Streaming BIM Lifecycle Information. Murray Hestley, Whiting-Turner Construction Eric Nulton, Penn State University
|
|
- Adelia Bryan
- 6 years ago
- Views:
Transcription
1 Streaming BIM Lifecycle Information Murray Hestley, Whiting-Turner Construction Eric Nulton, Penn State University
2 The Associated General Contractors of America (AGC) is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported to CES Records for AIA members. Certificates of Completion are available on request. This program is registered with the AIA/CES for continuing professional education. As such it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.
3 Copyr i ght This presentation and the materials provided are protected by U.S. and International copyright laws. Reproduction, distribution, display and use of the presentation or materials without written permission is prohibited. AGC of America, 2012
4 Cour se Descr i pt i on As owner, designer, and facility manager, the Office of Physical Plant (OPP) at the Pennsylvania State University (Penn State) has been successful with Building Information Modeling (BIM) implementation beyond construction. This has been achieved by keeping the end in mind and focusing on the use of BIM at project conception for building operations. By teaming with the Computer Integrated Construction (CIC) research group, developers of the BIM Project Execution Planning Guide, OPP has developed a strategic plan, and documented lessons learned from a large-scale BIM implementation. Penn State is currently integrating information into their facilities management system with a focus on preventative maintenance. Penn State is working extensively with vendors and Whiting-Turner to develop the integration between BIM software and their existing facilities management program. This strategy includes providing visualization of asset information, visibility of owner/operator data requirements, and feedback of building performance. The integration workflow includes a central database with a bidirectional link as the model and associated information will be accessed differently. The goal of this project was to develop a system, working within each of the project team's workflows, and was tested and validated on a University Park campus facility.
5 Lear ni ng Obj ect i ves Attendees will be able to: IDENTIFY BIM Initiatives at Penn State University UNDERSTAND Penn State and Whiting Turner's methods, strategies, and lessons learned for harvesting BIM data and importing it into a CMMS DEFINE Strategies for developing effective BIM to FM integration methodology.
6 How Does Penn State Define BIM?
7 Bui l di ng A Constructed Environment
8 Inf or mat i on Facility Data Room Information Energy Consumption Space Classifications Asset Data Make Model Serial # Voltage Horse Power Warranty Etc
9 Model Rendering Coordination Model Maintenance System
10 AND How Is Penn State DEVELOPING EFFECTIVE BIM FM INTEGRATION?
11 Implementation Methodology CONDUCT EXPERT INTERVIEWS WITH ALL OPP DEPARTMENTS PRIORITZE AREAS OF POTENTIAL INTEGRATION ORGANIZE FOCUS GROUP ANALYZE EXISTING SYSTEMS AND WORKFLOWS DEVELOP BIM TO FM INTEGRATION WITH FOCUS GROUP TEST&VALIDATE WITH INDUSTRY FEEDBACK/PILOT PROJECT
12 Interview Questions WHAT INFORMATION IS CURRENTLY TRACKED? HOW IS THIS INFORMATION TYPICALLY USED? WHAT ADDITIONAL INFORMATION CAN BE BENEFICIAL? WHO ARE YOUR KEY PLAYERS?
13 Interview Outcome OPP Department Interest Level Barrier to Entry BIM Technology Competency Information Overlap Predecessor Successor Advantage 1 Design & Construction High Medium High 6 2,4 High 2 Work Control Center High Low Very High 1 4,8 High HMC Design & Construction Energy and Engineering Commonwealth Services Campus Planning & Design Facilities Resources & Planning High Low High 1 2 High High Medium High 1,2 2 High Medium Medium Medium 1 2 Medium Medium Medium Medium Medium Medium Medium Medium Medium 8 Buildings and Grounds Low High Low 2 2 Medium 9 Campus Sustainability Office Low High Low Low 10 Environmental Health and Safety Low High Low Low 11 Administrative & Financial Services Low High Low Low *Departments are ranked in order of integration priority.
14 Why Utilize BIM for Operations and Maintenance? NOT MAINTENANCE FRIENDLY
15 Why Utilize BIM for Operations and Maintenance? MAINTENANCE FRIENDLY
16 Items Not Designed for Maintenance Cost 2 TIMES 4 TIMES 25 OVER Preventative Maintenance Corrective Maintenance YEARS
17 Why Utilize BIM for Operations and Maintenance? Improved Facility Visualization
18 Why Utilize BIM for Operations and Maintenance? Improved Facility Information
19 Penn State Projected Savings YEARLY 164,000 TOTAL WORK ORDERS 109,000 PM work 1.5 hrs each 55,000 CM & EM work 5 hrs each 438,000 man hours per year SAVING 45 MINUTES PER DAY PER PERSON TOTAL $2.2M POTENTIAL YEARLY SAVINGS Research and interoperability issues Estimated savings of ten percent in operations
20 Penn State Millennium Science Complex BIM to FM Pilot Study
21 BIM to FM Pilot Study Goals PROVIDE VISUALIZATION OF ASSET INFORMATION REDUCE COST AND PLANNING TIME PROVIDE VISIBILITY OF OPERATOR DATA REQUIREMENTS DELIVER FEEDBACK BUILDING PERFORMANCE
22 Pilot Phases 1. FACILITY DATA EXPORT Design & Construction Data Maintenance System
23 Deliverables Process VDC Process Map Schematic Design Preliminary Design 3D Civil Design Project Goals Defined Deliver Design Models Design Review & Coordination Fire Protection Design Criteria BIM Process Map Responsibility Matrix Define Standards Deliver Manufacturer Equipment Data Fire Protection Pkg Architectural, Structural, Plumbing, HVAC, Mechanical, and Electrical Bid Packages
24 VDC Process Map Permit Drawings Revise models No Construction Drawings & GMP FM Combine models Clash Detection Yes Pass Coordinated BIM Model Update models Repeat with other models Coordination No Yes Pass Prepare price Permit set Review and Approved Review & approve Issue building permit Consultant Input Trade Bid Packages
25 Deliverables Process VDC Process Map Schematic Design Preliminary Design 3D Civil Design Project Goals Defined Deliver Design Models Design Review & Coordination Fire Protection Design Criteria BIM Process Map Responsibility Matrix Define Standards Deliver Manufacturer Equipment Data Fire Protection Pkg Architectural, Structural, Plumbing, HVAC, Mechanical, and Electrical Bid Packages
26 Pilot Phases 1. FACILITY DATA EXPORT 2. BIM DATA SYNCHRONIZATION Design & Construction Data Maintenance System
27 Current Design & Construction Program Architecture Design Model HVAC Model Structure Design Model Concrete Model Steel Model Mechanical Piping Model MEP Design Model Civil/Site Design Model Electrical Model Plumbing Model Design Geometry Construction Geometry Data Transfer Fire Sprinkler Model Technology Model Facilities Management
28 Proposed Design & Construction Program HVAC Model Design Geometry Architecture Design Model Construction Geometry Concrete Model Structure Design Model Data Transfer Steel Model MEP Design Model Mechanical Piping Model As-Built Composite Model Civil/Site Design Model Electrical Model Plumbing Model Fire Sprinkler Model Technology Model Database Facilities Management
29 Pilot Phases 1. FACILITY DATA EXPORT 2. BIM DATA SYNCHRONIZATION 3. VISUALIZATION INTEGRATION Design & Construction Data Maintenance System
30 Data Transfer Process Design Stage Construction Stage Operations Stage DATA DATA Design Construction Input Input 3D MODEL Model Creation Extract Data ASSET DATA Owner Gatekeeper OG FM DATABASE Model Updated Update Data UPDATE Renovation Stage
31
32 AND How Is Penn State DEVELOPING EFFECTIVE BIM FM DATA INTEGRATION?
33 TYPICAL PUMP Information Requirements ENTERPRISE ASSET MANAGEMENT SYSTEM IBM MAXIMO WHICH PREVENTATIVELY MAINTAINS 50,000 MEP Assets Equipment Number Fluid Flowrate Total Head Pressure Pump RPM Construction Drawing ID Driver Voltage Phase A Driver Voltage Phase B Driver Voltage Phase C Driver Motor Amperage Phase A Driver Motor Amperage Phase B Driver Motor Amperage Phase C Type Model Model Number Manufacturer PENN STATE OFFICE OF PHYSICAL PLANT FACILITY ASSET REQUIREMENTS
34 Level of Development Definition LEVEL OF DEVELOPMENT DESCRIPTION Contains LOD 510 LOD 100 facility and geometry data in as-built conditions. PSU Asset Attribute's List data Operations and Maintenance manuals Warranty information Submittal information Contains LOD 200 facility and geometry data in as-built conditions. LOD 520 PSU Asset Attribute's List data Operations and Maintenance manuals Warranty information Submittal information LOD 530.
35 Updated Modeling Standards in Contract
36 BIM for Owners Additional Information at bim.psu.edu
37 Questions?
38 Thank You! Murray Hestley Whiting-Turner Eric Nulton Penn State University
Office of Physical Plant Case Study
The Pennsylvania State University Office of Physical Plant Case Study Methods used to analysis an owner organization for the planning of BIM implementation The Computer Integrated Construction Research
More information- DATA REQUIREMENTS BIM
UHS BIM Protocol S E C T I O N 1 - DATA REQUIREMENTS BIM authoring software: The design team is required to use parametric BIM authoring software for creation of models that include all geometry, physical
More informationUSGBC National Capital Region MasterClass Series: The Ins and Outs of Existing Building Commissioning Analysis Credit
USGBC National Capital Region MasterClass Series: The Ins and Outs of Existing Building Commissioning Analysis Credit Jeffrey Salay, PE, CEM, LEED AP Senior Principal 13 December 2017 GHT Limited is a
More informationFull-Scope Commissioning for High-Quality Buildings
Full-Scope Commissioning for High-Quality Buildings Pieter L. van der Mersch, PE, QCxP University of Colorado Boulder 21 st National Conference on Building Commissioning AIA Quality Assurance The Building
More informationBIM EXECUTION PLAN PROJECT INFORMATION PROJECT NUMBER
PROJECT NAME BIM EXECUTION PLAN PROJECT INFORMATION CLIENT PROJECT NAME PROJECT NUMBER XX XXXXX XX XXXXX XXXXXXXXXXXXXXXXXXXXXXXXX DATE XXXXXXXX 2016 PROJECT LOCATION & ADDRESS XXXXX, XXXXX. INTRODUCTION...
More informationBIM Checklist. Introduction
Introduction This Building Information Modeling (BIM) Checklist is intended to be used as a guide for project stakeholders who are looking to implement BIM/VDC in a design-build project. Since integration
More informationBuilding Information Modeling to Facilities Information Management and Beyond
Building Information Modeling to Facilities Information Management and Beyond Meghan Ruffo, Thomas Koltoniak, & Geoffrey Coon Carolinas HealthCare System Join the conversation #AU2016 Class summary Carolinas
More informationCOMMISSIONING PROCESS FOR BUILDINGS AND SYSTEMS ASHRAE STANDARD 202
COMMISSIONING PROCESS FOR BUILDINGS AND SYSTEMS ASHRAE STANDARD 202 Gerald J. Kettler, PE, CCP, CPMP 21 st National Conference on Building Commissioning AIA Quality Assurance The Building Commissioning
More informationInvolving Stakeholders in the Professional s Design and Construction Process
Involving Stakeholders in the Professional s Design and Construction Process Presented By: Peter Trozze, AIA Managing Director of Middle Eastern Operations Continuing Education The Middle East Chapter
More informationConference For Catholic Facility Management. Track 8 Making Cents of Financing and Building in this Economy
Track 8 Making Cents of Financing and Building in this Economy Course Description In October 2010, the AIA/CES system was updated with the new CES Discovery system, in that time we have transferred more
More informationNational Institute of Building Sciences
National Institute of Building Sciences Provider Number: G168 Session TH1B: Utilizing Information Technology for Better Building Performance Case Study: COBie from Design to Operations Presented by: Kristine
More informationFundamentals of Test & Balance for Engineers, Cx & Energy Providers Course Number: CXENERGY1619
AABC Commissioning Group AIA Provider Number 50111116 Fundamentals of Test & Balance for Engineers, Cx & Energy Providers Course Number: CXENERGY1619 Jim Hall, PE, TBE, CxA Systems Management & Balancing,
More informationCx at Penn State: A Program for Every Situation
Cx at Penn State: A Program for Every Situation AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute of Architects Continuing Education Systems
More informationUse of Commissioning for LEED Projects. H. Jay Enck President Commissioning & Green Building Solutions, Inc.
Use of Commissioning for LEED Projects H. Jay Enck President Commissioning & Green Building Solutions, Inc. AIA Quality Assurance Learning Objectives 1. Use of the commissioning process for more efficient
More information3D Virtual Master Campus Planning and Management
3D Virtual Master Campus Planning and Management Dr. Thomas Furlani Charles Hixon Best Practices The Eastern Regional Association of Physical Plant Administrators (ERAPPA) is a Registered Provider with
More informationStrategic Revit MEP Object Organization From BIM to Asset Management
MEP20732 Strategic Revit MEP Object Organization From BIM to Asset Management Jorge Quiroz Director DCV Consultores Sebastian Zaje Senior Technical Specialist - LATAM Autodesk George Broadbent Director
More informationUsing EMIS to Streamline RCx Projects. Lia Webster, P.E.
Using EMIS to Streamline RCx Projects Lia Webster, P.E. AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute of Architects Continuing Education
More informationBronx Mental Health Redevelopment Project
Bronx Mental Health Redevelopment Project Residential Village Bronx Campus Transitional Living Residences, Haven House Horizon House, and Studio Apartments BIM Orientation December 20, 2012 1 Bronx Mental
More informationLean Construction Institute
Lean Construction Institute Provider Number H561 Lean Design Forum P2SL/AIA/LCI 2016-Day One P2SLDF20161 January 28, 2016 7 LU/HSW Credit(s) earned on completion of this course will be reported to AIA
More informationManagement. Igor Starkov, EcoDomus. EcoDomus, Inc. 2011
Building Lifecycle Data Management enabled by COBie and BIM Igor Starkov, EcoDomus Hyde Griffith, Broaddus & Associates About EcoDomus Software and consulting firm with headquarters in San Francisco, and
More informationBIM 2016 and the NEC. Simon Rawlinson, 20 April 2015
BIM 2016 and the NEC Simon Rawlinson, 20 April 2015 Presentation overview Commercial requirements of BIM BIM and NEC Working Together Government requirements for a collaborative digital model Supporting
More informationPlease comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at
Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at http://www.leanconstruction.org/usage.pdf when using this file. Thank you. Provider Name: Lean Construction
More informationBIM enhances structural analysis regardless of project size. By Doug Fitzpatrick, P.E., LEED AP and Jeffrey Yoders
BIM enhances structural analysis regardless of project size By Doug Fitzpatrick, P.E., LEED AP and Jeffrey Yoders MARCH 2013 BIM enhances structural analysis regardless of project size By Jeffrey Yoders
More informationSuccessful Restaurant. Accessibility. Accessibility. Did you sign in? Best Practices. Copyright Materials. Course Description
Successful Restaurant Accessibility Successful Restaurant Accessibility TDLR Provider #1521 AIA/CES Provider #G583 Michael Love APA ICC IIDA Best Practices Did you sign in? Accessibility Professionals
More informationRFP Feasibility Design Services: Clinical Education & Assessment Center Expansion Questions & Answers: February 13 th, 2018
Question & Answer: #1 The RFP calls for a survey of the building to gain a comprehensive understanding of the existing building, utilities, building systems, occupancies and all existing conditions as
More informationIV.E.8 - BIM Standards
Contents 1. General... 3 1.1. Strategy & Objective... 3 1.2. Road Map... 4 2. Process... 7 2.1. Start... 7 2.2. Plan... 9 2.3. Execute... 12 2.4. Monitor... 14 2.5. Close-out... 16 3. Execution... 19 3.1.
More informationSylvia Kendra Associate Director Facilities Knowledge Management. January 11, 2017
Developing a 3D Building Information Management Practice Sylvia Kendra Associate Director Facilities Knowledge Management January 11, 2017 Find Us On Line Google search: Smithsonian AE Center Or Full url:
More informationBUILDING INFORMATION MODELLING BOUYGUES UK THE USE OF BIM TO IMPROVE PROJECT PERFORMANCE
BUILDING INFORMATION MODELLING BOUYGUES UK THE USE OF BIM TO IMPROVE PROJECT PERFORMANCE Presented by Chloe Obi 25 th January 2017 Presentation Structure 1. BIM Level 2 Requirements 2. Benefits for Industry
More informationDISTRICT 03: EASTERN CANADA'S FIRST 6- STOREY CLT BUILDING DAVID MIZRAHI, ENG. (ENSTIB, M.S.) DESIGN ENGINEER, NORDIC. Copyright Materials
: EASTERN CANADA'S FIRST 6- STOREY CLT BUILDING DAVID MIZRAHI, ENG. (ENSTIB, M.S.) DESIGN ENGINEER, NORDIC Copyright Materials This presentation is protected by US and International Copyright laws. Reproduction,
More information1.0 ABOUT THE NU GUIDELINES
Construction Policies & Procedures Northeastern University Guidelines for Capital Project Design & Implementation.0 ABOUT THE NU GUIDELINES This document is intended to describe in a comprehensive manner
More informationEnergy Efficiency & LEED v4 Certification at the O Connell Center. FEFPA Summer 2017
Energy Efficiency & LEED v4 Certification at the O Connell Center FEFPA Summer 2017 Course Number: Credit Designation: TLC Engineering for Architecture Presenters KRISTY M. WALSON PE, LEED AP BD+C, BEMP
More informationAddendum #02 New County Office Building Responses to RFP Questions
Sam Lin Manager Project Development Unit 1402 Maple Street Redwood City, CA 94063 650-369-4766 September 22, 2017 slin@smcgov.org Addendum #02 New County Office Building Responses to RFP Questions To All
More informationState of Tennessee Office of the State Architect {TN OSA) Building Information Modeling {BIM) Requirements. Version 1.0
State of Tennessee Office of the State Architect {TN OSA) Building Information Modeling {BIM) Requirements Version 1.0 April 22, 2013 Table of Contents 1. Introduction...... 1 1.1. Mission of the TN OSA
More informationAbout us. 5D Initiative
PRESS RELEASE The 5D Initiative enters into a process of more intensive cooperation with Autodesk, Bentley, CCT, RIB and Tekla in order to develop new BIM software solutions that fit needs of European
More informationTrane Engineers Newsletter Live
Trane Engineers Newsletter Live Acoustics in Outdoor HVAC Applications Presenters: Dave Guckelberger, Eric Sturm and Jeanne Harshaw (host) Trane program number: APP-CMC060-EN Agenda Trane Engineers Newsletter
More informationRealizing Complex Design Through BIM The Louisiana State Museum and Sports Hall of Fame
The Louisiana State Museum and Sports Hall of Fame Location: Natchitoches, Louisiana Category: A: BIM Excellence Type: New Construction Site Area: 36,500 sq. ft. GSF Total: 27,000 sq. ft NAA Total: 18,900
More informationVIRTUAL DESIGN & CONSTRUCTION, THE NEXT LEVEL OF COLLABORATION AND INTEGRATION 2016 Airport Construction Strategy Summit. Special Thanks To:
VIRTUAL DESIGN & CONSTRUCTION, THE NEXT LEVEL OF COLLABORATION AND INTEGRATION 2016 Special Thanks To: VIRTUAL DESIGN & CONSTRUCTION, THE NEXT LEVEL OF COLLABORATION AND INTEGRATION Overview Moderator:
More informationGeneral Contractor Regulatory Agency. [Info] Construction budget is defined as all hard costs including overhead and profit
Stanford University VDC Scorecard Center for Integrated Facility Engineering Basic Information Date: September 20, 2012 Name: Position: Company: Company's Role: Interviewee Information Name: Facility:
More informationBuilding Information Modeling (BIM) Execution Plan
10/19/2017 for [Stanford Project Name] [Stanford Project Number] Developed by [Primary A/E] TABLE OF CONTENTS USE OF THE BIM EXECUTION PLAN... 3 1. PROJECT INFORMATION... 3 2. PROJECT SCHEDULE AND MILESTONES...
More informationBuilding Enclosure Detailing for Balconies
Building Enclosure Detailing for Balconies COLIN SHANE M.ENG., P.ENG., P.E. PRINCIPAL, SENIOR PROJECT MANAGER RDH BUILDING SCIENCE INC. JUNE 2017 Disclaimer: This presentation was developed by a third
More informationEcoDomus, Inc
www.ecodomus.com Introduction BIM Data Requirements & Guidelines COBie: Data Entry and Responsibility Matrix COBie: Quality Control BIM and BAS Integration: Use Cases Mobile BIM and Work Orders Asset View
More informationUniversity of Illinois Business Instructional Facility LEED Gold Design. University of Illinois. University of Illinois
Keys to success: Sustainable design strategies included early. Clear and early benchmarking choice. Integrated design process. Consensus building. Keys to success: Sustainable design strategies considered
More informationThe benefits of reinventing the wheel BIM AND IPD BRING FUNDAMENTAL CHANGES TO ROLES IN A STRUCTURAL ENGINEERING FIRM
Page 1 of 5 The benefits of reinventing the wheel BIM AND IPD BRING FUNDAMENTAL CHANGES TO ROLES IN A STRUCTURAL ENGINEERING FIRM By Rick Oehmcke, S.E. Not that many years ago, few structural engineers
More informationSustainable Design Services
Point. Advisory Sustainable Design Services Building Information Modeling (BIM) Step 1. Download.bimar App p on Google Play or scan the QR code. Step 2. Point device at cover to view it in 3D augmented
More informationBIM Design & Construction Requirements. Follow-up Seminar. September 10,
BIM Design & Construction Requirements Follow-up Seminar September 10, 2009 www.indiana.edu/~uao/iubim.html Opening Comments Two years ago Indiana University began the process of embracing the use of Building
More informationLarge Campus Chilled Water System RetroCx
Large Campus Chilled Water System RetroCx Leonard Rozek, President E Cube, Inc. 21 st National Conference on Building Commissioning AIA Quality Assurance The Building Commissioning Association is a Registered
More informationINTEGRATED LIFECYCLE MANAGEMENT BIM/VDC REQUIREMENTS IMPLEMENTATION PLAN
INTEGRATED LIFECYCLE MANAGEMENT BIM/VDC REQUIREMENTS IMPLEMENTATION PLAN Manual for VDC, BIM/VDC and Lifecycle Data for design and construction projects at UNC Charlotte. February 2018 Integrated Lifecycle
More informationCAD+BIM+GIS+CMMS for Airport Facility Maintenance/Management: Making the best of each tool work - together
CAD+BIM+GIS+CMMS for Airport Facility Maintenance/Management: Making the best of each tool work - together Ahmet Çıtıpıtıoğlu, Ph.D., P.E. Engineering & Design Director TAV Construction TAV Integrated
More informationModular Wood Framing Goes Vertical
Modular Wood Framing Goes Vertical By: Troy Bean, P.E., S.E. DCI Engineers January 2013 The Wood Products Council is a Registered Provider with. Credit(s) earned on completion of this program will be reported
More informationShort list and Interview Notice Architect/ Engineering Team Selection Henning Building Replacement University Park, PA
DATE: January 19, 2018 UPDATED January 22, 2018 SUBJECT: TO: Short list and Interview Notice Architect/ Engineering Team Selection Henning Building Replacement University Park, PA Short Listed Teams HOK
More informationAIA 2009 BIM AWARDS. Category B: Design/Delivery Process Innovation Using BIM
Introduction AIA 2009 BIM AWARDS Category B: Design/Delivery Process Innovation Using BIM Project: UNIVERSITY OF COLORADO - DENVER HEALTH SCIENCE CENTER RESEARCH COMPLEX II Owner s Statement Architect
More informationBenjamin D. Hall Interdisciplinary Research Building
Benjamin D. Hall Interdisciplinary Research Building Design. Build. Operate. Maintain. 2007 BIM AWARDS AIA Technology in Architectural Practice Table of Contents ARCHITECT S STATEMENT DESCRIPTIVE DATA
More informationGlobal Warming and Geothermal Heat Pumps
Global Warming and Geothermal Heat Pumps John D. Manning, PE LEED TM Accredited Professional Earth Sensitive Solutions, LLC 9th Annual NYS Green Building Conference Friday, March 25 th, 2011 The U.S. Green
More informationMeeting Residential Energy. Construction. Copyright Materials. Loren Ross, P.E. Manager, Engineering Research American Wood Council
Meeting Residential Energy Requirements with Wood-Frame Construction Loren Ross, P.E. Manager, Engineering Research American Wood Council Copyright Materials This presentation is protected by US and International
More informationHelpful Hints for Creating Requests for Proposals:
Helpful Hints for Creating Requests for Proposals: Troy W. Miller, AIA, REFP Education Focus Leader Troy.Miller@LHBcorp.com Direct: 612.766.2819 Cell: 952.448.3357 Agenda 1. The Typical Request for Proposal
More informationa commentary to the NBIMS-US COBie standard
The COBie Guide: a commentary to the NBIMS-US COBie standard by Dr. Bill East, PhD, PE, F.ASCE 1, Mariangelica Carrasquillo-Mangual 2 EXECUTIVE SUMMARY The Construction-Operations Building information
More informationWHOLE LIFECYCLE INFORMATION FLOW UNDERPINNED BY BIM: TECHNOLOGY, PROCESS, POLICY AND PEOPLE
WHOLE LIFECYCLE INFORMATION FLOW UNDERPINNED BY BIM: TECHNOLOGY, PROCESS, POLICY AND PEOPLE Nashwan N. Dawood 1, and Vladimir Vukovic 2 1) Ph.D., Prof., Director of the Technology Futures Research Institute,
More informationLearning Objectives. Copyright Materials. This presentation is protected by US and International Copyright laws. Reproduction,
The Wood Products Council is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this program will be reported to AIA/CES
More informationBrown University Updated March 11, 2013 Facilities Design & Construction Standards
SECTION 01 17 90 UTILITY & CRITICAL SYSTEM CONNECTIONS AND INTERRUPTIONS PART 1 - GENERAL 1.1 SUMMARY: A. Brown University operates and maintains extensive campus and building utilities and distribution
More informationRon Wilkinson October 12, 2016
British Columbia Chapter ASHRAE Existing Building Commissioning RON WILKINSON P.E., LEED AP, CPMP Wilkinson Cx Management Seattle, WA, USA 1-206-602-4460 rwilk99@gmail.com WCxM Wilkinson Commissioning
More informationLife Cycle of BIM at the Port Authority
Life Cycle of BIM at the Port Authority Presenters Denise Berger, AIA Assistant Chief Engineer Operations Division Jorge Quiroz BIM/CAD Manager Engineering Solutions Sadia Janjua, LEED AP, PSP Senior Project
More informationResidence Hall Phase XVI Code Item 308 Code Item 312 Advanced Planning
The University of North Carolina at Charlotte Capital Projects Facilities Management 9201 University City Blvd. Charlotte, N.C. 28223-0001 TEL: 704/687-0558 PROJECT: UNC Charlotte Residence Hall Phase
More informationWood Frame Schools. Copyright Materials. Is it OK to Build a Wood School?
The Wood Products Council is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this program will be reported to AIA/CES
More informationAir Barrier and shelf angle design, detailing, and lessons learned
Air Barrier and shelf angle design, detailing, and lessons learned Corey S Zussman, AIA, NCARB, ALA, REWC, RWC, RRO, CDT, CQM, LEED AP BD+C Pepper Construction Company Air Barrier Association of America
More informationNovember Introduction. What was your role with the company? Has your business awareness and use of BIM advanced in the last twelve months?
November 2016 Executive Summary The second national survey to benchmark the level of Building Information Modelling (BIM) adoption in Ireland revealed that 76% (67% 2015) of respondents possessed confidence
More informationCopyright Materials. Register for Upcoming Webinars. Possibilities with Wood in Construction
Register for Upcoming Webinars Possibilities with Wood in Construction Speaker: Dr. Marjan Popovski, PhD, FPInnovations November 16, 2011 10 am PST 11 am MST 12 noon CST 1PM EST 1 AIA/CES (HSW) LU or PDH
More informationDesign Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright
Design Process 101 Michael Barnard, AIA, NCARB animalsheltering.org/expo #AnimalCareExpo Copyright 1 Design and Construction Process Needs Assessment Conceptual Design Schematic Design Design Development
More informationCapturing Equipment Data Requirements Using ISO & Assessing Conformance (EDRC) and OGI Pilot
Capturing Equipment Data Requirements Using ISO 15926 & Assessing Conformance (EDRC) and OGI Pilot Manoj Dharwadkar, Bentley Systems; Alan Johnston, MIMOSA; Mark Palmer, NIST EDRC and OGI Pilot Outline
More informationBusiness Case Our Challenge. Asset lifecycle definition of engineering information to support Operation, Maintenance and Projects
Asset lifecycle definition of engineering information to support Operation, Maintenance and Projects Business Case Our Challenge How to move from the current position of; Intelligent schematics (P&ID s)
More informationStage: A Case Study. Course Description. Learning Objectives
Arena Stage: A Case Study Brought to Lifeto The Wood Products Council is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES), Provider #G516. Credit(s)
More informationInsulation Technologies and Installation Specifications for Better Energy Performance of Commercial Buildings
Insulation Technologies and Installation Specifications for Better Energy Performance of Commercial Buildings Wood Products Council is a Registered Provider with The American Institute of Architects Continuing
More informationMinnesota State Colleges and Universities. South Central College. Request for Proposals for Commissioning Agent. STEM and Healthcare Renovation
Minnesota State Colleges and Universities South Central College Request for Proposals for Commissioning Agent STEM and Healthcare Renovation Date: 12/18/2017 ADDENDUM #1 1. The Sign-In sheet for the voluntary
More information2015 IBC Exit Systems
Objectives 2015 IBC Exit Systems Based on the 2015 International Building Code Upon completion, participants will be better able to: Determine those means of egress components that are defined as exits
More informationMaximo for Transportation 6.3 Overview of New Release
Maximo for Transportation 6.3 Overview of New Release August 27, 2007 Ken Donnelly, Strategy & Market Management Carey Clarke, Product Designer and Architect Agenda Overview of Maximo for Transportation
More informationUsing BIM to transform MEP design A WHITEPAPER BY PROGMAN
Using BIM to transform MEP design A WHITEPAPER BY PROGMAN Table of contents Introduction 3 Demands of BIM 4 BIM in Design 6 BIM in Procurement 9 BIM in Construction 10 Exploring Pre-fabrication Examining
More informationCarolinas HealthCare System Case Study Collaborate Bid Build (CB 2 ) A Different Approach to Project Delivery
Carolinas HealthCare System Case Study Collaborate Bid Build (CB 2 ) A Different Approach to Project Delivery Carolinas HealthCare System Case Study Behavioral Health Davidson, NC Project Team Carolinas
More informationRetro Commissioning Evaluation in Massachusetts NSTAR Perspectives. Erik C. Mellen, Senior Research Analyst Northeast Utilities
Retro Commissioning Evaluation in Massachusetts NSTAR Perspectives Erik C. Mellen, Senior Research Analyst Northeast Utilities AIA Quality Assurance The Building Commissioning Association is a Registered
More informationClick to edit Master title style
Click to edit Master title style The Impacts; Today & Tomorrow Charles Hixon Business Development Manager, Bergmann Associates Chair, TRB ABJ95 Sub-committee on VDC VDC - An Amalgam of Many Click to edit
More informationFACILITY INVENTORY: GET WHAT YOU ASK FOR by William Faesenmeier
FACILITY INVENTORY: GET WHAT YOU ASK FOR by William Faesenmeier A comprehensive inventory of a facility is the foundation of any facility asset management program. Due to limitations of staff, qualifications
More informationUniversity of Washington. Request for Qualifications. Commissioning Authority Services for
University of Washington Request for Qualifications Commissioning Authority Services for University of Washington Fluke Hall Renovation Project Project Number: 203880 Submittal Date: July 18, 2013 at 3:00
More informationAND BUILDING ENERGY CODES. NFRC Webinar/Membership Meeting March 25, 2014
NFRC WINDOW ENERGY RATINGS AND BUILDING ENERGY CODES NFRC Webinar/Membership Meeting March 25, 2014 LEARNING OBJECTIVES 1. Understand the 2012 IECC and ASHRAE 90.1-2010 fenestration energy requirements
More informationFigure i-1: The BIM Project Execution Planning Procedure. Building Information Modeling Project Execution Planning Guide
EXECUTIVE SUMMARY A Building Information Model (BIM) is a digital representation of physical and functional characteristics of a facility. 1 To successfully implement BIM, a project team must perform detailed
More informationIBM Maximo Integrators for TRIRIGA Version 1 Release 2. Implementation Guide
IBM Maximo Integrators for TRIRIGA Version 1 Release 2 Implementation Guide Note Before using this information and the product it supports, read the information in Notices on page 125. Contents Chapter
More informationNet Zero Building Commissioning. Phillip Saieg, CEM, LEED AP O+M Josh Harwood
Net Zero Building Commissioning Phillip Saieg, CEM, LEED AP O+M Josh Harwood AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute of Architects
More informationFINISHED CONCRETE FLOORING
FINISHED CONCRETE FLOORING 1 PROSOCO is a Registered provider with the American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported to CES
More informationCopyright Materials INTRODUCTION TO SIPATO AN EMPLOYEE OWNED COMPANY. This presentation is protected by US and
The Wood Products Council is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this program will be reported to AIA/CES
More informationThe ProjectWise Advantage
2014 Bentley Systems, Incorporated The ProjectWise Advantage October 15, 2013 Eddie Anderson Global Practice Leader - ProjectWise Email Eddie.Anderson@Bentley.com LinkedIn - linkedin.com/in/eddiejanderson
More information23/01/1438. Management of BIMProject: BIM Management Plan. Mohamed Mohsen Kamel. Prof. Dr. Emad Elbeltagi
Management of BIMProject: BIM Management Plan Cairo University, Faculty of Engineering MSc in Integrated Engineering Design Management IEDM 611: BIM for Facility Management Prepared and Presented by: Mohamed
More information2012 IBC Exit Systems
Accreditation Based on the 2012 International Building Code The International Code Council has been accredited as an Authorized Provider by the International Association for Continuing Education and Training
More informationREQUEST FOR PROPOSALS MECHANICAL/PLUMBING & ELECTRICAL ENGINEERING RFP # JUNE 28, 2010 PROPOSALS DUE: JULY 12, 2010
4800 N. Broadway, Boulder, CO 80304 REQUEST FOR PROPOSALS MECHANICAL/PLUMBING & ELECTRICAL ENGINEERING RFP #12-2010 JUNE 28, 2010 PROPOSALS DUE: JULY 12, 2010 TO: FROM: RE: Mechanical/Plumbing and Electrical
More informationBIM ADOPTION AND IMPLEMENTATION FOR ENGINEERING & CONSTRUCTION INDUSTRY PRACTICES
BIM ADOPTION AND IMPLEMENTATION FOR ENGINEERING & CONSTRUCTION INDUSTRY PRACTICES ARIEF RAHMAN BIM MANAGER PP Construction & Investment INDONESIA M: +62 8128858162 W: www.pt-pp.com www.pt-pp.com AGENDA
More informationAn Evaluation of ComEd s Retro- Commissioning Program
An Evaluation of ComEd s Retro- Commissioning Program Randy Gunn, Managing Director, Navigant George Malek, Portfolio Manager, ComEd 21 st National Conference on Building Commissioning AIA Quality Assurance
More informationBIM for infrastructure, Paul King Bentley Systems 2016 Bentley Systems, Incorporated
BIM for infrastructure, Paul King 1 WWW.BENTLEY.COM 2016 Bentley Systems 2016 Bentley Systems, Incorporated 3D infrastructure pic Bentley one! - green Role of the owner Defining better business outcomes
More informationBIMForum / Pankow Foundation - BIM Execution Planning (BxP) Guide Survey 2017 Will Ikerd, PE
BIMForum / Pankow Foundation - BIM Execution Planning (BxP) Guide Survey 2017 Sponsors #BIMForumED Speaker Twitter Handle BIMForum BxP Taskforce Will Ikerd, P.E. IKERD Consulting Engineers, Principal Investigator
More informationUser Requirements - Equipment Management
The User Requirements document outlines the tasks, and requirements for each task, that a user must be able to perform within the context of the new feature being designed. USER REQUIREMENTS - EQUIPMENT
More informationImplementing Budget Solutions for Schools: Construction Cost and Scheduling Benefits of Using Wood
Disclaimer: This presentation was developed by a third party and is not funded by WoodWorks or the Softwood Lumber Board. Modern School Construction in the Pacific Northwest: Achieving Performance and
More informationMinitab Headquarters
Minitab Headquarters State College, PA Erin E. Hess www.arche.psu.edu/thesis/eeh124 Consultant: Dr. David Riley This project delivery evaluation report researches and analyzes the agreements and commitments
More informationPromoting better business outcomes through the use of BIM and digital technologies.
Promoting better business outcomes through the use of BIM and digital technologies. Introduction The Role of the BIM Manager Agenda 18:00 Introduction + BIM update by Mike Turpin, Innovating Futures 18:10