1 Statement of Qualifications Project Development Education Construction & Management Development Advisory Services Site Selection Project Planning Design & Development Project Management Construction Oversight Carter Bailey Benjamin Mayer Stuart Monteith Orchard Street Austin, TX

2 SCOPE OF SERVICES PRE-DEVELOPMENT Site Identification & Analysis Predesign Studies Preliminary Site Plans Project Concepts Environmental Investigation Risk Management Phase One Budget Discussion Solicit Proposals & Negotiate Contracts Prepare preliminary Estimated Schedule of Commencement to Completion Consult on Project Budget and Reconcile possible Cost Reductions (Value Engineering) Review & Comment on Drawing Specifications prepared by Architect Set Final Project Budget based on Approved Design Conduct Pre-bid conferences to familiarize Contractors with Project Review Bids and make Recommendations Assign Contracts and conduct Pre-Construction meetings DEVELOPMENT PHASE SERVICES Conduct regular on-site meetings to review Construction Progress Review Draw Packages by Contractor, Architect and any other Consultants Develop orderly procedure for payment of fees and Draw packages to submit to Owners Lender Direct Contractor to prepare and update a Critical Path Schedule Monitor Contractor Performance on behalf of Owner and report progress to Owner on at least a monthly basis Notify Owner of any work not being performed to satisfaction Work with Contractor, Architect, and Governmental authorities to reach Substantial Completion Prepare punch list for Substantial Completion Monitor testing and start-up of Utilities, Systems, and Equipment Complete Final Closeout of the Project by obtaining all warranties, guarantees, bonds, and Certificate of Occupancy Coordinate the installation of Owners furniture, fixtures, and equipment Statement of Qualifications Project Development Vertique Development 2

3 SCOPE OF SERVICES TIMELINE REAL ESTATE Site Selection Process Project Budget & Schedule Purchase/Lease Negotiation Executed Lease DESIGN Site Layout/Preliminary Site Plan Conceptual Designs & Bids Design Approval BID/PERMIT Construction & Civil Drawings Building Permit & Applications Solicit & Review Bids Award Contracts Receive Site work & Building Permit Data Engineer Design CONSTRUCTION CONSTRUCTION AV Security Construction Commencement Progress Updates Job Site Inspections Onsite Meetings w/ Owner FFE Installations Punch List TENANT Signage FF&E Move DELIVERY Move In Closeout Package Ongoing Support Statement of Qualifications Project Development Vertique Development 3

4 PROJECT MANAGEMENT TOOLS Integrated Project Control Our suite of Project Management Tools allow us to Track, Manage, and Update all Clients & Vendors throughout the lifecycle of the Project. Project Dashboard This Serves as a high-level visualization of the Entire Project with links to the Project Overview, Budget, Schedule, & all relevant project documentation and pictures. Project Dashboard Overview Budget Schedule Overview Repository for Contact information of all Project Members, Contractors, Trades, and Design Professionals. Defines all roles & responsibilities and acts as the Library where all Important Project Documents are Held. Budget Assist the client in developing a First Phase Budget then progressing to a Master Project Budget maintaining the defined objective and scope of the work to be completed. Schedule Prepare and update the Project schedule including all design, planning, construction, equipment delivery, and Owner occupancy activities. Work diligently to manage the client s interests and coordinate with all parties throughout the lifecycle of the Project. Statement of Qualifications Project Development Vertique Development 4

5 CARPE DIEM PRESCHOOL CEDAR PARK, TX Sitework and Pad Site grading Building Frame Out Playground Installation Roof & Signage Completion Furniture Installation & Millwork buildout Project Completion Statement of Qualifications Project Development Vertique Development 5

6 Contact us: Carter Bailey Vertique Development Stuart Monteith Vertique Development Vertiquedevelopment.com

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September

More information

Owner s Representative SCOPE OF SERVICES

Owner s Representative SCOPE OF SERVICES Owner s Representative SCOPE OF SERVICES Scope of Services DeMaria s steady growth has enabled the construction of more sophisticated buildings through various methods and services. As your Owners Representative,

More information

OUTLINING THE PROCESS SECTION 2 YOUR NOTES

OUTLINING THE PROCESS SECTION 2 YOUR NOTES 1 OUTLINING THE PROCESS SECTION 2 YOUR NOTES Photocopy this page for Committee members ABF/10/08 2 OUTLINE THE THE PROCESS Phase 1: Pre-Design Planning Step 1:Needs recognition & initial action Step 2:Strategic

More information

Manage Deliverables - Construction Step 6 February 2015

Manage Deliverables - Construction Step 6 February 2015 Manage Deliverables - Construction Step 6 February 2015 1 Construction Phase Step 1: Needs Development Step 2: Scope Development Step 3: Selection of Design Team Step 4: Design Phase Step 5: Selection

More information

REQUEST FOR PROPOSAL. Design-Build Services for Intensive Care Unit and Patient Tower Expansion St. Charles Medical Center - Bend.

REQUEST FOR PROPOSAL. Design-Build Services for Intensive Care Unit and Patient Tower Expansion St. Charles Medical Center - Bend. REQUEST FOR PROPOSAL Design-Build Services for Intensive Care Unit and Patient Tower Expansion St. Charles Medical Center - Bend For St. Charles Health System Issued: May 9, 2016 Proposal Due: June 9,

More information

Township of Severn REQUEST FOR PROPOSAL. Architectural & Professional Services Fire Station Replacement

Township of Severn REQUEST FOR PROPOSAL. Architectural & Professional Services Fire Station Replacement Township of Severn REQUEST FOR PROPOSAL Architectural & Professional Services Fire Station Replacement Deadline for proposal submission is June 15, 2017 at 2:00 p.m. Contact Person: Tim Cranney Director

More information

CONTRACT SERVICES PHASE 1: PRE-CONSTRUCTION

CONTRACT SERVICES PHASE 1: PRE-CONSTRUCTION PHASE 1: PRE-CONSTRUCTION Schematics Phase Based upon program requirements and design parameters, D&J will establish conceptual budget and preliminary schedule for the project, which will highlight specific

More information

A , Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum

A , Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum A101 2007, Standard Form of Agreement Between Owner and Contractor where the basis of payment is a Stipulated Sum AIA Document A101 2007 is a standard form of agreement between owner and contractor for

More information

VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES. Part I: Proposal Information

VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES. Part I: Proposal Information VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES Part I: Proposal Information A General Information The Village of Vernon Hills is soliciting proposals for construction

More information

Attachment to Standard Form of Agreement Between Owner and Architect AIA Document B (Date)

Attachment to Standard Form of Agreement Between Owner and Architect AIA Document B (Date) Attachment to Standard Form of Agreement Between Owner and Architect AIA Document B103 2007 () Appropriation Year(s): Cost Center: Object Codes: Fee: Reimbursement: Amounts Fee: $ Reimbursables: $ Vendor

More information

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN

REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGEMENT at RISK SERVICES FOR THE BECKER COUNTY JAIL DETROIT LAKES, MN Introduction Becker County is issuing a RFQ for Construction Management at Risk Services

More information

Design Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright

Design Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright Design Process 101 Michael Barnard, AIA, NCARB animalsheltering.org/expo #AnimalCareExpo Copyright 1 Design and Construction Process Needs Assessment Conceptual Design Schematic Design Design Development

More information

PLANNING AND BUILDING CHECKLIST. For Church Leadership

PLANNING AND BUILDING CHECKLIST. For Church Leadership PLANNING AND BUILDING CHECKLIST For Church Leadership Dear Church Leader: This booklet is born out of the experiences and expertise gained in working with more than 100,000 churches over the last 90+ years.

More information

Document Synopses by Series

Document Synopses by Series Document Synopses by Series AIA Contract Documents are divided into six alphanumeric series by document use or purpose: A Series: Owner/Contractor Agreements B Series: Owner/Architect Agreements (p. 13)

More information

Appendix D University of Maine System. Supplementary Requirements to AIA Document B Standard Form of Architect s Services

Appendix D University of Maine System. Supplementary Requirements to AIA Document B Standard Form of Architect s Services Appendix D University of Maine System Supplementary Requirements to AIA Document B201-2007 Standard Form of Architect s Services This document provides the Architect s scope of services only and must be

More information

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk

More information

MAKE THE FOLLOWING ADDITIONS, MODIFICATIONS OR DELETIONS TO THE DRAWINGS AND SPECIFICATIONS:

MAKE THE FOLLOWING ADDITIONS, MODIFICATIONS OR DELETIONS TO THE DRAWINGS AND SPECIFICATIONS: ADDENDUM NO. 1 CITY OF PORT ARANSAS ELLIS MEMORIAL EXISTING LIBRARY RENOVATIONS AND REPAIRS CSP #2016-22 700 W. AVE A PORT ARANSAS, TX 78373 Issue Date: 01/07/2019 The following additions, deletions, modifications,

More information

CONSTRUCTION MANAGEMENT REQUEST FOR PROPOSAL EAST RUTHERFORD PUBLIC SCHOOLS

CONSTRUCTION MANAGEMENT REQUEST FOR PROPOSAL EAST RUTHERFORD PUBLIC SCHOOLS CONSTRUCTION MANAGEMENT REQUEST FOR PROPOSAL EAST RUTHERFORD PUBLIC SCHOOLS I. INTRODUCTION The East Rutherford School District is planning to hold a referendum on December 12, 2017 that incorporates facility

More information

Chapter 4 State Requirements for Educational Facilities Section 4.1

Chapter 4 State Requirements for Educational Facilities Section 4.1 providential cause, other impending danger to life safety, or pursuant to Section 1013.46(1)(b), F.S., the board can declare an emergency, can negotiate a contract with a design-build firm, design professional,

More information

Township of Severn REQUEST FOR PROPOSAL RFP REC Coldwater Fairgrounds and Village Green Parkland Development

Township of Severn REQUEST FOR PROPOSAL RFP REC Coldwater Fairgrounds and Village Green Parkland Development Township of Severn REQUEST FOR PROPOSAL RFP REC 2017-01 Coldwater Fairgrounds and Village Green Parkland Development Closing Date & Time The Township of Severn requires two (2) hard-copies and one (1)

More information

West Valley Library Parking Lot Repair with Porous Asphalt

West Valley Library Parking Lot Repair with Porous Asphalt RFQ-066 Request for Quote for West Valley Library Parking Lot Repair with Porous Asphalt Susan Miller Facilities Manager Yakima Valley Libraries April 3, 2017 RFQ NAME: ISSUING AGENCY: West Valley Library

More information

CONSTRUCTION MANAGEMENT

CONSTRUCTION MANAGEMENT CONSTRUCTION MANAGEMENT Construction Management is not a new idea. The function of the Construction Manager is to work on behalf of the owner to complete a project within the plans and specifications provided.

More information

Document B252TM 2007

Document B252TM 2007 Document B252TM 2007 Standard Form of Architect s Services: Architectural Interior Design for the following PROJECT: (Name and location or address) This document has important legal consequences. Consultation

More information

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility RFP Components CLIENT: TradePort International Corporation, Operators of John C. Munro

More information

REQUEST FOR COMPETITIVE PROPOSALS FOR ARCHITECTURAL SERVICES CITY OF PERRIS

REQUEST FOR COMPETITIVE PROPOSALS FOR ARCHITECTURAL SERVICES CITY OF PERRIS REQUEST FOR COMPETITIVE PROPOSALS FOR ARCHITECTURAL SERVICES BY CITY OF PERRIS Perris, California December 4 th, 2018 City of Perris is requesting Competitive Proposals from licensed architectural firms

More information

GOREE ARCHITECTS, INC Bellaire Blvd., Suite 105 Bellaire, TX Tel (713)

GOREE ARCHITECTS, INC Bellaire Blvd., Suite 105 Bellaire, TX Tel (713) GOREE ARCHITECTS, INC. 4710 Bellaire Blvd., Suite 105 Bellaire, TX 77401 Tel (713) 660-6102 DATE: February 22, 2016 FROM: TO: RE: Goree Architects, Inc. General Contractors of Record Tomball Ford Image

More information

Diocese of San Diego BUILDING AND RENOVATION GUIDELINES. Table of Contents. Building and Renovation Committee Bylaws 2

Diocese of San Diego BUILDING AND RENOVATION GUIDELINES. Table of Contents. Building and Renovation Committee Bylaws 2 ADMINISTRATION Diocesan-16 2/1/2011 Diocese of San Diego BUILDING AND RENOVATION GUIDELINES Table of Contents Page Building and Renovation Committee Bylaws 2 I. Preliminary Discussions at the Diocesan

More information

RFQ for Architectural Services - Attachment 5 North Campus Student Housing Phase IV(b) Haggett Hall Replacement and Oak Hall Project No.

RFQ for Architectural Services - Attachment 5 North Campus Student Housing Phase IV(b) Haggett Hall Replacement and Oak Hall Project No. SPECIAL CONDITIONS Article I, Section A delete this paragraph in its entirety and replace it with the following language: Owner s representative to act on its behalf with respect to this Agreement shall

More information

Township of Severn REQUEST FOR PROPOSAL. RFP REC b. Coldwater Fairgrounds and Village Green Parkland Development

Township of Severn REQUEST FOR PROPOSAL. RFP REC b. Coldwater Fairgrounds and Village Green Parkland Development Township of Severn REQUEST FOR PROPOSAL RFP REC 2017-01b Coldwater Fairgrounds and Village Green Parkland Development Closing Date & Time The Township of Severn requires one (1) hard-copies and one (1)

More information

Why Do I Need A Project Manager / Owner s Representative For My New Library Project?

Why Do I Need A Project Manager / Owner s Representative For My New Library Project? Why Do I Need A Project Manager / Owner s Representative For My New Library Project? 111 SW Columbia Street Suite 830 Portland, OR 97201 Tel: 503-225-1120 Fax: 503-224-3226 www.hillintl.com A Project Manager/Owner

More information

1.0 ABOUT THE NU GUIDELINES

1.0 ABOUT THE NU GUIDELINES Construction Policies & Procedures Northeastern University Guidelines for Capital Project Design & Implementation.0 ABOUT THE NU GUIDELINES This document is intended to describe in a comprehensive manner

More information

DRAFT. Request for Proposal for Construction Manager at Risk Services ASHRAE. New Headquarters Building. Peachtree Corners, GA

DRAFT. Request for Proposal for Construction Manager at Risk Services ASHRAE. New Headquarters Building. Peachtree Corners, GA DRAFT Request for Proposal for Construction Manager at Risk Services ASHRAE New Headquarters Building Peachtree Corners, GA 1. INTRODUCTION AND PROJECT DESCRIPTION A. Introduction On behalf of ASHRAE,

More information

CONSTRUCTION DOCUMENTS Part 1

CONSTRUCTION DOCUMENTS Part 1 Audio Presentation Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT) Preparatory Course 2011 The Construction Specifications Institute www.csinet.org

More information

Services. Contact. Owners Engineering Project Development Contract Development Construction Monitoring Technical Support

Services. Contact. Owners Engineering Project Development Contract Development Construction Monitoring Technical Support Services helps its clients solve technical and business challenges from initial project concept through divestiture or decommissioning. Services, described in detail on the following pages, include: Owners

More information

Ex AC. Examination for Architects in Canada Examen des architectes du Canada

Ex AC. Examination for Architects in Canada Examen des architectes du Canada Ex AC Examination for Architects in Canada Examen des architectes du Canada General and Specific Objectives Theme 1 general objective specific objectives rogramming 1.1 Understand the process for the preparation

More information

Facilities Management Project Delivery Model - Process Map - v

Facilities Management Project Delivery Model - Process Map - v Project Delivery Model - Process Map - v8.0-2016-05-25 Overview PLANNING DESIGN IMPLEMENTATION CLOSE OUT Project Identification Initiation Page 2 Project Planning Page 3 Schematic Design / Design Development

More information

REQUEST FOR QUALIFICATIONS AND PROPOSALS

REQUEST FOR QUALIFICATIONS AND PROPOSALS REQUEST FOR QUALIFICATIONS AND PROPOSALS CONSTRUCTION MANAGER AT RISK SERVICES Preconstruction Phase Services and Construction Phase Services Sheridan Economic and Educational Development Authority Sheridan

More information

PLANNING AND EVALUATION PRELIMINARY DESIGN

PLANNING AND EVALUATION PRELIMINARY DESIGN PLANNING AND EVALUATION Project Initiation Discuss and refine client requirements Project brief, Schedule, Budget Confirm client's space needs and program Establish scope of work Obtain client-supplied

More information

Committee Meeting. Procurement Processes for Professional Services and Contractors

Committee Meeting. Procurement Processes for Professional Services and Contractors Citizen s i Oversight Committee Meeting Procurement Processes for Professional Services and Contractors March 2, 2011 1 Procurement Process for Professional Services 2 Procurement Process for Professional

More information

A62 UT PRE-CONSTRUCTION MEETING AGENDA

A62 UT PRE-CONSTRUCTION MEETING AGENDA Provided below are the agenda items typically required by the Owner for the Pre-Construction Meeting. Guidance provided in agenda items does not revise the requirements of the Agreement. Instructions:

More information

Management. Construction. Development. WE PROVIDE A complete roster of building services to streamline the construction process

Management. Construction. Development. WE PROVIDE A complete roster of building services to streamline the construction process WE ARE: We are a family-owned construction company providing construction services to general contractors and real estate owners throughout the San Francisco Bay Area. Founded in 2001, Argo Construction

More information

FACTION CONSTRUCTION

FACTION CONSTRUCTION FACTION CONSTRUCTION Firm Profile & Philosophy Philosophy Faction Projects Inc. is focused on real estate development and the provision of integrated development management, architecture and construction

More information

MEETING MINUTES A. Please review attached meeting minutes for additional information and clarifications.

MEETING MINUTES A. Please review attached meeting minutes for additional information and clarifications. ADDENDUM 01 DATE: 08 June 2017 CLIENT NAME: PNC bank ISSUED BY: Christine Barber PROJECT NAME: Meadville Branch - Wealth Management Office ISSUED TO: Ryan Campbell, CBC Ryan Doyle, Perry Const. Mike Cole,

More information

The documents in the A-Series relate to various forms of agreement between an owner and a contractor.

The documents in the A-Series relate to various forms of agreement between an owner and a contractor. A-Series A- S E R I E S The documents in the A-Series relate to various forms of agreement between an owner and a contractor. A101 Owner-Contractor Agreement Form Stipulated Sum Basis of payment is a stipulated

More information

3,740. Demonstrating Competent Performance SIX EXPERIENCE AREAS. INTRODUCTION What is the Architectural Experience Program?

3,740. Demonstrating Competent Performance SIX EXPERIENCE AREAS. INTRODUCTION What is the Architectural Experience Program? What is the Architectural Experience Program? The Architectural Experience Program (AXP ) is an essential step in the path to becoming an architect. Through the AXP, you will learn about the daily realities

More information

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS February 5, 2019

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS February 5, 2019 EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS 25-19 February 5, 2019 TO: RE: Invited Firms Request for Submittals to El Paso Water - Public Service Board (EPWater) Statement of Work Professional

More information

Volume II- Project Development Processes

Volume II- Project Development Processes Volume II- Project Development Processes This section outlines the procedures that are expected of capital projects at The University of Chicago. These requirements supplement the planning procedures required

More information

Chapter 6, Construction

Chapter 6, Construction Chapter 6, Construction CHAPTER CONTENTS 6.1 OWNER-CONTRACTOR AGREEMENT A. Preparation B. Owner Signature C. Award 6.2 PRE-CONSTRUCTION CONFERENCE A. Administration B. Attendees C. Pre-Construction Conference

More information

A62 PRE-CONSTRUCTION MEETING AGENDA

A62 PRE-CONSTRUCTION MEETING AGENDA Provided below are the agenda items typically required by the Owner for the Pre-Construction Meeting. Guidance provided in agenda items does not revise the requirements of the Agreement. Instructions:

More information

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS June 27, 2017

EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS June 27, 2017 EL PASO WATER - PUBLIC SERVICE BOARD REQUEST FOR SUBMITTALS RFS 21-17 June 27, 2017 TO: RE: Invited Firms Request for Submittals to El Paso Water - Public Service Board (EPWater) Statement of Work Professional

More information

ANNEXURE A SCOPE OF WORK FOR PROFESSIONAL SERVICES: RESTORATION OF NON PAREILLE BUILDINGS. Principal Agent and Professional Architectural Services

ANNEXURE A SCOPE OF WORK FOR PROFESSIONAL SERVICES: RESTORATION OF NON PAREILLE BUILDINGS. Principal Agent and Professional Architectural Services T: +27 21 462 4502 F: +27 21 462 4509 E: info@sahra.org.za South African Heritage Resources Agency - Head Office 111 Harrington Street Cape Town P.O. Box 4637 Cape Town 8001 ANNEXURE A SCOPE OF WORK FOR

More information

CHAPTER 3: DESIGN. TN Higher Education Designers Manual October 2018 Page 1 of 12

CHAPTER 3: DESIGN. TN Higher Education Designers Manual October 2018 Page 1 of 12 3.01 GENERAL A. Design the project to meet the authorized scope, budget, and schedule. B. Upon initiation of the project, arrange to review with the Owner the service and administrative requirements as

More information

ATTACHMENT D SCOPE OF SERVICES

ATTACHMENT D SCOPE OF SERVICES ATTACHMENT D SCOPE OF SERVICES OBJECTIVE Owner s Capital Improvement Program (major capital, minor construction, repair, and rehabilitation projects) includes numerous construction and renovation projects.

More information

WHO WE ARE. Development / Build-to-Suit. Acquisitions. Sale-Leaseback Program

WHO WE ARE. Development / Build-to-Suit. Acquisitions. Sale-Leaseback Program WHO WE ARE Paragon is an experienced commercial real estate firm that actively develops, acquires and manages retail, industrial and healthcare properties nationwide. As a well-capitalized, privately held

More information

Attachment 04 Substantial and Final Completion Approval Form. Project Description Project # Date of Completion Permit # Project Manager Phone #

Attachment 04 Substantial and Final Completion Approval Form. Project Description Project # Date of Completion Permit # Project Manager Phone # UCF Design, Construction, and Renovation Standards Attachment 04 Substantial and Final Completion Approval Form Project Description Project # Date of Completion Permit # Phone # Intent: This Substantial

More information

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES

1997 Part 2. Document B141. Standard Form of Architect's Services: Design and Contract Administration TABLE OF ARTICLES TM Document B141 Standard Form of Architect's Services: Design and Contract Administration 1997 Part 2 TABLE OF ARTICLES 2.1 PROJECT ADMINISTRATION SERVICES 2.2 SUPPORTING SERVICES 2.3 EVALUATION AND PLANNING

More information

Comparison of Conventional and Alternative Project Delivery Methods: What s in an Acronym? PNWS AWWA May, 2013

Comparison of Conventional and Alternative Project Delivery Methods: What s in an Acronym? PNWS AWWA May, 2013 Comparison of Conventional and Alternative Project Delivery Methods: What s in an Acronym? PNWS AWWA May, 2013 Outline Alternative Delivery Options Oregon and Washington Legal Context Things an Owner Should

More information

Time to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO

Time to Build! What to Expect On Your Upcoming Design and Construction Journey PRESENTED TO Time to Build! What to Expect On Your Upcoming and Journey PRESENTED TO Christopher is an award-winning architect with more than 20 years of diversified architectural experience in design of projects from

More information

MONTHLY PROGRESS REPORT

MONTHLY PROGRESS REPORT MONTHLY PROGRESS REPORT Through May 2018 Strong Schools Bond Capital Improvement Projects Prepared by fs3 Hodges 1 TABLE OF CONTENTS Executive Summary page 3 Attachment 1 Consolidated Expenditure Report

More information

Owner's Representative Scope Matrix - D/B Rev 10/28/2013

Owner's Representative Scope Matrix - D/B Rev 10/28/2013 Ecluded Owner's Representative Scope Matri - D/B Rev 10/28/2013 The following matri is a worksheet to identify required and optional scope for Owner's Representative services. Please identify the scope

More information

SCOPE OF WORK FOR PROFESSIONAL SERVICES: HET POSTHUYS ELECTRICAL UPGRADE

SCOPE OF WORK FOR PROFESSIONAL SERVICES: HET POSTHUYS ELECTRICAL UPGRADE ANNEXURE A T: +27 21 462 4502 F: +27 21 462 4509 E: info@sahra.org.za South African Heritage Resources Agency - Head Office 111 Harrington Street Cape Town P.O. Box 4637 Cape Town 8001 SCOPE OF WORK FOR

More information

This document describes how Austin implements projects using The Austin Method. Step 1 Preliminary Design and Engineering

This document describes how Austin implements projects using The Austin Method. Step 1 Preliminary Design and Engineering The Austin Company offers multiple approaches in implementing a project. These generally can be classified into either a design-bid-construct or design-build project approach. In addition, Austin offers

More information

Facilities Construction Services Minor Capital Project Field Guide

Facilities Construction Services Minor Capital Project Field Guide Facilities Construction Services Minor Capital Project Field Guide Version 3 February 08, 2016 O:\CONSTRUCTION\Field Guide\Field Guide 2016\FIU 2016 Field Guide/ Version 3 Table of Contents 1. Introduction........3

More information

Step 1 Preliminary Design and Engineering

Step 1 Preliminary Design and Engineering The Austin Company offers a variety of approaches in implementing a project. These generally can be classified into either a design-bid-construct or design-build project approach. In addition, Austin offers

More information

ATLANTIC PROVINCES ASSOCIATION OF LANDSCAPE ARCHITECTS

ATLANTIC PROVINCES ASSOCIATION OF LANDSCAPE ARCHITECTS ATLANTIC PROVINCES ASSOCIATION OF LANDSCAPE ARCHITECTS CONSULTANT FEE SCHEDULE FOR LANDSCAPE ARCHITECTURAL CONSULTING SERVICES A GUIDELINE NOV 2008 TABLE OF CONTENTS Table Of Contents... 2 INTRODUCTION...

More information

The Practitioner s Blueprint to Construction Auditing Ron Risner, MBA, CIA, CCA, CCP 2012, The IIA Research Foundation.

The Practitioner s Blueprint to Construction Auditing Ron Risner, MBA, CIA, CCA, CCP 2012, The IIA Research Foundation. The Practitioner s Blueprint to Construction Auditing Ron Risner, MBA, CIA, CCA, CCP 2012, The IIA Research Foundation Table of Contents List of Figures Executive and Preface Acknowledgments About the

More information

Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION

Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION May 19, 2015 The Addison Public Library invites you to submit a reply to this Request for

More information

Construction Administration Process

Construction Administration Process Construction Administration Process February 1, 2009 Division of Construction, MCPS START COMPLETED OPEN SCHOOL 25.6 1 ISSUE TICE TO PROCEED LETTER TO BOE ACCEPTS FROM 30 BOE MEMBER INSPECTS 29 TEACHERS

More information

FMD Project File Management Procedures

FMD Project File Management Procedures Issued: November 10, 2014 Revised: April 9, 2015 GUIDELINE: Applies to: All Planning, Project Management and Business Office Employees of the Facilities Management Department (FMD) PURPOSE: To establish

More information

CLIENTS GUIDE ARCHITECTURE PROCESS. Architecture Urban design Interior Planning. FM ARCHITECTURE

CLIENTS GUIDE ARCHITECTURE PROCESS. Architecture Urban design Interior Planning. FM ARCHITECTURE CLIENTS GUIDE ARCHITECTURE PROCESS FM ARCHITECTURE www.fmarchitecture.com.au Architecture Urban design Interior Planning Undertaking a building project can be a daunting task, especially if you haven t

More information

Terms of Reference and Requirements

Terms of Reference and Requirements Terms of Reference and Requirements A. PROJECT BACKGROUND 1 Shanghai Municipal People s Government has commissioned EXPO as the Project Developer. EXPO s work includes: earth and site-works, detailed design

More information

Deyelopment stages & actions to be taken

Deyelopment stages & actions to be taken Deyelopment stages & actions to be taken I. Development stages and actions to be taken - ho 322, disk 162 1.1. By Ralph J. Stephenson PE 1.2. This material is designed to 1.2.1. 1. Provide a direct stimulus

More information

Effective Purchasing, Tendering & Supplier Selection

Effective Purchasing, Tendering & Supplier Selection Effective Purchasing, Tendering & Supplier Selection Street, 55100 Kuala Lumpur, Malaysia. Tel: +60327326992 Mobile: +601 8909 0379 Fax: +60327326992 Effective Purchasing, Tendering & Supplier Selection

More information

PROJECT UPDATES: 1.01 Cox Building Annex - Tony Salcido

PROJECT UPDATES: 1.01 Cox Building Annex - Tony Salcido PROJECT UPDATES: 1.01 Cox Building Annex - Tony Salcido 1. Final Commissioning phase (Qualify the Function of the various Systems to meet the design criteria) to be completed by 04/30/15. 2. Coordination

More information

Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011)

Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011) Ohio s Qualifications-Based Selection Law (as amended by Sub. H.B. 153, 129 th Ohio General Assembly, effective Sept. 28, 2011) Sec. 153.65. As used in sections 153.65 to 153.73 of the Revised Code: (A)(1)

More information

INTERNAL AUDIT DEPARTMENT

INTERNAL AUDIT DEPARTMENT CONSTRUCTION CONTRACT AUDIT Craig Hametner, CPA, CIA, CMA, CFE City Auditor Prepared By: Randall Mahaffey, CIA, CGAP Senior Audit Analyst Jed Johnson Audit Analyst Stephen Culpepper, CPA Audit Analyst

More information

Rick Carr, Arcadis U.S., Inc. Tim O Malley, The O Malley Group Bill Brannen, Mohave Educational Services Cooperative

Rick Carr, Arcadis U.S., Inc. Tim O Malley, The O Malley Group Bill Brannen, Mohave Educational Services Cooperative Rick Carr, Arcadis U.S., Inc. Tim O Malley, The O Malley Group Bill Brannen, Mohave Educational Services Cooperative This presentation will cover: What is JOC? JOC contracting terms JOC experience Types

More information

360Facility FACILITY MANAGEMENT SOFTWARE FOR INCREASED OPERATIONAL FUNCTIONALITY

360Facility FACILITY MANAGEMENT SOFTWARE FOR INCREASED OPERATIONAL FUNCTIONALITY FACILITY MANAGEMENT SOFTWARE FOR INCREASED OPERATIONAL FUNCTIONALITY Because the costs associated with workplace asset management consume over 30 percent of corporate non-payroll expenses, organizations

More information

PRIVATE PLAN ROOM. Document Information Sheet

PRIVATE PLAN ROOM. Document Information Sheet PRIVATE PLAN ROOM Document Information Sheet Job Name: Partial Renovation for Lewes Streets Department Breakroom Bid Date: October 22, 2018 2:00 pm Placed on file by: George, Miles, and Buhr Contact: Lee

More information

For Golf Course Architectural Services

For Golf Course Architectural Services REQUEST FOR PROPOSAL For Golf Course Architectural Services Issued By: For: Date: A Standard Form Prepared By The American Society of Golf Course Architects 125 N. Executive Drive, Suite 106 Brookfield,

More information

ALBUQUERQUE PUBLIC SCHOOLS. General Conditions of the Agreement between APS and the Design Professional

ALBUQUERQUE PUBLIC SCHOOLS. General Conditions of the Agreement between APS and the Design Professional ALBUQUERQUE PUBLIC SCHOOLS General Conditions of the Agreement between APS and the Design Professional (Part B of the Agreement) TABLE OF CONTENTS Article 1 Article 2 Definitions Design Professional s

More information

Town of Burlington, MA Request for Qualifications Owner s Project Manager (OPM) Services for the Design and Construction of DPW Facilities

Town of Burlington, MA Request for Qualifications Owner s Project Manager (OPM) Services for the Design and Construction of DPW Facilities Town of Burlington, MA Request for Qualifications Owner s Project Manager (OPM) Services for the Design and Construction of In accordance with Massachusetts General Laws, Chapter 149, Sec. 44A½, the Town

More information

APPENDICES DESIGN REQUIREMENTS. Appendix A. Performance Criteria for Design Projects

APPENDICES DESIGN REQUIREMENTS. Appendix A. Performance Criteria for Design Projects PROVINCE OF NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND INFRASTRUCTURE RENEWAL DTIR Document DC350 APPENDICES DESIGN REQUIREMENTS Appendix A Performance Criteria for Design Projects 2010 EDITION Printed

More information

Activation, Transition & Close Out Step 7. July 13, 2012

Activation, Transition & Close Out Step 7. July 13, 2012 Activation, Transition & Close Out Step 7 July 13, 2012 Project Management Concept Step 1: Needs Development Step 2: Scope Development Step 3: Procurement of Design Team Step 4: Design Step 5: Bid/Procurement

More information

MUNDELEIN ELEMENTARY SCHOOL DISTRICT 75. Job Description

MUNDELEIN ELEMENTARY SCHOOL DISTRICT 75. Job Description MUNDELEIN ELEMENTARY SCHOOL DISTRICT 75 Job Description JOB TITLE: QUALIFICATIONS: Business Manager 1. Master s degree in educational administration or business administration 2. Minimum of five years

More information

PING YUEN & PING YUEN NORTH REHABILITATION

PING YUEN & PING YUEN NORTH REHABILITATION REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT SERVICES PING YUEN & PING YUEN NORTH REHABILITATION On behalf of Ping Yuen, L.P. and North Ping Yuen, L.P. ( Owner ), Chinatown Community Development Center

More information

ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW

ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project PW January 31, 2018 To Whom It May Concern: I. INSTRUCTIONS ADDENDUM #1 Construction Support Services for the Water Treatment Plant Project 18-0018PW A. The following additions, deletions, revisions, and/or

More information

POSITION DESCRIPTION

POSITION DESCRIPTION POSITION DESCRIPTION Construction Manager Job Description Page 1 of 5 JOB TITLE: Construction Manager FLSA STATUS: Exempt DEPARTMENT: K-12 WORKER S COMP CODE: 8601 REPORTS TO: Program Manager EEO-1 JOB

More information

Village of Lynbrook. Request for Proposal Engineering Services. Police License Plate Reader/Intersection Camera System

Village of Lynbrook. Request for Proposal Engineering Services. Police License Plate Reader/Intersection Camera System Village of Lynbrook Request for Proposal Engineering Services Police License Plate Reader/Intersection Camera System 1 Columbus Drive Lynbrook, NY 11563 516-599-8300 July 16, 2018 Table of Contents 1.

More information

M $336M .73 S/L/A/M CONSTRUCTION SERVICES BY THE NUMBERS A BETTER WAY TO BUILD. YEARS OF CONSTRUCTION SERVICES DESIGN-BUILD PROJECTS

M $336M .73 S/L/A/M CONSTRUCTION SERVICES BY THE NUMBERS A BETTER WAY TO BUILD. YEARS OF CONSTRUCTION SERVICES DESIGN-BUILD PROJECTS A BETTER WAY TO BUILD. S/L/A/M CONSTRUCTION SERVICES BY THE NUMBERS Our team of construction professionals has more than 30 years of building experience in New England. We pride ourselves on the personal

More information

Coordination of Consultants

Coordination of Consultants Coordination of Consultants Ontario Association of Architects Practice Tip PT.27 Version 1.0 May 21, 2012 2012 OAA, all rights reserved. Persons who are not members of the OAA must obtain written permission

More information

LIFE OF A CAPITAL PROJECT

LIFE OF A CAPITAL PROJECT LIFE OF A CAPITAL PROJECT CAPITAL ASSET STRATEGIES (CAS) ARCHITECTS AND ENGINEERS (A&E) 5/4/2017 EARLY STEPS OF A MAJOR CAPITAL PROJECT (>$750,000) Scoping & Feasibility Project sponsor and campus leadership

More information

Building Contract Closeout. Ahmed Abd Alla Gouda, Chief Contracting Officer

Building Contract Closeout. Ahmed Abd Alla Gouda, Chief Contracting Officer Building Contract Closeout Ahmed Abd Alla Gouda, Chief Contracting Officer Content Construction Contracts Management from Award to Close Out. Barriers to Effective Construction Contract Management. Economy

More information

MANAGING THE CONSTRUCTION OF A NEW TXDOT FACILITY

MANAGING THE CONSTRUCTION OF A NEW TXDOT FACILITY MANAGING THE CONSTRUCTION OF A NEW TXDOT FACILITY Byron Hicks, P,E. Support Services Division Byron Heath Tibbets Support Services Division October 17, 2018 Presentation Topics Facilities Planning and

More information

WOHLSEN CONSTRUCTION COMPANY

WOHLSEN CONSTRUCTION COMPANY WOHLSEN CONSTRUCTION COMPANY JOB DESCRIPTION Job Title: Special Projects Estimator & Project Manager Job Reports To: SPG Manager Exempt or Non-Exempt: Exempt Job Summary: In addition to other duties as

More information

Philip A. Ginsburg, General Manager Toks Ajike, Director, Planning and Capital Projects

Philip A. Ginsburg, General Manager Toks Ajike, Director, Planning and Capital Projects Date January 17, 2017 To: Through: From: Subject: Recreation and Park Commission Capital Committee Philip A. Ginsburg, General Manager Toks Ajike, Director, Planning and Capital Projects Nicole Avril,

More information

Quarterly Library Building Project Update. 13 December 2018

Quarterly Library Building Project Update. 13 December 2018 Quarterly Library Building Project Update 13 December 2018 Agenda A Recap Process Charges and Working Groups Consultants and Firms Communications Primer of Terms Status of Funding Feedback on Salons Discussion

More information

Pre-Construction Conference Discussion Guide

Pre-Construction Conference Discussion Guide Pre-Construction Conference Discussion Guide This guide is a summary of the topics normally required at the Pre-Construction Conference based upon the Tennessee Board of Regents Designers Manual standard

More information

ABOUT RLG. Who We Are.

ABOUT RLG. Who We Are. Facility Services ABOUT RLG Who We Are. Robert Louis Group Facility Services is a multiple disciplined national leader in facility and vendor management. We excel at providing and performing facility services

More information