1 INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory Name: 10, HSS Road Chittagong Chittagong Chittagong Bangladesh 21 May 2014 The Alliance for Bangladesh Worker Safety Page 1/12

2 21 May 2014 Introduction to the Report The following report contains a site profile and summary of non-conformities identified during an onsite assessment commissioned by the Alliance for Bangladesh Worker Safety (Alliance) and conducted by a third-party Qualified Assessment Firm (QAF). The assessment was conducted against the Alliance for Bangladesh Worker Safety Assessment Protocols (APs) and Fire Safety and Structural Integrity Standard, which is harmonized with the factory assessment guidelines developed by Bangladesh University of Engineering and Technology (BUET) for the Bangladesh National Tripartite Plan of Action (NTPA). The goal of the Alliance process is to provide clear and practical technical requirements by which Bangladeshi Ready Made Garment (RMG) Factories producing for Alliance members may be consistently and fairly evaluated for fire, structural, and electrical safety in a non-duplicative manner. Each assessment will prompt action plans that will be used by RMG factories to systematically and sustainably improve safety conditions for garment workers. Beyond tracking and reporting on action steps taken in a transparent manner, the Alliance organization and its members will seek to further support factory improvements through technical assistance, training, implementation support for functional Worker Committees, and in some cases financial assistance and wage support for workers if factories are closed for remediation. The contents of the report do not constitute a guarantee of compliance with the applicable laws, the Alliance Standard or the absolute or continued safety against fire, electrical and/or structural integrity issues that may lead to injury or loss of life. The report is designed to provide a non-exhaustive summary of risk issues, based on a limited sampling and duration of time onsite by the named QAF. Neither the QAF nor the Alliance can certify or guarantee the quality, outcome, or effectiveness of actions taken in response to the report. For more information and report feedback please go to: The Alliance for Bangladesh Worker Safety Page 2/12

3 21 May 2014 GENERAL INFORMATION General Information Factory Name: Country: Province: City: Bangladesh Chittagong Chittagong Zip Code: 4200 Audit Duration: Re-Audit: Re-Audit After 0 Months Draft Report Date : Final Report Date : Are all Action Items From Previous Assessment Completed?: Buildings in Complex : Number of Building Levels (Stories) : Approximate Building Area (SF) : Date of Building Construction : Date of Last Building Renovation/Addition : Is the Building mixed use?: Ancillary Structures in Complex : Number of Ancillary Levels (Stories) : N/A There are two (2) structures in the premise. These includes one (1) 6 storied RCC main building and one shed for generator. Main building (G+5) sft. 1st phase (GF to 3rd)- in 1995 and 2nd phase (4th to 5th) to 2001 Addition of tin roofing shed on roof slab in the year of 2001 No Single storied generator building with steel roofing. one story The Alliance for Bangladesh Worker Safety Page 3/12

4 21 May 2014 Approximate Ancillary Structures Area (SF) : 200 sft Number of Occupants : Total number of occupants: 585 Exterior Facade Description : Structural System Description : Exterior facade of the building is of brick wall.the doors are wooden and windows are of glass within steel frame. Structural system is RCC moment resisting frame. Foundation type is strap foundation. This is an irregular structure. The Alliance for Bangladesh Worker Safety Page 4/12

5 21 May 2014 ASSESSMENT FINDINGS Structural System Design Are the available FoS for the columns adequate based on Preliminary calculation? High FoS for the columns noted as below (42 psf live load): Central column: 1.48 Corner column: 2.22 Edge column: 1.78 FoS of central and edge columns exceed the acceptable limits and require additional investigation. Central column FoS Document Review: Document review shows the column sizes & re-bar detail., Visual Assessment, Document Review: Document review shows the column sizes & re-bar detail., Visual Assessment Under guidance from a qualified structural engineer arrange Detail Engineering Assessment of the structure. This assessment should include destructive core testing to validate the in-situ concrete compressive strength. This detailed assessment should be c Provide results of preliminary calculations in space provided. a) column capacity; FoS > Safe b) column capacity; FoS Needs Evaluation c) Column capacity; FoS Needs Evaluation d) Column capacity; FoS < Unsafe In case of a critically low FoS (<1.25), consider Immediate Escalation Protocol If the structure has been previously expanded, was the structural impact on the entire structure analytically evaluated and confirmed by a qualified structural engineer. There is a horizontal & vertical expansion for which load impact on existing structure are not analytically evaluated. Document Review: Document review shows that there is a horizontal & vertical expansion for which load impact on existing structure are not analytically evaluated., Visual Assessment, Document Review: Document review shows that there is a horizontal & vertical expansion for which load impact on existing structure are not analytically evaluated., Visual Assessment Have a qualified structural engineer to complete an analytical evaluation of the structural impact of the addition. The Alliance for Bangladesh Worker Safety Page 5/12

6 21 May 2014 Reference Alliance Standards Part 8 Section 8.1 Applicability of Building Code. Where density of operations, storage of materials, or equipment weights require live load capacity in excess of 2.0 kn/m2 (42 psf), do the design documents confirm that the required load capacity exists? Or has the load capacity been analytically confirmed and certified by an Alliance-qualified structural engineer? The estimated floor load exceeds 42 psf in some storage area of 2nd and 4th floor( estimated load is about 66 psf). There is no analytical confirmation available for such load being accommodated in the design of the structure. Visual Assessment: Visual observation shows that the estimated floor load exceeds 42 psf in some storage area of 4th floor( estimated load is 66 psf). There is no analytical confirmation available for such load being accommodated in the design of the stru Have a qualified structural engineer confirm that capacity to support the load is available. Load Plans complying with Alliance Standard Part 8 Section should also be developed. Alliance Standards Part 8 Section 8.15 Minimum Floor Design Loads Are credible structural design documents available for review and kept on site? Non-Compliance Level: 2 Structural design documents are partially available for review and kept on site without design report. Document Review: Structural design documents are partially available for review and kept on site without design report. Have a qualified structural engineer to prepare credible as-built documents based on the requirements of Part 8 Section 8.19 of the Alliance Standard. Alliance Standard Part 8 Section 8.19 Required Structural Documentation for New and Existing Factories The Alliance for Bangladesh Worker Safety Page 6/12

7 21 May 2014 Can credible structural documentation indicating general conformance with 2006 BNBC or other comparable applicable international model building code be produced? Non-Compliance Level: 2 The design document does not clearly demonstrate the conformance with any applicable code. Document Review: Review of design documents does not clearly show conformity with codes. Engage a qualified structural engineer to develop the required documents to confirm the structural integrity of the buildings. Documents must comply with Alliance Standard Part 8 Section 8.19 and 8.20 Reference Alliance Standards Part 8 Section 8.2 Structural Integrity of Existing Factory Buildings Have provisions been made in floors or decks for a concentrated load (such as heavy equipment, water tanks, stored materials, etc) applied at a location wherever this load acting upon an otherwise unloaded floor would produce stresses greater than those caused by a uniform load? Non-Compliance Level: 2 Seven (7) nos. of 1000 liter capacity & three (3) nos. of 500 liter capacity water tanks are observed on cantilever part of the building. These all tank should be emptied/ removed immediately since preliminary calculations showing that the columns are ove Visual Assessment: Visual observation shows that seven (7) nos. of 1000 liter capacity & three (3) nos. of 500 liter capacity water tanks are observed on cantilever part of the building. These all tanks should be emptied/ relocated immediately since preli Relocate the water tanks from cantilever portion immediately under guidance of a qualified structural engineer.engage a qualified structural engineer to confirm and document that provisions have been made to accommodate concentrated loads. If provisions h The Alliance for Bangladesh Worker Safety Page 7/12

8 21 May 2014 Alliance Standard Part 8 Section 8.13 and 8.14 Can documentation be provided that the building is compliant with the requirements for wind loading and storm surge loadings as detailed in BNBC Part 6 Section 1.5.3? Non-Compliance Level: 1 There is no clear information available in the design documents to understand the consideration of wind loading & storm surge in the design of the building. Document Review: Design document review shows that there is no clear information available in the design documents to understand the consideration of wind loading & storm surge in the design of the building. Engage a qualified structural engineer to confirm satisfactory structural performance of the buildings under wind loading BNBC Part 6 Section 1.5. Compliance may be waived if the Factory Owner provides satisfactory evidence of a cyclone operations plan that includes full evacuation of the factory in advance of any approaching cyclone" Are Certificates of Occupancy available for review? Non-Compliance Level: 1 Certificates of Occupancy are not available for review. Organization is to apply for certificate of occupancy and obtain same as soon as possible from the concerned authority. Alliance Standard Part 8 Section 8.3 Preliminary Structural Assessment Structural System Construction Are the performance of key structural elements such as columns, slender columns, flat plates and transfer structures satisfactory? High The Alliance for Bangladesh Worker Safety Page 8/12

9 21 May 2014 Central Columns of the structure are found over-stressed in respect of vertical load calculation. But, there is no distinct sign that can prove the performance of key element are not satisfactory. Visual Assessment: Data from Visual observations shows that central Columns of the structure are found over-stressed in respect of vertical load calculation. But, there is no distinct sign that can proof the performance of key element are not satisfactory Engage a qualified structural engineer to confirm structural performance of the structure. Alliance Standard Part 8 Section Are all non-structural elements suspended from, attached to, or resting atop the structure adequately anchored and braced to resist earthquake forces? Non-Compliance Level: 2 In the store room there are racks which are not braced for earthquake force. There are 5 plastic water tanks with considerable height, which are not braced or anchored properly. Visual Assessment: Visual Inspection shows that in the store room, there are racks which are not braced for earthquake force. There are 5 plastic water tanks with considerable height, which are not braced or anchored properly. Adequately anchor and brace all non-structural elements to resist earthquake forces to comply with the BNBC and Alliance Standard Alliance Standards Part 8 Section 8.18 Seismic Bracing of Key Non-Structural Elements and 2006 BNBC Part 6 Have all areas of needed maintenance, including areas with efflorescence, dampness, standing water on rooftops, and corrosion been addressed. Non-Compliance Level: 1 Dampness is found at different location of the building.standing water on rooftops is found in the peripheral of plastic water tank in the cantilever part of the building. Visual Assessment: Visual observations shows the dampness at different location of the building. Standing water on rooftops is found in the peripheral of plastic water tank in the cantilever part of the building. The Alliance for Bangladesh Worker Safety Page 9/12

10 21 May 2014 Under guidance from a qualified structural engineer, address all areas of needed maintenance by correcting the identified issues. Alliance Standard Part 8 Section 8.26 Durability and Maintenance Is expansion joint material free from cracking and other forms of deterioration? Non-Compliance Level: 1 Cracking has developed at the building joint was no expansion joint was originally provided. Photograph: Cracking a location lacking an expansion joint. Have a qualified structural engineer provide further analysis of the the building joint to determine the appropriate course of corrective action. If necessary, structural engineer should include recommendations for installing an expansion joint where one Alliance Standard Part 8 Section 8.26 Durability and Maintenance Is the building free of active signs of water intrusion or ponding due to lack of performance of the façade system? Non-Compliance Level: 1 There is active signs of water intrusion due to lack of performance of the façade system Visual Assessment: Visual observation shows that there is active signs of water intrusion due to lack of performance of the façade system Repair the exterior façade system to prevent water intrusion. Alliance Standard Part 8 Section 8.26 Durability and Maintenance Structural Safety Programs Is a program in place to ensure that the live loads for which a floor or roof is or has been designed will not be exceeded? The Alliance for Bangladesh Worker Safety Page 10/12

11 21 May 2014 There is no program that will ensure that the designated load in each floor will not be exceeded Document Review: No evidence of existence of any program to control the live load on floor. Develop a program to ensure that all live loads for which a floor or roof has been designed for will not be exceeded. The designated Load Manager shall oversee this program and ensure it is enforced. Alliance Standard Part 13 Section 13.7 and Part 8 Section 8.9. Have Load Plans been prepared for each floor documenting the actual maximum operational loading that is intended and/or allowable on each floor. There is no load plan available showing the actual maximum operational loading that is allowable. Document Review: There is not load plan available in the documentation of the factory. Have a qualified structural engineer to develop Floor Loading Plans as per the requirements of Part 8 Section Alliance Standard Part 8 Section 8.10 Floor Loading Plans (Load Plans) Are Floor Load Plans posted as required? Floor load plans are not posted. Visual Assessment: Visual inspection of the factory does not show floor load plans being posted at each floor. Have a qualified structural engineer prepare load plans including the information required in Section 8.20 of the Alliance Standard and have it posted in all required location. The Alliance for Bangladesh Worker Safety Page 11/12

12 21 May 2014 Alliance Standard Part 8 Section Are areas used for storage of work materials and work products, clearly marked to indicate the acceptable loading limits as described in the Load Plan for that floor? There is no load plan. Also, there is no marking on the floor to designate spaces and height for storage of work materials. Visual Assessment: Visual inspection shows that there is no load plan. Also, there is no marking on the floor to designate spaces and height for storage of work materials. Have a qualified structural engineer prepare a load plan for each floor and have the floors marked for designating storage area as per the developed load plan Alliance Standard Part 8 Section 8.11 Floor Load Markings Is a designated representative (Factory Load Manager), who is onsite full time, trained regarding the structural floor capacity, and serves as an ongoing vendor resource and monitor of operational factory floor loadings? Non-Compliance Level: 1 There is no designated representative (Factory Load Manager), who is onsite full time, trained regarding the structural floor capacity, and serves as an ongoing vendor resource and monitor of operational factory floor loadings. Visual Assessment: Document Review Designate a representative as the Factory Load Manager. The Factory Owner shall ensure that at least one individual, the Factory Load Manager who is located onsite full time at the factory, is trained in calculating operational load characteristics of the Alliance Standards Part 8 Section 8.9 Factory Load Manager The Alliance for Bangladesh Worker Safety Page 12/12

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory Name: Karardi, Shibpur, Narsingdi, Narsingdi Dhaka Bangladesh 10 May 2013 The Alliance for Bangladesh Worker Safety Page 1/15 10 May 2013 Introduction

More information

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT A-23, 24, 25, 26 BSCIC, Industrial Estate, Kalurghat, Chittagong The Alliance for Bangladesh Worker Safety Page 1/15 Introduction to the Report The following

More information

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory 81, Kalmessar, "Jalal Shopping Complex" Board Bazar, Gazipur. 20 May 2014 The Alliance for Bangladesh Worker Safety Page 1/11 20 May 2014 Introduction

More information

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT Factory C.D.A Plot No. C-49, Sagarika Road, Pahartaly, Chittagong Chittagong 18 May 2014 The Alliance for Bangladesh Worker Safety Page 1/12 18 May 2014

More information

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Plot 33-35, Dhaka (EPZ), Savar Savar Dhaka Bangladesh The Alliance for Bangladesh Worker Safety Page 1/11 Introduction to the Report The following

More information

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) The Alliance for Bangladesh Worker Safety Page 1/12 Introduction to the Report The following report contains a site profile and summary of non-conformities

More information

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT Plot No.: 74-77, Sector -02, Karnaphuli EPZ North Patenga, Chittagong Chittagong Chittagong Bangladesh The Alliance for Bangladesh Worker Safety Page 1/11

More information

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Plot 47-52 & 68-73, KEPZ North Patenga Chittagong Chittagong The Alliance for Bangladesh Worker Safety Page 1/10 Introduction to the Report The following

More information

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT The Alliance for Bangladesh Worker Safety Page 1/9 Introduction to the Report The following report contains a site profile and summary of non-conformities

More information

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory Gilarchala, Gorgaria Master bari Sreepur, Gazipur Sreepur, Gazipur 22 Apr 2014 The Alliance for Bangladesh Worker Safety Page 1/10 Factory

More information

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory Haribaritek, Pubail College Gate, Pubail, Gazipur Gazipur Dhaka 09 Jul 2014 The Alliance for Worker Safety Page 1/11 09 Jul 2014 Introduction

More information

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) 234/8, Kafrul Tower Kachukhate Road Kafrul, Dhaka Cantonment Dhaka The Alliance for Bangladesh Worker Safety Page 1/10 16 Apr 2014 Introduction to

More information

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory SFB 2 Adamjee EPZ, Siddergonj, Narayangonj, Siddhirgonj Dhaka 22 Feb 2017 The Alliance for Worker Safety Page 1/11 22 Feb 2017 Introduction

More information

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory 138, Baizid Bostami Road Nasirabad Industrial Area, Chittagong 11 Feb 2016 The Alliance for Bangladesh Worker Safety Page 1/9 11 Feb 2016 Introduction

More information

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory Assessor: 936, Vogra Chowdhury Bari, Joydevpur, Gazipur Joydebpur, Gazipur Emkay Enterprises 16 May 2015 The Alliance for Bangladesh Worker

More information

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT Factory Kandi Boilarpur, Horindhora, Hemayetpur, Savar Savar Dhaka 27 May 2014 The Alliance for Worker Safety Page 1/10 Factory 27 May 2014 Introduction

More information

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory Name: Tianye (BD) Camping Tent Co. Ltd SFB#3, Ishwardi, EPZ, Paksey, Pabna Pabna Rajshahi Bangladesh 25 Oct 2016 The Alliance for Bangladesh

More information

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Assessor: South Panishail, Kashimpur, Gazipur Gazipur Dhaka Bangladesh Emkay Enterprises The Alliance for Bangladesh Worker Safety Page 1/9 Introduction

More information

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory Name: FCI BD, Ltd. Plot-36-39 Dhaka EPZ, Ganakbari, Savar Savar Dhaka Bangladesh The Alliance for Bangladesh Worker Safety Page 1/9 Introduction

More information

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Assessor: Plot M-4/3, Road 7, Section 7 Mirpur, Dhaka Dhaka Dhaka Bangladesh Emkay Enterprises The Alliance for Bangladesh Worker Safety Page 1/7 Introduction

More information

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT Factory 169-171 Tetulzhora Union, Hemayetpur, Savar Savar Dhaka 01 Mar 2014 The Alliance for Worker Safety Page 1/10 01 Mar 2014 Introduction to the Report

More information

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT Plot # 64/A Sector # 3 Karnafuli Export Processing Zone North Potenga Chittagong Chittagong Bangladesh The Alliance for Bangladesh Worker Safety Page 1/7

More information

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory Address: 50, New Chaktai (4th & 5th Floor), Haji Delware Hosen Sowdagar Market, Chittagong Chittagong Chittagong Bangladesh 05 May 2014 The

More information

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT 171-181, Baizid Bostami Road Nasirabad I/A, Chittagong Chittagong The Alliance for Bangladesh Worker Safety Page 1/11 Introduction to the Report The following

More information

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)

INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) 4-Tayebpur, Nischintapur Zirabo, Savar Savar Dhaka Bangladesh The Alliance for Bangladesh Worker Safety Page 1/5 Introduction to the Report The following

More information

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT Factory Name: 4 YOU CLOTHING LTD 367/1 Senpara Parbata, Mirpur-10, Dhaka Dhaka Dhaka Bangladesh The Alliance for Bangladesh Worker Safety Page 1/5 Introduction

More information

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT Factory Plot No. 74, Block -K, Rupnagar Ind. Area, Secti, Dhaka Dhaka Dhaka The Alliance for Worker Safety Page 1/5 Introduction to the Report The following

More information

INITIAL FIRE SAFETY ASSESSMENT - EXPANSION

INITIAL FIRE SAFETY ASSESSMENT - EXPANSION INITIAL FIRE SAFETY ASSESSMENT - EXPANSION Factory Sardagonj, Gavindabari, Kashimpur Gazipur Gazipur Dhaka The Alliance for Worker Safety Page 1/5 Introduction to the Report The following report contains

More information

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT

EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT Factory 191-192 Baizid Bostami Road, Nasirabad Industrial Area, Chittagong 24 May 2014 The Alliance for Bangladesh Worker Safety Page 1/13 24 May 2014 Introduction

More information

INITIAL FIRE ASSESSMENT REPORT (FAR)

INITIAL FIRE ASSESSMENT REPORT (FAR) INITIAL FIRE ASSESSMENT REPORT (FAR) Factory Haribaritek, Pubail College Gate, Pubail, Gazipur Gazipur Dhaka 09 Jul 2014 The Alliance for Worker Safety Page 1/16 09 Jul 2014 Introduction to the Report

More information

Al Islam Textile Ltd.

Al Islam Textile Ltd. Al Islam Textile Ltd. 9 Kornopara,Savar,Dhaka-1340 (23.824207N, 90.256342E) 27 APRIL 2014 1 2 Observations Item 1 observation Column loads in excess of design loads Verify concrete strengths in columns

More information

Apparel Gallery Ltd.

Apparel Gallery Ltd. Apparel Gallery Ltd. 147-148, Norshinghpur, Asulia, Savar, Dhaka (23.929985N,90.304914E) 23 March 2014 1 2 Observations Building 1 Heavy loading due to raised floor area on Ground Floor 3 Building 1 Raised

More information

Babylon Casualwear Ltd Aboni Fashions Ltd Suravee Garments Ltd

Babylon Casualwear Ltd Aboni Fashions Ltd Suravee Garments Ltd Babylon Casualwear Ltd Aboni Fashions Ltd Suravee Garments Ltd Plot-23,24, Tetulzhora, Hemayetpur, Savar, Dhaka (23.792784N, 90.254587E) 29 March 2014 1 2 Observations 3 Potentially Highly-stressed columns

More information

Suman Fashion Garments Ltd. Nipunika Ltd. Cha-72/1/B, Moddha Badda, Holland Centre, Progoti Sarani, Dhaka ( N, E) 09 March 2014

Suman Fashion Garments Ltd. Nipunika Ltd. Cha-72/1/B, Moddha Badda, Holland Centre, Progoti Sarani, Dhaka ( N, E) 09 March 2014 Suman Fashion Garments Ltd. Nipunika Ltd. Cha-72/1/B, Moddha Badda, Holland Centre, Progoti Sarani, Dhaka (23.78287N, 90.42559E) 09 March 2014 1 2 Observations 3 Columns appear to be stressed in excess

More information

Sonnet Textile Industries Ltd.

Sonnet Textile Industries Ltd. Sonnet Textile Industries Ltd. 49/B, Baizid Bostami Road, Nasirabad I/A, Chittagong. (22.31733N,91.80721E) 12 th June 2014 DEA 1 2 Observations 3 High column stresses, uncontrolled live loads and no loading

More information

Fakir Knitwears Ltd. Kayempur, Fatullah, Narayanganj-1400, Bangladesh ( N, E) 19 December 2013

Fakir Knitwears Ltd. Kayempur, Fatullah, Narayanganj-1400, Bangladesh ( N, E) 19 December 2013 1 Fakir Knitwears Ltd. Kayempur, Fatullah, Narayanganj-1400, Bangladesh (23.64049N, 90.50106E) 19 December 2013 2 Observations 3 High Column Loads - Main Building Engineering Assessment Required Cursory

More information

S B Design Ltd. Famous Design Ltd. 246/1/F, West Agargaon, Sher-E-Bangla Nagar, Dhaka-1207 ( N, E) 17 February 2015

S B Design Ltd. Famous Design Ltd. 246/1/F, West Agargaon, Sher-E-Bangla Nagar, Dhaka-1207 ( N, E) 17 February 2015 1 S B Design Ltd. Famous Design Ltd. 246/1/F, West Agargaon, Sher-E-Bangla Nagar, Dhaka-1207 (23.782446 N, 90.369530 E) 17 February 2015 2 High stress levels in columns 3 North Building South Building

More information

BUILDING INTEGRITY SUMMARY REPORT

BUILDING INTEGRITY SUMMARY REPORT BUILDING INTEGRITY SUMMARY REPORT SUPPLIER NAME SUPPLIER ADDRESS AUDIT DATE January 2014 AUDIT PERFORMED BY Cosmopolitan Industries Pvt Ltd Khejur Bagan, Bara Ashulia, Savar, Dhaka, Bangladesh Department

More information

Warn Knit Fashion Sun Knitwear Ltd. ARS Printing Chanmari, Near New Court, Fatullah, Narayanganj 1400, Bangladesh ( N, 90.

Warn Knit Fashion Sun Knitwear Ltd. ARS Printing Chanmari, Near New Court, Fatullah, Narayanganj 1400, Bangladesh ( N, 90. Warn Knit Fashion Sun Knitwear Ltd. ARS Printing Chanmari, Near New Court, Fatullah, Narayanganj 1400, Bangladesh (23.634373N, 90.497889E) 4 th December, 2016 2 High stress levels in columns that require

More information

Purna Fashions Ltd. RH Attire Ltd

Purna Fashions Ltd. RH Attire Ltd Purna Fashions Ltd. RH Attire Ltd SHAHNUR MARKET, 96 MURADPUR, HATHAZARI ROAD, PANCHLAISH THANA, Chittagong, Bangladesh (22.37245N, 91.83334E) 08 June 2014 1 2 Observations 3 High Column Stresses The columns

More information

Alif Apparels Ltd. (9813) Goldstar Garments Ltd. (9844)

Alif Apparels Ltd. (9813) Goldstar Garments Ltd. (9844) Alif Apparels Ltd. (9813) Goldstar Garments Ltd. (9844) 23/8 B&C, Holding #24/2, Khilje Road, Shyamoli Cinema Complex Building (2 nd Floor), Shyyamoli, Dhaka-1207 (+ 23.774489N, 90.365164E) 16.AUGUST.2014

More information

Dew Fashions Ltd. Le-Nouveautex Ltd. House-65,Board Bazar, Gazipur, Dhaka ( N, E) 22 June 2014

Dew Fashions Ltd. Le-Nouveautex Ltd. House-65,Board Bazar, Gazipur, Dhaka ( N, E) 22 June 2014 1 Dew Fashions Ltd. Le-Nouveautex Ltd. House-65,Board Bazar, Gazipur, Dhaka (+23.93941N,90.38554E) 22 June 2014 2 Observations Main Factory Building - Columns appear to be stressed to levels that require

More information

Tanzila Textile Ltd.

Tanzila Textile Ltd. 1 Tanzila Textile Ltd. Baroypara, Ashulia, Savar, Dhaka. (24.017986, 90.243410) 12 April 2014 2 Observations 3 Highly Stressed Columns (Building 03) Cursory calculations indicate column at high working

More information

ABA Fashions Ltd. Plot #9, Block F, Tongi, Gazipur-1710 ( N, E) 08 MARCH 2014

ABA Fashions Ltd. Plot #9, Block F, Tongi, Gazipur-1710 ( N, E) 08 MARCH 2014 ABA Fashions Ltd. Plot #9, Block F, Tongi, Gazipur-1710 (23.885176N, 90.399821E) 08 MARCH 2014 1 2 Observations 3 Highly stressed columns Cursory calculations indicate column at a high working stress.

More information

Elite Garments Ind. Ltd.

Elite Garments Ind. Ltd. Elite Garments Ind. Ltd. Bade Kalmeswer, Board Bazar, Gazipur, Bangladesh (23.954199, 90.380240) 5th April 2014 8th April 2015 1 2 Observations Made 3 Building 5 - Steel Portal Frame Main span varies from

More information

Structural Inspection Report

Structural Inspection Report Revision: Issue 2 Date: 23 rd June 2014 Cherry Pvt. Ltd. Florence Fashions Ltd. Ultimate Ltd. Chandand Fashion Ltd. Joy Fashion Ltd. Structural Inspection Report Authors: Adrian Ryan, Cathal Mac an tsearraigh

More information

BUILDING INTEGRITY DEA SUMMARY REPORT

BUILDING INTEGRITY DEA SUMMARY REPORT BUILDING INTEGRITY DEA SUMMARY REPORT SUPPLIER NAME OPEX Apparels Ltd. UNITS AUDITED Washing Plant 3 WG -5 WG 5 Extension (SKL) WG -3 Security Building SUPPLIER ADDRESS Kanchipur, Narayangonj, Dhaka, Bangladesh

More information

4A Yarn Dyeing Ltd. Kaichabari, Savar, Dhaka-1340, Bangladesh ( , ) 25 March 2014

4A Yarn Dyeing Ltd. Kaichabari, Savar, Dhaka-1340, Bangladesh ( , ) 25 March 2014 4A Yarn Dyeing Ltd. Kaichabari, Savar, Dhaka-1340, Bangladesh (23.945831, 90.261923) 25 March 2014 1 2 Observations 3 Highly stressed columns Outline calculations indicate that the working stresses of

More information

Panwin Designs Ltd. Baniachala (Bagher Bazar), Bhabanipur, Gazipur , rd May 2014

Panwin Designs Ltd. Baniachala (Bagher Bazar), Bhabanipur, Gazipur , rd May 2014 Panwin Designs Ltd. Baniachala (Bagher Bazar), Bhabanipur, Gazipur 24.166331, 90.420108 3 rd May 2014 1 Observations Building 1 2 Observations Building 1 Stress Levels in Columns 3 Observations Building

More information

BUILDING INTEGRITY DEA SUMMARY REPORT

BUILDING INTEGRITY DEA SUMMARY REPORT BUILDING INTEGRITY DEA SUMMARY REPORT SUPPLIER NAME UNITS AUDITED Opex Mills SSL2 Building 4X Generator Building 6X Generator Building Denim Generator Building Rope Denim Generator Building SSL Generator

More information

Saasco Tex (BD) Ltd Muksudpur Apparels Ltd Expo Dress Ltd Julfikar Fashions Ltd

Saasco Tex (BD) Ltd Muksudpur Apparels Ltd Expo Dress Ltd Julfikar Fashions Ltd Ltd Saasco Tex (BD) Ltd Muksudpur Apparels Ltd Expo Dress Ltd Julfikar Fashions Ltd Plot # 27, Holding # I/A, Milk vita Road, Section-7, Pallabi, Mirpur, Dhaka-1216. (23.819805N, 90.360526E) 24 th May

More information

A-One Polar Ltd. Bhulta,Rupgonj,Narayangonj. ( , ) 27th April 2014

A-One Polar Ltd. Bhulta,Rupgonj,Narayangonj. ( , ) 27th April 2014 1 A-One Polar Ltd Bhulta,Rupgonj,Narayangonj. (23.754782,90545710) 27th April 2014 2 Observations Observations Knitting & Garments building Building 1 1 3 4 Observations Roof structure: no roof bracing

More information

Camlet Fashions Ltd. Simco Fashions Ltd Fine Craft Ltd Ayesha & Galeya Fashions Ltd

Camlet Fashions Ltd. Simco Fashions Ltd Fine Craft Ltd Ayesha & Galeya Fashions Ltd Camlet Fashions Ltd. Simco Fashions Ltd Fine Craft Ltd Ayesha & Galeya Fashions Ltd 24/ka Shahid Minar Road (5 th Floor), Kallyanpur, Dhaka-1217. (23.77907778, 90.35986)- 28 th February 2015 1 2 Observations

More information

BUILDING INTEGRITY SUMMARY REPORT

BUILDING INTEGRITY SUMMARY REPORT BUILDING INTEGRITY SUMMARY REPORT SUPPLIER NAME Kenpark Bangladesh Apparel Pvt. Ltd (Unit 2) UNITS AUDITED SUPPLIER ADDRESS Wash Building Plot # 69-85, Karnaphuli Export Processing Zone, Chittagong, Bangladesh

More information

KDS IDR Ltd. CDA Plot # 15 (P)+16, Mohora I/A, Chandgaon, Chittagong ( N, E) Survey Date: 11 th March 2015

KDS IDR Ltd. CDA Plot # 15 (P)+16, Mohora I/A, Chandgaon, Chittagong ( N, E) Survey Date: 11 th March 2015 1 KDS IDR Ltd. CDA Plot # 15 (P)+16, Mohora I/A, Chandgaon, Chittagong (22.398815N, 91.865572E) Survey Date: 11 th March 2015 2 Observations Office Building - Pipe chased into column at 3rd floor level

More information

Shin Shin Apparels Ltd. (9615) Dag RS. 228, JL 73, Gorat, East Norshinghapur, Zirabo, Savar ( N, E) 27.MAY.2014

Shin Shin Apparels Ltd. (9615) Dag RS. 228, JL 73, Gorat, East Norshinghapur, Zirabo, Savar ( N, E) 27.MAY.2014 Shin Shin Apparels Ltd. (9615) Dag RS. 228, JL 73, Gorat, East Norshinghapur, Zirabo, Savar (+23.94071N, 90.30929E) 27.MAY.2014 Identified Priority 1 Concerns 1 st Priority 1 Concern Based on the Detail

More information

BUILDING INTEGRITY SUMMARY REPORT

BUILDING INTEGRITY SUMMARY REPORT BUILDING INTEGRITY SUMMARY REPORT SUPPLIER NAME Kenpark Bangladesh Pvt.Ltd (Unit 1) UNITS AUDITED SUPPLIER ADDRESS Dry Process Building Sector 8, Plot 31-42, Chittagong Export Processing Zone, Chittagong,

More information

Abanti Color Tex Ltd. Plot-S, A-646, Shashongaon Enayetnager, Fatullah, Narayangonj ( E, N) 28 June 2014

Abanti Color Tex Ltd. Plot-S, A-646, Shashongaon Enayetnager, Fatullah, Narayangonj ( E, N) 28 June 2014 1 Abanti Color Tex Ltd. Plot-S, A-646, Shashongaon Enayetnager, Fatullah, Narayangonj (90.476444E, 23.622806N) 28 June 2014 2 Preliminary calculations suggest columns in Units 1 and 2 are highly stressed

More information

Libas Textiles Ltd (9500)

Libas Textiles Ltd (9500) Revision : Issue 01 Date: 28.03.2014 Libas Textiles Ltd (9500) Nishchintopur, Mouchak, Kaliakoir, Gazipur, Bangladesh. (+24.01773N, +90.27978E) 22.MARCH.2014 Client Summary Report Observations & Actions

More information

BUILDING INTEGRITY DEA SUMMARY REPORT

BUILDING INTEGRITY DEA SUMMARY REPORT BUILDING INTEGRITY DEA SUMMARY REPORT SUPPLIER NAME UNITS AUDITED SUPPLIER ADDRESS Kenpark Bangladesh Pvt. Ltd. AUDIT DATE 10 th May, 2014 AUDIT PERFORMED BY AUDIT TEAM 1-storied prefabricated steel structure-

More information

PART 4: GENERAL CONDITIONS

PART 4: GENERAL CONDITIONS PART 4: GENERAL CONDITIONS STORING AND HANDLING MATERIALS Stacking materials 4.43 (1) Material and equipment must be placed, stacked or stored in a stable and secure manner. (2) Stacked material or containers

More information

Mark Sweater Ltd. Structural Inspection Report Observations & Actions Authors: Dariusz Tomiak Checked by: Dariusz Tomiak Approved by: Dariusz Tomiak

Mark Sweater Ltd. Structural Inspection Report Observations & Actions Authors: Dariusz Tomiak Checked by: Dariusz Tomiak Approved by: Dariusz Tomiak Mark Sweater Ltd. Surabari, Kashimpur, Gazipur-Sadar, Gazipur. (23.9716797, 90.3213635) 1 st March 2015 Structural Inspection Report Observations & Actions Authors: Dariusz Tomiak Checked by: Dariusz Tomiak

More information

Kuliarchar Sweater Industries Ltd.

Kuliarchar Sweater Industries Ltd. Kuliarchar Sweater Industries Ltd. Bada Kalmasher, K.B bazar, Gazipur, Bangladesh (23.954766, 90.380678) 9 March 2014 DEA 1 2 Observations Made 3 High Stress in Columns Cursory calculations indicate that

More information

DESIGN CRITERIA. Allowable Stress Design (ASD) AISC-1999.

DESIGN CRITERIA. Allowable Stress Design (ASD) AISC-1999. DESIGN CRITERIA 1. INTRODUCTION This appendix summarizes the codes, standards, criteria, and practices that are generally used in the design and construction structural engineering system for the Sarker

More information

BUILDING INTEGRITY SUMMARY REPORT

BUILDING INTEGRITY SUMMARY REPORT BUILDING INTEGRITY SUMMARY REPORT SUPPLIER NAME Karnafuli Shoes Industries Ltd (Garments Unit) SUPPLIER ADDRESS Building No 17, Building No 16, Canteen Building No 2, Canteen Building No 1; Building No

More information

Badhan Knit Fashions Ltd

Badhan Knit Fashions Ltd 1 Badhan Knit Fashions Ltd A-16/17, BSCIC Hoisery Industrial Area, Shashongaon, Enayetnagar Fatullah, Narayangnaj (23.623200, 90.479000) 5 th April 2014 2 Observations 3 High Column Loads: Detailed Engineering

More information

Star Garments (Pvt Ltd.)

Star Garments (Pvt Ltd.) Star Garments (Pvt Ltd.) Sha-23, Middle Badda, Dhaka. (23.780094N, 90.426299E) 02 July 2014 1 2 Observations 3 Inconsistencies between the drawings and the as constructed building Irregularities on drawings

More information

EH Textiles Ltd EH Fabrics Ltd

EH Textiles Ltd EH Fabrics Ltd EH Textiles Ltd EH Fabrics Ltd 221 225 Sataish Rd, Khortoil, Dhaka (23.9208N, 90.3880E) 31 October, 2013 1 2 Building Observations 3 Engineering Checks on columns required C2 perimeter columns drawings

More information

Aman Graphics and Design Ltd. Nazimnagar, Hemayetpur, Savar, Dhaka ( E, N) 29 April 2014

Aman Graphics and Design Ltd. Nazimnagar, Hemayetpur, Savar, Dhaka ( E, N) 29 April 2014 1 Aman Graphics and Design Ltd. Nazimnagar, Hemayetpur, Savar, Dhaka (23.79418E, 90.26393N) 29 April 2014 2 Building Observations 3 Building 1 - Columns appear to be stressed in excess of normal design

More information

SAFEGUARDS DURING CONSTRUCTION

SAFEGUARDS DURING CONSTRUCTION CHAPTER 14 SAFEGUARDS DURING CONSTRUCTION SECTION 1401 GENERAL [B] 1401.1 Scope. The provisions of this chapter shall govern safety during construction that is under the jurisdiction of this code and the

More information

BUILDING INTEGRITY SUMMARY REPORT

BUILDING INTEGRITY SUMMARY REPORT BUILDING INTEGRITY SUMMARY REPORT SUPPLIER NAME UNITS AUDITED Opex Mills 4X 6X Denim Rope Denim SSL SSL3 Utility Diesel SUPPLIER ADDRESS AUDIT DATE January 2014 AUDIT PERFORMED BY AUDIT TEAM Kanchpur,

More information

Amena (Pvt.) Ltd. (9817) Abdul Latif Market, Ahalia,Sector #5,Road #9-C,Uttara ( N, E) 15.June.2014

Amena (Pvt.) Ltd. (9817) Abdul Latif Market, Ahalia,Sector #5,Road #9-C,Uttara ( N, E) 15.June.2014 Amena (Pvt.) Ltd. (9817) Abdul Latif Market, Ahalia,Sector #5,Road #9-C,Uttara (+23.863478N, 90.388429E) 15.June.2014 Identified 1 st Priority 3 Concern 1 st Priority 3 Concern Uncontrolled storage loading

More information

Masco Cottons Ltd. 44, Redwan Complex, Gazipura Bustand, Tongi, Gazipur ( N, E) 25 January 2015

Masco Cottons Ltd. 44, Redwan Complex, Gazipura Bustand, Tongi, Gazipur ( N, E) 25 January 2015 1 Masco Cottons Ltd 44, Redwan Complex, Gazipura Bustand, Tongi, Gazipur (23.921111N, 90.392778E) 25 January 2015 2 Observations 3 Observations 2 Columns heavily loaded for following reasons: - Loaded

More information

LEARNING OF ETABS. 15 ft

LEARNING OF ETABS. 15 ft LEARNING OF ETABS Ram Krishna Mazumder, Institute of Earthquake Engineering Research, Chittagong University of Engineering and Technology, Chittagong 4349, Bangladesh rkmazumder@gmail.com +8801712862281

More information

Amity Design Ltd. House #7&9, Road #9 Block #D, Section #11 Mirpur Dhaka 1216, Bangladesh (23.820N, E) 03.MARCH.2014

Amity Design Ltd. House #7&9, Road #9 Block #D, Section #11 Mirpur Dhaka 1216, Bangladesh (23.820N, E) 03.MARCH.2014 Amity Design Ltd. House #7&9, Road #9 Block #D, Section #11 Mirpur Dhaka 1216, Bangladesh (23.820N, 90.366E) 03.MARCH.2014 Site Observations Structural drawing does not match with the existing building

More information

Cassiopea Fashions Ltd. Cassiopea Apparels Ltd.

Cassiopea Fashions Ltd. Cassiopea Apparels Ltd. 1 Cassiopea Fashions Ltd. Cassiopea Apparels Ltd. Bokran, Monipur, Vabanipur, Gazipur. (24.127427, 90.399544) 15 April 2014 2 Observations Made 3 No apparent stability system Steel Building 6 th floor

More information

CE 3150 Reinforced Concrete Design Design Project

CE 3150 Reinforced Concrete Design Design Project Problem Description For this design project you will work in your project groups to complete a partial design of an office building. Specifically, you will design and fully detail three components: 1.

More information

Pimkie Apparels Ltd. (9205) Plot #328, Bloc #F, Tongi Industrial Area, Tongi ( N, E) 27.May.2014

Pimkie Apparels Ltd. (9205) Plot #328, Bloc #F, Tongi Industrial Area, Tongi ( N, E) 27.May.2014 Pimkie Apparels Ltd. (9205) Plot #328, Bloc #F, Tongi Industrial Area, Tongi (+23.882757N, 90.396797E) 27.May.2014 Identified Priority 1 Concerns Garment Building Steel columns 1 st Priority 1 Concern

More information

CODE ANALYSIS REPORT SECOND FLOOR

CODE ANALYSIS REPORT SECOND FLOOR CODE ANALYSIS REPORT SECOND FLOOR 384 DWIGHT STREET HOLYOKE, MA Prepared by Dietz & Company Architects, Inc. 17 Hampden Street Springfield, MA March 2014 INTRODUCTION The following report is a preliminary

More information

Supplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2011 LARC)

Supplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2011 LARC) Supplemental Plan Correction Sheet for LA Residential Code Prescriptive Design (2011 LARC) Plan Check Submittal Date: Plan Check #: Permit App.# Job Address: Applicant: Phone: ( ) P.C. Engineer: Phone:

More information

Tanaz Fashions Ltd. & Zayantex Ltd. L Usine Fashion Ltd (Unit 1)

Tanaz Fashions Ltd. & Zayantex Ltd. L Usine Fashion Ltd (Unit 1) Tanaz Fashions Ltd. & Zayantex Ltd. L Usine Fashion Ltd (Unit 1) 216, Sataish Road, Gazipura, Tongi, Gazipur, Bangladesh (23.921458N,90.386581E) 22 September 2013 1 2 Local concrete spalling caused by

More information

CHAPTER 34 EXISTING BUILDINGS

CHAPTER 34 EXISTING BUILDINGS CHAPTER 34 EXISTING BUILDINGS SECTION 3401 GENERAL 3401.1 Scope. Provisions of this chapter shall govern the application of this code to existing buildings. Exception: Buildings and structures located

More information

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit: TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be

More information

Sabah Shawkat Cabinet of Structural Engineering 2017

Sabah Shawkat Cabinet of Structural Engineering 2017 3.1-1 Continuous beams Every building, whether it is large or small, must have a structural system capable of carrying all kinds of loads - vertical, horizontal, temperature, etc. In principle, the entire

More information

Structural Technical Report I October 5, 2006 Structural Concepts / Structural Existing Conditions Report

Structural Technical Report I October 5, 2006 Structural Concepts / Structural Existing Conditions Report 1 THE ODYSSEY ARLINGTON, VA Aaron Snyder Structural Option Advisor: M. Kevin Parfitt, PE Structural Technical Report I October 5, 2006 Structural Concepts / Structural Existing Conditions Report Executive

More information

RESPONSIBILITIES IN THE DESIGN PROCESS INVOLVING METAL PLATE CONNECTED WOOD TRUSSES

RESPONSIBILITIES IN THE DESIGN PROCESS INVOLVING METAL PLATE CONNECTED WOOD TRUSSES CHAPTER 2 RESPONSIBILITIES IN THE DESIGN PROCESS INVOLVING METAL PLATE CONNECTED WOOD TRUSSES 2.1 PURPOSE The purpose of this chapter is as follows: 2.1.1 To define and draw attention to the typical duties

More information

Mondol Fabrics Ltd. Nayapara,kasimpur, Gazipur ( N, E0) 8th March 2014

Mondol Fabrics Ltd. Nayapara,kasimpur, Gazipur ( N, E0) 8th March 2014 Mondol Fabrics Ltd Nayapara,kasimpur, Gazipur (23.990028N, 90.317336E0) 8th March 2014 1 2 Observations 3 Column Stresses in Toilet Area North of Building Cursory calculations indicate that column size

More information

STRUCTURAL OBSERVATION

STRUCTURAL OBSERVATION INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: 91.1702 Effective: 8-15-95 DOCUMENT NO. P/BC 2002-024 Revised: 11-12-02 Previously Issued As: MGD 110 STRUCTURAL OBSERVATION I. INTRODUCTION

More information

Construction Safety Education Forum. 6 March Scaffolding. Dimitri Barlas, State Coordinator Construction Work Health and Safety Division DRAFT

Construction Safety Education Forum. 6 March Scaffolding. Dimitri Barlas, State Coordinator Construction Work Health and Safety Division DRAFT Construction Safety Education Forum 6 March 2013 Scaffolding Dimitri Barlas, State Coordinator Construction Work Health and Safety Division DRAFT SRWSD in confidence 1 Presentation Outline Introduction

More information

SENIOR THESIS PROPOSAL STRUCTURAL REDESIGN USING STEEL FRAMING

SENIOR THESIS PROPOSAL STRUCTURAL REDESIGN USING STEEL FRAMING SENIOR THESIS PROPOSAL STRUCTURAL REDESIGN USING STEEL FRAMING THE TOWERS AT THE CITY UNIVERSITY OF NEW YORK NEW YORK CITY, NEW YORK ROBIN SCARAMASTRO AE 481 W DR. MEMARI EXECUTIVE SUMMARY The Towers at

More information

"Impact of New IS 1893 & Related Codes on Design of tall Buildings, Including Trend Setting Structures

Impact of New IS 1893 & Related Codes on Design of tall Buildings, Including Trend Setting Structures "Impact of New IS 1893 & Related Codes on Design of tall Buildings, Including Trend Setting Structures Conference on Planning and Design of Tall Buildings including Earthquake and Wind Effects By S. C.

More information

Following contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD.

Following contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD. Following contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD. Included are selected sections of codes taken directly from: 1997 Uniform

More information

Advisor: Dr. Andres Lepage Final Report April 7, 2009 APPENDIX A PHOTOGRAPHS

Advisor: Dr. Andres Lepage Final Report April 7, 2009 APPENDIX A PHOTOGRAPHS APPENDIX A PHOTOGRAPHS 66 PHOTOGRAPHS Figure 1A: Rendering of the Development Figure 2A: Night View of the North Building 67 PHOTOGRAPHS Figure 3A: Main Entrance of the North Building Figure 4A: Comparison

More information

Echotex Ltd. Chandra, Mouchak, Shafipur, Gazipur, Dhaka ( N, E) 6 February 2014

Echotex Ltd. Chandra, Mouchak, Shafipur, Gazipur, Dhaka ( N, E) 6 February 2014 Echotex Ltd Chandra, Mouchak, Shafipur, Gazipur, Dhaka (+24.03892N, 90.2586 E) 6 February 2014 1 2 Building Observations Garment Factory 3 Columns appear to be stressed in excess of normal design limits

More information

Administrative Changes

Administrative Changes Revised 11/29/06 Knox County Residential Building Codes Significant Changes From The 1995 CABO One And Two Family Dwelling Code To The 2006 International Residential Code All one and two family dwellings

More information

Note on the assessment:

Note on the assessment: EXCERPTS Note on the assessment: The following is an excerpt from the book Post-disaster shelter: 10 Designs, IFRC, 2013. Inclusion of this design is for information purposes and does not necessarily imply

More information

On Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866)

On Cold-Formed Steel Construction. Light Gauge Steel Engineers Association Washington, D.C Toll Free (866) TECHNICAL NOTE On Cold-Formed Steel Construction $5.00 Light Gauge Steel Engineers Association Washington, D.C. 20005 Toll Free (866) 465-4732 www.lgsea.com DESIGN OF BY-PASS SLIP CONNECTORS IN COLD-FORMED

More information

East Lyme Middle School EAST LYME MIDDLE SCHOOL

East Lyme Middle School EAST LYME MIDDLE SCHOOL Description: N EAST LYME MIDDLE SCHOOL The school consists of a multi story building with lower, main and upper level floors. The typical floor framing for the main and upper levels is wide flange steel

More information

National Property Inspections

National Property Inspections National Property Inspections Anywhere, USA (325) 382-8754 Property Location 9375 Burt Street Anywhere USA Prepared for John Investor Consultant Al Standard (325) 382-8754 Page 1 of 27 TABLE OF CONTENTS

More information

Study Trip Report on TOHOKU UNIVERSITY: INSPECTION OF DAMAGED BUILDING By: Sergio Sunley (E-Course)

Study Trip Report on TOHOKU UNIVERSITY: INSPECTION OF DAMAGED BUILDING By: Sergio Sunley (E-Course) Study Trip Report on TOHOKU UNIVERSITY: INSPECTION OF DAMAGED BUILDING By: Sergio Sunley (E-Course) Tohoku University is located at Sendai city, at the north region of Honshu island. After the March 11

More information