ADDENDUM # CLARIFICATIONS: This project must be completed no later than is October 15, This is a firm fixed date.

Size: px
Start display at page:

Download "ADDENDUM # CLARIFICATIONS: This project must be completed no later than is October 15, This is a firm fixed date."

Transcription

1 Date: December 7, 0 ADDENDUM # Solicitation#: DC--IFB-00 Description: Crawford Manor Radiator Replacement and Associated Upgrades Prospective respondents, and all those concerned, are hereby informed that the following changes to the above solicitation are made a part of the bid documents. Please note that the ACKNOWLEDGEMENT OF ADDENDA FORM can be found on Elm City Communities Collaboration Portal under the Document Library. This form must be completed and returned as a part of the response to this solicitation. Failure to complete and submit the ACKNOWLEDGEMENT OF ADDENDA FORM will deem this response as non-responsive.. CLARIFICATIONS: This project must be completed no later than is October 5, 07. This is a firm fixed date.. Contractor shall disregard Note # on HM drawings and notes on Mechanical drawings calling for horizontal HW S&R piping to be installed in pipe enclosures. New horizontal piping shall run exposed and insulated with PVC jacketing as noted in New Work Note # on Mechanical drawings to match existing piping that is being removed. Insulated piping located within the new vertical pipe chases does not require PVC jacketing but shall be insulated per specifications. Painting scope clarifications. The contractor shall paint all existing walls floor to ceiling in all closets receiving new vertical pipe chases applying two coats of paint on existing walls and using primer coat on all new GWB for new chases. Contractor shall repair all walls at attachment points where existing radiators are being replaced per A7 below then paint walls floor to ceiling to match existing adjacent wall colors applying two coats of paint.. Updated Wage Rate are attached QUESTIONS: Q. Can you drill into the wall under current regulations? A. Drilling into wall to be performed in compliance with Section 08. Drilling work practices are spelled out in Part. B of Section 08. Section 08 outlines the training and licensing required of the Contractor performing drilling into wallboard. Q. Is tenant furniture movement included in the contract? A. Yes, please see specification section 0000 B.. Q. Will you publish pre-bid attendees to the website? A. Yes, please see Collaboration Portal Q. The drawing appear to be 8 ½ x, where can we get a larger full sized set of the drawings? A. See attached full size pdfs of the contract drawings. I

2 Q5. Will you allow subs to re-visit a few empty apartments? If so when can that be scheduled? A5. Yes. A second pre-bid walkthrough will be held on Wednesday December 8 th at pm. Q. Are vouchers paid for by the Contractor? A. No. Q7. Include full description of patching and painting behind old radiator as required when the new radiator doesn t cover the hole? A7. Damaged wallboard behind radiators is to be repaired with wallboard joint compound and adhesive metal mesh patches whether or not the new radiator covers the damage per Abatement Key Note. Extent of priming and painting in room is between the HA and KBA. Q8. Is cutting and removal of base at new chase wall required? A8. Add the following sentence to Abatement Key Notes,, and 5 on Drawings HM.0, HM.0, and HM.0: "Remove vinyl base that will be covered by enclosure. Dispose of vinyl base as asbestos-contaminated waste." II

3 Page of 8 /7/0 General Decision Number: CT00 //0 CT Superseded General Decision Number: CT0500 State: Connecticut Construction Type: Building County: New Haven County in Connecticut. BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including stories). Note: Under Executive Order (EO) 58, an hourly minimum wage of $0.5 for calendar year 0 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January, 05. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $0.5 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 0. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at Modification Number Publication Date 0 0/08/0 0/5/0 0//0 0/0/0 0/08/0 5 0/9/0 05//0 7 0/7/0 8 07/0/0 9 07/08/0 0 07//0 08//0 08//0 09/0/0 //0 ASBE /0/0 ASBESTOS WORKER/HEAT & FROST INSULATOR...$ * BOIL /0/0 BOILERMAKER...$ 8..0 BRCT /0/0

4 Page of 8 /7/0 TILE SETTER...$.0.5 BRCT /0/0 BRICKLAYER...$.8 9. PAID HOLIDAY: Employees shall receive hours for Christmas Eve holiday provided the employee works the regularly scheduled day before and after the holiday. Employers may schedule work on Christmas Eve and employees shall receive pay for actual hours worked on that day in addition to holiday pay. BRCT /0/0 CEMENT MASON/CONCRETE FINISHER (Including Caulking)...$.8 9. PAID HOLIDAY: Employees shall receive hours for Christmas Eve holiday provided the employee works the regularly scheduled day before and after the holiday. Employers may schedule work on Christmas Eve and employees shall receive pay for actual hours worked on that day in addition to holiday pay. BRCT /0/0 TILE FINISHER...$ CARP /0/0 CARPENTER (Including Drywall Hanging, Acoustical Ceiling Installation, Soft Floor/Carpet Laying, Metal Stud Installation and Form Work)...$.00. CARP /0/0 MILLWRIGHT...$.7.8 ELEC /0/05

5 Page of 8 /7/0 LINE CONSTRUCTION Groundman...$.99.5%+.8 Linemen/Cable Splicer...$ 5..5%+0.70 ELEC /0/0 Entire County excluding Beacon Falls, Middlebury, Milford, Naugatuck, Oxford, Prospect, Seymour, Southbury, Waterbury and Wolcott Townships ELECTRICIAN (Including Low Voltage Wiring)...$ 7.50 %+5.0 ELEC /0/0 Beacon Falls, Middlebury, Milford, Naugatuck, Oxford, Prospect, Seymour, Southbury, Waterbury and Wolcott Townships ELECTRICIAN (Including Low Voltage Wiring)...$ 8.0 %+.75 ELEV /0/0 ELEVATOR MECHANIC...$ a+b FOOTNOTE: a.vacation: %/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked. b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day. ENGI /0/0 POWER EQUIPMENT OPERATOR: Asphalt Paver; Asphalt Spreader; Concrete Pump...$.5.55 Asphalt Roller...$ Backhoe/Excavator cubic yards and over...$ Backhoe/Excavator under cubic yards; Bulldozer Fine Grade; Grader/Blade; Rubber Tire Backhoe/Excavator...$ Bobcat/Skid Loader; Forklift...$ Bulldozer (Rough Grade

6 Page of 8 /7/0 Dozer)...$.0.55 Crane handling or erecting structural steel or stone...$ Cranes (00 ton capacity & over)...$ Cranes (under 00 ton rated capacity)...$ Earth Roller; Vibratory Hammer...$ Front End Loader ( cubic yards up to 7 cubic yards)..$.0.55 Front End Loader (7 cubic yards or over)...$ Front End Loader (under cubic yards)...$ Maintenance Engineer/Oiler..$ Mechanic...$ PAID HOLIDAYS: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, provided the employee works days during the week in which the holiday falls, if scheduled, and if scheduled, the working day before and the working day after the holiday. Crane with boom, including jib, 50 feet - $.50 extra. Crane with boom, including jib, 00 feet- $.50 extra. Crane with boom, including jib, 50 feet - $5.00 extra. Crane with boom, including jib, 00 feet - $7.00 extra. Crane with boom, including jib, 00 feet - $0.00 extra. All Cranes: When crane operator is operating equipment that requires a fully licensed crane operator to operate he receives an extra $.00 premium in addition to the hourly wage rate and benefit contributions: ) Crane handling or erecting structural steel or stone, hoisting engineer( drums or over) ) Cranes(00 ton rated capacity and over) Bauer Drill/Caisson ) Cranes(under 00 ton rated capacity) IRON /7/0 IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL...$ PAID HOLIDAY: Labor Day provided employee has been on the payroll for the 5 consecutive work days prior to Labor Day. LABO /0/0 LABORER Common/General Laborer...$ Fence Erector...$

7 Page 5 of 8 /7/0 Mason Tender (Brick/Concrete/Cement)...$ PAIN00-0 0/0/0 GLAZIER...$ a a. PAID HOLIDAYS: Labor Day and Christmas Day. PAIN /0/0 PAINTER Brush and Roller...$ Drywall Finishing/Taping...$ Paperhanger...$ Spray...$ PLUM /0/0 PIPEFITTER (Including HVAC Pipe Installation)...$ PLUM /0/0 PLUMBER (Excluding HVAC Pipe Installation)...$ ROOF /0/0 Cheshire, Meriden, Wallingford, Wolcott ROOFER Composition...$ Slate and Tile...$ ROOF /0/0 Ansonia, Beacon Falls, Bethany, Branford, Derby, East Haven, Guilford, Hamden, Madison, Middlebury, Milford, Naugatuck, New Haven, North Branford, North Haven, Orange, Prospect, Seymour, Southbury, Union City, Waterbury, WestHaven, Woodbridge Roofers: Cole Tar Pitch...$ 0.00 Slate, Tile, Composition, Shingles, Single Ply and Damp/Waterproofing...$ a 5.00+a

8 Page of 8 /7/0 a. PAID HOLIDAYS: July th, Labor Day and Christmas Day provided the employee is employed 5 days prior to the holiday. SFCT /0/0 SPRINKLER FITTER (Fire Sprinklers)...$ PAID HOLIDAYS: Memorial Day, July th, Labor Day, Thanksgiving Day and Christmas Day, provided the employee has been in the employment of a contractor 0 working days prior to any such paid holiday. SHEE /0/0 SHEETMETAL WORKER, Including HVAC Duct Installation...$.00.5 SUCT /5/009 LABORER: Landscape...$ WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ================================================================ Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (9CFR 5.5 (a) () (ii)). The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate). Union Rate Identifiers A four letter classification abbreviation identifier enclosed

9 Page 7 of 8 /7/0 in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM /0/0. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 098 indicates the local union number or district council number where applicable, i.e., Plumbers Local 098. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/0/0 is the effective date of the most current negotiated rate, which in this example is July, 0. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA //0. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 0 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5//0 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 00% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH /9/0. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 000 in the example, is an internal number used in producing the wage determination. 08/9/0 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/cba rate of the union locals from which the rate is based. WAGE DETERMINATION APPEALS PROCESS

10 Page 8 of 8 /7/0.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in.) and.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 00 Constitution Avenue, N.W. Washington, DC 00.) If the answer to the question in.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 9 CFR Part.8 and 9 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 00 Constitution Avenue, N.W. Washington, DC 00 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue..) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 00 Constitution Avenue, N.W. Washington, DC 00.) All decisions by the Administrative Review Board are final. ================================================================ END OF GENERAL DECISION

11

12 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT KENNETH BOROSON ARCHITECTS 5 Peck Street New Haven, CT p f ENVIROMED SERVICES, INC. ASBESTOS CONSULTANT 70 MURDOCK AVE, MERIDEN, CT BID DOCUMENTS

13 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT KENNETH BOROSON ARCHITECTS 5 Peck Street New Haven, CT p f ENVIROMED SERVICES, INC. ASBESTOS CONSULTANT 70 MURDOCK AVE, MERIDEN, CT BID DOCUMENTS

14 PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT KENNETH BOROSON ARCHITECTS 5 Peck Street New Haven, CT p f ENVIROMED SERVICES, INC. ASBESTOS CONSULTANT 70 MURDOCK AVE, MERIDEN, CT BID DOCUMENTS

15

16

17

18 . NOTES BELOW ARE NOT INTENDED TO REPLACE SPECIFICATIONS. SEE SPECIFICATIONS FOR REQUIREMENTS IN ADDITION TO GENERAL NOTES.. CONTRACTOR SHALL VISIT THE SITE AND BECOME INFORMED AS TO THE NATURE AND SCOPE OF WORK REQUIRED BY CONTRACT DOCUMENTS PRIOR TO BIDDING PROJECT.. PROVIDE ALL REQUIRED MATERIALS, LABOR, EQUIPMENT, AND SERVICES NECESSARY FOR THE INSTALLATION OF THE WORK AS SHOWN ON THESE DRAWINGS OR SPECIFIED BY THE BASE BUILDING DRAWING AND SPECIFICATIONS.. REFER TO AND CAREFULLY CHECK ARCHITECTURAL, ELECTRICAL, AND MECHANICAL DRAWINGS AND DETAILS, NOTES, LOCATIONS WHERE WALLS, PARTITIONS, CEILINGS, AND OTHER SURFACES ARE FURRED, LOCATIONS OF SHAFTS, SOFFITS, AND CONFLICTS WITH WORK OF OTHER TRADES, AND ARRANGE WORK ACCORDINGLY. FURNISH ALL OFFSETS, DAMPERS, CONNECTORS, ETC., REQUIRED TO MEET SUCH CONDITIONS. 5. DUE TO SCALE OF DRAWINGS, ALL REQUIRED OFFSETS, DAMPERS, ETC., MAY NOT BE INDICATED.. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND ARRANGE FOR ALL REQUIRED INSPECTIONS IN ACCORDANCE WITH STATE AND LOCAL GOVERNING CODES. 7. THE TERM "PROVIDE" SHALL MEAN "TO FURNISH, INSTALL, AND CONNECT COMPLETELY". 8. TURN OVER TO THE OWNER ALL MANUFACTURER'S WARRANTIES FOR EQUIPMENT AND MATERIALS PROVIDED. 9. WHERE THE CONTRACTOR PROPOSES TO USE AN ITEM OF EQUIPMENT OTHER THAN THAT SPECIFIED OR DETAILED ON THE DRAWINGS WHICH REQUIRES ANY REDESIGN OF THE STRUCTURE, PARTITIONS, FOUNDATIONS, PIPING, WIRING OR ANY OTHER PART OF THE MECHANICAL, ELECTRICAL OR ARCHITECTURAL LAYOUT, ALL SUCH REDESIGN AND ALL NEW DRAWINGS AND DETAILING REQUIRED THEREFORE, SHALL BE PREPARED AT THE CONTRACTOR'S EXPENSE AND ARE SUBJECT TO THE REVIEW AND APPROVAL OF THE OWNER OR HIS AUTHORIZED REPRESENTATIVE. OWNER RESERVES THE RIGHT TO HAVE THE ARCHITECT OR ENGINEER OF HIS CHOICE PREPARE ANY REDESIGN WORK AT THE CONTRACTOR'S EXPENSE. 0. CONTRACTOR SHALL COORDINATE ELECTRICAL REQUIREMENTS OF MECHANICAL EQUIPMENT WITH DIVISION.. ALL WORK SHALL BE DONE WITH LICENSED WORKMEN IN ACCORDANCE WITH STATE AND LOCAL GOVERNING AUTHORITIES.. BEFORE SELECTING MATERIAL AND EQUIPMENT, AND PROCESSING THE WORK, INSPECT AREAS WHERE MATERIAL AND EQUIPMENT ARE TO BE INSTALLED TO INSURE SUITABILITY AND CHECK NEEDED SPACE FOR PLACEMENT AND CLEARANCES.. BEFORE CUTTING AND DRILLING INTO BUILDING ELEMENTS, INSPECT AND LAYOUT WORK TO AVOID DAMAGING STRUCTURAL ELEMENTS AND BUILDING UTILITIES.. CONTRACTOR RESPONSIBLE FOR REPAIR AND PAYMENT FOR ALL UTILITIES DAMAGED DURING CONSTRUCTION. 5. FOLLOW MANUFACTURER'S RECOMMENDATIONS FOR INSTALLATION OF PROVIDED EQUIPMENT.. ALL SHOP DRAWINGS OF INDIVIDUAL COMPONENTS ARE TO BE SUBMITTED AS A COMPLETE PACKAGE. 7. HVAC DRAWINGS DO NOT NECESSARILY SHOW ALL CONDITIONS OF BUILDING. CONTRACTOR TO USE ALL DRAWINGS AND SPECIFICATIONS OF CONTRACT DOCUMENTS AND INSPECTION OF FIELD CONDITIONS FOR DIVISION. 8. HVAC PLANS, DETAILS AND ONE LINE DIAGRAMS SHOW THE GENERAL LOCATION AND ARRANGEMENT OF THE SYSTEM. THESE ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS, HANGERS, ACCESS DOORS, ETC. WHICH THE CONTRACTOR MUST PROVIDE TO COMPLETE THE SYSTEM. 9. ALL WORK IN INTERIOR FINISHED SPACES EXCEPT INDICATED IS TO BE CONCEALED ABOVE CEILING. PROVIDE ALL NECESSARY CUTTING, PATCHING, REPAINTING AND/OR REPLACEMENT OF FINISHES AS REQUIRED TO PERFORM COORDINATE WITH OTHER DIVISIONS. 0. IF MANUFACTURER OF EQUIPMENT REQUIRES LARGER CAPACITY CIRCUITRY AND/OR EQUIPMENT THE CONTRACTOR SHALL PROVIDE SUCH CAPACITY AND/OR EQUIPMENT UNDER THIS CONTRACT AT NO COST TO THE OWNER.. DO NOT SCALE DRAWINGS. CHECK EXISTING SPACE CONDITIONS AT THE JOB SITE.. DO NOT PENETRATE STAIR WALLS WITH ANY UTILITIES OR CONDUIT EXCEPT FOR UTILITIES SPECIFICALLY SERVING THAT STAIR.. PROVIDE FLEXIBLE JOINTS ON ALL PIPING AND DUCTWORK WHERE PENETRATING ALL BUILDING EXPANSION JOINTS.. PROVIDE FLEXIBLE CONNECTIONS BETWEEN MECHANICAL EQUIPMENT AND DUCTWORK AND PIPING. 5. REFER TO SPECIFICATION FOR ALL MATERIALS AND METHODS FOR PENETRATION THROUGH FIRE AND SMOKE RATED ASSEMBLIES.. NO THREADED FITTINGS -/" AND LARGER ALLOWED FOR HYDRONIC HVAC PIPING. 7. CONTRACTOR SHALL SELECT AND PROVIDE EXPANSION JOINTS OR EXPANSION LOOPS AND ANCHORS AS REQUIRED TO PREVENT TEMPERATURE EXPANSION STRESSES OF HYDRONIC PIPES BASED ON ACTUAL INSTALLATION/CONDITIONS. 8. ELECTRICAL CHARACTERISTICS FOR MECHANICAL EQUIPMENT: EQUIPMENT OF HIGHER ELECTRICAL CHARACTERISTICS MAY BE FURNISHED PROVIDED SUCH PROPOSED EQUIPMENT IS APPROVED IN WRITING AND CONNECTING ELECTRICAL SERVICES, CIRCUIT BREAKERS, AND CONDUIT SIZES ARE APPROPRIATELY MODIFIED. IF MINIMUM ENERGY RATINGS OR EFFICIENCIES ARE SPECIFIED, EQUIPMENT SHALL COMPLY WITH REQUIREMENTS. 9. ANY MATERIALS EXPOSED WITHIN THE PLENUM MUST BE NONCOMBUSTIBLE OR HAVE A MAXIMUM FLAME SPREAD INDEX OF 5 AND A MAXIMUM SMOKE-DEVELOPED INDEX OF 50 WHEN TESTED IN ACCORDANCE WITH ASTM E8. 0. ALL PENETRATIONS FOR THE INSTALLATION OF THE MECHANICAL SYSTEMS SHALL BE CAULKED AND SEALED FOR SMOKE AND FIRE AS REQUIRED.. THIS CONTRACT SHALL INCLUDE ALL THE NECESSARY PIPING, FITTINGS, TRANSITIONS ETC. AS NECESSARY TO INSTALL MECHANICAL SYSTEM, AND TO AVOID ANY CONFLICTS WITH OTHER TRADES AND THE BUILDING STRUCTURE.. IT IS NOT INTENDED THAT THE DRAWINGS SHOW EVERY PIPE, FITTING, RISE/DROP OR DETAIL. SYSTEM & COMPONENTS SHALL BE INSTALLED ACCORDING TO THE INTENT AND MEANING OF CONTRACT DOCUMENTS AND IN ACCORDANCE WITH GOOD PRACTICE AND WITH APPLICABLE CODES AND ORDINANCES.. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ELBOWS, TEES, DROPS, AND MISCELLANEOUS PIPING DUE TO ELEVATION CHANGES, OBSTRUCTIONS, COORDINATION WITH OTHER TRADES, ETC. TO INSTALL A COMPLETE, FUNCTIONING, MECHANICAL SYSTEM.. EQUIPMENT AND PIPING TO BE INSTALLED IN ACCORDANCE WITH SEISMIC REQUIREMENTS FOR THE INTERNATIONAL BUILDING CODE. 5. THE TERM "REMOVE" SHALL MEAN TO "REMOVE AND DISPOSE OF.". DETAIL MAJOR ELEMENTS, COMPONENTS, AND SYSTEM OF MECHANICAL EQUIPMENT AND MATERIALS IN RELATIONSHIPS WITH OTHER SYSTEMS, INSTALLATIONS, AND BUILDING COMPONENTS. SHOW SPACE REQUIREMENTS FOR INSTALLATION AND ACCESS. INDICATE IF SEQUENCE AND COORDINATION ARE IMPORTANT TO EFFICIENT FLOW OF THE WORK. INCLUDE THE FOLLOWING. A. PLANNED PIPING LAYOUT, INCLUDING VALVE AND SPECIALTY LOCATIONS AND VALVE-STEM MOVEMENT. B. CLEARANCES FOR INSTALLING AND MAINTAINING INSULATION. C. CLEARANCES FOR SERVING AND MAINTAINING EQUIPMENT, ACCESSORIES, AND SPECIALTIES, INCLUDING SPACE FOR DISASSEMBLY REQUIRED BY PERIODIC MAINTENANCE. D. EQUIPMENT AND ACCESSORY SERVICE CONNECTIONS AND SUPPORT DETAILS. E. EXTERIOR WALL AND FOUNDATION PENETRATIONS. F. FIRE-RATED WALL AND FLOOR PENETRATION. G. SIZES AND LOCATION OF REQUIRED CONCRETE PADS AND BASES. H. SCHEDULING, SEQUENCING, MOVEMENT, AND POSITIONING OF EQUIPMENT INTO BUILDING DURING CONSTRUCTION. I. FLOOR PLANS, ELEVATIONS, AND DETAILS TO INDICATE PENETRATIONS, FLOORS, WALLS, AND CEILINGS AND THEIR RELATIONSHIP TO OTHER PENETRATIONS AND INSTALLATIONS. J. ACCESS DOOR AND ACCESS PANEL LOCATIONS, WITH FIRE-RATINGS REQUIRED TO MAINTAIN FIRE RATING OF CONSTRUCTION, IN LOCATIONS AS REQUIRED FOR PROPER ACCESS FOR MAINTENANCE ADJUSTMENT, REPAIR AND REMOVAL OF ALL EQUIPMENT AND DEVICES. K. SCALE: MINIMUM /"='-0" FOR FLOOR PLAN, /8"='-0" FOR MECHANICAL ROOMS. A AD AHU AS AFF ATS B BAL BHP BMS BTU C C-C C-W CA CFM CF CO CW CV CUH DB DIA OR Ø DHW DN EA EAT EF ESP ET EWT SYMBOL X AMP ACCESS DOOR AIR HANDLING UNIT AIR SEPARATOR ABOVE FINISH FLOOR AUTOMATIC TRANSFER SWITCH BOILER BALANCE BREAK HORSEPOWER BUILDING MANAGEMENT SYSTEM BRITISH THERMAL UNIT CONDUIT COLUMN ENCLOSURE TO COLUMN ENCLOSURE COLUMN ENCLOSURE TO WALL COMBUSTION AIR CUBIC FEET PER MINUTE CHEMICAL FILL SYSTEM CLEAN OUT DOMESTIC COLD WATER CONTROL VALVE CABINET UNIT HEATER DRY BULB DIAMETER DOMESTIC HOT WATER HEATER DOWN EXHAUST AIR ENTERING AIR TEMPERATURE EXHAUST FAN EXTERNAL STATIC PRESSURE EXPANSION TANK ENTERING WATER TEMPERATURE GV HWR HWS HWR HWS X X X X X HWR X HWS G X X X DESCRIPTION GAS VENT PIPING HOT WATER RETURN PIPING D DRAIN PIPING HOT WATER SUPPLY PIPING HOT WATER RETURN PIPING TO REMAIN HOT WATER SUPPLY PIPING TO REMAIN GAS PIPING PIPING DIRECTION OF FLOW PIPING RISER UP PIPING RISER DOWN BRANCH/BOTTOM CONNECTION GAS COCK EX EXISTING TO REMAIN EXH EXHAUST EXP EXPANSION FC FLEXIBLE CONNECTOR FLG FLANGE F DEGREES FAHRENHEIT FPS FEET PER SECOND FS FLOW SWITCH FT FEET FTR FIN-TUBE RADIATION GA GAUGE GP GLYCOL PUMP/TANK SYSTEM GPM GALLONS PER MINUTE H HUMIDISTAT HC HEATING COIL HD HEAD HP HORSEPOWER HT HEIGHT HWR HOT WATER RETURN HWS HOT WATER SUPPLY HWS&R HOT WATER SUPPLY & RETURN HZ HERTZ ID INSIDE DIAMETER IN INCHES KVA KILLOVOLT AMPERE KW KILOWATTS L LENGTH LAT LEAVING AIR TEMPERATURE LB POUNDS LWT LEAVING WATER TEMPERATURE MD MOTORIZED DAMPER MAX MAXIMUM MBH THOUSAND BTU/HOUR MIN MINIMUM NG NATURAL GAS NO NUMBER NRS NON-RISING STEM NTS NOT TO SCALE OA OUTSIDE AIR OBD OPPOSED BLADE DAMPER OCPD OVER CURRENT PROTECTION DEVICE OED OPEN END DUCT, TERMINATE WITH STAINLESS STEEL BIRD SCREEN OS&Y OUTSIDE STEM & YOKE HOT WATER RETURN PIPING TO BE REMOVED HOT WATER SUPPLY PIPING TO BE REMOVED BELOW FLOOR PIPING P PH PNL POS PRESS PRV PS PSI RH RPM SF SP SV TEMP T TS TYP UH VD VT V VA W-W W-C W WB WG WH WT PUMP PHASE PANEL POSITIVE PRESSURE PRESSURE RELIEF VALVE PRESSURE SWITCH POUNDS PER SQUARE INCH RELATIVE HUMIDITY REVOLUTIONS PER MINUTE SUPPLY FAN STATIC PRESSURE SOLENOID VALVE TEMPERATURE THERMOSTAT TEMPERATURE SENSOR TYPICAL UNIT HEATER VOLUME DAMPER VENT VOLTS VOLTAGE AMPS WALL TO WALL WALL TO COLUMN ENCLOSURE WATTS WET BULB WATER GAUGE WATER HEATER WEIGHT M BALL VALVE BALANCING VALVE BUTTERFLY VALVE GATE VALVE ANGLE GATE VALVE GLOBE VALVE ISOLATION VALVE (REFER TO SPECS FOR TYPE) ANGLE GLOBE VALVE TWO WAY MOTORIZED CONTROL VALVE THREE WAY MOTORIZED CONTROL VALVE OS & Y MOTORIZED VALVE SAFETY RELIEF VALVE (PRESS.) (PRESSURE & TEMPERATURE) QUICK CLOSING LEVER VALVE PRV - PRESSURE REDUCING VALVE GAS COCK CHECK VALVE BACKFLOW PREVENTER HOSE END DRAIN HOSE BIB FLEXIBLE CONNECTION (PIPING) FLEXIBLE JOINT TRANSITION CAP PIPE CONNECTION, BOTTOM PIPE CONNECTION, TOP PIPE COUPLING (JOINT) ELBOW, 90 ELBOW, 5 PIPE TEE, OUTLET DOWN PIPE TEE, OUTLET UP PIPE UNION, SCREWED PIPE UNION, FLANGE M OR H O T P OR BA BD GBD OR # TS T XX XX MD DN UP D S TEMPERATURE/CO COMBINATION SENSOR WATER FLOW METER AIR VENT, AUTOMATIC AIR VENT, MANUAL PUMP STRAINER HUMIDISTAT/SENSOR OCCUPANCY SENSOR PRESSURE GAUGE WITH COCK VALVE RETURN / EXHAUST GRILLE THERMOSTAT/SENSOR PRESSURE SENSOR MOTORIZED DAMPER BAROMETRIC DAMPER BACKDRAFT DAMPER GRAVITY BACKDRAFT DAMPER RECTANGULAR TO RECTANGULAR OR ROUND TO ROUND RECTANGULAR TO ROUND TRANSITION VOLUME DAMPER THERMOMETER CONNECT PROVIDED PIPING/DUCT TO EXISTING PIPING/DUCT DISCONNECT PIPING/DUCT FROM EXISTING PIPING/DUCT MECHANICAL NOTE REFERENCE, NUMBER INDICATES NOTE DIRECTION OF FLOW PITCH DOWN IN DIRECTION OF FLOW PITCH UP IN DIRECTION OF FLOW PIPING FLEX CONNECTION (DUCTWORK) TEMPERATURE SENSOR FT OR RP EQUIPMENT TAG ACTIVE LENGTH (FT) KENNETH BOROSON ARCHITECTS 5 Peck Street New Haven, CT p f Whitney Avenue - Hamden Center II - Hamden CT 058 Ph: Fax: GAS PRESSURE REGULATOR PIPE UNION, SWEAT FIN TUBE RADIATOR S GAS SOLENOID VALVE PIPE ELBOW, TURNED DOWN HR-# HEATING RISER DESIGNATION PIPE ELBOW, TURNED UP PIPE TEE DIRT TRAP. MEASURE HOT WATER FLOW TO EACH INDIVIDUAL RISER PRIOR TO BEGINNING WORK LISTED BELOW.. REMOVE EXISTING FIN TUBE RADIATION.. PROVIDE NEW FIN TUBE RADIATION.. PROVIDE NEW ISOLATION VALVES ON HOT WATER SUPPLY AND RETURN PIPING AT RADIATORS. 5. PROVIDE NEW MANUAL CONTROL VALVES AT RADIATORS. MANUAL CONTROL VALVES TO BE DANFOSS MODEL RA-000 (OR APPROVED EQUAL) CONTROL VALVES WITH VALVE MOUNTED DIALS AND SENSORS. REMOTE SENSORS TO BE USED WHERE VALVES ARE LOCATED IN A CLOSET, OR PIPING DOES NOT ALLOW INSTALLATION OF VALVE MOUNTED SENSORS WITHIN SPACE SERVED BY RADIATOR.. PROVIDE NEW CABINET UNIT HEATERS IN STAIRWAYS. 5. PROVIDE NEW PIPING INSULATION FOR ALL EXPOSED PIPING IN TENANT SPACES. EXPOSED PIPING IN TENANT SPACES IS DEFINED AS ANY HEATING HOT WATER PIPING NOT WITHIN THE NEW RADIATOR ENCLOSURES, AND NOT WITHIN ANY WALLS, CEILINGS, OR SOFFITS. INSULATION TO INCLUDE A PVC JACKET.. PROVIDE NEW PIPING INSULATION FOR ALL PIPING ENCOUNTERED DURING WORK. SEE PLANS AND RELATED NOTES. 7. PROVIDE NEW INSULATION AND PVC JACKET FOR THE HOT WATER RISERS IN THE STAIRWAYS. 8. PROVIDE NEW FIRE STOPPING AT ALL HWS & HWR FLOOR PENETRATIONS. 9. RE-BALANCE HEATING SYSTEM. SHEET NAME MP.00 MECHANICAL SYMBOLS, NOTES, & ABBREVIATIONS M.00 MECHANICAL BASEMENT PLAN M.0 MECHANICAL GROUND FLOOR PLAN M.0 MECHANICAL SECOND & THIRD FLOOR PLAN M.0 MECHANICAL FOURTH THROUGH FIFTEENTH FLOOR PLAN M.00 MECHANICAL DETAILS AND SCHEDULES

19 KENNETH BOROSON ARCHITECTS 5 Peck Street New Haven, CT p f NEW WORK NOTES: GENERAL NOTES: Whitney Avenue - Hamden Center II - Hamden CT 058 Ph: Fax: H- ABOVE H- ABOVE A. LOCATIONS OF HOT WATER SUPPLY AND RETURN RISERS AND PIPING SHALL BE FIELD INSPECTED AND VERIFIED BY THE CONTRACTOR IN THE FIELD. RISER LOCATIONS AND PIPING ON THIS PLAN ARE SHOWN FOR REFERENCE ONLY. H-8 H-9 H-5 H- H-7 (E) "HWR H- (E) "HWR (E) 5"HWR (E)5" HWS H- H-0 H- H- H-5 H- H- H-

20 KENNETH BOROSON ARCHITECTS NEW WORK NOTES: GENERAL NOTES: 5 Peck Street New Haven, CT p f A. LOCATIONS OF HOT WATER SUPPLY AND RETURN RISERS SHALL BE FIELD INSPECTED AND VERIFIED BY THE CONTRACTOR IN THE FIELD. B. COORDINATE ALL WORK WITH HAZARDOUS MATERIALS (HM) DRAWINGS. PERFORM THE FOLLOWING WORK: EXISTING RISER H- A. REMOVE EXISTING FIN-TUBE AND PROVIDE NEW FIN-TUBE PER MECHANICAL SCHEDULES. REMOVE EXISTING PIPING FROM LOCATION OF NEW VALVES TO EXISTING FIN-TUBE. B. PROVIDE NEW ISOLATION VALVES ON HOT WATER SUPPLY & RETURN SERVING EACH RADIATOR. ISOLATION VALVES TO BE INSTALLED TO ALLOW REMOVAL OF NEW CONTROL VALVES. C. PROVIDE NEW MANUAL CONTROL VALVES AT EACH RADIATOR. MANUAL CONTROL VALVES TO BE DANFOSS MODEL RA-000 (OR APPROVED EQUAL) CONTROL VALVES WITH VALVE MOUNTED DIALS AND SENSORS. REMOTE SENSORS TO BE USED WHERE VALVES ARE LOCATED IN A CLOSET, OR PIPING DOES NOT ALLOW INSTALLATION OF VALVE MOUNTED SENSORS WITHIN SPACE SERVED BY RADIATOR. Whitney Avenue - Hamden Center II - Hamden CT 058 Ph: Fax: EXISTING RISER H- PROVIDE NEW PIPING INSULATION FOR ALL PIPING ENCOUNTERED DURING WORK. EXPOSED PIPING, INCLUDING ALL PIPING WITHIN CLOSETS, TO INCLUDE A PVC JACKET. SEE HAZARDOUS MATERIALS (HM) DRAWINGS. EXISTING FIN-TUBE TO BE REMOVED AND REPLACED. PROVIDE NEW FIRE STOPPING AT ALL HWS & HWR FLOOR PENETRATIONS. 5 REMOVE EXISTING AND PROVIDE NEW CABINET UNIT HEATER WITH INTEGRAL THERMOSTAT AND LOCKING ACCESS DOORS. PROVIDE NEW INSULATION AND VAPOR BARRIER ON EXISTING RISER PIPING. PROVIDE CHASE AROUND EXISTING RISER. EXISTING RADIATOR TO REMAIN 7 PROVIDE NEW INSULATION, VAPOR BARRIER, AND PVC JACKET ON EXISTING EXPOSED RISER PIPING. 8 PROVIDE NEW ISOLATION VALVES AND CONTROL VALVES IN BASEMENT / CRAWL SPACE BELOW. INSTALL REMOTE MOUNTED SENSOR. EXISTING RISER H-8 PROVIDE INSULATION AND VAPOR BARRIER FOR ALL PIPING AT CEILING OF LAUNDRY ROOM, AND FOR EXISTING RISER DOWN TO BASEMENT CRAWL SPACE. EXISTING RISER H-5 7 EXISTING RISER H-9 7'-0" 5 CUH - EXISTING RISER H- 7 HWS&R DOWN RELOCATE PIPING AND PENETRATION AS REQUIRED TO INSTALL NEW RADIATOR FT- '-" 8 FT-5 '-0" EXISTING RISER H-7 CUH- 5 FT- '-0" EXISTING RISER H- HWS&R DN '-" 7 EXISTING RISER H- PROVIDE HWS&R PIPE ENCLOSURE HWS&RE FT-5 7'-0" FT-5 7'-0" APT TYPE K 700 SQ. FT FT- '-" EXISTING RISER H-0 EXISTING RISER H- EXISTING RISER H-5 EXISTING RISER H- 5'-0" '-" HWS&R PROVIDE ENCLOSURE '-" / HWS&RE PROVIDE ENCLOSURE EXISTING RISER H- EXISTING RISER H- HWS&RE EXISTING RISER H-

21 KENNETH BOROSON ARCHITECTS NEW WORK NOTES: GENERAL NOTES: 5 Peck Street New Haven, CT p f A. LOCATIONS OF HOT WATER SUPPLY AND RETURN RISERS SHALL BE FIELD INSPECTED AND VERIFIED BY THE CONTRACTOR IN THE FIELD. B. COORDINATE ALL WORK WITH HAZARDOUS MATERIALS (HM) DRAWINGS. PERFORM THE FOLLOWING WORK: EXISTING RISER H- EXISTING RISER H- '-0" ON RD FT- '-" ON ND '-0" 5 A. REMOVE EXISTING FIN-TUBE AND PROVIDE NEW FIN-TUBE PER MECHANICAL SCHEDULES. REMOVE EXISTING PIPING FROM LOCATION OF NEW VALVES TO EXISTING FIN-TUBE. B. PROVIDE NEW ISOLATION VALVES ON HOT WATER SUPPLY & RETURN SERVING EACH RADIATOR. ISOLATION VALVES TO BE INSTALLED TO ALLOW REMOVAL OF NEW CONTROL VALVES. C. PROVIDE NEW MANUAL CONTROL VALVES AT EACH RADIATOR. MANUAL CONTROL VALVES TO BE DANFOSS MODEL RA-000 (OR APPROVED EQUAL) CONTROL VALVES WITH VALVE MOUNTED DIALS AND SENSORS. REMOTE SENSORS TO BE USED WHERE VALVES ARE LOCATED IN A CLOSET, OR PIPING DOES NOT ALLOW INSTALLATION OF VALVE MOUNTED SENSORS WITHIN SPACE SERVED BY RADIATOR. PROVIDE NEW PIPING INSULATION FOR ALL PIPING ENCOUNTERED DURING WORK. EXPOSED PIPING, INCLUDING ALL PIPING WITHIN CLOSETS, TO INCLUDE A PVC JACKET. SEE HAZARDOUS MATERIALS (HM) DRAWINGS. EXISTING FIN-TUBE TO BE REMOVED AND REPLACED. PROVIDE NEW FIRE STOPPING AT ALL HWS & HWR FLOOR PENETRATIONS. REMOVE EXISTING AND PROVIDE NEW CABINET UNIT HEATER WITH INTEGRAL THERMOSTAT AND LOCKING ACCESS DOORS. PROVIDE NEW INSULATION AND VAPOR BARRIER ON EXISTING RISER PIPING. PROVIDE CHASE AROUND EXISTING RISER. Whitney Avenue - Hamden Center II - Hamden CT 058 Ph: Fax: PROVIDE NEW INSULATION, VAPOR BARRIER, AND PVC JACKET ON EXISTING EXPOSED RISER PIPING. FT- '-" 8 PROVIDE NEW ISOLATION VALVES AND CONTROL VALVES IN BASEMENT / CRAWL SPACE BELOW. INSTALL REMOTE MOUNTED SENSOR. EXISTING RISER H-8 EXISTING RISER H-5 7 '-0" FT- '-" FOR ND '-0" FOR RD EXISTING RISER H-9 FT- '-0" EXISTING RISER H- 7 FT- '-" PROVIDE HWS&R PIPE ENCLOSURE FT- '-0" FT- '-0" ON RD EXISTING RISER H-7 FT-5 '-0" ON ND FT- '-0" PROVIDE HWS&R PIPE ENCLOSURE HWS&RE FT- '-0" EXISTING RISER H- FT- '-" HWS&R DN 7 EXISTING RISER H- / HWS&R PROVIDE ENCLOSURE HWS&R PROVIDE ENCLOSURE APT TYPE J 700 SQ. FT PROVIDE HWS&R PIPE ENCLOSURE HWS&RE '-" '-" '-" APT TYPE K 700 SQ. FT FT- '-" EXISTING RISER H-0 HWS&RE EXISTING RISER H- EXISTING RISER H-5 '-0" FOR ND 5'-" FOR RD EXISTING RISER H- HWS&R PROVIDE ENCLOSURE '-0" '-0" FOR ND '-" FOR RD '-" '-" EXISTING RISER H- HWS&R PROVIDE ENCLOSURE '-" HWS&RE / HWS&RE PROVIDE ENCLOSURE EXISTING RISER H- EXISTING RISER H-

22 NEW WORK NOTES: GENERAL NOTES: A. LOCATIONS OF HOT WATER SUPPLY AND RETURN RISERS SHALL BE FIELD INSPECTED AND VERIFIED BY THE CONTRACTOR IN THE FIELD. B. COORDINATE ALL WORK WITH HAZARDOUS MATERIALS (HM) DRAWINGS. KENNETH BOROSON ARCHITECTS 5 Peck Street New Haven, CT p f PERFORM THE FOLLOWING WORK: EXISTING RISER H- EXISTING RISER H- FT- '-0" '-0" A. REMOVE EXISTING FIN-TUBE AND PROVIDE NEW FIN-TUBE PER MECHANICAL SCHEDULES. REMOVE EXISTING PIPING FROM LOCATION OF NEW VALVES TO EXISTING FIN-TUBE. B. PROVIDE NEW ISOLATION VALVES ON HOT WATER SUPPLY & RETURN SERVING EACH RADIATOR. ISOLATION VALVES TO BE INSTALLED TO ALLOW REMOVAL OF NEW CONTROL VALVES. C. PROVIDE NEW MANUAL CONTROL VALVES AT EACH RADIATOR. MANUAL CONTROL VALVES TO BE DANFOSS MODEL RA-000 (OR APPROVED EQUAL) CONTROL VALVES WITH VALVE MOUNTED DIALS AND SENSORS. REMOTE SENSORS TO BE USED WHERE VALVES ARE LOCATED IN A CLOSET, OR PIPING DOES NOT ALLOW INSTALLATION OF VALVE MOUNTED SENSORS WITHIN SPACE SERVED BY RADIATOR. PROVIDE NEW PIPING INSULATION FOR ALL PIPING ENCOUNTERED DURING WORK. EXPOSED PIPING, INCLUDING ALL PIPING WITHIN CLOSETS, TO INCLUDE A PVC JACKET. SEE HAZARDOUS MATERIALS (HM) DRAWINGS. EXISTING FIN-TUBE TO BE REMOVED AND REPLACED. FT- '-0" EXISTING RISER H PROVIDE NEW FIRE STOPPING AT ALL HWS & HWR FLOOR PENETRATIONS. REMOVE EXISTING AND PROVIDE NEW CABINET UNIT HEATER WITH INTEGRAL THERMOSTAT AND LOCKING ACCESS DOORS. PROVIDE NEW INSULATION AND VAPOR BARRIER ON EXISTING RISER PIPING. PROVIDE CHASE AROUND EXISTING RISER. PROVIDE NEW INSULATION, VAPOR BARRIER, AND PVC JACKET ON EXISTING EXPOSED RISER PIPING. PROVIDE NEW ISOLATION VALVES AND CONTROL VALVES IN BASEMENT / CRAWL SPACE BELOW. INSTALL REMOTE MOUNTED SENSOR. '-0" FT- '-0" EXISTING RISER H-8 EXISTING RISER H-9 Whitney Avenue - Hamden Center II - Hamden CT 058 Ph: Fax: FT- '-0" EXISTING RISER H- 7 APT TYPE H FT- '-0" EXISTING RISER H-7 APT TYPE B FT- '-0" '-0" '-" '-0" ON TH FT- '-0" HWS&RE EXISTING RISER H- PROVIDE HWS&R PIPE ENCLOSURE FT- '-0" '-0" APT TYPE C APT TYPE D '-" '-0" ON TH EXISTING RISER H- / HWS&R PROVIDE ENCLOSURE HWS&R PROVIDE ENCLOSURE HWS&R PROVIDE ENCLOSURE HWS&RE '-0" '-" '-0" ON TH HWS&RE EXISTING RISER H- '-" '-" EXISTING RISER H-5 5'-" EXISTING RISER H- HWS&R PROVIDE ENCLOSURE '-0" '-" APT TYPE E '-" '-" APT TYPE F HWS&R PROVIDE ENCLOSURE HWS&RE '-" '-0" ON TH '-0" FT- '-0" EXISTING RISER H-0 EXISTING RISER H- HWS&RE EXISTING RISER H- EXISTING RISER H-

23 BKGD MASK TEXT KENNETH BOROSON ARCHITECTS 5 Peck Street New Haven, CT p f UNION (TYPICAL) MANUAL CONTROL VALVE SHUT-OFF VALVE BALANCING VALVE ECCENTRIC REDUCERS WHERE PIPE SIZE CHANGES " MIN CONNECT TO RISERS WALL SLANT TOP W/ PENCILPROOF LOUVER TAMPERPROOF DAMPER ELEMENT LENGTH PIPING DETAIL RETURN & ROLL PIPE HANGER IF REQUIRED ENCLOSURE ( GAUGE) BACK PANEL (0 GAUGE) COLOR BY ARCHITECT SCREW (TYPICAL) COPPER TUBE ALUMINUM FINS FLOOR NOTE: PROVIDE ACCESS DOORS ON ENCLOSURE FOR ALL CONCEALED VALVES MANUAL AIR VENT DRAIN LENGTH STOP WASHER 5^ SLACK SEISMIC RESTRAINT CABLES FULL NUTS CLEARANCE CLEARANCE TO STRUCTURE " MAX NOTE: US THIS DETAIL IF ROD LENGTH EXCEEDS TABLE HANGER LOCK NUTS TOGETHER AFTER SPRING ADJUSTMENT TO LEAVE CLEARANCE. PIPE SLEEVE PLAIN WASHER 5^ SLACK SEISMIC RESTRAINT CABLES PIPE, SEE DRAWING FOR TYPE AND SIZE HANGAR ROD TO SUPPORTING STRUCTURAL MEMBER "L" " (MAX) " (MAX) MAX STRUT CHANNEL & CONNECTION STRUT CHANNEL & BRACING LENGTH CLEARANCE 5^ SLACK SEISMIC RESTRAINT CABLES CLEARANCE TO STRUCTURE STOP WASHER HANGER LOCK NUTS TOGETHER AFTER SPRING ADJUSTMENT TO LEAVE CLEARANCE 5^ SLACK SEISMIC RESTRAINT CABLES PIPE, SEE DRAWINGS FOR TYPE AND SIZE DIAGONAL ANGLE MAX BOLT TO ANGLE HANGER ROD CLIP "L" ('-0" MAX) CONNECTION TO STRUCTURAL SUPPORTING MEMBER TO BE SAME FOR VERTICAL DIAGONAL AND LONGITUDINAL "L'S" EXPANSION ANCHORS SHOWN HERE FOR EXAMPLE ROD ADD PIPE SLEEVE WHEN THERMAL INSULATED PIPING IS USED DO NOT CONNECT BRACING OR HANGER DIRECTLY TO PIPE HANGER ROD SUPPORT FROM CEILING LOCKING NUT HEAVY DUTY CLEVIS HANGER SUPPORT NUT VAPOR BARRIER INSULATION CONDENSATE PIPING WELDED SADDLE Whitney Avenue - Hamden Center II - Hamden CT 058 Ph: Fax: M5.00 NOT TO SCALE M5.00 NOT TO SCALE M5.00 NOT TO SCALE M NOT TO SCALE M5.00 NOT TO SCALE M5.00 NOT TO SCALE UNIT MANUFACTURER MODEL FIN SIZE FINS / LF ROWS TUBE SIZE BTUH / LF COVER DEPTH / HEIGHT REMARKS MODINE MODEL S -/x-/ 50 -/ 80 5-/x FT- MODINE MODEL S -/x-/ 50 -/ 00 5-/x FT- MODINE MODEL S -/x-/ 50 -/ 70 5-/x8 FT- MODINE MODEL P -/x-/ 50 -/ /x FT-5 MODINE MODEL P -/x-/ 50 -/ 770 0x NOTES:. REFER TO PLANS FOR LENGTHS OF FIN-TUBE RADIATION.. MOUNTING OF ENCLOSURES TO BE PERFORMED BY HAZARDOUS MATERIALS CONTRACTOR UNDER SUPERVISION OF MECHANICAL CONTRACTOR.. ALL PERFORMANCE BASED ON 70 F AVERAGE WATER TEMPERATURE.. PROVIDE CORNER PIECES, END CAPS, AND OTHER ACCESSORIES WHERE REQUIRED. UNIT MANUFACTURER MODEL CAPACITY (MBH) MOTOR AND FAN WATER CFM HP RPM V-Ph-Hz GPM EWT F LWT F MAX PD FT EAT F LAT F REMARKS CUH- RITTLING RFRW / NOTES:. INCLUDE INTEGRAL THERMOSTAT AND LOCKING ACCESS DOOR FOR UNIT CONTROLS.

ATTACHMENT B. General Decision Number: SC /31/2017 SC15. Superseded General Decision Number: SC State: South Carolina

ATTACHMENT B. General Decision Number: SC /31/2017 SC15. Superseded General Decision Number: SC State: South Carolina General Decision Number: SC170015 03/31/2017 SC15 Superseded General Decision Number: SC20160015 State: South Carolina Construction Type: Building County: Beaufort County in South Carolina. ATTACHMENT

More information

ADDENDUM ADDENDUM NUMBER: One DATE: 30 October 2012

ADDENDUM ADDENDUM NUMBER: One DATE: 30 October 2012 ADDENDUM ADDENDUM NUMBER: One DATE: 30 October 2012 RE: Putnam County Emergency Services Disaster Response and Logistical Storage 410 S. State Road 19 Palatka, Florida Architect s Project No. 1132 FROM:

More information

INVITATION FOR BID TERMS AND CONDITIONS:

INVITATION FOR BID TERMS AND CONDITIONS: INVITATION FOR BID RE-ROOFING BUILDING at: Abingdon Child Development Center Early Head Start Roof Replacement 152 Highland Street, Abingdon, Virginia 24210. DESCRIPTION OF ITEMS: Notice is hereby given

More information

ADDENDUM NO. 1. Modernization of Two Elevators at 902 South L Street (Administration Building)

ADDENDUM NO. 1. Modernization of Two Elevators at 902 South L Street (Administration Building) ADDENDUM NO. 1 PROJECT: Modernization of Two Elevators at 902 South L Street (Administration Building) ADDENDUM DATED: February 23, 2017 DISTRIBUTION: To All current Bid Holders SUBJECT Addendum No. 1

More information

General Decision Number: WA /03/2017 WA100. Superseded General Decision Number: WA State: Washington

General Decision Number: WA /03/2017 WA100. Superseded General Decision Number: WA State: Washington General Decision Number: WA170100 03/03/2017 WA100 Superseded General Decision Number: WA20160100 State: Washington Construction Type: Heavy including water and sewer line construction County: Snohomish

More information

ATTACHMENT J.11 FORM OF OFFER LETTER

ATTACHMENT J.11 FORM OF OFFER LETTER ATTACHMENT J.11 FORM OF OFFER LETTER 1 General Decision Number: DC140002 01/03/2014 DC2 Superseded General Decision Number: DC20130002 State: District of Columbia Construction Type: Building County: District

More information

PROPOSED TASK ORDER: DESIGN-BID-BUILD FOR CONTRACTS:

PROPOSED TASK ORDER: DESIGN-BID-BUILD FOR CONTRACTS: NAVAL FACILITIES ENGINEERING COMMAND, MID ATLANTIC FEAD BEAUFORT BLDG 616 MOORE STREET BEAUFORT, SOUTH CAROLINA 29904 POC: Jeff Walker, jeffrey.a.walker1@navy.mil 843-228-8562 Alternate POC: Christine

More information

TYP. SINGLE PLY ROOFING ROOF SHEETING BROAN VENT CAP #10 x 1" GASKETED SMS TYP. 4 SIDES 8" FRAMED CURB HVAC SYSTEMS "BASIS OF DESIGN" ROOF INSULATION R-19 WALL INSULATION R-13 LIGHTING EFFIECNCY PER STANDARDS

More information

SECTION COOLING TOWER

SECTION COOLING TOWER PART 1 GENERAL 1.1 SECTION INCLUDES A. Mechanical induced draft Cooling Tower B. Controls C. Ladder and handrails 1.2 REFERENCES SECTION 23 65 00 COOLING TOWER A. ANSI/AFBMA 9 - Load Rating and Fatigue

More information

Connecticut Department of Labor Wage and Workplace Standards Division

Connecticut Department of Labor Wage and Workplace Standards Division Minimum Rates and Classifications for Building Construction ID# : B 22565 Connecticut Department of Labor Wage and Workplace Standards Division By virtue of the authority vested in the Labor Commissioner

More information

Design & Construction Standards, Revised January

Design & Construction Standards, Revised January PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Series Sump and Sewage Systems

Series Sump and Sewage Systems Series 000 Sump and Sewage Systems file no: 0. date: may 17, 13 supersedes: 0. date: march 29, 13 Series 000 Sump Series 0 & 2 Armstrong offers a complete range of high performance, easily maintained Column

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

CFFWA-20-1-U Chilled/Hot Water Universal Mount Fan Coil 2-Pipe Heat / Cool Fan Coil 60,000 BTUH

CFFWA-20-1-U Chilled/Hot Water Universal Mount Fan Coil 2-Pipe Heat / Cool Fan Coil 60,000 BTUH CFFWA-20-1-U Chilled/Hot Water Universal Mount Fan Coil 2-Pipe Heat / Cool Fan Coil 60,000 BTUH Rev. 1.3 HVAC Guide Specifications Chilled and Hot Water Universal Mount Fan Coil 2-Pipe Nominal Size: 60,000

More information

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION: SECTION 13 05 41 SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED 1-25-13 PART 1 GENERAL 1.1 DESCRIPTION: A. Provide seismic restraint in accordance with the requirements of this section

More information

ADDENDUM NO. 1. Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities

ADDENDUM NO. 1. Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities ADDENDUM NO. TO Mallory Valley Utility District Technical Specifications & Design Criteria for Water Supply & Distribution Facilities Date of Addendum: December, 00 Hethcoat & Davis, Inc. 78 Franklin Road,

More information

Buchanan, Buckingham, Buena Vista*, Carroll, Charlotte, Clifton. Forge*, Covington*, Craig, Cumberland, Dickenson, Floyd,

Buchanan, Buckingham, Buena Vista*, Carroll, Charlotte, Clifton. Forge*, Covington*, Craig, Cumberland, Dickenson, Floyd, General Decision Number: VA180128 01/05/2018 VA128 Superseded General Decision Number: VA20170128 State: Virginia Construction Type: Highway Counties: Alleghany, Appomattox, Augusta, Bath, Bland, Buchanan,

More information

REV. 9/08. Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms

REV. 9/08. Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms REV. 9/08 Mounting Structure PRE-INSTALLATION GUIDE for Ergon Skybooms SKYTRON MOUNTING STRUCTURES for Ceiling Mounted Equipment Foreword Skytron s objective is to provide a program and guideline to assist

More information

SPECIFICATIONS FOR THE INSTALLATION OF REDUCED PRESSURE BACKFLOW PREVENTERS AND CONCRETE VAULTS FOR METERS 4 AND LARGER

SPECIFICATIONS FOR THE INSTALLATION OF REDUCED PRESSURE BACKFLOW PREVENTERS AND CONCRETE VAULTS FOR METERS 4 AND LARGER SPECIFICATIONS FOR THE INSTALLATION OF REDUCED PRESSURE BACKFLOW PREVENTERS AND CONCRETE VAULTS FOR METERS 4 AND LARGER Updated January 2018 RP-2 Installation Specifications 1. In W.H.U.D s service area

More information

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018)

BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018) BASEMENT FINISH PERMIT AND BUILDING CODE REQUIREMENTS (REVISED 3/6/2018) PERMIT SUBMITTAL CHECKLIST: Signed and completed Building Permit application form. A separate Electrical permit is required from

More information

Lyndhurst Elementary School Renovation & Addition Secondary Technology Design Package

Lyndhurst Elementary School Renovation & Addition Secondary Technology Design Package Lyndhurst Elementary School Renovation & Addition Secondary Technology Design Package INVITATION TO BID PROJECT: Lyndhurst Elementary School Secondary Technology Package BID DUE DATE: AUGUST 23, 2017 TIME:

More information

MATERIAL ALLOWANCES AND UNIT PRICES

MATERIAL ALLOWANCES AND UNIT PRICES PART 1 - GENERAL 1.1 SECTION INCLUDES ADDITIONS AND RENOVATIONS TO WEST YORK AREA HIGH SCHOOL - #1231 SECTION 012200 MATERIAL ALLOWANCES AND UNIT PRICES A. Measurement and payment criteria applicable to

More information

SECTION VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT

SECTION VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT SECTION 220550 - VIBRATION ISOLATION FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL REQUIREMENTS 1.1 SUMMARY A. It is the intent of this specification to provide vibration isolation supports for Plumbing

More information

CONTACT LIST DOORS IN THE PATH OF EGRESS TRAVEL SHALL MEET THE REQUIREMENTS OF ICC / ANSI A117.1 : SECTION MANEUVERING CLEARANCES AT DOORS

CONTACT LIST DOORS IN THE PATH OF EGRESS TRAVEL SHALL MEET THE REQUIREMENTS OF ICC / ANSI A117.1 : SECTION MANEUVERING CLEARANCES AT DOORS DOORS TO EXTERIOR HAVE CLOSURES & LATCHES AND MEET THE REQUIREMENTS OF ICC / ANSI A7. : SECTION 404.2.7 DOOR HARDWARE SECTION 404.2.8 CLOSING SPEED SECTION 404.2.9 DOOR OPENING FORCE SECTION 404.2.5 TRESHOLDS

More information

2016 Wage Survey of Public and Private Construction Projects Building Construction Trades (Excludes Residential Construction)

2016 Wage Survey of Public and Private Construction Projects Building Construction Trades (Excludes Residential Construction) 2016 Wage Survey of Public and Private Construction Projects Building Construction Trades (Excludes Residential Construction) Please fill in for each craft that you have employed, the base wages plus fringe

More information

MINIMUM SPECIFICATIONS

MINIMUM SPECIFICATIONS MINIMUM SPECIFICATIONS A) GREENHOUSE STRUCTURE: (EDUCATOR) 30 X 96 Galvanized Steel Frame Consisting of: A. Column Post: Allied 2 x 4 Rectangle 6 Spacing B. Bows: Allied 2 x 3 Rectangle 6 Spacing C. Trusses:

More information

GENERAL PLAN REVIEW REQUIREMENTS

GENERAL PLAN REVIEW REQUIREMENTS GENERAL PLAN REVIEW REQUIREMENTS Cover Letter A letter (or an authorized pre-printed form) authorizing CCIS to perform the Plan Review is required. CCIS performs plan reviews for the ICC International

More information

Suspension Systems for Acoustical Lay-in Ceilings Seismic Design Categories D, E & F

Suspension Systems for Acoustical Lay-in Ceilings Seismic Design Categories D, E & F NWCB Technical Document SUSPENDED CEILINGS 401 Suspension Systems for Acoustical Lay-in Ceilings Seismic Design Categories D, E & F 10/09 This document has been revised based on current Building Code standards.

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

C. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers.

C. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-13 48 00.00 10 (October 2007) ---------------------------------- Preparing Activity: USACE Superseding UFGS-13 48 00.00 10 (April 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

More information

RESIDENTIAL BUILDING REQUIREMENTS

RESIDENTIAL BUILDING REQUIREMENTS RESIDENTIAL BUILDING REQUIREMENTS Residential Building Requirements This is an informational booklet with some of the general residential construction requirements taken from the codes adopted by Campbell

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

REQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS

REQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS REQUIREMENTS FOR INDOOR INSTALLATION OF PADMOUNTED TRANSFORMERS Introduction An applicant applying for permanent electric service who opts to have the padmounted transformers installed inside his building

More information

Section BUILDINGS, SHELTERS, ENCLOSURES

Section BUILDINGS, SHELTERS, ENCLOSURES Section 13121 BUILDINGS, SHELTERS, ENCLOSURES Part 1 GENERAL 1.1 SECTION INCLUDES 1.2 A. Pre-engineered buildings. B. Pre-engineered shelters. C. Pre-engineered enclosures. D. Electrical wiring and devices

More information

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect.

A. Codes and Standards that are standard at the University. C. Coordinate cleanout locations with Architect. PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING SECTION 221316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following soil and waste, sanitary drainage and vent piping inside the building: 1. Pipe, tube,

More information

SECTION PLUMBING PIPING SYSTEMS

SECTION PLUMBING PIPING SYSTEMS SECTION 15300 PLUMBING PIPING SYSTEMS PART 1 - GENERAL 1.01 SPECIAL NOTICE A. Each contractor shall read all relevant documents, become familiar with the job, the scope of work, type of general construction,

More information

SECTION HVAC DUCTS AND CASINGS

SECTION HVAC DUCTS AND CASINGS SECTION 23 31 00 HVAC DUCTS AND CASINGS PART 1 -GENERAL 1.1 SUMMARY A. Section includes metal ductwork, nonmetallic ductwork, casing and plenums, buried ductwork, kitchen hood ductwork, duct cleaning.

More information

ADDENDUM. Project: BYU-I Smith Building Chiller Replacement Project No.: Addendum No.: 1

ADDENDUM. Project: BYU-I Smith Building Chiller Replacement Project No.: Addendum No.: 1 ADDENDUM Project: BYU-I Smith Building Chiller Replacement Project No.: 11162 Addendum No.: 1 Project Address: BYU-Idaho Operations Building Rm. #213, Rexburg, Idaho 83460 Date: 2/18/16 Owner: BYU-Idaho

More information

RISER DETAIL NTS SHANNON FIRE PROTECTION, LLC SCALE: 3/32" = 1'-0"

RISER DETAIL NTS SHANNON FIRE PROTECTION, LLC SCALE: 3/32 = 1'-0 MAXIMUM DISTANCE BETWEEN HANGERS NOMINAL PIPE SIZE (in.) 3/4" 1" 1-1/4" 1-1/2" 2" 2-1/2" 3" 3-1/2" 4" 5" 6" 8" STEEL PIPE EXCEPT THREADED LIGHTWALL THREADED LIGHTWALL STEEL PIPE COPPER TUBE 10-0 10-0 CPVC

More information

UNDERGROUND SERVICES SECONDARY

UNDERGROUND SERVICES SECONDARY Reference UNDERGROUND SERVICES SECONDARY Underground services secondary... U- 1 General requirements for underground service... U- 2 Name of parts for underground service... U- 3 Conduit layouts... U-

More information

1. Vertical reciprocating conveyor, Hydraulic straddle VRC.

1. Vertical reciprocating conveyor, Hydraulic straddle VRC. PART 1: GENERAL 1.01 Section Includes: 1. Vertical reciprocating conveyor, Hydraulic straddle VRC. a. Machine, controller, platform, structural steel hoist frame. b. Wire mesh enclosure and gates. Related

More information

SECTION ACOUSTICAL PANEL CEILINGS

SECTION ACOUSTICAL PANEL CEILINGS SECTION 095113 ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Construction Summary

Construction Summary Construction Summary Project Name Item of Work Base Building Add-ons Total Cost Code Site Development $ 18,150.00 $ - $ 18,150.00 Landscaping $ 500.00 $ - $ 500.00 Cast-in-place Concrete $ 7,806.00 $ -

More information

SECTION FIELD ERECTED INDUCED DRAFT COOLING TOWER

SECTION FIELD ERECTED INDUCED DRAFT COOLING TOWER PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the contract including general and supplementary conditions and specifications section apply to this section. B. Related Sections:

More information

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board. 1.2 RELATED WORK A. Installation of steel framing members for walls, partitions,

More information

The following is required for a complete permit submittal for each unit.

The following is required for a complete permit submittal for each unit. P: (847)810-3503 OR (847)810-3503/3521, F: (847)615-4383 NEW MULTI-FAMILY DWELLING OR COMMERCIAL PERMIT REQUIREMENTS The following is required for a complete permit submittal for each unit. NEW MULTI-FAMILY

More information

Electric Service Standards

Electric Service Standards V: 1 of 6 A. Padmounted Requirements Complete requirements are contained in FPL specifications given to Customers for individual projects. Typical pad mounted transformer requirements include, but are

More information

ACBC Floor Mounted Active Beam

ACBC Floor Mounted Active Beam Floor Mounted Active Beam The Price Floor Mounted Active Beam,, is designed for occupant comfort. It provides high cooling and heating capacities while simultaneously supplying ventilation air from a DOAS

More information

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. SECTION 260529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. 1.2

More information

SECTION GYPSUM BOARD ASSEMBLIES

SECTION GYPSUM BOARD ASSEMBLIES SECTION 09 21 16 GYPSUM BOARD ASSEMBLIES PART 1 GENERAL 1.1 SECTION INCLUDES A. Metal stud wall and ceiling framing, 20 gauge. B. Metal channel suspended ceiling framing. C. Gypsum board. D. Gypsum sheathing.

More information

SERVICE LINES, METERS AND APPURTENANCES

SERVICE LINES, METERS AND APPURTENANCES AUGUST02 SECTION 02646 SERVICE LINES, METERS AND APPURTENANCES PART 1 - GENERAL 1.1 DESCRIPTION A. This section concerns materials and installation of corporation stops, curb stops, service lines, meters,

More information

Chilled Beams. The new system of choice?

Chilled Beams. The new system of choice? Chilled Beams The new system of choice? Presented By: Kevin M. Pope P.E. Jason Leffingwell Hammel Green And Abrahamson, Inc. and Ken Bauer, P.E., LEED AP Butters-Fetting Co., Inc. History of Chilled Beams

More information

ABSTRACT I. INTRODUCTION II. METHODS AND MATERIAL

ABSTRACT I. INTRODUCTION II. METHODS AND MATERIAL 2017 IJSRSET Volume 3 Issue 2 Print ISSN: 2395-1990 Online ISSN : 2394-4099 Themed Section: Engineering and Technology Chiller and AHU Design for A commercial Usage S M Azfar Hashmi, Mirza Muneer Baig,

More information

B. System Design and Performance Requirements

B. System Design and Performance Requirements 15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes

More information

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

where high efficiency is the standard

where high efficiency is the standard Access Doors 2016 where high efficiency is the standard Experience Milcor offers years of experience in the manufacture of a broad range of products and services for residential, commercial, institutional

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 1316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01

More information

SECTION PACKAGE BOOSTER PUMP STATIONS

SECTION PACKAGE BOOSTER PUMP STATIONS SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to

More information

Office of Design & Construction State University Plaza Albany, New York

Office of Design & Construction State University Plaza Albany, New York Instructions: Consultant should meet with the Campus and Fund at the work area(s) prior to completing this Checklist. At least two (2) meetings are required, one prior to Schematic Phase submission and

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

SECTION DRAINAGE AND VENT SYSTEMS CONSTRUCTION STANDARD

SECTION DRAINAGE AND VENT SYSTEMS CONSTRUCTION STANDARD PART 1: GENERAL 1.01 The design guidelines contained herein include the requirements for drainage and vent systems utilized at The University of Texas at Austin. It is the intention of this document to

More information

Cooling Tower Depot, Inc. 651 Corporate Circle, Suite 206 Golden, CO Phone (720) Fax: (720)

Cooling Tower Depot, Inc. 651 Corporate Circle, Suite 206 Golden, CO Phone (720) Fax: (720) CTD Proposal : - Project: Project Location: Cooling Tower Design Conditions and Dimensions: Water Flow Rate (gpm) 0 CTD Model # Hot Water Temp (F) 0 Cell Dimensions (ft) L x W x H Cold Water Temp (F) 0

More information

A. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms.

A. Codes and Standards that are Standards at the University. A. Provide floor drains in all toilet rooms, janitor closets, and mechanical rooms. PART 1: GENERAL 1.01 Purpose A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

A. Product Data shall be provided for each type of product indicated.

A. Product Data shall be provided for each type of product indicated. 32 31 13 CHAIN LINK FENCES AND GATES SECTION 1 GENERAL 1.1 SUMMARY This Section includes the following: 1. Chain Link Fences 2. Gates for Chain Link Fences. See electrical specifications for electrical

More information

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION

More information

Customer Requirements Customer-owned Transformer Vault Room

Customer Requirements Customer-owned Transformer Vault Room Scope This standard documents the requirements for customer-owned vault rooms containing transformers and switches that are owned, operated, and maintained by Tacoma Power. It does not address transformer

More information

A. Submit the following in addition to the standard requirements.

A. Submit the following in addition to the standard requirements. SECTION [13120] OMNIFLEX 300 MODULAR WALL SYSTEM SECTION 1 GENERAL 1.01 SECTION INCLUDES A. This Section specifies all requirements necessary to furnish and install a complete modular wall system including,

More information

The following is required for a complete permit submittal for each unit.

The following is required for a complete permit submittal for each unit. P: (847)810-3502 OR (847)810-3503/3521, F: (847)615-4383 MULTI-FAMILY OR COMMERCIAL ADDITION OR ALTERATION PERMIT REQUIREMENTS The following is required for a complete permit submittal for each unit. MULTI-FAMILY

More information

2. Detailed description of services Scope of Work (SoW) is attached in Attachment 1.

2. Detailed description of services Scope of Work (SoW) is attached in Attachment 1. Klamath Tribes Administration Invitation For Bids (IFB) IFB Number: 08-KTADM16 Maintenance Building/Storage Units 501 S. Chiloquin Blvd., Chiloquin Oregon A. General Information: The Klamath Tribes Administration

More information

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT

SECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT SECTION 220529 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Steel pipe hangers and supports. 2. Metal framing systems. 3. Thermal-hanger shield inserts. 4. Fastener systems.

More information

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES SECTION 15420 DRAINAGE AND VENT SYSTEMS PART 1 DESIGN DIRECTIVES 1.1 DESIGN CRITERIA A. All cleanouts above finished (accessible and non-accessible) ceilings shall be extended to the floor above. B. Do

More information

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application DATE: / / PERMIT # REQUEST FOR: NEW BUILDING ADDITION REMODEL PLUMBING ONLY ELECTRIC ONLY

More information

TYPICAL INSTALLATION INSTRUCTIONS

TYPICAL INSTALLATION INSTRUCTIONS TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Pewaukee, WI 53072 Inspection Date: 1/6/15 Prepared For: Report Number: Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar Dr. Pewaukee, WI 53072

More information

University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003

University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003 University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003 May 16, 2016 Addendum #1 Contract Number: UMA16-25 Project Number: 1000730 Speedtype: 157194 Title:

More information

Element Z General Design Requirements Existing Facilities Information

Element Z General Design Requirements Existing Facilities Information Anderson Central 100B, PART 1 - INTRODUCTION 1.01 OVERVIEW A. This Section provides general information for building systems and components. B. Refer to the Owner s Design Guideline Elements A though G

More information

Building Inspection Report

Building Inspection Report Building Inspection Report Sample Commercial Inspection Report Inspection Date: Prepared For: Prepared By: Professional Property Inspection Consultants 4857 Winterset Drive Columbus, OH 43220 (614) 459-5941

More information

Applying the Building Code During Design

Applying the Building Code During Design Applying the Building Code During Design A Step-By-Step Process AIA Learning Units The Salt Lake City CSI Chapter is a Registered Provider with The American Institute of Architects Continuing Education

More information

Fairfax County, Virginia

Fairfax County, Virginia Fairfax County, Virginia Typical Finished Basement Details Based on the 2009 International Residential Code CONTENTS General Requirements... 2 Emergency Escape and Rescue... 2 Wall Construction... 3 Floor/ceiling

More information

FEDERAL EMERGENCY MANAGEMENT AGENCY FEMA 414/January 2004 INSTALLING SEISMIC RESTRAINTS FOR DUCT AND PIPE

FEDERAL EMERGENCY MANAGEMENT AGENCY FEMA 414/January 2004 INSTALLING SEISMIC RESTRAINTS FOR DUCT AND PIPE FEDERAL EMERGENCY MANAGEMENT AGENCY FEMA 414/January 2004 INSTALLING SEISMIC RESTRAINTS FOR DUCT AND PIPE Notice: This guide was prepared by the Vibration Isolation and Seismic Control Manufacturers Association

More information

SECTION CHAIN-LINK FENCES AND GATES 02821/1

SECTION CHAIN-LINK FENCES AND GATES 02821/1 SECTION 02821 - CHAIN-LINK FENCES AND GATES 02821/1 PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Chain-Link Fences: 2. Gates: horizontal slide or swing. 3. Fences installed where

More information

Advanced Ventilation for Residential applications FBC Res 2010.

Advanced Ventilation for Residential applications FBC Res 2010. Advanced Ventilation for Residential applications FBC Res 2010. Course Description Review of the Residential Ventilation requirements in the Florida Building Code, Residential 2010. I. Introduction Dean

More information

Radon Vent Pipe System. Labeling Performance Indicators

Radon Vent Pipe System. Labeling Performance Indicators Section 6 Radon Vent Pipe Labeling Performance Indicators Radon Vent Pipe System Connected after sub-grade system installed Pipe cannot be trapped Provide space in chases Support at each floor level Discharge

More information

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL:

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL: N 1133521.33 E 1689742.43 STA: 10+53.07 INSTALL: 2-10" 90 BENDS CONNECT TO MIDDLEBUSH HALL INTERIOR PLANT PLUMBING MIDDLEBUSH HALL HW1 HWS HWR 10+00 FREDRICK APARTMENTS FINE ARTS INSTALL 422 LF 10" HWS

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Technical Services Information Bureau

Technical Services Information Bureau Technical Services Information Bureau INSTALLING ACOUSTICAL LAY-IN TYPE CEILINGS IN SEISMIC REGIONS AUGUST 2009 UPDATED MAY 2017 TECHNICAL BULLETIN This document covers the installation practices recognized

More information

Diffused Aeration Piping Equipment

Diffused Aeration Piping Equipment 1.0 General 1.1. The specifications in this section include all components of the Diffused Aeration System with the exception of the individual diffuser units. Refer to additional specification sections

More information

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco

More information

Sheet Metal Connectors, Inc.

Sheet Metal Connectors, Inc. Sheet Metal Connectors, Inc. HVAC ACCESSORY PRICE CATALOG JANUARY 1, 2004 CONTRACTOR PRICES POLYKEN TAPES ELGEN PRODUCTS TEK & ZIP SCREWS DP1010 DUCT SEALANT MINNEAPOLIS, MN ROCKFORD, IL 5850 Main Street

More information

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service. CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation

More information

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING 2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING E3305.3: now reads The space equal to the width and depth of the panelboard and extending

More information

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II Fire Inspection and Code Enforcement, 7 th Edition Chapter 6 Building Construction: Components Today we will Discuss fire walls, party walls, fire partitions, and curtain walls Discuss roof types and coverings

More information

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT SECTION 230548 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Elastomeric Isolation pads. 2. Elastomeric Isolation mounts. 3. [Freestanding] [Restrained] [Freestanding and restrained]

More information

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS BASEMENT FINISH REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS A construction permit is required. A homeowner may perform the construction work on his own property where he resides, without a

More information

HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT

HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT HILLSBOROUGH TOWNSHIP CODE ENFORCEMENT SAMPLE GUIDE FOR RESIDENTIAL DECKS revised 7 16 Call before you dig! 1 800 272 1000 New Jersey One Call. Utility Mark Out. THIS GENERIC GUIDE IS NOT ALL INCLUSIVE

More information

High Piled Combustible Storage Guideline

High Piled Combustible Storage Guideline Moreno Valley High Piled Combustible Storage Approved and Authorized By: Adria Reinertson, Fire Marshal Issued: May 5, 2017 Rev: 7-28-16 City of Moreno Valley Fire Department Page 1 of 19 High Piled Storage

More information

SECTION PIPING INSULATION

SECTION PIPING INSULATION SECTION 23 07 19 PIPING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Piping insulation for refrigerant piping within building envelope. 2. Furnishing and installation of insulation.

More information

SECTION CLIMBING WALLS

SECTION CLIMBING WALLS SECTION 13120-1 PART 1 - GENERAL 1.1 SUMMARY A. This section includes the following: 1. Custom Climbing Wall. B. Related Sections 1. Section Structural Steel 2. Section Rough Carpentry 3. Finishes 1.2

More information