5/25/2017. Lumpkin Detention Basin Houston, Texas By Brian Whitney, P.E., CFM Victor Rendon. Lumpkin Basin. Lumpkin Road Overall Description
|
|
- Howard Day
- 5 years ago
- Views:
Transcription
1 Lumpkin Detention Basin Houston, Texas By Brian Whitney, P.E., CFM Victor Rendon TEXAS FLOODPLAIN MANAGEMENT ASSOCIATION April 27, 2017 PROJECT LOCATION PROJECT VICINITY MAP Lumpkin Road Overall Description PROJECT LIMITS Lumpkin : +/- 3,600 LF Adjacent Development College (HCC) Commercial Industrial Residential LUMPKIN BASIN HCC Rummel Creek SPRING LEA / SHADOW OAKS SUBDIVISION W PROJECT LIMITS 1
2 Lumpkin Rd Rummel Creek 5/25/2017 PROJECT BACKGROUND & OBJECTIVES Lumpkin Road Overall Description Improve Drainage Deficiencies Reduce Flooding in Spring Lea /Shadow Oaks Neighborhood (North) Improve Safety and Mobility Additional Traffic Lanes Pedestrian Access For Houston Community College (HCC) Upgrade Traffic Components Replace Aging Water and Sewer Utilities Engineering Phase Project Area Overview Lumpkin Road Detention Westview Houston Community College IH-10 (TXDOT) 2
3 7 x4 Lumpkin Road 5/25/2017 EXISTING SYSTEM YR SHEET FLOW PONDING MAP Lumpkin Road HCC IH-10 HOME DEPOT Existing Conditions Existing 16.1 Ac-Ft (Site 3.33 acres) Off-line Basin RCP - Connection 15 to 25 Maintenance Berm Approx depth 12 North 36 Westview Road 7 x6 30 Restrictor Narrow 120-ft Zone at Outlet (limits depth) Existing Conditions Limited by 36 inflow/outflow pipe Limited access made maintenance difficult 3
4 Lumpkin Rd Rummel Creek 5/25/2017 Lumpkin Road Detention Westview Houston Community College IH-10 (TXDOT) Existing Drainage Conditions ILLUSTRATION OF EXISTING DRAINAGE CONDITIONS (NTS): North TxDOT I-10 WB Frontage Rd Lumpkin Road (open ditch) Existing 48 & 36 Water transmission line Westview Dr. TxDOT 2-10 x10 RCB HCFCD W Rummel Creek 60 Outfall to Parking Lot To TxDOT Existing Westview Dr. Detention Basin (12-ft deep) ILLUSTRATION OF PROPOSEDDRAINAGE CONDITIONS (NTS): Proposed Drainage Conditions No Impact TxDOT I-10 WB Frontage Rd Prop. Lumpkin Road Curb and Gutter Raised 48 & 36 Water transmission line To allow deeper storm sewer Westview Dr. TxDOT Dual 10 x10 RCB 2~24 Restrictor pipes to maintain existing peak flow to TxDOT 7-ft Deeper Westview Dr. Detention Basin Maintain Existing with 36 Restrictor 60 Outfall (restricted) 4
5 PROPOSED CONDITIONS YR SHEET FLOW Lumpkin Road IH-10 HCC Proposed Improvements Matched 100-yr Peak Reduced 10-yr Reduced total volume to TxDOT ROW by 19.5 ac-ft (100-yr) Proposed Improvements Overflow zone Lowered +/- 7 FT Total 26.5 Ac-Ft 24 to 30 Maintenance Berm 20 deep (max) 5
6 Proposed Improvements 120-ft Width 60-ft Width Modular block gravity wall Each block 2,000 2,500 lbs 6 Different vertical walls zones Remove poor existing clay & replace w/ cement stabilized sand base Crushed Concrete Drainage Backfill 24 to 30 Maintenance Berm Proposed Improvements All Weather Concrete Vehicular Access Ramp Both Levels Reduced Berm SAFETY ENHANCEMENTS Curbs Perimeter Fence 6
7 Construction Phase General Bid Information Construction Cost = $3,420,000 Construction Duration = 9 months Excavation & Disposal = 30,000 CY Redi-Rock modular system average bid $55 / sq. ft. Total for wall system = $1.2 - mil Total Area approximately 22,500 SF 3,880 Redi-Block Challenges Heavy rain events during the course of construction. Dewatering after heavy rain events Replacing poor soil with cement stabilized sand bedding Temporary shoring up to 22-feet Relocating a 36 & 48-in Transmission Water Lines 7
8 Temporary Access Ramp Rock filter Dam 36 outlet Inflow from Lumpkin Rd existing storm sewer Dewatering after storm events Temporary access ramp Water Line Relocation Relocation of a 36 & 48-inch transmission Water lines City of Houston Low Demand Water Window Work around the clock Limited time for pipe procurement 48-inch Water Line Installation Water Line Relocation 8
9 Construction Sequence East to West (North Walls) East to West (South Walls) Backwalls Construction Sequence East to West (North Walls) East to West (South Walls) Backwalls Construction Sequence East to West (North Walls) East to West (South Walls) Backwalls 9
10 Redi-Rock Installation Cement Stabilized Sand Foundation Base Redi-Rock Installation Temporary Trench Safety Protection Prior to Redi-Rock Installation Redi-Rock Installation Redi-Rock System Different Types of Blocks sizes Works As a Gravity Wall Aesthetically Pleasant 10
11 Redi-Rock Installation Initial Installation of Granular bedding (North Wall) Redi-Rock Installation Initial Installation of Redi-Rock System (North Wall) Geotextile 6-inch drain pipe Redi-Rock Installation Granular backfill Crushed Concrete Material 11
12 On Going Construction Curve walls 6-inch Drainage Pipe Redi-Rock Installation Reference to scale of walls with equipment Varied wall heights Protection of Pilot Channel During Top Soil Excavation TxDOT headwall 9 X 5-foot Inlet RCB 36 RCP Outlet Pipe 12
13 Safety Enhancements Pedestrian Guard Rail System 18 X 48 Circular foundations 8 Top Soil Placement Backflow interceptor outfall in slope paving under Vehicle Access Road 8-foot wide pilot channel Concrete Slope paving for overflow areas Concrete Vehicular Access ramp Earthen Slopes at 4:1 Backflow interceptor outfall in wall 8-foot wide concrete pilot channel Slope paving for overflow areas Concrete Vehicular Access ramp 13
14 Overall Project Overview Tax Day Flooding April 18, 2016 Houston Texas Before the Tax Day event 14
15 During the Tax Day Rain Event Peak Water at predicted 100-yr WSEL Upstream of detention basin. Limited Street Ponding Water at Spillway / access driveway along Westview Drive 15
16 Off-site inflow From west side of basin Lumpkin Road looking south Street Flooding from surcharged IH-10 Westbound Frontage Road No structural flooding to adjacent buildings. Downstream flooding Looking west towards Sam Houston Tollroad connection 2-10 x10 that is Rummel Creek along IH-10 Frontage Road 16
17 Conclusion Increased detention efficiency from 50% to 93% Increased effective storage volume by 15 ac-feet (total system net increase of 20 ac-feet) Reduced Flooding in Spring Lea /Shadow Oaks Neighborhood (North) Improved Maintenance Access for Basin Aesthetic Benefit to the area Questions & Answers 17
CONSTRUCTION PLAN CHECKLIST
CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted
More informationBowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP)
Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP) SMP-11 PLANNING CONSIDERATIONS: Design Life: 1 yr Acreage
More informationSTORM DRAINAGE DESIGN MANUAL
Appendix I STORM DRAINAGE DESIGN MANUAL by: SUNGATE DESIGN GROUP, P.A. GEN ERAL DESIGN STAN DARDS AN D POLICIES 1. STREET AND LOCAL DRAINAGE Discharge estimates for specified design storms shall be calculated
More informationPhase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)
Permit Application No.: 17-181 Rules: Erosion Control, Wetland Protection, and Waterbody Crossings & Structures Applicant: Hennepin County Received: 4/27/17 Project: CSAH 112 Phase II Complete: 9/5/17
More informationSUBDIVISION CHECKLIST. Subdivision Name. Prior To Review. Preliminary plan approved by Planning Commission / Council as required.
SUBDIVISION CHECKLIST Subdivision Name Account Number Review Engineer Prior To Review Preliminary plan approved by Planning Commission / Council as required. Review fee paid. Statement of Responsibility
More informationChapter 3: Permit Procedures and Requirements
Chapter 1: General Provisions 1 1 Short Title 1 2 Jurisdiction 1 3 Amendments and Revisions 1 4 Enforcement Responsibility 1 5 Review Process 1 6 Prior Approval 1 7 Relationship to Other Standards 1 8
More informationSECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS
SECTION 12 STANDARDS FOR CONSTRUCTION PLANS AND SPECIFICATIONS 12.1 The subdivider shall construct and install the improvements in accordance with the County's Standards for Construction Plans and Specifications
More informationDawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA (706) x 42228
Dawson County Public Works 25 Justice Way, Suite 2232, Dawsonville, GA 30534 (706) 344-3500 x 42228 DAWSON COUNTY STORM WATER REVIEW CHECKLIST Project Name: Property Address: Engineer: Fax #/Email: Date:
More informationSECTION STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 402 STORM DRAINAGE DESIGN CRITERIA 400-1
CITY OF THORNTON Standards and Specifications Revised: October 2012 SECTION 400 - STORM DRAINAGE DESIGN, GRADING, AND WATER QUALITY TECHNICAL CRITERIA TABLE OF CONTENTS PAGE 401 GENERAL PROVISIONS 400-1
More informationSuggested Stormwater Management Practices For Individual House Lots
Suggested Stormwater Management Practices For Individual House Lots These practices are necessary to satisfy the water quantity and water quality criteria of the Rappahannock Stormwater Ordinance. These
More informationLyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual
Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This
More informationSECTION TRENCHING
SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.
More informationUNIT PRICE LIST January 2009
UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only
More informationCUYAHOGA COUNTY ENGINEER
CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL Supplement to O.D.O.T. LOCATION and DESIGN MANUAL, Volume 2, Drainage Design, Section 1000 and 1100 May 28, 2010 Revisions to the July 29, 2009 edition are noted
More informationSPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.
2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction
More informationStorm Water System Improvements
IV Storm Water System Improvements A. General The purpose of this Section is to establish standard principles and practices for the design and construction of storm drainage facilities within the City
More informationCITY UTILITIES DESIGN STANDARDS MANUAL
CITY UTILITIES DESIGN STANDARDS MANUAL () September 2017 Page Chapter 1 Acronyms and Definitions 1.01 Purpose 1 1.02 Acronyms 1 1.03 Definitions 3 Chapter 2 Introduction 2.01 Purpose 1 2.02 Applicability
More informationAPPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT
APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision Plat Name: Location Description/ Nearest Intersection: Acreage:
More informationT a b l e o f C o n t e n t s
C i t y o f G l a d s t o n e P u b l i c W o r k s D e s i g n S t a n d a r d s T a b l e o f C o n t e n t s SECTION THREE SANITARY SEWER REQUIREMENTS... 1 3.0000 SANITARY SEWERS... 1 3.0010 General
More informationStorm Drain Inlet Protection
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
More informationInlet Protection. Fe= (Depends on soil type)
3.4 DESIGN CRITERIA: KEY CONSIDERATIONS Evaluate drainage patterns to ensure inlet protection will not cause flooding of roadway, property or structures Never block entire inlet opening Size according
More informationDesign Example Handouts. DURANGO DETENTION WORKBOOK LUNCH AND LEARN CITY OF DURANGO Meeting Date: February 7, 2017
Design Example Handouts DURANGO DETENTION WORKBOOK LUNCH AND LEARN CITY OF DURANGO Meeting Date: February 7, 2017 Design Example 1 Residential Infill Development Durango Detention Sheet: Basin Structure
More informationSECTION PAYMENT PROCEDURES
SECTION 01 29 00 PAYMENT PROCEDURES PART 1 GENERAL 1.01 SECTION INCLUDES A. For each BID item, the WORK will be measured and paid for on either a unit price basis or on a lump sum basis. The quantities
More informationDIVISION 5 STORM DRAINAGE CRITERIA
DIVISION 5 STORM DRAINAGE CRITERIA Section 5.01 GENERAL The following storm drainage design criteria shall apply to all storm drainage designs in the City. Additional design criteria are specified in the
More informationDRAINAGE STUDY PHASE 2 REPORT HORRY COUNTY STORMWATER DEPARTMENT HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: APRIL 07, 2016 J
DRAINAGE STUDY PHASE 2 REPORT FOR: HIGHWAY 9 & 57 HORRY COUNTY, SC PREPARED FOR: HORRY COUNTY STORMWATER DEPARTMENT APRIL 07, 2016 Prepared by: Savannah, GA Charleston, SC Myrtle Beach, SC Brunswick, GA
More informationPORT GAMBLE S'KLALLAM TRIBE IRR ROUTE 40 - RESIDENTIAL ROAD
PORT GAMBLE S'KLALLAM TRIBE IRR ROUTE 40 - RESIDENTIAL ROAD NORTH SECTION 5, TOWNSHIP 27N, RANGE 2E PCAS #P10113R2 VICINITY MAP PROJECT LOCATION SCALE: 1" = 100' DATUM: ELEV. NAVD 88 NORTH: NAD83/1991
More informationCHAPTER 17: STORM SEWER STANDARDS Introduction Administration Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
More informationProject Type: Drainage and Storm Systems
580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install
More informationCity of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017
City of Katy Flood Protection Study (Meeting 3 of 3) October 23, 2017 Phasing of Meetings April Meeting May Meeting October Review of Tax Day Storm Event and Immediate Actions Taken By City Review of Coordination
More informationINITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR
INITIAL INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT MCMANUS ASH POND A (AP-1) 40 CFR 257.82 EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part 257 and Part
More informationRETENTION BASIN EXAMPLE
-7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary
More informationCAPITAL IMPROVEMENT PLAN ($ Thousands) CITY OF HOUSTON - STORM DRAINAGE SYSTEM. M - Page 25 of 37. Proposed CIP
20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STORM DRAINAGE SYSTEM Project: Gulf Terrace Sec 1, Acre Homes Area M410007 Drainage and Paving Project Description Provides ROW acquisition,
More information2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form
2015 Financial Assurance (Basic form) 3/17/2015 Estimate Form Project Information (\aen i vake.. F;) N0.3-7114117 Project Name Section 1 - Grading and Erosion Control BMPs Quantity Units Price Earthwork
More information19 May Provide profiles for all storm sewer going into the ground with the grading permit showing 5 and 100yr HGLs.
19 May 2017 City of Thornton Attn: Nate Hatleback 9500 Civic Center Drive Thornton, CO 80229 Re: Initial Review Response to 05/16/17 Letter Dear Mr. Hatleback: This letter is in response to technical comments
More informationSC-01 Surface Outlet and Baffle Sediment Basin
Greenville County Technical Specification for: SC-01 Surface Outlet and Baffle Sediment Basin 1.0 Surface Outlet and Baffle Sediment Basin This Specification contains requirements for the design and construction
More informationB-PERMIT PLAN CHECK MANUAL
B-PERMIT PLAN CHECK MANUAL 8. EROSION CONTROL PLANS All B-Permit and Department of Building and Safety (B&S) Grading Permit plans must have an approved Wet Weather Erosion Control Plan (WWECP) i by September
More informationPART 3 STORM WATER TECHNICAL MANUAL
PART 3 STORM WATER TECHNICAL MANUAL A. INTRODUCTION The Storm Water Technical Manual contains requirements for land development and construction activities, as well as design criteria and guidelines for
More information2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1
2-16 EROSION, SEDIMENT & STORM WATER CONTROL REGULATIONS APPENDIX B1 There are three ways to accomplish urban soil erosion and sedimentation control: Allow erosion to take place and then control sediment
More informationLocal Stormwater Design Manual. City of Fairburn
APPENDIX D LOCAL STORMWATER DESIGN MANUAL Local Stormwater Design Manual City of Fairburn May 2008 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS...
More informationV. DRAINAGE IMPROVEMENTS
V. DRAINAGE IMPROVEMENTS 5.1 Formulation of Drainage Improvements As indicated in Chapter 4, following the completion of the hydrologic analysis associated with future land use conditions, drainage improvements
More informationManual for Erosion and Sediment Control Updates
Manual for Erosion and Sediment Control Updates Chapter 1 - The Erosion and Sedimentation Act of 1975 Minor revisions were made to content Existing pictures were replaced with new ones Chapter 2 Sediment
More informationSUBDIVISION IMPROVEMENT PLANS FORM
Page 1 of 9 CITY OF CONROE SUBDIVISION IMPROVEMENT PLANS CHECKLIST SUBMIT THREE FINAL SETS OF PLANS (maximum size 24 X36 ), OTHER ITEMS LISTED, AND THIS COMPLETED, CERTIFIED CHECKLIST TO THE ENGINEERING
More informationNEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL
NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by
More informationFinal Drainage Report
Thornton Electric Substation Project Final Drainage Report December 14, 2016 DRAFT Prepared for: Xcel Energy, 1800 Larimer Street, Suite 400, Denver, Colorado 80202 Prepared by: 350 Indiana Street, Suite
More informationFor Public Input Period
20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,
More informationPractices that capture and temporarily store the WQ v before allowing it to infiltrate into the soil.
Chapter 5: Acceptable Stormwater Management Practices (SMPs) This section presents a list of practices that are acceptable for water quality treatment. The practices on this list are selected based on
More informationARTICLE V: STORMWATER MANAGEMENT AND DRAINAGE SYSTEMS
ARTICLE V: STORMWATER MANAGEMENT AND DRAINAGE SYSTEMS Section 501: Purpose An adequate drainage system including necessary ditches, pipes, culverts, drains, inlets, bridges, detention ponds, etc. shall
More informationENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)
EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY
More information2018 Roadway Erosion Control CONTRACT NO ADDENDUM NUMBER TWO
July 27, 2018 2018 Roadway Erosion Control ADDENDUM NUMBER TWO This Addendum Number Two supersedes and/or supplements all portions of the Contract Documents with which it conflicts. Bidders must acknowledge
More informationEROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY
31 25 00 EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY A. Erosion and sedimentation control shall be provided by the Contractor for all areas of the site denuded or otherwise disturbed
More informationTown of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /
Town of Friday Harbor PO Box 219 / Friday Harbor / WA / 98250 (360) 378-2810 / fax (360) 378-5339 / www.fridayharbor.org LAND CLEARING, GRADING, OR FILLING PERMIT APPLICATION APPLICATION DATE GRD No. APPLICANT/FRANCHISE
More informationYork County STORMWATER LUNCH & LEARN
York County STORMWATER LUNCH & LEARN TOPICS Points of Exposure SWPPP's NOT's Construction Sequence Permanent BMP's Basin Details Major and Minor Modifications Construction Buffers Stabilization Questions
More informationRichland County Department of Public Works Engineering (Land Development) Division
Richland County Department of Public Works Engineering (Land Development) Division Commercial Projects What is a Commercial Project? Projects that are not related to residential single family homes and/or
More informationGEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO
GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST
More informationSECTION 4 STORM DRAINAGE
4.01 GENERAL SECTION 4 STORM DRAINAGE These standards shall provide minimum requirements for the design of Storm Drainage and related appurtenances within the City of West Sacramento rights of way and
More informationExample 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond)
Chapter 10 Design Examples Example 1: Pond Design in a residential development (Water Quantity calculations for a Wet Pond and Wet Extended Detention Pond) Example 2: Filter Design in a commercial development
More informationCITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION
CITY OF ALBANY Public Works Department ADDENDUM # ST-6-02 CROCKER LANE RECONSTRUCTION In order to clarify the intent of the Specifications and Drawings, the following provisions are provided and shall
More informationRevision 1 Dated October 2, UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE:
Revision 1 Dated October 2, 2014 1.3.2 UNIT PRICE BID SCHEDULE SCHEDULE OF PRICES FOR THE CONSTRUCTION OF THE: PEYTON DRIVE WIDENING - PHASE 3 AND ENGLISH CHANNEL IMPROVEMENTS Project No s. S12012 & 800360
More informationHydrology Study. Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated)
Hydrology Study Ascension Heights Subdivision Ascension Drive at Bel Aire Road San Mateo, California (Unincorporated) Prepared for San Mateo Real Estate & Construction March 9, 21 Rev. 1 11-8-211 Rev.
More informationSECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements
SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature
More informationReport. Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan. DTE Energy Company One Energy Plaza, Detroit, MI
Report Inflow Design Flood Control System Plan Belle River Power Plant East China, Michigan DTE Energy Company One Energy Plaza, Detroit, MI October 14, 2016 NTH Project No. 62-160047-04 NTH Consultants,
More informationCE 585 Construction Site Erosion Control The University of Alabama Tuscaloosa, AL. New Chevrolet and Cadillac Dealership Jasper, AL
CE 585 Construction Site Erosion Control The University of Alabama Tuscaloosa, AL New Chevrolet and Cadillac Dealership Jasper, AL Andrew Kennedy Homework #6 July 24, 2007 0 Table of Contents Table of
More informationSOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004
SOUTHSIDE TOWNSHIP ROADWAY STANDARDS POLICY Adopted September 7, 2004 General: Sections of the Minnesota Department of Transportation (Mn/DOT), Standard Specification for Construction, 2000 or Current
More informationTxDOT Houston District Permit Requirements (Information contained herein is subject to change)
Houston District Permit Requirements (Information contained herein is subject to change) Access Driveway for Commercial / Industrial Developments; or Street Tie-In / Drainage-Only 1) Complete the three
More informationEROSION AND SEDIMENT CONTROL STANDARDS CITY OF OVERLAND PARK DRAFT
A. Authority EROSION AND SEDIMENT CONTROL STANDARDS CITY OF OVERLAND PARK DRAFT 06.15.2005 As set forth in the Overland Park Municipal Code (OPMC), Chapter 16.200, the Director of Planning and Development
More informationSE-6 GRAVEL BAG BERM. Objectives. Potential Alternatives
Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Materials and Waste Management - WM DESCRIPTION AND PURPOSE A gravel
More informationCoal Combustion Residuals Inflow Design Flood Control System Plan
gaiconsultants.com I transforming ideas into reality., Coal Combustion Residuals Inflow Design Flood Control System Plan Virginia Electric and Power Company Possum Point Power Station Surface Impoundment
More informationProject Location: Various, Anywhere, PA Bid Date: 7/16/ Rock Construction Entrance
To: Project Name: Bidding Company Site Work Project Contact: Address: Various Phone: Fax: Bid Number: Project Location: Various, Anywhere, PA Bid Date: 7/16/2014 Clarifications: This takeoff does not include
More informationMill Creek/Peaks Branch/ State Thomas Drainage Relief Tunnel. Parkdale / Lawnview Avenue Neighborhood April 26, 2016
Mill Creek/Peaks Branch/ State Thomas Drainage Relief Tunnel Parkdale / Lawnview Avenue Neighborhood April 26, 2016 Mill Creek, Peaks Branch and State-Thomas Watersheds PARKDALE 2 Basin Characteristics
More informationSUPPLEMENTAL DRAWINGS
CITY OF GREATER SUDBURY SUPPLEMENTAL DRAWINGS TO THE ONTARIO PROVINCIAL STANDARD DRAWINGS Rev: February 2012 CITY OF GREATER SUDBURY STANDARD DRAWINGS TABLE OF CONTENTS Greater Sudbury Standard Drawings
More informationCITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS
CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS COMPLETE THROUGH REVISION #18 April 2009 CITY STANDARD DETAILS REVISIONS Revision No. Revision Date Effective Date 2 August
More informationTHUNDER BAY AREA DRAINAGE MASTER PLAN
THUNDER BAY AREA DRAINAGE MASTER PLAN Overall problem Vs. local solutions There are several areas with local flooding problems A review of the situation showed that the problem is not local, but that the
More informationHighway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination
Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse
More informationNovember 2011 Updated August 2014
November 2011 Updated August 2014 INDEX BMP SUMMARY FOR CONSTRUCTION SITES GENERAL DESIGN GUIDELINES ESC 1.0...Permanent Seeding ESC 2.0...Temporary Seeding ESC 3.0...Temporary Construction Entrance ESC
More informationZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS
OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS 1500.01 GENERAL REQUIREMENTS 1500.02 NATURE OF STORM WATER FACILITIES 1500.03 DRAINAGE EASEMENTS 1500.04 STORM WATER MANAGEMENT
More informationPROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM
PROJECT SCOPE OF WORK CITY OF TOWN AND COUNTRY STORMWATER PROGRAM Project ID Number: 2- Problem: Storm runoff from the park flows overland through a gap in a berm and then into the neighboring subdivision
More informationStormwater Local Design Manual For Houston County, Georgia
Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.
More informationEROSION CONTROL GENERAL NOTES EC JAN 2017 C.B.
EROSION CONTROL GENERAL NOTES EC - 000 EROSION CONTROL GENERAL NOTES EC - 001 INSTALL TEMPORARY DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT EXISTING PAVEMENT OR APPROVED ACCESS POINT OR AS PRACTICABLE
More informationPUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR
99.0 PUBLIC AND PRIVATE IMPROVEMENTS CODE 99.0 PUBLIC AND PRIVATE IMPROVEMENTS CODE OF THE TOWNSHIP OF UPPER ST. CLAIR TABLE OF CONTENTS 99.1. ADMINISTRATION AND GENERAL REGULATIONS...2 99.1.1. Title...2
More informationC43 West Basin Storage Reservoir. Hendry County Commission January 22, 2019
C43 West Basin Storage Reservoir Hendry County Commission January 22, 2019 Project Location SFWMD Trailer Compound C-43 Reservoir Townsend Canal Perimeter Dam Appox. 6 Mi C-43 Reservoir Separator Dam Perimeter
More informationWarner Robins Stormwater Local Design Manual
Warner Robins Stormwater Local Design Manual Prepared for Houston County City of Warner Robins City of Perry City of Centerville May 17, 2005 Version 4 (As presented with adopted Stormwater Ordinance)
More informationAppendix K: Soil Erosion and Sedimentation Control Plan Check List
Appendix K: Soil Erosion and Sedimentation Control Plan Check List Drain Commissioner 46 February 2005 SOIL EROSION AND SEDIMENTATION CONTROL PLAN CHECK LIST Items listed below must be clearly depicted
More informationTOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements
TOWN OF MANCHESTER PLANNING AND ZONING COMMISSION Subdivision Application Minimum Submission Requirements This checklist is to be completed and submitted with all Subdivision Applications. The Town reserves
More informationSTORMWATER DESIGN CRITERIA. PUBLIC WORKS DEPARTMENT City of Hudson Oaks, Texas
STORMWATER DESIGN CRITERIA PUBLIC WORKS DEPARTMENT City of Hudson Oaks, Texas REVISED JANUARY 23, 2014 TABLE OF CONTENTS Foreword.... 3 Storm Water Management Policy.... 4 Definitions.... 5 1. Preliminary
More informationAS A COURTESY, PLEASE TURN OFF CELL PHONES AND PAGERS WHILE MEETING IS IN PROGRESS.
Table of Contents Agenda 2 Wastewater Treatment Plant (WWTP) Hydraulic Capacity Update Staff Report 3 WWTP Capacity Outline 5 WWTP Capacity Charts 6 Drainage Concerns on Oak Hill Drive and Quail Drive
More informationSTANDARD CONSTRUCTION DETAILS EROSION CONTROL REVISED - JANUARY 2018
STANDARD CONSTRUCTION DETAILS REVISED - JANUARY 2018 TABLE OF CONTENTS STORM WATER POLLUTION PLAN NOTES - - - - - - - - - - - - - - - - - - - - - - - - - SD-EC01 SILT FENCE NOTES - - - - - - - - - - -
More informationAt least 2 feet above the seasonal high water table Overflow path or structure provided
General Conditions Map of proposed subwatershed to each subbasin, including total area and CN Design Flow or Design Volume to each STF, as appropriate Operation and Maintenance instructions for each STF
More informationPART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS
PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm
More informationTo: From: Date: Subject: Sherwood Lakes Drainage Alternatives Analysis 1
To: From: The City of Virginia Beach Lewis White and Rachael Johnson on behalf of WSP Date: June 6, 2017 Subject: s Drainage Alternatives Analysis This memorandum represents the summary of findings from
More informationSingle Family Residential Construction Erosion/Sediment Control Standards
Single Family Residential Construction Erosion/Sediment Control Standards Introduction: This booklet contains standard plans and procedures sufficient for typical building construction. It is not intended
More informationENGINEER S REPORT MAIN TILE IMPROVEMENTS DRAINAGE DISTRICT NO. 131 WRIGHT COUNTY
ENGINEER S REPORT MAIN TILE IMPROVEMENTS DRAINAGE DISTRICT NO. 131 WRIGHT COUNTY 2013 TABLE OF CONTENTS Page I. Introduction 1 II. Background 1 III. Existing Conditions 1-4 IV. Improvement Options 4-6
More informationDRAINAGE BASICS Common Terminology & Reference Tools Drainage Components Determine Existing Conditions Calculate Development Requirements
DRAINAGE BASICS 1 Common Terminology & Reference Tools Drainage Components Determine Existing Conditions Calculate Development Requirements 2 Common Terminology & Useful Tools CFS= Cubic Feet per Second-
More informationCity of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development
City of Redwood City Stormwater Pollution Prevention Program Drainage Guidelines for Residential Development General Requirements A. Plot & Finished Grading Plan must be submitted with Building Permit
More informationPort KC RFP NORTHLAND PARK BUILDING V
Port KC RFP NORTHLAND PARK BUILDING V 1. The RFP refers to landscaping plans. However, it does not appear that the landscaping plans were issued with the rest of the RFP. Will these be issued with an addendum?
More informationFROM ROOFTOP TO DRAIN NON-TRADITIONAL APPLICATIONS OF HEC-RAS 2D FROM ROOFTOP. Calibration: A Hands-On Approach to Making a Model Reflect Reality
FROM ROOFTOP TO DRAIN NON-TRADITIONAL APPLICATIONS OF HEC-RAS 2D Andrew C. Yung, PE, CFM Andres A. Salazar, PhD, PE April 26, 2017 1 FROM ROOFTOP 2 Amphitheater: 97,000 SF flexible engineered fabric roof
More informationMODEL Stormwater Local Design Manual. City of Centerville
MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge
More informationCHECK THE LOWER RIGHT CORNER OF EACH DETAIL FOR THE LATEST REVISION.
Standard Drawings Index NOTE: The specifications for materials and workmanship shall conform to the latest edition or the "Standard Specifications for Public Works Construction" published by the North
More informationCONSTRUCTION PLAN REVIEW CHECKLIST FOR PRIVATE DEVELOPMENT
ADDITION NAME: City of Grapevine, Texas CONSTRUCTION PLAN REVIEW CHECKLIST FOR PRIVATE DEVELOPMENT Updated April 16, 2018 Public Works Department Engineering Division 200 South Main Street Grapevine, Texas
More informationAppendix B. Design. Page i. Design
Page i Princeville, North Carolina Flood Risk Management Integrated Feasibility Report and Environmental Assessment Table of Contents 1.1. Introduction... 1 1.2. Existing Conditions... 1 1.3. Objectives...
More informationMERCED COUNTY CAMPUS PARKWAY SEGMENT 2
MERCED COUNTY BID LIST CAMPUS PARKWAY SEGMENT 2 CONTRACT 2017191 The bidder must provide unit prices for each bid item listed below, based on the specified unit of measure. The unit price for each item