1 NEW RIVER INLET CHANNEL REALIGNMENT PROJECT UPDATE NOVEMBER 1, 2012 Construction Schedule Preconstruction Conference Nov. Town Hall Dredge Arrives Nov. 15 th Sand Placement Begins Nov. 17 th Dredging Activities Conclude Jan. 13 th (Construction progress is weather dependent and allowed through March 31) What to Expect Construction Activities will be Conducted on a 24 hr/day Basis (for approx. 60 days) The contractor (Marinex) expects to work through the Thanksgiving holiday. They may or may not work through the Christmas holiday. It depends on how close they are to finishing the project. Approximately 500 to 1,000 ft. of Beach Closed to Public (Closures Will be on a Moving Scale). The closed areas will be marked off and there will be a narrow walkway open adjacent to the dune line (where allowable). Night Time Noise Adjacent to Construction. Mainly the Back up Alarm (sounds like an alarm clock). Lighting in Construction Area, Inlet, and Beach. Please see the attached slide presentation from the project s engineer Coastal Planning and Engineering. There are several pictures of other beach projects. Also attached is a project synopsis. Administration of the project will be done by CP&E. They will be overseeing the contractor s work and will provide the Town with updates during the project. A representative from CP&E will conduct biweekly public meetings at Town Hall. These meeting times will be available on the Town s website. Design Intent Re align Channel to Provide Wave and Current Protection to North End of North Topsail Beach. Placed Sand will Provide Erosion Mitigation. Post Construction Monitoring is Recommended to Quantify Project Performance. Material Expected to Wash Away over Time. (Anticipate 2/3 Volume to Remain After 4 Years Assuming Normal Storm Patterns) Channel Width: 500 Channel Depth: 18 +/ Usable Sand: Approx. 597,000 CY Length of Project: 9,500 ft. or approx 1.7 miles (midway between Marina Way and Bay Court)

2 New River Inlet Channel Realignment & Beach Restoration Town of North Topsail Beach, NC November 1, 2012 Coastal Planning & Engineering of North Carolina, Inc. Ken Willson & Robert Neal Tracking No

3 Progress Schedule Remaining Monitoring Onslow Beach Expected Week of Nov. 16 th Southern Project Area Expected Week of Nov. 16 th Construction Preconstruction Conference Nov. Town Hall Dredge Arrives Nov. 15 th Sand Placement Begins Nov. 17 th Dredging Activities Conclude Jan. 13 th Tracking No (Construction progress is weather dependent and allowed through March 31) 2

4 What to Expect Construction Activities Conducted On 24 hr / Day Basis Approximately 500 to 1,000 ft. of Beach Closed to Public (Closures Will be on a Moving Scale) Night Time Noise Adjacent to Construction Site Back-up Alarm Tracking No Lighting in Construction Area Inlet and Beach 3

5 Tracking No Construction Process 4

6 Example Projects Post Construction Pre-Construction Tracking No

7 Tracking No Example Projects 6

8 Tracking No Construction Layout 7

9 Tracking No Construction Layout 8

10 Tracking No Construction Layout 9

11 Design Intent Re-align Channel to Provide Wave and Current Protection to North End of North Topsail Beach Placed Sand will Provide Erosion Mitigation Post Construction Monitoring is Recommended to Quantify Project Performance Material Expected to Wash Away over Time (Anticipate 2/3 Volume to Remain After 4 Years Assuming Normal Storm Patterns) Tracking No

12 Tracking No Questions? Thank You For Your Time! 11

13 Tracking No Spreader 12

14 Tracking No Cutterhead 13

15 Tracking No Storm Damage Reduction 14

16 COASTAL PLANNING & ENGINEERING OF NORTH CAROLINA, INC MASONBORO LOOP ROAD, WILMINGTON, NC PHONE FAX INTERNET: July 24, 2012 Steve Foster Town of North Topsail Beach 2008 Loggerhead Court North Topsail Beach, NC Re: North Topsail Beach New River Inlet Channel Realignment & Beach Restoration Project Synopsis Dear Mr. Foster: The New River Inlet Channel Realignment & Beach Restoration is proposed for construction during the 2012/2013 dredging season. Construction is anticipated to begin as early as November 16, 2012 and must be completed by April 1, The project entails removal of approximately 597,000 cubic yards for construction of a 500 ft. wide channel at a depth of -17 NAVD88. Two (2) locations have been identified where a shallower depth must be specified to avoid known concentrations of clay. These areas are shown on the drawings as clay avoidance areas and specify a -14 NAVD88 design elevation. Beach placement will extend from the north end of Topsail Island, adjacent to New River Inlet, and reach approximately 9,500 feet to midway between Marina Way and Bay Court. The shoreline (Ele. 1.4 NAVD88) will be extended an average initial width of approximately 180 feet across the project area. The width is expected to adjust rapidly after construction as the beach reshapes with the natural wave climate. Some areas along the beach may see a reduction in the 180 foot beach width of as much as 100 ft. or more as the sand equilibrates, migrating seaward to nourish the sub marine portions of the beach profile. This is expected to occur within the first year after construction. The sand will be placed up to an elevation of 6.5 NAVD88 to extend the existing beach. This elevation is approximately 5 feet above mean high water (MHW) and should be very close to the existing vegetation line on the beach. The construction documents allow the Contractor a tolerance of 1 vertical foot below the 6.5 NAVD88 elevation for sand placement to qualify for payment. The tolerance is provided to account for the method of construction and varying placement densities. The Contractor will be placing the sand by hydraulic pipeline and spreading the material with heavy construction equipment (bull-dozers, etc.). Providing the tolerance eliminates potential issues arising from the material being adjusted by wind, waves, or any other force that may shift the sands prior to the Contractor s surveying the material for payment. New River Inlet will be dredged to a minimum depth of -17 NAVD88 and may extend an additional 2 feet (-19 NAVD88). The additional depth allows the Contractor maneuverability to ensure material above the -17 ft. contour is removed. The dredging will be conducted by a hydraulic cutterhead. The equipment cannot be controlled to limit excavation to certain elevation and allow for all the material above that elevation to be removed. Approximately half of the cutterhead diameter must be placed below the -17 NAVD88 contour to ensure material above the -17 contour is removed MASONBORO LOOP ROAD, WILMINGTON, NC PHONE: FAX COASTAL PLANNING & ENGINEERING OF NORTH CAROLINA, INC.

17 Typical View of a Hydraulicc Cutterhead There are two (2) areas designated in the drawings where clayey material has been identified above the - 17 contour. Excavation limits have been raised in these areas to avoid placing clay on the beach. Material above an elevation of -14 NAVD88 will be removed in the areas where clay is identified. Work is expected on a 24-hour per day basis, 7 days a week including holidays (Thanksgiving, Christmas, New Years, Martin Luther King Day, Presidents Day). The Contractorr shall be required to control night-time noise and lighting. However, a back-upp alarm on the shore-based equipment and safety lighting on the dredge are expected to create disturbances during the evening and night-time hours. The Contractor is expected to stage or store materials along the beach and at the terminus of New River Road. Access along New River Road shall be maintained but will most likely be constricted between the residential units and inlet located at the end of the road. Staging along the beach should be contained within an approximate 750 ft. section of beachh that will be closed to the public during construction. This closed section will be the Contractor s immediate work area and will progress down the beach. The Contractor will also be allowed to use the beach access located near Bay Court but will not be allowed to impedee others from using the same access MASONBORO LOOP ROAD, W ILMINGTON, NC PHONE: FAX CO ASTAL PLANNING & ENGINEERING OF NORTH CARO LINA, INC.

18 Typical View of Staging Areaa on the Beach During construction increased traffic along the roadways is not expected to be an issue; however an increase in water-based traffic willl be noticeable. Navigation throughh New River Inlet shall not be prohibited by the Contractor, but recreational vessels will need to take caution. The Contractorr shall be bound to abide by all US Coast Guard regulations but similar to road construction, the dredging equipment will create potential hazards to unaware boaters. The work must be completed no later than March 31, This is a permit requirement due to environmental concerns from the state and federal agencies. If the work is not satisfactorily completed by March 31, 2013 the Town has the option to require the Contractor to complete the work during the 2013/2014 dredging season. The Contractor will be required to remove all equipment from the beach until November 16, The Contractor may then complete the work, but will be charged $1,000 / day for every day it takes to complete the work. The $1,000 / day is considered liquidated damages to the Town for the project extending beyond the original completion date. The Contractor will invoice for work on a monthly basis except for mobilization costs. Sixty (60%) percent of the mobilization costs will be due to the Contractor when the production requirement of an estimated 5,000 cubic yards is placed on the beach within a 24-hr period. The estimate will be made by reviewing the dredging records and visual observations of the beach. The 5,000 cubic yard requirement is equivalent to filling a football field approximately 3 ft. high. (The total beach placement of 597,000 cubic yards is equivalent to filling a football field approximately 35 stories high.) The 5,000 cubic yard requirement is also near the minimum production level that providess adequate time to complete the project within the approximate 135 day construction window MASONBORO LOOP ROAD, W ILMINGTON, NC PHONE: FAX CO ASTAL PLANNING & ENGINEERING OF NORTH CARO LINA, INC.

19 The Town will be able to hold as retainage 10% of all monies invoiced until the work is completed. The Town may elect to stop withholding retainage from the invoices once 50% of the work is complete if the Contractor is on schedule and performing in an acceptable manner. If the Town elects to stop withholding retainage approximately 5% of the construction value will be available to the Town to correct any deficiencies in the work. The 5% is in addition to the required Performance Bond the Contractor will provide. The bond will be equivalent to construction cost and may be used to correct any deficient work of the Contractor also. The remaining specifications detail constructionn standards, requirements and submittals the Contractor must adhere to or provide to allow review and proper accounting of the work. These specifications will aid to credit the work completed and to document the final measurements of the realigned channel and restored beach. The specifications are standard industry regulations and are provided to help ensure a beneficial project for the Contractor and the Town. If you have any questions or comments, please contact me. Sincerely, COASTAL PLANNING & ENGINEERING, INC. Kenneth T. Willson Project Manager 4038 MASONBORO LOOP ROAD, W ILMINGTON, NC PHONE: FAX CO ASTAL PLANNING & ENGINEERING OF NORTH CARO LINA, INC.

Town of Duck North Carolina

Town of Duck North Carolina Town of Duck North Carolina Town of Duck Shore Protection Project Photograph obtained by. (July 7. 2017). Beach Maintenance Plan August 2017 Prepared By:. 4038 Masonboro Loop Road Wilmington, NC 28409

More information

Town of Duck North Carolina

Town of Duck North Carolina Town of Duck North Carolina Town of Duck Shore Protection Project Photograph obtained by. (July 7, 2017). Beach Maintenance Plan August 2017 Updated September 2018 Prepared By:. 4038 Masonboro Loop Road

More information

APPENDIX C DESIGN & ENGINEERING

APPENDIX C DESIGN & ENGINEERING APPENDIX C DESIGN & ENGINEERING Study Authority. This study is authorized under Section 204 of the Water Resources Development Act of 1992, as amended. Study Description. This appendix presents the results

More information

Final General Reevaluation Report and Final Environmental Impact Statement. Hurricane Protection and Beach Erosion Control

Final General Reevaluation Report and Final Environmental Impact Statement. Hurricane Protection and Beach Erosion Control Final General Reevaluation Report and Final Environmental Impact Statement on Hurricane Protection and Beach Erosion Control WEST ONSLOW BEACH AND NEW RIVER INLET (TOPSAIL BEACH), NORTH CAROLINA Appendix

More information

Notice of Availability (NOA) of the Draft Environmental Impact Statement. (DEIS) and the Announcement of a Public Hearing for the Installation of a

Notice of Availability (NOA) of the Draft Environmental Impact Statement. (DEIS) and the Announcement of a Public Hearing for the Installation of a This document is scheduled to be published in the Federal Register on 08/28/2015 and available online at http://federalregister.gov/a/2015-21282, and on FDsys.gov BILLING CODE: 3720-58 DEPARTMENT OF DEFENSE

More information

Final General Reevaluation Report and Final Environmental Impact Statement. Hurricane Protection and Beach Erosion Control

Final General Reevaluation Report and Final Environmental Impact Statement. Hurricane Protection and Beach Erosion Control Final General Reevaluation Report and Final Environmental Impact Statement on Hurricane Protection and Beach Erosion Control WEST ONSLOW BEACH AND NEW RIVER INLET (TOPSAIL BEACH), NORTH CAROLINA Appendix

More information

The State of New Jersey s Shore Protection Program

The State of New Jersey s Shore Protection Program Oakwood Beach Storm Damage Reduction Project NJDEP-Bureau of Coastal Engineering Glenn Golden, Project Manager U.S. Army Corps Civil Works Programs Branch Dwight Pakan, Project Manager, Philadelphia District

More information

Coastal Management ENVIRONMENTAL QUALITY

Coastal Management ENVIRONMENTAL QUALITY Joint Legislative Oversight Committee on Agriculture, Natural and Economic Resources October 8, 2018 Coastal Management ENVIRONMENTAL QUALITY NC Division of Coastal Management NC Coastal Area Management

More information

The release of the Final Environmental Impact Statement (FEIS) for the Bogue

The release of the Final Environmental Impact Statement (FEIS) for the Bogue This document is scheduled to be published in the Federal Register on 03/05/2018 and available online at https://federalregister.gov/d/2018-04408, and on FDsys.gov BILLING CODE: 3720-58 DEPARTMENT OF DEFENSE

More information

GREAT KILLS HARBOR, STATEN ISLAND, NEW YORK FEDERAL NAVIGATION PROJECT MAINTENANCE DREDGING

GREAT KILLS HARBOR, STATEN ISLAND, NEW YORK FEDERAL NAVIGATION PROJECT MAINTENANCE DREDGING Public Notice In replying refer to: Public Notice No. GREAT KILLS HARBOR FY13 Published: April 30, 2013, Expires: May 30, 2013 New York District 26 Federal Plaza New York, N.Y. 10278 ATTN: CENAN-OP-ST

More information

AMENDMENTS TO BAYFIELD COUNTY ZONING ORDINANCE. Lake Superior Shoreland Lot Development Requirements.

AMENDMENTS TO BAYFIELD COUNTY ZONING ORDINANCE. Lake Superior Shoreland Lot Development Requirements. AMENDMENTS TO BAYFIELD COUNTY ZONING ORDINANCE Sec. 13-1-34 is created to read as follows: Sec. 13-1-34 Lake Superior Shoreland Lot Development Requirements. Introduction. Much of Bayfield County s Lake

More information

Photo on 22 October 2016 Post Matthew. Nags Head Shoreline Management Committee Public Meeting April 15, 2017

Photo on 22 October 2016 Post Matthew. Nags Head Shoreline Management Committee Public Meeting April 15, 2017 Photo on 22 October 2016 Post Matthew Nags Head Shoreline Management Committee Public Meeting April 15, 2017 Presentation Outline Nags Head Beach Nourishment Planning History Review of the 2011 Beach Nourishment

More information

LEE COUNTY, FLORIDA GASPARILLA ISLAND SEGMENT SHORE PROTECTION PROJECT 2013 BEACH RENOURISHMENT POST CONSTRUCTION MONITORING REPORT.

LEE COUNTY, FLORIDA GASPARILLA ISLAND SEGMENT SHORE PROTECTION PROJECT 2013 BEACH RENOURISHMENT POST CONSTRUCTION MONITORING REPORT. LEE COUNTY, FLORIDA GASPARILLA ISLAND SEGMENT SHORE PROTECTION PROJECT 2013 BEACH RENOURISHMENT POST CONSTRUCTION MONITORING REPORT August 2014 U.S. ARMY CORPS OF ENGINEERS JACKSONVILLE DISTRICT Table

More information

APPENDIX A SECTION 404(B)(1) EVALUATION TYBEE ISLAND, GEORGIA SHORE PROTECTION PROJECT RENOURISHMENT

APPENDIX A SECTION 404(B)(1) EVALUATION TYBEE ISLAND, GEORGIA SHORE PROTECTION PROJECT RENOURISHMENT APPENDIX A SECTION 404(B)(1) EVALUATION TYBEE ISLAND, GEORGIA SHORE PROTECTION PROJECT 2014-2015 RENOURISHMENT U.S. ARMY CORPS OF ENGINEERS SAVANNAH DISTRICT JUNE 2014 This page intentionally blank. SECTION

More information

Kiawah Island 2016 Beach Monitoring

Kiawah Island 2016 Beach Monitoring Kiawah Island 2016 Beach Monitoring Steven Traynum Coastal Science & Engineering straynum@coastalscience.com 3/8/17 1 Coastal Science & Engineering CSE founded in 1984 Most SC nourishment and groin experience

More information

CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES

CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES CITY OF LA QUINTA GENERAL NOTES GENERAL NOTES 1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE LATEST EDITION OF THE STANDARD PLANS OF THE CITY OF LA QUINTA, THE LATEST EDITION OF THE STANDARD SPECIFICATIONS

More information

Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY

Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY Draft Reformulation Public Information October 2016 US Army Corps of Engineers Presentation Outline Project Overview

More information

Public Notice. Navigation Section Notice Date: May 23, 2018 PO Box 3755 Expiration Date: June 21, 2018

Public Notice. Navigation Section Notice Date: May 23, 2018 PO Box 3755 Expiration Date: June 21, 2018 Public Notice Navigation Section Notice Date: May 23, 2018 PO Box 3755 Expiration Date: June 21, 2018 Seattle, WA 98124-3755 Reference: PMP-18-15 ATTN: John Pell (OD-TS-NS) or Joanne Gardiner (PMP-E) US

More information

PA-03. Honorable Mike Kelly. Pennsylvania 114th Congress. 3rd Congressional District. Miles

PA-03. Honorable Mike Kelly. Pennsylvania 114th Congress. 3rd Congressional District. Miles PA-03 Honorable Mike Kelly Pennsylvania 114th Congress 3rd Congressional District 2 3 & 1&& / 0 1, O&M, Erie Harbor 2, CG-CAP 204, Presque Isle Regional Sediment Management 3, CG, Presque Isle Shoreline

More information

15A NCAC 07H.0308 SPECIFIC USE STANDARDS FOR OCEAN HAZARD AREAS (a) Ocean Shoreline Erosion Control Activities: (1) Use Standards Applicable to all

15A NCAC 07H.0308 SPECIFIC USE STANDARDS FOR OCEAN HAZARD AREAS (a) Ocean Shoreline Erosion Control Activities: (1) Use Standards Applicable to all 15A NCAC 07H.0308 SPECIFIC USE STANDARDS FOR OCEAN HAZARD AREAS (a) Ocean Shoreline Erosion Control Activities: (1) Use Standards Applicable to all Erosion Control Activities: (A) All oceanfront erosion

More information

Nags Head Beach Nourishment Project

Nags Head Beach Nourishment Project Proposed Plan Up to 4.6 million CY Construction in Spring- Summer 2011 Via Hopper Dredge & Other Feasible Equipment All Previous NC Beach Nourishment Projects Oct 2006 Wilmington District Washington Regulatory

More information

Washoe County PLAN SUBMITTAL

Washoe County PLAN SUBMITTAL Washoe County PLAN SUBMITTAL Grading Residential and Commercial Washoe County Permits Plus Zone 1001 East Ninth Street PO Box 11130 Reno, NV 89520-0027 GRADING PERMIT SUBMITTAL GUIDELINES The following

More information

PUBLIC NOTICE. Figure 8 Beach Homeowners Association, Inc. C/o: Mr. David Kellam (Administrator) 15 Bridge Road Wilmington, North Carolina 28411

PUBLIC NOTICE. Figure 8 Beach Homeowners Association, Inc. C/o: Mr. David Kellam (Administrator) 15 Bridge Road Wilmington, North Carolina 28411 US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: June 29, 2016 Comment Deadline: August 1, 2016 Corps Action ID Number: SAW-2006-41158 All interested parties are herby advised that

More information

Comprehensive Barrier Island Restoration Plan

Comprehensive Barrier Island Restoration Plan Mississippi Coastal Improvements Program (MsCIP) Comprehensive Barrier Island Restoration Plan 202 National Conference on Beach Preservation Technology February 0, 202 Justin McDonald, P.E. Lead Project

More information

Maine s Coastal Sand Dune Rules

Maine s Coastal Sand Dune Rules Maine s Coastal Sand Dune Rules July 2017 David Cherry Project Manager Land Division Southern Maine Regional Office Protecting Maine s Air, Land and Water Sand dune systems are mapped by the Maine Geological

More information

PUBLIC NOTICE. Dredge, with 10-years maintenance, and placement of sand on an adjacent beach

PUBLIC NOTICE. Dredge, with 10-years maintenance, and placement of sand on an adjacent beach PUBLIC NOTICE US Army Corps of Engineers New York District Jacob K. Javits Federal Building New York, N.Y. 10278-0090 ATTN: Regulatory Branch In replying refer to: Public Notice Number: NAN-2017-00816-EKN

More information

ARTICLE IX BEACH STANDARDS

ARTICLE IX BEACH STANDARDS 900. Specific Project Standards for Beaches and Dunes. In 1988 the Beachfront Management Act was adopted. Amendments to the Act were approved in 1990. A series of maps showing the location of the baseline

More information

Public Information Meeting 7 MARCH 2017

Public Information Meeting 7 MARCH 2017 Public Information Meeting 7 MARCH 2017 Outline of the Presentation Overview of the project Key dates and milestones Anticipated construction Timetable & Activities Required sea turtle monitoring during

More information

ATTACHMENT 2 PROJECT NEED AND JUSTIFICATION

ATTACHMENT 2 PROJECT NEED AND JUSTIFICATION ATTACHMENT 2 PROJECT NEED AND JUSTIFICATION INTRODUCTION The Project includes providing erosion control and shoreline stabilization measures including beach nourishment, maintenance dredging and bypassing,

More information

MARCH 4, protection office oro tecttr ebeach com

MARCH 4, protection office oro tecttr ebeach com MARCH 4, 2016 protection office oro tecttr ebeach com BOGUE BANKS MASTER BEACH NOURISHMENT PLAN CARTERET COUNTY, NC SUMMARY REPORT Prepared For: Prepared By: March 4, 2016 Summary Report Page ii TABLE

More information

New Jersey Department of Environmental Protection

New Jersey Department of Environmental Protection New Jersey Department of Environmental Protection Assistant Commissioner Marilyn Lennon Land Use Management Division of Land Use Regulation Manager Virginia Kopkash September 16, 2013 Transformation of

More information

2. Does not require, involve or include any additions to, or repair or modification of, the existing foundation.

2. Does not require, involve or include any additions to, or repair or modification of, the existing foundation. SECTION 3109 STRUCTURES SEAWARD OF A COASTAL CONSTRUCTION CONTROL LINE 3109.1 General. The provisions of this section shall apply to the design and construction of habitable structures, and substantial

More information

Appendix C. Clean Water Act: Section 404(b)(1) Evaluation

Appendix C. Clean Water Act: Section 404(b)(1) Evaluation Appendix C Clean Water Act: Section 404(b)(1) Evaluation CLEAN WATER ACT: SECTION 404 (b) (1) EVALUATION CLEAN WATER ACT: SECTION 404 (b) (1) EVALUATION MONTAUK POINT STORM DAMAGE REDUCTION PROJECT MONTAUK

More information

SEPTEMBER 18, 2018 SUBMITTED TO: STATE OF NEW YORK DEPARTMENT OF STATE COASTAL ZONE MANAGEMENT PROGRAM

SEPTEMBER 18, 2018 SUBMITTED TO: STATE OF NEW YORK DEPARTMENT OF STATE COASTAL ZONE MANAGEMENT PROGRAM COASTAL ZONE MANAGEMENT CONSISTENCY DETERMINATION FOR THE IMPROVEMENT DREDGING OF THE NEW HAVEN HARBOR FEDERAL NAVIGATION PROJECT (NEW HAVEN, CONNECTICUT) SEPTEMBER 18, 2018 SUBMITTED TO: STATE OF NEW

More information

Shrewsbury River Basin, Sea Bright, New Jersey Coastal Storm Risk Management Feasibility Study

Shrewsbury River Basin, Sea Bright, New Jersey Coastal Storm Risk Management Feasibility Study Shrewsbury River Basin, Sea Bright, New Jersey Coastal Storm Risk Management Feasibility Study Draft Integrated Feasibility Report & Environmental Assessment Appendix E: Pertinent Correspondence & Environmental

More information

DRAFT Coastal Resiliency Technical Bulletin Page 1

DRAFT Coastal Resiliency Technical Bulletin Page 1 DRAFT Coastal Resiliency Technical Bulletin This guidance is intended to clarify how the Coastal Resiliency Goal and Objectives of the Regional Policy Plan (RPP) are to be applied and interpreted in Cape

More information

NORTH CAROLINA TERMINAL GROIN STUDY. Feasibility and Advisability of the Use of a Terminal Groin as an Erosion Control Device

NORTH CAROLINA TERMINAL GROIN STUDY. Feasibility and Advisability of the Use of a Terminal Groin as an Erosion Control Device NORTH CAROLINA TERMINAL GROIN STUDY Feasibility and Advisability of the Use of a Terminal Groin as an Erosion Control Device Science Panel Meeting December 1, 2009 Meeting Agenda Introductions Status of

More information

PROJECT REVIEW PLAN. Preconstruction, Engineering and Design Phase Implementation Documents

PROJECT REVIEW PLAN. Preconstruction, Engineering and Design Phase Implementation Documents PROJECT REVIEW PLAN For Preconstruction, Engineering and Design Phase Implementation Documents For Beach Erosion Control and Hurricane Protection Project Miami-Dade County, Florida Miami Beach Hot Spots

More information

NC BEACH AND INLET MANAGEMENT PLAN FINAL REPORT

NC BEACH AND INLET MANAGEMENT PLAN FINAL REPORT Executive Summary Background North Carolina is renowned for its 326 miles of ocean shoreline, barrier islands and 19 active inlet complexes. North Carolina beaches and inlets have tremendous economic value

More information

SECTION 6.0 AVOIDANCE, MINIMIZATION AND MITIGATIVE MEASURES

SECTION 6.0 AVOIDANCE, MINIMIZATION AND MITIGATIVE MEASURES SECTION 6.0 AVOIDANCE, MINIMIZATION AND MITIGATIVE MEASURES CEQ regulations (40 CFR 1508.20) define mitigation to include: (1) avoiding the impact altogether by not taking a certain action or parts of

More information

STATE OF NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF COASTAL ENGINEERING

STATE OF NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF COASTAL ENGINEERING INDEX OF DRAWINGS SHEET NO. DESCRIPTION 1 TITLE SHEET AND LOCATION PLAN 2 GENERAL NOTES AND SITE ACCESS AND STAGING AREA LAYOUT 3 EXISTING CONDITIONS AND DEMOLITION PLAN 4 CONSTRUCTION PLAN AND PROFILE

More information

MEETING DATE: March 6, 2017 ITEM: 6. ITEM DESCRIPTION: Discussion and possible action on Marriot beach and dune permit application.

MEETING DATE: March 6, 2017 ITEM: 6. ITEM DESCRIPTION: Discussion and possible action on Marriot beach and dune permit application. SHORELINE TASK FORCE AGENDA REQUEST FORM MEETING DATE: March 6, 2017 ITEM: 6 TO: Shoreline Task Force FROM: Brandon Hill, Shoreline Management Director ITEM DESCRIPTION: Discussion and possible action

More information

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION US Army Corps of Engineers Philadelphia District PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION CECIL COUNTY MARYLAND STORMWATER MANAGEMENT PLAN NARRATIVE INITIAL SUBMISSION JUNE 2014 1 PEARCE CREEK

More information

A World of Solutions

A World of Solutions Project Goals Engineering, Economics, & Environmental Principles Minimization of execution risks Construction industry s highest standards Cost savings vs. conventional methods Consistency with Master

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

Team Member Affiliation WEDA Member Role

Team Member Affiliation WEDA Member Role Summary: Dominion Cove Point LNG, LP (DCP) owns and operates the Cove Point Liquefied Natural Gas (LNG) Terminal (terminal), an LNG import terminal in Lusby, Maryland (Figure 1). The terminal includes

More information

02 APRIL PUBLIC NOTICE U.S. Army Corps of Engineers, Savannah District

02 APRIL PUBLIC NOTICE U.S. Army Corps of Engineers, Savannah District DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA 31401-3604 Planning Branch TO WHOM IT MAY CONCERN: 02 APRIL 2019 PUBLIC NOTICE U.S. Army

More information

FLOODPLAIN PERMIT APPLICATION SUBMITTAL REQUIREMENTS

FLOODPLAIN PERMIT APPLICATION SUBMITTAL REQUIREMENTS Planning Department 215 South 4 th Street, Suite F Hamilton, MT 59840 Phone 406-375-6530 Fax 406-375-6531 planning@rc.mt.gov FLOODPLAIN PERMIT APPLICATION SUBMITTAL REQUIREMENTS To initiate the permit

More information

geosystems for soil containment geotubes geocontainers geobags Marine Engineering Products TC Mirafi

geosystems for soil containment geotubes geocontainers geobags Marine Engineering Products TC Mirafi geosystems for soil containment geocontainers geobags Marine Engineering Products TC Mirafi 1 Mirafi geosynthetics are used as integral components in the design and construction of a variety of marine

More information

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR EASEMENT NOTES:. EASEMENT LIMIT SHOWN AS PROVIDED BY. TESC NOTES:. CONTRACTOR SHALL DEVELOP TEMPORARY EROSION AND SEDIMENT CONTROL PLAN AND PROVIDE ONSITE CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL)

More information

May 4, Applicant: Lake Charles Harbor and Terminal District 150 Marine Street Lake Charles, Louisiana 70602

May 4, Applicant: Lake Charles Harbor and Terminal District 150 Marine Street Lake Charles, Louisiana 70602 2011 Environmental Excellence Award Application May 4, 2011 Applicant: Lake Charles Harbor and Terminal District 150 Marine Street Lake Charles, Louisiana 70602 Contact: Mr. Channing Hayden, Jr. Director

More information

Conceptual Engineering Report Collier County Beaches, Florida

Conceptual Engineering Report Collier County Beaches, Florida Conceptual Engineering Report Collier County Beaches, Florida Presented to Collier County Coastal Advisory Committee October 13, 2011 Steve Keehn, PE, CPE Topics Goals Monitoring & Performance Summary

More information

Meeting with PRRD Board

Meeting with PRRD Board Received DC Office May 11/17 Site C Project Peace River Channel Contouring and Side Channel Enhancement Meeting with PRRD Board Background - The Peace River has fluctuating water levels which can cause

More information

SANDY HOOK CHANNEL, NEW YORK HARBOR FEDERAL NAVIGATION PROJECT MAINTENANCE DREDGING

SANDY HOOK CHANNEL, NEW YORK HARBOR FEDERAL NAVIGATION PROJECT MAINTENANCE DREDGING Public Notice In replying refer to: Public Notice No. Sandy Hook Channel, NY Harbor FY17 Published: 14 February 2017 Expires: 14 March 2017 New York District 26 Federal Plaza New York, N.Y. 10278 ATTN:

More information

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY Public Notice U.S. Army Corps Permit Application No: SWG-2000-02888 Of Engineers Date Issued: 3 April 2018 Galveston District Comments Due: 3 May 2018 U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND

More information

CHAPTER 62B-34 GENERAL PERMITS FOR ACTIVITIES SEAWARD OF THE COASTAL CONSTRUCTION CONTROL LINE

CHAPTER 62B-34 GENERAL PERMITS FOR ACTIVITIES SEAWARD OF THE COASTAL CONSTRUCTION CONTROL LINE 1 2 CHAPTER 62B-34 GENERAL PERMITS FOR ACTIVITIES SEAWARD OF THE COASTAL CONSTRUCTION CONTROL LINE 3 4 5 6 7 8 9 10 11 12 13 14 15 62B-34.010 62B-34.030 62B-34.040 62B-34.050 62B-34.055 62B-34.060 62B-34.070

More information

Detailed Project Description

Detailed Project Description Detailed Project Description The current sedimentation patterns in the river have resulted in the expansion and downstream migration of the gravel bar. Because the portion of the bar that must be removed

More information

Feasibility Report and Environmental Impact Statement. Coastal Storm Damage Reduction. SURF CITY and NORTH TOPSAIL BEACH NORTH CAROLINA.

Feasibility Report and Environmental Impact Statement. Coastal Storm Damage Reduction. SURF CITY and NORTH TOPSAIL BEACH NORTH CAROLINA. Feasibility Report and Environmental Impact Statement on Coastal Storm Damage Reduction SURF CITY and NORTH TOPSAIL BEACH NORTH CAROLINA Appendix N Project Costs Appendix N: Cost Engineering SURF CITY

More information

Initial Construction and Maintenance Costs

Initial Construction and Maintenance Costs VI. Initial Construction and Maintenance Costs This section documents the state of knowledge regarding the initial and maintenance costs associated with terminal groin structures. As part of the cost study,

More information

ORDINANCE NO. Commercial WECS: A WECS of equal to or greater than 15 kw in total name plate generating capacity.

ORDINANCE NO. Commercial WECS: A WECS of equal to or greater than 15 kw in total name plate generating capacity. ORDINANCE NO. AN ORDINANCE AMENDING ORDINANCE NO. 1060 KNOWN AS THE WILLMAR ZONING ORDINANCE BY ADDING SECTION 11 RELATING TO WIND ENERGY CONVERSION SYSTEMS (WECS) The City of Willmar does ordain as follows:

More information

COASTAL SHORE PROTECTION WITH LIVING SHORELINES

COASTAL SHORE PROTECTION WITH LIVING SHORELINES COASTAL SHORE PROTECTION WITH LIVING SHORELINES Role of the Army Corps Regulatory Program UCONN, Clear Living Shorelines II Workshop June 24, 2015 Groton CT Cori M. Rose Senior Project Manager/PWS cori.m.rose@usace.army.mil

More information

NATIONAL OCEAN SERVICE

NATIONAL OCEAN SERVICE NATIONAL OCEAN SERVICE Jeff Payne, Ph.D., Office for Coastal Management Steve Thur, Ph.D., Acting Director National Centers for Coastal Ocean Science February 23, 2017 NATIONAL OCEAN SERVICE oceanservice.noaa.gov

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

SEDIMENT CHOREOGRAPHY

SEDIMENT CHOREOGRAPHY Global Reach. Local Benefit. SEDIMENT CHOREOGRAPHY 4/15/2016 Maritime and the Regional Economy The Port of Cleveland spurs job creation and helps our region compete globally by connecting local businesses

More information

BEACH AND INLET PROJECTS UPDATE

BEACH AND INLET PROJECTS UPDATE BEACH AND INLET PROJECTS UPDATE Topics Post-Matthew FEMA Emergency Dune Restoration Project Revised Permit Based on Updated Survey Adjust Design Due to Post-Storm Recovery/Erosion USACE Delta Project Expected

More information

The Clean Water Act and 404/401 Process in Hawaii

The Clean Water Act and 404/401 Process in Hawaii The Clean Water Act and 404/401 Process in Hawaii Presented by: Robert Walker, PE Coastal Engineer Anchor QEA, LLC Clean Water Act (1972) Restore and maintain the chemical, physical, and biological integrity

More information

Mississippi Coastal Improvements Program A Comprehensive Plan for Coastal Resilience

Mississippi Coastal Improvements Program A Comprehensive Plan for Coastal Resilience Mississippi Coastal Improvements Program A Comprehensive Plan for Coastal Resilience 200 Coastal Resilience Symposium 26 May 200 US Army Corps of Engineers BUILDING STRONG Mississippi Coastal Improvements

More information

Appendix D 404(b) Analysis

Appendix D 404(b) Analysis Appendix D 404(b) Analysis Appendix D - Evaluation of Section 404(b)(1) Guidelines I. Project Description A. Location: Delaware Bay and bayshore communities (Pickering Beach, Kitts Hummock, Bowers Beach,

More information

PORT OF PORT TOWNSEND. Point Hudson Marina Breakwater Preliminary Design

PORT OF PORT TOWNSEND. Point Hudson Marina Breakwater Preliminary Design PORT OF PORT TOWNSEND Point Hudson Marina Breakwater Preliminary Design December 5, 2014 1 Outline Project Status (Scopes of Work, To-Do List from Conceptual Design) Existing Conditions Alternative Evaluation

More information

SEDIMENT QUALITY CONTROL/QUALITY ASSURANCE PLAN FOR BEACH RESTORATION OR NOURISHMENT USING AN OFFSHORE BORROW AREA. [FDEP Permit No.

SEDIMENT QUALITY CONTROL/QUALITY ASSURANCE PLAN FOR BEACH RESTORATION OR NOURISHMENT USING AN OFFSHORE BORROW AREA. [FDEP Permit No. SEDIMENT QUALITY CONTROL/QUALITY ASSURANCE PLAN FOR BEACH RESTORATION OR NOURISHMENT USING AN OFFSHORE BORROW AREA [FDEP Permit No.] Palm Beach Co Department of Environment Resources Management Jupiter/Carlin

More information

Developing a Texas Preferred Ike Dike/Coastal Spine

Developing a Texas Preferred Ike Dike/Coastal Spine Developing a Texas Preferred Ike Dike/Coastal Spine Planning Environment Time All truth passes through three stages. First, it is ridiculed. Second, it is violently opposed. Third, it is accepted as being

More information

Appendix 1 CWA Section 404 Compliance Forms Section 404(b)(1) Guideline Short Form and Coastal Zone Consistency

Appendix 1 CWA Section 404 Compliance Forms Section 404(b)(1) Guideline Short Form and Coastal Zone Consistency Appendix 1 CWA Section 404 Compliance Forms Section 404(b)(1) Guideline Short Form and Coastal Zone Consistency HSC PDR for HSC Flare at Bayport Ship Channel Environmental Assessment This page left intentionally

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION NOTICE OF PREPARATION Date: June 12, 2014 To: From: Subject: Governor s Office of Planning and Research/State Clearinghouse Unit, Responsible Agencies, Trustee Agencies, and Interested Parties Announcement

More information

Perimeter protection such as seawalls and levees (or raised roadways serving as levees)

Perimeter protection such as seawalls and levees (or raised roadways serving as levees) INTRODUCTION This document discusses flood issues and some conceived strategies to alleviate such issues in the Back Bay. The Back Bay experiences frequent wind tides that push water against the surrounding

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

TEXAS CITY CHANNEL DEEPENING A DESIGN-BUILD FIRST

TEXAS CITY CHANNEL DEEPENING A DESIGN-BUILD FIRST TEXAS CITY CHANNEL DEEPENING A DESIGN-BUILD FIRST Larry A. Wise, P.E. 1 and Philip J. Burgmeier 2 ABSTRACT Chosen for its efficient delivery process, the Texas City Channel Deepening Project marks the

More information

SUBMITTAL REQUIREMENTS:

SUBMITTAL REQUIREMENTS: 9611 SE 36 th Street Mercer Island, WA 98040-3732 PHONE (206) 275-7605 FAX (206) 275-7726 Wet Season Grading Restriction (October 1 through April 1) Seasonal Development Limitation Waiver CHECKLIST FOR

More information

ACKNOWLEDGEMENTS. Sincerely, Executive Director and Staff. Rockingham Planning Commission. 156 Water Street Exeter, NH (603)

ACKNOWLEDGEMENTS. Sincerely, Executive Director and Staff. Rockingham Planning Commission. 156 Water Street Exeter, NH (603) ACKNOWLEDGEMENTS The gratefully acknowledges the participation of coastal New Hampshire municipalities in the preparation of this report: City of Portsmouth Town of New Castle Town of Rye Town of North

More information

Mississippi Coastal Improvements Program (MsCIP) Comprehensive Barrier Island Restoration Plan

Mississippi Coastal Improvements Program (MsCIP) Comprehensive Barrier Island Restoration Plan Mississippi Coastal Improvements Program (MsCIP) Comprehensive Barrier Island Restoration Plan BOEM Gulf of Mexico Sand Management Working Group October, 205 Justin McDonald, P.E. US Army Corps of Engineers

More information

COASTAL TX PROTECTION AND RESTORATION FEASIBILITY STUDY

COASTAL TX PROTECTION AND RESTORATION FEASIBILITY STUDY COASTAL TX PROTECTION AND RESTORATION FEASIBILITY STUDY Stakeholders Forum Dr. Kelly Burks-Copes, Project Manager Mr. Tony Williams, Coastal Resources US Army Corps of Engineers, Galveston District Texas

More information

WELCOME The Walk Bridge Project CTDOT Project No

WELCOME The Walk Bridge Project CTDOT Project No 1 WELCOME The Walk Bridge Project CTDOT Project No. 0301-0176 Walk Bridge Public Scoping/Public Information Meeting 1. Project description 2. Study process 3. Findings 4. Potential solutions 5. Next steps

More information

Utilizing Dredge Material in Wetland and Estuarine Restoration. Bartholomew Wilson P.G. Delaware Center for the Inland Bays

Utilizing Dredge Material in Wetland and Estuarine Restoration. Bartholomew Wilson P.G. Delaware Center for the Inland Bays Utilizing Dredge Material in Wetland and Estuarine Restoration Bartholomew Wilson P.G. Delaware Center for the Inland Bays Inland Bays Fringe Wetland Restoration Workgroup DNREC s Shoreline and Waterway,

More information

REQUIRED INFORMATION Please check the following boxes that apply to your lot or parcel and complete the other requested information.

REQUIRED INFORMATION Please check the following boxes that apply to your lot or parcel and complete the other requested information. MARTIN COUNTY EXCAVATION AND FILL PERMIT APPLICATION This application to be used only for excavating or filling activities not associated with a building permit or development review and for projects requiring

More information

Virginia Beach Comprehensive Sea Level Rise and Recurrent Flooding Planning Study

Virginia Beach Comprehensive Sea Level Rise and Recurrent Flooding Planning Study 1 Virginia Beach Comprehensive Sea Level Rise and Recurrent Flooding Planning Study Policy Recommendations and City-wide Flood Protection Strategies January 15, 2019 2 Agenda Project Overview Hazards and

More information

CONTINUING AUTHORITIES PROGRAM (CAP) OVERVIEW

CONTINUING AUTHORITIES PROGRAM (CAP) OVERVIEW CONTINUING AUTHORITIES PROGRAM (CAP) OVERVIEW USACE Jacksonville District Brandon Burch Project Manager Trusted Partners Delivering Value, Today and Tomorrow Trusted Partners Delivering Value, Today and

More information

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, MOBILE DISTRICT P.O. BOX 2288 MOBILE, AL

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, MOBILE DISTRICT P.O. BOX 2288 MOBILE, AL DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, MOBILE DISTRICT P.O. BOX 2288 MOBILE, AL 36628-0001 CESAM RD-A April 15, 2018 PUBLIC NOTICE NO. SAM-2018-01191-DCH JOINT PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS

More information

Adapting Living Shorelines: Siting and Design for Climate Impacts

Adapting Living Shorelines: Siting and Design for Climate Impacts Adapting Living Shorelines: Siting and Design for Climate Impacts Molly Mitchell & Donna Marie Bilkovic Monitoring and Assessing Impacts of Changes in Weather Patterns and Extreme Events on BMP Siting

More information

PUBLIC NOTICE. Attn: Mr. Greg Rudolph, Carteret County Shore Protection office Post Office Box 4297 Emerald Isle, North Carolina 28594

PUBLIC NOTICE. Attn: Mr. Greg Rudolph, Carteret County Shore Protection office Post Office Box 4297 Emerald Isle, North Carolina 28594 US Army Corps Of Engineers Wilmington District PUBLIC NOTICE Issue Date: March 1, 2018 Comment Deadline: April 2, 2018 Corps Action ID Number: SAW-2009-00293 All interested parties are hereby advised that

More information

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN THE HOUSATONIC RIVER, STRATFORD AND MILFORD, CONNECTICUT

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN THE HOUSATONIC RIVER, STRATFORD AND MILFORD, CONNECTICUT I-~ I II I " I US Army Corps of Engineers New England District 66 Virginia Road Concord, MA 01742-2751 Public Notice In Reply Refer to: Jack Karalius nae-pn-nav@usace.army.mil Programs/Project Management

More information

Public Notice 15 DAY PUBLIC NOTICE

Public Notice 15 DAY PUBLIC NOTICE US Army Corps of Engineers New England District 696 Virginia Road Concord, MA 01742-2751 Public Notice In Reply Refer to: Programs and Project Management Division Date: September 24, 2015 Comment Period

More information

VILLAGE OF BALD HEAD ISLAND SHORELINE PROTECTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT

VILLAGE OF BALD HEAD ISLAND SHORELINE PROTECTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT VILLAGE OF BALD HEAD ISLAND SHORELINE PROTECTION PROJECT DRAFT ENVIRONMENTAL IMPACT STATEMENT Prepared By: U.S. Army Corps of Engineers Wilmington District and Land Management Group, Inc. (Third Party

More information

CHAPTER 7. San Dieguito River Flooding Adaptation

CHAPTER 7. San Dieguito River Flooding Adaptation CHAPTER 7 San Dieguito River Flooding Adaptation This chapter includes a range of adaptation measures to address vulnerabilities from flooding along the San Dieguito River, including the river valley,

More information

Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description

Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description Introduction The analysis of the Warren Wagon Road Improvement Project is tiered to the 2003 Environmental

More information

Asharoken Coastal Storm Damage Risk Reduction Feasibility Study

Asharoken Coastal Storm Damage Risk Reduction Feasibility Study Asharoken Coastal Storm Damage Risk Reduction Feasibility Study Megan Jadrosich Project Manager U.S. Army Corps of Engineers Project Progress New York District Public Update April 23, 2009 Outline Summary

More information

STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION PLANS FOR PROPOSED

STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION PLANS FOR PROPOSED STATE OF SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION PLANS FOR PROPOSED PROJECT 000P-151 US HWY 12 DAY COUNTY Construction of New Field Approach PCN i4g8 Sheet 1 of 11 ENVIRONMENTAL COMMITMENTS An Environmental

More information

PART II - SURVEYING AND GRADING CRITERIA

PART II - SURVEYING AND GRADING CRITERIA PART II - SURVEYING AND GRADING CRITERIA A. Surveying Procedures 1. Unless a temporary benchmark is approved in advance by the City Engineer, all submitted civil plans, including but not limited to grading,

More information

Coastal Science and Engineering Collaborative (CSEC) Overview

Coastal Science and Engineering Collaborative (CSEC) Overview Coastal Science and Engineering Collaborative (CSEC) Overview 1 237 237 237 217 217 217 200 80 252 NNBF 200 119 174 200 Workshop 27.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112

More information

Walk Bridge Project. Norwalk Shellfish Commission. November 1,

Walk Bridge Project. Norwalk Shellfish Commission. November 1, Walk Bridge Project Norwalk Shellfish Commission November 1, 2018 Meeting Agenda 1. Welcome & Introductions John Hanifin, CTDOT 2. Project Update Christian Brown, HNTB Lauren DiGovanni, HNTB 3. Project

More information

Atlantic Coast of NY, East Rockaway Inlet to Rockaway Inlet and Jamaica Bay APPENDIX N COASTAL ZONE MANAGEMENT

Atlantic Coast of NY, East Rockaway Inlet to Rockaway Inlet and Jamaica Bay APPENDIX N COASTAL ZONE MANAGEMENT Atlantic Coast of NY, East Rockaway Inlet to Rockaway Inlet and Jamaica Bay APPENDIX N COASTAL ZONE MANAGEMENT Hurricane Sandy General Reevaluation Report August 2016 New York (and New York City Local

More information

Engineering with Nature for Coastal Resilience

Engineering with Nature for Coastal Resilience Engineering with Nature for Coastal Resilience Dr. Todd S. Bridges Senior Research Scientist, Environmental Science U.S. Army Engineer Research and Development Center, U.S. Army Corps of Engineers todd.s.bridges@usace.army.mil

More information