ADDENDUM NUMBER ONE (1) September 30, 2015

Size: px
Start display at page:

Download "ADDENDUM NUMBER ONE (1) September 30, 2015"

Transcription

1 ADDENDUM NUMBER ONE (1) September 30, 2015 TO: LAWRENCE H. PEEK ARCHITECTS P.O. Box 2932; Homer, Alaska CITY OF WHITTIER PUBLIC SAFETY FACILITY WHITTIER, ALASKA ARCHITECT S PROJECT NUMBER The following corrections, changes, additions, deletions, revisions and/or clarifications are hereby made part of the Contract Documents for the CITY OF WHITTIER PUBLIC SAFETY FACILITY located in Whittier, Alaska. In case of conflicts between this Addendum and previously issued documents, this Addendum shall take precedence. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject the Bidder to disqualification. This Addendum consists of FIVE (5) pages and SIX (6) enclosures with supporting pictures. Item No. 1: Item No. 2: Item No. 3: Item No. 4: Item No. 5: Item No. 6: Instruction to Bidders, item 7, requires the Bidder to supply an Insurance Binder with their bid. The bid documents do not indicate any insurance requirements. Please clarify the insurance requirements so that we can obtain the required document to submit with our bid. SEE ENCLOSURE No. 1. It was requested at pre-bid meeting on September 3 rd, 2015 for additional information on existing concrete slab thickness. SEE ENCLOSURE No. 2. Wall types 3A, 3B & 3C are called out without sound insulation. Theses wall types are shown to be used within the shower room areas. Please confirm the walls called out on Detail 2 on A2.4 do not require sound batt insulation? CONFIRMED, AS DESIGNED. Would it be acceptable to use a shaft wall assembly, such as WP-6850 in lieu of wall type the elevator shaft shown on Detail 1 on A2.4? I WOULD NEED TO HAVE A SUBMITTAL OF WP-6850 TO REVIEW, IT WOULD HAVE TO HAVE SAME FIRE-RATING, LOAD-BEARING/LATERAL STABILITY AND BE ACCEPTABLE TO BOTH FIRE MARSHAL AND ELEVATOR MANUFACTURER. IF ALL THESE ARE REQUIREMENTS ARE MET THEN YES. Provide collateral loading to be applied to the bottom chord of mezzanine floor joist. Spec Sec , page #2, item B references a collateral load requirement of 10 psf for the building design, please clarify the collateral load requirements if any for the bottom chord of mezzanine floor joist. USE 5PSF FOR THE TOP CHORD AND 5 PSF FOR THE BOTTOM CHORD OF THE JOISTS. Spec Sec , page #1, item 1.3 / B - references AISC. The AISC no longer applies to Pre-Engineered Metal Buildings. The AISC has been replaced with the IAS Certification Standards. This can be confirmed with the MOA / Mark Panilo PRE-ENGINEERED METAL BUILDING TO BE COMPLIANT WITH AISC AS APPLICABLE. IAS IS A QUALITY CERTIFICATION PROGRAM AND NOT REQUIRED FOR THIS PROJECT.

2 Item No. 7: Spec Sec , page #3, item 2.1 / I - references red shop primer. Spec Sec , page # 5, item 3.1 / A - references gray shop primer. Please clarify. PROVIDE GRAY STEEL. Item No. 8: Item No. 9: Item No. 10: Item No. 11: Item No. 12: Item No. 13: Page A3.3 references PEMB sub-framing to be Galv. (silver) Will prime painted PEMB secondary sub-framing (painted to match prime painted primary framing) be considered or accepted in regards to cost effectiveness. PROVIDE G-90 GALVANIZED SECONDARY SUB-FRAMING. Page A6.2. Will increased deflection design limits to the PEMB be required for drop ceiling areas. If so, please clarify exact locations and confirm the required deflection limits in these areas. NO. Page S2.1, general notes #5. Bottom of steel to be minus 12. Please confirm/clarify if this is for all PEMB columns, i.e. interior and exterior perimeter PEMB steel columns. ALL PEMB COLUMNS SHOULD BE SET MINUS 12". Page S5.1. It was originally assumed that the exterior hot dipped galvanized stair assembly would be self-supporting (stand-alone), with structural foundation & footings and designed with self-supporting bracing. Per detail #8 on page S5.1 this may not be the case. If the exterior stair assembly is assumed to attach to the PEMB, the PEMB Manufacturer will need to know the loads imposed on the PEMB structure (seismic, wind, etc.) and the location(s) of the vertical girt shown in the detail so that the connections and support members can be designed and sized properly to accommodate the imposed loads. Please clarify and provide information. NOTE: the penetration through the insulated wall panel (PL1/2x4x1-3 ) may be a frost build up area, it is also assumed that this connection plate is required to be hot dipped galvanized. Please clarify. FIELD LOCATE PER THE DETAIL, SIZE MEMBER/CONNECTION FOR A 2 KIP HORIZONTAL LOAD, PER DETAIL THE CONNECTION PLATE IS PER THE STAIR FABRICATORS AND IS GALVANIZED. Page S5.1, detail #2 and #5 shows PEMB columns to be set on leveling nuts with a 3/4 grout spacing. It is common and most typical for PEMB structures to be designed for columns to sit on - full base plate size full load bearing - smooth concrete level surfaces. Can this detail be modified to accommodate a standard PEMB application. THE DETAILS DON'T SPECIFY LEVELING NUTS, CONTRACTORS OPTION YOU SHOULD COORDINATE WITH THEM ON HOW THEY WANT TO ENSURE A LEVEL SURFACE. I NORMALLY SEE EITHER LEVELING NUTS OR SHIM PACKS, BUT THIS IS BETWEEN YOU AND THE GENERAL. Page A3.1 South Elevation. 5 ea. Mechanical Arctic Hoods. For PEMB design provide sizes of the required PEMB framed openings, sill heights of these framed openings, and the weight each framed openings is required to support. THERE ARE 6 HOODS ON THE SOUTH WALL, NOT COUNTING THE SMALL HOOD IN THE ELEVATOR MACHINE ROOM. THE OPENINGS NEED TO BE LARGE ENOUGH FOR THE DUCT TO FIT THROUGH WITH AN ADDITIONAL 1/4" TO 1/2" SPACE AROUND THE DUCT FOR FLASHING/COLLARS. M3.1 SHOWS THREE OF THE SIX; 20/12 HRV EXHAUST, 28/12 HRV SUPPLY, AND 22/22 EF- 3 EXHAUST. M3.2 SHOWS THE OTHER THREE OF SIX; 2 EACH 18/18 EF- 1/EF-2 EXHAUST AND 24/80 MAU S SUPPLY AIR. SILL HEIGHTS CAN BE ESTIMATED OFF OF DESIGNED DUCTWORK CENTERLINES FROM FIRST FLOOR FINISHED FLOOR ELEVATION AS FOLLOWS: - 20/12 HRV EXHAUST: 13 2 of 5

3 - 28/12 HRV SUPPLY: 13-22/22 EF-3 EXHAUST: /18 EF-1 EXHAUST: 18-18/18 EF-2 EXHAUST: 18-24/80 MAU S SUPPLY: 22.5 ASSUME FRAMED OPENINGS WILL SUPPORT ALL WEIGHT OF EXTERIOR DUCTWORK AND ALL INTERIOR DUCTWORK WITHIN 10 FEET OF THE OPENING. Item No. 14: Item No. 15: Item No. 16: Page A2.2 Public Works Mezzanine additional concrete housekeeping pads for mechanical equipment. Will the PEMB design be required to have additional point loads in some areas of the two mezzanine floors to accommodate the concrete housekeeping pads and mechanical equipment? If so, please provide all necessary information. THE LOADING OF THE PAD AND EQUIPMENT IS IN THE UNIFORM LOADING REQUIREMENT, NO ADDITIONAL LOADING REQUIRED. Page A4.2 Elevator Safety Beam. This specific beam will require two additional beams connecting between main frame rafters in order to be supported. If this elevator beam and any other structural members are to be provided by the PEMB Manufacturer opposed to the elevator contractor please provide the hoisting capacity and loading requirements for the specific elevator safety beam. THE GENERAL NEEDS TO SUPPLY YOU WITH REQUIREMENTS PER THE ELEVATOR MANUFACTURER THEY CHOOSE. SEE ENCLOSURE No. 5. A3.1 Exterior Finish Schedule - please clarify. A.) Upper Insulated Wall Panels to be Royal Blue B.) Lower Insulated Wall Panels to be Warm White C.) SR2 5 Insulated Metal Roof Panels to be Regal White D.) High eave & low eave soffit panels to match wall color in their respective locations E.) All fascia panels Royal Blue. UPPER INSULATED WALL PANELS TO BE WARM WHITE. LOWER INSULATED WALL PANELS TO BE ROYAL BLUE. INSULATED METAL ROOFING PANELS TO BE REGAL WHITE. SOFFIT AND LOW/HIGH EAVE PANELS TO BE WARM WHITE. Item No. 17: Item No. 18: Item No. 19: Is there a preference or a spec requirement for type of all interior PEMB columns, i.e. pipe, PEMB built-up, HSS. If not, we will assume most cost effectiveness. NO PREFERENCE. Spec 05510, paragraph 1.6.A.2 states Abrasive nosings. There are no abrasive nosings further specified or detailed in the drawings. Please confirm there are no stair abrasive nosings required, or clarify. PROVIDE ABRASIVE NOSING PER SPECIFICATION METAL STAIRS TO THE EXTERIOR AND PUBLIC WORKS AREA STAIRS AS DESIGNED. There is 2 asphalt indicated for the parking lot to the east of the building shown on sheet C8, and 3 asphalt at the north side of the building shown on sheet C5. The west side of the building asphalt thickness is not indicated. Please clarify the extent of 2 and 3 asphalt for the project. EAST AND WEST ENDS ARE 2 INCH FOR PASSENGER VEHICLES; NORTH SIDE IS 3 INCH FOR HEAVIER EQUIPMENT. Item No. 20: Sheet S2.3 note calls for 6 each 8 round bollards. The sheet count is actually 8 each. Additionally, the Architectural, sheet A2.1 sheet count for exterior bollards is 12 each, excluding the 6 on the north side of the building. Please clarify the quantity and size of exterior bollards, excluding the 14 each 6 bollards shown at the north side of the building. ARCHITECTURAL SHEET A2.1 IS CORRECT. (8) 3 of 5

4 8 ROUND AT BUILDING EXTERIOR CORNERS & EXTERIOR STAIR TOWER, PLUS (14) 6 ROUND AT ALL EXTERIOR O.H.D. s (NOTE THERE ARE MORE INSIDE OF BUILDING), PLUS ENSTAR REQUIRED BOLLARDS AT GAS METER (COORD. w/ ENSTAR), PLUS (2) AT GENERATOR PAD, PLUS CHUGACH ELECTRIC REQUIRED BOLLARDS FOR NEW TRANFORMER PAD (COORD. w/ CHUGACH ELEC). Item No. 21: Item No. 22: Item No. 23: Item No. 24: Item No. 25: Elevator shafts typically required tube steel for guide rail support. There is nothing indicated in the documents for guide rail support. Please provide elevator guide rail support tube steel size and anchoring requirements to the structure. SEE SPECIFICATION SECTION AND REFERENCE MANUFACTURER REQUIREMENTS. SEE ENCLOSURE No. 5 (RAIL FORCE & BRACKET SPACING). The traction elevator requires an elevator hoist beam. There is nothing indicated in the documents. Please provide the elevator hoist beam size and other steel requirements for the hoist beam and related structural supports. SAFETY BEAM SHOWN ON 2/A4.2. REFERENCE MANUFACTURER REQUIREMENTS. SEE ENCLOSURE No. 5 (SAFETY BEAM LOCATION & NOTE 4, SHEET 1). Can you please clarify the foundation waterproofing spec. Specification section paragraph 2.1 calls out various waterproofing manufactures. 2.2 calls out the products to be used. The 60 mil EPDM is not a product that is used for waterproofing foundations. This material is a roofing product. The Carlisle products used would be CCW 861 sheet waterproofing and the Grace product would be bituthene. SEE ENCLOSURE No. 3. Please provide loading requirements to the mezzanine floors where the stairs will attach to the 2 nd & 3 rd floor mezzanines. THE PEMB NEEDS TO DESIGN FOR 1.5KIP POINT LOADS AT EACH STAIR STRINGER CONNECTION. This may not make any difference overall Please Note: Spec Sec 07620, page # 3 references Occupancy Category ll. Whereas Spec Sec 13122, page # 2 references Occupancy lv Essential Facility. THE ENTIRE FACILITY IS OCCUPANCY IV ESSENTIAL FACILITY, SO USE THAT EVERYWHERE. Item No. 26: Please clarify what size stringers are required for the interior stair per sheet A4.3 and stairs 102 per sheet A4.2? FOR FRAMED STAIRS SHOWN ON A4.3 USE C12X30 SIMILAR TO EXTERIOR STAIR SHOWN IN STRUCTURAL. FOR METAL PAN STAIRS SHOWN ON A4.2 FABRICATE PER SPECIFICATION SECTION METAL STAIRS. THIS IS A PERFORMANCE SPECIFICATION FOR THE METAL PAN STAIRS, FABRICATOR RESPONSIBLE TO ENGINEER THE STRINGERS PER THE LOADS AND SPANS. Item No. 27: Item No. 28: Item No. 29: Concealers asks for color to be selected by the architect. There is an extra cost for custom colors (per color set up charge) will these be a standard color sections such as white or chrome or, if they are custom colors, how many different colors should I assume? COLOR TO BE WHITE E&K notes that all walls are sleeved and this is not a standard sprinkler requirement please confirm that it is desired. I HAVE NO OBJECTION TO NOT PROVIDING SLEEVES AT WALLS ABOVE SUSPENDED CEILINGS (CONCEALED) AS LONG AS FIRE-STOPPING IS STILL PROVIDED AT REQUIRED RATED ASSEMBLY PENETRATIONS. Water flow information. I have been making calls to find this info but I have not 4 of 5

5 been able to obtain it as of yet. We need the static, residual, and gallons flowing for the nearest hydrant to use for bid purposes. SEE ENCLOSURE No. 4. Item No. 30: Item No. 31: Item No. 32: C. Will there be any additional off site staging provided by the City and, if so, how large will the area be and how far from the project site will it be? CITY OF WHITTIER HAS SECURED THE FOREST SERVICE LOT (LOT 2, BLOCK 2 CITY OF WHITTIER SUBDIVISION) TO THE EAST AS DISCUSSED IN THE PRE- CONSTRUCTION CONFERENCE. Sheet C3 appears to show the asphalt paving extending around the building to the south, extending 10 from the building. Detail on C5 does not show the asphalt. Please confirm that asphalt paving is required at this area, and if it is the 2 or 3 asphalt. NO PAVEMENT DOWN THE SOUTH SIDE, LINE IS GRAVEL SHOULDER. The finish schedule calls for a 'Thoroshield sealer (urethane)'. I am not sure if they want a sealer or a urethane. If they want a urethane, I don't see anything spec'd that is specific to floors. Should I assume the floors get sealer of a urethane? PROVIDE APF s POLYURETHANE 250 PRODUCT WHEREVER S SEALED CONCRETE IS NOTED/DESIGNATED IN DRAWINGS AND/OR SPECIFICATIONS. SEE ENCLOSURE No. 6 ENCLOSURES: 1. Insurance Requirements from City of Whittier Attorney. 2. Written description of samples taken and SEVEN (7) pictures of THREE (3) existing slab core samples completed on September 18 th, 2015 by City of Whittier Public Works manager. 3. Carlisle Sure-Seal Butyl Membrane Waterproofing System Cut Sheet h Hydrant Flow Calculations from City of Whittier Public Works Department. 5. Otis Elevator Gen2 Design Information from Manufacturer s web site. 6. APF s Polyurethane 250 Product literature from Manufacturer s web site. END OF ADDENDUM NUMBER ONE (1) 5 of 5

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO. 2017-26R Stone Group Architects Project No. 1731 ADDENDUM DATE: September 14, 2017 BID DATE: September 18, 2017 2:00 P.M. C.S.T. SCOPE OF THIS ADDENDUM:

More information

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 052100 - STEEL JOISTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections

More information

SECTION STEEL DECKING

SECTION STEEL DECKING SECTION 05 31 00 STEEL DECKING SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Refer to Section 05 36 00, COMPOSITE METAL DECKING for floor

More information

.1 American Institute of Steel Construction (AISC) Specifications for Steel Buildings AISC

.1 American Institute of Steel Construction (AISC) Specifications for Steel Buildings AISC 05 12 00 STRUCTURAL STEEL FRAMING Page 1 of 3 1 General 1.1 SECTION INCLUDES.1 Structural steel framing and support members 1.2 RELATED SECTIONS.1 Section 05 50 00 Metal Fabrications 1.3 REFERENCES.1 American

More information

Residential Plan Review for New One and Two Family Dwellings

Residential Plan Review for New One and Two Family Dwellings The following is a list of items that are normally included in a set of construction drawings for one and two family dwellings. The items in bold depict those items that will be reviewed for during the

More information

SECTION NON-STRUCTURAL METAL FRAMING

SECTION NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 22 16 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

SECTION FABRICATED ENGINEERED STRUCTURES. A. Pre-engineered, shop-fabricated structural steel building with formed purlin framing.

SECTION FABRICATED ENGINEERED STRUCTURES. A. Pre-engineered, shop-fabricated structural steel building with formed purlin framing. PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 13 34 00 FABRICATED ENGINEERED STRUCTURES A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1

More information

Invitation to Bid # CC Project Title: High Zone 5.0 Million Gallon Reinforced Concrete Culinary Water Tank Project No.

Invitation to Bid # CC Project Title: High Zone 5.0 Million Gallon Reinforced Concrete Culinary Water Tank Project No. Riverton City Purchasing Department 12830 South 1700 West Riverton, UT 84065 801-208-3175 Fax: 801-254-1810 May 5, 2017 ADDENDUM #3 Invitation to Bid # CC17-332 Project Title: High Zone 5.0 Million Gallon

More information

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.

SECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents. SECTION 06110 WOOD FRAMING PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But Not Supplied

More information

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage

Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage The following list of code requirements is intended to assist you in complying with the Code of Public

More information

RESIDENTIAL BUILDING PLAN REQUIREMENTS

RESIDENTIAL BUILDING PLAN REQUIREMENTS CITY OF MANSFIELD BUREAU OF BUILDING AND CODES 30 NORTH DIAMOND STREET 3RD FLOOR MANSFIELD, OHIO 44902 Phone (419) 755-9688 Fax (419) 755-9453 www.ci.mansfield.oh.us RESIDENTIAL BUILDING PLAN REQUIREMENTS

More information

SECTION NON-STRUCTURAL METAL FRAMING

SECTION NON-STRUCTURAL METAL FRAMING SECTION 09 22 16 PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories

More information

Summary of Modifications/Changes in this Update

Summary of Modifications/Changes in this Update Summary of Modifications/Changes in this Update This Summary of Changes is for information only. It is not a part of the referenced document, and should not be used for project documentation. U.S. Department

More information

SECTION ORNAMENTAL ALUMINUM RAILING

SECTION ORNAMENTAL ALUMINUM RAILING SECTION 05730 ORNAMENTAL ALUMINUM RAILING PART 1 GENERAL 1.1 SECTION INCLUDES A. Aluminum Pipe Railing 1.2 RELATED SECTIONS A. Section 03300 Cast-In-Place Concrete: Placement of sleeves cast in concrete.

More information

SECTION MANUAL FOUR FOLD DOORS MODEL 38 DECORATIVE PANEL DESIGN

SECTION MANUAL FOUR FOLD DOORS MODEL 38 DECORATIVE PANEL DESIGN SECTION 08350 MANUAL FOUR FOLD DOORS MODEL 38 DECORATIVE PANEL DESIGN PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS ARCHITECTURE, LLC 1827 1 ST AVENUE NORTH, SUITE 104 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 3 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 055113 - METAL PAN STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011. DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:

More information

All subcontractor bidders are responsible for assuring that their subcontractors and vendors are properly apprised of the contents of this Addendum.

All subcontractor bidders are responsible for assuring that their subcontractors and vendors are properly apprised of the contents of this Addendum. ADDENDUM NUMBER: 2 PROJECT: UNC Charlotte Residence Hall Phase XIV - Elevator Bid Package DATE: May 28, 2015 OWNER: UNC Charlotte ARCHITECT: FWA Group NOTICE TO BIDDERS: This addendum is issued prior to

More information

1.02 SYSTEM DESCRIPTION

1.02 SYSTEM DESCRIPTION 1 OF 7 MODULAR MEZZANINES GUIDE SPECIFICATIONS FOR PART 1 - GENERAL 1.01 RELATED WORK A. SECTION 03 30 00: Cast in Place Concrete (and Concrete Finishing) 1. The area where mezzanine is installed shall

More information

SECTION R614 STRUCTURAL INSULATED PANEL WALL CONSTRUCTION

SECTION R614 STRUCTURAL INSULATED PANEL WALL CONSTRUCTION Section R614 Add new section to read as shown: (RB34-06/07) SECTION R614 STRUCTURAL INSULATED PANEL WALL CONSTRUCTION R614.1 General. Structural insulated panel (SIP) walls shall be designed in accordance

More information

A D D E N D U M T O B I D PRE-ENGINEERED METAL BUILDING

A D D E N D U M T O B I D PRE-ENGINEERED METAL BUILDING Guadalupe County Auditor s Office 307 W. Court, Suite 205 Seguin, Texas 78155 830-303-4188 Ext. 1328 A D D E N D U M T O B I D PRE-ENGINEERED METAL BUILDING Bid Title: PRE-ENGINEERED METAL BUILDING Bid

More information

TG Structural Steel Superstructure

TG Structural Steel Superstructure TG07.1 - Structural Steel Superstructure Questions are numbered in the order received. Numbers missing in the sequence either have been answered in a previous response set or will be included in a future

More information

STRUCTURAL STEEL FRAMING

STRUCTURAL STEEL FRAMING SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section includes 1. Structural steel framing 2. Structural steel framing required for support and framing of rooftop mechanical

More information

PROJECT: 4/30/14 DATE: REVISIONS: 6/10/14 7/28/14 11/3/14 11/12/14 11/14/14 OF 6

PROJECT: 4/30/14 DATE: REVISIONS: 6/10/14 7/28/14 11/3/14 11/12/14 11/14/14 OF 6 4/30/14 C 7/31/2014 4'-6" RAMP TO EXISTING GRADE DRAWN: JW 11/12/2014 AS REQ'D 7'-10 1/2" 7'-10 1/2" 7'-10 1/2" 7'-10 1/2" 2'-0 1/2" 4'-10 1/2" 6" 3'-10" 3'-8" L2X2X1/8 @ 16" OC (TYP) L2X2X1/8 @ 16"

More information

3. Strength Limit States The majority of what the AISC Specification addresses. 1. Yielding 2. Buckling 3. Rupture 4. Others

3. Strength Limit States The majority of what the AISC Specification addresses. 1. Yielding 2. Buckling 3. Rupture 4. Others DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING 1. Steel framed structures shall be designed in accordance with the latest addition of the AISC Specification for Structural Steel Buildings. The COMMENTARY

More information

AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7

AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7 AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7 www.airwayscrossing.ca Excellent access to Barlow Trail/McKnight Blvd. Bays starting at 4,000 sq. ft. Surface loading T5 lighting

More information

COLQUITT COUNTY BOARD OF COMMISSIONERS 101 East Central Avenue

COLQUITT COUNTY BOARD OF COMMISSIONERS 101 East Central Avenue COLQUITT COUNTY BOARD OF COMMISSIONERS 101 East Central Avenue TERRY R. CLARK Chairman LUKE STRONG, JR District 1 Commissioner CHRIS HUNNICUTT District 2 Commissioner MARC DEMOTT District 3 Commissioner

More information

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1 16 May 2014 Page 1 PART 1 GENERAL 1.1 DESCRIPTION This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories

More information

SECTION PLATE CONNECTED WOOD TRUSSES

SECTION PLATE CONNECTED WOOD TRUSSES SECTION 06173 PLATE CONNECTED WOOD TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Shop fabricated wood trusses for roof and floor framing. 2. Bridging, bracing, and anchorage. B. Related Sections:

More information

ADDENDUM NO. 2. November 8, For: Wawona Hotel Heating Replacement CIF 5013

ADDENDUM NO. 2. November 8, For: Wawona Hotel Heating Replacement CIF 5013 November 8, 2012 For: Wawona Hotel Heating Replacement CIF 5013 Issued by: The Yosemite National Park Concessionaire Delaware North Companies Parks & Resorts at Yosemite, Inc. (DNC) Yosemite National Park

More information

1 Exam Prep Architectural Sheet Metal Manual Tabs and Highlights

1 Exam Prep Architectural Sheet Metal Manual Tabs and Highlights 1 Exam Prep Architectural Sheet Metal Manual Tabs and Highlights These 1 Exam Prep tabs are based on the 2012 Sheet Metal and Air Conditioning Contractors' National Association, Inc., seventh edition.

More information

BEARING METAL STUD FRAMING

BEARING METAL STUD FRAMING L-1 Section 05410 Long Form Specification LOAD BEARING METAL STUD FRAMING This section includes axially loaded steel studs, with unique slotted top channels, usually of 0.91, 1.2 and 1.5 mm (16, 18, or

More information

HEAVY STEEL CONSTRUCTION

HEAVY STEEL CONSTRUCTION HEAVY STEEL CONSTRUCTION PRE-ENGINEERED PRE ENGINEERED STEEL BUILDINGS Prismatic Constructions Work Shops, Storage Buildings etc. Figure 1 Figure 2 Prismatic steel constructions can be manufactured as

More information

Preassembled steel stairs with concrete-filled treads.

Preassembled steel stairs with concrete-filled treads. SECTION 055113 - PART 1 - GENERAL 1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this

More information

Insulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM):

Insulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM): SECTION 05120 STRUCTURAL STEEL PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03342 - Insulating Cellular Concrete. 2. 05210 - Steel Joists. 3. 09900 - Painting. 1.02 REFERENCES A. America Society

More information

SECTION ORNAMENTAL ALUMINUM RAILING

SECTION ORNAMENTAL ALUMINUM RAILING SECTION 05730 ORNAMENTAL ALUMINUM RAILING PART 1 GENERAL 1.1 SECTION INCLUDES A. Decorative Wire Rope Railing 1.2 RELATED SECTIONS A. Section 03300 Cast-In-Place Concrete: Placement of sleeves cast in

More information

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 PART 1 GENERAL 1.1 DESCRIPTION A. Work Included: 1. Furnish all labor and materials to complete the fabrication of detention windows

More information

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section.

SECTION ALUMINUM WALKWAY COVERS. A. The requirements of Division 1 specifications shall apply to work specified in the section. SECTION 10 5300 ALUMINUM WALKWAY COVERS Part 1 General 1.01 Related Documents A. The requirements of Division 1 specifications shall apply to work specified in the section. 1.02 References A. International

More information

Superior Aluminum Guide Specification 10/4/2016 Non-Welded Aluminum Pipe Railing

Superior Aluminum Guide Specification 10/4/2016 Non-Welded Aluminum Pipe Railing The following specification has been developed by: Superior Aluminum Products 555 East Main Street Russia, Ohio 45363-0430 to assist Architects and Designers in the specification of Non Welded Concealed

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 092216 - NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION METAL ROOF AND SOFFIT PANELS

SECTION METAL ROOF AND SOFFIT PANELS Metal Panel Systems, Inc. 11506 Reading Road Cincinnati, Ohio 45241-2512 Telephone: 800-554-6126 or 513-554-6120 Fax: 513-554-6121 www.metalpanelsystems.com info@metalpanelsystems.com Specifications for

More information

CEILING MOUNTED ARTICULATING JIB CRANE

CEILING MOUNTED ARTICULATING JIB CRANE SECTION 14657 CEILING MOUNTED ARTICULATING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station

More information

SECTION WOOD FRAMING. A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents.

SECTION WOOD FRAMING. A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents. SECTION 06 1100 WOOD FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But

More information

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014

STATE UNIVERSITY CONSTRUCTION FUND. UNIVERSITY CON DIRECTIVE 5-1 Issue date: October 2014 STATE STRUCTION FUND DIRECTIVE 5-1 Issue date: October 2014 STRUCTURAL STEEL 1. General: It is the Fund's policy that the design of the structural steel is the prime responsibility of the project's Structural

More information

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE II RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING

More information

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of work

More information

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE:

SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE: IRC CODE UPDATES TO: RESIDENTIAL BUILDING CONTRACTORS FROM: GARY STABER, BUILDING OFFICIAL SUBJECT: NEW 2000 INTERNATIONAL RESIDENTIAL CODE (IRC) DATE: 6/1/2003 INTERNATIONAL RESIDENTIAL CODE (IRC) APPLICABILITY:

More information

ROUTT COUNTY REGIONAL BUILDING DEPARTMENT 136 * P.O.

ROUTT COUNTY REGIONAL BUILDING DEPARTMENT 136 * P.O. ROUTT COUNTY REGIONAL BUILDING DEPARTMENT 136 6 th Street * P.O. Box 773840 * Steamboat Springs, CO 80477 (970)870-5566 * FAX (970)870-5489* Email: Building@co.routt.co.us INSPECTIONS POLICY SCHEDULING

More information

SECTION ROOF ACCESSORIES

SECTION ROOF ACCESSORIES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 72 00 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable

More information

DIVISION 20 GENERAL SECTIONS FOR PLUMBING, FIRE SUPPRESSION & HVAC SECTION VIBRATION ISOLATORS

DIVISION 20 GENERAL SECTIONS FOR PLUMBING, FIRE SUPPRESSION & HVAC SECTION VIBRATION ISOLATORS DIVISION 20 GENERAL SECTIONS FOR PLUMBING, FIRE SUPPRESSION & HVAC SECTION 20 05 80 PART 1 GENERAL 1.01 DESCRIPTION A. Provide a complete vibration isolation system to isolate motorized equipment, piping,

More information

#G445 Plans, 48'x28' x 10' detached garage with bonus room By SDS-CAD Specialized Design Systems

#G445 Plans, 48'x28' x 10' detached garage with bonus room By SDS-CAD Specialized Design Systems Architectural asphalt shingles and horizontal True Wood 7" Reveal siding over structural panel. Nailing schedule is 6" on ends 12" on centers 6d nails. Trusses are engineered on Bonus attic trusses 24"

More information

SECTION METAL BUILDING SYSTEMS

SECTION METAL BUILDING SYSTEMS SECTION 13 3419 PART 1 GENERAL 1.01 SECTION INCLUDES A. Manufacturer-engineered, shop-fabricated structural steel building frame. B. Insulated Metal wall and roof panels including gutters and downspouts.

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 077200 - ROOF ACCESSORIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

ADDENDUM NO. 2 Consisting of 3 pages and Attachments

ADDENDUM NO. 2 Consisting of 3 pages and Attachments 10404-125 Street, Edmonton, AB. T5N 1T2 Tel: 780.455.5975 Fax: 780.454.2397 info@cdyarchitect.com ADDENDUM NO. 2 Consisting of 3 pages and Attachments PROJECT: Maina Centre Ville Phase II, Beaumont, Alberta

More information

1.02 SYSTEM DESCRIPTION

1.02 SYSTEM DESCRIPTION 1 OF 7 MODULAR MEZZANINES GUIDE SPECIFICATIONS FOR PART 1 - GENERAL 1.01 RELATED WORK A. SECTION 03 30 00: Cast in Place Concrete (and Concrete Finishing) 1. The area where mezzanine is installed shall

More information

SECTION METAL STAIRS

SECTION METAL STAIRS SECTION 05510 METAL STAIRS PART 1 GENERAL 1.01 SECTION INCLUDES A. Stairs with concrete treads. B. Stairs with metal treads. C. Structural steel stair framing and supports. D. Handrails and guards. 1.02

More information

SECTION ACOUSTICAL CEILINGS

SECTION ACOUSTICAL CEILINGS PART 1- GENERAL 1.1 DESCRIPTION SECTION 09 51 00 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable

More information

POST AND FRAME STRUCTURES (Pole Barns)

POST AND FRAME STRUCTURES (Pole Barns) POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:

More information

Crossroads at Westfields Building II

Crossroads at Westfields Building II Crossroads at Westfields Building II Chantilly, Va STEPHEN LUMPP Structural option Faculty Consultant: Dr. Andres Lepage Technical Report 2 EXECUTIVE SUMMARY This report is a study of alternate floor systems

More information

ADDENDUM NUMBER TWO (2) DATE: May 1, 2015

ADDENDUM NUMBER TWO (2) DATE: May 1, 2015 ADDENDUM NUMBER TWO (2) DATE: May 1, 2015 PROJECT: FROM: TO: Tenant Improvements for: RELOCATION OF TIME INC. LIFESTYLE GROUP KPS GROUP, INC. 2101 First Avenue North Birmingham, Alabama 35203 All Bidders

More information

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT 1 East Franklin Street Phone: 301-790-4163 Third Floor Hagerstown, MD 21740 Fax: 301-791-2650 BUILDING PERMIT APPLICATION FOR RESIDENTIAL ACCESSORY

More information

GARAGE MAIN FLOOR PLAN

GARAGE MAIN FLOOR PLAN BUILDING CONTRACTOR/HOME OWNER TO REVIEW AND VERIFY ALL DIMENSIONS, SPECS, AND CONNECTIONS BEFORE CONSTRUCTION BEGINS. SHED TO BE BUILT AS PER IRC, UBC OR CURRENT LOCAL CODE To the best of my knowledge

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT. A. ASME B31.1 (American Society of Mechanical Engineers) - Power Piping SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section includes pipe and equipment supports, hangers, anchors, bases sleeves and the sealing of

More information

DIVISION 5 METALS COLD FORMED METAL FRAMING Structural Metal Stud Framing

DIVISION 5 METALS COLD FORMED METAL FRAMING Structural Metal Stud Framing 05 40 00 COLD FORMED METAL FRAMING 05 41 00 Structural Metal Stud Framing 05 50 00 METAL FABRICATIONS 05 51 00 Metal Stairs 05 51 13 Metal Pan Stairs 05 52 00 Metal Railings 05 52 13 Pipe and Tube Railings

More information

SECTION METAL FLOOR PLATE STAIRS

SECTION METAL FLOOR PLATE STAIRS SECTION 05513 - METAL FLOOR PLATE STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Florida Building Code 6th Edition (2017) High-Velocity Hurricane Zone Uniform Permit Application Form

Florida Building Code 6th Edition (2017) High-Velocity Hurricane Zone Uniform Permit Application Form Are there Gas Vent Stacks? Yes No Type: Natural LPGX FBC SECTION 1524 HIGH-VELOCITY HURRICANE ZONES REQUIRED OWNER S NOTIFICATION FOR ROOFING CONSIDERATIONS 1524.1 Scope. As it pertains to this section,

More information

DECK CONSTRUCTION REQUIREMENTS

DECK CONSTRUCTION REQUIREMENTS DECK CONSTRUCTION REQUIREMENTS Should you have any questions after reading the following information, please call the Building Inspection Department at 651-439-4439 to discuss the topics of concern. We

More information

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION [ ] COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 [08 33 13] COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Metal Counter

More information

Following contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD.

Following contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD. Following contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD. Included are selected sections of codes taken directly from: 1997 Uniform

More information

A NEW PRE-K BUILDING FOR BIG SPRING LAKE KINDERGARTEN SCHOOL FOR THE ALBERTVILLE CITY BOARD OF EDUCATION ALBERTVILLE, ALABAMA

A NEW PRE-K BUILDING FOR BIG SPRING LAKE KINDERGARTEN SCHOOL FOR THE ALBERTVILLE CITY BOARD OF EDUCATION ALBERTVILLE, ALABAMA McKee and Associates Architecture and Interior Design Addendum No. FOUR Date: 09.24.18 Project: A NEW PRE-K BUILDING FOR BIG SPRING LAKE KINDERGARTEN SCHOOL FOR THE ALBERTVILLE CITY BOARD OF EDUCATION

More information

SERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651

SERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651 SERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651 PART 1 GENERAL 1.1 DESCRIPTION A. Work Included: 1. Furnish all labor and materials to complete the fabrication of detention windows as

More information

* RESIDENTIAL PLAN REVIEW *

* RESIDENTIAL PLAN REVIEW * CITY OF DES MOINES, IOWA COMMUNITY DEVELOPMENT DEPARTMENT PERMIT AND DEVELOPMENT CENTER 602 Robert D. Ray Drive DES MOINES, IOWA 50309 Phone: 515.283.4200 Facsimile: 515.283.4270 Based on the scope of

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05 40 00 COLD-FORMED METAL FRAMING SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the

More information

TP: 89'-0" BP: 86'-6 1/4" 2'-0" Typ TP: 89'-0" BP: 86'-6 1/4" 2'-0" Typ S201 TW: 89'-0" TF: 86'-0" S201 TW: 87'-11 1/4" S201 TF: 86'-10 1/4" S201

TP: 89'-0 BP: 86'-6 1/4 2'-0 Typ TP: 89'-0 BP: 86'-6 1/4 2'-0 Typ S201 TW: 89'-0 TF: 86'-0 S201 TW: 87'-11 1/4 S201 TF: 86'-10 1/4 S201 Resource reginc.com 0.. '-" P: '-" 0'-0" " P: '- /" 0'-" '-" '-0" '-0" 0'-0" '-0" '-" '- /" TF: '-0" TW: '-0" TF: '-0" TW: '-0" TF: '-0" TW: '- /" TF: '-" " Typ Sim. P: '-" " TF: '-0" C '- /" '-" Varies

More information

UCC Permit Application Procedures

UCC Permit Application Procedures How do I apply for a permit? UCC Permit Application Procedures 1. Please complete the CodeMaster Pan Review Application 2. Please provide the scope of work description and/or construction documents/plans.

More information

SECTION 2 DIVISION 05 METALS

SECTION 2 DIVISION 05 METALS SECTION 2 DIVISION 05 METALS DIVISION 5 - METALS Note: This is a guide for Designers only. Contents shall not be used in lieu of specifications as part of the Designer s Contract Documents. GENERAL DESIGN:

More information

STANMYRE + NOEL Architects, P.C Preston White Drive, Suite 104 Reston, VA v f

STANMYRE + NOEL Architects, P.C Preston White Drive, Suite 104 Reston, VA v f STANMYRE + NOEL Architects, P.C. 1890 Preston White Drive, Suite 104 Reston, VA 20191 v. 703.471.9350 f. 703.834.1031 info@snarchitects.com S E P T E M B E R 19, 2 0 1 6 ADDENDUM #3 PROJECT: WHITE OAKS

More information

Work Order Number *************************************************************************** SECTION C20 STAIRS 02/18

Work Order Number *************************************************************************** SECTION C20 STAIRS 02/18 NAVFAC PTS-C20 (February 2018) ------------------------------ Preparing Activity: NAVFAC SUPERSEDING PTS-C20 (September 2016) PERFORMANCE TECHNICAL SPECIFICATION SECTION C20 STAIRS 02/18 NOTE: This section

More information

SECTION ROOF SPECIALTIES

SECTION ROOF SPECIALTIES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 71 00 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable

More information

MCCARTY ARCHITECTS, P.A. POST OFFICE BOX 440 / 533 WEST MAIN STREET TUPELO, MS / FOR ANSWERS TO QUESTIONS CONTACT: JUSTIN HARRINGTON

MCCARTY ARCHITECTS, P.A. POST OFFICE BOX 440 / 533 WEST MAIN STREET TUPELO, MS / FOR ANSWERS TO QUESTIONS CONTACT: JUSTIN HARRINGTON ADDENDUM NUMBER FROM: MCCARTY ARCHITECTS, P.A. POST OFFICE BOX 0 / 533 WEST MAIN STREET TUPELO, MS 3880 / 3880 FOR ANSWERS TO QUESTIONS CONTACT: JUSTIN HARRINGTON PHONE: -8-00 PROJECT: ACADEMIC STUDENT

More information

Residential Deck Safety, Construction and Repair. Juneau Permit Center, 4 th Floor Marine View Center,(907) February 2016

Residential Deck Safety, Construction and Repair. Juneau Permit Center, 4 th Floor Marine View Center,(907) February 2016 February 2016 Residential Deck Safety, Construction and Repair Juneau Permit Center, 4 th Floor Marine View Center,(907)586-0770 This handout is designed to help you build your deck to comply with the

More information

Item 2.3 Unit pricing GC to provide a square foot unit cost for material and labor to replace plywood decking beneath new concrete walkway slab.

Item 2.3 Unit pricing GC to provide a square foot unit cost for material and labor to replace plywood decking beneath new concrete walkway slab. Willow Glen Housing Repairs Project #9-59 Addendum Item. Change to bid date The bid date will be extended to March 8, 09, :00pm at the Housing Authority of Columbus Central Office,000 Wynnton Road Columbus,

More information

ADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1

ADDENDUM No. 6. ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1 ADDENDUM No. 6 ITB No. 4424: W.R. Wheeler (Swift Run) Service Center PUD Non-motorized Improvements Phase 1 Due: June 9, 2016 at 2:00 p.m. (local time) The following changes, additions, and/or deletions

More information

Super-Compact Ceiling Hanger Model KSCH Patent Pending Ceiling Isolation Theory: Resiliently suspended ceiling systems are designed to minimize floor impact noise and airborne sound transmissions through

More information

SECTION TURBINE VENTILATORS

SECTION TURBINE VENTILATORS SECTION 07 72 00 TURBINE VENTILATORS **This is a CSI Three-Part Specification using CSI MasterFormat 2004-2010 Section Numbers and Titles. This specification must be edited to suit your particular project.

More information

Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions

Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions (Specifier Note: The purpose of this guide specification is to assist the specifier in correctly specifying perforated

More information

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION: SECTION 13 05 41 SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED 1-25-13 PART 1 GENERAL 1.1 DESCRIPTION: A. Provide seismic restraint in accordance with the requirements of this section

More information

City of Westerville Guide to Commercial Inspections

City of Westerville Guide to Commercial Inspections City of Westerville Guide to Commercial Inspections FOOTINGS - After the excavation, with the form work and any required reinforcing steel in place. All footings shall have loose soil removed, reinforcing

More information

ADDENDUM #1a Page 1 of 1

ADDENDUM #1a Page 1 of 1 ADDENDUM #1a Page 1 of 1 PROJECT: Nortrax, Ottawa PROJECT NO: 1223 DATE: 5 August 2014 The following information supplements and/or supersedes the bid documents issued on 1 January 2014. This Addendum

More information

PRE-ENGINEERED METAL BUILDING SYSTEM

PRE-ENGINEERED METAL BUILDING SYSTEM PRE-ENGINEERED METAL BUILDING SYSTEM PART 1 GENERAL 1.1 SUMMARY A. The building shall include all primary and secondary structural framing members, connection bolts, roof and wall covering, flashing, gutter,

More information

GARAGE MAIN FLOOR PLAN

GARAGE MAIN FLOOR PLAN 12'-0" 4'-6" 3'-0" 4'-6" 3040 14'-0" LADDER LT LINE BUNK CABIN 11'-4" x 13'-4" 14'-0" BUILDING CONTRACTOR/HOME OWNER TO REVIEW AND VERIFY ALL DIMENSIONS, SPECS, AND CONNECTIONS BEFORE CONSTRUCTION BEGINS.

More information

STATEMENT OF SPECIAL INSPECTION FORM

STATEMENT OF SPECIAL INSPECTION FORM Project Title: Permit #: Project Address: STATEMENT OF SPECIAL INSPECTION FORM This Statement of Special Inspections is submitted in fulfillment of the requirements of CBC Sections 1704 and 1705. Special

More information

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project.

This guide can be used to prepare a specification for incorporating free standing jib cranes into a competitively bid construction project. SECTION 14651 FREE STANDING JIB CRANE ***** Gorbel, Inc. manufacturers a broad range of material handling cranes including monorail, bridge, gantry, and jib cranes. Numerous work station and industrial

More information

GARAGE MAIN FLOOR PLAN

GARAGE MAIN FLOOR PLAN BUILDING CONTRACTOR/HOME OWNER TO REVIEW AND VERIFY ALL DIMENSIONS, SPECS, AND CONNECTIONS BEFORE CONSTRUCTION BEGINS. SHED TO BE BUILT AS PER IRC, UBC OR CURRENT LOCAL CODE To the best of my knowledge

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan

Brent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan Brief Building Overview: 200 Minuteman Park stands as a 200,000 square foot Class A office building in Andover, Massachusetts, worth roughly $15,000,000. Although the building has a large square footage,

More information

DIVISION 05 METALS Commissioning of Metals STRUCTURAL METAL FRAMING Structural Steel Framing

DIVISION 05 METALS Commissioning of Metals STRUCTURAL METAL FRAMING Structural Steel Framing DIVISION 05 METALS 05 00 00 METALS 05 01 00 Maintenance of Metals 05 01 10 Maintenance of Structural Metal Framing 05 10 20 Maintenance of Metal Joists 05 10 30 Maintenance of Metal Decking 05 10 40 Maintenance

More information

POST AND FRAME STRUCTURES (Pole Barns)

POST AND FRAME STRUCTURES (Pole Barns) POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:

More information