1 580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install additional access manhole; repair storm sewer lateral connection, replace damaged sections of culvert; relocate water mains & replace sanitary sewer that cross through the culvert. 573 BP-036, Airfield Stormwater Drainage Improv. Phase OEA $529,892 Greater Orlando Aviation Authority Repairs to the existing Airfield Stormwater Drainage Orlando Executive Airport. Work involved complete inspection and desilting of approximately 4040 lf of storm water lines. After inspection repairs were made based upon line condition. Pipe liner was installed, joint repairs were made, or new CIPP was installed. Nine storm inlets were replaced. Chemically grouted 314 joints. Trenching, stormwater sewer pipe installation, inlets, cast-in-place pipe liner & pavement replacement for open trenches. 566 Winter Park Drive North Realignment $5,661,289 City of Casselberry Construct approx. 1.5 miles of two lane roadway through an undeveloped ROW along with supporting drainage & utility infrastructure. Work included excavation, embankment, stabilization, base, asphalt, reinforcing steel, lift station, mast arm assembly, signalization, MOT, irrigation. Drainage system included approx. 11,250 lf RCP 24"-42", 32 inlets and 28 manholes; utilities included approx 2,361 lf 8" potable water main with 14 service connections, approx 2,334 lf 8" reclaimed water main with 12 service connections and approx 4,487 lf of 6"-10" PVC sanitary sewer with 17 manholes and 25 service connections. 563 Lake Tyler Sediment Removal Structures $1,089,616 Orange County Highway Construction Project consists of the installation of three pre-fabricated Stormwater Treatment Units, 3 cfs and 14 cfs capacity. Two of the sediment removal structures were installed within a residential condominium complex and one was installed within an apartment complex. Installation of 1,148 LF of 15", 30" 36" concrete pipe along with three end treatments. Performed chemical grouting of soil to stabilize structures close to excavation area. Replaced 3500 SY of sod to match existing landscape conditions. Wednesday, November 17, 2010 Page 1 of 5

2 549 Rockledge Road Area Sanitary & Storm Sewer Construction $2,170,568 Construction of Sanitary and Storm Sewer in an existing subdivision. Work included installation of approx 1,110 LF of RCP Storm Sewer pipe from 18" to 24", installation of 10 structures, 43 manholes, 9,387 LF of 8" PVC Sewer Main, 200 4" lateral services and clean-outs, remove and replace approximately 2265 LF of curb and gutter, remove and replace 1000 SY of 4" concrete sidewalk, 2000 SY of 6" concrete driveway, installation of approx 24,500 SY of reclaimed asphalt and approx 10,000 SY of sod. 516 Tohopekaliga Avenue Extension $3,056,408 Project included the construction of a new four lane roadway, 4,000 lf of storm pipe from 60" to 18" and under drain, communication ducts, fencing, striping, geoweb, MOT. 514 Parktowne Industrial Center Ph-1 Drainage and Utility Improvements $1,400,443 City of Edgewater Project included the construction of two (2) stormwater ponds which entailed about 50,000 CY of earth and rock excavation, a 1,100 lf drainage ditch, a 2,300 lf storm drainage system with piping ranging in size from 54" down to 24", 1,800 lf gravity sanitary system installed to a depth of 12', and various utility adjustments and connections. Mr. Ken Hooper was the City's Project Manager on this project. 503 Martin Luther King Jr. Boulevard, Phase I $3,803,645 Project consisted of 2,900 lf of new two-lane roadway construction including water main, storm and sanitary sewer, retention pond excavation, curb, sidewalk, signalization, irrigation and sod. 488 West Ramp Phase 2 and West Access Road $1,571,896 Kissimmee Gateway Airport Construct aircraft parking apron to include: storm, grading, base, asphalt, markings, electrical. Wednesday, November 17, 2010 Page 2 of 5

3 480 City of Ocoee Old Winter Garden Road & Professional Parkway $6,997,105 Project required the widening of miles of existing Old Winter Garden Rd. from a 2 lane road into a 4 lane divided roadway. Work included utility relocations/improvements, storm pond excavation, storm drainage system installations, signalization, fencing, landscape & irrigation, signage, and pavement markings. Relocation and improvements of Sprint Telephone facilities located within the right-of-way of this project. 472 Cranes Roost PS Modif. & Reuse Weir Structure $406,220 City of Altamonte Springs Rehabilitation of storm water pump station from Cranes Roost, new 150 HP vertical turbine pumps, new controls. Also, sheet down to existing 21" gravity sewer & pour concrete structure for reclaimed water supply enhancement. 471 Budinger Avenue Roadway Improvements $390,252 City of St. Cloud Construction of water main, 30" storm drainage, roadway and signalization improvements. 468 Crystal Lake Stormwater Improvements $296,456 City of Clermont Work consists of clearing & grubbing, earthwork, construction of storm drainage system, installation of 6 baffle boxes to treat stormwater, grading and misc. work. 457 Drury Avenue Improvements $577, LF of paving to improve road, sanitary and storm sewer drainage, utilities, paving and sidewalk Wednesday, November 17, 2010 Page 3 of 5

4 452 City of Oviedo Sugarberry Ditch $200,253 Installation of 30"- 42" HDPE storm drainage system in residential area under tight working conditions with 15' distance between homes. 451 East Palmetto Avenue Improvements $1,116,051 City of Longwood Storm replacement, road construction, new water lines, sanitary sewer, sidewalks, driveways, MOT, landscaping and sodding Vacuum Sewer - North Utility System Expansion $739,567 City of Longwood Installation of approx. 10,000 LF of 4" and 6" sewer pipe for an extension of existing vacuum sewer system and approx. 7,150 LF of 8" watermain. Work consisted of dewatering, excavation, restoration and sod. 395 Rio Grande Intersections: Drainage, Sanitary & Traffic Improve. $1,254,120 Drainage & sanitary improvements at Rio Grande intersections. Work included concrete pavers & header curb in 2 intersections, new concrete curbs & asphalt pavement, replacement of concrete curbs, sidewalk, wheelchair ramps, digging large retention pond and installed storm drain control structures and weirs. This pond helped eliminate flooding in a College Park neighborhood. 388 Boyd Street Phase 3: Vineland Rd & Palmetto St Rehab. $861,082 City of Winter Garden Replacement of sanitary & storm sewer on two city streets and complete reconstruction of streets, including asphalt paving, curbs, sidewalks, grading and grassing, MOT and temporary erosion control.. Wednesday, November 17, 2010 Page 4 of 5

5 379 Guernsey Basin Drainage Improvements Phase 2 $1,131,996 Approximately 1500 lf of 54 and 48 RCP was installed down the center of a historic brick paved street, the installation was deep enough to require the whole street to be removed and reconstructed. The storm system ended with a submerged outfall structure in Lake Adair which required a sheeted coffer dam to install in dry conditions. All brick pavers were cleaned and re-installed per the City requirements. As part of this project 2 new brick round-abouts were created. The storm installation included several inlets, conflict structures and manholes. 300 LF of Gravity sewer and new water services were installed for all residents in the construction area. Critical OUC (Florida Hospital) utilities were inspected and protected as part of the project. During the project all residents were provided access to their homes and all home delivery or pick up services were maintained at all times. 373 GOAA, OIA, Operations Fire Training Facility $946,056 Greater Orlando Aviation Authority Construction of 3-story fire training facility, 2 acres of 8" concrete paving, fire lines, storm, grading, GEO synthetic liners 313 Gore Street Outfall Improvements $902,487 Construction of an alum chemical feed system for the Gore feeder canal into Clear Lake. Work includes storm drainage, box culvert, concrete slope paving, dewatering, flac pump station, flac curtain. 298 City of Sanford Mill Creek Year 3A Drainage Improvements $597,286 Continuation of storm drainage system. Work included installation of large diameter RCP, box culvert, manholes, sanitary sewer relocations, pour-in-place headwalls, by-pass pumping, excavation of two retention ponds (approx. 60,000 CY), curbs & walks, base, asphalt paving. 278 City of Sanford Mill Creek Year 2 Drainage Project $719,985 Installation of storm drainage system including precast manholes, inlets, 58" x 91" elliptical RCP, 8' x 4' precast box culvert, excavation, dewatering, pour-in-place concrete structures, fabriform, by-pass pumping of existing ditch, open cut in roadways, Wednesday, November 17, 2010 Page 5 of 5

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS COMPLETE THROUGH REVISION #18 April 2009 CITY STANDARD DETAILS REVISIONS Revision No. Revision Date Effective Date 2 August

More information

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number) EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY

More information

Richland County Department of Public Works Engineering (Land Development) Division

Richland County Department of Public Works Engineering (Land Development) Division Richland County Department of Public Works Engineering (Land Development) Division Commercial Projects What is a Commercial Project? Projects that are not related to residential single family homes and/or

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, :30 PM 600 S. Commerce Ave. Sebring, FL AGENDA

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, :30 PM 600 S. Commerce Ave. Sebring, FL AGENDA HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, 2018 5:30 PM 600 S. Commerce Ave. Sebring, FL 33870 AGENDA 1 MEETING CALLED TO ORDER: Invitation to fill out "citizens not on the agenda

More information

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17 S&L Gravel, Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $6,425.00 $6,425.00 $6,425.00 $10,000.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 25.00 $25.00 $625.00

More information

ENGINEERING DESIGN & IMPROVEMENT STANDARDS

ENGINEERING DESIGN & IMPROVEMENT STANDARDS ENGINEERING DESIGN & IMPROVEMENT STANDARDS 2016 Prepared by: Engineering Division For latest edition of these Improvement Standards, refer to City of Visalia website at: www.visalia.city/engineeringdocuments

More information

ARCHITECT: GENERAL NOTES 1. THE CONTRACTOR SHALL REVIEW ALL DRAWINGS AND SPECIFICATIONS AND ADVISE THE ENGINEER OF ANY CONFLICTS OF REPRESENTATION BETWEEN DRAWINGS AND/OR SPECIFICATIONS PRIOR TO COMMENCING

More information

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements SECTION 3 DRAINAGE 3-1 General All Drainage plans for proposed development shall be prepared by a Professional Engineer registered in Virginia, except as noted below. Further, their seal and signature

More information

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BID TABULATION SUMMARY JOB 940094 PAGE 1 STATE PROJECT NO. 162-080-04 BIDS RECEIVED UNTIL 11:00 A.M. ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BETWEEN 2ND STREET NORTH AND 15 STREET NORTH IN ST.

More information

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012 City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and Impact

More information

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects 2.0 ROADWAYS 2.1 Road Classification 2.1.1 Standard Drawing Classification All Road Widths and Road Allowances shall be designed in accordance with the most recent Town of New Tecumseth Standards: TNT.SD

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008

PITTSBURGH TECHNOLOGY CENTER PUBLIC IMPROVEMENTS SITE PREPARATION CONTRACT NO. 11 BID TABULATION BID OPENING DATE: MARCH 11, 2008 BT-1 of 7 Clearing and Grubbing L.S. $50,000.00 $50,000.00 $5,335.00 $5,335.00 $14,560.00 $14,560.00 $20,000.00 $20,000.00 $10,600.00 $10,600.00 Class 1 Excavation 4300 C.Y. $20.00 $86,000.00 $15.00 $64,500.00

More information

Project Need and Evaluation

Project Need and Evaluation City of Brooklyn Center 2011 Palmer Lake East Street and Utility Reconstruction Project Public Hearings February 14, 2011 Public Improvement Hearing: Special Assessments Local public improvements to the

More information

CITY OF SAFETY HARBOR ENGINEERING

CITY OF SAFETY HARBOR ENGINEERING CITY OF SAFETY HARBOR ENGINEERING The Engineering Department provides the city with technical services including design of construction and maintenance projects, review of development plans, field surveys,

More information

Design-Build Capital Infrastructure Project

Design-Build Capital Infrastructure Project Design-Build Capital Infrastructure Project US$60 Million Project Duration 2012 Responsible for drainage systems and construction QA-QC oversight and project documentation and as-built review and acceptance.

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth

More information

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO

WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO WASHINGTON UNION ROAD RECONSTRUCTION XENIA TOWNSHIP GREENE COUNTY, OHIO 42 380 68 coddington ave ledbetter road shawnee creek s patton street ledbetter road wesley ave 68 starr drive 42 twist run 85 35

More information

City of Elgin SUBDIVISION FINAL ENGINEERING Engineering Submittal Checklist

City of Elgin SUBDIVISION FINAL ENGINEERING Engineering Submittal Checklist If this is a re-submittal, please provide a point-by-point response to previous review comments, identifying how each comment has been addressed, location in the plan set of the changes made to address

More information

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1

PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road from Riverside Drive to Rock Island Road. RFP No. J P1 PRESENTATION FOR: Construction Engineering and Inspection-Wiles Road STAFFING MATRIX Construction Engineering and Inspection-Wiles Road JAMES JEFFERS, P.E. Senior Project Engineer Years of Experience:

More information

10:00 AM, Wednesday, April 8, 2015

10:00 AM, Wednesday, April 8, 2015 NOTICE OF MANDATORY PRE-BID CONFERENCE WILL BE HELD AT 10:00 AM, Wednesday, April 8, 2015 IN ROOM 16, CITY HALL BUILDING, 101 NORTH MAIN STREET WINSTON-SALEM, NORTH CAROLINA The purpose of this conference

More information

Table of Contents for Guide Specifications

Table of Contents for Guide Specifications Table of Contents for Guide Specifications 01270A Measurement and Payment 01355A Environmental Protection 01356A Storm Water Pollution Prevention Measures 01421 Basic Storm Water Pollution Prevention Plan

More information

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project

SPECIAL NOTES FOR CONTRACT. Bidding Requirements and Conditions. Specifications Governing this Project RES. NO. PROPOSAL FOR THE COMPLETION OF 2015-28 TO THE SATISFACTION OF THE BUTLER COUNTY COMMISSIONERS AND THE COUNTY ENGINEER: SAID WORK CONSISTING OF TYLERSVILLE ROAD IMPROVEMENTS, PHASE I TO THE COUNTY

More information

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision Plat Name: Location Description/ Nearest Intersection: Acreage:

More information

Attachment D-1: Civil/Structural Scope of Work

Attachment D-1: Civil/Structural Scope of Work Attachment D-1: Civil/Structural Scope of Work Project: Location: Targa Sound Renewable Fuels Project Tacoma, WA Prepared by: NORWEST ENGINEERING Consulting Engineers 4110 N.E. 122 nd Avenue, Portland,

More information

City of Naples Utilities Department Wastewater Collections Division

City of Naples Utilities Department Wastewater Collections Division City of Naples Utilities Department Wastewater Collections Division Request for Proposal Reclaimed Water Fire Hydrant & Water Service Installations February 2015 Reclaimed Water Fire Hydrant & Services

More information

ADDENDUM NO. 1 APRIL 24, 2017

ADDENDUM NO. 1 APRIL 24, 2017 DERBY DESTINATION DEVELOPMENT PUBLIC PROJECT NO. 1 EAST FREEDOM STREET PUBLIC PROJECT NO. 2 WEST FREEDOM STREET PUBLIC PROJECT NO. 3 WATERLINE IMPROVEMENTS PUBLIC PROJECT NO. 4 SANITARY SEWER IMPROVEMENTS

More information

EXCAVATION / RIGHT OF WAY PERMIT

EXCAVATION / RIGHT OF WAY PERMIT $25 Application Fee PERMIT# EXCAVATION / RIGHT OF WAY PERMIT NOTE: No permit shall be issued without current Montana Contractors License, Insurance and Bonding on file with the Public Works Department.

More information

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014

Sunnyside Valley Irrigation District Enclosed Lateral Improvements Projects Contract : Regions 011, 13 & 014 Sunnyside Valley Irrigation District Addendum No. 1 Enclosed Lateral Improvements Projects 2010-2011 Issued: 8/30/2010 Contract 10-003: Regions 011, 013 & 014 Page 1 of 7 Sunnyside Valley Irrigation District

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

10.0 Storm Sewer Systems

10.0 Storm Sewer Systems October 2003 Chapter 10.0, Storm Sewer Systems Page 1 10.0 Storm Sewer Systems 10.1 Introduction A storm sewer system consists of a system of inlets, pipes, manholes, junctions, cleanouts, outlets, and

More information

Task Order Authorization

Task Order Authorization Task Order Authorization Task Order Number: 6 Task Order Name: 2017 Small Drainage Program Hourly Rate: See attached Exhibit B Budget Not To Exceed: $79,795.00 This Task Order pertains to the On-Call Agreement

More information

COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS

COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS CEE BS, Fulltime (3 positions) Posted 1/30/2017 COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS SUFFOLK COUNTY IS AN EQUAL OPPORTUNITY / AFFIRMATIVE ACTION EMPLOYER

More information

For Public Input Period

For Public Input Period 20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,

More information

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and

More information

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction. Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification 7. Introduction This chapter summarizes methods to evaluate runoff conveyance in various street cross sections and curb types in the Town of Castle Rock and identifies acceptable upper limits of street

More information

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017 2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017 2017 CBD Improvements Agenda Meeting Agenda Introduction Scope of Improvements Time frames for improvements May vary

More information

Cass County Soil Erosion & Sedimentation Control Program

Cass County Soil Erosion & Sedimentation Control Program Cass County Soil Erosion & Sedimentation Control Program Both residents and visitors of Cass County enjoy the beauty of over 250 lakes and ponds, along with numerous streams, creeks, and wetlands that

More information

PERVIOUS PAVEMENT. Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers

PERVIOUS PAVEMENT. Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers 4.1-a PERVIOUS PAVEMENT Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers DESCRIPTION Pervious pavement is any system comprised of a load bearing surface that allows for movement of

More information

[Rev - 1] 06/

[Rev - 1] 06/ WVU DESIGN GUIDELINES & CONSTRUCTION STANDARDS DIVISION 33 UTILITIES SECTION 334100 STORMWATER MANAGEMENT PART 1 GENERAL 1.1. Any deviances from the following instructions must be approved during design

More information

UTILITY NOTES GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: TREE PROTECTION NOTES

UTILITY NOTES GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: TREE PROTECTION NOTES GENERAL CONSTRUCTION NOTES PAVING AND GRADING NOTES: UTILITY NOTES PROPOSED LEGEND 66.50 66.50 GROUND SPOT ELEVATION GROUND SPOT ELEVATION (MATCH EXISTING GRADE) MATCH EXISTING GRADE MITERED END SECTION

More information

VIRGINIA UTILITY PROTECTION SERVICE, INC. Title: Ticket Entry - Work Type List Working Document

VIRGINIA UTILITY PROTECTION SERVICE, INC. Title: Ticket Entry - Work Type List Working Document Printed copies are for reference only. Please refer to the electronic copy for the latest version. Purpose: To provide instructions for editing the work type list through Newtin administrator accounts

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements Keys Edge Community Development District Engineer s Report Infrastructure Improvements Prepared for Keys Edge Community Development District Board of Supervisors Miami-Dade County, Florida Prepared by

More information

NORTH OF THE PROPERTY ON BOYETTE ROAD, PUBLISHED ELEVATION 92.29' (NAVD88).

NORTH OF THE PROPERTY ON BOYETTE ROAD, PUBLISHED ELEVATION 92.29' (NAVD88). "REUSE OF THIS DOCUMENT: THE IDEAS & DESIGNS INCORPORATED INTO THIS DRAWING ARE PROVIDED AS A PROFESSIONAL SERVICE TO THIS CLIENT AND ARE THE PROPERTY OF MPH THESE IDEAS & DESIGNS ARE NOT TO BE USED FOR

More information

Storm Drain Inlet Protection

Storm Drain Inlet Protection Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

Preliminary Engineering Study. Richland Avenue Pedestrian Crossing. Volume I: Preliminary Report

Preliminary Engineering Study. Richland Avenue Pedestrian Crossing. Volume I: Preliminary Report Preliminary Engineering Study Richland Avenue Pedestrian Crossing Volume I: Preliminary Report SUBMITTED TO: City of Athens Engineering and Public Works Athens, Ohio SUBMITTED BY: January 12, 2016 Prepared

More information

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2 CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2 7.1. GENERAL.... 2 7.1.1. Inspection Restriction Dates.... 2 7.1.2. Complete Improvements.... 2 7.1.3. Public Improvements.... 2 7.1.4. Warranty

More information

HIGH SCHOOL #2 Severance, CO MANAGEMENT PLAN November,

HIGH SCHOOL #2 Severance, CO MANAGEMENT PLAN November, HIGH SCHOOL #2 Severance, CO MANAGEMENT PLAN November, 18 2016 1 VICINITY MAP Site Data Land Use Statistics o Proposed Developed Site 55 acres 22.8% o Flood Plain 6 acres 2.4% o Open Space 100.6 acres

More information

Drainage Report for US-50 Camino Corridor Safety Project

Drainage Report for US-50 Camino Corridor Safety Project Project Study Report (Project Development Support) Drainage Report for US-50 Camino Corridor Safety Project In El Dorado County Camino, California from PM 20.00 to 26.00 EL Dorado-50-PM 20.00 to 26.00

More information

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432 PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:

More information

City of North Miami Beach, Florida COMMUNITY DEVELOPMENT DEPARTMENT

City of North Miami Beach, Florida COMMUNITY DEVELOPMENT DEPARTMENT City of North Miami Beach, Florida COMMUNITY DEVELOPMENT DEPARTMENT TO: Planning and Zoning Board FROM: Carlos M. Rivero, City Planner DATE: August 10, 2015 RE: Storage Facility P&Z ITEM # 15-010 OWNER

More information

City of Surrey, ND Municipal Infrastructure Needs Assessment September 2012

City of Surrey, ND Municipal Infrastructure Needs Assessment September 2012 City of Surrey, ND Municipal Infrastructure Needs Assessment September 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and

More information

DIVISION 5 STORM DRAINAGE CRITERIA

DIVISION 5 STORM DRAINAGE CRITERIA DIVISION 5 STORM DRAINAGE CRITERIA Section 5.01 GENERAL The following storm drainage design criteria shall apply to all storm drainage designs in the City. Additional design criteria are specified in the

More information

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012

ADOT Yuma District. Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 ADOT Yuma District Alvin Stump, P.E. ADOT Yuma District Engineer Rural Transportation Summit January 20, 2012 Active Construction Projects SR 95@ Bill Williams River NWR Rd CAP Intersection US 95, Castle

More information

D-1 THE CITY OF HARRISBURG 1 1/2" MIN. ID-2 WEARING COARSE EXISTING STREET SURFACE AC-20 SEALER (ALL AROUND) 1 1/2" MIN. ID-2 BINDER COARSE

D-1 THE CITY OF HARRISBURG 1 1/2 MIN. ID-2 WEARING COARSE EXISTING STREET SURFACE AC-20 SEALER (ALL AROUND) 1 1/2 MIN. ID-2 BINDER COARSE EXISTING STREET SURFACE 1 1/2" MIN. ID-2 BINDER COARSE 1 1/2" MIN. ID-2 WEARING COARSE AC-20 SEALER (ALL AROUND) 8" CLASS A P.C. CONCRETE SAW CUT TOP OF CONCRETE SHALL MEET SURFACE OF EXISTING CONCRETE.

More information

A.3 Concrete Cross gutter 18

A.3 Concrete Cross gutter 18 TABLE OF CONTENTS SECTION NUMBER PAGE NO. SECTION 1 - General Requirements 1-3 SECTION 2 - Preparation of Plans 4-8 SECTION 3 - Inspection 9-10 SECTION 4 - Roads and Streets 11-15 STANDARD DRAWINGS A.1

More information

ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form.

ADDENDUM #2 JUNE 30, It is required that all bidders acknowledge receipt of Addenda on Page BF-2 of the Bid Form. ADDENDUM #2 JUNE 30, 2017 APRON REHABILITATION PHASE 3 HENRY E. ROHLSEN AIRPORT ST. CROIX, U.S. VIRGIN ISLANDS FAA AIP No.: 3-78-0002-037-2017 This addendum modifies or interprets the proposal documents

More information

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013 WATSON ROAD FACILITY PAGE 1 OF 6 PART 1 GENERAL 1.1 Description The work covered by this Section includes all labour, materials, equipment, and supervision necessary to complete the site services as shown

More information

Greenfield Pond B Rehabilitation

Greenfield Pond B Rehabilitation Preliminary Investigation Report Centennial, Colorado November 15, 2011 Prepared for: Liverpool Metropolitan District Prepared by: Stantec Consulting Services, Inc. Table of Contents Executive Summary...

More information

A City Project Review of Eagles Edge subdivision water system and drainage improvements.

A City Project Review of Eagles Edge subdivision water system and drainage improvements. DATE: November 24, 2014 TO: FROM: Planning Commission Jonathan Lange, Planner Community Development Department FILE NO.: CSP2014 0021 PROPOSAL: A City Project Review of Eagles Edge subdivision water system

More information

TRANSPORTATION & PUBLIC WORKS DEPARTMENT TECHNICAL STANDARDS

TRANSPORTATION & PUBLIC WORKS DEPARTMENT TECHNICAL STANDARDS Athens-Clarke County Unified Government TRANSPORTATION & PUBLIC WORKS DEPARTMENT TECHNICAL STANDARDS JULY, 2009 PREFACE The technical standards presented herein reflect the current policies and practices

More information

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS UTAH COUNTY HEALTH DEPARTMENT Div. of Environmental Health 151 South University Avenue, Provo 84601 (801) 851-7525 FAX 851-7521 GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS This is intended to

More information

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION PROFESSIONAL CONSULTING, LLC. Octagon 10, Office Center 1719 Route 10, Suite 225 Parsippany,

More information

The City of North Las Vegas (CNLV) does not allow valley gutters to be constructed across streets with right-of-way widths of 80 feet or greater.

The City of North Las Vegas (CNLV) does not allow valley gutters to be constructed across streets with right-of-way widths of 80 feet or greater. Background The City of rth Las Vegas strives to provide the development community with adequate information to ensure the successful completion of any project in the City. To aid in the submittal of a

More information

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY Guidance on restoration of City Rights-of-Way Public Works Department Directors Office 747 Market Street Suite 408 Tacoma, WA 98402 253-591-5525 Right-of-Way

More information

Storm Drain Inlet Protection for Construction Sites (1060)

Storm Drain Inlet Protection for Construction Sites (1060) Storm Drain Inlet Protection for Construction Sites (1060) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A temporary device installed in or around a storm drain

More information

Mecklenburg County Land Development Standards Manual (MCLDSM)

Mecklenburg County Land Development Standards Manual (MCLDSM) Mecklenburg County Land Development Standards Manual (MCLDSM) Revised July 1, 2010 1 Mecklenburg County Land Development Standards Manual Mecklenburg County (Including ETJ) Land Development Specifications

More information

MOA Project # Golden View Drive Intersection & Safety Upgrades

MOA Project # Golden View Drive Intersection & Safety Upgrades Appropriate transitions can include extending the insulation beyond the roadway improvements, reducing the insulation thickness, or angling the insulation downward. Use of a frost tolerant section, an

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

Gwinnett County Stormwater System Assessment Program

Gwinnett County Stormwater System Assessment Program Gwinnett County Stormwater System Assessment Program Jonathan Semerjian, PE Dept. of Water Resources Stormwater Management Sam Fleming, PE Dewberry Presentation Overview Project Background Drivers Enhanced

More information

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER 4 INDEX DRAINAGE

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER 4 INDEX DRAINAGE CHAPTER 4 INDEX DRAINAGE Supplement to Chapter 4 4.01 GENERAL INFORMATION 4.01.01 References 4.01.03 General Procedures 4.02 STORM SEWER DESIGN 4.02.15 Sewer Bulkheads 4.02.18 Storm Sewers Under Structures

More information

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE

SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE SPECIFICATIONS FOR STREET CONSTRUCTION WITHIN THE TOWN OF PLAINVILLE BE IT ORDAINED by the Town Council of the Town of Plainville: SECTION 1. SUBDIVISIONS. All subdivisions hereinafter developed within

More information

ISSUED: 1/16/15 REVISION: 1.0 REVISION: STANDARD DETAIL COMBINATION 6'' CURB & GUTTER CITY OF FALLS CHURCH VA PUBLIC WORKS

ISSUED: 1/16/15 REVISION: 1.0 REVISION: STANDARD DETAIL COMBINATION 6'' CURB & GUTTER CITY OF FALLS CHURCH VA PUBLIC WORKS ISSUED: 1/16/15 1.0 COMBINATION 6'' CURB & GUTTER ISSUED: 1/16/15 1.0 SIDEWALK DETAIL ISSUED: 7/7/15 1.0 VALLEY GUTTER ISSUED: 2/11/16 1.0 BRICK PAVER SIDEWALK DETAIL 1''=1' WIDTH VARIES SEE SHEET 2 MIN.

More information

CITY OF BURLINGTON REGENT STREET ALLEY SEWER AND STREET IMPROVEMENTS

CITY OF BURLINGTON REGENT STREET ALLEY SEWER AND STREET IMPROVEMENTS SKAGIT COUNTY WASHINGTON SCHEDULE A - SANITARY SEWER MAINLINE REPLACEMENT SCHEDULE B - GRADING AND STORM DRAIN IMPROVEMENTS CITY OFFICIALS STEVE SEXTON Mayor TED MONTGOMERY TONYA BIECHE City Council RICK

More information

MODEL Stormwater Local Design Manual. City of Centerville

MODEL Stormwater Local Design Manual. City of Centerville MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge

More information

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds

King County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds News Release Contact: Al Sanders 206-477-1016 August 31, 2015 Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds The Flood Control District

More information

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives

More information

Transportation, Engineering and Development Business Group Standard Construction Plan Notes for Development Projects January 2013

Transportation, Engineering and Development Business Group Standard Construction Plan Notes for Development Projects January 2013 Transportation, Engineering and Development Business Group Standard Construction Plan Notes for Development Projects January 0 The City of Naperville Transportation, Engineering and Development (TED) Business

More information

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587 CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587 JANUARY 2010 TABLE OF CONTENTS SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 APPENDIX ROADWAY DESIGN DRAINAGE

More information

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL)

SUPPLEMENTAL ECMS ADVANCED INFORMATION JULY 14, 2016 (ALL WORK TO BE COMPLETED TO APPEAR IN THE PROPOSAL) Updated June 27, 2016 BEAVER COUNTY SR 7446(LBB) #92912 PROPOSAL:$54.72 PLANS:$42.46 12X18:$52.11 24X36:$752.70 EXSTRUCT:$48.62 12X18:$59.67 24X36:$861.90 The description and location of the project is

More information

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS

Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # PROJECT SPECIFICATIONS TABLE OF CONTENTS Fox Avenue Improvements From Gamebird Road to Dalton Street Bid # 2016-04 PROJECT SPECIFICATIONS TABLE OF CONTENTS SECTION 100 GENERAL... 1 SECTION 200 MATERIALS... 1 CONSTRUCTION METHODS... 1 SECTION

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS

April 1, CITY OF PORTSMOUTH Public Works Department. Bid # Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS April 1, 2009 CITY OF PORTSMOUTH Public Works Department Bid #54-09 2009 Annual Paving Project ADDENDUM NO. 1 NOTICE TO ALL BIDDERS This Addendum forms part of the original document marked Bid #54-09 2009

More information

Section XXV Preconstruction Assessments and Damage Mitigation Procedures

Section XXV Preconstruction Assessments and Damage Mitigation Procedures Section XXV Preconstruction Assessments and Damage Mitigation Procedures A. Introduction - In recent years, HRSD has received an increasing number of complaints from residents and locality staff regarding

More information

Alternative No. 1 Total Cost DRAFT

Alternative No. 1 Total Cost DRAFT OPINION OF PROBABLE PROJECT COSTS SUMMARY OF ALL THREE ALTERNATIVE ALIGNMENTS Item Description Alternative No. 1 Total Cost Alternative No. 2 Total Cost Alternative No. 3 Total Cost Design Phase 1. Preliminary

More information

MONROE COUNTY ZONING OFFICE

MONROE COUNTY ZONING OFFICE MONROE COUNTY ZONING OFFICE 100 South Main Street Waterloo, IL 62298 618-939-8681 Ext. 260 mczoning@htc.net PROCEDURES FOR NEW CONSTRUCTION 1. Applicant must provide a recorded copy of deed to the property

More information

STANDARD TECHNICAL SPECIFICATIONS

STANDARD TECHNICAL SPECIFICATIONS CITY OF TARPON SPRINGS, FLORIDA STANDARD TECHNICAL SPECIFICATIONS FEBRUARY 2011 PUBLISHED BY: DEVELOPMENT SERVICES DEPARTMENT TABLE OF CONTENTS GENERAL CONSTRUCTION OPERATIONS...4 ACRONYMS & ABBREVIATIONS...5

More information

SANITARY SEWER FEASIBILITY STUDY AND REPORT NORTH SEBASTIAN AREA

SANITARY SEWER FEASIBILITY STUDY AND REPORT NORTH SEBASTIAN AREA SANITARY SEWER FEASIBILITY STUDY AND REPORT FOR THE NORTH SEBASTIAN AREA INDIAN RIVER COUNTY, FLORIDA November 2013 Prepared for: Indian River County Utilities Prepared by: MASTELLER & MOLER, INC. ~ CONSULTING

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS

CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587 JANUARY 2010 TABLE OF CONTENTS SECTION 1 SECTION 2 SECTION 3 SECTION 4 SECTION 5 SECTION 6 APPENDIX ROADWAY DESIGN DRAINAGE

More information

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE The Existing Roadway Condition Assessment Report (ERCAR) should include the evaluation of all elements against new construction criteria.

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

Preferred Elevated Tank Site

Preferred Elevated Tank Site Preferred Elevated Tank Site Preferred Site No. 3 is on private property owned by Hopewell Developments. Approximately 5 acres of land will be required, including lands required for a permanent access

More information

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application Good for 90 days from the Date Issued This permit is only required if the work location is owned or controlled by the City of Homestead and

More information

PARKING LOT AND ROADWAY MAINTENANCE

PARKING LOT AND ROADWAY MAINTENANCE Village of Vernon Hills Community Development Engineering Division Phone 847-367-3704 Fax 847-367-2541 PERMIT APPLICATION PROCESS PARKING LOT AND ROADWAY MAINTENANCE Removal and replacement, concrete and

More information