for the future Identify stakeholders early and reevaluate throughout the process Use several inputs to the requirements gathering process Policy and procedure manuals Workflow diagrams Observation of business processes Follow a structured process for documenting requirements (IEEE or other standard) Continue to use requirements as part of procurement (development custom developed applications) and implementation phases 18
19 Questions and Discussion Questions and Discussion 19
20 Thank You Chad Snow Erin Provazek (979) Ben Roper (979)
21 References IEEE Standard Recommended Practice for Software Requirements Specifications Project Management Institute (PMI) National Institute of Standards and Technology (NIST) 21
SYSTEM MODERNIZATION BEST PRACTICES
tl SYSTEM MODERNIZATION BEST PRACTICES SYSTEM MODERNIZATION WORKING GROUP C1 5912-C aamva_systemmodernization_dvd_insert.indd 1 6/7/17 11:01 AM System Modernization Best Practices provides a roadmap to
More informationPART THREE - WORK PLAN AND IV&V METHODOLOGY WORK PLAN. FL IT IV&V Work Plan
WORK PLAN FL IT IV&V Work Plan PART THREE - WORK PLAN AND IV&V METHODOLOGY ID Task Name Duration 1 FL IT IV&V Project Work Plan 261 days 2 DDI / SI Contract Award 0 days 3 Project Initiation and Planning
More informationDefine Your Enterprise Mobility Roadmap and Strategy
Define Your Enterprise Mobility Roadmap and Strategy Session ID 8946 20 Min - Wed.,02:30 p.m. - 02:50 p.m. Nixon Xavier, Consulting Director, Enterprise Mobility 1 Agenda Overview The approach Mobile enterprise
More informationProject performance management using balanced score card (BSC) approach
Project performance management using balanced score card (BSC) approach Published in PMI global network Prepared by Ilango Vasudevan, Consulting Director, SaraS Project Performance Management Scorecard
More informationRequirements Analysis and Design Definition. Chapter Study Group Learning Materials
Requirements Analysis and Design Definition Chapter Study Group Learning Materials 2015, International Institute of Business Analysis (IIBA ). Permission is granted to IIBA Chapters to use and modify this
More informationProject Integration Management
Project Integration Management Presented by Project Masters Inc. *Throughout this presentation, we reference and recognize the following trademarks, service marks, and copyrights of the Project Management
More informationBusiness Analysis Essentials
Understand the business analyst's role and responsibilities in a successful project. In this introductory course, you'll delve into the role and responsibilities of the business analyst (BA)- the communication
More informationProject Management Body of Knowledge Chapter 3 Project Processes
Project Management Body of Knowledge Chapter 3 Project Processes PMP Exam Prep PMBOK Chapter 1 - Introduction Chapter 2 - Organizational Influences & Life Cycles Chapter 3 - Project Processes Chapter 3
More informationChild Welfare Services New System Project. Requirements Management Plan
Child Welfare Services New System Project Requirements Management Plan September 2017 Revision History REVISION HISTORY REVISION/VERSION # DATE OF RELEASE AUTHOR SUMMARY OF CHANGES Version 1.0 October
More informationSenior Business Process Analyst - Source to Pay (SAPO)
Senior Business Process Analyst - Source to Pay (SAPO) Location: [Asia & Pacific] [Philippines] [Quezon City] Category: Support Services Job Type: Fixed term, Full-time PURPOSE OF POSITION: The Business
More informationMaximizing The Value Of Your Smart Grid Investment
Maximizing The Value Of Your Smart Grid Investment Publication Date: August 25, 2015 Author: Kody M. Salem and Kara Truschel EXECUTIVE SUMMARY With thorough planning and a rigorous approach to updating
More informationSolution Analysis and Design Strategy (D18)
(D18) Department of Financial Services Date: 11/29/2018 Revision: 1.0 Table of Contents Table of Contents... 2 Revision History... 3 Executive Summary... 4 1 Introduction... 4 2 Solution Analysis and Design
More informationProject Management Process Groups. PMP Study Group Based on the PMBOK Guide 4 th Edition
Project Management Process Groups PMP Study Group Based on the PMBOK Guide 4 th Edition Introduction PM Process Groups In order for a project to be successful, the project team must: Select appropriate
More information10 weeks 36 hours. Hone your project management knowledge and take your career to the next level with our Project Management training.
Hone your project management knowledge and take your career to the next level with our Project Management training. 2018 Fall Course START: Monday 10/1 6-9:40pm 10 weeks 36 hours The Schoolcraft College
More informationPROGRESS ON THE COMMUNITY COLLEGES SYSTEM ERP PLAN, DESIGN AND IMPLEMENTATION PROGRAM. A Report to the:
PROGRESS ON THE COMMUNITY COLLEGES SYSTEM ERP PLAN, DESIGN AND IMPLEMENTATION PROGRAM A Report to the: Joint Legislative Oversight Committee on Information Technology Submitted By NC Community College
More informationGlobal Shared Services Transition Director
Global Shared Services Transition Director Location: [North America] [United States] Town/City: Position location to be determined by home country of successful candidate within the US or Costa Rica where
More informationT H E B O T T O M L I N E
R E S E A R C H N O T E P R O G R A M : A L L D O C U M E N T R 5 9 A P R I L 2 0 1 7 UNDERSTANDING THE VALUE MATRIX A N A L Y S T Rebecca Wettemann T H E B O T T O M L I N E The Nucleus Research Technology
More informationDefining Project Scope
Defining Project Scope Casey Ayers PMP MBA CaseyAyers.com @caseyayers linkedin.com/in/caseyayers PMP is a registered mark of the Project Management Institute, Inc. Module Overview Overview Project Scope
More informationSystems Analysis and Design in a Changing World, Fourth Edition
Systems Analysis and Design in a Changing World, Fourth Edition Learning Objectives Describe the activities of the systems analysis life cycle phase Explain the effect of business process reengineering
More informationStakeholder Strategies with Successful Solutions
Risk Methodology 7 th Annual Symposium Strategies with Successful Solutions By Dwight Davis, MBA, CPT, PMP dwight@dwightdavis.org August 1, 01 create your future www.utdallas.edu Introduction Dwight Davis
More informationProject Management Methodology. Construct & Unit Test SubPhase
Project Management Methodology & Unit Test SubPhase Course Purpose Familiarize team members with the & Unit Test Sub- Phase processes. Understand process flows, team member roles, and artifacts employed.
More informationProject Management Session 6.2. Project Initiation Phase Integration Management
Project Management Session 6.2 Project Initiation Phase Integration Management 1 Project Phases & Knowledge Areas 1. Integration 2. Scope Management 3. Time Management 4. Cost Management 5. Quality Management
More informationTable of Contents. Executive Summary...3. Overview of Division...5. Summary of Accomplishments...6
Finance Division Table of Contents Executive Summary...3 Overview of Division...5 Summary of Accomplishments...6 Smart Goals... 7 Outcomes and Performance Measures 2 Executive Summary MISSION STATEMENT
More informationVANCOUVER Chapter Study Group. BABOK Chapter 5 Enterprise Analysis
VANCOUVER Chapter Study Group BABOK Chapter 5 Enterprise Analysis January 27, 2016 David Ghotbi, CBAP Introduction PD Hours. Presentation and quizzes at IIBA Vancouver Chapter website Certification Update
More informationMITA 01 MITA SS A: Achievable Strategies for the MITA Roadmap and Enterprise Maturity Overview of MMIS Procurement Strategy Process
MITA 01 MITA SS A: Achievable Strategies for the MITA Roadmap and Enterprise Maturity Overview of MMIS Procurement Process Presented September 10, 2013] At the Medicaid Enterprise Systems Conference Charleston,
More informationFLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES REGULATORY LIFECYCLE MANAGEMENT SYSTEM (RLMS) STUDY PROJECT. Deliverable 3 Success Criteria
FLORIDA DEPARTMENT OF AGRICULTURE AND CONSUMER SERVICES REGULATORY LIFECYCLE MANAGEMENT SYSTEM (RLMS) STUDY PROJECT Deliverable 3 Success Criteria Date: 10/20/2014 Version: 002 TABLE OF CONTENTS SECTION
More informationLCS International, Inc. PMP Review. Chapter 3 Developing the Project Scope Statement. Presented by David J. Lanners, MBA, PMP
PMP Review Chapter 3 Developing the Project Scope Statement Presented by David J. Lanners, MBA, PMP These slides are intended to be used only in settings where each viewer has an original copy of the Sybex
More informationProject Management Knowledge Areas SECTION III
Project Management Knowledge Areas SECTION III 1 Project Integration Management CHAPTER 4 2 The Key to Overall Project Success: Good Project Integration Management Project managers must coordinate all
More informationProVision Global Implementation Manager
ProVision Global Implementation Manager Location: [North America] [United States] [*Position location to be determined by home country of successful candidate within a jurisdiction (country or U.S. state)
More informationSystems Analysis for Business Analysts (3 Day)
www.peaklearningllc.com Systems Analysis for Business Analysts (3 Day) This is a basic course to help business analysts understand the basics of systems analysis. This course is ideal for people who are
More informationBUSINESS PRACTICE REENGINEERING: WHAT CAN YOU DO TO IMPROVE OUTCOMES?
Monday: Breakout Session 2 Workshop B Time: 2:45 p.m. - 4:00 p.m. Location: Regency 2 BUSINESS PRACTICE REENGINEERING: WHAT CAN YOU DO TO IMPROVE OUTCOMES? Are you trying to do more collect more money,
More informationGAHIMSS Chapter. CPHIMS Review Session. Systems Analysis. Stephanie Troncalli, Healthcare IT Strategist Himformatics July 22, 2016
GAHIMSS Chapter CPHIMS Review Session Systems Analysis Stephanie Troncalli, Healthcare IT Strategist Himformatics July 22, 2016 CPHIMS Competency Areas CPHIMS Examination Content Outline (effective February,
More informationDEPARTMENT OF ELDER AFFAIRS (DOEA) PROJECT CHARTER. ENTERPRISE CLIENT INFORMATION AND REGISTRATION TRACKING SYSTEM (ecirts) PROJECT FOR
JEFFREY S. BRAGG, SECRETARY DEPARTMENT OF ELDER AFFAIRS (DOEA) PROJECT CHARTER FOR ENTERPRISE CLIENT INFORMATION AND REGISTRATION TRACKING SYSTEM (ecirts) PROJECT JULY 17, 2018 20180622_CIRTS_Project_Charter_v1.05
More information[Name] [ ID] [Contact Number]
[Name] [Email ID] [Contact Number] THIS IS ONLY MODEL RESUME - DO NOT COPY AND PASTE INTO YOUR RESUME. PROFILE SUMMARY 15+ years of IT experience in Consulting and worked with the Major clients for the
More informationPART THREE: Work Plan and IV&V Methodology (RFP 5.3.3)
PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3) 3.1 IV&V Methodology and Work Plan 3.1.1 NTT DATA IV&V Framework We believe that successful IV&V is more than just verification that the processes
More informationPROCUREMENT TO PAYMENT OCTOBER 27, 2015
PROCUREMENT TO PAYMENT OCTOBER 27, 2015 Agenda 3 Welcome and Introductions Background and Purpose Overview of Requirements Process Area Requirements Requirements Questions & Discussion Meeting Closeout
More informationChapter 8 6/11/2015. Implementation Framework. Project Team Structure
Chapter 8 Implementation Framework McGraw-Hill/Irwin 2007 The McGraw-Hill Companies, All Rights Reserved 8-1 Project Team Structure A project team assumes the responsibilities and functions of carrying
More informationProject Delivery Summit Leveraging Project Resources
Project Delivery Summit 2013 Track 1: Project Management Session 9: Tips for Project Success Leveraging Project Resources August 28, 2013 2013 Xerox Corporation. All rights reserved. Xerox and Xerox and
More informationOvercoming Project Pitfalls of Poor Quality Requirements MetaPM Business Analysis CPTFA Approach
Overcoming Project Pitfalls of Poor Quality Requirements MetaPM Business Analysis CPTFA Approach Take Away for the Project Managers 1. Save the project scope, efforts and budget due to any gap in the requirements
More informationCreating opportunities. Changing lives.
Combining 90 Years of Academic Excellence with 25 Years of Optimizing Business Performance to Train Tomorrow s Global Business Leaders Today High Demand and Higher Salaries In today s competitive business
More informationProject Roles and Responsibilities or I thought Joe did that task. Prepared for PMI-NNV June 17, 2015 By Cheryl Allen, MS, PMP Lisa Bausell, MBA, PMP
Project Roles and Responsibilities or I thought Joe did that task Prepared for PMI-NNV June 17, 2015 By Cheryl Allen, MS, PMP Lisa Bausell, MBA, PMP Agenda Organizational Structure Models Generic Project
More informationERP Package Selection A Well Rounded Evaluation
ERP Package Selection A Well Rounded Evaluation Session ID#: 105250 Selection should consider many factors. Align the selection with your long term strategy. Prepared by: Stephen Coco Managing Director
More informationCreating Business Value with ECM at the Region of Niagara
Lead more Creating Business Value with ECM at the Region of Niagara Name: Steve Kopstick Title: President Creating Business Value with ECM The Region of Niagara The Journey The Solution The Future Why?
More informationA Hybrid Approach to the Use of Agile in Health IT. Session 147 March 7, 2018 Spencer Reeser-Stout, Senior Project Manager
A Hybrid Approach to the Use of Agile in Health IT Session 147 March 7, 2018 Spencer Reeser-Stout, Senior Project Manager 1 Conflict of Interest Spencer Reeser-Stout, CSM, MBA Has no real or apparent conflicts
More informationJOB DESCRIPTION. The Subject Position has no responsibility for ongoing and sustained supervision of other staff.
JOB DESCRIPTION I. JOB IDENTIFICATION Position Title: Business Analyst Job Code: NEW Position Number: Various Linguistic Profile: BBC Group and Level: ADG E Supervisor Title: Chief, Business and Technology
More informationERP Is it for me? American Public Power Association Business & Financial Conference September 17, 2018
ERP Is it for me? American Public Power Association Business & Financial Conference September 17, 2018 About your instructor Amanda Lasinski, Consulting Manager > Energy and Utilities Team > 12 years of
More informationInformation Services Group Public Sector
IV&V Assessment Report - Deliverable IVV2.2 Presented by: Information Services Group Public Sector February 12, 2019 2019 Information Services Group, Inc. All Rights Reserved Copyright 2019, Information
More informationPMBOK Guide Fifth Edition Pre Release Version October 10, 2012
5.3.1 Define Scope: Inputs PMBOK Guide Fifth Edition 5.3.1.1 Scope Management Plan Described in Section 5.1.3.1.The scope management plan is a component of the project management plan that establishes
More informationWhat We Know Now: Lessons Learned Implementing Federal Financial Systems Projects
Forum: Driving Performance Strategies for More Effective Government What We Know Now: Lessons Learned Implementing Federal Financial Systems Projects By Debra Cammer Hines and Angela Carrington This contribution
More informationINFS 328 Systems Analysis and Design
INFS 328 Systems Analysis and Design Session 5 Systems Analysis Lecturer: Prof. Ellis Edwin Badu, Dept. of Information Studies Contact Information: eebadu@ug.edu.gh College of Education School of Continuing
More informationCommittee on Information Technology
Committee on Information Technology Regular Meeting March 15, 2018 1 Dr. Carlton B. Goodlett Place, City Hall, Room 305 San Francisco, CA 94102 1 Agenda Roll Call Approval of Meeting Minutes from February
More informationERP Selection for Multi-faceted Higher Education Systems in the Software-as-a-Service Era
ERP Selection for Multi-faceted Higher Education Systems in the Software-as-a-Service Era Steven Fulkerson, President s Delegate, ERP Selection Committee, The University of Arkansas System David Hemingson,
More informationState of North Carolina
State of North Carolina Cronin Award Nomination July 28, 2015 Submitted by: Patti Bowers, State Purchasing Officer North Carolina Department of Administration Division of Purchase and Contract Executive
More informationIT Audit Process. Michael Romeu-Lugo MBA, CISA March 27, IT Audit Process. Prof. Mike Romeu
Michael Romeu-Lugo MBA, CISA March 27, 2017 1 Agenda Audit Planning PS 1203 / PG 2203 Evidence PS 1205 / PG 2205 References: ITAF 3 rd Edition Information Systems Auditing: Tools and Techniques Creating
More informationGoverning Body Geneva, March 2007 MNE FOR DECISION
INTERNATIONAL LABOUR OFFICE 298th Session Governing Body Geneva, March 2007 Subcommittee on Multinational Enterprises MNE FOR DECISION FOURTH ITEM ON THE AGENDA Report on the modalities of a programme
More informationProject Management Framework with reference to PMBOK (PMI) July 01, 2009
Project Management Framework with reference to PMBOK (PMI) July 01, 2009 Introduction Context Agenda Introduction to Methodologies What is a Methodology? Benefits of an Effective Methodology Methodology
More informationLarge Federal Agency Leverages IV&V to Achieve Quality Delivery for Critical Modernization Initiative
Large Federal Agency Leverages IV&V to Achieve Quality Delivery for Critical Modernization Initiative Capgemini Government Solutions provides Independent Verification and Validation (IV&V) services to
More informationTopics to be covered. Project Management Tools 9/3/2016
Project Management Tools Darrell Gardner, PMO In a Box CCR: Technical Project Management 2016 Building Leaders for Business Topics to be covered Introduction Who am I? Soap Box Buy In. Three things to
More informationCorporate Services Targeted Review Information Report
Town of Newmarket 395 Mulock Drive P.O. Box 328, Newmarket, Ontario, L3Y 4X7 Email: info@newmarket.ca Website: newmarket.ca Phone: 905-895-5193 Report Number: 2018-10 Corporate Targeted Review Information
More informationPeopleSoft Upgrades by HCL
PeopleSoft Upgrades by HCL In today s world of mergers, acquisitions and globalization, organizations across the world are spreading their horizons. In order to deliver world-class Customer Service and
More informationERP Package Selection A Well Rounded Evaluation
ERP Package Selection A Well Rounded Evaluation Session ID#: 103290 Selection should consider many factors. Align the selection with your long term strategy. Prepared by: Stephen Coco Managing Director
More informationTEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION
TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION PREPARED BY: KAREN LEWIS, CPPO, C.P.M., CTPM SPECIFICATION FAX NO.: (512) 374-5480 NO: 958-77-20 E-MAIL: klewis@dot.state.tx.us DATE: FEBRUARY
More informationGartner Decision Tools for Vendor Selection
Gartner Decision Tools for Vendor Selection Ralph Witcher These materials can be reproduced only with Gartner s written approval. Such approvals must be requested via e-mail quote.requests@gartner.com.
More informationPMI LUNCH AND LEARN OCTOBER 29, 2018
PMI LUNCH AND LEARN OCTOBER 29, 2018 Agenda Project Update Procurement Activities Lessons Learned PMI Lunch and Learn 10/29/2018 PMI Lunch and Learn 10/29/2018 Florida PALM Project Update Establishment
More informationObjectives of Project Management Framework. What are the Characteristics Of Project. Activities involved Project Management
PMP Training Training Topics Chapter 1 Introduction to PMP Objectives of PMP Requirements for PMP Exam About PMP Exam PMP Exam Syllabus Chapter 2 Objectives of Project Management Framework What is Project
More informationBusiness Events as a focal point of analysis
Business Events as a focal point of analysis November 5, 2015 - Las Vegas John Bethke, MBA, CBAP, CPA Bethke Consulting, LLC Purpose of Presentation! To describe an analysis framework using business events
More informationHuman Resources Information System Business Case Executive Summary
Human Resources Information System Business Case Executive Summary January 2009 Oregon Department of Administrative Services Statewide (503) 373-3270 Human Resource Management System (HRIS) BusinE-mail
More informationProject Management Basics
IIA Beach Cities Chapter September 20, 2017 Project Management Basics Michael Haas PMP Dina Keirouz PMP Overview Introductions What is Project Management What is the role of the Project Manager Questions
More informationBuilding the Business Case for Next-Generation HR Systems. Business Builder
Business Builder Brandon Hall Group Research Team December 2016 TABLE OF CONTENTS Executive Summary 3 The Agenda 3 Business Impact 4 Business Need 4 Solution 5 Questions to Consider 7 Building a Business
More informationLearning and Technology Services
Learning and Technology Services Project Management Processes DRAFT for discussion only Heather Williams January 14, 2010 Document Revision History Version Date Author(s) Description of Change 1 August
More informationCity of Tacoma Performance Audit for SAP
1 Table of Contents Section 1 Executive Summary... 4 Section 2 Audit Methodology, Key Findings and Recommendations... 7 Section 2.1: Introduction... 7 Section 2.2: Audit Approach... 7 Section 2.3: Technical
More informationSoftware Project & Risk Management Courses Offered by The Westfall Team
Software Project & Risk Management is a 5-day course designed to provide a knowledge base and practical skills for anyone interested in implementing or improving Software Project and Risk Management techniques
More informationStep 2: Analyze Stakeholders/Drivers and Define the Target Business Strategy
Step 2: Analyze Stakeholders/Drivers and Define the Target Business Strategy Version 1.5, December 2006 1. Step Description and Purpose The step Analyze Stakeholders/Drivers and Define the Target Business
More information10 Success Factors. for Sales Performance Management. About NICE
About NICE NICE (Nasdaq: NICE) is the worldwide leading provider of both cloud and onpremise enterprise software solutions that empower organizations to make smarter decisions based on advanced analytics
More informationFEAPO 2018 Annual Membership Meeting. Updates from NASCIO
FEAPO 2018 Annual Membership Meeting Updates from NASCIO Eric Sweden MSIH MBA CGCIO Program Director, Enterprise Architecture & Governance National Association of State Chief Information Officers O 859.514.9189
More informationEnterprise Applications Evaluation
Enterprise Applications Evaluation 1 Client Locations Coast-to-Coast Practice Locations California Illinois North Carolina 1.800.806.3080 Presented to Presented to August 2013 Agenda Introductions Current
More informationGetting to Accountability
Getting to Accountability Maximizing Your Privacy Management Program Agenda Introductions Accountability Fundamentals Privacy Management Status Privacy Management Program Strategy Develop a Resource-Based
More informationCh.5 Standardization & Continuous Improvement.
Module 3 : Value Enhancement Strategies. Ch.5 Standardization & Continuous Improvement. Edited by Dr. Seung Hyun Lee (Ph.D., CPM) IEMS Research Center, E-mail : lkangsan@iems.co.kr General Issues in Standardization.
More informationAssociate Director, Product Development
Associate Director, Product Development As part of the Mayor s Office of Operations, this unit is the City s go-to resource for harnessing digital tools and capabilities to improve the lives of low-income
More informationRequest for Information
Request for Information RFI 19-02 - System Applications and Products in Data Processing (SAP) Training Prepared By: Proposal Due Date: Yasmeen Hasan, Buyer Hasan.yasmeen@hccs.edu 713-718-6217 September
More informationManaging Risk in Your P2P Process: 10 Ways that Automation Can Help Mitigate Risk
Managing Risk in Your P2P Process: 10 Ways that Automation Can Help Mitigate Risk Chris Doxey, CAPP, CCSA, CICA, CPC President, Doxey, Inc. chris@chrisdoxey.com 571-267-9107 Agenda Introduction to Risk
More informationPMP Exam Prep Coaching Program
PMP Exam Prep Coaching Program Project Management 1 Project Management Develop Project Charter Develop Project Management Plan Monitor and Control Perform Integrated Change Control Close Project or Phase
More informationNASCIO Submission. May 30, 2008
NASCIO Submission May 30, 2008 BEACON Lights the Way from the Limitations of the Past to the Possibilities of the Future in North Carolina State Government Enterprise IT Management Initiatives Office of
More informationPMP Exam Preparation Workshop. Chapter # 5 Project Scope Management
PMP Exam Preparation Workshop Chapter # 5 Copyright PMI SOC 2013 1 Learning Objectives By the end of this session you will understand: How scope management processes relate to the process groups Project
More informationerpsolutions.biz Total Quality Control Management for Dynamics 365 Operations Enterprise
erpsolutions.biz Total Quality Control Management for Dynamics 365 Operations Enterprise www.erpsolutions.biz Quality management for today s Maze of complexity Manufacturers in today s industries face
More informationServices Description. Transformation and Plan Services. Business Transformation and Plan Services
Services Description Business ation and Plan Services Business ation and Plan Services SAP Business ation and Plan Services provides consulting and prototyping services to facilitate Licensee innovation
More informationOverview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Changes
Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Changes PMI -- Project Management Institute» Leading global association for the project management profession»
More informationBill Drafting Systems: A Collaborative Effort Office of Legislative Counsel, California
Bill Drafting Systems: A Collaborative Effort Office of Legislative Counsel, California Kendra Nielsen, Principal Deputy Legislative Counsel Elaine Filer, Information Systems Manager August 9, 2017 Background
More informationIngraining Technology Into Strategic Planning- Strategic IT Planning. CAST Strategic Planning & Strategic IT Planning Workbook 4/25/2018
Ingraining Technology Into Strategic Planning- Strategic IT Planning with MAJD ALWAN, PH.D. CAST Strategic Planning & Strategic IT Planning Workbook http://www.leadingage.org/strategic-it-planning-tools
More informationEngineering. CMMI for Development V.1.2 Module 3. M03/Engineering/v1.2
Engineering CMMI for Development V.1.2 Module 3 M03/Engineering/v1.2 Agenda Global scope RD Development REQM Management TS Technical Solution PI Product Integration VER Verification VAL Validation SE Process
More informationProject Manager. KEY SKILLS Testing Mentoring Team Leading Business Process Reengineering JAD Session Facilitation
Project Manager PROFESSIONAL SYNOPSIS As a seasoned IT Project Manager, this individual possesses analytical skills focused on delivering solutions to business problems and is adept at translating business
More informationWelcome. ASPE Web Seminars: The PMI PBA from the PMP s Point of View. Today s Presenter :
Welcome. ASPE Web Seminars: The PMI PBA from the PMP s Point of View Today s Presenter : Chris Knotts, PMP New skills evangelist, Product Manager, and enterprise training specialist ASPE ASPE Expert Q&A
More informationThree key areas to consider when looking for a new budgeting software solution
Three key areas to consider when looking for a new budgeting software solution Three key areas to consider when looking for solution How to find the solution and company to meet your organization s needs
More informationWORK PLAN AND IV&V METHODOLOGY Information Technology - Independent Verification and Validation RFP No IVV-B
1. Work Plan & IV&V Methodology 1.1 Compass Solutions IV&V Approach The Compass Solutions Independent Verification and Validation approach is based on the Enterprise Performance Life Cycle (EPLC) framework
More informationProject Scope Management
Assalam-o-alaikum Project Management Process Groups Project Integration Management Knowledge Areas Initiating Planning Executing Scope Time Cost Quality Human Resources Communications Monitoring & Controlling
More informationINFORMATION TECHNOLOGY Business Plan
INFORMATION TECHNOLOGY 2016 Business Plan Agenda Our Purpose, Mission, Vision, and Services Current Organization County Expectations from ITS Successes and Challenges 2016 Goals and Objectives Performance
More informationMaintenance Process Training. Maintenance ERP Processes. Maintenance Process Standards
Suite 4 /110 Robinson Ave Belmont WA 6104 Ph: 08 9277 4901 Fax: 08 9277 5901 Web: assetmaint.com.au Email: info@assetmaint.com.au E M P O W E R I N G B U S I N E S S PO Box 367 Belmont WA 6984 AMG has
More informationApplying Systems Engineering to ITS Projects: Advancing Beyond Federal Rule 940. INCOSE IW Transportation Working Group January 27, 2015
Applying Systems Engineering to ITS Projects: Advancing Beyond Federal Rule 940 William Gleckler Deputy Systems Engineering Officer, NYCT Capital Program Management Vincent Cavataio, CCM Deputy Systems
More informationProject Management. Sharif MBA Fall 1385 Session 2 - Dr. Sepehri. PM Overview PM Associations. PMBOK 2004 Burke Ch. 2, 3
Project Management Sharif MBA Fall 1385 Session 2 - Dr. Sepehri PM Overview PM Associations PMBOK 2004 Burke Ch. 2, 3 1 PMI Project Management Institute http://www.pmi.org world s foremost advocate for
More informationGUIDE TO THE CHANGES IN PMP simpl learn i
GUIDE TO THE CHANGES IN PMP- 2015 simpl learn i Table of contents Introduction the purpose of this manual 1 New Tasks: Initiating 3 New Tasks: Planning 4 New Tasks: Executing 6 New Tasks: Monitoring and
More information