AMERICAN SAMOA POWER AUTHORITY Materials Management Office INVITATION FOR BIDS ( IFB ) UTULEI & VATIA PRV CONCRETE VAULT CONSTRUCTION
|
|
- Lester Murphy
- 6 years ago
- Views:
Transcription
1 AMERICAN SAMOA POWER AUTHORITY Materials Management Office INVITATION FOR BIDS ( IFB ) UTULEI & VATIA PRV CONCRETE VAULT CONSTRUCTION Issuance Date: March 1, 2016 Closing Date: March 15, 10:00 a.m. APPROVED FOR ISSUANCE IOANA S. ULI Acting Procurement Manager
2 INVITATION FOR BIDS ( IFB ) NOTICE TO BIDDERS ISSUANCE DATE: March 1, 2016 IFB NO. PROJECT NAME: CLOSING DATE/TIME: ASPA WTR UTULEI & VATIA PRV CONCRETE VAULT CONSTRUCTION March 15, 2016, 10:00 a.m., American Samoa Time The American Samoa Power Authority (ASPA) hereby issues this Invitation for Bids ( IFB ) to evaluate and award a one time contract for the Utulei & Vatia PRV Concrete Vault Construction as per attached plans and drawings. Bidders shall provide sufficient written and verifiable information that responds to the requirements set forth herein and in the Scope of Work ( SOW ). The deadline for any questions/clarifications is March 7, 4:00 pm. Qualified Bidders must submit bids and forms in a sealed envelop, box, or other enclosure addressed to the ASPA Procurement Manager. Bids must be submitted to the ASPA Procurement Office no later than 10:00 a.m. on or before March 15, The sealed envelope or box must be labeled IFB No. ASPA WTR Utulei & Vatia PRV Concrete Vault Construction. Late submittals will not be opened or considered. For more information about this IFB, you may contact: Ioana S. Uli, Acting Procurement Manager PH: (684) bids@aspower.com The American Samoa Power Authority reserves the right to: 1. Reject all bids and reissue a new or amended IFB; 2. Request additional information from any Bidder submitting a bid; 3. Select a firm for award based on other than least cost (e.g. capability to complete work in a timely fashion or based on proven technical capabilities); 4. Negotiate a Contract with the firm selected for award; and 5. Waive any non-material violations of rules set up in this IFB at its sole discretion. Utu Abe Malae, Executive Director Date Page 2 of 14
3 AMERICAN SAMOA POWER AUTHORITY GENERAL TERMS AND CONDITION I. SOLICITATION The American Samoa Power Authority ( ASPA ) issues this IFB in order to solicit bids for the as detailed in Attachment A Specifications & Drawings. II. SCOPE OF WORK The selected bidder is responsible for, but not limited to specification and drawing on Attachment B. III. PREPARATION INSTRUCTIONS Bid Price Bidder must set forth unit and total cost for Scope of work as stated on Attachment C - Bid Transmittal Form. ASPA will award this IFB in whole or in part to selected bidder(s). IV. CONTRACT TERM A Purchase Order will be issued to the awarded Bidder. V. BASIS FOR AWARD The awards will be made by ASPA in accordance with the evaluation criteria set forth herein and with Section of ASPA Procurement Rules. The award evaluation shall be documented and a determination shall be made towards Bidders whose bids are susceptible of being selected for award. ASPA reserve the right to make the award to the bidder who submits the bid, which meets the requirements, set forth herein and best meets the needs of ASPA after taking into consideration the aforementioned factors. ASPA also reserves the right to select portions of a bid, or to reject any and all Bids. The Procurement Manager shall notify the winning bidders accordingly. VI. WITHDRAWAL OF BID Any Bid may be withdrawn prior to the scheduled time for the opening of the bids by notifying ASPA in a written request. No bid may be withdrawn after the time scheduled for opening of bids. VII. OPENING AND COMPARISON OF BID Page 3 of 14
4 In accordance with procurement Rule 3-110, bids will be opened and recorded as part of the record on the date and at the time indicated above at the Procurement Office in Taunt or in another place designated by ASPA Procurement Manager in writing. VIII. IFB CONDITIONS ASPA reserves the right to issue any addendum to this IFB. Bidders shall send ASPA a signed form confirming receipt of any addendum, and shall submit supporting/additional information as required by any addenda. In the event that any bidder fails to acknowledge receipt of any such addendum in the space provided, his or her bid shall be considered irregular and will be accepted by ASPA only if it is in ASPA s best interest. In the event that addenda are not received until after the Bidder has submitted his or her bid, a supplementary bid may be submitted revising the original bid. Such supplementary bid must be received by ASPA prior to the scheduled time for opening of bids. IX. EVALUATION CRITERIA Bids will be evaluated by the Procurement Division, Requesting Division and approved by the Procurement Manager. Submission of a bid shall constitute a waiver of any challenge or dispute of the review process as well as the choice of methodology for selection of award. X. INDEMNITY PROVISION The successful bidder shall indemnify and hold harmless the American Samoa Power Authority from against any and all claims, damages, losses, and expenses, including attorney s fees, arising out of or resulting from the performance of the work, providing that such claim, damage, loss or expense is attributable to bodily injury, sickness, disease, death or damage to property of whatsoever nature, including the loss of use resulting there from, and whether or not is caused in whole or in part by any negligent act or omission of the successful bidder, its subcontractors, or anyone employed by any of them or anyone for whose acts any of the maybe liable, regardless of whether or not it is caused in part by the negligence of ASPA and/or the strict liability of ASPA, its agents and employees. XI. AWARD, CANCELLATION & REJECTION Page 4 of 14 Award shall be made to the lowest responsible and responsive bidder, whose bid is determined to be the most advantageous to the American Samoa Power Authority, taking into consideration the evaluation factors set forth in this solicitation. No other factors or criteria shall be used in the evaluation. The right is reserved as the interest of ASPA may require waiving any minor irregularity in bids received. The Procurement Manager shall have the authority to award, cancel, or reject bids, in whole or in part for anyone or more items if determines it is in the public interest. Award issued to the lowest responsible bidder within the specified time for acceptance as indicated in the solicitation, results in a binding contract without action by either party. In case of an error in the extension of prices, unit price will govern. It is the policy of ASPA to award contracts to qualified bidders. ASPA reserve the right to increase or decrease the quantity of the items for award and make additional awards for the same type items and
5 the vendor agrees to such modifications and additional awards based on the bid prices for a period of thirty (30) days after the original award. No award shall be made under this solicitation which shall require advance payment. Page 5 of 14
6 ATTACHMENT A PRESSURE REDUCING VALVE VAULT SPECIFICATIONS AND DRAWINGS 1. CMU WALL. 1.1 CONCRETE MASONRY UNITS All Workmanship and materials shall be in accordance with the latest edition of Uniform Building code and ACI CMUs shall have a min compressive strength at 28 days of 1500 psi. Mortar shall have a min compressive strength of 1500 psi. All CMU shall be 6" to match the existing materials and shall be filled with 2000 psi grout. All units shall be sound and free of cracks or other defects that interfere with the proper placement of the unit or significantly impair the strength or permanence of the construction CMU shall be constructed in running patterns throughout and shall be wetted during placement The initial bed joint shall not be less than 1/4" in thickness or more than 1" thick, subsequent joint shall not be less than 1/4" or more than 1/2" in thickness. 2. CAST-IN-PLACE CONCRETE. PART 1 - GENERAL 1.1 SECTION INCLUDES Cast-in-place concrete, floors, shear walls, foundation walls, pads, thrust blocks and slabs on grade. 1.2 REFERENCES ACI Structural Concrete for Buildings ACI Guide for Concrete Floor and Slab Construction ACI Recommended Practice for Measuring, Mixing, Transporting and Placing Concrete ACI 305R - Hot Weather Concreting ACI 306R - Cold Weather Concreting ACI Standard Practice for Curing Concrete. Page 6 of 14
7 1.2.7 ACI Building Code Requirements for Reinforced Concrete ANSI/ASTM D994 - Preformed Expansion Joint Filler for Concrete (Bituminous Type) ANSI/ASTM D Concrete Joint Sealer, Hot-Poured Elastic Type ANSI/ASTM D Preformed Expansion Joint Fillers for Concrete Paving and Structural Construction (Non-extruding and Resilient Bituminous Types) ANSI/ASTM D Preformed Sponge Rubber and Cork Expansion Joint Fillers for Concrete Paving and Structural Construction ASTM B221 - Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Shapes, and Tubes ASTM C33 - Concrete Aggregates ASTM C94 - Ready-Mixed Concrete ASTM C150 - Portland Cement ASTM C260 - Air Entraining Admixtures for Concrete ASTM C330 - Light Weight Aggregates For Structural Concrete ASTM C494 - Chemicals Admixtures for Concrete ASTM C618 - Fly Ash and Raw or Calcinated Natural Pozzolan for Use as a Mineral Admixture in Portland Cement Concrete ASTM A775/A775M-00 Epoxy-Coated Reinforcing Steel Bars 1.3 PROJECT RECORD DOCUMENTS Accurately record actual locations of embedded utilities and components which are concealed from view QUALITY ASSURANCE PART 2 - PRODUCTS Perform Work in accordance with ACI Maintain one copy of documents on site Acquire cement and aggregate from same source for all work Conform to ACI 305R when concreting during hot weather Conform to ACI 306R when concreting during cold weather CONCRETE MATERIALS Cement: ASTM C150, Portland type II Water: Clean and not detrimental to concrete ACCESSORIES Non-Shrink Grout: Premixed compound consisting of non-metallic Page 7 of 14
8 aggregate, cement, water reducing and plasticizing agents; capable of developing minimum compressive strength of 2,400 psi in 48 hours and 7,000 psi in 28 days JOINT DEVICES AND FILLER MATERIALS Joint Filler: ASTM D1751, ASTM D994, asphalt impregnated fiberboard, closed cell polyvinyl chloride, molded vinyl foam or pre-molded sponge rubber Construction Joint Devices: Integral galvanized steel or extruded plastic Expansion and Contraction Joint Devices: ASTM B221 alloy, extruded aluminum; resilient neoprene filler strip with a Shore A hardness of 35 to permit plus or minus 25 percent joint movement with full recovery CONCRETE MIX PART 3 - EXECUTION Mix and deliver concrete in accordance with ASTM C94 and ACI Use accelerating admixtures only when approved by Engineer Use set retarding admixtures during hot weather only when approved by Engineer Add air entraining agent to normal weight concrete mix for work exposed to exterior Provide Engineer with tickets indicating mix times, delivery and additives to the mix. 3.1 EXAMINATION Verify site conditions and verify requirements for concrete cover over reinforcement Verify that anchors, seats, plates, reinforcement and other items to be cast into concrete are accurately placed, positioned securely, and will not cause hardship in placing concrete. 3.2 PREPARATION Prepare previously placed concrete by cleaning with steel brush and applying bonding agent in accordance with manufacturer's instructions In locations where new concrete is dowelled to existing work, drill holes in existing concrete, insert steel dowels and pack solid with non-shrink grout. Page 8 of 14
9 3.3 PLACING CONCRETE Place concrete in accordance with ACI 304, ACI 301 and/or ACI Notify Engineer minimum 24 hours prior to commencement of operations Ensure reinforcement, inserts, embedded parts, formed expansion and contraction joints are not disturbed during concrete placement Install vapor barrier under interior slabs on grade. Lap joints minimum 6 inches and seal watertight by sealant applied between overlapping edges and ends or taping edges and ends Install joint devices in accordance with manufacturer's instructions Maintain records of concrete placement. Record date, location, quantity, air temperature, and test samples taken Place concrete continuously between predetermined expansion, control, and construction joints Do not interrupt successive placement; do not permit cold joints to occur Screed floors and slabs on grade level, maintaining surface flatness of maximum 1/4 inch in 10 ft. 3.4 SEPARATE FLOOR TOPPINGS Prior to placing floor topping, roughen substrate concrete surface and remove deleterious material. Broom and vacuum clean Place required dividers, edge strips, reinforcing and other items to be cast in Apply bonding agent to substrate in accordance with manufacturer's instructions Place concrete floor toppings to required lines and levels. 3.5 CONCRETE FINISHING Finish concrete floor surfaces in accordance with ACI In areas with floor drains, maintain floor elevation at walls; pitch surfaces uniformly to drains at 1/8 inch per foot nominal or as indicated on drawings. 3.6 CURING AND PROTECTION Immediately after placement, protect concrete from premature drying, excessively hot or cold temperatures, and mechanical injury Maintain concrete with minimal moisture loss at relatively constant temperature for period necessary for hydration of cement and hardening of concrete. Page 9 of 14
10 3.6.3 Cure floor surfaces in accordance with ACI FIELD QUALITY CONTROL Field inspection and testing will be performed. Provide free access to Work and cooperate with appointed firm Submit proposed mix design of each class of concrete to Owner for review prior to commencement of Work Tests of cement and aggregates may be performed to ensure conformance with specified requirements. 3.8 PATCHING Allow Engineer to inspect concrete surfaces immediately upon removal of forms Excessive honeycomb or embedded debris in concrete is not acceptable. Notify Engineer upon discovery Patch imperfections as directed and in accordance with ACI DEFECTIVE CONCRETE Defective Concrete: Concrete not conforming to required lines, details, dimensions, tolerances or specified requirements Repair or replacement of defective concrete will be determined by the Engineer Do not patch, fill, touch-up, repair, or replace exposed concrete except upon express direction of Engineer for each individual area SCHEDULE - CONCRETE TYPES AND FINISHES Foundation Walls: 4,000 psi 28 day concrete, form finish with honeycomb filled surface Floors: 4,000 psi at 28 days, form finish with honeycomb filled surface SCHEDULE - JOINT FILLERS Basement Floor Slab Perimeter: Joint filler Type A set 1/8 inch below floor slab elevation Exterior Retaining Wall at Loading Dock: Joint filler Type F recessed 3/8 inch with sealant cover. 3. REBAR. 1.1 General. Page 10 of 14
11 1.1.1 All rebar shall conform to ASTM 615 Grade 60 and shall be #4 deformed bars. Vertical rebar shall be at 16" centers and horizontal rebar at 18" centers All rebar shall be free from rust and other coating that would affect reinforcing bond Welding of reinforcing bars are not permitted. 4. VAULT COVER. 1.1 General The checkered plates, the angle frame, the anchors and hinges shall all be Stainless Steel SST A316-Marine resistance All shall be installed as shown and as specified on drawings. 5. DRAWINGS. 1. C01 Vicinity & Site Map (attached) 2. C02 - PRV Vault Detail (attached) Page 11 of 14
12 ATTACHMENT B SCOPE OF WORK The American Samoa Power Authority is requesting the services of a qualified, professional contractor to provide labor, materials, equipment, tools, transportation, supplies and incidentals required for; The excavation and construction of two (2) 6' x 5' x 4.5' "open bottom" concrete vault in Utulei & Vatia, as specified and shown on drawing sheet no. "CO2". The exact location of the above vault will be marked out by ASPA engineers prior to excavation. The work shall comply with all ASPA requirements as specified and as shown in the drawings and specifications provided by ASPA. The contractor will provide all materials and services necessary for the successful completion of the project. ASPA is responsible for all the piping/plumbing work. Project Time Indemnity The contractor shall complete the work within twenty (20) calendar days. The Contractor shall indemnify, defend, and save harmless ASPA, its officers, employees, and agents from and against any claims and demands whatsoever, including costs and attorney s fees, resulting from the Contractor s negligent acts or omission in connection with the performance of the scope of work Clean up As the work progresses and immediately after completion of the work, the contractor shall clean up and remove all refused materials of any kind resulting from the work. The contractor shall not be allowed to deposit any kind of debris into the stream. Page 12 of 14
13 Environmental Pollution Control: The contractor shall conduct the work in accordance with local and federal laws of the EPA. Maintenance Period: The contractor shall agree to maintain the vault for a one (1) year period without additional costs to ASPA. Page 13 of 14
14 ATTACHMENT C BID TRANSMITTAL FORM TO: American Samoa Power Authority, Attn: Procurement Manager ADDRESS: P.O. Box PPB, Pago Pago, American Samoa, TITLE: IFB NO. BIDDER: ASPA WTR DATE:, 2016 Item DESCRIPTION Unit Total Price 1 Excavation and construction of a one 6' x 5' x 4.5' "open bottom" concrete vault at Utulei. LS $ 2 Excavation and construction of a one 6' x 5' x 4.5' "open bottom" concrete vault at Vatia. LS $ TOTAL COST $ Total Bid Amount in Words: Submitted by: Date: Title: Page 14 of 14
MANUFACTURER S SPECIFICATIONS Section LIME CONCRETE. A. This section describes the requirements for floors and slabs on grade.
MANUFACTURER S SPECIFICATIONS Section 03330 LIME CONCRETE ST. ASTIER NATURAL HYDRAULIC LIME CONCRETE PART 1 GENERAL 1.01 General A. This section describes the requirements for floors and slabs on grade.
More informationSECTION CONCRETE. B. ACI 318 Building Code Requirements for Structural Concrete and Commentary
SECTION 03300 CONCRETE PART 1 GENERAL 1.01 SCOPE OF WORK Concrete foundation walls, sanitary structures, pipe encasements, thrust blocking and slabs on grade. 1.02 REFERENCES A. ACI 301 Specification for
More informationSECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.
SECTION 02750 RIGID PAVEMENT PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Portland Cement Concrete (PCC) pavement. B. Related Sections: 1.2 REFERENCES 1. Section 02315 Excavation. 2. Section 02721
More informationSECTION CAST-IN-PLACE CONCRETE FOR UTILITIES
FOR UTILITIES PART 1 - GENERAL 1.1 SECTION INCLUDES A. Cast-in-place concrete for tunnel walls and slabs; steam manholes, chases, precast items and other miscellaneous structures; control, expansion and
More informationSECTION CAST-IN-PLACE CONCRETE
SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. The Contractor shall furnish all work and materials, including cement, sand and coarse aggregate, water, admixtures, curing
More informationSECTION STRUCTURAL PRECAST CONCRETE
SECTION 03500 STRUCTURAL PRECAST CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Section Includes. This section covers Prestressed or Precast concrete member construction, including product design not shown on
More information.1 Formwork for cast-in-place concrete with shoring, bracing, and anchorage.
03 10 00 CONCRETE FORMING AND ACCESSORIES Page 1 of 4 1 General 1.1 SECTION INCLUDES.1 Formwork for cast-in-place concrete with shoring, bracing, and anchorage..2 Form accessories..3 Form stripping. 1.2
More informationA. Submittal Procedures: See Article 13 of the General Conditions.
SECTION 321313 - CONCRETE PAVING PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Driveways. 2. Roadways. 3. Parking lots. 4. Curbs and gutters. 5. Walks. B. Proposed Substitutions: See Article 2,
More informationBy CTS Cement Manufacturing Corp.
CSI SECTION 03 60 00 GROUTING 03 62 00 NON-SHRINK GROUTING 03 62 13 NON-METALLIC NON-SHRINK GROUTING High Flow, Non-Metallic, Multi-Purpose, Cementitious, Non-Shrink Grout EDITOR NOTE: The following guideline
More informationMANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems
SECTION 02607-1 1.0 GENERAL 1.1 SCOPE: A. This section covers the work necessary for the construction of sanitary and storm system manholes, catch basins, and miscellaneous concrete structures complete.
More informationSECTION SITE CONCRETE
SECTION 321313 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationDIVISION 3 HEAVY DUTY CONCRETE FLOOR TOPPING SECTION 03340
DIVISION 3 HEAVY DUTY CONCRETE FLOOR TOPPING SECTION 03340 PART 1 - GENERAL 1.01 GENERAL REQUIREMENTS A. The General provisions of the contract, including GENERAL CONDITIONS, SUPPLEMENTARY CONDITIONS AND
More informationSUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation)
PART 1 GENERAL SUGGESTED MANHOLE FRAME SEALING SPECIFICATION (Rehabilitation) 1.01 SCOPE This specification includes the materials and procedures required for the internal sealing of the frame-chimney
More informationSECTION CAST-IN-PLACE CONCRETE
SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Furnish equipment, materials, and labor required for the supply, casting, finishing, curing, and testing of cast-in-place concrete, as
More informationMOBILGARD ADL 40 LUBE OIL. July 9, 2007
AMERICAN SAMOA POWER AUTHORITY OFFICE OF PROCUREMENT INVITATION FOR BID MOBILGARD ADL 40 LUBE OIL July 9, 2007 IFB NO, 2007GEN1008 ANDRA SAMOA Chief Executive Officer IFB NO. 2007GEN1008 MOBILGARD ADL
More informationSECTION MASONRY ACCESSORIES
PART 1 GENERAL 1.01 SCOPE OF WORK A. Contractor shall furnish all labor, materials, equipment and incidentals required to provide masonry accessories as shown on the Contract Drawings and specified herein.
More informationMay 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building
May 8, 2017 ADDENDUM #1 IFB 17-082 Resin Floor System For Highway Department Central District Building Addendum #1 is being issued to offer an alternate resin flooring system. 096700 FLUID-APPLIED FLOORING
More informationSPECIFICATIONS FOR AluSystems Aluminum Composite Panels Series 20 Dry Joint 1.00 GENERAL 1.01 RANGE OF WORK Section includes: Laminated panels and attachment systems for use as exterior cladding. A. Provide
More informationSECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES
Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle
More informationFIVE STAR PRODUCTS, INC. (800)
FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 Page 1 of 11 DESIGN-A-SPEC GUIDELINES FIVE STAR RS ANCHOR GEL CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS PART
More informationCOMPLETE REVISION May Process Industry Practices Structural. PIP STS03001 Plain and Reinforced Concrete Specification
Structural PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice has been prepared from the technical requirements in the existing
More informationARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE
ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE MANNINGTON COLORFIELDS SHEET RUBBER FLOORING Section 09 65 16 Sheet rubber Flooring (Thermoset Rubber) Created May 2012 Mannington Mills, Inc. P. O. Box
More informationITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS
ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing
More information***************************************************************************************************************
03450 ARCHITECTURAL PRECAST CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 45 13 ***************************************************************************************************************
More informationPIP STS03001 Plain and Reinforced Concrete Specification
May 2017 Structural PIP STS03001 Plain and Reinforced Concrete Specification PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice
More informationA. The scope of this standard includes recommendations for the specification of cast-in-place concrete.
PART 1: GENERAL 1.01 Scope of Standard A. The scope of this standard includes recommendations for the specification of cast-in-place concrete. 1.02 Related Standards A. Structural Systems (currently The
More informationSECTION PRECAST STRUCTURAL PRETENSIONED CONCRETE
PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 03 41 33 PRECAST STRUCTURAL PRETENSIONED CONCRETE SPEC WRITER NOTE: Delete between //--// if not applicable to project. Also delete any other item or paragraph
More informationKolorines Glass Mosaic Tiles Project Specification
Kolorines Glass Mosaic Tiles Project Specification SUGGESTED SPECIFICATION Glass Mosaic Tile Installation for Swimming Pools NOTES TO SPECIFIER: 1. Specify PremiumPlus Thin-Set mixed with CustomFlex Additive
More informationGUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410
GUIDE SPECIFICATIONS For STRUCTURAL PRECAST HOLLOW CORE SLABS SECTION 03410 Note to user: These guide specifications are provided by Mid- States Concrete Products as a service to you; they are NOT specific
More informationSECTION COLD APPLIED RUBBER MODIFIED ASPHALT WATERPROOFING
P.O. Box 599 - Mars, PA 16046 800-321-3337 SECTION 07555 COLD APPLIED RUBBER MODIFIED ASPHALT WATERPROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including
More informationSECTION CAST-IN-PLACE CONCRETE
SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.01 SUMMARY A. Furnish equipment, materials, and labor required for the supply, casting, finishing, curing, and testing of cast-in-place concrete, as
More informationSTANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL
STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL 1. SCOPE 2. DESIGN 3. MATERIALS 4. CONSTRUCTION 5. METHOD OF MEASUREMENT AND PAYMENT SCOPE This Specification sets out requirements for the design,
More informationCONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS SCOPE...3
CITY OF TORONTO TS 3.65 TRANSPORTATION SERVICES STANDARD CONSTRUCTION SPECIFICATIONS June 2001 CONSTRUCTION SPECIFICATION FOR CONCRETE CROSSWALK INDEX TS 3.65.01 SCOPE...3 TS 3.65.02 TS 3.65.03 REFERENCES...3
More informationREVISED SECTION REINFORCING STEEL FOR CONCRETE STRUCTURES. Approved:
To: SUPERSEDED BY EB 06-057 EFFECTIVE 05/03/07 New York State Department of Transportation ENGINEERING INSTRUCTION EI 03-030 Title: REVISED SECTION 556 - REINFORCING STEEL FOR CONCRETE STRUCTURES Approved:
More informationCorium Brick Rainscreen System Specifications
CORIUM BRICK RAINSCREEN SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. Work Included: The Work of this Section shall include but not be limited to the following: 1. Corium brick plates 2. Galvanized and coated
More informationSPECIFICATION FOR REINFORCED SOIL WALL
SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details
More informationNORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS
PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment
More informationTECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , &
TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS Financial Project ID 429140-1-52-01, 429140-2-52-01 & 428267-1-52-01 The official record of this Technical Special Provision is the electronic file signed
More informationSECTION CONCRETE PAVING FOR PEDESTRIAN AREAS. A. This Section includes exterior cement concrete pavement for the following:
SECTION 321313 CONCRETE PAVING FOR PEDESTRIAN AREAS PART 1 GENERAL 1.1 SUMMARY A. This Section includes exterior cement concrete pavement for the following: 1. Walkways. 2. Courtyards. 3. Plazas. 4. Pedestrian
More informationSECTION INSTALLATION AND/OR REPLACEMENT OF MASONRY UNITS AND REPOINTING
SECTION 04210 INSTALLATION AND/OR REPLACEMENT OF MASONRY UNITS AND REPOINTING PART I GENERAL 1.1 SUMMARY A. Provide installation of new or replacement of masonry units and/or repointing of masonry units
More informationSECTION UNIT MASONRY SYSTEM
SECTION 04320 UNIT MASONRY SYSTEM PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete masonry and face brick units. B. Reinforcement, anchorage, and accessories. 1.03 SUBMITTALS A. Submit product data under
More informationAMERICAN SAMOA POWER AUTHORITY MATERIALS MANAGEMENT OFFICE P.O. Box PPB, Pago Pago AS 96799, (684) /3031,
AMERICAN SAMOA POWER AUTHORITY MATERIALS MANAGEMENT OFFICE P.O. Box PPB, Pago Pago AS 96799, (684)699-3057/3031, www.aspower.com REQUEST FOR PROPOSAL ( RFP ) TIRE REPLACEMENT SERVICES APRIL 18, 2017 RFP
More informationSECTION REINFORCING STEEL
SECTION REINFORCING STEEL 1. DESCRIPTION This specification shall govern the furnishing and placing of reinforcing steel, deformed and smooth, of the size and quantity designated on the plans and in accordance
More informationGUIDE SPECIFICATION FOR MULTI-PURPOSE EXPANSION/CONTRACTION JOINT FILLER: NOMAFLEX
GUIDE SPECIFICATION FOR MULTI-PURPOSE EXPANSION/CONTRACTION JOINT FILLER: NOMAFLEX SECTION 03 15 00 CONCRETE ACCESSORIES EXPANSION/CONTRACTION JOINT FILLER Specifier Notes: This guide specification is
More informationSECTION INTERIOR STONE INTERIOR STONE
SECTION 04401- INTERIOR STONE 04401-1 PART ONE: GENERAL 1.1 Description INTERIOR STONE 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor/Vendor and shall be
More information***************************************************************************************************************
03365 POST-TENSIONED CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 38 00. ***************************************************************************************************************
More informationDIVISION 04 MASONRY CAST STONE. A. Design Considerations. 1. Cast stone shall comply with ASTM C1364, Standard Specification for Cast Stone.
DIVISION 04 MASONRY 04720 CAST STONE A. Design Considerations 1. Cast stone shall comply with ASTM C1364, Standard Specification for Cast Stone. 2. Care must be taken in the design of individual units
More informationThe Contractor is responsible for quality control, including workmanship and materials furnished by his subcontractors and suppliers.
SECTION 05 31 13 STEEL FLOOR DECKING PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the contract, including General and Supplementary Conditions and Division 01 - Specification
More informationSECTION CONTROLLED LOW STRENGTH MATERIAL
SECTION 03300 CONTROLLED LOW STRENGTH MATERIAL PART 1 GENERAL 1.1 DESCRIPTION A. This Section specifies Controlled Low Strength Material (CLSM) to be used as described in this specification, including
More informationConstruction Specification for Utility Adjustments
Engineering & Construction Services Division Standard Specifications for Road Works TS 4.50 September 2017 for Utility Adjustments Table of Contents TS 4.50.01 SCOPE... 2 TS 4.50.02 REFERENCES... 2 TS
More information1.02 STANDARD REFERENCES: The following standard specifications shall apply to the Work of this Section as indicated:
SECTION 04220 CONCRETE UNIT MASONRY PART 1 - GENERAL 1.01 SCOPE: A. The CONTRACTOR shall furnish all labor, materials and equipment necessary for the masonry construction as shown on the drawings or as
More informationG. Shop drawing of wall with all dimensions, details, and finishes. Drawings must include post foundations.
DURA-CRETE S-SERIES PRECAST CONCRETE WALL SPECIFICATIONS PART 1 GENERAL 1.01 SECTION INCLUDES A. Concrete Screen Wall Description: Work under this item shall consist of furnishing and erecting a wall in
More informationINSULATED CONCRETE MASONRY UNITS Section 04220
INSULATED CONCRETE MASONRY UNITS Section 04220 PART 1 GENERAL 1.01 Summary A. Section Includes 1. Insulated masonry wall units (CMU's) 2. Decorative insulated masonry wall units 1.02 SUBMITTALS A. Samples:
More informationSECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM
ARCHITECTURAL SPECIFICATIONS MANUFACTURER: InterBlock LLC PO Box 1123, Sheboygan, WI 53082 Phone Number 920-207-7234 SECTION 03100 STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM PART 1 GENERAL 1.01 Summary
More informationSPECIFICATIONS PRECAST PRESTRESSED CONCRETE PART 1 GENERAL 1.6.2.5 Openings, inserts and related reinforcement 1.6.3 Each drawing submitted to bear stamp of 1.1 Related Work qualified Professional Engineer
More informationSECTION STRUCTURAL PRECAST HOLLOW CORE SLABS
PART 1 GENERAL 1.01 SCOPE OF WORK A. The Contractor shall furnish all labor, materials, equipment and incidentals to provide a complete structural precast hollow core slab system as shown on the Contract
More informationCELCORE CELLULAR INSULATING CONCRETE SPECIFICATION FOR RETROFIT PLACEMENT OVER EXISTING ROOF MEMBRANES
PART 1: SCOPE CELCORE CELLULAR INSULATING CONCRETE SPECIFICATION FOR RETROFIT PLACEMENT OVER EXISTING ROOF MEMBRANES 1.1 An Approved Celcore Applicator shall furnish all labor, materials and supervision
More informationDIVISION 04 MASONRY. Section Title Number MASONRY Maintenance of Masonry Masonry Mortaring Masonry Accessories
04 00 00 MASONRY 04 01 00 Maintenance of Masonry 04 01 20 Maintenance of Masonry 04 05 13 Masonry Mortaring 04 05 23 Masonry Accessories 04 20 00 UNIT MASONRY 04 21 00 Clay Unit and Brick Veneer 04 22
More informationA. Drawings and general provisions of the contract, including General and Supplementary Conditions, apply to this section.
SECTION 03 01 30 MAINTENANCE OF CAST-IN-PLACE CONCRETE SECTION 03 01 40 MAINTENANCE OF PRECAST CONCRETE SECTION 03 01 50 MAINTENANCE OF CAST DECKS AND UNDERLAYMENT SECTION 03 01 60 MAINTENANCE OF GROUTING
More informationSECTION BRICK MASONRY ASSEMBLIES
PART 1 - GENERAL 1.1 SUMMARY A. Section includes the following: 1. Face brick. 2. Mortar and grout. 3. Ties and anchors. 4. Miscellaneous masonry accessories. 1.2 SUBMITTALS A. Product Data: For each type
More informationDURRELL DESIGN GROUP, PLLC ROOF REPLACEMENT BARR ELEMENTARY SCHOOL JACKSON PUBLIC SCHOOL DISTRICT JACKSON, MISSISSIPPI.
DURRELL DESIGN GROUP, PLLC 500-G E. WOODROW WILSON AVENUE JACKSON, MISSISSIPPI 39216 PHONE: 601.708.4788 FAX: 601.488.4717 ROOF REPLACEMENT BARR ELEMENTARY SCHOOL JACKSON PUBLIC SCHOOL DISTRICT JACKSON,
More informationSECTION MANHOLES AND STRUCTURES. A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems.
SECTION 33 05 13 MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Manholes for water, storm drain and sanitary sewer systems. B. Related Sections: 1. Section 03 20 00 - Concrete
More informationSECTION 11 - REINFORCED AND PLAIN CONCRETE WORKS CONTENTS
CONTENTS SPECIFICATIONS SECTION NO. Scope 11.20 Codes and Standards 11.21 Form Release Agent 11.22 Supports, Chairs and Spacers 11.23 Reinforcement 11.24 Forms 11.25 Premoulded Joint Filler 11.26 Cement
More informationREQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St.
531 N. Nash Street Hortonville, WI 54944-0099 Phone: 920-779-6011 Fax: 920-779-6552 www.hortonvillewi.org REQUEST FOR BIDS BUILDING DEMOLITION 102 W. Main St. Date Issued: February 5, 2016 Date Due: March
More informationSECTION COMMON WORK RESULTS FOR CONCRETE SSPECIALTY COATINGS
SECTION 03 05 00 COMMON WORK RESULTS FOR CONCRETE 09 97 00 SSPECIALTY COATINGS Weld Crete ************************************************************************************************************************
More informationWHAT IS PRECAST/PRESTRESSED CONCRETE?
PRODUCT LOAD TABLES 1 WHAT IS PRECAST/PRESTRESSED CONCRETE? PRECAST/PRESTRESSED CONCRETE is an architectural and structural material possessing great strength. Specifically, PRESTRESSED CONCRETE has unique
More informationBroadcast Parking Garage System
AIA Specification Part 1 General Broadcast Parking Garage System 1.01 Work Included A. All work to be provided in this section shall include material, labor, and equipment necessary to furnish the complete
More information1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards.
WOOD FLOORING GENERAL INFORMATION 1.1 This section applies to factory finished wood strip flooring. 1.2 Reference Standard: NOFMA - National Oak Flooring Manufacturers Association Grading Standards. 1.3
More informationCSI SECTION MAINTENANCE OF CONCRETE Repair & Resurfacing with Rapid Hardening, High Strength, Low-Shrink, Non-Metallic Cementitious Materials
CSI SECTION 03 01 00 MAINTENANCE OF CONCRETE Repair & Resurfacing with Rapid Hardening, High Strength, Low-Shrink, Non-Metallic Cementitious Materials EDITOR NOTE: The following guideline specification
More informationWOOD FLOORING WOOD FLOORING
09550 - WOOD FLOORING 09550-1 PART ONE: GENERAL 1.1 Description WOOD FLOORING 1.1.1 Work in this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance
More informationA. The work of this section includes, but is not limited to, the following:
SECTION 07 14 00 FLUID APPLIED WATERPROOFING SYSTEM PART 1: GENERAL 1.1 RELATED DOCUMENTS A. All of the Contract Documents, including General and Supplementary Conditions and Division 01 General Requirements,
More informationPulaski County, Virginia
Pulaski County, Virginia Typical Retaining Wall Details Based on the 2009 International Residential Code CONTENTS Timber Retaining Wall... 2 General Requirements... 2 Wall Construction... 2 Deadmen...
More informationSECTION 806 MANHOLE REHABILITATION
SECTION 806 MANHOLE REHABILITATION 806-1 DESCRIPTION: This specification consists of all work, materials, labor and equipment required for manhole rehabilitation for the purpose of eliminating infiltration
More informationSECTION Specification for Building Limes Specification For Building Sands from Natural Sources Methods of Tests for Paints.
SECTION 09200 PART 1 - GENERAL 1.01 DESCRIPTION A. Extent of Work: The extent of lath and plaster work is shown on the drawings and in schedules and includes interior and exterior plaster work, and fibreglass
More informationTILE TILE
09300 - TILE 09300-1 PART ONE: GENERAL 1.1 Description TILE 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance with the requirements
More informationSECTION UTILITY MANHOLES AND STRUCTURES
SECTION 33 05 14 UTILITY MANHOLES AND STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Precast reinforced concrete manholes and structures with tongue-and-groove joints with masonry transition
More informationREQUEST FOR PROPOSAL (RFP) SERVICE AND MAINTENANCE OF AIR CONDITIONING UNITS FOR ASPA OFFICES AUGUST 5, 2013
MATERIALS MANAGEMENT OFFICE REQUEST FOR PROPOSAL (RFP) SERVICE AND MAINTENANCE OF AIR CONDITIONING UNITS FOR ASPA OFFICES AUGUST 5, 2013 RFP NO. FY13.1142.FSM UTU ABE MALAE Executive Officer Page 1 of
More informationSept 30, 2004 Page 1
Sept 30, 2004 Page 1 This section includes a manufacturer's guide specification for TERRAFOAM EPS building insulation. Refer also to Product Description for detailed product properties, options, and other
More informationE. Section Polymer Modified Cement Waterproofing. K. Section Sub drainage: Foundation perimeter drainage.
DELTA -DRAIN Section 07 10 00 Dampproofing and Waterproofing PART 1 GENERAL 1.1 SECTION INCLUDES A. Below grade drainage sheets. B. Plaza deck and planter drainage sheets. 1.2 RELATED SECTIONS A. Section
More informationSECTION Vitrified Clay Wall Coping 2014
SECTION 04220 2014 PART 1 GENERAL 1.1 DESCRIPTION A. SCOPE OF WORK 1. Provide new coping as indicated on Drawings. B. RELATED SECTIONS 1. Section 02050: Selective Demolition. 2. Section 07650: Metal Flashing.
More informationDIVISION 03 CONCRETE CONCRETE Maintenance of Concrete
DIVISION 03 CONCRETE 03 00 00 CONCRETE 03 01 00 Maintenance of Concrete 03 01 10 Maintenance of Concrete Forming and Accessories 03 01 20 Maintenance of Concrete Reinforcing 03 01 23 Maintenance of Stressing
More informationSECTION ARCHITECTURAL CAST STONE
PART 1 - GENERAL 1.1 RELATED DOCUMENTS SECTION 047200 ARCHITECTURAL CAST STONE A. RELATED DRAWINGS All drawings, to include supplemental drawings, instructions and conditions of this contract. B. RELATED
More informationSECTION EXPANSION CONTROL
SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationSECTION PERMANENT FORMS Insulating Concrete Forms Rev
SECTION 03 11 19 PERMANENT FORMS Insulating Concrete Forms Rev 5.20.14 PART 1 GENERAL 1.01 SUMMARY A. Supply and installation of permanent insulating concrete forms as formwork, placement of steel reinforcement
More information1.1 Related Work Specified in Other Sections (Delete if Not Applicable):
NOTE TO SPECIFIER: Concrete Resurfacing (Broom Finish) System provides an economical alternative to the removal and replacement of existing concrete. This system creates a flexible and durable finish that
More informationNarrow Modular Pavers (NMP) for Sand-Set Installations
The following specification refers to the Stepstone, Inc. product known as: Narrow Modular Pavers (NMP) for Sand-Set Installations Narrow Modular Pavers are part of the California Architectural Paver line
More informationConstruction Specification for Concrete Bus Pad
Engineering & Construction Services Division Standard Specifications for Road Works TS 3.41 June 2017 for Concrete Bus Pad Table of Contents SCOPE... 3 REFERENCES... 3 DEFINITIONS... 3 DESIGN AND SUBMISSION
More information***************************************************************************************************************
09330 QUARRY TILE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 09 30 16 ***************************************************************************************************************
More informationCONCRETE POLISHING SPECIFICATION NEW OR EXISTING CONCRETE
CONCRETE POLISHING SPECIFICATION NEW OR EXISTING CONCRETE PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division
More informationSECTION EXPANSION CONTROL
SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More information1. Cast-in-place concrete is specified in Section
SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record
More informationSECTION ROOF SPECIALTIES
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 71 00 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable
More informationBIO-AQUIFER STORM SYSTEM
BIO-AQUIFER STORM SYSTEM Specifications for Construction PART 1 GENERAL 1.01 SECTION INCLUDES A. Providing labor, materials, tools and equipment to furnish and install a permeable concrete paving stone
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-03 11 13.00 10 (May 2014) --------------------------------- Preparing Activity: USACE Superseding UFGS-03 11 13.00 10 (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS
More information1.02 RELATED WORK: Refer to the following sections for related work:
SECTION 4200 - CONCRETE STRUCTURES PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of header curb, retaining walls, energy dissipation structures for drainage channels, reinforced concrete
More informationI N V I T A T I O N T O B I D City and Borough of Wrangell Premanufactured Restroom
Overview The (CBW) requests sealed bids from interested and qualified firms to provide a, on a one-time basis. Supplier shall furnish all labor, materials, tools, and equipment necessary for supplying
More informationSECTION SPECIALTY PLACED CONCRETE - SHOTCRETE
SECTION 03370 SPECIALTY PLACED CONCRETE - SHOTCRETE 1.1 SECTION INCLUDES PART 1 GENERAL A. Shotcrete applied by [dry-mix] [or] [wet-mix] process. 1.2 RELATED SECTIONS A. Section 03013 - Maintenance of
More information- PRECAST CONCRETE POTABLE WATER STORAGE TANKS
PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2
More informationSection PANEL SIGNAGE
Section 10 14 23 PANEL SIGNAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including FDOT DIVISION I GENERAL REQUIREMENTS & COVENANTS Specification Sections,
More informationDIVISION 03 CONCRETE SPECIFICATION : FORMS AND FORMWORK
DIVISION 03 CONCRETE SPECIFICATION 031000: FORMS AND FORMWORK PART 1.0 GENERAL 1.1 DESCRIPTION The work of this specification includes furnishing of all labor, materials, equipment and incidentals to install,