1 Appendix P CNR Crossing Application
2 AECOM 3292 Production Way, Floor tel Burnaby, BC, Canada V5A 4R fax May 17, 2017 British Columbia Railway Company West Esplanade North Vancouver BC V7M 3J3 richard.myhilljones@gov.bc.ca Attention: Richard K. Myhill-Jones Director, Real Estate CN Acquisition Limited Avenue 2 Floor, Building B Edmonton, AB, T5E 0B9 Attention: Sara Lovegrove CN Design and Construction/Prairie Utilities Coordinator Dear Sirs and Mesdames: Regarding: North Shore Wastewater Treatment Plant - Conveyance System Utility Crossing Application We write with respect to the following railway line lands which are owned by the British Columbia Railway Company ( BCR ) and leased to CN Acquisition Limited ( CN ): PID: Legal Description: DISTRICT LOT 4286 (REFERENCE PLAN 1270) GROUP 1 NEW WESTMINSTER DISTRICT, EXCEPT PART IN REFERENCE PLAN 3863 (the Railway Line ). The Greater Vancouver Sewage and Drainage District ( GVS&DD ) is undertaking a secondary treatment upgrade program on the North Shore of Burrard Inlet, which is required by Metro Vancouver's Integrated Liquid Waste and Resource Management Plan (ILWRMP), as approved pursuant to the Environmental Management Act, and the new federal Wastewater Systems Effluent Regulations ( WSER ). The North Shore Wastewater Treatment Plant (NSWWTP) is being constructed within the District of North Vancouver and will replace the existing Lions Gate Wastewater Treatment Plant (LGWWTP), which is located within the District of West Vancouver and which was commissioned in The LGWWTP provides primary waste water treatment to the 200,000 residents of the North Shore municipalities of West Vancouver, the City of North Vancouver and 2017 AECOM Canada Ltd. All Rights Reserved. This proposal may contain confidential information and may not be provided to anyone other than the addressee and its employees without AECOM s written consent. L_ _CN Permitting_R1 (2).Docx
3 Page 2 May 17, 2017 the District of North Vancouver as well as the Squamish Nation and the Tsleil-Waututh Nation. The NSWWTP Program comprises design and construction of the new secondary wastewater treatment plant, design and construction of interconnection works between the LGWWTP and the NSWWTP (the conveyance system ), and decommissioning of the existing LGWWTP. The NSWWTP must be operational by the end of 2020 per the ILWRMP and the WSER. The conveyance system to and from the NSWWTP includes the following: a wastewater pump station a new 900mm diameter forcemain extending from the new pump station to the NSWWTP (the forcemain ), a 2100 mm secondary effluent pipe extending from a chamber upstream of the marine outfall at LGWWTP to the NSWWTP (the effluent pipe ), a 1200mm diameter extension of the trunk sewer system from the LGWWTP to the new pump station, and various other sewer connections and trunk sewer extensions to facilitate the conveyance of wastewater from the District of North Vancouver and the Squamish Nation to the NSWWTP The proposed alignment of the forcemain and effluent pipe ( Utility Line ) extends east from the LGWWTP generally parallel to and north of the existing Canadian National Railway ( CNR ) tracks within the Railway Line. The Utility Line will cross beneath the CNR tracks under the Lions Gate Bridge. We propose constructing the Utility Line at Mile MP 1.90 of the Railway Line, Squamish Subdivision which is within District of West Vancouver boundary, on the east side of the Bridge Road and the existing LGWWTP and approximately 16.2m east of the Lions Gate Bridge piers. According to the proposed design, both the Utility Line will be encased in steel casings and installed by trenchless techniques. GVS&DD plans to procure the conveyance system work through a Design-Build methodology. GVS&DD will engage in a competitive selection process in order to retain a single entity ( Project Co ) to design, build and commission the work. To meet GVS&DD deadline to achieve secondary effluent treatment of December 31, 2020, the Design-Build approach is necessary to meet the schedule constraints of the project. The following table correlates the checklist requirements provided by CNR and entitled CN a Guide to the Pipe and Wire Process Water/Sewer Pipelines : 2017 AECOM Canada Ltd. All Rights Reserved. This proposal may contain confidential information and may not be provided to anyone other than the addressee and its employees without AECOM s written consent. L_ _CN Permitting_R1 (2).Docx
4 Page 3 May 17, 2017 Checklist Item Description Included in this Submission 1 Plans for Effluent and Forcemain crossings including : Yes Site Plan and Profile Location Plan Land Description Specifications for carrier pipe and casing pipes included in plan 2 Geotechnical Recommendation Letter Yes This application package is submitted under Indicative Design Phase of the project with the purpose of negotiating an agreement relating to the construction, maintenance and apportionment of the costs of utility crossings for the forcemain and effluent pipelines. We have addressed this package to both BCR and CN because we understand that under the terms of its lease, CN cannot offer GVSDD any rights to occupy or use the Railway Line for underground work. During the Design Build phase either the Project Co or GVS&DD will provide detailed design plans for the utility crossings. Please do not hesitate to contact me ( ) if you have any questions or concerns. Sincerely, AECOM Canada Ltd. Tatiana Irimia, P.Eng. Senior Project Engineer tatiana.irimia@aecom.com cc: Joan Liu, Senior Project Engineer Metro Vancouver 2017 AECOM Canada Ltd. All Rights Reserved. This proposal may contain confidential information and may not be provided to anyone other than the addressee and its employees without AECOM s written consent. L_ _CN Permitting_R1 (2).Docx
5
6
7
8 SH17-04 DATA CARRIER PIPE CASING PIPE Contents to be handled RAW SEWAGE - Outside Diameter 900mm 1219mm Pipe Material HDPE Steel Specification and Grade DR 17 ASTM A252 GRADE 2 Wall Thickness 5.3mm 12.7mm Maximum Operating Pressure 30psi - Maximum Surge & Test Pressure 60psi - Maximum Operating Temperature 21 DEGREES - Type of Joint BUTT FUSION Welded, End Seals Coating NiL Method of Installation Trenchless Trenchless Length 46.5m 46.5m OWNER - METRO VANCOUVER INSTALLATION & MAINTENANCE TO BE IN ACCORDANCE WITH TC E10 CONTACT; JOAN LIU JOAN.LIU@METROVANCOUVER.ORG 1219mm O.D. STEEL CASING PIPE ASTM A252 GRADE 2 STEEL (MIN. YIELD STRENGTH 241 MPA) WALL THICKNESS 12.7mm L=46.5m 900Ø HDPE SAN FM NON-METALLIC CASING SPACERS RACI TYPE NOTES: 1. HYDROVAC TO CONFIRM DEPTH AND LOCATIONS OF EXISTING UTILITIES PRIOR TO CONSTRUCTION. 2. ENDS OF CASING TO BE PROVIDED WITH END SEALS. CANADIAN NATIONAL RAILWAY DIVISIONAL ENGINEER REGIONAL ENGINEER MANAGER RAILWAY CHAINAGE MILEAGE MP 1.90 SUBDIVISION SQUAMISH
9 SH17-04 DATA CARRIER PIPE CASING PIPE Contents to be handled TREATED EFFLUENT - Outside Diameter 2133mm 2428mm Pipe Material Steel Steel Specification and Grade ASTM A572 GR.42 ASTM A252 GRADE 2 Wall Thickness 9.5mm 12.7mm Maximum Operating Pressure 4psi - Maximum Surge & Test Pressure 8psi - Maximum Operating Temperature 14 DEGREES - Minimum Operating Temperature 10 DEGREES - Type of Joint Welded Welded, End Seals Coating Polyurethane to AWWA - C222 Method of Installation Trenchless Trenchless OWNER - METRO VANCOUVER INSTALLATION & MAINTENANCE TO BE IN ACCORDANCE WITH TC E10 CONTACT; JOAN LIU JOAN.LIU@METROVANCOUVER.ORG 2428mm O.D. STEEL CASING PIPE ASTM A252 GRADE 2 STEEL (MIN. YIELD STRENGTH 241 MPA) WALL THICKNESS 12.7mm L=46.5m NON-METALLIC CASING SPACERS RACI TYPE 2133Ø STEEL SAN PIPE NOTES: 1. HYDROVAC TO CONFIRM DEPTH AND LOCATIONS OF EXISTING UTILITIES PRIOR TO CONSTRUCTION. 2. ENDS OF CASING TO BE PROVIDED WITH END SEALS. CANADIAN NATIONAL RAILWAY DIVISIONAL ENGINEER REGIONAL ENGINEER MANAGER RAILWAY CHAINAGE MILEAGE MP 1.90 SUBDIVISION SQUAMISH
PIPELINE CROSSING/ENCROACHMENT APPLICATION FORM (OIL/GAS)
PIPELINE CROSSING/ENCROACHMENT APPLICATION FORM (OIL/GAS) Complete this form and return it along with a non-refundable application fee of $1,150 (+GST) made out to Canadian National Railway Company. Credit
More informationProject and Environmental Review Conveyance for the NSWWTP Report
Report Prepared by: AECOM 3292 Production Way, Floor 4 604.444.6400 tel Burnaby, BC, Canada V5A 4R4 July 2017 Project Number: 60513172 Distribution List # Hard Copies PDF Required Association / Company
More informationAppendix D. Stormwater Pollution Prevention Plan
Appendix D Memorandum AECOM 3292 Production Way, Floor 4 604 444 6400 tel Burnaby, BC, Canada V5A 4R4 604 294 8597 fax www.aecom.com To Joan Liu, Metro Vancouver Page 1 CC Subject Conveyance for the NSWWTP
More informationBowinn Ma MLA North Vancouver-Lonsdale
January 1, 2018 Mayor and Council City of North Vancouver 141 W. 14 th St North Vancouver, BC V7M 1H9 Bowinn Ma MLA North Vancouver-Lonsdale Dear City of North Vancouver Mayor and Council: As you are all
More informationCOPY PROJECT AND ENVIRONMENTAL REVIEW REPORT PER NO CONVEYANCE FOR NORTH SHORE WASTEWATER TREATMENT PLANT
PROJECT AND ENVIRONMENTAL REVIEW REPORT PER NO. 17-090 CONVEYANCE FOR NORTH SHORE WASTEWATER TREATMENT PLANT Prepared for: Director, Planning & Development April 20, 2018 VANCOUVER FRASER PORT AUTHORITY
More informationGreater Vancouver Regional District - Parks. Metro Vancouver Regional Parks Plan
SERVICKS AND SOUJTIQrsIS FOS A IJVABLE REuiON A330.Kingsvvay,.Burnaby,.8C;Canada V5H.4G8' 6Q4.-432--6'200 www.metrovancouver.org BOARD IN BR For Metro Vancouver meetings on Friday, February 26,2016 Please
More informationMarch 29, to the. Please sign in and take a Comment Sheet
elcome to the Public Information Centre for the River Street Pump Station Twin- Forcemain Extension and Ravensview Trunk Sewer Twinning Please sign in and take a Comment Sheet Utilities Kingston staff
More informationCITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413
Page: 1 of 5 CITY OF PANAMA CITY BEACH Utilities Administration & Engineering Offices 116 South Arnold Road Panama City Beach, FL 32413 COMMERCIAL/RESIDENTIAL UTILITY PLAN COMPLETENESS CHECK LIST Updated
More informationAPPLICATION FOR PIPE OR WIRE OCCUPANCY
APPLICATION FOR PIPE OR WIRE OCCUPANCY Please answer all questions and direct cover letter / project description, completed application, application fee, and three (3) copies of project plans to: AECOM
More informationFLOODPLAIN MANAGEMENT STRATEGY FEASIBILITY PLAN. EB3679 February 2011
FLOODPLAIN MANAGEMENT STRATEGY FEASIBILITY PLAN EB3679 February 2011 FLOODPLAIN MANAGEMENT STRATEGY FEASIBILITY PLAN Prepared for: The City of Westminster 511 Royal Avenue Westminster, BC V3L 1H9 Prepared
More informationFusible PVCTM Pipe for Trenchless Applications
Fusible PVCTM Pipe for Trenchless Applications M U N I C I P A L S Y S T E M S FUSIBLE PVC TM PIPE FOR HDD AND OTHER TRENCHLESS APPLICATIONS 100mm 900mm (4" 36") CIOD & IPS Sizes 12.2m (40 ft) lengths
More informationGREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT (GVS&DD) BOARD OF DIRECTORS
Meeting 4 of 6 GREATER VANCOUVER SEWERAGE AND DRAINAGE DISTRICT (GVS&DD) BOARD OF DIRECTORS REGULAR BOARD MEETING Friday, March 6, 2015 9:00 A.M. 2 nd Floor Boardroom, 4330 Kingsway, Burnaby, British Columbia
More informationczc= r&:ob ;0_ City of Richmond Report to Committee J2f J2( ""'"::::>
City of Richmond Report to Committee To: From: Public Works and Transportation Committee John Irving, P.Eng. MPA Director, Engineering Date: August 25, 2017 File: 10-6060-03-01/2017- Vol 01 Re: Metro Vancouver
More informationApplication for Underground Pipeline Crossing or Longitudinal of Railroad Property and or Track
Wheeling and Lake Erie Railway Company Real Estate Department, 100 East First Street, Brewster, OH 44613 Application for Underground Pipeline Crossing or Longitudinal of Railroad Property and or Track
More informationMATERIAL SPECIFICATION FOR SMOOTH WALLED STEEL PIPE
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1802 NOVEMBER 2004 MATERIAL SPECIFICATION FOR SMOOTH WALLED STEEL PIPE TABLE OF CONTENTS 1802.01 SCOPE 1802.02 REFERENCES 1802.03 DEFINITIONS - Not
More informationJason McDiarmid, R.E.T. Terra Erosion Control Ltd.
Career History Terra Erosion Control Ltd. Project Manager Nelson, British Columbia November 2009 to Present Stantec Consulting Ltd. Edmonton Alberta Environmental Consultant / Project Manager May 2003
More informationApplication for Underground Pipeline Crossing or Longitudinal of Railroad Property and or Track
Wheeling and Lake Erie Railway Company Real Estate Department, 100 East First Street, Brewster, OH 44613 Application for Underground Pipeline Crossing or Longitudinal of Railroad Property and or Track
More informationDERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN
DERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN Submitted to: Town of Milton Regional Municipality of Halton Submitted by: AMEC Earth & Environmental 3215 North Service Road
More informationBACKGROUND INFORMATION DEVELOPMENT COST CHARGE BYLAW REVIEW & UPDATE
BACKGROUND INFORMATION DEVELOPMENT COST CHARGE BYLAW REVIEW & UPDATE On April 29, 2013 the District of North Vancouver adopted a new DCC bylaw containing new rates that become effective November 1, 2013.
More informationAppendix J. Construction Environmental Management Plan
Appendix J Construction Environmental Management Plan Conveyance for the North Shore Wastewater Treatment Plant Project Construction Environmental Management Plan (CEMP) Metro Vancouver Project Number:
More informationQuarterly CEU Training - Pipe 05/08/ Isolation valves & bypass End Current Events Isolation valves important upstream and downstream (ACV can
10. Isolation valves & bypass End Current Events Isolation valves important upstream and downstream (ACV can t be serviced unless whole line is drained) Bypass if using smaller bypass, service large valve
More informationMaterial Specification for. Large Diameter Watermains
Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 7.80 November 2016 Large Diameter Watermains Table of Contents TS 7.80.01 SCOPE... 2 TS 7.80.01.01 Application...
More informationMATERIAL SPECIFICATION FOR SMOOTH WALLED STEEL PIPE
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1802 NOVEMBER 2008 MATERIAL SPECIFICATION FOR SMOOTH WALLED STEEL PIPE TABLE OF CONTENTS 1802.01 SCOPE 1802.02 REFERENCES 1802.03 DEFINITIONS - Not
More informationWeholite LIGHTWEIGHT PIPE SYSTEM
Weholite LIGHTWEIGHT PIPE SYSTEM The lightweight pipe that takes a heavier load Weholite pipe is large diameter, profile wall pipe made from highdensity polyethylene (HDPE) resin, which is manufactured
More informationAPPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer
APPENDIX I Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer THE CITY OF BARRIE PROJECT NO. 15M-00594-01 CONCEPTUAL DESIGN SALEM ROAD AND MCKAY ROAD TRUNK WATERMAIN AND SANITARY
More informationIntegrated Liquid Waste and Resource Management
Integrated Liquid Waste and Resource Management A Liquid Waste Management Plan for the Greater Vancouver Sewerage & Drainage District and Member Municipalities N o v e m b e r 2 0 0 9 www.metrovancouver.org
More informationIntegrated Liquid Waste and Resource Management
Integrated Liquid Waste and Resource Management A Liquid Waste Management Plan for the Greater Vancouver Sewerage & Drainage District and Member Municipalities M a y 2 0 1 0 www.metrovancouver.org File:
More informationAppendix O. Environmental Site Assessment
Appendix O Environmental Site Assessment AECOM 3292 Production Way, Floor 4 604 444 6400 tel Burnaby, BC, Canada V5A 4R4 604 294 8597 fax www.aecom.com April 12, 2017 Metro Vancouver 4330 Kingsway Burnaby,
More informationFEASIBILITY STUDY FOR SEWER SERVICING OF LOTS USING ONSITE SYSTEMS
FEASIBILITY STUDY FOR SEWER SERVICING OF LOTS USING ONSITE SYSTEMS NOVEMBER 2005 DAYTON & KNIGHT LTD. Consulting Engineers 213.17 FEASIBILITY STUDY FOR SEWER SERVICING OF LOTS USING ONSITE SYSTEMS TABLE
More informationCapital Expenditure Summary
Capital Expenditure Summary UTILITIES COMMITTEE PRESENTATION Frank Huber DIRECTOR, MAJOR PROJECTS, MANAGEMENT SYSTEMS AND UTILITY SERVICES WATER SERVICES July 12, 2018 http://orbit.gvrd.bc.ca/orbit/llisapi.dll/properties/25601136
More informationThe Standards referred to shall be the most recent edition.
Page 1 of 7 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described hereunder shall consist of the excavation of trenches and tunnels; the supply and installation of pipe and/or encasement pipe; the
More informationMetro Vancouver Regional District
For Metro Vancouver meetings on Friday, Septembier 22,2017 Please note these are not the official minutes. Board in Brief is an informal summary. Material relating to any of the foiiowing items is avaiiabie
More informationREPORT TO PLANNING, TRANSPORTATION AND PROTECTIVE SERVICES COMMITTEE MEETING OF WEDNESDAY, APRIL 24, 2013
PPS/JP 2013-06 REPORT TO PLANNING, TRANSPORTATION AND PROTECTIVE SERVICES COMMITTEE MEETING OF WEDNESDAY, APRIL 24, 2013 SUBJECT CAPITAL REGIONAL DISTRICT AMENDMENT TO TOWNSHIP OF ESQUIMALT OFFICIAL COMMUNITY
More informationPROVEN. Copyright 2006 Canadian Wood Lagging Corporation DARE TO COMPARE:
TM PROVEN mechanical protection volume/scale capacity cost/benefit winner DARE TO COMPARE: www.woodlagging.com Wood Lagging could replace other conventional pipe protection systems under many conditions.
More informationCORE AREA WASTEWATER TREATMENT PROJECT BOARD
Attachment 1 CORE AREA WASTEWATER TREATMENT PROJECT BOARD Executive Summary BACKGROUND The seven municipalities that make up the Core Area of the Capital Regional District discharge untreated sewage into
More informationSECTION WASTEWATER FORCE MAINS
SECTION 02732 WASTEWATER FORCE MAINS PART - GENERAL 1.01 GENERAL: A. This section includes the general requirements for design and installation of force main systems serving wastewater lift stations. B.
More informationThe Corporation of Delta COUNCIL REPORT Regular Meeting. South Delta Sanitary Sewer Capacity
The Corporation of Delta COUNCIL REPORT Regular Meeting F.02 To: Mayor and Council File No.: 5440-30/SD From: Engineering Department Date: July 6, 2012 South Delta Sanitary Sewer Capacity The following
More informationCOPY PROJECT AND ENVIRONMENTAL REVIEW REPORT PER NO NEPTUNE BULK TERMINALS (CANADA) LTD. DUST SUPPRESSION UPGRADE
PROJECT AND ENVIRONMENTAL REVIEW REPORT PER NO. 16-072 NEPTUNE BULK TERMINALS (CANADA) LTD. DUST SUPPRESSION UPGRADE Prepared for: Director, Planning & Development May 15, 2017 VANCOUVER FRASER PORT AUTHORITY
More informationVulnerability of Metro Vancouver Wastewater Infrastructure to Climate Change
Vulnerability of Metro Vancouver Wastewater Infrastructure to Climate Change Andrew Boyland, P.Eng. Kerr Wood Leidal Associates Arash Masbough, M.A.Sc., PMP, P.Eng. Associated Engineering Today s Presentation
More information5.5 Additional Item WMC June 8, 2011
5.5 Additional Item WMC June 8, 2011 Waste Management Committee Meeting Date: June 8, 2011 To: From: Waste Management Committee Fred Nenninger, Project Manager, Wastewater Secondary Treatment Upgrades
More informationWastewater Management in Metro Vancouver. Margaret Morales 14 March 2011 PLAN 597
Wastewater Management in Metro Vancouver Margaret Morales 14 March 2011 PLAN 597 Outline Metro Vancouver an overview Wastewater Management in Metro Vancouver ILWMP What makes it Integrated? Governance
More informationMayor and Council Tony Seibert, Drainage Engineer Waechter Creek Culvert Emergency Repair at Simpson Road Extension
SS 1~A ABBOTSFORD Report No. ENG 23-2014 COUNCIL REPORT Regular Committee March 14,2014 File No: 5330-30 To: From: Subject: Mayor and Council Tony Seibert, Drainage Engineer Waechter Creek Culvert Emergency
More informationAdd: D3.1(k) Engineer for the purposes of this Project shall have the same meaning as Contract Administrator.
Corporate Finance epartment Materials Management ivision 342-2013 AENUM 1 Page 1 of 5 PLESSIS ROA TWINNING AN GRAE SEPARATION AT CN REITT SUBIVISION: RAIL SHOOFLY GRAE PREPARATION AN MISCELLANEOUS WASTEWATER
More informationPostal Code V7M 1A5 Fax
Contact financially sensitive in formation which you do not want provided to third parties. public through the Access to Information Act. Please advise PMV of any commercially or municipalities, First
More informationBuilt to Last Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA September 30, 2014
87 th Annual WEFTEC Conference Built to Last Rehabilitating 5 Miles of Sewer Force Main in Newport Beach, CA September 30, 2014 Dan Bunce, P.E., PMP and Victoria Pilko, PMP Orange County Sanitation District
More informationLIQUID WASTE. Guide to Managing Wastewater. Automotive Repair Industry
LIQUID WASTE Guide to Managing Wastewater Automotive Repair Industry Guide to Managing Wastewater Automotive Repair Industry 2018 Metro Vancouver This guide was developed with the cooperation of and input
More informationAmendment to OPSS 416 (Nov 2013) Construction Specification for Pipeline and Utility Installation by Jacking and Boring
Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 416 September 2017 Amendment to OPSS 416 (Nov 2013) Construction Specification for Pipeline and Utility
More informationThe City of Edmonton Combined Sewer Overflow (CSO) Control Strategy. Implementation Plan. Prepared for: Alberta Environment.
The City of Edmonton Combined Sewer Overflow (CSO) Control Strategy Prepared for: Alberta Environment June 2000 Prepared by: City of Edmonton Asset Management and Public Works Drainage Services TABLE OF
More informationPROJECT BRIEF for the John Hart Generating Station Replacement Project
PROJECT BRIEF for the John Hart Generating Station Replacement Project Issue Date: March 13, 2012 TABLE OF CONTENTS John Hart Generating Station Replacement Project Page ii of 17 1. INTRODUCTION... 3 1.1
More information1 Metro Vancouver Case Study Vancouver Sewage Area Infrastructure Vulnerability to Climate Change
1 Metro Vancouver Case Study Vancouver Sewage Area Infrastructure Vulnerability to Climate Change 1.1 Background Within the First National Engineering Vulnerability Assessment, the Public Infrastructure
More informationTHE KANSAS CITY SOUTHERN RAILWAY COMPANY 427 West 12 th Street Kansas City, Missouri
Utility Permit Process Instructions How to apply: In an effort to effectively facilitate the permit process, The Kansas City Southern Railway Company ( KCS ) has partnered with JLL who is committed to
More informationRight-of-Way Permit Process
Right-of-Way Permit Process 2018 Louisiana Transportation Conference Joy K. Johnson, P.E. Right-of-Way Permit Engineer Road Design Section History 1938 First R/W permit issued at DOTD HQ» Project Permit
More informationREPORT. Region of Peel. East Brampton Trunk Sewer Twinning Environmental Assessment. Project File Report
REPORT Region of Peel East Brampton Trunk Sewer Twinning Environmental Assessment Project File Report June 2014 CONFIDENTIALITY AND COPYRIGHT This document is for the sole use of the addressee and Associated
More informationProject No: Regarding: Performance Verification Plan for Certificate of Compliance at Government Road, Squamish, BC
AECOM 200 415 Gorge Road East 250 389-3403 tel Victoria, BC, Canada V8T 2W1 250 475 6388 fax www.aecom.com March 11, 2016 John Brodie BCR Properties Ltd. c/o David Tiplady Piteau Associates Ltd. 300 788
More informationAppendix J Effluent Pump Station
Appendix J Effluent Pump Station TECHNICAL MEMORANDUM Salmon Creek Treatment Plant Effluent Pump Station Hydraulics and Phasing Analysis for the Phase 5A Project Columbia River Outfall and Effluent Pipeline
More informationLIQUID WASTE. Guide to Managing Wastewater. Commercial Vehicle Washing Industry
LIQUID WASTE Guide to Managing Wastewater Commercial Vehicle Washing Industry Guide to Managing Wastewater Commercial Vehicle Washing Industry 2018 Metro Vancouver This guide was developed with the cooperation
More informationADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02
ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON April 23, 2015 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 30, 2015, in accordance
More information... 4... 7... 7... 7 - - - - o o o ᶟ Our reference: Your reference: Bretagna Estate - Electrical Bretagna Estate - Electrical Services Report 15 February 2018 Kabod Development Group (Pty) Ltd
More informationRaci spacer type L ST 503I 2/7
RACI SPACER TYPE L Mar./10 Rev. 1.0 - General revision Editing L.Manoni Approval G.Borta 1/7 D es c ri pti o n Raci s.r.l. - via Adriano, 101 20128 Milano Italy - www.raci.it tel. +3902262351 fax +390226235215
More informationAppendix J Conceptual Design of Watermain and Sanitary Sewer
City of Barrie - Hewitt's Secondary Plan Class Environmental Assessment (Phase 3 and 4) Study Environmental Study Report Appendix J Conceptual Design of Watermain and Sanitary Sewer Hatch 2017 All rights
More information8. Vertical Alignment (Profiles).
8. Vertical Alignment (Profiles). a. Cover Over Pipeline. 1) Normal depth for sewer pipelines is eight (8) to ten (10) feet measured from the lowest profile grade or ground line. 2) Provide a minimum of
More informationPublic Works & Infrastructure Committee. Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division
STAFF REPORT ACTION REQUIRED Contract Award - Request for Proposals No. 9117-13-7210 Professional Engineering Services for the Design and Construction Administration of the Wet Weather Flow System to Control
More informationBA Blacktop Ltd. An ISO 9001:2008 registered
BA Blacktop Ltd. An ISO 9001:2008 registered company began operation in the Province of British Columbia in 1956. Since then, we have grown into a major general contractor with a progressive and multi-disciplined
More informationMETRO VANCOUVER REGIONAL DISTRICT LIQUID WASTE COMMITTEE
METRO VANCOUVER REGIONAL DISTRICT LIQUID WASTE COMMITTEE REGULAR MEETING January 17, 2019 1:00 p.m. 28 th Floor Committee Room, 4730 Kingsway, Burnaby, British Columbia R E V I S E D A G E N D A 1 1. ADOPTION
More informationCONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 416 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING TABLE OF CONTENTS 416.01 SCOPE 416.02 REFERENCES
More informationSwagelining for Water Transmission & Sewer Force Main Renewal 16 through 65.
Swagelining for Water Transmission & Sewer Force Main Renewal 16 through 65 www.murphypipelines.com Murphy Pipelines Services For 2 through 65 Water & Force Main Replacement Trenchless Design Design Build
More informationDriscoPlex Pipe and Fittings Features and Benefits
DriscoPlex Pipe and Fittings Features and Benefits PP1001 Release June 12, 2003 Rev. 03-15-2007 Legal Disclaimer This presentation is for informational purposes only and is intended for use as a reference
More informationOUTLINE SERVICES SCHEME REPORT (WATER AND SEWER)
OUTLINE SCHEME REPORT (WATER AND SEWER) 327043 HOLDING 263, WILLOWGLEN AGRICULTURAL HOLDINGS Issue 1 SHELL SUMMIT ROAD PROPOSED FILLING STATION ON THE REMAINING EXTENT OF PORTION 123 (A PORTION OF PORTION
More informationSCALE BAR 1:2500 RM OF WOODLANDS OVERALL PLAN - LOW PRESSURE SEWER MAIN. Certificate of Authorization JESSICA MANNESS ENGINEERING, INC. No.
OF SURVEY OVERALL PLAN - LOW PRESSURE SEWER MAIN 0 50 100 SCALE BAR 1:2500 200 500 THIS IS NOT A LEGAL PLAN - CONCEPT ONLY OF SURVEY PLAN - LOW PRESSURE SEWER MAIN 0 50 100 SCALE BAR 1:2500 200 500 THIS
More informationGUIDANCE MEMO NO : GUIDANCE CRITERIA FOR THE SEPARATION OF WATER MAINS AND NON-POTABLE PIPELINES
State of California Memorandum Department of Health Services Date: April 4, 2003 To: From: Subject: Regional and District Engineers David P. Spath, Ph.D., Chief (Original signed by Dave) Drinking Water
More informationPVC. System Specifications TABLE 1 TABLE 2
TRICON PVC TABLE 1 Pipe Size Minimum Insulation Thickness PVC Jacket O.D. PVC Jacket Wall 2 1.81 6.14.070 3 1.25 6.14.070 4 1.75 8.16.080 6 1.69 10.20.100 8 1.69 12.24.120 10 1.65 14.32.140 12 1.47 16.00.160
More informationF. Provide at least 2 feet of vertical separation between a water line and any utility or stormdrain crossing it.
Section 3 F. Provide at least 2 feet of vertical separation between a water line and any utility or stormdrain crossing it. 3.8 Highway Crossings The design engineer shall, prior to the design of any highway
More informationReinforced Concrete Microtunnelling Pipe Designed for Project Conditions and MTBM Machines
Reinforced Concrete Microtunnelling Pipe Designed for Project Conditions and MTBM Machines Maged Mekhael, Munro Ltd. TRENCHLESS TECHNOLOGY ROADSHOW May 28-29, 2014 Scotiabank Convention Centre, Niagara
More informationSTEAM TO HOT WATER CONVERSION
STEAM TO HOT WATER CONVERSION Steam to Hot Water Conversion Toronto 300-3901 Highway #7 Vaughan, ON L4L 8L5 (905) 265-9777 Vancouver 210-4180 Lougheed Highway Burnaby, BC V5C 6A7 (604) 689-3410 www.fvbenergy.com
More informationAPPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE
APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0
More informationSclairpipe VERSATILE HIGH DENSITY POLYETHYLENE PIPE
Sclairpipe VERSATILE HIGH DENSITY POLYETHYLENE PIPE Sclairpipe Sclairpipe high density polyethylene (HDPE) pipe represents the latest advances in both material and manufacturing techniques. Since 1968,
More information2019 Annual Review of Sewer Rates and Environmental Updates Under the Sewer & Watercourse By-law
ADMINISTRATIVE REPORT Report Date: November 27, 2018 Contact: Daniel Roberge Contact No.: 604.873.7360 RTS No.: 12725 VanRIMS No.: 08-2000-20 Meeting Date: December 11, 2018 TO: FROM: SUBJECT: Vancouver
More informationGreater Vancouver Regional District Liquid Waste Management Plan
Greater Vancouver Regional District Liquid Waste Management Plan February 2001 Greater Vancouver Regional District Liquid Waste Management Plan February 2001 GREATER VANCOUVER REGIONAL DISTRICT LIQUID
More informationPL ONTARIO MUNICIPAL BOARD COMMISSION DES AFFAIRS MUNICIPALES DE L ONTARIO
PL100206 ONTARIO MUNICIPAL BOARD COMMISSION DES AFFAIRS MUNICIPALES DE L ONTARIO IN THE MATTER OF subsection 17 (36) of the Planning Act, R.S.O. 1990, c.p.13, as amended Appellants: Greater Ottawa Homebuilders
More informationSECTION WASTEWATER FORCE MAINS
SECTION 02732 WASTEWATER FORCE MAINS PART 1 GENERAL 1.01 GENERAL: A. This section includes the general requirements for design and installation of force main systems serving wastewater lift stations. B.
More informationWaste Discharge Permit Application
Greater Vancouver Sewerage & Drainage District Sewer Use Bylaw No. 299 (as amended), 2007 Apr 2018-26992661 GVS&DD This is an application for a Waste Discharge Permit under the Greater Vancouver Sewerage
More informationDesign Criteria for Walnut Street Emergency Bypass Force Main Jacksonville, FL
Design Criteria for Walnut Street Emergency Bypass Force Main Jacksonville, FL PREPARED FOR: PREPARED BY: JEA Elizabeth DiMeo, P.E. JEA Manager,W/WW Distribution & Collection E&C DATE: December 18, 2018
More informationComposite Production Systems Global Poly Linepipe
Headquarters 25 Bethridge Road Toronto, ON M9W 1M7 Canada Tel: +1 416 743 7111 Canada 3501 54 Avenue Southeast Calgary, AB T2C 0A9 Canada Tel: +1 403 503 0548 shawcor.com Shawcor Ltd. is a global energy
More informationTrans Mountain Pipeline. Update to Council May 13, 2014 Sadhu Johnston, Deputy City Manager
Trans Mountain Pipeline Update to Council May 13, 2014 Sadhu Johnston, Deputy City Manager 1 Agenda 1. Background 2. Key Issues Regarding NEB Process: Incompleteness of Trans Mountain s Application NEB
More informationWelcome South London Wastewater Servicing Study. Municipal Class Environmental Assessment Master Plan Public Information Centre.
Welcome South London Wastewater Servicing Study Municipal Class Environmental Assessment Master Plan Public Information Centre February 26, 2018 The purpose of this Public Information Centre (PIC) is to:
More informationSupports Item No. 3 T&T Committee Agenda February 17, 2009
Supports Item No. 3 T&T Committee Agenda February 17, 2009 ADMINISTRATIVE REPORT Report Date: February 6, 2009 Contact: Jerry Dobrovolny Contact No.: 604.873.7331 RTS No.: 07712 VanRIMS No.: 08-2000-20
More informationWalker County Manufactured Home Rental Community Regulations Infrastructure Development Plan
A. In accordance with Local Government Code Section 232.007, an Infrastructure Development Plan (IDP) is required for all manufactured home rental communities, as defined in Section A 1.0 E of these regulations,
More informationMETRO VANCOUVER REGIONAL DISTRICT UTILITIES COMMITTEE
METRO VACOUVER REGIOAL DISTRICT UTILITIES COMMITTEE REGULAR MEETIG Thursday, July 12, 9:00 am 28th Floor Committee Room, 4730 Kingsway, Burnaby, British Columbia A G E D A1 1. ADOPTIO OF THE AGEDA 1.1
More informationRef. clause Existing provision Bidder s query BHEL s clarification
for the works of Engineering, Procurement, Supply and Construction of onshore / offshore civil, structural and architectural works for Sea Water Intake & Outfall system of the proposed thermal power plant
More informationWHEREAS: GREATER VANCOUVER REGIONAL DISTRICT LABOUR RELATIONS SERVICE BYLAW NO. 1182, 2012
GREATER VANCOUVER REGIONAL DISTRICT LABOUR RELATIONS SERVICE BYLAW NO. 1182, 2012 A bylaw to establish the Labour Relations Service of the Greater Vancouver Regional District WHEREAS: A. Subject to the
More informationLIQUID WASTE. Guide to Managing Wastewater. Swimming Pools and Ice Rinks
LIQUID WASTE Guide to Managing Wastewater Swimming Pools and Ice Rinks Guide to Managing Wastewater Swimming Pools and Ice Rinks 2018 Metro Vancouver This guide was developed with the cooperation of and
More informationDrainage Servicing Report - Terms of Reference
Urban Form and Corporate Strategic Development City Planning 7th Floor, Edmonton Tower 10111 104 Avenue NW Edmonton, AB T5J 0J4 edmonton.ca July 2018 1 Introduction: Drainage Servicing Reports Drainage
More informationThe Idea of Sewage as a Resource
The Idea of Sewage as a Resource The Idea of Sewage as a Resource An Introductory Study of Knowledge and Decision Making in Liquid Waste Management in Metro Vancouver, BC. Canada. Margaret Morales and
More informationCITY OF VANCOUVER ADMINISTRATIVE REPORT. General Manager of Engineering Services in consultation with the Director of Current Planning
CITY OF VANCOUVER ADMINISTRATIVE REPORT Date: September 1, 2005 Author: Dale Bracewell Phone No.: 604.871.6440 RTS No.: 5291 CC File No.: 8203 Meeting Date: September 20, 2005 TO: FROM: SUBJECT: Standing
More informationCONSTRUCTION SPECIFICATION FOR PIPELINE AND UTILITY INSTALLATION BY JACKING AND BORING
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 416 NOVEMBER 2018 (Formerly OPSS 416, November 2013) Note: The MUNI implemented in November 2018 replaces OPSS 416 COMMON, November 2013 with no technical
More informationSliplining 36-in. PCCP with Fusible PVC - DC Water's Long-Term Control Plan 'Division E'
North American Society for Trenchless Technology (NASTT) NASTT s 2014 No-Dig Show Orlando, Florida April 13-17, 2014 Paper MA-T4-02 Sliplining 36-in. PCCP with Fusible PVC - DC Water's Long-Term Control
More informationCITY OF RICHMOND INVITATION TO TENDER
CITY OF RICHMOND INVITATION TO TENDER Contract T.2892 Contract: AC Watermain Replacement, Comstock Area The City of Richmond invites tenders for construction work at the above-mentioned locations. Work
More informationFEI GVS & DD BIOMETHANE PURCHASE AGREEMENT EXHIBIT
B-5 GVS&DD Biomethane Agreement Streamlined Review Process September 25, 2013-1 - Contents Regulatory Background Regulatory History Approvals Sought Project Description Project Overview Interconnection
More informationAPPENDIX I PROVINCE WORK
APPENDIX I PROVINCE WORK Notwithstanding Section 2.33 [Principles for Resolving Conflicts within Documents] of Schedule 1, in the case of any conflict, ambiguity or inconsistency between or among any of