1 Philadelphia Regional Port Authority 3460 North Delaware Ave. 2 nd Floor Philadelphia, PA May 24, 2018 To: All Bidders From: Kate Bailey Director of Procurement Re: ADDENDUM NO. 1 Project RFP for Design Build of SouthPort Vehicle Processing Facility This Addendum No. 1 is issued to: 1. Clarify that the Pre-bid meeting is Mandatory. 2. Clarify that the Pre-bid will be held on Friday, May 25, 2018 at 10:00 AM. The location of the pre-bid meeting will be at: PhilaPort 3460 North Delaware Avenue 2 nd Floor Philadelphia, PA Provide Special Conditions to the Project (attached to this Addendum 1) 4. Provide additional specifications which should be a part of Specifications Vol. 1: a. SECTION PAINT SPRAY BOOTH (attached to this Addendum 1 and electronically) 5. Clarify the following points: PhilaPort s plans and specifications for this project are prepared so any contractor/design-builder is able to complete the proposed work. The proposer is required to carefully examine the proposal, plans, specifications, and project site before submitting a proposal. The submission of a proposal will be considered proof that the proposer has made such examination and understands the conditions encountered; the character, quality and quantities of work to be performed; the material to be furnished; and the requirements of the plans, specifications, and proposal. PhilaPort will make no allowance or concession for the proposal failure to make the required examinations. Additionally, all quantities stated in the proposal form are considered approximate and accurate, however, the proposer is to perform their own diligence with these amounts. PhilaPort reserves the right to increase, to decrease or omit any of the quantities of work. An increase or decrease of quantities of the items will not be sufficient grounds for granting an increase in the unit prices proposal, except as in the case of differing site conditions, suspensions (continued from page 1, #5)

2 Philadelphia Regional Port Authority 3460 North Delaware Ave. 2 nd Floor Philadelphia, PA of work and significant changes in character of work. For Lump Sum work, the proposal for the project is to be all inclusive regardless of whether or not the work required to complete the project is explicitly listed in the Bid Form. All other terms and conditions remain unchanged. Bidders shall acknowledge receipt of this addendum by immediately faxing a copy of the completed acknowledgment to Kate Bailey at or procurement@philaport.com ACKNOWLEDGMENT OF RECEIPT OF ADDENDUM NO. 1 RFP for Design Build of SouthPort Vehicle Processing Facility Date By Company Telephone Fax

3 SPECIAL CONDITIONS

4 Per Addendum 1 Special Conditions Project: Project No: RFP for Design Build SouthPort Vehicle Processing Facility These Special Conditions set forth in addendum 1 apply to the aforementioned Project. Section 8.18 (a) is replaced with the following language: 8.18 Liquidated Damages. a. Delay in completion of the Work. The Contractor acknowledges and agrees that PhilaPort will incur substantial damages if the Work is not performed in accordance with the requirements of this Agreement. The parties agree that it would be extremely difficult and impractical under the presently known and anticipated facts and circumstances to ascertain and fix actual damages that PhilaPort would incur under these circumstances, and, accordingly, the parties agree that PhilaPort s remedy shall be to recover from the Contractor as liquidated damages, not as a penalty, Twenty thousand dollars ($20,000) per day for each day the Work remains incomplete for the first fifteen calendar days and then Thirty Thousand Dollars ($30,000) for each calendar day thereafter the Work remains incomplete. The liquidated damages identified in this Section relate solely to the Contractor s delay in completing the Work in accordance with the requirements of this Agreement and not to other breaches, actions or omissions of the Contractor. The liquidated damages identified in this Section shall not limit PhilaPort s remedies for other breaches, actions, or omissions of the Contractor, including termination for failure to complete the Work. Section 8.18(b) remains unchanged. Sections 13.2 and 13.5 are replaced with the following language: 13.2 INVOICE FOR PROGRESS PAYMENTS. A. During the progress of the Work, the DBC shall submit invoices of the value of the Work performed to PhilaPort. All invoices shall be supported by data, as required by PhilaPort, substantiating the DBC's right to payment. PhilaPort will review and accept the invoice for validity. PhilaPort is committed to meeting with contractors after each progress meeting to review pencil copies of invoices PAYMENTS WITHHELD. A. PhilaPort may decline to approve an Invoice in whole or in part if the Work has not progressed to the point indicated, or the quality and quantity of the Work is not in accordance with the Contract Documents. PhilaPort may also decline to approve any Invoice, because of subsequently discovered evidence or subsequent inspections, which may nullify the whole or any part of any Invoice previously issued to such extent as may be necessary in their opinion to protect PhilaPort from loss because of deficiency items, including but not limited to: 1. Defective work not remedied; or 2. Reasonable doubt that the Work can be completed for the unpaid balance of the Contract Sum; or 3. Reasonable indication that the Work will not be completed within the contract time; or 4. Unsatisfactory prosecution of the Work by the DBC; or 1

5 5. Failure of the DBC to maintain insurance; or 6. Failure of the DBC to properly submit the required submittals and forms, as required in the Administrative Procedures. B. If PhilaPort withholds payment from the DBC for any of the aforementioned reasons, PhilaPort will provide notification to the DBC of the reason for withholding payment within fifteen (15) days of PhilaPort s receipt of the Invoice. The DBC may withhold payment from a subcontractor, supplier, or manufacturer responsible for the defective/non-conforming item. If payment is withheld from the subcontractor, supplier, or manufacturer for such defective/non-conforming item, the DBC must notify the subcontractor, supplier, or manufacturer and PhilaPort (including the Construction Manager if applicable) of the reason for the withholding within 15 days of the date after the DBC receives the notice of defective/non-conforming item from PhilaPort. C. Funding for this project is advanced from Commonwealth capital facilities funds to PhilaPort restricted accounts. Payments for authorized invoices will be transfer via ACH. PhilaPort is committed to paying vendor within 14 days of complete, verified and approved invoice submittals. To accomplish expeditious vendor payments PhilaPort is committed to: - Timely internal review and verification process - Streamlined, automated approval process - Dedicated staff for initial invoice set up and ongoing support 2

6 Specifications Volume 1: SECTION PAINT SPRAY BOOTH

7 Philadelphia Regional Port Authority Project No Vehicle Processing Center SECTION PAINT SPRAY BOOTH PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Provide Paint Spray Booth, Prep Booth and Paint Mix Room, and associated ventilation equipment, complying with the requirements in this specification chapter. B. The following specifications sections shall apply: 1. Section Common Motor Requirements for Plumbing Equipment. 2. Section Facility Natural-Gas Piping. 3. Section Metal Ducts. 4. Section B Low-Voltage Electrical Power Conductors and Cables. 1.2 QUALITY ASSURANCE A. Equipment shall be produced by a manufacturer of established reputation with a minimum of five years experience supplying specified equipment. B. Provide equipment complying with this specification and manufactured by one of the following: 1. Global Finishing Solutions. C. Equipment supplied and installed shall comply with the following building codes and industry standards: 1. International Building Code. 2. International Fire Code. 3. NFPA-33: Standard for Spray Application Using Flammable of Combustible Materials. 4. NFPA-70: National Electrical Code. 5. NFPA-86: Standard for Ovens & Furnaces. 6. NFPA-91: Standard for Exhaust Systems for Air Conveying of Materials. 7. NFPA-101: Life Safety Code. 8. OSHA Safety & Health Standards (29 CFR ). 9. ASHRAE 90.1: Energy Standard for Buildings Except Low-Rise Residential Buildings. 10. All parts and equipment shall carry the appropriate UL and ETL Listings, where applicable. D. Provide a qualified manufacturer s representative at site to supervise work related to equipment installation, check out, and start up. E. Manufacturer s representative of the Paint Spray Booth system shall be responsible for the design and performance of the equipment to owner s satisfaction. PAINT SPRAY BOOTH

8 Philadelphia Regional Port Authority Project No Vehicle Processing Center 1.3 SUBMITTALS A. Product Data: Submit Product Data in accordance with Division 1 of these specifications. B. Operations and Maintenance Manual: 1. Submit Operations and Maintenance Manuals in accordance with Division 1- General Requirements of these specifications. 2. Provide complete parts, operating, and maintenance manual covering equipment at time of installation. 3. Schematic diagrams of electrical, plumbing, and mechanical ventilation, and cooling and heating air system. 4. Manufacturer s printed operating instructions. 5. Printed listing of periodic preventive maintenance items and recommended frequency to validate warranties. Failure to provide maintenance information will indicate that preventive maintenance is not a condition for validation of warranties. 1.4 WARRANTY A. Warranty work against defects in materials, functions and workmanship specified herein shall be good for 3 years from substantial completion. B. Warranty shall include materials and labor necessary to correct defects. C. Defects shall include, but not be limited to substandard operation; loose, damaged, and missing parts; and abnormal deterioration of finish. Defects shall not include damage due to neglect, misuse, or situations resulting from non-performance of a manufacturer s recommended preventive maintenance schedule. 1.5 PRODUCT DELIVERY, STORAGE, AND HANDLING A. Deliver equipment in manufacturer s containers, appropriately packaged and/or crated for protection during domestic shipment and storage in humid and/or dusty conditions. B. Label all containers on outside with item description(s) per title and Equipment Identifier of this specification. C. Provide equipment and materials specified complete in one shipment for each equipment item. PART 2 - PRODUCTS 2.1 SYSTEM DESCRIPTION A. General: The Paint Spray Booths equipment shall be dual-skin, downdraft, drive-in/back-out configuration, with high-performance airflow ceiling (HPAC), similar to Global Finishing Solutions, Ultra XD Equipment Series with BT Heater. Prep Booths be an excel workstation. Mix Room shall be a two sided Ultra XD Paint Mix Room. PAINT SPRAY BOOTH

9 Philadelphia Regional Port Authority Project No Vehicle Processing Center B. Dimensions: 1. Exterior Dimensions: 14 5 W x 11 H x 30 5 L. 2. Internal Dimensions: 14 W x 9 H x 30 L. C. Construction: 1. High-performance airflow filter ceiling (HPAC). 2. Dual-skin insulated panels, made of rust-resistant, G-40, galvanized sheet metal Primed and coated on both sides with a baked-on polyester topcoat Inch galvanized steel H-channel columns construction; to connect wall panels without the use of nuts and/or bolts. 4. Floor Track Leveling. 5. Full 14-Ft wide, 2-Ft High plenum. D. Doors: 1. 3-slab entry door with (3) observation windows, 9-8 W x H. 2. Center door between booths. 3. Personnel service door with observation window, 2-8 x Weld free design, provide with high quality hardware, including fully-adjustable heavyduty handles, hinges and latches. Provide with durable hollow rubber seals. E. Ceiling: F. Floor: 1. High Performance Air flow Ceiling (HPAC), fully filtered. With integrated hip ceiling lights. 1. Floor shall be a single-row pit type system, along the center and includes the following parts from bottom to top: G. Lights: a. Full length concrete pit, 27-Ft. b. Diffusion tray. c. Wire-grid for filter support. d. Filter media. e. Heavy-duty steel grating. 1. (10) 4-tube, Class-I, Div.2, LED light fixtures, inside ceiling and accessible. 2. (4) 4-tube, side wall, Class-I, Div.2, LED Light Fixtures. 3. Include color-corrected light tubes. 4. ETL listed. 5. Provide interlock switch to disable painting operations when light access door is opened. H. Air Heating Equipment: 1. Basis of Design is GFS BT Side mounted, 15,000-CFM, 150,000-BTUH Input, Natural Gas. PAINT SPRAY BOOTH

10 Philadelphia Regional Port Authority Project No Vehicle Processing Center 3. Intake/Exhaust fan Motor HP: 15-HP DD / 7.5-HP BD. 4. Intake fan shall be reverse-incline, direct drive air-foil centrifugal, aluminum non-sparking construction. 5. Exhaust fan shall be tube axial. 6. Burner shall be direct-fire type made of corrosion-resistant aluminum. 7. Auto-Pressure Control: Include fans variable frequency drives and pressure transducer for auto-balancing. 8. Options: dual hi-limit switch, door safety interlock, and filter monitoring. 9. Gas Min Inlet Pressure: 11.3-iwc. 10. Gas Max Inlet Pressure: 5.0-psi. I. Advance Cure: 1. Provide cabin with integrated ADVANCE-CURE system to achieve faster and more even drying. J. Filters: 1. Booth Plenum: Diffusion Blanket Media. 2. Pit: GFS Wave Roll Media. 3. Air Heater Intake: Framed 5-Pocket. K. Controls: 1. Provide with automated controls LOGIC3 control panel, and integrate with DX cooling system control. 2. Include following features/modes: a. 3-programmable options to control time, and temperature, adjustable for any type of coating. b. SmartFlash feature to manage dry temperature between coats. c. Economy Mode energy saving feature. d. Built in self-diagnostic and alarms. PART 3 - EXECUTION 3.1 EXAMINATION A. Inspect delivered equipment for damage from shipping and exposure to weather. Compare delivered equipment with packing lists and specifications to assure receipt of all equipment items and specified accessories. B. Coordinate location of rough-in work and utility stub-outs to assure match with equipment to be installed. PAINT SPRAY BOOTH

11 Philadelphia Regional Port Authority Project No Vehicle Processing Center 3.2 INSTALLATION, GENERAL A. General Contractor shall provide final connection of equipment to all utilities, including disconnects, floor, piping and conduit structures, with labor services and incidentals necessary for complete and operational equipment installation. B. Manufacturer s Representative shall provide connections between equipment and roughed-in utilities and equipment connections. Installer is responsible for all system wiring and connections to mechanical and plumbing utilities for a complete operation of equipment after installation. C. General Contractor shall coordinate all equipment features which interface with building systems that are required beyond the roughed-in utilities. 3.3 ELECTRIC CONNECTIONS A. Electrical contractor shall furnish and install electrical power to equipment connection points at the direction of the equipment manufacturer representative. B. Coordinate with electrical plans and division 26 of the specifications. 3.4 PLUMBING CONNECTIONS A. Plumbing contractor shall furnish and install natural gas and compressed air connections to equipment at the direction of equipment manufacturer representative. B. Coordinate with plumbing plans and division 23 of the specifications. 3.5 INTAKE AND EXHAUST DUCTS A. Equipment supplier shall furnish exhaust and intake ducts, duct sizes as instructed by manufacturer. Ductwork shall be fabricated from 18-gage G90 galvanized steel. Include duct sections with required access and cleaning doors. B. Mechanical contractor shall install intake and exhaust duct on site. Mechanical contractor shall make connections to Paint Booth Equipment as instructed by equipment representative on site. Mechanical contractor shall provide all required cables, supports, anchors and clamps for complete and safe installation, and approved by equipment supplier, owner and AHJ. C. Maintain following clearances from building to air exhaust point above the roof: 1. At least 6-Ft from any exterior wall or roof. 2. At least 30-Ft away from the property line. 3. Terminate at higher elevation than all air intakes on the roof and at least 10-Ft away. 3.6 FIRE SUPPRESSION A. Fire suppression system shall be wet pipe sprinkler type which complies with NFPA 17. PAINT SPRAY BOOTH

12 Philadelphia Regional Port Authority Project No Vehicle Processing Center 3.7 CLEARANCES A. Provide code and service required clearances around and above Paint Spray Booth equipment, including, clearances to doors, heating and cooling equipment and filters. B. Any electrical and wiring devices which are installed within 3-Ft of Paint Spray Booth doors must be listed for Class-I, Div. 2. C. Provide code required explosion relief clearance above the Paint Spray Booth. D. Equipment representative shall examine and approve the construction documents and the physical area allocated for the paint spray booth before ordering or installing equipment to ensure all clearances shall be met. 3.8 IDENTIFICATION A. Manufacturer shall securely attach in a prominent location, on each major item of equipment, a non-corrosive nameplate showing manufacturer s name, address, model number, serial number, and pertinent utility or operating data. B. Label all parts of equipment as to its function. 3.9 CLEANING A. Touch-up damage to painted finishes. B. Wipe and clean equipment of any oil, grease and solvents, and make ready for use. C. Clean area around equipment installation and remove packing or installation debris from job site. D. Notify Architect or designated representative for acceptance inspection TESTING A. After final connections are made and prior to authorizing payment, specified equipment shall be tested for compliance with specification in the presence of the Architect or designated representative using acceptance procedures provided by the manufacturer. Testing report shall be submitted to the Architect or designated representative. B. Malfunctions during testing shall be corrected within five days and re-tested. Malfunctions during second testing shall be corrected within five days and re-tested. C. Inadequate performance: If equipment fails the third test, Owner may elect to have all installed equipment removed from site at no cost or obligation to the Owner. PAINT SPRAY BOOTH

13 Philadelphia Regional Port Authority Project No Vehicle Processing Center 3.11 DEMONSTRATION A. Training: Provide technical representative to provide training to Owner s maintenance personnel in operation and maintenance of specified equipment. B. Manufacturer shall provide Spare Parts Kit of the most critical parts which are applicable to the installed system. C. Manufacturer shall provide at least one complete set of spare filter and light tubes. END OF SECTION PAINT SPRAY BOOTH I:\Projects\ \ _0001\70_Specifications\0002\ docx

14 This Page Intentionally Blank

15

16

17

18

B. Provide equipment complying with this specification and manufactured by one of the following:

B. Provide equipment complying with this specification and manufactured by one of the following: SECTION 230910 PAINT SPRAY BOOTH PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Provide Paint Spray Booth, Prep Booth and Paint Mix Room, and associated ventilation equipment, complying with the

More information

PIKES PEAK PARKING RESTORATION TABLE OF CONTENTS

PIKES PEAK PARKING RESTORATION TABLE OF CONTENTS 23 HEATING, VENTILATING AND AIR CONDITIONING TABLE OF CONTENTS TABLE OF CONTENTS DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING - Basic HVAC Requirements 238239.19 - Wall and Ceiling Unit Heaters

More information

Truck and Large Equipment. Galvanized Spray Booths. Global Finishing Solutions

Truck and Large Equipment. Galvanized Spray Booths. Global Finishing Solutions Global Finishing Solutions Truck and Large Equipment Galvanized Spray Booths > Heavy-Duty Construction > Inside Accessible Energy Efficient Light Fixtures > and - Models > Expandable Modular Designs GFS

More information

SECTION AIR-TO-AIR ENERGY RECOVERY EQUIPMENT

SECTION AIR-TO-AIR ENERGY RECOVERY EQUIPMENT SECTION 23 72 00 AIR-TO-AIR ENERGY RECOVERY EQUIPMENT PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION LINEAR MOTION SLUDGE MIXERS

SECTION LINEAR MOTION SLUDGE MIXERS SECTION 11480 LINEAR MOTION SLUDGE MIXERS PART 1 -- GENERAL 1.01 THE REQUIREMENT A. The Contractor shall furnish, install, adjust, finish paint and test one (1) linear motion sludge mixer for mounting

More information

SECTION EXHAUST FANS PART 1 GENERAL

SECTION EXHAUST FANS PART 1 GENERAL SECTION 15800 EXHAUST FANS PART 1 GENERAL 1.01 DESCRIPTION A. The Contractor shall furnish all labor, materials, accessories and all incidentals required to install wet well and control building ventilation

More information

Dick s Sporting Goods Demolition Package

Dick s Sporting Goods Demolition Package REQUEST FOR PROPOSAL FOR COMPETITIVE SEALED PROPOSALS TO PROVIDE: Dick s Sporting Goods Demolition Package at Salt Lake City, UT 2425 E. Camelback Rd. Suite 750 Phoenix AZ 85016 Notice of Extended Payment

More information

PAINT BOOTHS GENERAL PURPOSE

PAINT BOOTHS GENERAL PURPOSE PAINT BOOTHS GENERAL PURPOSE 1 INDUSTRY-LEADING PRODUCTS With precise contamination control and premium angled ceiling hip lights, General Purpose Paint Booths from Global Finishing Solutions (GFS) enable

More information

PAINT BOOTHS LARGE EQUIPMENT

PAINT BOOTHS LARGE EQUIPMENT PAINT BOOTHS LARGE EQUIPMENT 1 THE FINISHING TOUCH A flawless paint finish can make a product stand out from the rest. With precise contamination control and excellent lighting, Large Equipment Booths

More information

SECTION FUEL-FIRED UNIT HEATERS

SECTION FUEL-FIRED UNIT HEATERS SECTION 23 55 33 PART 1 - GENERAL 1.1 DESCRIPTION A. This Section includes gas-fired unit heaters. SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable

More information

SECTIONAL OVERHEAD DOORS SECTION SECTIONAL OVERHEAD DOORS PART 1 GENERAL

SECTIONAL OVERHEAD DOORS SECTION SECTIONAL OVERHEAD DOORS PART 1 GENERAL 13686.00 SECTIONAL OVERHEAD DOORS 083613-1 1.1 RELATED DOCUMENTS SECTION 083613 - SECTIONAL OVERHEAD DOORS PART 1 GENERAL A. Drawings and general provisions of Contract, including General and Supplementary

More information

I N V I T A T I O N T O B I D City and Borough of Wrangell Premanufactured Restroom

I N V I T A T I O N T O B I D City and Borough of Wrangell Premanufactured Restroom Overview The (CBW) requests sealed bids from interested and qualified firms to provide a, on a one-time basis. Supplier shall furnish all labor, materials, tools, and equipment necessary for supplying

More information

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists

ANSI/ ASME HST Performance Standard For Overhead Electric Wire Rope Hoists SECTION 412213- BRIDGE CRANES Part 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

TENOCHCA HALL - FAN COIL UNITS, RESTROOM AND FINISH RENOVATION PROJECT NO

TENOCHCA HALL - FAN COIL UNITS, RESTROOM AND FINISH RENOVATION PROJECT NO SECTION 26 05 00 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL REQUIREMENTS 1.1 RELATED DOCUMENTS A. The general conditions and Division 1 are part of this section and the contract for this work and

More information

TECHNICAL QUESTIONS FOR ITB-DOT-17/ LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE

TECHNICAL QUESTIONS FOR ITB-DOT-17/ LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE TECHNICAL QUESTIONS FOR ITB-DOT-17/18-7004LV DEMOLITION AND CONSTRUCTION OF DISTRICT SEVEN OFFICE SPACE Question 1: Question 2: Question 3: Question 4: Question 5: Question 6: When area configurations

More information

603 Summit Avenue, Suite 102 Greensboro, N.C Voice/FAX (336)

603 Summit Avenue, Suite 102 Greensboro, N.C Voice/FAX (336) Ricky L. Loman, AIA Architect 603 Summit Avenue, Suite 102 Greensboro, N.C. 27405-7700 Voice/FAX (336) 273-7999 ADDENDUM: Number 1 ISSUED: March 14, 2017 SUBJECT: New Agriculture & Equipment Storage Barn

More information

ATTACHMENT A. Bid # 6793

ATTACHMENT A. Bid # 6793 ATTACHMENT A SCOPE OF WORK TECHNICAL SPECIFICATIONS AND CONTRACT DRAWINGS STORAGE SHED INSTALLATION AT THE SAN JOAQUIN COUNTY HOUSEHOLD HAZARDOUS WASTE FACILITY Bid # 6793 Department of Public Works Solid

More information

City of Westerville Guide to Commercial Inspections

City of Westerville Guide to Commercial Inspections City of Westerville Guide to Commercial Inspections FOOTINGS - After the excavation, with the form work and any required reinforcing steel in place. All footings shall have loose soil removed, reinforcing

More information

L-SERIES: LTH3900 SPECIFICATIONS Stainless Steel Hollow Metal Sliding Fire Door System

L-SERIES: LTH3900 SPECIFICATIONS Stainless Steel Hollow Metal Sliding Fire Door System Version 5.22.13 L-SERIES: LTH3900 SPECIFICATIONS Stainless Steel Hollow Metal Sliding Fire Door System OPTIONS ARE LISTED IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT CONSULT MANUFACTURER

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 23 08 00 Commissioning of HVAC Systems 1. GENERAL A. GENERAL PROVISIONS 1. Drawings and general provisions of the Contract, including General Conditions and Division - 1 Specifications Sections, apply

More information

Spray Booth Guideline

Spray Booth Guideline Department of Development Service 135 North D Street, Perris CA. 92570 Phone: (951) 443-1029 Fax: (951) 943-3293 2016 CODES PURPOSE The intent of this guideline is to provide the information necessary

More information

INVITATION FOR BID (IFB):

INVITATION FOR BID (IFB): DATE: May 8, 2018 ADDENDUM NO. 1 INVITATION FOR BID (IFB): B180022132 RPD Furnish & Install Ballistic Glass Lobby Counters IFB #B180022132 WAS ISSUED: Wednesday April 25, 2018 RECEIPT DATE: May 23, 2018

More information

SECTION Motor Operated Horizontal Sliding Sound Control Door

SECTION Motor Operated Horizontal Sliding Sound Control Door SECTION 08 34 73 Motor Operated Horizontal Sliding Sound Control Door PART 1 GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of the Contract, including general and Supplementary Conditions

More information

SECTION The specification section is organized by placing information in three standard parts:

SECTION The specification section is organized by placing information in three standard parts: SECTION 14244 LIMITED USE HYDRAULIC ELEVATOR ***** Since 1982 Liftavator, Inc. has provided limited use/limited application (LU/LA) elevators, residential elevators, hydraulic vertical platform wheelchair

More information

RFP for Elevator Maintenance

RFP for Elevator Maintenance Housing Authority of the City of Shreveport Request for Proposals for Elevator Maintenance and Repair Services for the HACS Administrative Office at 2500 Line Avenue, Shreveport, LA 71104 Proposals due:

More information

Installation, Operating and Maintenance Instructions Incognito Series Air Curtain

Installation, Operating and Maintenance Instructions Incognito Series Air Curtain Installation, Operating and Maintenance Instructions Incognito Series Air Curtain Models: INC10036, INC10042, INC10048, INC10064, INC10072, INC10084, INC10096, INC10108, INC10120, INC10144. READ THIS OWNER

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF WELDED SYSTEM PART 1 GENERAL 1.1 SECTION

More information

SECTION PAYMENT PROCEDURES

SECTION PAYMENT PROCEDURES SECTION 012900 PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract including General and Supplementary Conditions and other Division 01 Specifications Sections apply

More information

1.02 Related Sections A. Section Heating, Ventilation and Air Conditioning (HVAC). C. Section Pneumatic and Electric Control HVAC.

1.02 Related Sections A. Section Heating, Ventilation and Air Conditioning (HVAC). C. Section Pneumatic and Electric Control HVAC. PART 1: GENERAL 1.01 Section Includes A. Dual duct terminal units. B. Variable volume regulators. C. Integral damper motor operators. D. Integral controls. 1.02 Related Sections A. Section 23 00 00 Heating,

More information

Division 00 Procurement and Contracting Requirements

Division 00 Procurement and Contracting Requirements SECTION 00 01 10 TABLE OF CONTENTS Division SECTION NO. VOLUME ONE Title SECTION TITLE Division 00 Procurement and Contracting Requirements 00 11 00 Invitation to Bidders 00 21 00 Instructions to Bidders

More information

SINGLE SWING DOOR PAIRED SWING DOOR

SINGLE SWING DOOR PAIRED SWING DOOR Rev. 091416 SINGLE SWING DOOR PAIRED SWING DOOR Drawing No.: Revision: Date: If you need to contact Customer Service Please complete the following information and retain for future reference: Serial Number:

More information

SECTION CONVECTORS

SECTION CONVECTORS SECTION 23 82 33 PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph

More information

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 PART 1 GENERAL 1.1 DESCRIPTION A. Work Included: 1. Furnish all labor and materials to complete the fabrication of detention windows

More information

ADDENDUM 2 - JULY 14, 2015

ADDENDUM 2 - JULY 14, 2015 7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures

More information

SECTION GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL

SECTION GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL 1.01 DESCRIPTION SECTION 16000 GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL A. This Section includes the general provisions applicable to electrical work and testing of the completed electrical systems.

More information

LTH3700, HOLLOW METAL SLIDING FIRE DOOR

LTH3700, HOLLOW METAL SLIDING FIRE DOOR LTH3700, HOLLOW METAL SLIDING FIRE DOOR Consult Manufacturer for additional options or modifications PART 1-GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

SECTION INSTALLATION OF OWNER-FURNISHED PRODUCTS

SECTION INSTALLATION OF OWNER-FURNISHED PRODUCTS SECTION 13 00 50 INSTALLATION OF PART 1 GENERAL 1.1 GENERAL A. Furnish and install all tools, supplies, materials, equipment, appurtenances, and labor necessary for the installation, testing, and placing

More information

HOLLOW METAL DOORS AND FRAMES SECTION HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL

HOLLOW METAL DOORS AND FRAMES SECTION HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 13686.00 HOLLOW METAL DOORS AND FRAMES 081113-1 SECTION 081113 - HOLLOW METAL DOORS AND FRAMES 1.1 RELATED DOCUMENTS: PART 1 - GENERAL A. Drawings and general provisions of Contract, including General

More information

SECTION LOW-VOLTAGE TRANSFORMERS

SECTION LOW-VOLTAGE TRANSFORMERS PART 1 GENERAL 1.1 DESCRIPTION SECTION 26 22 00 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between // // if not applicable to project. Also, delete any other item or paragraph not

More information

DiSorb Diffuser Product Specifications Section Sound Diffuser-Absorber for Ceilings and Walls (DiSorb Diffuser-Absorber)

DiSorb Diffuser Product Specifications Section Sound Diffuser-Absorber for Ceilings and Walls (DiSorb Diffuser-Absorber) DiSorb Diffuser Product Specifications PART 1 - GENERAL 1.01 SUMMARY A. This section includes Sound Diffuser-Absorbers for Ceilings and/or Walls. Types include: 1.02 RELATED SECTIONS 1. DiSorb Diffuser-Absorber,

More information

N-SERIES: NTH3500 SPECIFICATIONS Hollow Metal Sliding Door System

N-SERIES: NTH3500 SPECIFICATIONS Hollow Metal Sliding Door System Version 5.22.13 N-SERIES: NTH3500 SPECIFICATIONS Hollow Metal Sliding Door System OPTIONS ARE LISTED IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT CONSULT MANUFACTURER FOR ADDITONAL

More information

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS [OR WOOD] PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including: Page 1 of 7 SECTION 083925 MECHANICAL ROOM FLOOD DOORS AND FRAMES **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for

More information

SECTION DOOR HARDWARE

SECTION DOOR HARDWARE SECTION 087100 -DOOR HARDWARE PART 1- GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

STANDARD SPECIFICATION FOR ALUMINUM FRAMING FOR RAILROAD PASSENGER SHELTERS

STANDARD SPECIFICATION FOR ALUMINUM FRAMING FOR RAILROAD PASSENGER SHELTERS SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107 STANDARD SPECIFICATION FOR ALUMINUM FRAMING FOR RAILROAD PASSENGER SHELTERS REVISION DATE SPECIFICATION # F-S-304_

More information

Division 16 Sections for electrical service for elevators to and including disconnect and fused switches at machine room.

Division 16 Sections for electrical service for elevators to and including disconnect and fused switches at machine room. A+ ELEVATORS & LIFTS An A+ Connection Company Phone: 888-444-APLUS (2758) Fax: 888-444-9377 Email: info@aplusconnection.com Web: www.aplusconnection.com GEAR DRIVE An A+ Connection Company SECTION 14202

More information

SECTION HVAC AIR CLEANING DEVICES

SECTION HVAC AIR CLEANING DEVICES SECTION 23 40 00 PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph

More information

TOWN OF LABRADOR CITY FORM OF TENDER TLC SUPPLY & INSTALLATION OF CONCRETE FLOOR

TOWN OF LABRADOR CITY FORM OF TENDER TLC SUPPLY & INSTALLATION OF CONCRETE FLOOR TOWN OF LABRADOR CITY FORM OF TENDER TLC-04-18 SUPPLY & INSTALLATION OF CONCRETE FLOOR Tenderer Address Telephone # The undersigned bidder has carefully examined the Form of Tender, Instructions to Bidders,

More information

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS SECTION 01 00 00 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Summary of Work: 1. General 2. Contract. B. Contract Considerations: 1. Schedule of values. 2. Applications for payment. 3.

More information

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS SECTION 13096 MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS Prepared by: NELCO 125 Chenoweth Lane, Ste. 206 Louisville, KY 40207 (502) 899-3726 13096-1 MODULAR GALVANIZED RF SHIELDING SYSTEM PART

More information

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS SECTION 11000 MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 DESCRIPTION A. This section contains general information required to install mechanical equipment as shown on the plans and

More information

SPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders

SPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders Welcome to the O Keeffe s Guide Specification System prepared as an aid to specify in preparing written construction documents. For specification assistance with specific product applications, please contact

More information

N-SERIES: NTH2700 SPECIFICATIONS Tubular Composite Top Hung Sliding Door System

N-SERIES: NTH2700 SPECIFICATIONS Tubular Composite Top Hung Sliding Door System Version 5.22.13 N-SERIES: NTH2700 SPECIFICATIONS Tubular Composite Top Hung Sliding Door System OPTIONS ARE LISTED IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT CONSULT MANUFACTURER

More information

AMBICO Limited Section BLAST RESISTANT STEEL OVERHEAD DOOR ASSEMBLIES Page 1

AMBICO Limited Section BLAST RESISTANT STEEL OVERHEAD DOOR ASSEMBLIES Page 1 Page 1 This section includes Blast Resistant, Steel, Overhead Door Assemblies, with integral electric operators and accessories. This section includes proprietary, descriptive and performance type specification

More information

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

Facilities Planning and Construction (FP&C)

Facilities Planning and Construction (FP&C) Appendix 8.4a Facilities Planning and Construction (FP&C) UAA FP&C Quality Assessment Checklist (A) Project: PM: Project ID: Updated:

More information

2. Provide a revised bid form which includes revised language in Section II, Bidder Responsiveness Section. (attached to this Addendum 1)

2. Provide a revised bid form which includes revised language in Section II, Bidder Responsiveness Section. (attached to this Addendum 1) Philadelphia Regional Port Authority 3460 North Delaware Ave. 2 nd Floor Philadelphia, PA 19134 October 30, 2018 To: All Bidders From: Kate Bailey Director of Procurement Re: ADDENDUM NO. 1 Project 18-110.1

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF MODULAR GALVANIZED SYSTEM PART

More information

"SRMZ" ROOFTOP PACKAGED MULTIZONE UNITS Self Contained Single Package Units 17.5 to 43 Ton Cooling Capacities

SRMZ ROOFTOP PACKAGED MULTIZONE UNITS Self Contained Single Package Units 17.5 to 43 Ton Cooling Capacities "SRMZ" ROOFTOP PACKAGED MULTIZONE UNITS Self Contained Single Package Units 17.5 to 43 Ton Cooling Capacities Packaged Rooftop Multizone shall be Spinnaker Industries Inc. Model Series SRMZ. Units shall

More information

ADDENDUM 1. Repair and Maintenance of Landfill Gas Chiller System. Return date: Bid must be received no later than 2:00 PM, Monday, June 25, 2018

ADDENDUM 1. Repair and Maintenance of Landfill Gas Chiller System. Return date: Bid must be received no later than 2:00 PM, Monday, June 25, 2018 ADDENDUM 1 Date: June 13, 2018 Bid No.: Title: 18-11/AL Repair and Maintenance of Landfill Gas Chiller System Return date: Bid must be received no later than 2:00 PM, Monday, June 25, 2018 This Addendum

More information

SECTION OVERHEAD COILING FIRE DOORS MODEL 662 OVERHEAD COILING COUNTER FIRE DOORS WITH INTEGRAL FRAME

SECTION OVERHEAD COILING FIRE DOORS MODEL 662 OVERHEAD COILING COUNTER FIRE DOORS WITH INTEGRAL FRAME SECTION 08331 OVERHEAD COILING FIRE DOORS MODEL 662 OVERHEAD COILING COUNTER FIRE DOORS WITH INTEGRAL FRAME Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES

More information

Watercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS

Watercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS Watercrest - Sand Hill - Columbia, SC 00 0110-1 TABLE OF CONTENTS DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS INTRODUCTORY INFORMATION Document 00 0101 Document 00 0110 Project Title Page CONTRACTING

More information

PERMIT SUBMITTAL GUIDE FOR COMMERCIAL PROJECTS

PERMIT SUBMITTAL GUIDE FOR COMMERCIAL PROJECTS Collier Township 2418 Hilltop Road, Suite 100, Presto, PA 15142 Ph. 412-279-9998 PERMIT SUBMITTAL GUIDE FOR COMMERCIAL PROJECTS This guide applies to all projects except 1 & 2 family dwellings and townhouses

More information

2.2 Elevators may not include any proprietary controls or systems.

2.2 Elevators may not include any proprietary controls or systems. PART 1: GENERAL Scope of Standard A. This standard provides general guidance concerning the specific preferences of Sam Houston State University for elevator and escalator basic requirements. B. SHSU recognizes

More information

SECTION / STC 52 METAL SOUND CONTROL DOORS

SECTION / STC 52 METAL SOUND CONTROL DOORS SECTION 08 34 73 / 08 34 73.13 STC 52 METAL SOUND CONTROL DOORS PART 1 GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of the Contract, including general and Supplementary Conditions

More information

C. Samples: For each door face material, at least 3 by 5 inches (75 by 125 mm) in size, in specified finish.

C. Samples: For each door face material, at least 3 by 5 inches (75 by 125 mm) in size, in specified finish. SECTION 083113 - ACCESS DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Project Manual Index of Specifications Shenandoah Schools Concession Building

Project Manual Index of Specifications Shenandoah Schools Concession Building INDEX OF SPECIFICATIONS Division 0..BIDDING AND CONTRACT REQUIREMENTS 00 11 13 Advertisement for Bids 00 21 13 Instructions to Bidders 00 41 00 Bid Forms 00 43 13 Bid Security Form 00 72 00 General Conditions

More information

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

F-SERIES: FF XT SPECIFICATIONS Exterior Swinging Four-Fold Door Systems

F-SERIES: FF XT SPECIFICATIONS Exterior Swinging Four-Fold Door Systems Version 5.22.13 F-SERIES: FF100-600XT SPECIFICATIONS Exterior Swinging Four-Fold Door Systems OPTIONS ARE LISTED IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT. CONSULT MANUFACTURER

More information

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including: Page 1 of 7 SECTION 083925 MECHANICAL ROOM FLOOD DOORS AND FRAMES **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

EXECUTION REQUIREMENTS

EXECUTION REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: Execution requirements. B. Related Requirements: 1. Specification Sections 2 through 49. PART 2 - PRODUCTS (Not Used). PART 3 - EXECUTION 3.1 SAFETY 01

More information

SECTION LIGHTING. A. Section Basic Electrical Materials and Methods

SECTION LIGHTING. A. Section Basic Electrical Materials and Methods SECTION 16500 LIGHTING PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide lighting fixtures of sizes, types and ratings as indicated; complete with, but not necessarily limited to, housings, lamps, lamp holders,

More information

The Town will coordinate with the adjacent property Owner for access allowing work to the East side of the building.

The Town will coordinate with the adjacent property Owner for access allowing work to the East side of the building. ADDENDUM #1 EXTERIOR REPAIRS YOUTH SERVICES BUREAU 63 LINDEN STREET MANCHESTER, CT 06040 BID #15/16-68 S/P+A PROJECT NO. 15.207 DATE: March 15, 2016 The following changes to the Drawings and Project Specifications

More information

SECTION ENCLOSED BUS ASSEMBLIES

SECTION ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

SERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651

SERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651 SERIES SA30 STEEL/ALUMINUM FIXED DETENTION WINDOWS SECTION 08651 PART 1 GENERAL 1.1 DESCRIPTION A. Work Included: 1. Furnish all labor and materials to complete the fabrication of detention windows as

More information

SECTION COPPER/ SOLDERED RF SYSTEM SPECIFICATIONS

SECTION COPPER/ SOLDERED RF SYSTEM SPECIFICATIONS SECTION 13096 COPPER/ SOLDERED RF SYSTEM SPECIFICATIONS Prepared by: NELCO 125 Chenoweth Lane, Ste. 206 Louisville, KY 40207 (502) 899-3726 13096-1 SECTION 13096 COPPER RADIO FREQUENCY SHIELDING ENCLOSURE

More information

AMENDMENT OF SOLICITATION

AMENDMENT OF SOLICITATION Metropolitan Washington Airports Authority PROCUREMENT AND CONTRACTS DEPT. AMENDMENT OF SOLICITATION PAGE 1 Metropolitan Washington Airports Authority 1A. AMENDMENT OF SOLICITATION NO. 1B. DATED Procurement

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION Section 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Invitation

More information

SECTION SUPPLEMENTARY GENERAL CONDITIONS

SECTION SUPPLEMENTARY GENERAL CONDITIONS SECTION 00800 SUPPLEMENTARY GENERAL CONDITIONS PART 1 - GENERAL 1.1 SCOPE OF WORK In general, the Work consists of application of a fluid applied membrane, installation of new tapered insulation, installation

More information

SECTION COOLING TOWER

SECTION COOLING TOWER PART 1 GENERAL 1.1 SECTION INCLUDES A. Mechanical induced draft Cooling Tower B. Controls C. Ladder and handrails 1.2 REFERENCES SECTION 23 65 00 COOLING TOWER A. ANSI/AFBMA 9 - Load Rating and Fatigue

More information

F-SERIES: F SPECIFICATIONS Four-Fold Door Systems

F-SERIES: F SPECIFICATIONS Four-Fold Door Systems Version 5.22.13 F-SERIES: F100-600 SPECIFICATIONS Four-Fold Door Systems OPTIONS ARE IN BOLD, PLEASE MODIFY THESE AREAS AS NEEDED BASED ON YOUR PROJECT. CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS.

More information

Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control

Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control Special Specification 6292 Radar Vehicle Detection System for Signalized Intersection Control 1. DESCRIPTION 2. MATERIALS Furnish, install, relocate, or remove radar vehicle detection systems (RVDS) of

More information

A. The work consists of furnishing a Chiller Noise Reduction System as listed in the specifications.

A. The work consists of furnishing a Chiller Noise Reduction System as listed in the specifications. SECTION 32 31 14 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply

More information

Automated Cantilevered Aluminum Sliding Gate

Automated Cantilevered Aluminum Sliding Gate Town of Derry, New Hampshire REQUEST FOR PROPOSALS B18-128 January 25, 2018 The Town of Derry - Department of Public Works is seeking proposals for: Automated Cantilevered Aluminum Sliding Gate Introduction

More information

SECTION SECTIONAL OVERHEAD DOORS 416 SERIES SECTIONAL STEEL DOORS

SECTION SECTIONAL OVERHEAD DOORS 416 SERIES SECTIONAL STEEL DOORS SECTION 08 36 00 SECTIONAL OVERHEAD DOORS 416 SERIES SECTIONAL STEEL DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word click on

More information

Town of Milton Halton Paramedic Services Station No. 17 and Milton Fire Station No. 5 Tender No and

Town of Milton Halton Paramedic Services Station No. 17 and Milton Fire Station No. 5 Tender No and Town of Milton No. 17 and Milton Fire Station No. 5 Tender No. 19-500-1 and 19-500-2 BID SUBMISSION 19-500-2 Part Two In accordance with Tender No. 19-500-2, Tender Form Part Two must be submitted electronically

More information

This Addendum Number One forms part of the Contract Documents and modifies the original Bidding Documents dated June 8, 2016.

This Addendum Number One forms part of the Contract Documents and modifies the original Bidding Documents dated June 8, 2016. ADDENDUM NUMBER ONE - June 15, 2016 CITY OF CLARKSVILLE TO: All Bidders of Record This Addendum Number One forms part of the Contract Documents and modifies the original Bidding Documents dated June 8,

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

FF200, FOUR-FOLD DOORS CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS.

FF200, FOUR-FOLD DOORS CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS. FF200, FOUR-FOLD DOORS CONSULT MANUFACTURER FOR ADDITIONAL OPTIONS OR MODIFICATIONS. PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

More information

City Of Mendota Construction Procedures

City Of Mendota Construction Procedures City Of Mendota Construction Procedures Building Permit Application: A permit shall be obtained prior to commencing work of any type. Failure to do so may result in doubling the permit fees. At the time

More information

SECTION AIR TERMINAL UNITS

SECTION AIR TERMINAL UNITS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Specification Sections, apply to this Section. B. Related Sections:

More information

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK

DIVISION 5 - STRUCTURAL STEEL AND IRON WORK DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete

More information

B. Pumps are to be manufactured by Flygt Pumps. No substitutes will be considered.

B. Pumps are to be manufactured by Flygt Pumps. No substitutes will be considered. I. General Requirements A. This bid is for furnishing and delivering pumps for use at the Southeast Pollution Control Treatment Plant, Cesar Chavez Pump Station, Channel Pump Station, Bruce Flynn Pump

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF MODULAR PAN SYSTEM PART 1 GENERAL 1.1

More information

SECTION SECTIONAL OVERHEAD DOORS 424 SERIES SECTIONAL STEEL DOORS

SECTION SECTIONAL OVERHEAD DOORS 424 SERIES SECTIONAL STEEL DOORS SECTION 08 36 00 SECTIONAL OVERHEAD DOORS 424 SERIES SECTIONAL STEEL DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word click on

More information

1. Include construction details, materials, individual components and profiles, and finishes.

1. Include construction details, materials, individual components and profiles, and finishes. SECTION 08 31 13 - ACCESS DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings,and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

2. Provide a revised Section 17 and 27 to our Instructions to Bidders (attached)

2. Provide a revised Section 17 and 27 to our Instructions to Bidders (attached) Philadelphia Regional Port Authority 3460 North Delaware Ave. 2 nd Floor Philadelphia, PA 19134 November 19, 2018 To: All Bidders From: Kate Bailey Director of Procurement Re: ADDENDUM NO. 1 Project 18-152.0