Your Office Fit Out Checklist

Size: px
Start display at page:

Download "Your Office Fit Out Checklist"

Transcription

1 Your Office Fit Out Checklist Plan your office refurbishment from start to finish with our definitive Office Fit Out Checklist. We ll take you through the planning process step-by-step, to help ensure your office transformation is an enjoyable and successful one ThreeHundredAndSixty Degrees 3

2 1 Primary Concerns Are your existing facilities outdated / unusable? Has your business recently undergone an expansion, contraction or reorganisation? Are you looking to boost morale and productivity? Would you like to improve your company s image and reputation? 2 The Reason or Reasons Behind Your Planned Refurbishments Resizing Relocating Redesigning Rebranding Merging Legislation Environmental Health & Safety Improve your company profile 3 What You Are Looking To Achieve Refurbish a new office space Refurbish your existing office space CAT B fit out. Category B will incorporate everything that makes your office individual and functional, including partitions, meeting rooms, specialist lighting and facilities, breakout spaces and kitchen areas, furniture, graphics and branding CAT A fit out. Category A refers to a basic landlord fit out working from a blank canvas. This kind of fit out includes the installation of the building s mechanical and electrical services such as lighting sockets and air conditioning ducts, raised flooring, suspended ceilings, etc. CAT A and CAT B fit out ThreeHundredAndSixty Degrees 2

3 4 Identifying Your Needs Has a feasibility study been carried out to help determine how much space you need? Storage audit taken place 5 Talk to Your Landlord License to Alter obtained Renegotiated the terms of your lease Ask about landlord contributions Dilapidations clauses renewed Building survey carried out 6 Key Parties Identified Have you identified an Office Fit Out Champion? Have senior management been notified? Have all of your staff been made aware? 7 Services You Require From Your Office Design & Fit Out Company Project management of the whole project Space audits and feasibility studies Space planning Interior design Furniture selection and procurement Mechanical and electrical design, installation and data cabling Air conditioning, heating and ventilation Plumbing Building regulations approvals 2017 ThreeHundredAndSixty Degrees 3

4 Health and safety Knowledge of the Equality Act Experience of refurbishment in occupation Willing to arrange for you to visit other projects they have done Able to work to a fixed budget Good value for money Guaranteed on-time completion Environmentally conscious 8 Drawing Up a Budget Changes in occupancy costs (energy bills, maintenance costs etc.) Building control fees Insurance costs Fire plan assessments Design and fit out costs Space planning / site survey IT and telecoms equipment Furniture Waste disposal Security Temporary storage throughout project Contingency costs Mechanical and electrical works 2017 ThreeHundredAndSixty Degrees 4

5 9 Ensure You re Insured Public Liability Insurance Professional Indemnity Insurance Contractors All Risks insurance 10 Minimising Disruption Find out how much work can be done during office hours and what needs to be done out of hours. Approach other building occupants about potentially gaining access to their facilities, if needed - while the works are being carried out. 11 Establish Lead Times in Advance Heating, ventilation and air conditioning IT and telephony Furniture and storage Custom joinery 12 Health and Safety Assurance Ask your fit out contractor for health and safety advice Consider H&S arrangements for contractors access Consider H&S arrangements for contractors use of welfare 13 Managing the Movement of People During the Works Put someone in charge of managing the packing and decluttering process Talk to your IT department and get expert advice if required Make arrangements with your removal company 2017 ThreeHundredAndSixty Degrees 5

6 Arrange crates and labels for packing up Arrange temporary storage solutions 14 Design Produce a full layout (including desks, meeting rooms, kitchens, comms rooms, IT etc.) Put together some mood boards to find the look and feel that s right for your business Involve your Marketing team in agreeing a colour scheme that s right for your brand Look for ways of maximising sustainability and energy efficiency 15 Furniture That Fits Are you getting good quality for your money? Will it be practical for everyday work? Are the chairs ergonomic? Will it work with your existing computers and other equipment? Do you have enough storage? 16 Storage Needs Individual storage lockers and desks Document storage Storerooms Secure storage and safes Future needs for all of the above 17 Technology Considerations Power points Floor boxes and data points Location of printers 2017 ThreeHundredAndSixty Degrees 6

7 Comms room / cabinets Cabling Backup generator Servers Service and support Wireless sub-metering for your energy use IT management and coordination who will make sure it all works? 18 Work on Site Separate waste and recycle and plasterboard, carpet and other materials to be stripped out Follow the proper procedures to dispose of hazardous materials Run weekly site meetings Have a sign off procedure in place for any changes Take photos of the works at every stage to record defects De-snag as you go to save time later on and minimise disruption when everybody has moved Keep staff informed of key dates, so they know what s happening and when 2017 ThreeHundredAndSixty Degrees 7

OFFICE REFURBISHMENT CHECKLIST YOUR STEP BY STEP GUIDE TO ENSURING YOUR OFFICE REFURBISHMENT GOES WITHOUT A HITCH

OFFICE REFURBISHMENT CHECKLIST YOUR STEP BY STEP GUIDE TO ENSURING YOUR OFFICE REFURBISHMENT GOES WITHOUT A HITCH 1 OFFICE REFURBISHMENT CHECKLIST YOUR STEP BY STEP GUIDE TO ENSURING YOUR OFFICE REFURBISHMENT GOES WITHOUT A HITCH 1 OFFICE REFURBISHMENT CHECKLIST YOUR STEP BY STEP GUIDE TO ENSURING YOUR OFFICE REFURBISHMENT

More information

ACTIVITIES CHECKLIST ASSIGNED TO DUE DONE

ACTIVITIES CHECKLIST ASSIGNED TO DUE DONE I 2 3 4 5 6 7 8 9 I0 II I2 I3 I4 I5 I6 I7 Form a Move Committee. Delegate and assign responsibilities to each member of the Move Committee. Find out if any licenses or permits are required at new facilities.

More information

A GUIDE TO Office Interior Design & Development Terminology

A GUIDE TO Office Interior Design & Development Terminology A GUIDE TO Office Interior Design & Development Terminology 1 Experts In Creating Amazing Work Space Environments. 2 Contents Introduction 4 Design And Visual Terminology 5 Contract Related Terminology

More information

SUSTAINABLE OFFICE DESIGN CHECKLIST YOUR STEP-BY-STEP GUIDE TO A GREEN OFFICE INTERIOR

SUSTAINABLE OFFICE DESIGN CHECKLIST YOUR STEP-BY-STEP GUIDE TO A GREEN OFFICE INTERIOR 1 SUSTAINABLE OFFICE DESIGN CHECKLIST YOUR STEP-BY-STEP GUIDE TO A GREEN OFFICE INTERIOR 1 SUSTAINABLE OFFICE DESIGN CHECKLIST YOUR STEP-BY-STEP GUIDE TO A GREEN OFFICE INTERIOR There are many reasons

More information

MOVE PLANNING CHECKLIST

MOVE PLANNING CHECKLIST MOVE PLANNG CHECKLIST PRELIMARY Finalize Lease for new location Notify present Landlord of termination date Advise staff of date and location of move Engage designer for new premises (if required) Create

More information

Fitout Planning Design Budgeting Fitout Process Post-Construction

Fitout Planning Design Budgeting Fitout Process Post-Construction A guide to provide you with all the general information involved in planning an office fitout. For further details or to get an exact quote for your project arrange a free consultation with Cadwell. Fitout

More information

CDM FAQ Sheet

CDM FAQ Sheet CDM 2015 - FAQ Sheet 1. The change to the regulations means Domestic works are now included. What if you are doing DIY in your own house? Do the regulations apply to this? If the home owner is doing the

More information

Emergency Response Checklist. Laboratories and Research Facilities

Emergency Response Checklist. Laboratories and Research Facilities Emergency Response Checklist THIS PAGE INTENTIONALLY LEFT BLANK Ver. 1.0 01/2018 ii Record of Changes Description of Change Date of Change Entered By Date Entered Ver. 1.0 01/2018 iii TABLE OF CONTENTS

More information

Recommended Further Reading. A Guide to Managing Health and Safety in Construction, published by the

Recommended Further Reading. A Guide to Managing Health and Safety in Construction, published by the Recommended Further Reading and References ClOB Handbook of Fadlities Management, ed. Alan Spedding, 1994, published by Longman Scientific & Technical Fadlities Management: Theory and Practice, Keith Alexander,

More information

Designing for Flexible Building Services in Office-Based Environments. James Brittain Denice Jaunzens Hywel Davies

Designing for Flexible Building Services in Office-Based Environments. James Brittain Denice Jaunzens Hywel Davies Designing for Flexible Building Services in Office-Based Environments Understanding Client Needs James Brittain Denice Jaunzens Hywel Davies ABS consulting BRE CIBSE Summary As the pace of change increases

More information

SPECIFICATIONS SYSTEMS NEW INSTALLATION

SPECIFICATIONS SYSTEMS NEW INSTALLATION MINIMUM PERCENTAGES: SPECIFICATIONS SYSTEMS NEW INSTALLATION Bidders must offer a minimum percent discount from published catalog price list of 65% on Systems and Metal Case Goods and must submit a discount

More information

otel business, from housekeeping to banqueting everything in be-

otel business, from housekeeping to banqueting everything in be- Talk to us and rest assured we will deliver... e understand every aspect of the hotel business, from housekeeping to anqueting and everything in between. We draw on this knowledge to ring you service that

More information

BUILDING ENERGY EFFICIENCY CERTIFICATE

BUILDING ENERGY EFFICIENCY CERTIFICATE BUILDING ENERGY EFFICIENCY CERTIFICATE BUILDING DETAILS Building name 390 St Kilda Road Certificate no. Owner's name Building address The Trust Company (Australia) Limited 390 St Kilda Road, Melbourne,

More information

Please make sure you have taken the following steps in preparation for your scheduled move on

Please make sure you have taken the following steps in preparation for your scheduled move on Individual Move Checklist, for the Downtown Campus Center Move. Please make sure you have taken the following steps in preparation for your scheduled move on. Table of Contents Packing Checklist 3 Office/Workstation

More information

Office Interiors. Office partitions, furniture, shelving, storage, space planning and refurbishment.

Office Interiors. Office partitions, furniture, shelving, storage, space planning and refurbishment. Office Interiors Office partitions, furniture, shelving, storage, space planning and refurbishment www.avantauk.com 600 Series partitioning Our full range of Office Partitioning is available at www.avantauk.com

More information

2018 REQUEST FOR PROPOSAL FOR JANITORIAL SERVICES. Alberta Construction Safety Association (ACSA)

2018 REQUEST FOR PROPOSAL FOR JANITORIAL SERVICES. Alberta Construction Safety Association (ACSA) 2018 REQUEST FOR PROPOSAL FOR JANITORIAL SERVICES Alberta Construction Safety Association (ACSA) CLOSING DATE: February 9 th, 2018 SECTION 1 PURPOSE AND CONTENT 1.1 We are Alberta s partner in construction

More information

SPECIFICATIONS SYSTEMS MATCHING EXISTING. This Matching Existing Furniture Contract will be for the following Manufacturer s only:

SPECIFICATIONS SYSTEMS MATCHING EXISTING. This Matching Existing Furniture Contract will be for the following Manufacturer s only: SPECIFICATIONS SYSTEMS MATCHING EXISTING This Matching Existing Furniture Contract will be for the following Manufacturer s only: Haworth Herman Miller Steelcase Global Hon Kimball Allsteel Knoll Maxon

More information

BUILDING ENERGY EFFICIENCY CERTIFICATE

BUILDING ENERGY EFFICIENCY CERTIFICATE BUILDING ENERGY EFFICIENCY CERTIFICATE BUILDING DETAILS Building name BEEC Example Building Certificate no. Owner's name Example Company Name Issue date 6/10/2011 Building address 123 ANYWHERE STREET BRISBANE

More information

Box Clever Consulting. Executive Summary Project Report. July Strand Plaza. Liverpool. for. Primesite Developments

Box Clever Consulting. Executive Summary Project Report. July Strand Plaza. Liverpool. for. Primesite Developments Box Clever Consulting Executive Summary Project Report July 2017 Strand Plaza Liverpool for Primesite Developments Author - Graham Flynn Issued - 05/08/17 Strand Plaza - Liverpool Status Report @ End of

More information

ENVIRONMENTAL AUDITING GUIDE TD 16/16/E

ENVIRONMENTAL AUDITING GUIDE TD 16/16/E ENVIRONMENTAL AUDITING GUIDE MIDDLE EAST GASES ASSOCIATION (MEGA) European Business Center, Office BC 25 Dubai Investments Park, PO Box: 166 Dubai-UAE Tel: +971-4-8135525 / Fax: +971-4-8135575 / E-mail:

More information

CATAMARAN TOWER - 1 Seef Area Plot 19, 20

CATAMARAN TOWER - 1 Seef Area Plot 19, 20 STATUS REPORT NO 18 [As on September 30, 2017] This report is intended as a status report and covers only the activities completed till date, non-completed works and work-in-progress. A. Project Details

More information

Job Description IT & FACILITIES TECHNICIAN (MAINTENANCE)

Job Description IT & FACILITIES TECHNICIAN (MAINTENANCE) Job Description IT & FACILITIES TECHNICIAN (MAINTENANCE) Job Title: Department: Responsible to: IT & Facilities Technician (Maintenance) IT & Facilities IT & Facilities Manager Main purpose of job: To

More information

MATERIALS AND RESOURCES

MATERIALS AND RESOURCES MATERIALS AND RESOURCES MR- P1: STORAGE AND COLLECTION OF RECYCLABLES To reduce the waste that is generated by building occupants and hauled to and disposed of in landfills. PREREQUISITE REQUIREMENTS Provide

More information

Cargotec Supplier Requirements

Cargotec Supplier Requirements Cargotec Supplier Requirements 2015-02-17 CSR V2.0 1 Management Responsibility... 6 1.1 Business Plan... 6 1.2 Key Performance Indicators... 6 1.3 Financial Stability... 6 1.4 Quality Management System...

More information

CIC Guidelines Preliminary Design

CIC Guidelines Preliminary Design Version 1.0 / August 2016 Stage 3 of 8 Approval: Of previous stage, design documentation, updated programme and cost plan. List matters from previous stage to be addressed in current stage. Documentation:

More information

IMPORTANT (Please read this before using the checklist).

IMPORTANT (Please read this before using the checklist). PRE-ASSESSMENT ESTIMAT IMPTANT (Please read this before using the checklist). This pre-assessment checklist allows a quick evaluation of the rating, that could be achieved, under a formal BREEAM Offices

More information

Facilities Officer Job Profile

Facilities Officer Job Profile Facilities Officer Job Profile About the HCPC The Health and Care Professions Council (HCPC) is the regulator of 16 different health and care professions. Our primary function is to protect the public.

More information

AMP 5 Excellence in Health & Safety Awards Excellence in Health and Safety Innovation

AMP 5 Excellence in Health & Safety Awards Excellence in Health and Safety Innovation AMP 5 Excellence in Health & Safety Awards 2011 Excellence in Health and Safety Innovation Table of Contents Introduction...3 1. Tangible Benefits to Health and Safety, Including Cost and Risk Reduction...4

More information

HOMEBUILDING PROCESS TIMELINE. 13 Steps from Start to Finish HOMEBUILDING RESOURCE GUIDE

HOMEBUILDING PROCESS TIMELINE. 13 Steps from Start to Finish HOMEBUILDING RESOURCE GUIDE HOMEBUILDING PROCESS TIMELINE 13 Steps from Start to Finish HOMEBUILDING RESOURCE GUIDE INTRODUCTION Building a new home can feel like a daunting process, especially if you have never done it before. However,

More information

Hazardous Waste Management Policy

Hazardous Waste Management Policy Level 3 - H&S Policy Structure Hazardous Waste Management Policy BACKGROUND The University produces hazardous waste from all areas, not just laboratories and workshops, which means that this policy potentially

More information

West One Wellington Street A popular West End location in the heart of professional Leeds.

West One Wellington Street A popular West End location in the heart of professional Leeds. West One 110 114 Wellington Street A popular West End location in the heart of professional Leeds. A statement West End location Choosing the right address can be crucial to the success of your business.

More information

Guide to Leasing Retail Business Space

Guide to Leasing Retail Business Space Guide to Leasing Retail Business Space Are you looking for retail space for your new or existing business? It s an important decision that can help boost your bottom line. This guide will walk you through

More information

SOL UTIONS LIVING SOLUTIONS LIVING SOLUTIONS

SOL UTIONS LIVING SOLUTIONS LIVING SOLUTIONS Buyer s Guide HOMES 1300 985 110 LIVING SUPPORT SOLUTIONS 2 BCDS0868 Contents Just imagine the space you can create 4 More reasons to choose SmartSpace 8 SmartSpace Project Planner 9 Design your SmartSpace

More information

3.3 Guidelines for Performing Building Inspections All building inspectors should read and understand the following information:

3.3 Guidelines for Performing Building Inspections All building inspectors should read and understand the following information: 3.0 BUILDING SAFETY INSPECTIONS 3.1 General Information In order to maintain safe working environments for all University employees and students, quarterly building safety inspections are required. To

More information

Site Waste Management Plans A guide for the construction industry and supply chain

Site Waste Management Plans A guide for the construction industry and supply chain GG899 www.envirowise.gov.uk Envirowise Advice Line: 0800 585794 Notes:...... Envirowise - sustainable practices, sustainable profits. Envirowise is a Government-funded programme dedicated to putting the

More information

Legionella Procedure. Document Control. Date of next Review. Revision No. Publication on Web Site. Date Document Reviewed. Summary of main changes

Legionella Procedure. Document Control. Date of next Review. Revision No. Publication on Web Site. Date Document Reviewed. Summary of main changes Document Control Revision No. Date Document Reviewed Publication on Web Site Date of next Review Summary of main changes Draft May 2017 New version of document 1 May 2017 May 2017 May 2018 Update of document

More information

THE FLORIDA BAR S LAW OFFICE MANAGEMENT ASSISTANCE SERVICE NEW LAW PRACTICE // NEW OFFICE CHECKLIST

THE FLORIDA BAR S LAW OFFICE MANAGEMENT ASSISTANCE SERVICE NEW LAW PRACTICE // NEW OFFICE CHECKLIST THE FLORIDA BAR S LAW OFFICE MANAGEMENT ASSISTANCE SERVICE NEW LAW PRACTICE // NEW OFFICE CHECKLIST OPENING DAY (visit us at www.flabar.org/newflabar/memberservices/lomas) CATEGORY Accountant Accountant

More information

Environmental Performance Plan !

Environmental Performance Plan ! Environmental Performance Plan 2011 2016! Version Date Author / Reviewers Issued Description of changes 3.0 16 March Editing clarifications 2011 Drafted by Julia Callaghan, Sustainability Coordinator and

More information

ATTACHMENT N LEED PROJECT PROCEDURES

ATTACHMENT N LEED PROJECT PROCEDURES ATTACHMENT N LEED PROJECT PROCEDURES 1. All subcontractors, sub-subcontractors and suppliers at all tiers are to include the following items in their trade scope of work: a. Submit data and documentation

More information

Strategic Facilities Management

Strategic Facilities Management 54 Strategic Facilities Management Andre Michau, director of Afroteq Advisory and Ronald Nothnagel, director at FM Solutions talk to GLA Can your company afford not to engage with these experts? 55 Over

More information

Annex G to Loughborough University Facilities Management Health and Safety Procedure

Annex G to Loughborough University Facilities Management Health and Safety Procedure Annex G to Loughborough University Facilities Management Health and Safety Procedure Working with Contractors Including the Construction (Design and Management Regulations) 2015 General 1. The Construction

More information

JOB DESCRIPTION Clerk of Works (CoW)

JOB DESCRIPTION Clerk of Works (CoW) JOB DESCRIPTION Clerk of Works (CoW) RESPONSIBLE TO: RESPONSIBLE FOR: LOCATION OF ROLE: Senior Client Project Manager - AIEC The Clerk of Works will oversee delivery of the AIEC construction project works

More information

DOING BUSINESS WITH THE TRUST TENDERING FOR TRUST CONTRACTS

DOING BUSINESS WITH THE TRUST TENDERING FOR TRUST CONTRACTS DOING BUSINESS WITH THE TRUST TENDERING FOR TRUST CONTRACTS CONTENTS Page NHS Procurement... 3 Introduction... 4 Legislation and Codes of Practice... 5-6 Information Required by the Trust... 7 Tendering

More information

MEMBERSHIP GUIDE Canada

MEMBERSHIP GUIDE Canada MEMBERSHIP GUIDE Canada TABLE OF CONTENTS 1. MEMBERSHIP COMES WITH RESPONSIBILITIES 2. HOW TO TAKE ADVANTAGE OF YOUR MEMBERSHIP 3. MEMBERSHIP SHOPPING METHODS 4. PRODUCT ORDER DETAILS 5. GETTING YOUR PRODUCT

More information

Total Facilities Management. We enhance your energy, engineering, mechanical and maintenance issues

Total Facilities Management. We enhance your energy, engineering, mechanical and maintenance issues Total Facilities Management We enhance your energy, engineering, mechanical and maintenance issues ABOUT US Aplus is a reliable, local, professional and affordable maintenance and cleaning services company.

More information

Your guide to LEASING PREMISES

Your guide to LEASING PREMISES Your guide to LEASING PREMISES Follow these proven steps to achieve a better deal on better premises Introduction Thanks for downloading our eguide on Leasing Premises. It s intended to be a primer that

More information

Hazardous. Scheme. the power behind your business

Hazardous. Scheme. the power behind your business Hazardous Areas Scheme YOUR GUIDE TO REGISTRATION the power behind your business GUIDE TO REGISTRATION REQUIREMENTS Electrical work in potentially explosive atmospheres (hazardous areas) is not included

More information

Ductless Heat Pump Program Guidelines

Ductless Heat Pump Program Guidelines Ductless Heat Pump Program Guidelines In order for Lane Electric and its members to insure quality heat pump installation, we are requiring that all systems meet the necessary qualifications for the Bonneville

More information

Document B252TM 2007

Document B252TM 2007 Document B252TM 2007 Standard Form of Architect s Services: Architectural Interior Design for the following PROJECT: (Name and location or address) This document has important legal consequences. Consultation

More information

Novartis Pharmaceuticals UK Ltd - Frimley Business Park

Novartis Pharmaceuticals UK Ltd - Frimley Business Park Novartis Pharmaceuticals UK Ltd - Frimley Business Park construction industry as a whole and Facilities Managers themselves more aware of the benefits of drawing on facilities management expertise during

More information

SUBSTANTIAL IMPROVEMENT

SUBSTANTIAL IMPROVEMENT SUBSTANTIAL IMPROVEMENT General Discussion The following discussion addresses several of the issues surrounding the NFIP regulations concerning substantial improvement and substantial damage. The attached

More information

ISSUE CERTIFICATE OF PRACTICAL COMPLETION AND INITIATE HANDOVER TO UNIVERSITY

ISSUE CERTIFICATE OF PRACTICAL COMPLETION AND INITIATE HANDOVER TO UNIVERSITY THE UNIVERSITY of EDINBURGH Estates & Buildings ESTATE DEVELOPMENT ISSUE/REVISION JK 5 LAST MODIFIED 2 December 2010 DATE PRINTED RIBA stages JK JK 5 ISSUE CERTIFICATE OF PRACTICAL COMPLETION AND INITIATE

More information

Guideline Leaflet PC03: Five Year Inspection Reports Church Buildings

Guideline Leaflet PC03: Five Year Inspection Reports Church Buildings Guideline Leaflet PC03: Five Year Inspection Reports Church Buildings We recommend that all churches obtain a report on the condition of their building every five years. This leaflet explains what is needed

More information

Construction Summary

Construction Summary Construction Summary Project Name Item of Work Base Building Add-ons Total Cost Code Site Development $ 18,150.00 $ - $ 18,150.00 Landscaping $ 500.00 $ - $ 500.00 Cast-in-place Concrete $ 7,806.00 $ -

More information

Portable Appliance Testing

Portable Appliance Testing Portable Appliance Testing 1. PURPOSE 1.1 The purpose of this procedure is to provide a standardised system for the inspection and testing of portable electrical appliances throughout the University, to

More information

POSITION DESCRIPTION. JOB TITLE: Director, Corporate Services STATUS: Permanent. LOCATION: Sydney HOURS: 35 hours per week

POSITION DESCRIPTION. JOB TITLE: Director, Corporate Services STATUS: Permanent. LOCATION: Sydney HOURS: 35 hours per week POSITION DESCRIPTION Cancer Council Australia is the nation s leading non-government cancer control organisation. Cancer Council develops and promotes independent, evidence-based policy and information

More information

Reduce hassle and avoid wasting money

Reduce hassle and avoid wasting money Reduce hassle and avoid wasting money Managed Print Services Essentials you can The easy way to cut costs, and more. If you need a simple and effective way to stop unnecessarily wasting money on print,

More information

Fellow and Incorporated Engineer

Fellow and Incorporated Engineer Fellow and Incorporated Engineer Application Guidance Independence Integrity Professionalism and sound science 1 Your pathway to recognition as a Fellow and Incorporated Engineer The Energy Institute The

More information

Energy Efficiency in New Constructions built by Blake Taylor

Energy Efficiency in New Constructions built by Blake Taylor Energy Efficiency in New Constructions built by Blake Taylor Yes, he builds a beautiful home. It is so full of detail. He really loves what he does, you can tell. It is so rich in architectural detail.

More information

Corporate Responsibility Policy

Corporate Responsibility Policy Generator & Switchgear Services Generator & Switchgear Services Policy For further information please contact: sales@burtonwoodgroup.com Burtonwood Generator & Switchgear Services Ltd Unit 2, St Michaels

More information

PLANNING AND EVALUATION PRELIMINARY DESIGN

PLANNING AND EVALUATION PRELIMINARY DESIGN PLANNING AND EVALUATION Project Initiation Discuss and refine client requirements Project brief, Schedule, Budget Confirm client's space needs and program Establish scope of work Obtain client-supplied

More information

DETAILED PLANNING AND DELIVERY THE KEY TO SUCCESSFUL RELOCATION

DETAILED PLANNING AND DELIVERY THE KEY TO SUCCESSFUL RELOCATION DETAILED PLANNING AND DELIVERY THE KEY TO SUCCESSFUL RELOCATION CONTENTS FOUR/FIVE SIX/SEVEN EIGHT/NINE TEN/ELEVEN TWELVE/THIRTEEN FOURTEEN Introduction Move management Meet the team Scale of the operation

More information

Reference Designs for Standard Classroom Upgrade NELSON TWO STOREY BLOCK

Reference Designs for Standard Classroom Upgrade NELSON TWO STOREY BLOCK Reference Designs for Standard Classroom Upgrade NELSON TWO STOREY BLOCK Version 1.0, September 2016 Document history Revision date Version Summary of changes September 2016 1.0 First version for general

More information

HOTEL SANDFORD. C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated.

HOTEL SANDFORD. C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall where indicated. SECTION 024119 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Phone: (+974) / Fax: (+974)

Phone: (+974) / Fax: (+974) Company Profile Who we are We ARE Sky Creative! With the combined experience of over 35 years of trading and contracting experience, our team has established an enviable reputation as a global and regional

More information

Syllabus Link: Quality Assurance and Quality Control

Syllabus Link: Quality Assurance and Quality Control Syllabus Link: Quality Assurance and Quality Control Quality Control and Quality Assurance Quality is the ability to meet requirements. Manufacturers set a quality standard for their products and they

More information

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES If your home or business incurred damage, the engineering department, in conjunction with the Flood Mitigation Officer, will

More information

ELECTRONETICS. Scope: Prep Area

ELECTRONETICS. Scope: Prep Area ELECTRONETICS 5S TRAINING Scope: Prep Area February 19, 2010 Sponsor Michael Quinn, VP Manufacturing Production & Assembly, Northwest Center Scott Patterson, Plant Manager, Electronetics What is 5S? It

More information

Bowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy.

Bowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy. Bowmer Kirkland & Kirkland & Accommodation Health & Safety Policy December 2013 www.bandk.co.uk Index Policy Statement Page 3 Interaction of Health and Safety Responsibilities Page 5 Organisation Page

More information

DIVISION 02 SELECTIVE DEMOLITION

DIVISION 02 SELECTIVE DEMOLITION DIVISION 02 SELECTIVE DEMOLITION SECTION 02 41 19 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Demolition and removal of selected portions of a building.

More information

Our comprehensive SQF Storage and Distribution Food Safety Management System package contains everything you will need to achieve SQF Certification.

Our comprehensive SQF Storage and Distribution Food Safety Management System package contains everything you will need to achieve SQF Certification. Our comprehensive SQF Storage and Distribution Food Safety Management System package contains everything you will need to achieve SQF Certification. We include a workbook to assist in the implementation

More information

Why You Should Use an Architect

Why You Should Use an Architect Why You Should Use an Architect AN ARCHICENTRE AUSTRALIA DESIGN FEASIBILITY PROVIDES THE FOLLOWING SKETCHES ALONG SIDE A REPORT: Sketch floor plan of your existing home or site Sketch floor plan of your

More information

Positive measures to. Winter-Proof Your Home. and reduce energy costs

Positive measures to. Winter-Proof Your Home. and reduce energy costs Positive measures to Winter-Proof Your Home and reduce energy costs With temperatures plummeting and energy prices soaring - it s time to Winter-Proof Your Home At Kingspan Retrofit we know that your home

More information

Helping the A/E team. Presented by: William (Bill) Todd, RCDD/OSP. DataCom Design Group Houston, Texas

Helping the A/E team. Presented by: William (Bill) Todd, RCDD/OSP. DataCom Design Group Houston, Texas Helping the A/E team Understand ITSs Design Needs Presented by: William (Bill) Todd, RCDD/OSP Sr. Technology Design Consultant DataCom Design Group Houston, Texas Provide General Guidelines In early stages

More information

EXPERTS IN ENERGY EFFICIENCY CONSULTANCY

EXPERTS IN ENERGY EFFICIENCY CONSULTANCY EXPERTS IN ENERGY EFFICIENCY CONSULTANCY Our building energy related services help customers to meet the critical need for constructing sustainable buildings and fulfill legislative requirements across

More information

SELL YOUR HOME FASTER Stephy Lim

SELL YOUR HOME FASTER Stephy Lim 1 0 T I P S T O H E L P Y O U T O SELL YOUR HOME FASTER Stephy Lim If you ve ever been in a situation where you need to sell a house fast, you know how frustrating it can be. Everyday, you WHAT PROBLEM

More information

Technical information 2017

Technical information 2017 Technical information 2017 Exterior Exterior General We are proud to offer a 10 year warranty on all nhouses sold. The nhouse is constructed using Cross Laminated Timber (CLT) structural panels with exceptional

More information

A healthy appetite for business. Professional Indemnity Insurance A guide for your broker team.

A healthy appetite for business. Professional Indemnity Insurance A guide for your broker team. A healthy appetite for business. Professional Indemnity Insurance A guide for your broker team. Professional Indemnity Insurance Whether your client is a local accountant, architect, large software developer

More information

Green Retrofit buildings:

Green Retrofit buildings: Green Retrofit buildings: from sustainability to profitability Dr. Wisdom Kwawu University of Reading On secondment to the British Institute of Facilities Management Background Corporate Social Responsibility

More information

CIC Guidelines Construction Administration and Observation

CIC Guidelines Construction Administration and Observation Version 1.0 / August 2016 Construction Administration Stage 7 of 8 Approval: To commence post-contract award activities. Documentation: From previous stage that forms the basis of the ongoing design. Approval:

More information

HOW TO DO BUSINESS WITH BANGOR UNIVERSITY A GUIDE FOR SUPPLIERS

HOW TO DO BUSINESS WITH BANGOR UNIVERSITY A GUIDE FOR SUPPLIERS HOW TO DO BUSINESS WITH BANGOR UNIVERSITY A GUIDE FOR SUPPLIERS Produced by Bangor University s Corporate Procurement Team July 2016 Version 1.0 CONTENT About this Guide.. 3 Background.. 4 The Procurement

More information

BUILDING PATHOLOGY & DILAPIDATION Unit 2 Property Surveys

BUILDING PATHOLOGY & DILAPIDATION Unit 2 Property Surveys BUILDING PATHOLOGY & DILAPIDATION Unit 2 Property Surveys 2.1 Learning Objectives Understand the two main types of property surveys Differentiate the different property surveys and describe their purpose

More information

The Easy Guide to Determining Business Continuity Strategies

The Easy Guide to Determining Business Continuity Strategies Continuity In Business business continuity resources for busy continuity planners The Easy Guide to Determining Business Continuity Strategies You ve got a BIA! Now you need to work out the strategies

More information

Confirm with the agent when you can pick up with keys. This will determine your moving day.

Confirm with the agent when you can pick up with keys. This will determine your moving day. Moving into a home is a difficult, exhausting and tedious task. Below is a helpful checklist you can use to ensure you complete all of the necessary tasks during your move. 6-8 weeks before moving: Plan

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

Storm Damage Assessment Report For: 1234 Example Street., Houston, TX 77002

Storm Damage Assessment Report For: 1234 Example Street., Houston, TX 77002 Storm Damage Assessment Report For: 1234 Example Street., Houston, TX 77002 Prepared For: Miriam Saliba nspection Date: 9/6/2017 Prepared By: Adam Wells TREC License # 21140 105 E Spreading Oaks Ave, Friendswood,

More information

Building and renovating

Building and renovating Building and renovating Last updated: 20 November 2017 Summary This factsheet contains information about: the laws in Victoria on building and renovating the Victorian Building Authority owner-builders

More information

PROJECT INITIATION DOCUMENT (PID)

PROJECT INITIATION DOCUMENT (PID) Appendix 1 PROJECT INITIATION DOCUMENT (PID) Project Name: AGILE WORKING Project Manager: Responsible for delivery of project, day-to-day management and team leadership. Responsible for compliance with

More information

/ Policy Number: Policy Name: Capital Planning and Development Processes Definitions

/ Policy Number: Policy Name: Capital Planning and Development Processes Definitions Page 1 7-101 Definition A. Alternative Construction Delivery Methods: Building Delivery Processes that vary from the more standard Design-Bid-Build model. These may include Construction Manager-At-Risk

More information

BRC Global Standard for Packaging and Packaging Materials

BRC Global Standard for Packaging and Packaging Materials BRC Global Standard for Packaging and Packaging Materials P556: ISO 9001: 2015 to Issue 5 upgrade tool Scope This checklist is intended to assist sites in understanding the key similarities between ISO

More information

Corporate Real Estate & Green Building

Corporate Real Estate & Green Building Corporate Real Estate & Green Building CoreNet Global - London Corporate Real Estate Forum Thursday 9 th June 2016 Julie Hirigoyen, Chief Executive, UK Green Building Council IDEAS FOR DISCUSSION Introduction

More information

Whether you take in a lot of money. or you collect pennies

Whether you take in a lot of money. or you collect pennies Whether you take in a lot of money or you collect pennies ..it is important to maintain good cash handling procedures: Segregation of Duties Security Reconciliation Management Review Documentation It s

More information

THE KEY ELEMENTS OF QUANTITY SURVEYING WORK

THE KEY ELEMENTS OF QUANTITY SURVEYING WORK THE KEY ELEMENTS OF QUANTITY SURVEYING WORK A Presentation to the Institution of Surveyors of Uganda by Tom Joseph Mukasa BSc, MSc, MRICS, ICIOB, AISU 2016 1. The following are key elements (divided into

More information

Fairhurst House 7 Acorn Business Park Heaton Lane, Stockport Cheshire, SK4 1AS

Fairhurst House 7 Acorn Business Park Heaton Lane, Stockport Cheshire, SK4 1AS Fairhurst House 7 Acorn Business Park Heaton Lane, Stockport Cheshire, SK4 1AS www.redrockfacilities.co.uk 0844 800 9358 COMPLIANCE PROPERTY SPECIALIST /CLIENT DRIVE About us Red Rock offer a complete

More information

Education Infrastructure Service. Asbestos Management Process

Education Infrastructure Service. Asbestos Management Process Education Infrastructure Service Asbestos Management Process Version 9 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by

More information

Integrated Property Management Solution

Integrated Property Management Solution Integrated Property Management Solution 30 minutes to discuss: Value proposition why Vision and SPM Best of Breed there is an alternative The concept incorporating good practice The process working with

More information

Please return all requested forms and provide all information by the following deadlines:

Please return all requested forms and provide all information by the following deadlines: EXHIBITION MANUAL Responsibilities of the exhibitor The exhibitor must observe and comply with all rules stated in these guidelines, and must assume responsibility for any acts performed by his/her employees,

More information

Responsible Sourcing Policy

Responsible Sourcing Policy June 2015 Document Owner Group Procurement Version 5.1 Date of Issue 08 June 2015 Creation Date: June 2015 Page 2 of 13 1 Purpose, Scope & Priorities 1.1 Purpose The purpose of this document is to describe

More information

Capability Statement

Capability Statement Capability Statement About Fairbrother Facility Management The Fairbrother name stands for excellence - a term that reflects the calibre of our people, the quality of our work, and the way in which we

More information

CORPORATE EVENT PLANNING CHECKLIST

CORPORATE EVENT PLANNING CHECKLIST CORPORATE EVENT PLANNING CHECKLIST to keep you on track every step of the way PRE EVENT Project Management Set your event objectives, budget, schedules, and deadlines. Name it. Identify key staff roles

More information