SELECTION OF TUNNEL METHODS. By: Dr. Gary S. Brierley

Size: px
Start display at page:

Download "SELECTION OF TUNNEL METHODS. By: Dr. Gary S. Brierley"

Transcription

1 SELECTION OF TUNNEL METHODS By: Dr. Gary S. Brierley

2 Successful Tunnel Design 2 Produce a satisfactory finished facility for no more money and in no more time than is required for the existing ground conditions.

3 3 Tunnels are Different than Above-Ground Structures Entirely within the ground. The ground cannot be specified. The ground can be changed. Serial Construction Schedule.

4 4 Tunnels are Different than Above-Ground Structures Work from inside/out. The ground requires temporary support. Lots of third party impacts. Land not owned by project.

5 Building a Tunnel 5 Excavate the ground Control the ground during the process of excavation. Support the ground as the tunnel is advanced. Install the final lining.

6 6 Evaluating Tunneling Issues

7 Risk Management 7 The Geotech The Designer The Contractor The Owner Third Parties Insurers, etc.

8 8 Case Histories

9 Phoenix Casa Grande Highway

10

11

12

13

14

15

16

17

18 Lake Merced

19

20

21

22

23 23 Coldwater Sanitary Relief Project

24 Coldwater WWTP Drainage Pattern Coldwater Creek and Existing Trunk Sewer Alignment 24 Lambert St. Louis International Airport BRIERLEY ASSOCIATES

25 TH-15 Geotechnical Investigation 25 TH-14 TH-11 TH-13 TH-10 TH-9 TH-12 TH-7 Tunnel Alignments Public ROW Roadways Creek / Easement Parallel Existing Trunk Sewer Test Hole Locations 15 Total Test Holes Spatial Variation Representative Mix Based on Alignments TH-5 TH-8 TH-1 TH-6 TH-3 TH-4 TH-2

26 AIRPORT WWTP TH-1 TH-3 TH-14 TH-11 TH-10 TH-9 TH-7 TH-5 26 PROFILE ALONG CREEK BRIERLEY ASSOCIATES

27

28 28 South Austin Regional Wastewater Treatment Plant Presented By: Kevin Koeller, P.E. Tunneling Through Backfill and Lift Station Walls Without Disturbing Plant Operations Gary Brierley, P.E.

29 Project Background 29 SARWWTP receives flow from the south half of Austin (SAR Service Area) PER confirmed flow from service area Flow from two separate service areas is delivered to the site via two tunnels Tunnels terminate in two separate lift stations approximately 90 feet deep No definition of division of flow Existing Onion Creek Tunnel Existing Govalle Tunnel

30 Tunnel Route 30 Avoid Damage to Operating Facilities Minimize Interruptions of Plant Operations Tunnel Must be Constructible Lift Station No. 1 Drain Tunnel No 4 Lift Station No. 2 Interconnect Tunnel Access Shaft Access Shaft

31 Tunnels Between Access Shafts No Access Shaft 1 to Access Shaft ft Decker Model 70 TBM 5.75 ft dia Hobas Pipe 63 in. Downhill - 0.2% Taylor Shale

32 Backfill of Existing Lift Stations 32 Probing Operations Compaction Grouting

33 Saguaro Ranch Tunnel

34 34 Portal Cut

35 35 Horizontal Boring

36 36 Pilot Tunnel

37 37 Shotcrete

38 38 Top Heading

39 39 Final Tunnel

40 40 Grand & Bates Sewer Relief Tunnel

41 Tunnel Alignment 41 Grand & Bates / Plan View

42 Subsurface Conditions 42 Overburden Soil 25 to 75 ft. fill/loess/alluvial soils Rubble fill (rip rap) at Outfall Structure Highly Weathered Limestone Low quality fractured zones with shale seams Pinnacled surface/karst potential k = 2.5 x 10-3 cm/sec Unweathered St. Louis Limestone White-light Gray, thin-massive bedding Chert lenses and nodules k = 1.5 x 10-5 cm/sec

43 VE Proposed Alternative Alignment 43 Simplified Alignment Reduces Construction Time, Effort, and Cost

44 Increased Tunnel Diameter in Precast Concrete Liner Pipe increases storage volume by over 40%

45 Limited Use of Drill & Blast 45 Drill-Blast Starter Tunnel Used to Permit Assembly of TBM

46 Simplified Ground Support ft. #8 Resin Grouted Rock dowels and WWF Provide Primary Crown Support 8 x 11.5 in. Channel Crown Sets at Railroad & Highway Crossings

47 47 Montreal

48

49

50

51

52

53 New Crystal Springs Bypass (Polhemus) Tunnel 53 Design Challenges By: Dr. Gary S. Brierley City And County Of San Francisco Public Utilities Commission San Francisco Water Department June 27, 2007

54 54 SFPUC Water Supply Improvement Program

55 55 Need for the Project

56

57 Project Location 57 North Shaft Landslide area New Tunnel South Shaft Area

58 58 Ground Conditions

59 Ground Conditions 59 Sandstone Mélange Matrix

60 Tunnel Boring Machine

61 61 Temporary Tunnel Lining

62

63 63 Crossing San Mateo Creek

64 A Final Recommendation: THINK! THINK! THINK!

Stevens & Associates, Inc. Tunnel Construction Projects. Fact Sheets

Stevens & Associates, Inc. Tunnel Construction Projects. Fact Sheets Stevens & Associates, Inc. Tunnel Construction Projects Fact Sheets Stevens & Associates, Inc. 4 Knights Court Newbury, MA 01951 978-764-9886 glen@stevensai.com Massachusetts Water Resources Authority

More information

Case study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan

Case study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan Case study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan West Rail Tsing Kwai Tunnel Location of major Tunnel Portal West Rail Tsing Kwai Tunnel Construction Features -

More information

APPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer

APPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer APPENDIX I Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer THE CITY OF BARRIE PROJECT NO. 15M-00594-01 CONCEPTUAL DESIGN SALEM ROAD AND MCKAY ROAD TRUNK WATERMAIN AND SANITARY

More information

Challenges and results of Using hand mining to tunnel the mcalpine creek relief sewer

Challenges and results of Using hand mining to tunnel the mcalpine creek relief sewer 96 th Annual NC AWWA-WEA Conference Chuck Shue, PE McKim & Creed, Inc. Senior Project Manager Challenges and results of Using hand mining to tunnel the mcalpine creek relief sewer OUTLINE Project overview

More information

Kiewit Approach for Tunnel Stabilization and Sewer Pipeline Replacement Project

Kiewit Approach for Tunnel Stabilization and Sewer Pipeline Replacement Project South Coast Water District Kiewit Approach for Tunnel Stabilization and Sewer Pipeline Replacement Project Board of Directors January 14-15, 2013 Overview of Construction Plan Highlights of Kiewit s Construction

More information

Index to Technical Specifications

Index to Technical Specifications Index to Technical Specifications Item Number Subject I II EXCAVATION 1.01 Trenching and Excavation Regulations 1.02 Site Grading or General Excavation 1.03 Structural Excavation 1.04 Trench Excavation

More information

SHAFT CONSTRUCTION SECANT PILE

SHAFT CONSTRUCTION SECANT PILE by Rob jameson and eric lindquist feature story SECANT PILE SHAFT CONSTRUCTION Modern Tools and Techniques Allow Excavation to Depths Previously Considered Infeasible By Rob Jameson and Eric Lindquist

More information

6 Preliminary Assessment of Construction Method and Constructability Issues

6 Preliminary Assessment of Construction Method and Constructability Issues 6 Preliminary Assessment of Construction Method and Constructability Issues 6.1 Construction Approach Appendix C includes conceptual designs of the alternatives discussed below. Generally, the conceptual

More information

Presentation Outline

Presentation Outline St. John s Tunnel Rehabilitation A Demonstration of Successful Fast- Track Design and Construction Christopher P. Russell, P.E. Shannon & Wilson Inc., Staff Engineer Gregory R. Fischer, Ph.D., P.E. Shannon

More information

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions City Utilities operates the largest municipally-owned wastewater collection and treatment system in Indiana. The system serves 161 square miles and includes 1,014 miles of sanitary sewer lines, 365 miles

More information

STORM SEWER TAP PERMIT REQUIREMENTS

STORM SEWER TAP PERMIT REQUIREMENTS STORM SEWER TAP PERMIT REQUIREMENTS The Fishers Construction Specifications discusses sump pump and storm sewer tap requirements per the following code under Chapter 4, Storm Sewer Design Standards and

More information

Slurry MTBM in Alluvial Soils and 25k Rock Chris L. Windley, P.E. McKim & Creed Inc. Stephen D. Leitch, P.E. Hazen and Sawyer, P.C. Joshua P.

Slurry MTBM in Alluvial Soils and 25k Rock Chris L. Windley, P.E. McKim & Creed Inc. Stephen D. Leitch, P.E. Hazen and Sawyer, P.C. Joshua P. Slurry MTBM in Alluvial Soils and 25k Rock Chris L. Windley, P.E. McKim & Creed Inc. Stephen D. Leitch, P.E. Hazen and Sawyer, P.C. Joshua P. Farmer, P.E. Hazen and Sawyer, P.C. Project Background City

More information

Today s Date: April 15, 2015 Bid Opening Date: April 22, 2015

Today s Date: April 15, 2015 Bid Opening Date: April 22, 2015 ADDENDUM NO. 1 FOR CONSTRUCTION OF COMMUNITY SEWAGE LIFT STATIONS & WASTEWATER TREATMENT LAGOONS FOR THE WHITE SHIELD COMMUNITY FORT BERTHOLD RESERVATION McLEAN COUNTY, NORTH DAKOTA Project AB-14-S59,

More information

CONSTRUCTION SPECIFICATION FOR PIPELINE INSTALLATION BY TUNNELLING

CONSTRUCTION SPECIFICATION FOR PIPELINE INSTALLATION BY TUNNELLING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 415 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR PIPELINE INSTALLATION BY TUNNELLING TABLE OF CONTENTS 415.01 SCOPE 415.02 REFERENCES 415.03 DEFINITIONS

More information

ADDENDUM #4. PROJECT: Cerro Reservoir Outlet Works Replacement BID NO: FROM: Scott Murphy DATE: January 8, 2019

ADDENDUM #4. PROJECT: Cerro Reservoir Outlet Works Replacement BID NO: FROM: Scott Murphy DATE: January 8, 2019 ADDENDUM #4 PROJECT: BID NO: 18-021 FROM: Scott Murphy DATE: Questions and Answers 1. Is it the expectation that all imported rip-rap products be 100% fractured material? Answer: The intent for imported

More information

Successful Foundation Preparations in Karst Bedrock of the Masonry Section of Wolf Creek Dam

Successful Foundation Preparations in Karst Bedrock of the Masonry Section of Wolf Creek Dam Successful Foundation Preparations in Karst Bedrock of the Masonry Section of Wolf Creek Dam David M. Robison, P.G. Geotechnical and Dam Safety Section, Louisville District, U.S. Army Corps of Engineers

More information

A Trenchless Approach to Lift Station Elimination

A Trenchless Approach to Lift Station Elimination A Trenchless Approach to Lift Station Elimination PRESENTED BY: SCOTT MAUGHN, P.E. DANIEL HUFFINES, P.E. FSAWWA Fall Conference November 27, 2018 1 AGENDA Project Background Preliminary Investigations

More information

Deep Water Drilled Shafts for the Herrington Lake Bridge Replacement Project

Deep Water Drilled Shafts for the Herrington Lake Bridge Replacement Project Deep Water Drilled Shafts for the Herrington Lake Bridge Replacement Project Darrin Beckett, P.E. Kentucky Transportation Cabinet 49 th Southeastern Transportation Geotechnical Engineering Conference October

More information

A Sigh of Relief: Completion of the San Mateo El Cerrito Relief Line. Kourosh Iranpour, PE

A Sigh of Relief: Completion of the San Mateo El Cerrito Relief Line. Kourosh Iranpour, PE A Sigh of Relief: Completion of the San Mateo El Cerrito Relief Line Kourosh Iranpour, PE Presentation Outline Background information Selection of preferred alignment Primary project challenges Selection

More information

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered RFB for Wastewater Force Main #3 October 2, 2015 Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered The proposed force main will be required to transmit up to 1000 gallons of wastewater

More information

Foster Park Retrieval Shaft

Foster Park Retrieval Shaft Fort Wayne Tunnel Works Foster Park Retrieval Shaft October 25, 2017 Agenda Brief review of the Tunnel & Shafts project Why we have to be in Foster Park Retrieval Shaft Drop Shaft What the project is going

More information

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587 CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587 JANUARY 2010 TABLE OF CONTENTS SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 APPENDIX ROADWAY DESIGN DRAINAGE

More information

TECHNICAL NOTE HDPE Pipe and Utility Crossings

TECHNICAL NOTE HDPE Pipe and Utility Crossings TECHNICAL NOTE HDPE Pipe and Utility Crossings TN 5.09 April 2008 Introduction Underground utilities include storm sewer, electric, sanitary sewer, gas, water, telephone and cable. Utility conflicts are

More information

SECTION HORIZONTAL DIRECTIONAL DRILLING

SECTION HORIZONTAL DIRECTIONAL DRILLING SECTION 330532- HORIZONTAL DIRECTIONAL DRILLING PART 1 - GENERAL 1.1 DESCRIPTION A. Furnish all labor, materials, tools, and equipment required to install pipes below the outer perimeter prison fence using

More information

F. Provide at least 2 feet of vertical separation between a water line and any utility or stormdrain crossing it.

F. Provide at least 2 feet of vertical separation between a water line and any utility or stormdrain crossing it. Section 3 F. Provide at least 2 feet of vertical separation between a water line and any utility or stormdrain crossing it. 3.8 Highway Crossings The design engineer shall, prior to the design of any highway

More information

File No Supplemental November Geotechnical and Environmental Consulting Engineers

File No Supplemental November Geotechnical and Environmental Consulting Engineers Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price) SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

VOLUME 2 TECHNICAL SPECIFICATIONS BID NO PROJECT MANUAL FOR BONDS RANCH ROAD WIDENING PROJECT BIDS DUE JULY 9, :00 P.M.

VOLUME 2 TECHNICAL SPECIFICATIONS BID NO PROJECT MANUAL FOR BONDS RANCH ROAD WIDENING PROJECT BIDS DUE JULY 9, :00 P.M. Vendor Name: JACK BEACHAM, C.P.M., A.P.P. PURCHASING AGENT TARRANT COUNTY PURCHASING DEPARTMENT ROB COX, C.P.M., A.P.P. ASSISTANT PURCHASING AGENT VOLUME 2 TECHNICAL SPECIFICATIONS BID NO. 2015-161 PROJECT

More information

ITEM 432 TUNNEL CONSTRUCTION

ITEM 432 TUNNEL CONSTRUCTION AFTER MARCH 1, 2012 ITEM 432 TUNNEL CONSTRUCTION 432.1 Description. This Item shall govern for tunnel lines under railroads, state highways, and concrete paved streets or other obstructions indicated.

More information

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe.

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe. STANDARD SPECIFICATIONS SECTION 02445 BORING AND JACKING PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for boring and jacking casing pipe. 1.2 DEFINITIONS A. Carrier Pipe: Sewer or water

More information

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing. SECTION 02221 TRENCHING, BACKFILLING AND COMPACTION PART 1 GENERAL 1.01 WORK INCLUDED A. Excavation for piped utility material. B. Provide necessary sheeting, shoring and bracing. C. Prepare trench bottom

More information

Appendix K: Soil Erosion and Sedimentation Control Plan Check List

Appendix K: Soil Erosion and Sedimentation Control Plan Check List Appendix K: Soil Erosion and Sedimentation Control Plan Check List Drain Commissioner 46 February 2005 SOIL EROSION AND SEDIMENTATION CONTROL PLAN CHECK LIST Items listed below must be clearly depicted

More information

Texas-Sized Challenges

Texas-Sized Challenges Aerial view of the City of Austin s Water Treatment Plant No. 4 in northwest Austin near the intersection of RM 620 and Bullick Hollow Road. cover story Delivering Water Provides Texas-Sized Challenges

More information

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006

More information

Ø1.8m Double Shield TBM for Mixed Ground Sewer Tunnels in Cincinnati

Ø1.8m Double Shield TBM for Mixed Ground Sewer Tunnels in Cincinnati Ø1.8m Double Shield TBM for Mixed Ground Sewer Tunnels in Cincinnati Steve Lamb The Robbins Company, Solon, Ohio, USA Steve Abernathy Midwest Mole, Inc., Indianapolis, Indiana, USA ABSTRACT: A Robbins

More information

SECTION DRILLED CONCRETE PIERS AND SHAFTS

SECTION DRILLED CONCRETE PIERS AND SHAFTS 1 PART ONE - GENERAL 1.1 COORDINATION SECTION 02466 DRILLED CONCRETE PIERS AND SHAFTS A. The General, Supplementary, and Special Conditions of these specifications shall all be considered as a part of

More information

D&B versus TBM some case stories

D&B versus TBM some case stories D&B versus TBM some case stories TBM Applications II Bergen, June 6 th and 7 th Project Manager Anne Kathrine Kalager Case stories Two different Projects Considerations regarding excavation method: New

More information

Optimization of Supports in a Road Tunnel through Conglomerate during Construction

Optimization of Supports in a Road Tunnel through Conglomerate during Construction Optimization of Supports in a Road Tunnel through Conglomerate during Construction Tülin SOLAK, Temelsu International Engineering Services Inc., Turkey, tulin.solak@temelsu.com.tr Bülent ULUKAN, Temelsu

More information

a tankage process. delivery. 4. Avoid 6x6 T-bar Page 1 of 7 POLY Tank

a tankage process. delivery. 4. Avoid 6x6 T-bar Page 1 of 7 POLY Tank You will find the following preliminary tank installation information helpful when making plans for your water storage project. A complete Installation Manual will be forwarded to you upon receipt of a

More information

IEEE 18-May Intake. Tunnel. Outlet

IEEE 18-May Intake. Tunnel. Outlet IEEE 18-May-2011 Intake Tunnel Outlet 1 Increase water diversion capacity at the Sir Adam Beck complex by 500 m 3 /s (+27%) Increase average annual energy output at the Sir Adam Beck complex by 1.6 billion

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

Controlling CSO Discharges in the City of Toronto: Don River and Central Waterfront Project

Controlling CSO Discharges in the City of Toronto: Don River and Central Waterfront Project Controlling CSO Discharges in the City of Toronto: Don River and Central Waterfront Project Michael D Andrea, M.E.Sc., P.Eng. Chief Engineer and Executive Director Engineering & Construction Services City

More information

Table of Contents 18.1 GENERAL Overview Responsibilities References

Table of Contents 18.1 GENERAL Overview Responsibilities References Table of Contents Section Page 18.1 GENERAL... 18.1-1 18.1.1 Overview... 18.1-1 18.1.2 Responsibilities... 18.1-1 18.1.3 References... 18.1-2 18.2 MISCELLANEOUS FOUNDATION DESIGNS... 18.2-1 18.2.1 Buildings...

More information

ALMEDA TUNNEL PAST, PRESENT AND FUTURE

ALMEDA TUNNEL PAST, PRESENT AND FUTURE ALMEDA TUNNEL PAST, PRESENT AND FUTURE Ravi Kaleyatodi, P.E., CPM Senior Assistant Director, City of Houston Ravi.kaleyatodi@cityofhouston.net Paul C. Wallick, P.E., Senior Project Manager Patricia Frayre,

More information

Reducing Overflows using a Baffling Solution. OWEA AWWA 2014 Technical Conference & Expo August 28, 2014 Columbus, Ohio

Reducing Overflows using a Baffling Solution. OWEA AWWA 2014 Technical Conference & Expo August 28, 2014 Columbus, Ohio Reducing Overflows using a Baffling Solution OWEA AWWA 2014 Technical Conference & Expo August 28, 2014 Columbus, Ohio 1 Presented by: Steve Janosko, P.E. Project Manager Tony Margevicius, P.E. Vice President

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

Construction and Maintenance Challenges with Sudbury s Sewage Rock Tunnel

Construction and Maintenance Challenges with Sudbury s Sewage Rock Tunnel Construction and Maintenance Challenges with Sudbury s Sewage Rock Tunnel Trenchless Technology Road Show 2014 Niagara Falls Robert Langlois, P.Eng Associate/Project Manager TRENCHLESS TECHNOLOGY ROADSHOW

More information

CONTRACT PROPOSAL/CONTRACT ACCEPTANCE HIGDON LOOP ROAD BRIDGE

CONTRACT PROPOSAL/CONTRACT ACCEPTANCE HIGDON LOOP ROAD BRIDGE CONTRACT PROPOSAL/CONTRACT ACCEPTANCE PROJECT # 2017-NC-001 For Construction of HIGDON LOOP ROAD BRIDGE located in Nelson County Kentucky 09/2017 REQUEST FOR BIDS HIGDON LOOP ROAD BRIDGE REPLACEMENT Nelson

More information

G&P GEOTECHNICS SDN BHD CHECKLIST FOR EARTHWORKS (ROCK EXCAVATION AND ROCK SLOPE STRENGTHENING WORKS) WORK INSTRUCTIONS FOR ENGINEERS KYW.

G&P GEOTECHNICS SDN BHD CHECKLIST FOR EARTHWORKS (ROCK EXCAVATION AND ROCK SLOPE STRENGTHENING WORKS) WORK INSTRUCTIONS FOR ENGINEERS KYW. Page 1 of 4 WORK INSTRUCTIONS FOR ENGINEERS Compiled by Checked by Approved by KYW : : TYC : LSS OP-3-57. (ROCK EXCAVATION) Page 2 of 4 NO. CHECKLIST ITEMS PROJECT Project Name : Project No.: Checked By

More information

JUST THE FACTS CONCRETE PIPE VS. HDPE

JUST THE FACTS CONCRETE PIPE VS. HDPE JUST THE FACTS CONCRETE PIPE VS. HDPE Just the FACTS! DRAINAGE PIPE PERFORMANCE AND DESIGN COMPARISON CONCRETE VS. HDPE Contents Current Standards............................2 Corrugation Growth and its

More information

Public Utilities PELICAN MARSH ELEMENTARY SCHOOL WATER SERVICE REPLACEMENT

Public Utilities PELICAN MARSH ELEMENTARY SCHOOL WATER SERVICE REPLACEMENT Public Utilities PELICAN MARSH ELEMENTARY SCHOOL WATER SERVICE REPLACEMENT Prepared By: 3800 Via Del Rey Bonita Springs, FL 34134 July 2015 Table of Contents Name Section Bid Schedule Project Description

More information

Geotechnical Investigations Water Main Construction

Geotechnical Investigations Water Main Construction Geotechnical Investigations Water Main Construction GHD Water Andrew R. Glitzer, P.E. Sr. Project Engineer Water Main Construction Why Consider Geotechnical Evaluations? Not a typically a part of routine

More information

Presented by: Frank Guyamier

Presented by: Frank Guyamier FTBA Orlando Tuesday, March 20, 2012 Presented by: Frank Guyamier Project Engineer P3 PROJECT PARTNERS Public Sponsors 90% Equity Partner Design/Build Contractor 10% Equity Partner VMS Operator Federal

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

REPAIR OF AN 80-YEAR- OLD DRY STACK WALL. Ryan Eaves, E.I.T. Bridge Division Geotechnical Branch

REPAIR OF AN 80-YEAR- OLD DRY STACK WALL. Ryan Eaves, E.I.T. Bridge Division Geotechnical Branch REPAIR OF AN 80-YEAR- OLD DRY STACK WALL Ryan Eaves, E.I.T. Bridge Division Geotechnical Branch October 2015 Project Location Located on Texas 290 90 miles southwest of San Angelo Remote area 10 miles

More information

Department of Administration State Construction Office SITE PREPARATION AND GRADING CRITERIA

Department of Administration State Construction Office SITE PREPARATION AND GRADING CRITERIA Revised May 17, 2011 Department of Administration State Construction Office SITE PREPARATION AND GRADING CRITERIA INTRODUCTION These criteria are established to provide uniform construction practices and

More information

CONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146

CONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146 GEOTECHNICAL EXPLORATION SERVICES REPORT CONDUCTED FOR: Collier Boulevard PREPARED FOR: Mr. Christopher L. Johnson Director of Land Development Stock Development, LLC Professional Circle, Suite 01 Naples,

More information

Waterview Connection Tunnels

Waterview Connection Tunnels Hamish Maclean Waterview Connection Tunnels Fissure grouting and rock defect characterisation for the Waterview cross passage tunnels H.J. Maclean, S. Cartwright and A. Giauque S. Cartwright et al, 2017

More information

Tunnel. Immersed Tunnels

Tunnel. Immersed Tunnels Tunnel Tunnels are underground spaces, usually, in a tubular shape with substantial lengths. They can either be man-made or natural and can be used as passageways, storages, carriageways and utility ducts.

More information

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING

DIVISION 33 - UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES SECTION UTILITY PIPE BORING AND JACKING DIVISION 33 UTILITIES PART 1 GENERAL 1.01 SCOPE A. This work shall consist of the underground construction of a pipeline across the state right-ofway, or other facility as indicated on the plans and as

More information

Design and Implementation of the South Hartford CSO Tunnel

Design and Implementation of the South Hartford CSO Tunnel Design and Implementation of the South Hartford CSO Tunnel Brian Canterbury, P.E., AECOM James Sullivan, P.E., AECOM Andrew Perham, The Metropolitan District The Metropolitan District NEWEA January 22,

More information

FEATURES & BENEFITS OF ARMTEC TUNNEL LINER PLATE

FEATURES & BENEFITS OF ARMTEC TUNNEL LINER PLATE TUNNEL LINER PLATE FEATURES & BENEFITS OF ARMTEC TUNNEL LINER PLATE SAFE ECONOMICAL VERSATILE SIMPLE EASY TO HANDLE READILY AVAILABLE All underground work can be undertaken from within the assembled shell.

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

DETROIT RIVER INTERNATIONAL CROSSING STUDY MAG

DETROIT RIVER INTERNATIONAL CROSSING STUDY MAG DETROIT RIVER INTERNATIONAL CROSSING STUDY MAG Meeting September 5 th, 2006 1 Agenda 1. Study Update 2. Construction Staging for Tunneling 3. Other Business 2 Deep Borehole Program 3 Status Update - Engineering

More information

Trenchless Technology

Trenchless Technology TRENCHLESS TECHNOLOGY Gene Woodbridge Earth Boring Co. Limited www.earthboring.ca Earth Boring Co. Limited 1576 Ifield Road Mississauga, ON L5H 3W1 (905) 277-9632 fax (905) 274-9040 Trenchless Technology

More information

REPAIR OF DISPLACED SHIELD TUNNEL OF THE TAIPEI RAPID

REPAIR OF DISPLACED SHIELD TUNNEL OF THE TAIPEI RAPID REPAIR OF DISPLACED SHIELD TUNNEL OF THE TAIPEI RAPID TRANSIT SYSTEM Chi-Te Chang, Ming-Jung Wang, Chien-Tzen Chang, and Chieh-Wen Sun Central District Office, Department of Rapid Transit System, Taipei

More information

STANDARD SPECIFICATIONS SECTION TUNNELING. A. Section includes requirements for constructing tunnels 48-inch and larger diameter.

STANDARD SPECIFICATIONS SECTION TUNNELING. A. Section includes requirements for constructing tunnels 48-inch and larger diameter. STANDARD SPECIFICATIONS SECTION 02420 TUNNELING PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for constructing tunnels 48-inch and larger diameter. 1.2 DEFINITIONS A. Carrier Pipe: Sewer

More information

CONSTRUCTION SPECIFICATION FOR TUNNELLING

CONSTRUCTION SPECIFICATION FOR TUNNELLING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 415 FEBRUARY 1990 CONSTRUCTION SPECIFICATION FOR TUNNELLING 415.01 SCOPE 415.02 REFERENCES 415.03 DEFINITIONS TABLE OF CONTENTS 415.04 SUBMISSION AND

More information

Two-Phase Project Adds Capacity, Reliability, and Redundancy to 80-year-old Pump Station in Saint Paul

Two-Phase Project Adds Capacity, Reliability, and Redundancy to 80-year-old Pump Station in Saint Paul Two-Phase Project Adds Capacity, Reliability, and Redundancy to 80-year-old Pump Station in Saint Paul Project Overview Minnesota s state capital, Saint Paul, is built around the Mississippi and Minnesota

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

2014 Summer Winter Integrated Field Technologies (SWIFT) Conference, Vancouver, BC

2014 Summer Winter Integrated Field Technologies (SWIFT) Conference, Vancouver, BC 2014 Summer Winter Integrated Field Technologies (SWIFT) Conference, Vancouver, BC Etobicoke Creek Trunk Sanitary Sewer Microtunnel Design under Runway 5-23 at Toronto Pearson International Airport By

More information

WARNING DO NOT BID ON THIS PROJECT

WARNING DO NOT BID ON THIS PROJECT WARNING DO NOT BID ON THIS PROJECT Nick H. Strater, P.G., Associate, Brierley Associates, Bedford, NH Brian C. Dorwart, P.E., P.G., Sr. Consultant, Brierley Associates, Bedford, NH For projects advertised

More information

Construction and Design of Drilled Shafts in Hard Pinnacle Limestones

Construction and Design of Drilled Shafts in Hard Pinnacle Limestones 148 TRANSPORTA T/ON RESEARCH RECORD 1277 Construction and Design of Drilled s in Hard Pinnacle Limestones DAN A. BROWN Construction and design of drilled shaft foundations in hard pinnacle limestone requires

More information

Soft Ground Tunneling through Contaminated Groundwater

Soft Ground Tunneling through Contaminated Groundwater 5 th Annual Technical Forum GEOHAZARDS IN TRANSPORTATION IN THE APPALACHIAN REGION Soft Ground Tunneling through Contaminated Groundwater Nasri Munfah P.E. and Subal Sarkar P.E. Parsons Brinckerhoff, New

More information

DESIGN AND INSTALLATION OF THE SHORING AND DECKING FOR TTC YONGE STATION

DESIGN AND INSTALLATION OF THE SHORING AND DECKING FOR TTC YONGE STATION DESIGN AND INSTALLATION OF THE SHORING AND DECKING FOR TTC YONGE STATION INTRODUCTION By Dawn Tattle, P. Eng. Anchor Shoring & Caissons Ltd. TTC Yonge Station is the largest and most complicated of the

More information

Rock Tunnel Engineering INTRODUCTION. Tunnel a hole in the ground to provide for desired movement or as mobility channel.

Rock Tunnel Engineering INTRODUCTION. Tunnel a hole in the ground to provide for desired movement or as mobility channel. Rock Tunnel Engineering INTRODUCTION Tunnel a hole in the ground to provide for desired movement or as mobility channel. Serves as highway, railroad, pedestrian passageway, water conveyance, waste water

More information

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations. Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS Section SECTION 39 - MANHOLES TABLE OF CONTENTS Page 39-1 GENERAL... 39.1 39-2 CONCRETE MANHOLES... 39.1 39-2.01 NOT USED... 39.1 39-2.02 Concrete Storm Drain Manholes... 39.1 39-3 SADDLE SEWER MANHOLES...

More information

VTA s BART Silicon Valley Phase II Extension

VTA s BART Silicon Valley Phase II Extension VTA s BART Silicon Valley Phase II Extension Downtown-Diridon Community Working Group December 1, 2015 1 Agenda Follow-up Items and Work Plan New Starts Project Development & Schedule Update Construction

More information

APPLICATION OF THREE DIFFERENT TRENCHLESS METHODS TO SOLVE UNIQUE CROSSING CONSTRAINTS

APPLICATION OF THREE DIFFERENT TRENCHLESS METHODS TO SOLVE UNIQUE CROSSING CONSTRAINTS The Northern California Pipe User s Group 20th Annual Sharing Technologies Seminar www.norcalpug.com Berkeley, CA February 16, 2012 APPLICATION OF THREE DIFFERENT TRENCHLESS METHODS TO SOLVE UNIQUE CROSSING

More information

Chapter 3 Previous Studies

Chapter 3 Previous Studies Chapter 3 Previous Studies The Vista Grande stormwater conveyance system and watershed area has been evaluated in a number of reports and studies for the CCSF, the Daly City and San Mateo County over the

More information

10:00 AM, Wednesday, April 8, 2015

10:00 AM, Wednesday, April 8, 2015 NOTICE OF MANDATORY PRE-BID CONFERENCE WILL BE HELD AT 10:00 AM, Wednesday, April 8, 2015 IN ROOM 16, CITY HALL BUILDING, 101 NORTH MAIN STREET WINSTON-SALEM, NORTH CAROLINA The purpose of this conference

More information

10:00 AM, Wednesday, May 6, Peters Creek Sanitary Sewer Rehabilitation Project

10:00 AM, Wednesday, May 6, Peters Creek Sanitary Sewer Rehabilitation Project NOTICE OF MANDATORY PRE-BID CONFERENCE WILL BE HELD AT 10:00 AM, Wednesday, May 6, 2015 IN ROOM 16, CITY HALL BUILDING, 101 NORTH MAIN STREET WINSTON-SALEM, NORTH CAROLINA The purpose of this conference

More information

INFLOW & INFILTRATION CORRECTION VIA LATERAL LINE DITCH LEAK REPAIRS

INFLOW & INFILTRATION CORRECTION VIA LATERAL LINE DITCH LEAK REPAIRS 1 of 5 8/1/2013 2:10 PM INFLOW & INFILTRATION CORRECTION VIA LATERAL LINE DITCH LEAK REPAIRS Project Location and Description Glen Mayberry, Project Manager Roy F. Weston, Houston, TX The project is in

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

SECTION BORING AND/OR JACKING PIPE

SECTION BORING AND/OR JACKING PIPE 02910-1 of 6 SECTION 02910 BORING AND/OR JACKING PIPE 02910.01 GENERAL A. Description Boring and/or jacking pipe shall include, but not necessarily be limited to, furnishing and installing carrier pipe

More information

LESSONS LEARNED DURING INSTALLATION OF LARGE DIAMETER CIPP LINING IN AN ENVIRONMENTAL MITIGATION AREA (TM1-T3-05)

LESSONS LEARNED DURING INSTALLATION OF LARGE DIAMETER CIPP LINING IN AN ENVIRONMENTAL MITIGATION AREA (TM1-T3-05) LESSONS LEARNED DURING INSTALLATION OF LARGE DIAMETER CIPP LINING IN AN ENVIRONMENTAL MITIGATION AREA (TM1-T3-05) Jennifer Glynn, P.E., RMC Water and Environment, Walnut Creek, California NASTT s 2016

More information

Case Histories. Cap and Compaction Grouting for Sinkhole Remediation R.M. Bivens, P.E. Rembco Geotechnical Contractors, Inc.

Case Histories. Cap and Compaction Grouting for Sinkhole Remediation R.M. Bivens, P.E. Rembco Geotechnical Contractors, Inc. Case Histories Cap and Compaction Grouting for Sinkhole Remediation R.M. Bivens, P.E. Rembco Geotechnical Contractors, Inc. Cap Grouting Capping the top of the rock surface with grout to provide a barrier

More information

Compaction and Jet Grouting

Compaction and Jet Grouting Compaction and Jet Grouting Alan Ringen, PE Senior Vice President Breakthroughs in Tunneling Short Course August 16, 2017 Grouting Principles Geotechnical Grouting: The injection of pumpable fluid materials

More information

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM

PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 2- Problem: Storm runoff from the park flows overland through a gap in a berm and then into the neighboring subdivision

More information

Improving the Seismic Resilience of Lifeline Tunnels

Improving the Seismic Resilience of Lifeline Tunnels Improving the Seismic Resilience of Lifeline Tunnels V.S. Romero Jacobs Associates, Auckland, New Zealand. R.J. Caulfield Jacobs Associates, San Francisco, California, USA. 2012 NZSEE Conference ABSTRACT:

More information

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without

More information

ADDENDUM #1 Village of Hawthorn Woods Darlington Drive Culvert Replacement Date: January 29, 2018

ADDENDUM #1 Village of Hawthorn Woods Darlington Drive Culvert Replacement Date: January 29, 2018 CBBEL PROJECT NO. 02-0065.H0226 ADDENDUM #1 Village of Hawthorn Woods Darlington Drive Culvert Replacement Date: January 29, 2018 Modification No. 1 In regards to the COBBLESTONE PAVERS specification,

More information

Section 403. DRAINAGE STRUCTURES

Section 403. DRAINAGE STRUCTURES 403.01 Section 403. DRAINAGE STRUCTURES 403.01. Description. This work consists of adjusting, constructing, or temporarily lowering drainage structures and cleaning existing drainage structures and leads

More information

Cost Estimating Framework

Cost Estimating Framework Cost Estimating Framework Water and Wastewater Master Study Prepared by: GM BluePlan Engineering for: Project No. 717022 TABLE OF CONTENTS 1 Introduction... 1 2 Cost Estimation Framework... 2 2.1 Approach

More information

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe.

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe. AFTER MARCH 1, 2012 ITEM 460 REINFORCED CONCRETE PIPE 460.1 Description. This Item shall govern for the furnishing of reinforced concrete pipe. 460.2 Materials. A. Except as modified herein, materials,

More information

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Soil Survey Report March 29, 2015 Matthew G. Moore, P.E.

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Soil Survey Report March 29, 2015 Matthew G. Moore, P.E. LD-40 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Soil Survey Report March 29, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia Insert

More information

CONSTRUCTION SPECIFICATION FOR GRADING

CONSTRUCTION SPECIFICATION FOR GRADING ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 206 NOVEMBER 2000 CONSTRUCTION SPECIFICATION FOR GRADING TABLE OF CONTENTS 206.01 SCOPE 206.02 REFERENCES 206.03 DEFINITIONS 206.04 SUBMISSION AND

More information