RAINBOW POND AND DOWNSTREAM GENERAL NOTES & ABBREVIATIONS CHANNEL SHEET 2 OF 28

Size: px
Start display at page:

Download "RAINBOW POND AND DOWNSTREAM GENERAL NOTES & ABBREVIATIONS CHANNEL SHEET 2 OF 28"

Transcription

1

2 Commercial Dr. S.E. GENERAL NOTES & ABBREVIATIONS CURB AND GUTTER SUBGRADE 9 MATERIALS STRUCTURAL FILL IN THE BUILDING AREA SUB BASE FOR SLAB SUPPORT MISCELLANEOUS BACKFILL BELOW STRUCTURAL FILL OR ROAD MISCELLANEOUS BACKFILL BELOW UNPAVED, NON-BUILDING AREAS ROAD SUB GRADE SIDEWALK / TRAIL SUB GRADE PERCENT (%) COMPACTION 9 9 MARK DESCRIPTION DATE DDG //08 SHEET OF 8

3 Point Table Point # Elevation Northing Easting Description RBR YPC HV- RPC SET HV- RPC SET HV- RPC SET 0 Commercial Dr. S.E HV- RPC SET HV- RPC SET HV-6 RPC SET DDG /9/08 SHEET OF 8

4 0 Commercial Dr. S.E DDG /9/08 SHEET OF 8

5 SHEET OF 8

6 TH STREET TH STREET INTI AVENUE Commercial Dr. S.E. /9/08 IDALIA ROAD ARKANSAS INCA ROAD RD STREET COORDINATE CONTROL PLANS ROADS, POND & TRAIL 6 SHEET 6 OF 8

7 Commercial Dr. S.E. COORDINATE CONTROL PLANS CONCRETE BOX CULVERT & ALIGNMENT 7 /9/08 SHEET 7 OF 8 VANCOUVER ROAD ARKANSAS STREET TULIP ROAD INCA ROAD 0' UTILITY EASEMENT (SOUTHERN UNION) IDALIA ROAD

8 TH STREET TH STREET INTI AVENUE 0 Commercial Dr. S.E. POND BOTTOM ELEV=670.7 RD STREET B-B ugtl 0 ugtl NOTE: DUE TO THE EXTREMELY FLAT SLOPES THROUGHOUT THE PROJECT AREAS, ALL GRADING FOR, POND BOTTOM,AND CBC/CULVERTS SHALL BE 0.'± GRADES/INVERTS SHOWN. KEYED NOTES:. INSTALL -STRAND BARBLESS WIRE FENCE, SEE DETAIL SHEET 0.. ' WIDE PIPE GATE, SEE DETAILS SHEET 0. RAINBOW POND GRADING PLAN INCA ROAD ugtl ugtl ugtl ugtl ugtl ugtl ugtl A-A 0 DO NOT DISTURB NATIVE VEGETATION ugtl ugtl ugtl DO NOT DISTURB NATIVE VEGETATION ugtl ugtl GAS GAS S GAS. " STORM DRAIN, MEDIAN DROP INLET, AND SLOPE BLANKET, SEE SHEET.. INSTALL 6" THICK, ' VERTICAL CUTOFF WALL SAME REINFORCEMENT AS RUNDOWN.. TRANSITION POND EMERGENCY SPILLWAY SIDE SLOPE FROM SECTION B-B TO INCA ROAD GRADE AS SHOWN. 6. POND TRAIL, 6" AGGREGATE BASE COURSE SURFACE, SEE TYP. DETAIL SHEET. 7. ALL INTERIOR POND SIDE SLOPES SHALL BE GRAVEL MULCHED PER APWA SPEC. 0. DDG //08 8 SHEET 8 OF 8

9 ugtl DO NOT DISTURB NATIVE VEGETATION rd ST. ugtl ugtl ugtl 7 ugtl ugtl ugtl ugtl MATCH LINE STATION SEE SHEET 0 NOTE: DUE TO THE EXTREMELY FLAT SLOPES THROUGHOUT THE PROJECT AREAS, ALL GRADING FOR, POND BOTTOM,AND CBC/CULVERTS SHALL BE 0.'± GRADES/INVERTS SHOWN. KEYED NOTES:. -CELL 'X' CBC, SEE SHEET 7.. STA INSTALL 7 LF VALLEY GUTTER PER CORR STD. DWG. VG-0.. STA. +., 9.' RT. TO STA. +0.,.6' RT., INSTALL SINGLE FACE W-BEAM GUARDRAIL NMDOT ITEM WITH W-BEAM END ANCHOR NMDOT ITEM INSTALL -STRAND BARBLESS WIRE FENCE, SEE DETAIL SHEET 0.. INSTALL ' WIDE PIPE GATE, SEE DETAILS SHEET POND EMERGENCY SPILLWAY, SEE DETAILS SHEET STA , ' RT. INSTALL BARRICADE PER CORR STD. DWG. TCSS-0 W-7. 0 Commercial Dr. S.E. INCA ROAD DO NOT DISTURB NATIVE VEGETATION 8. TRANSITION FROM EXISTING ROADWAY WIDTH OF 8'± AT STA. 0+0, TO PROPOSED 0' ROADWAY WIDTH AT STA TYPICAL SECTION A-A INCA ROAD STA. 0+0 TO +0 STA. +60 TO 9+00 INCA ROAD PLAN & PROFILE STA 0+00 TO 7+00 /0/08 9 SHEET 9 OF 8

10 MATCH LINE STATION SEE SHEET 9 ugtl ugtl DO NOT DISTURB NATIVE VEGETATION ugtl ugtl ugtl ugtl ugtl INCA ROAD MATCH LINE STATION SEE SHEET NOTE: DUE TO THE EXTREMELY FLAT SLOPES THROUGHOUT THE PROJECT AREAS, ALL GRADING FOR, POND BOTTOM,AND CBC/CULVERTS SHALL BE 0.'± GRADES/INVERTS SHOWN. KEYED NOTES:. INSTALL -STRAND BARBLESS WIRE FENCE, SEE DETAIL SHEET 0.. POND EMERGENCY SPILLWAY, SEE DETAILS SHEET 0.. POND RUNDOWN, SEE DETAILS SHEET.. POND TRAIL, 6" AGGREGATE BASE COURSE SURFACE, SEE TYP. DETAIL SHEET. TYPICAL SECTION A-A INCA ROAD STA TO Commercial Dr. S.E. INCA ROAD PLAN & PROFILE STA 7+00 TO +00 /0/08 0 SHEET 0 OF 8

11 6 INTI AVE MATCH LINE STATION SEE SHEET 0 DO NOT DISTURB NATIVE VEGETATION KEYED NOTES: NOTE: DUE TO THE EXTREMELY FLAT SLOPES THROUGHOUT THE PROJECT AREAS, ALL GRADING FOR, POND BOTTOM,AND CBC/CULVERTS SHALL BE 0.'± GRADES/INVERTS SHOWN.. INSTALL -STRAND BARBLESS WIRE FENCE, SEE DETAIL SHEET 0.. ' WIDE PIPE GATE, SEE DETAILS SHEET 0.. POND RUNDOWN, SEE DETAILS SHEET.. TRANSITION FROM 0' PROPOSED ROADWAY STA. 0+0 TO 9'± EXISTING ROADWAY WIDTH AT STA. +0±.. BARRICADE, SEE SHEET, KEYED NOTES 8 & "UNMAINTAINED ROAD AHEAD" SIGN, SEE SHEET, KEYED NOTE 7. 0 Commercial Dr. S.E. INCA ROAD INCA ROAD PLAN & PROFILE STA +00 TO +00 /0/08 SHEET OF 8

12 MATCH LINE STATION SEE SHEET ugtlugtl ugtl ugtl ugtl u INCA ROAD A NOTE: DUE TO THE EXTREMELY FLAT SLOPES THROUGHOUT THE PROJECT AREAS, ALL GRADING FOR, POND BOTTOM,AND CBC/CULVERTS SHALL BE 0.'± GRADES/INVERTS SHOWN. KEYED NOTES:. INSTALL -STRAND BARBLESS WIRE FENCE, SEE DETAIL SHEET 0. 0 Commercial Dr. S.E. A. VALLEY GUTTER, SEE SHEET 9.. -CELL 'X' CBC, SEE SHEET 7.. BARRICADE, SEE SHEET 9. rd STREET TYPICAL SECTION A-A rd STREET STA TO 7+0 STA TO 9+00 RD STREET PLAN & PROFILE STA 0+00 TO 7+00 //08 SHEET OF 8

13 MATCH LINE STATION SEE SHEET INTI AVENUE NOTE: DUE TO THE EXTREMELY FLAT SLOPES THROUGHOUT THE PROJECT AREAS, ALL GRADING FOR, POND BOTTOM,AND CBC/CULVERTS SHALL BE 0.'± GRADES/INVERTS SHOWN. KEYED NOTES:. TRANSITION FROM PROPOSED 0' ROADWAY WIDTH AT STA. 9+7 TO EXISTING ROADWAY 9'± WIDTH AT STA INSTALL -STRAND BARBLESS WIRE FENCE, SEE DETAIL SHEET 0.. HEADER CURB, SEE SHEET. 0 Commercial Dr. S.E. rd STREET RD STREET PLAN & PROFILE STA 7+00 TO +00 //08 SHEET OF 8

14 rd ST A A th ST 8 MATCH LINE STATION SEE SHEET NOTE: DUE TO THE EXTREMELY FLAT SLOPES THROUGHOUT THE PROJECT AREAS, ALL GRADING FOR, POND BOTTOM,AND CBC/CULVERTS SHALL BE 0.'± GRADES/INVERTS SHOWN. KEYED NOTES:. MEDIAN DROP INLET, TYPE, URBAN USE GRATE, PER NMDOT STD. DWG. 6-0-/.. INSTALL CONCRETE BLANKET MITERED TO SLOPE PER NMDOT STD. DWG. -A-&/.. INSTALL 8 LF " RCP.. INSTALL 6 LF " RCP.. INSTALL 8" HEADER CURB, SEE DETAIL SHEET. 0 Commercial Dr. S.E. 6. INSTALL -STRAND BARBLESS WIRE FENCE, SEE DETAIL SHEET STA ' RT. INSTALL " UNMAINTAINED ROAD AHEAD" SIGN, SEE DETAIL SHEET 0. INTI AVENUE TYPICAL SECTION A-A INTI AVENUE STA. 0+6 TO STA TO STA ' RT. INSTALL BARRICADE PER CORR STD. DWG. TCSS-0 W INSTALL 8" HEADER CURB TRANSITION WITH 6' OPENING CENTERED ON STA. +6. ' RT, SEE DETAIL SHEET. INTI AVENUE PLAN & PROFILE STA 0+00 TO 7+00 //08 SHEET OF 8

15 MATCH LINE STATION SEE SHEET 6 7 th ST 9 8 INCA ROAD DO NOT DISTURB NATIVE VEGETATION NOTE: DUE TO THE EXTREMELY FLAT SLOPES THROUGHOUT THE PROJECT AREAS, ALL GRADING FOR, POND BOTTOM,AND CBC/CULVERTS SHALL BE 0.'± GRADES/INVERTS SHOWN. KEYED NOTES:. INSTALL -STRAND BARBLESS WIRE FENCE, SEE DETAIL SHEET 0.. INSTALL ' WIDE PIPE GATE, SEE DETAIL SHEET 0.. INSTALL 8" HEADER CURB, SEE DETAIL SHEET.. INSTALL 8" HEADER CURB TRANSITION WITH ' OPENING CENTERED ON STA ' RT., SEE DETAIL SHEET.. POND RUNDOWN THICKENED EDGE, SEE DETAILS SHEET. 6. POND RUNDOWN, SEE DETAILS SHEET. 7. STA ' LT. INSTALL " UNMAINTAINED ROAD AHEAD" SIGN, SEE DETAIL SHEET 0. 0 Commercial Dr. S.E. 0 INTI AVENUE 8. STA ' RT. INSTALL BARRICADE PER CORR STD. DWG. TCSS-0 W-6R. 9. BARRICADE, SEE SHEET INSTALL 6" THICK, ' VERTICAL CUTOFF WALL SAME REINFORCEMENT AS RUNDOWN.. END HEADER CURB AT STA. +.7,.6' RT., TBC ELEV TRANSITION TO POND RUNDOWN.. POND TRAIL, 6" AGGREGATE BASE COURSE SURFACE, SEE TYP. DETAIL SHEET. INTI AVENUE PLAN & PROFILE STA 7+00 TO +9.7 //08 SHEET OF 8

16 NOTE: DUE TO THE EXTREMELY FLAT SLOPES THROUGHOUT THE PROJECT AREAS, ALL GRADING FOR, POND BOTTOM,AND CBC/CULVERTS SHALL BE 0.'± GRADES/INVERTS SHOWN. NOTE: DUE TO THE EXTREMELY FLAT SLOPES THROUGHOUT THE PROJECT AREAS, ALL GRADING FOR, POND BOTTOM,AND CBC/CULVERTS SHALL BE 0.'± GRADES/INVERTS SHOWN A A 6 0 Commercial Dr. S.E. A A DO NOT DISTURB NATIVE VEGETATION KEYED NOTES:. INSTALL -STRAND BARBLESS WIRE FENCE, SEE DETAIL SHEET 0.. BARRICADE, SEE SHEET.. MEDIAN DROP INLET, SEE SHEET.. 8" HEADER CURB, SEE SHEET. th STREET. TRANSITION FROM 0' PROPOSED ROADWAY WIDTH AT STA. +00 TO EXISTING ROADWAY OF 8.'± AT STA. +0. TYPICAL SECTION A-A th STREET STA. 0+ TO +00 KEYED NOTES:. INSTALL -STRAND BARBLESS WIRE FENCE, SEE DETAIL SHEET 0.. 8" HEADER CURB, SEE SHEET.. "UNMAINTAINED ROAD AHEAD" SIGN, SEE SHEET.. BARRICADE, SEE SHEET.. STA ' RT. INSTALL BARRICADE PER CORR STD. DWG. TCSS-0 W-6L. 6. TRANSITION FROM 0' PROPOSED ROADWAY WIDTH AT STA. +00 TO EXISTING ROADWAY WIDTH OF 0'± AT STA th STREET TYPICAL SECTION A-A th STREET STA. 0+ TO +00 TH & TH STREET PLAN & PROFILE STA 0+00 TO +00 //08 6 SHEET 6 OF 8

17 MATCH LINE STATION SEE SHEET DO NOT DISTURB NATIVE VEGETATION 7 NOTE: DUE TO THE EXTREMELY FLAT SLOPES THROUGHOUT THE PROJECT AREAS, ALL GRADING FOR, POND BOTTOM,AND CBC/CULVERTS SHALL BE 0.'± GRADES/INVERTS SHOWN. KEYED NOTES: ugtlugtl ugtl ugtl ugtl ugtl ugtl ugtl ugtl INCA ROAD RD STREET 7 B-B A-A 8 GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS B-B A-A IDALIA ROAD 0. BUILD HEADWALL PER NMDOT STD. DWG. -80-, &/, H=', ' BETWEEN TOEWALL & COMPACTED SOIL, HEADWALL REINFORCEMENT SHALL TIE TO CBC REINFORCEMENT.. MATCH HEADWALL ELEVATION TO VALLEY GUTTER INVERT ELEVATION, WHERE VALLEY GUTTER INTERSECTS HEADWALL ONLY.. OVERFLOW WEIR, SEE DETAIL SHEET.. BUILD DROP STRUCTURE, REINFORCEMENT TIED TO CBC AND HEADWALL, SEE DETAIL SHEET 0.. INSTALL -STRAND BARBLESS WIRE FENCE, SEE DETAIL SHEET INSTALL ' WIDE PIPE GATE, SEE DETAILS SHEET MAINTENANCE ROAD, 6" AGGREGATE BASE COURSE SURFACE, SEE DETAIL SHEET. 0 Commercial Dr. S.E. DO NOT DISTURB NATIVE VEGETATION DOWNSTREAM 8. STA TO +9. INSTALL " CONCRETE SLOPE PAVEMENT SECTION, SEE DETAIL SHEET. 9. STA TO INSTALL -CELL 'X' CBC PER NMDOT STD. DWG. -6- & /,TIE REINFORCEMENT TO HEADWALL REINFORCEMENT. 0. STA TO INSTALL -CELL 'X' CBC PER NMDOT STD. DWG. -6-, & /, TIE REINFORCEMENT TO HEADWALL REINFORCEMENT.. SHOTCRETE ACCESS RAMP, SEE DETAIL SHEET.. INSTALL D 0 = 6" RIPRAP SIDE SLOPES, STA TO +7.6 AND STA. +9. TO +88.6, SEE DETAIL BELOW. D 0 = 6" RIPRAP MIN " THICK SAME BURY DEPTH AS SHOTCRETE SIDE SLOPES EXCAVATION PAY LINE ' 90% MAX DRY DENSITY PER ASTM D-7 FILTER FABRIC CLASS NON-WOVEN GEOTEXTILE ALIGNMENT PLAN & PROFILE STA 0+00 TO 7+00 //08 7 SHEET 7 OF 8

18 VANCOUVER ROAD TULIP ROAD MATCH LINE STATION SEE SHEET DO NOT DISTURB NATIVE VEGETATION 8 w w w w w w w w w sswr sswr sswr sswr sswr sswr sswr NOTE: DUE TO THE EXTREMELY FLAT SLOPES THROUGHOUT THE PROJECT AREAS, ALL GRADING FOR, POND BOTTOM,AND CBC/CULVERTS SHALL BE 0.'± GRADES/INVERTS SHOWN. KEYED NOTES:. BUILD HEADWALL PER NMDOT STD. DWG. -80-, &/, H=', ' BETWEEN TOEWALL & COMPACTED SOIL, HEADWALL REINFORCEMENT SHALL TIE TO CBC REINFORCEMENT.. STA TO 0+. INSTALL -CELL 'X' CBC PER NMDOT STD. DWG. -6-, & /, TIE REINFORCEMENT TO HEADWALL REINFORCEMENT.. SEE SHEET 9 FOR TULIP ROAD AND VANCOUVER ROAD REMOVALS AND IMPROVEMENTS. 0 Commercial Dr. S.E.. MAINTENANCE ROAD, 6" AGGREGATE BASE COURSE SURFACE, SEE DETAIL SHEET.. INSTALL -STRAND BARBLESS WIRE FENCE, SEE DETAIL SHEET INSTALL ' WIDE PIPE GATE, SEE DETAILS SHEET SHOTCRETE ACCESS RAMP, SEE DETAIL SHEET. ohe ohe ohe ohe ohe ohe ohe ohe uge uge DOWNSTREAM 8. STA. +. TO INSTALL -CELL 'X' CBC PER NMDOT STD. DWG. -6-, & /,TIE REINFORCEMENT TO HEADWALL REINFORCEMENT. 9. FOR BLOW-UP AND DIMENSIONS, SEE DETAILS SHEET. 0. STA BUILD 6" THICK, ' VERTICAL CUTOFF WALL USE SAME REINFORCEMENT AS TYPICAL SHOTCRETE SECTION. ALIGNMENT PLAN & PROFILE STA 7+00 TO +00 //08 8 SHEET 8 OF 8

19 NOTE: DUE TO THE EXTREMELY FLAT SLOPES THROUGHOUT THE PROJECT AREAS, ALL GRADING FOR, POND BOTTOM,AND CBC/CULVERTS SHALL BE 0.'± GRADES/INVERTS SHOWN. NOTE: DUE TO THE EXTREMELY FLAT SLOPES THROUGHOUT THE PROJECT AREAS, ALL GRADING FOR, POND BOTTOM,AND CBC/CULVERTS SHALL BE 0.'± GRADES/INVERTS SHOWN ohe ohe ohe ohe ohe ohe ohe 6 uge uge 7 0 Commercial Dr. S.E. w w w w w w w w w 6 sswr sswr sswr sswr sswr sswr sswr 0 KEYED NOTES:. -CELL 'X' CBC, SEE SHEET 8. TULIP ROAD VANCOUVER ROAD. STA. +00 TO + 6' LT. REMOVE APPROXIMATELY LF GUARDRAIL AND INSTALL SINGLE FACE W-BEAM GUARDRAIL NMDOT ITEM WITH W-BEAM END ANCHOR NMDOT ITEM 6060 FROM STA. +00± TO STA.+7 AND FROM STA.+7 TO +06. TIE NEW GUARDRAIL TO EXISTING GUARDRAIL.. STA. 0+7 TO +06, 6' RT. INSTALL SINGLE FACE W-BEAM GUARDRAIL NMDOT ITEM WITH W-BEAM END ANCHOR NMDOT ITEM INSTALL -STRAND BARBLESS WIRE FENCE, SEE DETAIL SHEET 0.. INSTALL ' WIDE PIPE GATE, SEE DETAILS SHEET STA TO +.7 SAWCUT AND REMOVE APPROXIMATELY 0± SF ASPHALT AND REPLACE PER CORR STD. DWG. PS-0 RESIDENTIAL SECTION - OPTION. 7. MAINTENANCE ROAD, 6" AGGREGATE BASE COURSE SURFACE, SEE DETAIL SHEET. KEYED NOTES:. -CELL 'X' CBC, SEE SHEET 8.. STA. + TO +89 9' RT. REMOVE APPROXIMATELY 6 LF GUARDRAIL AND INSTALL SINGLE FACE W-BEAM GUARDRAIL NMDOT ITEM W/ W-BEAM END ANCHOR NMDOT ITEM 6060 FROM STA. + TO STA. +76 TO +96 9' LT. INSTALL SINGLE FACE W-BEAM GUARDRAIL NMDOT ITEM W/ W-BEAM END ANCHOR NMDOT ITEM INSTALL -STRAND BARBLESS WIRE FENCE, SEE DETAIL SHEET 0.. INSTALL ' WIDE PIPE GATE, SEE DETAILS SHEET STA TO +0.6 SAW CUT AND REMOVE APPROXIMATELY 0± SF ASPHALT AND REPLACE PER CORR STD. DWG. PS-0 RESIDENTIAL SECTION - OP.. 7. RELOCATE WATERLINE UNDER PROPOSED CBC, SEE DETAIL SHEET. 8. STA. +6 TO +86 ENCASE LF 8" SEWER LINE PER CORR STD. DWG. S-. 9. STA. +66 TO +0 ' LT. REMOVE AND REPLACE 8 LF CURB AND GUTTER PER CORR STD. DWG. CG FOR BLOW-UP AND DIMENSIONS, SEE DETAILS SHEET. TULIP & VANCOUVER ROAD PLAN & PROFILE STA //08 9 SHEET 9 OF 8

20 0 Commercial Dr. S.E. STRAND BARBLESS WIRE FENCE DROP STRUCTURE DETAIL PIPE GATE DETAIL DETAILS SOUTHERN SANDOVAL COUNTY ARROYO FLOOD CONTROL AUTHORITY YOUR BOND FUNDS AT WORK RAINBOW POND AND DOWNSTREAM PROJECT COST: $XXX,XXX START: XXXXXXXX 08 END: XXXXXXXX 08 PROJECT MANAGER: ANDRES SANCHEZ, P.E. ENGINEER: SSCAFCA CONTRACTOR: XXX CONTRACTING,INC. "FLOOD CONTROL TODAY FOR A SAFER TOMORROW" JAMES F. FAHEY, JR. JOHN CHANEY MARK CONKLING STEVEN M. HOUSE MICHAEL OBREY DDG //08 PROJECT SIGN DETAIL POND EMERGENCY SPILLWAY DETAIL 6 "UNMAINTAINED ROAD" SIGN DETAIL 0 SHEET 0 OF 8

21 OVERFLOW WEIR DETAIL POND RUNDOWN TYPICAL SECTION DETAIL 0 Commercial Dr. S.E. POND TRAIL / MAINTENANCE ROAD, 6" AGGREGATE BASE COURSE DETAILS SHOTCRETE TYPICAL SECTION DETAIL DDG HEADER CURB DETAIL 6 HEADER CURB TRANSITION DETAIL 7 FULLY-LINED TYPICAL SECTION DETAIL //08 SHEET OF 8

22 unk unk unk unk unk unk unk unk unk unk unk w w w w w w w w w w w w w w sswr sswr sswr sswr sswr sswr sswr sswr sswr sswr sswr CBC HEADWALL DETAIL TYPICAL WATERLINE ADJUSTMENT DETAIL 0 Commercial Dr. S.E. DETAILS ' CUTOFF WALL DDG //08 DOWNSTREAM OUTFALL DETAIL SHEET OF 8

23 0 Commercial Dr. S.E. A DETAILS DDG //08 SHOTCRETE RAMP DETAIL " CONCRETE SLOPE PAVEMENT SECTION SHEET OF 8

24 0 Commercial Dr. S.E. INCA ROAD CROSS SECTIONS // SHEET OF 8

25 0 Commercial Dr. S.E. RD, TH & TH STREET CROSS SECTIONS // SHEET OF 8

26 0 Commercial Dr. S.E. INTI AVENUE CROSS SECTIONS // SHEET 6 OF 8

27 0 Commercial Dr. S.E. CROSS SECTIONS // SHEET 7 OF 8

28 IDALIA ROAD IDALIA ROAD IDALIA ROAD Commercial Dr. S.E. BID ALTERNATES A-A DROP STRUCTURE DETAIL 8 //08 SHEET 8 OF 8

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority

ESTIMATED DISTRIBUTION OF MATERIAL LIST Lomitas Negras Phase 2 Southern Sandoval County Arroyo Flood Control Authority PAY DESCRIPTION GENERAL 1 1200 Construction Traffic Control and Barricading: including any and all access signs and permitting by the City of LS 1 Rio Rancho, 2 1504 Temporary Pollution Control: NPDES

More information

Revision 1 Dated October 2, UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE:

Revision 1 Dated October 2, UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE: Revision 1 Dated October 2, 2014 1.3.2 UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE: PEYTON DRIVE WIDENING - PHASE 3 AND ENGLISH CHANNEL IMPROVEMENTS Project No s. S12012 & 800360

More information

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form

2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form 2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form Project Information (\aen i vake.. F;) N0.3-7114117 Project Name Section 1 - Grading and Erosion Control BMPs Quantity Units Price Earthwork

More information

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.

EROSION CONTROL GENERAL NOTES EC JAN 2017 C.B. EROSION CONTROL GENERAL NOTES EC - 000 EROSION CONTROL GENERAL NOTES EC - 001 INSTALL TEMPORARY DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT EXISTING PAVEMENT OR APPROVED ACCESS POINT OR AS PRACTICABLE

More information

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR EASEMENT NOTES:. EASEMENT LIMIT SHOWN AS PROVIDED BY. TESC NOTES:. CONTRACTOR SHALL DEVELOP TEMPORARY EROSION AND SEDIMENT CONTROL PLAN AND PROVIDE ONSITE CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL)

More information

CITY AND COUNTY OF DENVER

CITY AND COUNTY OF DENVER 2-1.1b REMOVE COMBINATION CONCRETE CURB, GUTTER AND SIDEWALK (3'-11") 2-1.2a REMOVE 6" CONCRETE CURB AND/OR GUTTER S Holly: See near STA: 25+56 S Poplar 300 LF 25 LF 2-1.4 REMOVE HANDICAP CONCRETE CURB

More information

M&M CARGO PARKING LOT REHABILITATION 5103 MAHER AVENUE LAREDO, TEXAS MAYOR PRO-TEMPORE, DISTRICT II DISTRICT VIII COUNCIL MEMBER

M&M CARGO PARKING LOT REHABILITATION 5103 MAHER AVENUE LAREDO, TEXAS MAYOR PRO-TEMPORE, DISTRICT II DISTRICT VIII COUNCIL MEMBER LAREDO INTERNATIONAL AIRPORT M&M CARGO PARKING LOT REHABILITATION 5103 MAHER AVENUE LAREDO, TEXAS 78041 CITY OF LAREDO, TEXAS HONORABLE RAUL G. SALINAS, MAYOR ESTEBAN RANGEL MAYOR PRO-TEMPORE, DISTRICT

More information

CITY OF GARLAND - ENGINEERING DEPARTMENT - PRIVATE DEVELOPMENT PAVING SUMMARY CASE NUMBER: PROJECT NAME: CONTRACTOR: PHONE NUMBER: (rev.

CITY OF GARLAND - ENGINEERING DEPARTMENT - PRIVATE DEVELOPMENT PAVING SUMMARY CASE NUMBER: PROJECT NAME: CONTRACTOR: PHONE NUMBER: (rev. PAVING SUMMARY 5" Concrete Street Paving including curbs 6" Concrete Street Paving including curbs 7" Concrete Street Paving including curbs 8" Concrete Street Paving including curbs 8-5-8 Concrete Alley

More information

COST ESTIMATE STREET IMPROVEMENTS (Off Site)

COST ESTIMATE STREET IMPROVEMENTS (Off Site) STREET IMPROVEMENTS (Off Site) Developer: Planning Case # Engineer: TM No./PM No.: Phone No: Date: ITEM QUANTITY UNIT UNIT COST () AMOUNT 6" Curb and Gutter LF 13. 6" Curb only LF 1.5 8" Curb and Gutter

More information

SCHEDULE OF QUANTITIES AND PRICES

SCHEDULE OF QUANTITIES AND PRICES SCHEDULE OF QUANTITIES AND PRICES BIDDER: SANTA ANA Schedule 33B - City of Santa Ana, 17th Street Crossing BID ITEM DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL PRICE 33-01570-01 MAINTENANCE AND PROTECTION

More information

IN T R A / M IN T R A M

IN T R A / M IN T R A M SPRING MESA SUBDIVISION CONSTRUCTION PLANS A PART OF SECTION 35, TOWNSHIP 2 SOUTH, RANGELINE 70 WEST, 6th. PRINCIPAL MERIDIAN. CITY OF ARVADA, COUNTY OF JEFFERSON, STATE OF COLORADO COVER SHEET MARTIN

More information

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number) EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY

More information

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 507 JULY 1991 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOR UNDERGROUND UTILITIES 507.01 SCOPE 507.02 REFERENCES 507.03 Not Used 507.04 Not Used

More information

Chapter 3: Permit Procedures and Requirements

Chapter 3: Permit Procedures and Requirements Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8

More information

SUBDIVISION CHECKLIST. Subdivision Name. Prior To Review. Preliminary plan approved by Planning Commission / Council as required.

SUBDIVISION CHECKLIST. Subdivision Name. Prior To Review. Preliminary plan approved by Planning Commission / Council as required. SUBDIVISION CHECKLIST Subdivision Name Account Number Review Engineer Prior To Review Preliminary plan approved by Planning Commission / Council as required. Review fee paid. Statement of Responsibility

More information

ADVERTISEMENT SET DECEMBER 2013

ADVERTISEMENT SET DECEMBER 2013 Sheet List Table GREELEY CANAL #2 WCR 21 PROJECT AREA N SH-392 ADVERTISEMENT SET DECEMBER 2013 LINE DESCRIPTION PROPOSED LINE POWER / COMMUNICATIONS EXISTING LINE LINE DESCRIPTION PROPOSED LINE BOUNDARY

More information

Bidder Name: ITEMIZED BID: The bidder should complete the following section in accordance with Sec 102.7. The bidder proposes to furnish all labor, materials, equipment, services, etc. required for the

More information

Dial or (800)

Dial or (800) GENERAL NOTES 2 EROSION CONTROL ITEMS TO BE PLACED AS SHOWN ON THE PLAN OR AS DIRECTED BY THE ENGINEER. NO TREES (AND/OR SHRUBS) ARE TO BE REMOVED WITHOUT THE APPROVAL OF THE ENGINEER. 2 EXCAVATION FOR

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

CONDITIONS EXISTING EXISTING CONDITIONS SURVEY PROVIDED BY EGAN, FIELD & NOWAK ON FEBRUARY 20, PRELIMINARY - NOT FOR CONSTRUCTION

CONDITIONS EXISTING EXISTING CONDITIONS SURVEY PROVIDED BY EGAN, FIELD & NOWAK ON FEBRUARY 20, PRELIMINARY - NOT FOR CONSTRUCTION K:\TWC_LDEV\\ABRA\Maple Grove, \ Design\CAD\PlanSheets\C- CONDITIONS.dwg April 4, 018 - :44pm 40 0 8 CONDITIONS SURVEY PROVIDED EGAN, FIELD & NOWAK ON FEBRUARY 0, 018. LIMITS OF CONSTRUCTION OVERHEAD POWER

More information

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE 3.33' 3.0' 2.0' 4.33' 4.0' 3.0' 1.00' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3067-V OR AS NOTED ON PLANS. "INFA-SHIELD" SEAL OR EQUAL. RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR).

More information

MANHOLE TO REMAIN AT EXISTING ELEVATION RIM: EXISTING SAS MH STA: ' DIA.

MANHOLE TO REMAIN AT EXISTING ELEVATION RIM: EXISTING SAS MH STA: ' DIA. + + MANHOLE TO REMAIN AT EXISTING ELEVATION + + + + 6+ 7+ 8+ 9+ 9+ MANHOLE TO REMAIN AT EXISTING ELEVATION..6. 9.9 + EXISTING SAS MH STA: +.6 ' DIA. MANHOLE RIM:.86 9. INV IN:(NW)9. INV OUT:(SE)9. 9. H

More information

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO 42 380 68 coddington ave ledbetter road shawnee creek s patton street ledbetter road wesley ave 68 starr drive 42 twist run 85 35

More information

19 May Provide profiles for all storm sewer going into the ground with the grading permit showing 5 and 100yr HGLs.

19 May Provide profiles for all storm sewer going into the ground with the grading permit showing 5 and 100yr HGLs. 19 May 2017 City of Thornton Attn: Nate Hatleback 9500 Civic Center Drive Thornton, CO 80229 Re: Initial Review Response to 05/16/17 Letter Dear Mr. Hatleback: This letter is in response to technical comments

More information

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS

SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS 12.1 The subdivider shall construct and install the improvements in accordance with the County's Standards for Construction Plans and Specifications

More information

TYPE "A" CATCH BASIN

TYPE A CATCH BASIN 27" 1.67' TO BACK OF CURB LINE TOP OF GRATE ELEV. - SEE PLAN NEENAH CASTING R-3250-BV OR APPROVED EQUAL. "INFI SHIELD" SEAL OR APPROVED EQUAL RINGS (2 MIN., 1' MAX. OF RINGS AND MORTAR). PLASTER OUTSIDE,

More information

DESIGN GRADING AND EROSION CONTROL A. Slope Criteria

DESIGN GRADING AND EROSION CONTROL A. Slope Criteria Section 5. DESIGN GRADING AND EROSION CONTROL A. Slope Criteria Earthen slopes shall conform to the following: Maximum slope should not be steeper than 6:1 (horizontal to vertical) unless protected from

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004

SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004 SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004 General: Sections of the Minnesota Department of Transportation (Mn/DOT), Standard Specification for Construction, 2000 or Current

More information

MAY 11, 2017 T-MC-107A & T-MC-107B1

MAY 11, 2017 T-MC-107A & T-MC-107B1 Schedule of Bid Items - Part A ROADWAY 107A 201(A) - CLEARING AND GRUBBING - LSUM 1.00 30,000.00 30,000.00 $100,000.00 $100,000.00 $65,000.00 $65,000.00 $120,000.00 $120,000.00 $50,000.00 $50,000.00 $18,262.05

More information

DOCUMENT ADDENDA AND MODIFICATIONS

DOCUMENT ADDENDA AND MODIFICATIONS DOCUMENT ADDENDA AND MODIFICATIONS PART 1 1.1 PROCEDURE GENERAL A. For filing purposes, add Addenda and Modifications to the Contract Documents following this page. Modified June 20, 2017 Addenda and Modifications

More information

175 th Street Quivira to Antioch (TH-1343) Preliminary Engineering Study Overland Park, KS

175 th Street Quivira to Antioch (TH-1343) Preliminary Engineering Study Overland Park, KS 175 th Street Quivira to Antioch (TH-1343) Preliminary Engineering Study Overland Park, KS June 2012 Prepared by: Public Works Department City of Overland Park, KS EXECUTIVE SUMMARY... 2 INTRODUCTION...

More information

1.00 LS $150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150,000.

1.00 LS $150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150, $ 150,000. LAS VEGAS PAVING CORP. CONTRI CONSTRUCTION COMPANY AGGREGATE INDUSTRIES-SWR, INC. TAB CONTRACTORS, INC. ITEM DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT

More information

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013

ADDENDUM NO. 1. for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA. Posting Date: June 20, 2013 ADDENDUM NO. 1 for the VETERANS PARK RENOVATIONS CITY OF TALLADEGA, ALABAMA Posting Date: June 20, 2013 BIDDERS SHALL CONFORM TO THE FOLLOWING CHANGES AS A PART OF THE BID DOCUMENTS, WHICH SHALL BECOME

More information

(ITEMS APPLICABLE TO THIS PROJECT MARKED WITH "X")

(ITEMS APPLICABLE TO THIS PROJECT MARKED WITH X) Development Services Planning Division 150 N. Lakeshore Drive Ocoee, FL 34761 Phone: 407.905.3157 Fax: 407.905.3158 Received Date Office Use Only (ITEMS APPLICABLE TO THIS PROJECT MARKED WITH "X") DATE:

More information

PAY QUANTITY NOTES INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS EARTHWORK WHERE NO QUANTITY IS SHOWN ON P & P SHEETS.

PAY QUANTITY NOTES INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS EARTHWORK WHERE NO QUANTITY IS SHOWN ON P & P SHEETS. PAY QUANTITY NOTES (F-1) (F-2) (F-3) (F-4) (F-5) (F-6) (F-7) (F-8) (F-9) (F-10) (F-11) (F-12) (F-13) (F-14) (F-15) (F-16) (F-17) (F-18) (F-19) INCLUDES CU. YDS. FOR DRIVEWAYS, RETURNS, DIKES, AND MISCELLANEOUS

More information

HORIZON MEADOWS MINOR DEVELOPMENT PERMIT AMENDMENT LOT 1, BLOCK 3 OF HORIZON MEADOWS SUBDIVISION FILING NO. 1

HORIZON MEADOWS MINOR DEVELOPMENT PERMIT AMENDMENT LOT 1, BLOCK 3 OF HORIZON MEADOWS SUBDIVISION FILING NO. 1 HORIZON MEADOWS MINOR DEVELOPMENT PERMIT AMENDMENT LOT 1, BLOCK 3 OF HORIZON MEADOWS SUBDIVISION FILING NO. 1 MDP 201-033A SAWCUT ASPHALT 5' NORTH OF EXIST. CURB OWLINE 31' SAWCUT ASPHALT 2' NORTH OF EXIST.

More information

YES, we received Addendum No. 1

YES, we received Addendum No. 1 TRANSMITTAL SHEET Date sent: Friday, April 6, 2018 Sent to: All Planholders Deliver to: Project Estimator Transmission sent from: Reichhardt & Ebe Engineering Number of pages including this page: 36 CONFIRMATION

More information

CHAPTER 20 PUBLIC IMPROVEMENTS OPINION OF COSTS TABLE OF CONTENTS

CHAPTER 20 PUBLIC IMPROVEMENTS OPINION OF COSTS TABLE OF CONTENTS CHAPTER 20 PUBLIC IMPROVEMENTS OPINION OF COSTS TABLE OF CONTENTS Section Title Page 20.1 General... 20-1 20.2 Units and Costs... 20-1 20.2.1 Erosion Control...20-1 20.2.2 Street Improvements...20-1 20.2.3

More information

CONSTRUCTION PLAN REVIEW CHECKLIST FOR PRIVATE DEVELOPMENT

CONSTRUCTION PLAN REVIEW CHECKLIST FOR PRIVATE DEVELOPMENT ADDITION NAME: City of Grapevine, Texas CONSTRUCTION PLAN REVIEW CHECKLIST FOR PRIVATE DEVELOPMENT Updated April 16, 2018 Public Works Department Engineering Division 200 South Main Street Grapevine, Texas

More information

:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1,

:00 PM CST. McDonald Construction Inc of Slidell $1,002, Magee Excavation & Development LLC $1, General Info Number: 316-00-17-47-2 Description: Lake Village Drainage Improvements - N. Pearl Mill & Overlay Deadline: 2017-7-9 2:00 PM CST Bids Business Bid Total McDonald Construction Inc of Slidell

More information

(ENGLISH UNITS) FILE:

(ENGLISH UNITS) FILE: J u l i a R. B u e r e n, D i r e c t o r Deputy Directors Brian M. Balbas Stephen Kowalewski Steven Silveira Joe Yee Memo TO: Engineering Services Staff DATE: FROM: Warren Lai, Assistant Public Works

More information

CHECK THE LOWER RIGHT CORNER OF EACH DETAIL FOR THE LATEST REVISION.

CHECK THE LOWER RIGHT CORNER OF EACH DETAIL FOR THE LATEST REVISION. Standard Drawings Index NOTE: The specifications for materials and workmanship shall conform to the latest edition or the "Standard Specifications for Public Works Construction" published by the North

More information

CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS

CITY OF SCHERTZ TEXAS ENGINEERING AND PUBLIC WORKS TEXAS STANDARD CONSTRUCTION NOTES DRWN. BY: DSGN. BY: KJW 1 of 2 *Place geotextile fabric as a permeable seperator to prevent mixing of coarse aggregate and underlying soil. (as needed). 1. GEOTEXTILE

More information

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2

MERCED COUNTY CAMPUS PARKWAY SEGMENT 2 MERCED COUNTY BID LIST CAMPUS PARKWAY SEGMENT 2 CONTRACT 2017191 The bidder must provide unit prices for each bid item listed below, based on the specified unit of measure. The unit price for each item

More information

COUNTY OF BEXAR. Curbed Streets. Residential PUBLIC WORKS DEPARTMENT

COUNTY OF BEXAR. Curbed Streets. Residential PUBLIC WORKS DEPARTMENT COUNTY OF BEXAR PUBLIC WORKS DEPARTMENT 233 N. Pecos La Trinidad, Suite 420 San Antonio, Texas 78207-3188 Main 210-335-6700 DRIVEWAY APPROACH SPECIFICATIONS Curbed Streets Residential Applicability: All

More information

Kansas Department of Transportation DISTRICT 1. Project(s): 089 U / HSIP-U231(701) Min: Max:

Kansas Department of Transportation DISTRICT 1. Project(s): 089 U / HSIP-U231(701) Min: Max: Page 1 of 18 SECTION: 01 COMMON ITEMS 1 025323 MOBILIZATION 2 070626 MOBILIZATION (DBE) 3 025600 FIELD OFFICE AND LABORATORY (TYPE A) 4 012340 FOUNDATION STABILIZATION (SET PRICE) 5 020100 CONTRACTOR CONSTRUCTION

More information

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders. Addendum #1 Project: Coteau Street & Utility Improvements Bid Date: 1:00 P.M., Local Time, March 20, 2017 Bid Location: Office of the City Administrator/Clerk, City of Lake Benton 106 S. Center Street

More information

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS

ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS ARIZONA DEPARTMENT OF TRANSPORTATION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION CONTRACTS AND SPECIFICATIONS SECTION TABULATION OF BIDS CONTRACT # 2016138 TRACS No. Project No. County District Gross

More information

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT

Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT Division IV Section 4100 Measurement and Payment PUBLIC WORKS DEPARTMENT DIVISION IV CONSTRUCTION AND MATERIAL SPECIFICATIONS SECTION 4100 MEASUREMENT AND PAYMENT 4100 SCOPE... 2 4101 Clearing and Grubbing...

More information

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc. 2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction

More information

Section 403. DRAINAGE STRUCTURES

Section 403. DRAINAGE STRUCTURES 403.01 Section 403. DRAINAGE STRUCTURES 403.01. Description. This work consists of adjusting, constructing, or temporarily lowering drainage structures and cleaning existing drainage structures and leads

More information

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1

SECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1 CITY OF THORNTON Standards and Specifications Revised: October 2012 SECTION 400 - STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 401 GENERAL PROVISIONS 400-1

More information

SUPPLEMENTAL DRAWINGS

SUPPLEMENTAL DRAWINGS CITY OF GREATER SUDBURY SUPPLEMENTAL DRAWINGS TO THE ONTARIO PROVINCIAL STANDARD DRAWINGS Rev: February 2012 CITY OF GREATER SUDBURY STANDARD DRAWINGS TABLE OF CONTENTS Greater Sudbury Standard Drawings

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

STORM DRAINAGE DESIGN MANUAL

STORM DRAINAGE DESIGN MANUAL Appendix I STORM DRAINAGE DESIGN MANUAL by: SUNGATE DESIGN GROUP, P.A. GEN ERAL DESIGN STAN DARDS AN D POLICIES 1. STREET AND LOCAL DRAINAGE Discharge estimates for specified design storms shall be calculated

More information

CITY OF ANN ARBOR, MICHIGAN Public Services Area/Project Management Unit 301 E. Huron Street P.O. Box 8647, Ann Arbor, Michigan 48107

CITY OF ANN ARBOR, MICHIGAN Public Services Area/Project Management Unit 301 E. Huron Street P.O. Box 8647, Ann Arbor, Michigan 48107 CITY OF ANN ARBOR, MICHIGAN Public Services Area/Project Management Unit 301 E. Huron Street P.O. Box 8647, Ann Arbor, Michigan 48107 Web: www.a2gov.org Printed on recycled paper May 17, 2016 Subject:

More information

5/25/2017. Lumpkin Detention Basin Houston, Texas By Brian Whitney, P.E., CFM Victor Rendon. Lumpkin Basin. Lumpkin Road Overall Description

5/25/2017. Lumpkin Detention Basin Houston, Texas By Brian Whitney, P.E., CFM Victor Rendon. Lumpkin Basin. Lumpkin Road Overall Description Lumpkin Detention Basin Houston, Texas By Brian Whitney, P.E., CFM Victor Rendon TEXAS FLOODPLAIN MANAGEMENT ASSOCIATION April 27, 2017 PROJECT LOCATION PROJECT VICINITY MAP Lumpkin Road Overall Description

More information

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY 31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed

More information

Project Location: Various, Anywhere, PA Bid Date: 7/16/ Rock Construction Entrance

Project Location: Various, Anywhere, PA Bid Date: 7/16/ Rock Construction Entrance To: Project Name: Bidding Company Site Work Project Contact: Address: Various Phone: Fax: Bid Number: Project Location: Various, Anywhere, PA Bid Date: 7/16/2014 Clarifications: This takeoff does not include

More information

Figure Inlet protection (Source: Minnesota DOT)

Figure Inlet protection (Source: Minnesota DOT) 3.9 INLET PROTECTION Figure 3.14. Inlet protection (Source: Minnesota DOT) Overview Description: A manufactured protective device or barrier used to trap sediment at a storm drain surface or curb inlet.

More information

PORT GAMBLE S'KLALLAM TRIBE IRR ROUTE 40 - RESIDENTIAL ROAD

PORT GAMBLE S'KLALLAM TRIBE IRR ROUTE 40 - RESIDENTIAL ROAD PORT GAMBLE S'KLALLAM TRIBE IRR ROUTE 40 - RESIDENTIAL ROAD NORTH SECTION 5, TOWNSHIP 27N, RANGE 2E PCAS #P10113R2 VICINITY MAP PROJECT LOCATION SCALE: 1" = 100' DATUM: ELEV. NAVD 88 NORTH: NAD83/1991

More information

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018

STANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018 STANDARD CONSTRUCTION DETAILS REVISED - JANUARY 2018 TABLE OF CONTENTS STORM WATER POLLUTION PLAN NOTES - - - - - - - - - - - - - - - - - - - - - - - - - SD-EC01 SILT FENCE NOTES - - - - - - - - - - -

More information

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES

CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 492 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR SITE RESTORATION FOLLOWING INSTALLATION OF PIPELINES, UTILITIES, AND ASSOCIATED STRUCTURES TABLE OF

More information

ADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02

ADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02 ADDENDUM NO. 2 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON April 28, 2015 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 30, 2015, in accordance

More information

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED?????

SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? SUMMARY OF PUBLIC WORK STANDARD SPECIFICATION REVISIONS 2011 ADOPTED????? 102.10 Minimum Rate of Wage Scale Typo. Several paragraphs were repeated. 105.5 Inspection of Work Clarified that the contractor

More information

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS COMPLETE THROUGH REVISION #18 April 2009 CITY STANDARD DETAILS REVISIONS Revision No. Revision Date Effective Date 2 August

More information

SECTION PAYMENT PROCEDURES

SECTION PAYMENT PROCEDURES SECTION 01 29 00 PAYMENT PROCEDURES PART 1 GENERAL 1.01 SECTION INCLUDES A. For each BID item, the WORK will be measured and paid for on either a unit price basis or on a lump sum basis. The quantities

More information

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 2004 Specifications CSJ: 0932-01-076 SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 1.0 Description of Project 1.1. General. This project provides for the widening of

More information

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL:

HITT STREET UNIVERSITY PROJECT #: CP REFER TO CP PLANS FOR ELECTRICAL DUCTBANK IN HITT STREET INSTALL: N 1133521.33 E 1689742.43 STA: 10+53.07 INSTALL: 2-10" 90 BENDS CONNECT TO MIDDLEBUSH HALL INTERIOR PLANT PLUMBING MIDDLEBUSH HALL HW1 HWS HWR 10+00 FREDRICK APARTMENTS FINE ARTS INSTALL 422 LF 10" HWS

More information

ADDENDUM NO. 1 TO THE INVITATION TO BID - ITB # RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN

ADDENDUM NO. 1 TO THE INVITATION TO BID - ITB # RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN ADDENDUM NO. 1 TO THE INVITATION TO BID - ITB #4320 2014 RAMP & SIDEWALK REPAIR PROJECT CITY OF ANN ARBOR, MICHIGAN The following changes, additions, and/or deletions shall be made to the Bid Documents

More information

2.1.2 Minimum wall thickness shall be 90 mm Frames and covers shall be bitumen coated by dipping.

2.1.2 Minimum wall thickness shall be 90 mm Frames and covers shall be bitumen coated by dipping. 1.0 GENERAL 1.1 Scope 2.0 PRODUCTS 1.1.1 The work shall consist of the construction, renovation or the adjustment of manholes and/or catchbasins as detailed on the plans or where designated by the Engineer

More information

GENERAL PLAN OF SERVICING

GENERAL PLAN OF SERVICING No. REVISIONS By 400 333 Preston Street GENERAL PLAN OF SERVICING 38158 100 T UTILITY LEGEND TRANSFORMER SERVICING LEGEND SANITARY MANHOLE C/W IDENTIFICATION TRANSFORMER C/W CONCRETE WINGS SANITARY SEWER

More information

T. P. Concrete, Inc. Wood Sewer & Excavating, Inc. 589 CY , , , SF

T. P. Concrete, Inc. Wood Sewer & Excavating, Inc. 589 CY , , , SF 30051 FURNISH AND INSTALL AGGREGATE SLURRY BACKFILL 589 CY 50.00 29,450.00 55.00 32,395.00 50.00 29,450.00 30584 FURNISH AND INSTALL 8" CRUSHED AGGREGATE DRIVEWAY APPROACH BASE 480 SF 0.75 360.00 0.85

More information

EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02

EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02 EL DORADO COLONIA STREET IMPROVEMENT PROJECT PHASE III IN THE CITY OF EL CENTRO ADDENDUM NO. 02 Date: April 22, 2009 To: Prospective Bidders/Plan Holders From: Abraham Campos, PE on behalf of City of El

More information

PERMANENT PAVEMENT REPAIR NO SCALE

PERMANENT PAVEMENT REPAIR NO SCALE SAWCUT EXISTING PAVEMENT 2" BITUMINOUS CONCRETE SURFACE COURSE, CLASS 2 (MIN) CLEAN EDGE PRIOR TO PAVING AND PAINT WITH LIQUID BITUMEN. INSTALL SEALANT OVER JOINT UPON COMPLETION 2" BITUMINOUS CONCRETE

More information

SEMINOLE TRIBE OF FLORIDA PURCHASING DEPARTMENT RFB MABEL T FRANK WAY ROADWAY CONSTRUCTION BIG CYPRESS INDIAN RESERVATION

SEMINOLE TRIBE OF FLORIDA PURCHASING DEPARTMENT RFB MABEL T FRANK WAY ROADWAY CONSTRUCTION BIG CYPRESS INDIAN RESERVATION SEMINOLE TRIBE OF FLORIDA PURCHASING DEPARTMENT RFB MABEL T FRANK WAY ROADWAY CONSTRUCTION BIG CYPRESS INDIAN RESERVATION 6300 STIRLING ROAD HOLLYWOOD, FLORIDA 33024 ADDENDUM NUMBER THREE June 12, 2015

More information

General Legend Details...100

General Legend Details...100 SECTION 1 - ROADWAYS TABLE OF CONTENTS General Legend Details......100 Details Roadway Section......... 110 Residential Street Intersection.........115 Waterway and Waterway Transition Detail........116

More information

The Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged.

The Contract Documents for the referenced project are hereby amended in the following particulars only, with all other conditions remaining unchanged. 1700 East Iron Ave. Salina, KS 67401 785-827-0433 phone 785-827-5949 fax 6 March 2018 Arizona California Colorado Kansas Louisiana Missouri Nebraska New Mexico Texas Utah ADDENDUM NO. 2 RE: City of Kingman,

More information

GENERAL NOTES AND CONDITIONS STORM SEWER 1. ALL EARTHWORK, GRADING AND PAVING SHALL BE PERFORMED IN ACCORDANCE WITH STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION IN ILLINOIS, STATE OF ILLINOIS

More information

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows. 403.01 Section 403. DRAINAGE STRUCTURES 403.01 Description. Adjust, construct, or temporarily lower drainage structures. Clean existing drainage structures and leads as directed by the Engineer. Drainage

More information

Entellus 75 NORTH STREET MERRILL SHERIFF CONSTRUCTION. 181 North 200 West, Suite #4. Bountiful, UT Phone

Entellus 75 NORTH STREET MERRILL SHERIFF CONSTRUCTION. 181 North 200 West, Suite #4. Bountiful, UT Phone Entllus DUMPSTER PAD AND REPLACE WITH NEW BETWEEN THESE TWO POINTS SAWCUT ALONG DEMO LINE REMOVE PARKING SPOTS CURB, GUTTER, ASPHALT AND LANDSCAPING, WITHIN HATCHED AREA FOR NEW ADDITION CURB & GUTTER

More information

STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS

STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS 16.01 GENERAL Specifications in this section shall apply to the construction of storm sewer systems including excavation, trenching, backfilling,

More information

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # 2016-04 PROJECT SPECIFICATIONS TABLE OF CONTENTS SECTION 100 GENERAL... 1 SECTION 200 MATERIALS... 1 CONSTRUCTION METHODS... 1 SECTION

More information

Project Type: Drainage and Storm Systems

Project Type: Drainage and Storm Systems 580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install

More information

The work required for this project includes, but is not limited to, the following items, not listed in order of execution.

The work required for this project includes, but is not limited to, the following items, not listed in order of execution. ESTIMATE OF QUANTITIES SPECIFICATIONS Construction Specifications: South Dakota Standard Specifications for Roads and Bridges, 2004 Edition and Required Provisions, Supplemental Specifications and/or Special

More information

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02 ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON April 23, 2015 To All Tenderers: This Addendum is issued prior to the Tender Closing Date April 30, 2015, in accordance

More information

ROADWAY DESIGN AND CONSTRUCTION STANDARDS

ROADWAY DESIGN AND CONSTRUCTION STANDARDS ROADWAY DESIGN AND CONSTRUCTION STANDARDS Adopted: 1990 Amended: 1994 2003 2011 2013 ROADWAY DESIGN AND CONSTRUCTION STANDARDS ORIGINALLY ADOPTED IN 1990 Resolution No. R-990-046 OFFICIALLY AMENDED IN

More information

PUBLIC WORKS STANDARD DETAILS

PUBLIC WORKS STANDARD DETAILS PUBLIC WORKS STANDARD DETAILS SUBSTANTIAL EFFORT HAS BEEN MADE TO ENSURE THE INFORMATION CONTAINED IN THESE STANDARDS IS ACCURATE. HOWEVER, THE CITY OF BRADENTON BEACH CANNOT ACCEPT RESPONSIBILITY FOR

More information

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH

CHAPTER 2. Restricted Residential ½ Street** Design Speed 25 MPH 25 MPH 25 MPH 25 MPH 40 MPH 50 MPH 55 MPH CHAPTER 2 201 ROADS 201.1 General This section is to assist the designer in determining what is needed for the design of roads in public rights-of-way. For these standards, the terms used are: Restricted

More information

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013 SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR

More information

PUBLIC WORKS DEPARTMENT GENERAL NOTES

PUBLIC WORKS DEPARTMENT GENERAL NOTES PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard

More information

ELLIOTT WAY IMPROVEMENTS

ELLIOTT WAY IMPROVEMENTS OWNER: THE VILLAGE OF CROTON-ON-HUDSON CROTON-ON-HUDSON TOWN HALL 1 VAN WYCK STREET CROTON-ON-HUDSON, NY 1050 ACTING VILLAGE MANAGER: JANINE KING LOCATION MAP SITE * COMMISSIONER OF PUBLIC WORKS: MARCO

More information

TENDER WELLCOX ACCESS ROAD ADDENDUM 1

TENDER WELLCOX ACCESS ROAD ADDENDUM 1 TENDER 2336-2019 WELLCOX ACCESS ROAD ADDENDUM 1 This addendum shall be read in conjunction with and considered as an integral part of the Tender Contract 2336-2019. Revisions supersede the information

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $3,379,844.00 Scott Construction Corporation - Portland, ME $3,572,184.50 CPM Constructors - Freeport, ME $3,732,667.25 Page 1 of 16 Wyman

More information

COLLIER COUNTY Growth Management Department

COLLIER COUNTY Growth Management Department COLLIER COUNTY Growth Management Department July 07, 2015 Josh Fruth Davidson Engineering, Inc Suite 201 4365 Radio Rd Naples, FL 34104 EMAIL - Josh@DavidsonEngineering.Com; jessica@davidsonengineering.com

More information

Florida Department of Environmental Protection Bureau of Design and Construction 3540 Thomasville Road Tallahassee, Florida 32309

Florida Department of Environmental Protection Bureau of Design and Construction 3540 Thomasville Road Tallahassee, Florida 32309 Florida Department of Environmental Protection Bureau of Design and Construction 3540 Thomasville Road Tallahassee, Florida 32309 Rick Scott Governor Jennifer Carroll Lt. Governor Herschel T. Vinyard Jr.

More information

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway.

(D) Surface Slope Bituminous patch in front of the truncated domes must not exceed 5% measured perpendicular to the flow line or edge of roadway. Last Revision by CO Special Provisions: 09/14/18 Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2018-143 ((2360) PLANT MIXED ASPHALT PAVEMENT (MSCR)) when using this writeup.

More information

APPENDIX I APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY

APPENDIX I APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY APPENDIX I SAMPLE COST ESTIMATES AND SUMMARY May 7, 2002 This page left blank intentionally. May 7, 2002 Preliminary Cost Estimate Summary ESTIMATE TYPE A ABC Consulting Hwy 99:06 ABC Project No. 1234-01-56789

More information

QUANTITIES MOBILIZATION PAVT, REM EROSION CONTROL, INLET PROTECTION, FABRIC DROP 12 EA AGGREGATE BASE AGGREGATE BASE, CONDITIONING SHOULDER, CL II

QUANTITIES MOBILIZATION PAVT, REM EROSION CONTROL, INLET PROTECTION, FABRIC DROP 12 EA AGGREGATE BASE AGGREGATE BASE, CONDITIONING SHOULDER, CL II 7/12/18 GENERAL NOTES SPECIFICATIONS: ALL WORK AND MATERIALS, UNLESS OTHERWISE STATED IN THESE PLANS, SHALL BE IN ACCORDANCE WITH THE MICHIGAN DEPARTMENT OF TRANSPORTATION (MDOT) 2012 STANDARD SPECIFICATIONS

More information