1 SECTION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplemental Conditions, Division B and other Division 1 Specifications Sections, apply to this Section WORK INCLUDED A. Storm Sewerage System, including all manholes, pipe, bedding, fittings, connections to existing facilities, system accessories and construction of Infiltration Areas. B. Bypass Pumping during work activities (if necessary). C. Cleaning, inspection, and testing. D. Removal of existing storm sewerage pipe and drainage structures FIELD MEASUREMENTS A. Contractor shall be responsible for the horizontal and vertical layout of the proposed sewers and structures based upon the information shown on the contract drawings. If the Contractor deems that additional data may be required, the Owner must be notified in writing prior to the submittal of the bid. B. Verify that survey bench mark, control point, and intended elevations for the work are as shown on the drawings and that the layout can be performed based upon the information provided on the drawings. C. Where existing utilities are to be crossed or connect into by proposed facilities, the Contractor shall excavate and obtain facility elevations prior to the start of the sewer work. The Contractor shall immediately notify the Owner and Professional of any discrepancies, other than what has been assumed on the plan, so that adjustments and/or relocations can be made. D. Upon completion of the work activities, the Contractor must provide the Owner with As-Built Drawings of all sewers installed, denoting horizontal location on the site, with top and invert elevations of the sewers. The Owner reserves the right to request that the As-Built Drawings be signed and sealed by a registered professional land surveyor QUALITY ASSURANCE A. Regulatory Requirements: Comply with applicable requirements of federal, state, and local laws, regulations and codes having jurisdiction at project site. B. Reference Standards and Specifications: 1. Applicable requirements of standards and specifications ( )
2 1.05 SUBMITTALS referenced herein, apply to this section in addition to the following publications of the issues listed below, but referred to by basic designations only, form an integral part of this Specification. 2. Pennsylvania Department of Transportation (PennDOT) Standards: Form 408, Latest Edition. 3. American Society for Testing and Materials (ASTM) Specifications. 4. Standard Specifications for Materials and Construction for Local Governments and Authorities. A. Product Data for all piping. B. Shop Drawings for all sewer appurtenances proposed for use, including but not limited to precast concrete structures, including frames, grates, boot connectors, etc. C. Upon completion of work, accurately survey and record actual locations of pipe runs, connections, structures, with associated tops and invert elevations. An As-Built Plan must be submitted, and the Owner reserves the right to request that a Professional Surveyor certify the location and elevations of the facilities installed PROJECT CONDITIONS A. Coordination: Coordinate this work with the work of other Sections to avoid any delay or interference with other work. B. Cooperation: Coordinate this work with the work of other Sections to avoid any delay in progress of building or any interference with progress of other work. C. Where existing utilities are to be crossed by proposed construction, the Contractor shall excavate test pits, or verify by other means, prior to the start of any construction activities to determine the existing elevations, materials, and sizes. Test pit information shall be supplied to the Owner prior to the start of construction to permit adjustments that may be required to avoid conflict. The Contractor must also verify, prior to construction, the elevation of the any utilities proposed to be crossed or where connection to new facilities are proposed, to determine if any change in proposed grade is necessary. D. Existing Utilities 1. PA One Call: The Contractor's attention is called to the fact that he may go across gas, cable television, electric and water lines, so, before starting any work, all utility companies must be notified so their service lines can be located. The Contractor shall notify Pennsylvania One Call System, Inc. at a minimum of three working days prior to any construction on site. The Contractor shall verify the depth of ( )
3 these lines well in advance of any construction in order to adjust the new line in case of any conflict. 2. Locations indicated are approximate based upon information available at the time of site design work. Contact local "PA One Call System" prior to excavation and verify exact locations of all existing utilities. 3. Perform necessary exploratory tests for verification if necessary. The Owner and Professional will assume no responsibility for hazardous conditions, losses and accidents arising out of failure to perform by this Contractor or other Parties or both. 4. Should incorrectly charted or uncharted piping or other utilities be encountered during excavation, consult utility Owner immediately for directions. Cooperate with Owner and utility services in keeping respective services and facilities in operation. Repair damaged utilities to the satisfaction of utility Owner. 5. The Contractor shall remove and legally dispose off-site the existing storm sewer piping and drainage structures specified on the Construction Drawings, including all paving materials required to be removed in order to gain access to the pipe and any pipe trench backfill material deemed to be unsuitable for reuse as backfill by the Owner s Representative. The Contractor shall ascertain the alignment of the sewer pipe to be removed and layout the alignments of proposed pavement sawcuts for review and acceptance of the Owner s Representative prior to initiating sawcutting operations. The Contractor shall backfill the trenches created by the pipe and drainage structure removals with the materials and in the manner as shown on the Pipe Bedding and Trenching Detail. Materials excavated during the removal operations, deemed to be acceptable as backfill material by the Owner s Representative may be reused as backfill, at the discretion of the Contractor. The Contractor shall restore the finished ground-surface to, or better than, its condition prior to the pipe and structure removals. E. Disposition of Utilities: 1. Observe rules and regulations governing respective utilities during execution of work of this Section. 2. Adequately protect all active utilities from damage. 3. Remove or relocate all active utilities only as shown or as specified. 4. Remove, plug or cap inactive and abandoned utilities encountered in excavating and grading operations. In absence of specific requirements, remove, plug or cap such utilities lines at least 3 feet outside building walls or as required by local regulations. 5. No additional compensation shall be paid to the Contractor in ( )
4 the event that an existing utility line must be replaced due to damaged as a result of the construction activities. F. Benchmarks, Monuments and Other Reference Points: Protect from damage and displacement; if disturbed or destroyed, replace at Contractor s expense. PART 2 - PRODUCTS 2.01 BEDDING MATERIAL A. Shall be angular or subangular No. 57 aggregate meeting grading requirements of PennDOT Specifications Section PIPE A. Polyethylene Pipe for Storm Sewer: Storm Sewer Pipe (for sizes up to and including 36" diameter) shall be corrugated polyethylene pipe type S (smooth lined interior) conforming with standards of AASHTO M294 Type S. Pipe to be ADS N-12 by Advance Drainage Systems or approved equal. Pipe shall be perforated, where so specified. All fittings and associated appurtenances shall be as recommended by the manufacturer. B. Corrugated Plastic Tubing for Underdrains: ASTM F405 flexible type, perforated with required fittings, installed with perforations down; provide with geotextile- surround where indicated. C. Polyvinylchloride Pipe (PVC): PVC sewer pipe shall conform to Standard Specifications for Rigid Polyvinyl chloride Compounds, ASTM D-1784, Class B or C or C. The pipe shall be produced using a continuous extrusion process employing a prime grade l of unplasticized polyvinyl chloride. PVC sewer pipe 15 inches in diameter or smaller shall meet the requirements of ASTM D 3034 SDR 35 minimum; pipe and fittings larger than 15 inches in diameter shall meet the requirements of ASTM F 679, wall thickness T-1, pipe stiffness of 46 psi. The joint system shall be an integral bell gasketed joint, which forms a watertight seal. D. Fittings and Accessory Components: Provide proper fittings for installation and connection of lines as shown on construction plans meeting applicable requirements of associated types of pipe. All materials shall be provided and installed in strict accordance with manufacturer s instructions INLETS / MANHOLES A. All inlets, drain basins and yard drains, shall be as detailed and noted on the Contract Drawings. B. Precast concrete units are permitted for all storm manholes and inlets, and shall conform to ASTM Specification C 478 and shall be as manufactured by United States Concrete Pipe Company or approved equal. Yard Drain structures shall consist of 24"-diameter Reinforced Concrete Pipe, or approved equal. Precast structures shall meet PennDOT Form 408 Specifications and federal and local standards. The ( )
5 connection of all pipes to manholes must be made via prefabricated factory openings or core drilled openings using a Kor-N-Seal Expansion Band connector or approved equal. Drain Basins to be constructed as components of the Infiltration Areas shall be of heavy-duty PVC as manufactured be Nyloplast, or Owner-approved equal. (Nyloplast America, 3130 Verona Avenue, Buford, GA 30518, Telephone: , Fax: ). C. Brick: Brick for manholes, inlets, bulkheads, inlets and other drainage structures shall be solid concrete brick, hard burned common brick having low absorption, or well-burned No.2 paving brick. D. Grates, Frames, and Covers: 1. Shall be cast of gray iron and shall be sound true to form and thickness, and fitted and match-marked to assure proper seating. Castings shall be free from burnt-on sand and other injurious defects. 2. Standard Manhole Frames shall conform to the Standard Detail shown on the Contract Drawings. Otherwise, manhole frames and covers to be Neenah Foundry Co. No. R-1573 or Allegheny Foundry Co. Frame Pattern No. 109 and Cover Pattern No. 110, or approved equal. 3. Standard Inlet Frames shall be Type M Series No or 3574 as manufactured by Neenah Foundry Company, or approved equal. A Bicycle Safe Grate shall be installed in all Pedestrian Traffic Areas which would consist of the parking lots. A Basket Type Grate shall be installed in drainage channels, and a diagonal Grate shall be installed at other locations as specified on the Drawings. Yard Drains shall be topped with a Beehive Grate and Frame No. R-2564, as manufactured by Neenah Foundry Co., or approved equal. 4. All storm manhole covers to bear the words Storm Sewer. 5. The contact surfaces of all manhole covers and corresponding supporting rings in the frames shall be machined to provide full perimeter contact. E. An adjusting ring equal to R1979-H as manufactured by Neenah Foundry Co., or approved equal, shall be provided for each manhole in a street or parking lot area. F. Manhole and/or Inlet Steps shall be Allegheny Foundry Co. Pattern No. A-1488 or Polypropylene Plastic Coated (ASTM D-2146 Type II CR ) 3/8 Grade 40 Deformed Steel Bar (ASTM A-615), or approved equal. G. Mortar shall be ASTM C-270 Type M. Prepackaged masonry cement will not be acceptable. Mortar shall consist of one (1) part cement to two and one-half (2-1/2) parts sand, and water. 1. Cement shall conform to ATM C-150, Type Sand shall conform to PennDOT Section ( )
6 3. Water shall be clean and free from oil, acids, salts or other injurious substances CONCRETE AND REINFORCEMENT A. Concrete for storm sewer appurtenance construction shall be 4,000 psi mix. Joint mortar shall be 1:2 Portland cement-sand mix, masonry mortar to be 1:3. At Contractor's option, hydrated lime may be substituted for cement, not to exceed 10% of cement used in masonry mortar. B. The minimum compressive strength for all concrete and concrete sections shall be 4,000 p.s.i. C. Reinforcement: Steel conforming to the following: 1. Fabric: ASTM A-185, welded wire fabric, plain. 2. Reinforcement Bars: ASTM A-615, Grade 60, deformed, epoxy coated. D. Concrete Encasement: 1. Storm sewer piping which passes beneath the building shall be encased in concrete, as shown and detailed on the Contract Drawings. 2. Loose material shall be removed from the trench and the concrete placed with continuous contact with undisturbed soil on the sides and bottom of the trench. A base course of concrete shall be screeded to a level that ensures the pipe to be at the specified grade. Each length of pipe shall be held in rigid alignment and braced to prevent flotation. The pipe joints shall be carefully sealed to prevent entrance of concrete mortar and water into the joints. Jointing of the pipe shall be done before the encasement is poured. The Contractor has the option to construct formwork, in lieu of placing the encasement concrete against undisturbed soil trench walls. No additional monies will be paid to the Contractor in the event the Contractor chooses this option. 3. The minimum compressive strength of the concrete encasement shall be 4000 psi. 4. Reinforcement bars shall not be placed within the concrete encasement. PART 3 - EXECUTION 3.01 EXAMINATION A. Examine areas in which work is to be performed. Report, in writing, to the Owner's Representative, all prevailing conditions that will adversely affect satisfactory execution of work. Do not proceed with ( )
7 work until unsatisfactory conditions have been corrected. B. Starting work constitutes acceptance of the existing conditions and this Contractor shall then, at his expense, be responsible for correcting all unsatisfactory and defective work encountered. C. Contractor shall assume full responsibility for safeguarding and protecting all poles and other structures which may occur near to his work or in any way may be affected by any of his work under this Contract TRENCHING, BACKFILLING AND COMPACTION A. Trenching, backfilling and compacting: In accordance with applicable requirements of Section B. Generally, excavate to the line and grade shown. The excavation shall not be carried closer than to within two inches of final grade until the pipe is ready to be installed. Fine graders just ahead of the pipe laying operation shall remove the remaining two inches. C. The Infiltration Areas shown on the Contract Drawings must not be constructed or placed in service until the entire contributing drainage areas have been stabilized. Runoff from untreated, recently constructed areas within the drainage area may otherwise load the newly formed area with a large load of fine sediment, seriously impairing the natural infiltration ability of the Infiltration Area (basin) floors. D. Backfilling from top of bedding to a point at least one foot over the top of pipe barrel shall be placed by hand in six (6) inch layers and thoroughly tamped into place around the pipe. Extreme care shall be exercised to the level one foot above pipe barrel to insure that no damage is caused to the pipe or that its alignment or grade is not disturbed in any way. Only clean materials may be used in this operation, clean earth (no rocks) sand or rock dust INSTALLATION OF SEWERS A. Install sewer lines in straight line and on uniform rate of grade between points where changes in alignment or grade are shown. Bed the barrel of pipe firmly at required line and grade. Keep stopper in mouth of pipe when pipe-laying is not in progress. Set bell of pipe upstream. Support barrels of pipe continuously and scoop out space for proper clearance of bell. B. Installation of pipe shall be against the flow and shall be to grades and alignment indicated on Drawings to provide a smooth, uniform flow line. Under no circumstances shall pipe be blocked to grade. C. Pipe shall not be installed during undesirable weather conditions. Under no circumstances shall pipe be installed in water. D. All joints shall be kept free of dirt, watertight and thoroughly secured. Contractor shall take all measures necessary to insure a tight joint ( )
8 E. Pipe Bedding: The trench bottom shall be filled with material in six (6) inch maximum lift and compacted to 95% maximum density ASTM D up to the spring line of the pipe. The remainder of the trench shall be backfilled as specified on the Drawings. F. All pipe entering structures shall be cut flush with the inside face of the structure, and the cut ends of the pipe surface of the structure shall be properly rounded and finished so that there will be no protrusion, ragged edges or imperfections that will impede the flow of water or affect the hydraulic characteristics of the installation. G. After installed piping has been tested and inspected, backfill excavations with approved material. Tamp and compact in place. Tamp carefully around pipe and above top of pipe in layers not over 6 inches. Observe care in backfilling not to disturb pipe. H. Provide granular bedding and dewatering materials and methods required to facilitate installation. I. Bypassing when connecting to existing facilities shall be performed by pumping flow from a manhole upstream of the work area to a manhole below the work area. Other means of bypass pumping may be accepted upon approval of the Owner s Representative. The pumps(s) and bypass lines shall be of adequate capacity and size to handle the flow. J. All proposed direct connections to sewer pipe shall be made by core drilling and performing the connection in accordance with the detail provided on the Plans CONSTRUCTION OF STRUCTURES A. Size of excavation shall be sufficient to leave a minimum of twelve (12) inches and a maximum of twenty-four (24) inches clear between structure and the excavation or bracing. Any over-depth excavation below such appurtenances that has not been directed will be considered unauthorized and shall be refilled with bedding material at no additional cost. B. Masonry work shall be laid up true and plumb and horizontal joints shall not be more than ½. Masonry units shall be laid in full bed of mortar and joints in each course shall be filled solid with mortar before another course is laid on top. Brick shall be wet before being laid in warm weather. Brick shall not be laid in freezing weather. Protect brick work from the weather when storming or freezing and at other times when necessary during the progress of the work. Inlet frames shall be set in a full bed of mortar and at the elevation established by the Contract Drawings. C. Precast structures shall be set on properly prepared granular or concrete subbase providing full support to unit. D. All inflow / outflow pipes shall be cut flush with inside face of inlet/manhole and parged with cement mortar. E. Concrete base for precast inlets/manholes shall have a minimum thickness of eight (8) inches if on earth and six (6) inches if on ( )
9 rock and shall be poured in place using concrete. Concrete flow lines shall be poured in all inlets to direct the flow of water to the outflow pipe. Casting shall be set in full mortar bed. Care shall be exercised to see that frames and grates are to exact finished grades specified on the Contract Drawings. F. Upon installation of all Concrete Structures, Manholes and Inlets, and piping networks in and out of such structures, the Contractor shall pour a concrete invert in the structures to direct low flow from the inlet pipe(s) to the outlet pipe(s). The poured in place concrete invert shall have a minimum depressed area of four (4) inches for low flow 3.06 FIELD QUALITY CONTROL A. Tests: 1. Visual Test: All sewer lines shall be inspected visually by the Contractor and checked by the Owner's Representative to verify accuracy of alignment and freedom from debris and obstructions. The full diameter of the pipe should be visible when viewed between consecutive manholes. The method of test can be photography, closed circuit television or visually lamping with mirrors and lights. 2. Deflection Testing: The maximum allowable pipe deflection is 7.5 %. If the Owner's Representative directs as a result of the visual test, a "go, no-go" mandrel or sewer ball shall be used to prove pipe deflection is within allowable limits. The Contractor may, at his option, use a deflectometer, calibrated television or photography PROTECTION OF PROPOSED STRUCTURES Use of heavy equipment over or across the storm drainage system at any stage of construction shall be at the risk of the Contractor. Displacement or injury to the system due to such operation shall be repaired or replaced when directed at no additional cost to the Owner CLEANING OF NEW SEWERS Upon completion of site drainage facilities, if deemed necessary by the Owner, the entire sewer system that was installed by the Contractor shall be flushed using high pressure water jets to remove dirt and other foreign material from pipe and related structures. Any debris shall be screened at the downstream point of connection to the existing storm/sanitary system and not be allowed to enter the system. Debris shall be removed and disposed of at an approved offsite location ABANDONMENT OF EXISTING STORM SEWER A. The Contractor shall close open ends of abandon underground piping indicated to remain in place. Include closures strong enough to ( )
10 END OF SECTION withstand hydrostatic and earth pressures that may result after ends of abandon pipe have been closed. Any of the following procedures may be used: 1. Close open ends of pipe with at lease 8" thick, brick masonry bulkheads. 2. Close open ends of pipe with threaded metal caps, plastic plugs, or other acceptable methods suitable for size and type of material being closed. Do not use wood plugs ( )
PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017
SECTION 02630 - STORM DRAINAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationSECTION FACILITY SANITARY SEWERS
SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More information***************************************************************************************************************
02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************
More informationITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS
ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing
More informationB. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.
SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 221313 - FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More information***************************************************************************************************************
02735 WASTE WATER DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 22 14 00 ***************************************************************************************************************
More informationSECTION UTILITY MANHOLES AND STRUCTURES
SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition
More informationMANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems
SECTION 02607-1 1.0 GENERAL 1.1 SCOPE: A. This section covers the work necessary for the construction of sanitary and storm system manholes, catch basins, and miscellaneous concrete structures complete.
More informationSection Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers
STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with
More informationSECTION A1 EXCAVATION AND BACKFILL GENERAL
SECTION A1 EXCAVATION AND BACKFILL GENERAL The work under this section shall include all excavation to such width and depth as shown on the drawings, specified herein, or ordered by the Engineer. Such
More informationSummary of the 2011 Changes
The following is a list of amendments to the Residential Site Improvement s, N.J.A.C. 5:21, adopted in 2011. The Notice of Adoption of these changes appeared in the New Jersey Register on May 16, 2011.
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY PHASE II
SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
More informationSECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.
SECTION 33 05 13 MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. B. Related Sections: 1. Section 03 20 00 - Concrete
More informationSECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES
SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.
More informationSITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013
WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown
More informationC. Foundation stabilization for pipe and utility structures.
PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization
More informationSECTION TRENCHING & BACKFILLING
SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain
More informationNew Fulton State Hospital Energy Control Center and Services Building (ECC/SVC) Project Number: M
SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY 1.2 SUBMITTALS 1.3 PROJECT CONDITIONS
SECTION 334100 - STORM UTILITY DRAINAGE PIPING PART 1 - GENERAL 1.1 SUMMARY Section Includes: 1. Pipe and fittings. 2. Drain Basin. 3. De-chlorination tablet feeder. 4. Non-pressure transition couplings.
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION...19.1 19-1.01 Exploratory Excavation...19.1 19-1.02 Trench Width...19.1 19-1.02.A Storm Drain
More informationSECTION FOUNDATION DRAINAGE
SECTION 33 41 13 SPEC WRITER NOTES: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section
More informationCHAPTER 6. Sanitary Sewer
CHAPTER 6 Sanitary Sewer A. Introduction All proposed developments, subdivisions, and buildings must have a properly designed and constructed sanitary sewer collection system. The system shall provide
More informationSECTION CAST-IN-PLACE CONCRETE
SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing
More informationSECTION DUCTILE IRON FITTINGS. A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller.
PART 1 - GENERAL 1.1 DESCRIPTION A. This section includes materials, installation, and testing of ductile iron fittings 48 inches and smaller. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Section 01300 Record
More informationSECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL
SECTION C1 DUCTILE IRON PIPE AND FITTINGS GENERAL This section covers the furnishing and installation of ductile iron water pipe, fittings, thrust restraint and pipe disinfection. Ductile Iron Pipe MATERIALS
More informationSECTION POLYVINYL CHLORIDE (PVC) WATERLINE
SECTION 02632 POLYVINYL CHLORIDE (PVC) WATERLINE PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment, and incidentals required, and install polyvinyl chloride (PVC) waterline,
More information1. B16.1 Cast Iron Pipe Flanges and Flanged Fittings, Class C 111 Rubber Gasket Joints for Ductile Iron Pressure Pipe and Fittings
SECTION 33 34 00 SANITARY FORCE MAIN PART 1 GENERAL 1.1 SCOPE OF WORK A. This section specifies the requirements for furnishing and installing sanitary force main and appurtenances. The pipe shall be of
More informationINDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2
INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...
More informationTRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)
PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without
More informationB. Backfill and compact utility bedding and fill placed in the utility trenches between the top of the utility bedding and the subgrade elevation.
SECTION 312333 TRENCHING AND BACKFILLING PART 1 - GENERAL 1.1 SUMMARY A. Excavate trenches for new electric and telephone conduits, gas lines, and their appurtenances from at least 5 feet outside the building
More informationSANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.
SANITARY SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sanitary Sewer Gravity Mains B. Sanitary Sewer Force Mains C. Sanitary Sewer Services 1.02 DESCRIPTION OF WORK A. Construct sanitary sewer gravity
More information901 - PIPE SEWERS COMPLETE IN PLACE
901 - PIPE SEWERS COMPLETE IN PLACE 901.01 Description 901.02 Materials and Material Handling 901.03 Excavation 901.04 Limits as to Width of Trench 901.05 Unauthorized Excavation 901.06 Subgrade 901.07
More informationDIVISION 4 SANITARY SEWERS AND STORM DRAINS
DIVISION 4 SANITARY SEWERS AND STORM DRAINS 401 PIPE AND FITTINGS FOR SANITARY SEWERS AND STORM DRAINS...1 401.01.00 MATERIALS... 1 401.01.01 CERTIFICATION OF MATERIALS... 1 401.01.02 PIPE... 1 401.01.02A
More informationSPECIFICATION FOR PIPE CULVERT CONSTRUCTION
SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.
More informationBAYFILTER SPECIFICATIONS
PART 1.00 GENERAL 1.1 DESCRIPTION BAYFILTER SPECIFICATIONS A. The BayFilter system s internal components manufacturer selected by the Contractor and approved by the Engineer, shall furnish all labor, materials,
More informationFabrication and Installation Table of Contents
Fabrication and Installation Table of Contents HDPE AQUASHIELD PRODUCTS 2 Fabrication and Installation 2 System Fabrication 3 Aqua-Swirl Installation 4 Step 1 Excavation and Bedding 4 Step 2 Pipe Connection
More informationSECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES
SECTION 02215 EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES PART 1 - GENERAL 1.1 DESCRIPTION: This section includes materials, testing, and installation of earthwork for excavations, fills, and
More informationBIO-AQUIFER STORM SYSTEM
BIO-AQUIFER STORM SYSTEM Specifications for Construction PART 1 GENERAL 1.01 SECTION INCLUDES A. Providing labor, materials, tools and equipment to furnish and install a permeable concrete paving stone
More informationDARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES
SECTION 15420 DRAINAGE AND VENT SYSTEMS PART 1 DESIGN DIRECTIVES 1.1 DESIGN CRITERIA A. All cleanouts above finished (accessible and non-accessible) ceilings shall be extended to the floor above. B. Do
More informationDIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING
DIVISION 33 UTILITIES PART 1 GENERAL 1.01 SCOPE A. This work shall consist of the underground construction of a pipeline across the state right-ofway, or other facility as indicated on the plans and as
More informationSECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION
820-1 SCOPE OF WORK: SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION a. Furnish all labor, materials, equipment, and incidentals required for demolition and/or removal and disposal of existing
More informationSECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)
SECTION 02623 HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE) PART 1 - GENERAL 1.1 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals required and install high density
More informationPERMEABLE INTERLOCKING PAVERS
PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement
More informationSTATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 811 CONDUIT AND DRAINAGE STRUCTURES
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 811 CONDUIT AND DRAINAGE STRUCTURES January 18, 2013 811.01 Conduit Description 811.02 Conduit Materials 811.03 Conduit Definitions
More information2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.
General: 1. Construct utilities in accordance to TWA approved plans and shop drawings. Any deviation from the approved plans shall be approved by the DEVELOPER S ENGINEER and TWA 2. A preconstruction meeting
More informationSECTION WATER DISTRIBUTION
SECTION 33 10 00 WATER DISTRIBUTION PART 1 GENERAL 1.01 SUMMARY 1.02 CODES A. Section Includes: 1. Underground water service piping, watermains and appurtenances. A. All work shall comply with the most
More informationSDR26 material is to be used as a minimum on all U-M projects.
BuildingName The Description of the Project P00000000 0000 DOCUMENTS SPECIFICATION DIVISION 33 NUMBER SECTION DESCRIPTION DIVISION 33 SANITARY SEWER UTILITIES SECTION 333100 - SANITARY SEWER END OF CONTENTS
More informationSpecifications for Electrical Underground Residential Distribution Systems
Specifications for Electrical Underground Residential Distribution Systems Specification DDS-2 Revision 13, February 2010 ONCOR ELECTRIC DELIVERY COMPANY SPECIFICATIONS FOR ELECTRICAL UNDERGROUND RESIDENTIAL
More informationSUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation)
PART 1 GENERAL SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation) 1.01 SCOPE This specification includes the materials and procedures required for the internal sealing of the frame-chimney
More informationSECTION BASIC ELECTRICAL MATERIALS AND METHODS
SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:
More informationSEPTIC TANK CONSTRUCTION GUIDELINES
SEPTIC TANK CONSTRUCTION GUIDELINES Septic tank for this airport will be designed/ built by the general contractor of the building facilities. At the time of the project design, availability of a septic
More informationSample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction
Sample Bid Specification Revision 2 PVC Expanded-in-Place Pipeline Reconstruction 1.00 DESCRIPTION 1.01 WORK INCLUDED: This work shall include the furnishing of all labor, equipment and materials necessary
More informationContact the Jurisdictional Engineer for materials allowed by each jurisdiction.
Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 22 1316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
More informationSPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular
More informationHydrodynamic Separation Product Calculator
Hydrodynamic Separation Product Calculator Example Project BMP #1 CDS 2015-4 Project Information Project Name Example Project Option # A Country US State Kentucky City Covington Contact Information First
More informationSPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006
Michigan Department Of Transportation 3703C (11/06) 1 Materials 1.1 Pipe SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Page 1 of 5 The type of pipe used for the pipe jacking method shall be capable
More informationSECTION UNCLASSIFIED EXCAVATION AND GRADING
SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on
More informationContact Clark Public Utilities Construction Services department at (360) to initiate a request for service.
CHAPTER3 Clark Public Utilities Commercial Electric Service Handbook Commercial Underground Services Preparing for the installation The following checklist will assist in preparing a project for the installation
More informationTYPE "A" CATCH BASIN
27" 1.67' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3250-BV OR APPROVED EQUAL. "INFI SHIELD" SEAL OR APPROVED EQUAL RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR). PLASTER OUTSIDE,
More informationPART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS
PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm
More informationSection [ ] Storm Water Treatment Device
PART 1 GENERAL Section [ ] Storm Water Treatment Device 01.01.00 Purpose The purpose of this specification is to establish generally acceptable criteria for Storm Water Treatment Devices (SWTD) that treat
More informationGUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410
GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 Note to user: These guide specifications are provided by Mid- States Concrete Products as a service to you; they are NOT specific
More informationSECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements
SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature
More informationMASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 22 PLUMBING
SECTION 221316 - SANITARY WASTE AND VENT PIPING PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following soil and waste, sanitary drainage and vent piping inside the building: 1. Pipe, tube,
More informationSPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE
SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE BE IT ORDAINED by the Town Council of the Town of Plainville: SECTION 1. SUBDIVISIONS. All subdivisions hereinafter developed within
More informationSTANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe.
STANDARD SPECIFICATIONS SECTION 02445 BORING AND JACKING PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for boring and jacking casing pipe. 1.2 DEFINITIONS A. Carrier Pipe: Sewer or water
More informationSECTION GRAVITY IRRIGATION PIPELINES RUBBER GASKETED REINFORCED CONCRETE PIPE (RGRCP)
SECTION 02513 GRAVITY IRRIGATION PIPELINES RUBBER GASKETED REINFORCED CONCRETE PIPE (RGRCP) PART 1 GENERAL 1.01 SECTION INCLUDES A. Irrigation pipeline, as herein specified, consists of installing pipe
More informationA. This Section includes subdrainage systems for foundations and underslab areas. A. Product Data: For each type of drainage panel indicated.
ZGF Partnership Page 1 of 7 SECTION 33 46 00 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes subdrainage systems for foundations and underslab areas. 1.2 SUBMITTALS A. Product Data: For each type
More informationCITY OF EDMOND STANDARD SPECIFICATIONS FOR CONSTRUCTION
601.00 RIPRAP 600.00 GENERAL CONSTRUCTION 601.01 DESCRIPTION. This work shall consist of furnishing and placing riprap protection of the type specified at the locations and in reasonably close conformity
More informationSECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT
SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating
More informationSECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.
SECTION 02750 RIGID PAVEMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Portland Cement Concrete (PCC) pavement. B. Related Sections: 1.2 REFERENCES 1. Section 02315 Excavation. 2. Section 02721
More informationINDUSTRIAL PIPE FITTINGS, LLC
Page 1 of 9 SPIROLITE MUNICIPAL AND INDUSTRIAL ODOR CONTROL PIPING Municipal wastewater treatment plants, industrial processes and composting facilities can be assured of trouble free transport of foul
More informationA Design Review of Waterproofing Codes
A Design Review of Waterproofing Codes Section 1807 of Chapter 18 of the International Building Code addresses waterproofing under the section title of Dampproofing and Waterproofing. The section defines
More informationBASED ON DFD MASTER SPECIFICATION DATED 2/24/2014
1 0 1 0 1 0 1 SECTION 1. TRENCHING BASED ON DFD MASTER SPECIFICATION DATED // P A R T 1 - G E N E R A L SCOPE The work under this section shall consist of providing all work, materials, labor, equipment,
More informationChapter 8 TECHNICAL SPECIFICATIONS FOR CONVEYANCE SYSTEMS
Chapter 8 8.01 General Provisions 8.02 Manholes and Structures 8.02.1 Materials 8.02.2 Workmanship on Manholes 8.02.3 Types of Connections 8.03 Catch Basins and Inlets (Storm only) 8.03.1 Materials 8.03.2
More informationSTANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL
STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL 1. SCOPE 2. DESIGN 3. MATERIALS 4. CONSTRUCTION 5. METHOD OF MEASUREMENT AND PAYMENT SCOPE This Specification sets out requirements for the design,
More informationA.2.a Random Riprap... Table
3601 RIPRAP MATERIAL 3601.1 SCOPE Provide stone and filter layer material for use in random or hand-placed riprap, gabion, and revet mattress construction. 3601.2 REQUIREMENTS A Stones A.1 Quality Provide
More informationConstruction Specification for Concrete Unit Pavers
Engineering & Construction Services Division Standard Specifications for Road Works TS 3.80 September 2017 for Concrete Unit Pavers Table of Contents TS 3.80.01 SCOPE... 2 TS 3.80.02 REFERENCES... 2 TS
More informationCONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL
CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CS 3-01 GENERAL: A. The foundation, bedding and backfill for all trenches shall conform with the requirements of the City Standard
More informationITEM 464 REINFORCED CONCRETE PIPE
ITEM 464 REINFORCED CONCRETE PIPE 464.1. Description. This Item shall govern for furnishing and installing all concrete pipe and materials and for constructing precast concrete pipe culverts or precast
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19-1 19-1.01 Exploratory Excavation... 19-1 19-1.02 Trench... 19-1 19-1.02.AStorm Drain Pipe...
More informationITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS
ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown
More information1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.
MTS Jack and Bore Design Criteria Note: For the purposes of this Design Criteria and subsequent Construction Notes, the term Jack and Bore is used generically to refer to a number of trenchless construction
More informationSECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.
SECTION 02830 CHAIN LINK FENCES AND GATES (GALVANIZED) 1.0 GENERAL 1.1 Section Includes A. Fence framework, fabric, gates, and accessories. B. Excavation for post bases; concrete footing for posts. C.
More informationITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION
SECTION 74 AIRPORT OBSTRUCTION LIGHTS (FAA L-119) 74-1 GENERAL The Contractor shall perform all work required by the plans and specifications for construction of obstruction lights in accordance with the
More informationSECTION PIPE & PIPE FITTINGS PART 1 GENERAL
SECTION 02610 PIPE & PIPE FITTINGS PART 1 GENERAL 1.01 DESCRIPTION A. This Section includes the material and bedding requirements for all pipe and pipe fittings for underground pressure and non-pressure
More informationNarrow Modular Pavers (NMP) for Sand-Set Installations
The following specification refers to the Stepstone, Inc. product known as: Narrow Modular Pavers (NMP) for Sand-Set Installations Narrow Modular Pavers are part of the California Architectural Paver line
More informationLS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION
LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION A. Section Includes B. References C. Quality Assurance D. Submittals E. Delivery, Storage and Handling F. Environmental Conditions G. Summary H. Concrete
More informationSECTION GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS
SECTION 2100 - GRADING AND SITE PREPARATION CITY OF LEE S SUMMIT, MISSOURI STANDARD SPECIFICATIONS The City of Lee s Summit hereby adopts Section 2100 of the Kansas City Metropolitan Chapter of APWA Construction
More informationUnderground Piping for Private Hydrants & Sprinkler Supply Line
City of Brea Brea Fire Department Fire Prevention 1 Civic Center Circle Phone: (714) 990-7655 Underground Piping for Private Hydrants & Sprinkler Supply Line PURPOSE The provision of adequate water supplies
More informationINDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1
March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural
More informationDESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General
DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and
More informationSECTION INTERLOCKING CONCRETE PAVERS
SECTION 23 14 13 INTERLOCKING CONCRETE PAVERS (1995 MasterFormat Section 02780) Note: This guide specification for concrete paver applications in the U.S. for concrete pavers and bedding sand over a compacted
More informationSTANDARD SPECIFICATIONS SECTION TUNNELING. A. Section includes requirements for constructing tunnels 48-inch and larger diameter.
STANDARD SPECIFICATIONS SECTION 02420 TUNNELING PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for constructing tunnels 48-inch and larger diameter. 1.2 DEFINITIONS A. Carrier Pipe: Sewer
More informationPAVING SLABS ON A CONCRETE BASE
SECTION 32 14 13.16 PAVING SLABS ON A CONCRETE BASE (1995 MasterFormat Section 02784) Note: This guide specification for the U.S. is for paving slabs on a sand bed over concrete for pedestrian applications.
More informationHYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS
HYDROGRID SUBSURFACE IRRIGATED HARTRU TENNIS COURTS PART 1 - GENERAL WORK INCLUDED A. Provide all equipment and materials, and do all work necessary to construct a HydroGrid subsurface irrigated fastdry
More informationAmendment to OPSS 493 (Nov 2015) Construction Specification for Temporary Potable Water Supply Services
Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 493 September 2017 Amendment to OPSS 493 (Nov 2015) Construction Specification for Temporary Potable Water
More information