1 Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director 10/29/2013 Project Addendum No. 1 PID No SUM SR Noise Walls Letting: November 7, 2013 Notice to all Bidders and Suppliers to please be advised of the attached Proposal Addendum. The Department utilizes Bid Express ( as the official medium for electronic bid submittal. All bidders must prepare bids and submit them online via Bid Express. Addenda amendments must be acknowledged in the miscellaneous section of the Expedite (EBS) file and all amendments loaded in order for your bid to be considered for award of this project. Bid express will not accept bids that do not have amendments incorporated. Failure to incorporate changed quantities or items in your Expedite (EBS) submissions will result in the rejection of your bid. ODOT is an Equal Opportunity Employer and Provider of Services
2 Proposal Addendum For SUM ; PID Project Completion Date Change: No Bid Item Changes, Additions or Deletions: No Please be advised of the following: In the Scope of Services Section 6 replace Sta ± with Sta ± In the Scope of Services Section 6 replace 4700± ft with 5325± ft Replace Section a.in the Scope of Services with the following: a. Remove the existing Guardrail and replace with Single Slope Barrier Type D (Standard Construction Drawing RM-4.5) at the same offset from the Lane Line as the Guardrail (include a 4 PVC Raceway as per Standard Drawing RM-4.3, the Raceway will be installed inside the Single Slope Barrier and not mounted on the outside of the barrier) Replace Section 15.2.B.2.c and Section 15.3.B.2.c in the Scope of Services with the following: c. The color of the highway side of this noise barrier is to be Brick Red (Federal Color Number 20109). The color of the residential side of the noise barrier will be light gray (Federal Color Number Light Gray). The color of the Support Posts will be Buff (Federal Color Number 13522) In the Scope of Services Section a replace Sta with Sta Replace Section b in the Scope of Services with the following: b. Refer to Section 15 for the Noise Barrier Requirements for Structure SUM B. A physical connection between the Ground Mounted and Structure Mounted Noise Barrier is not required but there must be an overlap of the barriers such that there is not a gap as viewed from the highway. Replace Section e in the Scope of Services with the following: e. The Concrete Noise Barrier Panels will be a form lined Brick matching Architectural Polymers #111 Ohio Sand Brick or Approved Equal on the Highway Side. The Concrete Noise Barrier Panels will be a form lined Ashlar Stone matching Architectural Polymers #905 Small Aged Ashlar Stone or Approved Equal on the residential side. Replace Section f in the Scope of Services with the following: f. The Panels will be Sealed/Coated with a color matching Brick Red (Federal Color Number 20109). This will be performed on the Highway Side only. No color will be applied on the residential side of the noise barrier panels. The residential sides of the noise barrier panels will be sealed in accordance with current Noise Barrier Specifications.
3 Replace Section g in the Scope of Services with the following: g. The Panel Caps (Coping), Finials [The finials will be attached to the top of the concrete posts at 250± foot intervals and at the beginning and end of the proposed concrete noise wall. The proposed finial design shall match the existing finials attached to the top of the concrete posts at various intervals along the existing concrete noise walls at the IR 271/SR 8 interchange; SUM ; PID 24508; Plan Sheet No and 1342] and Posts will be sealed/coated with a color matching Buff (Federal Color Number 13552) Replace Section d.iii in the Scope of Services with the following: iii. The color of the highway side of this noise barrier is to be Brick Red (Federal Color Number 20109). The color of the residential side of the noise barrier will be light gray (Federal Color Number Light Gray). The color of the Support Posts will be Buff (Federal Color Number 13522) Replace the paragraph in Section 16.2 of the Scope of Services that begins with All signs will be placed between Noise Barrier and the Roadway with the following All signs will be placed between Noise Barrier and the Roadway, no sign supports will be permitted to be placed on the outside (Residential Side) of the Noise Barrier. All affected Flat Sheet Signs and supports will be removed, disposed of and replaced. Extrusheet Signs and supports may be left in place and the Noise Barrier alignment can go around them or they can be removed, disposed of and replaced. Replace Attachment B with the attached report entitled Revised Noise Wall Foundation Exploration Report SUM-271/8 Noise Wall prepared by S&ME, revised September 2013 Add the following to Section 10 of the Scope of Services: BEST MANAGEMENT PRACTICES/SOIL EROSION AND SEDIMENTATION CONTROL WATER COLUMN AND SEDIMENTATION IMPACTS WILL BE KEPT TO A MINIMUM THROUGH THE USE OF BEST MANAGEMENT PRACTICES FOR SOIL EROSION AND SEDIMENTATION CONTROL. ALL SOIL EROSION AND SEDIMENT CONTROL MEASURES WILL BE IN PLACE PRIOR TO ANY EXCAVATION, GRADING OR FILLING OPERATIONS AND INSTALLATION OF PROPOSED STRUCTURES OR UTILITIES. THEY WILL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETED AND THE AREA IS STABILIZED AS ACCEPTED BY THE ENGINEER. STREAM AVOIDANCE UNDER NO CIRCUMSTANCES WILL THE CONTRACTOR IMPACT BRANDYWINE CREEK. NO EXCAVATION, GRADING OR FILLING OPERATIONS WILL BE PERFORMED IN BRANDYWINE CREEK. UNDER NO CIRCUMSTANCES WILL THE CONTRACTOR STORE CONSTRUCTION EQUIPMENT AND/OR MATERIALS IN BRANDYWINE CREEK.
4 WETLANDS AVOIDANCE UNDER NO CIRCUMSTANCES WILL THE CONTRACTOR IMPACT THE WETLANDS LOCATED WITHIN THE PROJECT AREA. NO EXCAVATION, GRADING OR FILLING OPERATIONS WILL BE PERFORMED IN THESE WETLANDS. UNDER NO CIRCUMSTANCES WILL THE CONTRACTOR STORE CONSTRUCTION EQUIPMENT AND/OR MATERIALS IN THESE WETLANDS. STAGING AREAS ODOT CONSTRUCTION AND MATERIALS SPECIFICATIONS SECTION (PROTECTION AND RESTORATION OF PROPERTY) PROHIBITS THE CONTRACTOR FROM CREATING STAGING AREAS NEAR STREAMS/WETLANDS. AREAS DISTURBED BY EQUIPMENT ACTIVITIES ANY AREAS DISTURBED BY EQUIPMENT ACTIVITIES MUST BE SEEDED WITH NATIVE PLANT SPECIES AND MULCHED TO PREVENT EROSION OF SEDIMENTS INTO WATERS OF THE UNITED STATES. CONSTRUCTION AND DEMOLITION DEBRIS THE CONTRACTOR WILL TAKE PRECAUTIONS TO AVOID AND/OR LIMIT CONSTRUCTION AND DEMOLITION DEBRIS FROM ENTERING THE STREAM(S). ANY DEBRIS THAT DOES FALL INTO THE STREAM(S) WILL BE REMOVED AS SOON AS POSSIBLE. STRUCTURE PAINTING/CONCRETE SEALING OPERATIONS THE CONTRACTOR WILL TAKE ALL PRECAUTIONS NECESSARY TO PREVENT EPOXY-URETHANE SEALER, PAINT OR OTHER MATERIALS USED TO REPAIR, CLEAN, PAINT, SEAL OR TREAT ANY STRUCTURE FROM ENTERING ANY STREAMS, WETLANDS OR OTHER WATERS OF THE UNITED STATES AND TAKE THE APPROPRIATE ACTIONS IN THE EVENT OF A RELEASE. Add the following Note: No Plan sheets: No Answers to Pre-Bid Questions: Yes Q1 A1 Q2 A2 Submitted 03:49:21 PM Addressed with this Addendum Submitted 03:52:09 PM Addressed with this Addendum
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 6/2/2014 Project 140353 Addendum No. 1 PID No. 86675 MOT IR 75 11.75/11.80
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 4/14/2015 Project 150249 Addendum No. 2 PID No. 81747 FRA IR 270
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 12/5/2012 Project 130002 Addendum 1 PID 76691 ALL IR 75 5.53 Part1;
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 4/1/2014 Project 140227 Addendum No. 1 PID No. 86154 SUM Akron Cleveland
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 11/3/2014 Project 140485 Addendum No. 8 PID No. 77254 LUC IR 75
More informationOhio Department of Transportation
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 Ted Strickland, Governor Jolene M. Molitoris, Director THE DEPARTMENT UTILIZES BID EXPRESS (http://www.bidx.com)
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 11/21/2014 Project 140560 Addendum No. 2 PID No. 82972 HAM IR 275
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 1/13/2014 Project 141016 Addendum No. 1 PID No. 87277 HOL SR 515
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 3/5/2013 Project 130164 Addendum No. 1 PID No. 81599 SUM SR 619
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 5/1/2013 Project 130251 Addendum No. 2 PID No. 80695 LUC IR 475
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 5/11/2015 Project 153037 Addendum No. 2 PID No. 98695 CUY SR 10
More informationOhio Department of Transportation
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 Ted Strickland, Governor Jolene M. Molitoris, Director THE DEPARTMENT UTILIZES BID EXPRESS (http://www.bidx.com)
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 10/16/2014 Project 140522 Addendum No. 1 PID No. 76282 FRA USR 40
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 3/21/2011 Project 110136 Addendum No. 6 PID No. 16144 WOO SR 25
More informationJANUARY 25, 2016 ADDENDUM NO. 3 FOR. ORD Baggage Service Road Retaining Wall Repair
JANUARY 25, 2016 ADDENDUM NO. 3 FOR ORD Baggage Service Road Retaining Wall Repair Specifications and Contract Documents Number: 132110 CDA Project Number: H6163.15-02 For which bids are scheduled to be
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 10/30/2014 Project 140485 Addendum No. 7 PID No. 77254 LUC IR 75
More information10:00 AM, Wednesday, May 6, Peters Creek Sanitary Sewer Rehabilitation Project
NOTICE OF MANDATORY PRE-BID CONFERENCE WILL BE HELD AT 10:00 AM, Wednesday, May 6, 2015 IN ROOM 16, CITY HALL BUILDING, 101 NORTH MAIN STREET WINSTON-SALEM, NORTH CAROLINA The purpose of this conference
More informationPAWLEYS ISLAND TOWN HALL
DOCUMENT 001116 - INVITATION TO RE-BID 1.1 PROJECT INFORMATION A. Notice to Bidders: Prequalified bidders are invited to submit bids for Project as described in this Document according to the Instructions
More informationMAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0
MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2018.05 EXIT 103 SOUTHBOUND UNDERPASS BRIDGE REHABILITATION MILE 103.0 The bid opening date is Thursday March 15, 2018 at 11:00 a.m. The following changes
More informationCUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE CITY OF BRECKSVILLE,
CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE FOR THE CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS RQ# 41677 BIDS DUE ON: May 1, 2018, at 2:00 p.m. ADDENDUM NUMBER 1, April 25, 2018, Page
More informationADDENDUM NO. 1 FOR ROADWAY RECONSTRUCTION RFP # June 7, 2016
ADDENDUM NO. 1 FOR ROADWAY RECONSTRUCTION RFP #2017-01 NOTICE TO PROSPECTIVE BIDDERS June 7, 2016 Prospective bidders are hereby informed of the following corrections, additions, deletions, and/or modifications
More informationODOT District Roadway General Notes R401: LINEAR GRADING R402: ITEM RESHAPING UNDER GUARDRAIL R403: CURB RAMPS / DETECTABLE WARNINGS
R401: LINEAR GRADING R402: ITEM 209 - RESHAPING UNDER GUARDRAIL R403: CURB RAMPS / DETECTABLE WARNINGS R404: DELETED R405: BARRIER REFLECTORS R406: PAVEMENT MARKING LANE WIDTHS R407: TYPE A ANCHOR ASSEMBLY
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 4/26/2012 Project 123004 Addendum No. 1 PID No. 86921 DEL/MRW IR
More informationThis addendum is being issued to answer questions submitted by the question deadline and to distribute a revised bid price form.
INVITATION TO BID (ITB) FOR POOL CONSTRUCTION AT THE FORD WOODS PARK CONTROL No. 122972 ADDENDUM No. 5 City of Dearborn ISSUE DATE: 12/4/17 DUE DATE: 12/13/17 AT 3:00 p.m. Local Time This addendum is being
More informationConstruction & Demolition Debris Facility Daily Log of Operations {as required by O.A.C. Rules (B)(9)&(10)} Yearly Cover Sheet Form 1
Division of Materials & Waste Management Construction & Demolition Debris Facility Daily Log of Operations {as required by O.A.C. Rules 3745-400-11(B)(9)&(10)} Yearly Cover Sheet Form 1 This daily log
More informationOhio Department of Transportation
Ohio Department of Transportation District 6 400 E. William Street Delaware, Ohio 43015 (740) 833-8000 8000 John R. Kasich, Governor Jerry Wray, Director Jack R. Marchbanks, District Deputy Director August
More informationODOT Design & Construction Requirements for MSE Walls
ODOT Design & Construction Requirements for MSE Walls Peter Narsavage, P.E. Foundation Engineering Coordinator Ohio Department of Transportation Office of Structural Engineering 2006 Ohio Transportation
More informationMAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5
MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2017.02 Pavement Rehabilitation Clear Zone Improvements MM 64.4 to MM 68.5 The following changes are made to the Proposal, Specifications and Plans: SPECIFICATIONS:
More informationDOCUMENT ADDENDUM NO. ONE. Prepared By:
DOCUMENT 00900 ADDENDUM NO. ONE Prepared By: GRAEF-USA INC. One Honey Creek Corporate Center 125 South 84 th Street, Suite 401 Milwaukee, WI 53214-1470 January 22, 2018 For Racine Avenue (CTH Y) Recreational
More informationQUESTIONS AND ANSWERS THROUGH 10:00 PM DECEMBER 15, 2015
OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION ADDENDUM NO. 3 PROJECT NO. 39-16-01 (PART A & PART B) QUESTIONS AND ANSWERS THROUGH 10:00 PM DECEMBER 15, 2015 Q#17 Would the OTC allow a contractor to use OTC
More informationANSWERS TO QUESTIONS RECEIVED THROUGH 11:00 A.M. ON JANUARY 4, 2019:
ADDENDUM NO. PROJECT NO. 3-9-07 PAGE 2 ANSWERS TO QUESTIONS RECEIVED THROUGH :00 A.M. ON JANUARY, 209: Q# Plan sheet 2 has a note MAINTENANCE OF TRAFFIC (LOCAL ROADS) which relates to bid item 22 and calls
More informationDOCUMENT ADDENDA AND MODIFICATIONS
DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications
More informationSpring Lake Public Schools. Spring Lake, MI. March RE: High School Storage Buildings
Spring Lake Public Schools Spring Lake, MI March 2018 RE: High School Storage Buildings Advertisement for bids Bid Proposal Sealed bids for Spring Lake Public Schools-High School Storage Buildings will
More informationMAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT ROADSIDE CLEARING MM 75.3 TO MM 82.9 MM 99.2 TO MM 109.1
MAINE TURNPIKE AUTHORITY ADDENDUM NO. 1 CONTRACT 2015.07 ROADSIDE CLEARING MM 75.3 TO MM 82.9 MM 99.2 TO MM 109.1 The following are questions asked at the pre-bid meeting held on October 29, 2015 at 10:00
More informationANSWERS TO QUESTIONS RECEIVED THROUGH 1:00 PM ON MAY 24, 2018:
ADDENDUM NO. 3 PROJECT NO. 43805 (PART A & B) PAGE 2 ANSWERS TO QUESTIONS RECEIVED THROUGH :00 PM ON MAY 24, 208: Q#32 Addendum # answered Question #7 indicating that an average depth of 3 feet for the
More informationAddendum No. 1 Page 1 of 2
Addendum No. 1 Page 1 of 2 DATE: March 14, 2016 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Bidders SUBJECT: Addendum No. 1 PROJECT NAME: Parking Lot S7 Improvements JJC PROJECT
More informationInvitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $
Addendum No. 1 TOWNSHIP ROAD 510 RECONSTRUCTION Invitation to Tender No. T170523EN Amendment 1. Bidders shall note the following: a) Revised Section 3.3.2 Unit Price Table : REVISED Schedule A : Invitation
More informationThe State of Ohio Bridges
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director ABCD NEOH Chapter The State of Ohio Bridges Tim Keller, P.E. Administrator ODOT Office of Structural Engineering Agenda 1.
More informationREBECCA LG BOSTICK, ARCHITECTS, INC
REBECCA LG BOSTICK, ARCHITECTS, INC 703-768-2250 ADDENDUM NO. 3 Page 1 of 4 (plus attachments -2 pages) SILVERBROOK ELEMENTARY SCHOOL RENOVATION Fairfax County Public Schools 9350 Crosspointe Drive, Fairfax
More informationTENDER BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 2
TENDER 2334-2019 BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 2 This addendum shall be read in conjunction with and considered as an integral part of the Tender Contract 2334-2019. Revisions
More informationCITY OF TACOMA Department of Neighborhood and Community Services
CITY OF TACOMA Department of Neighborhood and Community Services ADDENDUM NO. 3 DATE: January 31, 2017 REVISIONS TO: Request for Bids Specification No. NC16-0353F On-Call Building Demolition NOTICE TO
More informationWater Pollution Control for Work in Sensitive Areas
Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed
More informationMainelli Wagner & Associates, Inc.
www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 December 28, 2018 The Platte County Board of Supervisors will
More informationDepartment of Transportation Rapid City Region Office 2300 Eglin Street P.O. Box 1970 Rapid City, SD Phone: 605/ FAX: 605/
Connecting South Dakota and the Nation Department of Transportation Rapid City Region Office 2300 Eglin Street P.O. Box 1970 Rapid City, SD 57709-1970 Phone: 605/394-2244 FAX: 605/394-1904 April 4, 2019
More informationWilliam M. Scott, PE CME Associate
ADDENDUM NO. 2 TO THE CONFORMED MANUAL for Project No. 17-692 Date of Addendum: March 27, 2018 Date of Bid Receipt: March 29, 2018 (NO CHANGE) Time of Bid Receipt: 11:00 a.m. (EDT) (NO CHANGE) Date of
More informationREQUEST FOR PROPOSAL DEMOLITION & REMOVAL OF THE OLD TOWN HALL 2278 US ROUTE 4 EAST
REQUEST FOR PROPOSAL DEMOLITION & REMOVAL OF THE OLD TOWN HALL 2278 US ROUTE 4 EAST MENDON, VT 05701 TOWN OF MENDON, VERMONT August, 2018 1 1. SUMMARY AND BACKGROUND The Town of Mendon s original Town
More informationADDENDUM #1 MARCH 10, CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF
ADDENDUM #1 MARCH 10, 2016 CENTRAL WINDS PARK ROADWAY IMPROVEMENTS Bid # ITB-02/16/BF TO: ALL PLAN HOLDERS This Addendum No. 1 to the Contract Documents for City of Winter Springs project "Central Winds
More informationSANBORN COUNTY
Sheet 1 of 12 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0500 Remove Pipe Culvert 134 Ft 110E1010 Remove Asphalt Concrete Pavement 178
More informationPIC PID Const Project Pre Bid Meeting. April 25, 2013
PIC-674-4.21 PID 83958 Const Project 466314 Pre Bid Meeting April 25, 2013 1 Project Goals Complete Replacement of PIC-674-0430 structure Improve deficient sight distance by reconstructing vertical curves
More informationLaney College Childcare Center Renovation 900 Fallon Street Oakland, CA 94607
LANEY COLLEGE CHILDCARE CENTER RENOVATION DOCUMENT 00 9113 ADDENDA BID NO. 18-19/09 Peralta Community College District Laney College Childcare Center Renovation 900 Fallon Street Oakland, CA 94607 October
More information~lamance <tount!' 9'~UUJ ;i)epwdment 124 We6t ElmStltm (j,taluun,.ncjjdli &vwfina 27253!Jefepfwae(336) :Jax(336)
~lamance
More informationTHE 2013 CONSTRUCTION AND MATERIAL SPECIFICATION BOOK IS PART OF THE BIDDING DOCUMENTS ON THIS PROJECT PROPOSAL STATE OF OHIO
Project Number: 150157 PID #: 86594 Contract ID: BRO86594 EDGE Goal: 6% Brown SR 763-11.92 Brdg Replace BRIDGE REPLACEMENT (1 BRIDGE) Work Type Percentage Performed by Prime: 50 THE 2013 CONSTRUCTION AND
More informationSECTION TRENCHING & BACKFILLING
SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications
More informationI. General Information. A. Project Team & Contacts: Role Company Name Phone City of Johnson City Jeff Owner Water & Sewer Harmon, PE Department
I. General Information Civil Engineering Surveying Environmental Consulting Tysinger, Hampton & Partners, Inc. OPTIONAL PRE-BID MEETING MINUTES Austin Springs Road Water Line Replacement Project ITB #6190
More informationCity of Tacoma Tacoma Public Utilities Tacoma Power. REQUEST FOR BIDS PG F Alder Lake Park Sewage Treatment Expansion
City of Tacoma Tacoma Public Utilities Tacoma Power REQUEST FOR BIDS PG14-0667F Alder Lake Park Sewage Treatment Expansion Submittal Deadline: 11:00 a.m., Pacific Time, Tuesday, April 14, 2015 Submittal
More informationMECHANICAL SYSTEM REPLACEMENT BROWN COUNTY COURTHOUSE 200 EAST COURT STREET MOUNT STERLING, ILLINOIS 62353
ARCHITECHNICS, INC. 510 MAINE STREET QUINCY, ILLINOIS 62301 PROJECT NO. : 5661A ADDENDUM NO.: 1 ISSUED: 12/4/2017 Project: MECHANICAL SYSTEM REPLACEMENT BROWN COUNTY COURTHOUSE 200 EAST COURT STREET MOUNT
More informationCITY OF MILTON CONSTRUCTION NOTES
CITY OF MILTON CONSTRUCTION NOTES 1. Driveways shall be constructed of concrete and sloped per Georgia Highway standard 9031-J. Curb shall not be broken from gutter. Curb and gutter to be removed to existing
More informationConstruction Administration Updates
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Construction Administration Updates Clint Bishop Construction Administration Updates Construction Administration Updates
More informationThe developer/contractor shall be responsible for replacing all fences which must be disturbed for the installation of sanitary sewer or water lines.
SECTION 15.0 PIPE TRENCHES 15.01 Clearing and Grubbing The developer/contractor shall be responsible for the clearing and grubbing of the entire right-of-way. See Sections 13.01 and 14.01. Clearing and
More informationSECTION REVISIONS, CLARIFICATIONS AND MODIFICATIONS ADDENDA. Date Issued No /26/ No.
SECTION 00 90 00 REVISONS, CLARIFICATIONS AND MODIFICATIONS ADDENDA Section No. ADDENDUM NUMBER No. of Pages Date Issued 00 90 01 No. 1 52 11/26/14 00 90 02 No. 2 12 12/10/14 ~ END OF SECTION 00 90 00
More informationCUY-480-Valley View Bridge. Matchmaker April 20, 2017 Bureau of Workers Compensation 4800 E. 131 st Street
CUY-480-Valley View Bridge Matchmaker April 20, 2017 Bureau of Workers Compensation 4800 E. 131 st Street Agenda Welcome Project Overview Prequalification & Work types Procurement Overview Matchmaker 2
More informationBIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX BID PACKAGE #1 SITE WORK
HOSKINS ARCHITECTURE, LLC 1827 1 ST AVENUE NORTH, SUITE 104 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 1 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX BID PACKAGE #1 SITE WORK
More informationCHARLES COUNTY GOVERNMENT ITB NO NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) TEMI DRIVE CONSTRUCTION
CHARLES COUNTY GOVERNMENT Department of Fiscal and Administrative Services Purchasing Division Telephone: 301-645-0656 October 7, 2014 ITB NO. 15-10 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES)
More informationSection 208. SOIL EROSION AND SEDIMENTATION CONTROL
208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01. Description. This work consists of installing and maintaining erosion and sedimentation controls to minimize soil erosion and control
More informationThis document shall become attached to and part of the Construction Documents for the aforementioned project.
ADDENDUM Pre Bid Addendum No. 01 TO PLANS AND SPECIFICATIONS FOR Livonia Public Schools High School Press Boxes SHW Project No. 7113.059, 7113.060 & 7113.061 February 20, 2014 NOTE: If you have questions
More informationADDENDUM NO. 1 CITY OF SOUTH PORTLAND, MAINE WATERMAN DRIVE PARKING IMPROVEMENTS BID # August 21, 2014 PREPARED BY:
ADDENDUM NO. TO CITY OF SOUTH PORTLAND, MAINE WATERMAN DRIVE PARKING IMPROVEMENTS BID #04-5 August 2, 204 PREPARED BY: SEBAGO TECHNICS, INC. 75 John Roberts Road Suite A South Portland, ME 0406 3036 Addendum
More informationADDENDUM NO. 2. Wilder Road Rehabilitation Project I-69 to Imlay City Road LCRC No DATE: August 31, 2017
ADDENDUM NO. 2 Wilder Road Rehabilitation Project I-69 to Imlay City Road LCRC No. 459-012-179953 DATE: August 31, 2017 FROM: Patrick R. Phelan, P.E. BMJ Engineers and Surveyors 519 Huron Avenue Port Huron,
More informationIf a new residence s electrical service is not located within 200 feet of existing
Primary Line Extensions CHAPTER 4 If a new residence s electrical service is not located within 200 feet of existing primary electrical facilities, a primary line extension is required to place a close
More informationADDENDUM NUMBER ONE. for BOLDEN STADIUM RENOVATIONS & BUILDING ADDITIONS PHASE 2 RICHLAND COUNTY SCHOOL DISTRICT ONE COLUMBIA, SOUTH CAROLINA
for RICHLAND COUNTY SCHOOL DISTRICT ONE COLUMBIA, SOUTH CAROLINA PREPARED BY: Clayton Design, Inc. 2549 Forest Drive, Suite 3 Columbia, South Carolina 29204 And Cumming Construction Management, Inc. 720
More information10:00 AM, Wednesday, April 8, 2015
NOTICE OF MANDATORY PRE-BID CONFERENCE WILL BE HELD AT 10:00 AM, Wednesday, April 8, 2015 IN ROOM 16, CITY HALL BUILDING, 101 NORTH MAIN STREET WINSTON-SALEM, NORTH CAROLINA The purpose of this conference
More informationThe Metropolitan Sewer District of Greater Cincinnati
The Metropolitan Sewer District of Greater Cincinnati Dry Run Area Sewers, Phase 1 and Phase 2 Contract A, Project ID 10270000_10270005 Date Issued: 03/25/2010 ADDENDUM NO. 2 This addendum will only be
More informationSECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION
820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing
More informationADDENDUM NO. 1. 1:30 PM, Thursday, September 14, 2017 (Not Changed)
ADDENDUM NO. 1 TO: PLANS AND SPECIFICATIONS FOR STATE OF MISSOURI Construct Range Macon Training Site Macon, Missouri PROJECT NO. T1805-01 Bid Opening Date is: 1:30 PM, Thursday, September 14, 2017 (Not
More informationNotice to Bidders (REV 1)
Page 1 of 6 MATADERO CREEK SEDIMENT REMOVAL & EROSION REPAIR AND SAN TOMAS AQUINO CREEK EROSION REPAIR PROJECT Project No. 62084001, Task No. 5188 Contract No. C0642 1. Notice. Notice is hereby given that
More informationItem Name Description Unit of Measure Mobilization Per WSDOT Lump Sum
Page 1 of 6 DESIGN STANDARDS FOR: MEASUREMENT AND PAYMENT Where bids are utilities for construction, repair or alteration for Public Work park projects, the following bid item descriptions and units of
More informationDIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012
2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012 PART FIVE DOCUMENTS FOR SITE AND INFRASTRUCTURE 31 00 00. EARTHWORK 31 10 00. SITE CLEARING.1 STRUCTURE REMOVAL: Include
More informationADDENDUM #1 Village of Hawthorn Woods Darlington Drive Culvert Replacement Date: January 29, 2018
CBBEL PROJECT NO. 02-0065.H0226 ADDENDUM #1 Village of Hawthorn Woods Darlington Drive Culvert Replacement Date: January 29, 2018 Modification No. 1 In regards to the COBBLESTONE PAVERS specification,
More informationSECTION 10 - TRENCHING AND BACKFILLING
SECTION 10 - TRENCHING AND BACKFILLING 10.1 General A. Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 10.1.1 Related requirements
More informationTWIN VALLEY PUMP STATION IMPROVEMENTS - CITY OF FARMINGTON FARMINGTON, MI 48335
TWIN VALLEY PUMP STATION IMPROVEMENTS - CITY OF FARMINGTON FARMINGTON, MI 48335 BIDS TO BE RECEIVED UNTIL 1:00 P.M., LOCAL TIME, WEDNESDAY, OCTOBER 28, 2015, AT THE OFFICE OF THE CITY CLERK LOCATED AT
More informationQ&A: The Block/Parsons Alley Construction RFP
Q&A: The Block/Parsons Alley Construction RFP 1. Is there a Geotechnical Report available? 2. Would it be possible to extend the bid date to a day other than a Monday? 3. Is it possible to extend the date
More informationSpecifying Asphalt Pavement the ODOT Way
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director Specifying Asphalt Pavement the ODOT Way David Miller, P.E. Office of Pavement Engineering Workshop on Design and Rehabilitation
More informationPlease acknowledge receipt of this Addendum No. 01 on the Bid Schedule submitted with your sealed Bid
Bids for the construction of the Westar Place, PH 2 (), will be received by the City of Westerville, Ohio until the closing date and time of 3:00 p.m. (local time) on Wednesday, December 12, 2018 and will
More informationDepartment of Transportation Mitchell Region Office
Connecting South Dakota and the Nation Department of Transportation Mitchell Region Office PO Box 1206 Mitchell, SD 57301-7206 605/995-8129 FAX: 605/995-8135 September 28, 2018 TO: Interested Bidders (pdf
More informationNovember 29, CITY OF PLANT CITY Purchasing Division (813)
November 29, 2018 CITY OF PLANT CITY Purchasing Division (813) 659-4270 IFB 18-014UM-LG 12-inch Water Transmission Main-Franklin St., Hancock St. and Terrace Drive West ADDENDUM No. 3 *Bidders are required
More informationChampaign Park District Trevett Finch Retaining Wall Bid ADDENDUM 1 (2/27/18)
Champaign Park District Trevett Finch Retaining Wall Bid ADDENDUM 1 (2/27/18) Modifications have been made to the original bid packet, these changes are listed below and in the drawings provided (L1,,
More informationOhio Department of Transportation - Prebid Questions
Ohio Department of Transportation - Prebid Questions Project No. 110510 Sale Date - 9/29/2011 CUY-22212 - SR-17-8.38 (BROOKPARK ROAD) 9/22/2011 10:38:17 AM Quanity of materials for asbestos abatement?
More informationPRE-BID CONFERENCE AGENDA. Lime Sludge Drying Beds Maintenance. for Lewis & Clark Regional Water System, Inc. Tea, South Dakota
1. INTRODUCTIONS PRE-BID CONFERENCE AGENDA for Lewis & Clark Regional Water System, Inc. Tea, South Dakota Pre-Bid date March 14, 2017-2:00 PM CDT 2. ROSTER Please sign the roster sheet 3. WORK INCLUDES:
More informationCOMMUNICATIONS NETWORK UPGRADES AT VARIOUS LOCATIONS CITY OF SIOUX FALLS, SOUTH DAKOTA Bid Request No ADDENDUM NO.
COMMUNICATIONS NETWORK UPGRADES AT VARIOUS LOCATIONS CITY OF SIOUX FALLS, SOUTH DAKOTA Bid Request No. 15-1079 2015 CONTRACTOR S BID DATE: PLACE FOR CONTRACTOR S TO SUBMIT BIDS: Thursday, June 25th, 2015,
More informationRequest for Proposal # Cane Creek Park Fiber Optic Cable Upfit
Request for Proposal # 2018-049 Cane Creek Park Fiber Optic Cable Upfit ADDENDUM NO. 1 ISSUE DATE: February 2, 2018 Bidders on this project are hereby notified that this Addendum shall be attached to and
More informationMarch 28, Addendum #4 IFB SA 1713 POTOMAC MILLS T23 WATER TANK REHABILITATION
Procurement Department P.O. Box 2266 Woodbridge, Virginia 22195-2266 Fax (703) 335-7954 March 28, 2017 Addendum #4 IFB SA 1713 POTOMAC MILLS T23 WATER TANK REHABILITATION THIS SOLICITATION IS HEREBY AMENDED
More informationAddendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018
155 Corey Avenue St. Pete Beach, FL 33706-1839 www.stpetebeach.org Addendum 1 Valve & Valve Vault Replacement Issued June 13, 2018 Note that this Addendum does not change the bid due date and time as stated
More informationMay 31, Prepared By: Thompson Engineering, Inc Cottage Hill Road Ste. 190 Mobile, Al Office (251) Fax: (251)
Addendum No. 1 to the Water Street Signal Planning And Striping Plan Concrete Sidewalk Phase Mobile, Alabama For the City of Mobile, Alabama Project No. 2017-2060-06 May 31, 2017 Prepared By: Thompson
More informationOhio Department of Transportation Central Office 1980 West Broad Street Columbus, OH John R. Kasich, Governor Jerry Wray, Director
Ohio Department of Transportation Central Office 1980 West Broad Street Columbus, OH 43223 John R. Kasich, Governor Jerry Wray, Director 2/5/2015 Project 150030 Addendum No. 6 PID No. 88310 FRA IR 270
More informationCITY OF DE SOTO Miller Park Trail Extension and Picnic Table Pads
CITY OF DE SOTO Miller Park Trail Extension and Picnic Table Pads City of De Soto Johnson County, Kansas PREPARED BY: City of De Soto, Kansas 32905 West 84 th Street De Soto, Kansas 66018 SPECIFICATIONS
More informationADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION THE TOWN OF MALTA AND A PORTION OF THE 115KV
ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION IN THE TOWN OF MALTA AND A PORTION OF THE 115KV LUTHER FOREST STATION IN THE TOWN OF STILLWATER SARATOGA
More informationSECTION WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING
SECTION 334701 - WATER TREATMENT RESIDUAL REMOVAL, DISPOSAL, AND LAGOON CLEANING PART 1 - GENERAL 1.1 DESCRIPTION A. Scope: 1. The Contractor shall provide all labor, materials, tools, and equipment required
More informationSPECIAL PROVISIONS WATERWAY PERMITS CONDITIONS PID: Date: 3/8/18 C-R-S: UNI-TR
SPECIAL PROVISIONS WATERWAY PERMITS CONDITIONS C-R-S: UNI-TR 0308-00.57 PID: 99910 Date: 3/8/18 Special Provisions: UNI-TR 0308-00.57, PID 99910 Page 2 of 7 1. Waterway Permits Time Restrictions: USACE
More informationMainelli Wagner & Associates, Inc.
www.mwaeng.com Mainelli Wagner & Associates, Inc. 6920 Van Dorn Street, Suite A, Lincoln, NE 68506 Phone: (402) 421-1717 Fax: (402) 421-6061 August 8, 2018 The Cuming County Board of Supervisors will be
More informationPurchasing and Property Services AOC East Fowler Avenue Tampa, Florida (813)
Purchasing and Property Services AOC 200 4202 East Fowler Avenue Tampa, Florida 33620 (813) 974-2481 Web Address: http://usfweb2.usf.edu/purchasing/purch2.htm April 23, 2015 Invitation to Bid No. Entitled:
More information36 JASPER THPMAS ROAD CRAWFORDVILLE, FL.
N ARRAN RD. N US 319 CRAWFORDVILLE HWY SR 61 SHADEVILLE RD. WAKULLA HARVEY MILL ROAD US 319 PREBLE-RISH INC CIVIL SURVEYING SITE PLANNING 36 JASPER THPMAS ROAD CRAWFORDVILLE, FL. 32327 GENERAL NOTES: 1.
More information