Master Plan Update Executive Summary
|
|
- Dortha O’Neal’
- 5 years ago
- Views:
Transcription
1
2 Master Plan Update Executive Summary City of Yuba City Water System Yuba City Final 5/18/04 Prepared under the responsible charge of Ligaya Kohagura Iron Point Road, Suite 300 Folsom, CA 95630
3 PURPOSE The purpose of this study is to update the Yuba City s (City s) July 1997 Water System Master Plan. This update evaluates current and future water needs for the City and the City s Sphere of Influence (SOI) to meet projected growth. In addition, the update addresses changes brought about by the City s May 2001 acquisition of the Hillcrest Water Company, whose service area was comprised of five regions located in the local unincorporated areas of Sutter County. To be consistent with the City s General Plan timeline, estimates for future water demands were developed for the service area s build out conditions using the per capita projection method and the historical peaking demand factors. Yuba City Build Out Population Population OBJECTIVES Present data and information related to the Hillcrest Water Company water system. Address projected population and land-use information in the City s Draft General Plan update. Update the City s hydraulic network computer model to include the Hillcrest water regions. 120, ,000 80,000 60,000 40,000 20,000 0 Yuba City Build-Out Population by Region City s Water Service Area (SOI and Region 6) Update the City's Capital Improvement Program to determine when new facilities will be needed to meet future water demand forecasts for the SOI at build-out conditions. Provide a foundation on which to base future decisions regarding the construction of facilities required for the production, conservation, transmission, and distribution of water to the City s SOI. FINDINGS AND RECOMMENDATIONS Table ES-1 on the following page summarizes the most significant findings and recommendations in the master plan update. Population 60,000 50,000 40,000 30,000 20,000 10,000 0 Acknowledgements Yuba City Regions 1 and 2/3 Region 5 (Tierra Buena) Regions 4A/5A, 4B/5B Region 6 Region 7 We wish to acknowledge the assistance and cooperation of the following City of Yuba City staff who provided significant contributions toward this master plan update: Bill Lewis, Bobby Howard, Jerry Orr, and Diana Langley. P:\08741\024\Reports\Final\ \Executive Summary\ Executive Summary.doc 1
4 Table ES-1 Summary of Findings and Recommendations Findings Recommendations Groundwater Distribution Connect Regions 1, 2, 3, and 5 to the City s surface water system. Groundwater wells in Regions 1, 2, 3, and 5 have lower water quality compared to the City s surface water. The groundwater is relatively hard, has a discernable sulfide smell, and is high in iron, manganese, arsenic, and nitrates. The existing groundwater distribution system in Regions 1, 2, 3, and 5 meet design level pressure and velocity criteria for average day and maximum day demands. However, peak conditions with all pumps activated in each region, the ability to support fire-flow varies throughout each region. Under peak conditions, the majority of Region 5 has adequate pressure with the exception of a few areas. Recommend looping Region 1 to Regions 2 and 3. With this improvement, the groundwater pumping capacity can meet the peak hour and maximum day plus fire (4,000 gpm fire flow) conditions in these regions. Surface Water Distribution Due to the high demand, simply increasing the pipe diameter is insufficient to mitigate the problem. 1) Recommend constructing the new UPRR tank during Phase 1. Under existing Peak Hour demands, there were several areas in the modeled system that experienced low pressures and velocities in excess of 10 fps. The primary area is on the west side of the City limits near Sam s Club. With the existing conditions, the model s pressures were found to be lower than 20 psi. Design standards require a minimum of 30 psi 2) Route piping to this tank south along State Highway 20 (Colusa Avenue) and north to Butte House Road. 3) From Hwy 20/Harter, connect piping to Tharp Road/Hwy 20 and to Hwy 20/Walton. P:\08741\024\Reports\Final\ \Executive Summary\ES Table1.doc 2
5 Findings The majority of the City has adequate fire-flow with a minimum 20 psi system pressure. There are a few exceptions where pipe sizes are either too small and/or pipes are not sufficiently looped. Recommendations Loop dead-end line at Sherwood Drive and Windsor Drive with an 8-inch pipeline to the existing pipeline on East Hillcrest Drive and Windsor Drive. Increase pipe size to twelve inch on the terminal west end of Bridge Street. The simulation to reflect refilling the Burns tank over 6-hours showed a flow rate of 5,556 gpm is required. This flow is 1,233 gpm greater than the City s existing maximum day demand. The distribution system modeled for future buildout of the City s SOI identified main transmission lines for either upsizing or new additions along main roads. At buildout, the system meets the Peak Hour demand except for one area south of the Burns tank. In this area, system pressure falls below 30 psi and even below 20 psi in the area immediately south of the Burns tank (east of Garden Highway). The buildout fire-flow scenarios show no deficiencies with the system proposed. The City s existing storage facilities have a total storage volume of 9 million gallons. At buildout conditions, a total storage volume of 39.3 million gallons is needed for the entire water service area (SOI and Region 6). To accommodate the tank s high refill rate, flow capacity to the southern part of the City must be increased. Future pipeline improvements have been identified throughout the existing system to aid in distributing flow more directly from the WTP to the southern portion of the distribution grid where the Burns tank is located. Install a transmission main (T-main) to circulate water through the SOI, functioning as the backbone of the distribution system and to service the proposed storage tanks. Install additional pumping capacity and supplemental storage capacity at the existing Burns tank site. Construct recommended system improvements to meet buildout conditions. Install additional storage tanks in the distribution system as identified in Chapter 6. Since the water service area is continuous, flat in topography, within the same pressure zone, and the distribution system will be well looped, there will be plenty of storage redundancy. P:\08741\024\Reports\Final\ \Executive Summary\ES Table1.doc 3
6 Findings One pipeline was found to have pipe flow velocities exceeding the design standard of 7 feet per second. Recommendations Replace 8 inch piping with 14 inch piping from Forbes Avenue and Cooper Avenue east to Plumas Street and then north 250 feet and east on Teegarden Avenue to Shasta Street. Surface Water Treatment Plan Expand the existing SWTP to meet the future maximum day demands. Phase 2: Construct a 24 mgd expansion to increase WTP capacity to 48 mgd. Continued growth within the existing City limits will be limited and requires a buildout capacity of approximately 24 mgd. However, projected ultimate demand for the total service area (including Region 6) is 65 mgd. The existing low-lift pumping station (LLPS) has a total capacity of 26.2 mgd and firm capacity of 19.5 mgd. Phase 3: Construct a 17 mgd expansion to increase WTP capacity to 65 mgd. Phase 1: Install one 6.7 mgd pump at the existing LLPS to increase the firm capacity to 26.2 mgd. Phase 2: Construct a second LLPS with 24 mgd firm capacity. Install five 7 mgd pumps. Construct a new 60-inch diameter pipeline from LLPS to the WTP. Phase 3: Install one 6.7 mgd pump at the existing LLPS. Expand capacity of second LLPS to 35 mgd firm capacity. Install one 7 mgd pump. The piping intake at the Feather River does not currently have fish screens. Modifications to the intake would likely require installation of fish screens. Phase 1: Construct a common fish screen facility to serve both the existing and new LLPSs. Add a new 36-inch diameter raw water pipeline from the existing LLPS. Construct a 48-inch diameter raw water pipeline from the fish screen to the new LLPS. Phase 2: Install additional screens; increase capacity of screening facility to 65 mgd. Heavy loads of grit (silt and sand) are deposited into the flocculation basins and require basins to be shut down and cleaned twice a year. Construct an induced vortex-type grit removal system. P:\08741\024\Reports\Final\ \Executive Summary\ES Table1.doc 4
7 Findings The existing flash mix, flocculation, and sedimentation basins have a total capacity of 24 mgd. Expansion is required for future demand. Recommendations Phase 2: To the east of the existing basins construct a second flash mixer and three new sedimentation basins (8.5 mgd capacity each). Phase 3: To the west of the existing basins, construct a third flash mixer and three new flocculation and sedimentation basins (8.5 mgd capacity each). An alternative to a flash mix and conventional sedimentation system would be an Actiflo system, which would require one-third the area of a conventional flocculation and sedimentation basin with a 20 percent cost savings. The existing four filters have an operating hydraulic capacity of 24 mgd. Expansion is required for future demand. Phase 2: Construct four new filters to increase the plant hydraulic capacity to 48 mgd. Construct two new 42-inch diameter treated water pipelines from the filter gallery to the new clearwells. Phase 3: Construct four new additional filters to increase plant hydraulic capacity to greater than 65 mgd. The existing clearwells provides a total storage of 4 million gallons. The normal criterion for clearwell capacity is to provide storage equal to at least 15 percent of the treatment plant capacity. For Phase 2 capacity of 48 mgd, total storage required is at least 8 MG. For the Phase 3 capacity of 65 mgd, the total storage required is at least 10 MG. A 12 MG storage volume at the WTP is recommended to provide enough volume for multiple purposes including disinfectant contact time, WTP operational storage, and operational storage for the distribution system. Phase 2: Construct a 4 MG storage tank to increase WTP total storage to 8 MG. Phase 3: Construct a 4 MG storage tank to increase WTP total storage to 12 MG. P:\08741\024\Reports\Final\ \Executive Summary\ES Table1.doc 5
8 Service Areas and Water Supply Sources Currently, surface water service is provided within the City limit boundary only. All other areas within the service area are served by groundwater wells. Regions 4A/5A and 4B/5B are primarily undeveloped. Because the groundwater is relatively hard, and at times has a discernable sulfide smell, customers consider the MGD 140 groundwater to be poor quality compared to the City s 120 surface water. In addition, the groundwater is high in iron, 100 manganese, arsenic, nitrates, and other primary and 80 secondary standards. In planning for long-term service 60 area supply, this update assumes all groundwater 40 customers will eventually be converted to surface water 20 0 supply. Year 2005 Water Demands for Yuba City Water Service Area Average Annual 77.1 Maximum Day 44.0 Peak Hour 22.0 Region 4A/5A Region 6 Region 5* (Tierra Buena) Existing Yuba City Limits Region 4B/5B Region 2* MGD 140 Projected Yuba City Total Water Service Area Demand at Build-Out Region 3* Region 1* Average Annual *Former Hillcrest Regions Regions 4A/5A and 4B/5B are Primarily Undeveloped Maximum Day Peak Hour Currently, surface water service is provided within the City limit boundary only. However, due to poor groundwater quality, this update assumes all groundwater customers will eventually be converted to surface water supply. P:\08741\024\Reports\Final\ \Executive Summary\ Executive Summary.doc 6
9 CAPITAL IMPROVEMENT PROGRAM Recommended improvements to the service area have been divided into three planning phases in order to facilitate implementation and to assist the City with planning and funding water system improvements. Phase 1 - (24 mgd capacity) Improvements to the existing water distribution system within the City and Regions 5 to meet City s operating criteria (including fire-flow conditions). Includes improvements to the surface water distribution system to service Region 5 and new residential developments in the western portion of the City. Phase 2 - (48 mgd capacity) Improvements to the surface water distribution system and to serve Regions 1, 2, 3, and portions of Regions 4A/5A and 4B/5B. Includes expansion of the City s WTP to 48 mgd. Does not include fireflow piping improvements in Regions 1, 2 and 3. Figure ES-1 concludes this Executive Summary (and is provided in large scale format in the Master Plan Update). This figure maps out the CIP to improvements needed to meet the City s total water service area demands and operational goals through build-out conditions. Phase 1 Improvements needed before 2005 Phase 2 Improvements needed before Phase 3 - (65 mgd Capacity) Improvements to the surface water distribution system to serve the entire SOI under buildout conditions. Includes expansion of the City s WTP to at least 65 mgd. Fireflow Improvements Includes piping improvements needed in Regions 1, 2 and 3 to maintain a minimum system pressure of 20 psi and maximum pipe velocity of 10 feet per second during fireflow conditions. No planning period has been identified for Regions 1, 2 and 3 fireflow piping improvements. Table ES-2 (following page) summarizes estimated costs for each phase. Proposed improvements in these tables do not include improvements needed to serve Region 7. Phase 3 Improvements needed before P:\08741\024\Reports\Final\ \Executive Summary\ Executive Summary.doc 7
10 Table ES-2 Summary of Capital Improvement Program Costs Phase 1 Distribution Piping 11,450,000 Storage Tanks and Pumping Station 5,175,000 Sub-total 16,625,000 Contingency (25%) 4,160,000 Engineering, Administration, CM (20%) 4,160,000 Phase 1 Total (rounded) 24,945,000 Phase 2 Distribution Piping 28,740,000 Storage Tanks and Pumping Station 7,750,000 Surface Water Treatment Plant Expansion to 48 mgd 26,645,000 Sub-total 63,135,000 Contingency (25%) 15,780,000 Engineering, Administration, CM (20%) 15,780,000 Phase 2 Total (rounded) 94,695,000 Phase 3 Distribution Piping 44,946,000 Storage Tanks and Pumping Station 19,000,000 Surface Water Treatment Plant Expansion to 65 mgd 17,350,000 Sub-total 81,296,000 Contingency (25%) 20,320,000 Engineering, Administration, CM (20%) 20,320,000 Phase 3 Total (rounded) 121,936,000 Fireflow Improvements Fireflow piping 14,982,000 Sub-total 14,982,000 Contingency (25%) 3,750,000 Engineering, Administration, CM (20%) 3,750,000 Phase 3 Total (rounded) 22,482,000 P:\08741\024\Reports\Final\ \Executive Summary\ Executive Summary.doc 8
11 George Washington Blvd Hooper Rd. Ohlyer Harter Rd. Harter Rd. Walton Ave Walton Ave Phillips Railroad Ave R45B-5-12" Pease Rd Butte House Rd. R45A-13-12" R45A-4-16" R45A-10-12" Tierra Buena Road R45A-11-16" R45A-12-16" R45A-1-14" Elmer Rd R45A-9-14" Region 6 R6-1-12" Blevin Jaime Dr. YC-1-12" R6-2-12" New Blevin/Jamie Storage Capacity MG Pumping Capacity mgd YC-10-42" YC-6-16" State Hwy 99 R6-2-12" YC-10-42" Yuba City WTP Clearwell Expansion to 12.0 MG Pump Expansion to 33.5 mgd N Township Rd Jefferson Royo Ranchero D R45A-3-16" R45A-3-16" R45A-6-36" Queen St YC-12-12" New UPRR/Elmer Dr. Storage Capacity MG Pumping Capcity mgd R45A-6-36" Tharp Rd R5-2-12" R45B-16-16" UPRR R45B-5-12" State Hwy 20 R45A-2-16" Franklin Road R45B-14-16" R5-1-16" Two New Harter/Franklin Rd Storage Capacity - 2 X 3.0 MG Pumping Capacity - 2 X 8.2 mgd R45B-18-30" R45B-4-12" R45B-15-16" El Margarita Rd Lassen R45B-6-12" R5-1-16" R45B-2-12" R45B-25-12" R45B-1-12" R45B-19-30" R45B-13-16" Bridge St. R45A-8-12" R45B-17-36" R2-4-12" Franklin Harding Klamath Cherry R2-1-12" R2-2-14" Sam Brannon Tank 1.0 MG R2-7-16" Anneka Ln R2-6-16" R2-8-14" Forbes Clark Ave/ Bunce Rd B Street ExYC-1-30" ExYC-5-14" Rowe Ave. Tank 1.0 MG R45B-12-16" R2-5-14" Richland Rd ExYC-1-30" R2-8-14" Garden Hwy R45B-5-12" Lincoln Road R45B-9-16" New G.W./Lincoln Rd Storage Capacity MG Pumping Capacity mgd R45B-8-16" R45B-24-30" New Sanborn/Lincoln Rd Storage Capacity MG Pumping Capacity mgd R3-1-16" Sanborn Rd R45B-12-16" R2-3-30" R3-1-16" R3-2-14" Lincoln Rd R3-4-14" Hwy 99 R2-3-30" R1-5-16" R1-2-12" Jones R1-1-12" R3-4-14" Teesdale YC-8-24" YC-9-24" Burns Tank 3.0 MG Burns R45B-15-16" Smith R3-5-14" New Burns Dr Storage Capacity MG Pumping Capacity mgd Bogue Road R45B-3-12" R45B-11-16" R3-3-16" R1-5-16" R3-3-16" City of Yuba City Yuba City Master Plan Update Future development south of Bogue Road would require the desgination of a separate pressure zone Existing Pipe 6-inch 8-inch 10-inch 12-inch 14-inch 16-inch 18-inch 20-inch 24-inch 30-inch 36-inch Proposed 12-inch Proposed 14-inch Proposed 16-inch Proposed 24-inch Proposed 30-inch Proposed 36-inch Proposed 42-inch Existing Tank New Tank Plot Title Plot By Date Map No Scale HDR Engineering, Inc. Folsom, CA Figure 4-3. Yuba City Buildout Sphere of Influence Proposed Improved Distribution System ctadokor 02/5/ Feet Plot File Fig4-3YCBO.plt
City of Yuba City. Yuba City Update to Water Demand and Infrastructure System Evaluation. Technical Memorandum
City of Yuba City Yuba City Update to Water Demand and Infrastructure System Evaluation Technical Memorandum July 2006 Table of Contents Introduction... 1 Background...1 Purpose and Objectives...1 Water
More informationEl Margarita Development Analysis
303 Second Street, Suite 300 South San Francisco, California 94107 415-243-2150 FAX: 415-896-0999 El Margarita Development Analysis 28 January 2015 Prepared for City of Yuba City 1201 Civic Center Boulevard
More informationEXISTING SYSTEM ANALYSIS
Chapter 6 EXISTING SYSTEM ANALYSIS This chapter describes the evaluation of the existing water distribution system, using the calibrated hydraulic model and the 2006 water demands. The system evaluations
More informationDescription of Water Systems
Description of Water Systems 1 WATER SYSTEM OWNERSHIP AND MANAGEMENT The City is a Washington State municipal corporation that owns and operates a Group A community water system within the boundaries of
More informationCHAPTER 4 HYDRAULIC ANALYSIS
CHAPTER 4 HYDRAULIC ANALYSIS This chapter presents information on the computer hydraulic model of the City s water system and the results of hydraulic analyses. The purpose of the hydraulic analysis is
More information7 Public Utilities. The City surface water supply also has access to a limited water supply from a back-up water well.
7 Public Utilities This chapter of the General Plan establishes policies and provisions for public utilities, including water supply, wastewater treatment, and solid waste handling. The provision of adequate
More informationMontara Water and Sanitary District 2011 New Customer CIP and Water Capacity Charge. Presentation to Board April 21, 2011
Montara Water and Sanitary District 2011 New Customer CIP and Water Capacity Charge Presentation to Board April 21, 2011 PRESENTATION OUTLINE Master Plan Overview Purpose and Approach Supply and Demand
More informationVirgin Valley Water District Water System Deficiencies VVWD BOARD MEETING DECEMBER 6, 2016
Virgin Valley Water District Water System Deficiencies VVWD BOARD MEETING DECEMBER 6, 2016 Recap of Growth Projections 2.75% growth rate Average daily demand per Equivalent Dwelling Unit (EDU) of 410 gallons
More informationWATER SYSTEM MASTER PLAN 10. DISTRIBUTION SYSTEM EVALUATION
WATER SYSTEM MASTER PLAN 10. DISTRIBUTION SYSTEM EVALUATION This section provides an analysis of the current water distribution system s performance. Evaluation criteria, supply scenarios, and evaluations
More informationWater Distribution System Facility Plan
Water Distribution System Facility Plan July 2007 CVO\070040005 Contents Section Page Executive Summary...ES-1 1 Introduction...1-1 Financial Plan...1-1 Acknowledgements...1-1 MWC Staff...1-1 MWC Commissioners...1-1
More informationWest Bountiful City. Water System Capital Facilities Plan
Water System Capital Facilities Plan August 2008 TABLE OF CONTENTS 1.0 Executive Summary... 1 2.0 Definition of Terms and Abbreviations... 2 3.0 Introduction... 3 3.1 Background...3 3.2 Scope of Investigation...3
More informationWater Treatment Plant and Water Supply Study CITY OF SNOHOMISH, WASHINGTON
Water Treatment Plant and Water Supply Study CITY OF SNOHOMISH, WASHINGTON May 2009 TABLE OF CONTENTS EXECUTIVE SUMMARY Page Purpose and Background... ES-1 Existing Water System... ES-1 Water Demands...
More informationWater and Wastewater Impact Fee Analysis Capital Improvement Plan City of Lockhart February 2017
TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 ANALYSIS OF WATER & WASTEWATER SYSTEMS... 1 2.1 Present Water Demands... 1 2.2 Water Supply... 3 2.3 Water Treatment Plant... 4 2.4 Storage, High-Service Pumps,
More informationEXECUTIVE SUMMARY. The capital improvements costs through Year 2025 have been summarized as follows: RECOMMENDED IMPROVEMENTS (Ref.
EXECUTIVE SUMMARY This report evaluates the ability of the Dothan Water System to adequately meet the City s short range and future water supply, infrastructure and maintenance needs. The report evaluated
More informationSection 1 - Introduction...7. Section 2 - Raw Water Supply Section 3 - Water Treatment Section 4 - Water Distribution System...
Table of Contents Section 1 - Introduction...7 1.1 Population Growth...7 1.1.1 Service Area...7 1.1.2 Past Population...7 1.1.3 Projected Population Growth...9 1.2 Water Demands...9 1.2.1 Past Water Demands...9
More informationCHAPTER 8 CAPITAL IMPROVEMENT PLAN
INTRODUCTION CHAPTER 8 CAPITAL IMPROVEMENT PLAN This chapter presents 6-, 10-, and 20-year Capital Improvement Plans (CIPs) in accordance with the requirements of WAC 26-290. Water system capital improvements
More informationSection 5 - Planning Criteria. Section 5
Section 5 - Planning Criteria Section 5 SECTION 5 PLANNING CRITERIA This section presents the design criteria and methodologies for analysis used to evaluate the existing distribution system and its facilities
More information2006 Water Master Plan
2006 Water Master Plan Prepared for: City of Fountain 116 South Main Street Fountain, Colorado 017 Prepared by: Black & Veatch Corporation 6300 South Syracuse Way Suite 300 Centennial, Colorado 0111 Project
More informationWater Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting
Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting October 12, 2017 Water Treatment Plant Phase 1 Upgrades 22 mgd WTP Expand capacity to 32 mgd Upgrades to most processes Only
More informationZone 40 Water System Infrastructure Plan
SACRAMENTO COUNTY WATER AGENCY Sacramento County Water Agency April 2006 Sacramento County Water Agency Staff: Darrell Eck, Senior Civil Engineer Dan Barry, Senior Civil Engineer Mike Crooks, Senior Civil
More informationPRELIMINARY WASTEWATER CAPACITY STUDY
PRELIMINARY WASTEWATER CAPACITY STUDY Tentative Tract Map No. 18955 CITY OF HESPERIA Prepared for: HESPERIA VENTURES I, LLC 10410 Roberts Road Calimesa, CA 92320 Tel (714) 785 2381 Mr. John Ohanian Prepared
More informationThis is the title of the proposed project. A CIP contract or project number will be assigned to the projects as funding is established.
WATER PROJECTS PROJECT DESCRIPTIONS The CIP includes a general list of projects scheduled during each of the five years of the program, followed by detailed project sheets arranged by project category,
More informationCHAPTER 6 Evaluation of Future Water System at Buildout
CHAPER 6 Evaluation of Future Water System at Buildout 6.1 OVERVIEW his chapter presents an evaluation of the City s future expanded water distribution system and its ability to meet recommended water
More informationWater Management and Conservation Plan
Water Management and Conservation Plan March 2009 Water Management and Conservation Plan March 2009 CVO\082060036 Contents Section Page 1 Introduction...1-1 Overview...1-1 Plan Organization...1-3 Affected
More informationTable of Contents. 3.1 Source Capacity Analysis
Table of Contents 3.1 Source Capacity Analysis... 3-1 3.1.1. Design Criteria... 3-1 3.1.2. Source Capacity Evaluation... 3-1 3.1.2.1 Plateau Zone... 3-1 3.1.2.2 Cascade View Zone... 3-4 3.2 Storage Capacity
More informationMASTER WATER PLAN UPDATE 1. INTRODUCTION. 1.1 Objective and Scope
MASTER WATER PLAN UPDATE 1. INTRODUCTION 1.1 Objective and Scope This study is an update to the City of Victoria s Master Water Plan, which was last updated in 2009 by Urban Engineering. The objective
More informationIntroduction. Purpose
Introduction This Master Plan update includes updating the text of the Utilities Section of the current Master Plan and adding a report concerning telecommunications. Each element examines the existing
More informationSewer Modeling of Near- Term Development Technical Memorandum
Sewer Modeling of Near- Term Development City of Reedley, CA March 8, 2018 Page Intentionally Blank The City of Reedley (City) is anticipating near-term developments to the north of the City s currently
More informationSt. John the Baptist Parish
St. John the Baptist Parish Conceptual Engineering of Mississippi River Water Source for LaPlace March 26, 2015 digital engineering 1 Major Water System Components Conceputalized Laplace Water System New
More informationMillbrae Station Area Specific Plan
Exhibit B Millbrae Station Area Specific Plan Prepared for Accepted by City Council March 22, 2016 478-12-15-04 Table of Contents Executive Summary ES.1 Overview/Purpose... ES-1 ES.2 Water System Technical
More informationFINAL ENGINEERING REPORT
FINAL ENGINEERING REPORT FORT PECK ASSINIBOINE AND SIOUX WATER SUPPLY SYSTEM DRY PRAIRIE RURAL WATER SYSTEM JANUARY 2002 VOLUME I FINAL ENGINEERING REPORT FORT PECK ASSINIBOINE AND SIOUX WATER SUPPLY SYSTEM
More informationSECTION 4 RECOMMENDED DISTRIBUTION SYSTEM IMPROVEMENTS
4.1 General SECTION 4 RECOMMENDED DISTRIBUTION SYSTEM IMPROVEMENTS Distribution system improvements, which have been organized and prioritized in this section, are forecasted and intended to be completed
More informationCity of Richland Comprehensive Water System Plan
City of Richland June 2010 RH2 Engineering, Inc 114 Columbia Point Drive, Suite C Richland, WA 99352 Contact: Paul R. Cross, P.E. (509) 946-5181 Prepared by: June 2010 Signed: 6/28/2010 Signed: 6/28/2010
More informationSouth Coast Water District 2017 Master Plan Updates
South Coast Water District 2017 Master Plan Updates SCWD Sara Mathis, PE AECOM Henry Liang, PE Kelly McEnerney, EIT June 22, 2017 2017 Master Plan Update Presentation Outline Approach Potable Water System
More informationAPPENDIX B. WSSC Design Criteria for Water Distribution Systems
a. System Requirements ) Pressure Requirements APPENDIX B WSSC Design Criteria for Water Distribution Systems a) The water distribution system shall have adequate capacity to supply domestic demand to
More informationAPPENDIX M VANDEN MEADOWS PROJECT WATER MODELING STUDY AND TECHNICAL MEMORANDUM
APPENDIX M VANDEN MEADOWS PROJECT WATER MODELING STUDY AND TECHNICAL MEMORANDUM TECHNICAL MEMORANDUM Date: March 16, 2011 FROM: Victor M. Alaniz, P.E. Nolte Associates, Inc. 2495 Natomas Park Drive, Fourth
More informationReport. Lake Water Supply Hydraulic Modeling. Village of. Lindenhurst, IL. April 2012
Lake Water Supply Hydraulic Modeling Report Village of Lindenhurst, IL April 2012 R:\MAD\Documents\Reports\Archive\2012\Lindenhurst, IL\Lake Water Supply.HM.1290.039.mjf.jan\Report\!Front Cover (Blue=Water)
More informationLarge -Scale Pressurized Irrigation Systems
Large -Scale Pressurized Irrigation Systems CASE STUDY: April 19 2016 PRESENTED BY: James Bledsoe, PE Keller Associates, Inc. 208.288.1992 Background Nampa s Existing Pressure Irrigation System Population
More informationUtility Partner Data Report
Utility Partner Data Report Project Title: Studying Distribution System Hydraulics and Flow Dynamics to Improve Water Utility Operational Decision Making Water Distribution System: Paris, Kentucky Project
More informationSouth Coast Water District 2016 Master Plan Updates
South Coast Water District 2016 Master Plan Updates SCWD Sara Mathis, PE AECOM Henry Liang, PE Greg Bradshaw, PE Kelly McEnerney, EIT November 14, 2016 2016 Master Plan Update Presentation Outline Approach
More informationTask Order 6 System Interconnects
TECHNICAL MEMORANDUM 6 Date: November 3, 2014 To: From: RE: Peace River Manasota Regional Water Supply Authority (PRMRWSA) Atkins Team Task Order 6 System Interconnects System Interconnects 6.1 Introduction
More informationInland Empire Utilities Agency Carollo Engineers, Inc. CH2M HILL DRAFT
TECHNICAL MEMORANDUM IEUA Wastewater Facilities Master Plan TM 3 Regional Trunk Sewer Analysis PREPARED FOR: PREPARED BY: REVIEWED BY: Inland Empire Utilities Agency Carollo Engineers, Inc. CH2M HILL DATE:
More informationEAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan. Table 4-1 Capacity Evaluation d/d Criteria
EAST VALLEY WATER DISTRICT Wastewater Collection System Master Plan 4 Capacity Analysis The capacity analysis used the calibrated dry weather and wet weather wastewater collection system model to evaluate
More informationTable A Summary Water System Data Data
PS OMAS TECHNICAL MEMORANDUM NO. 2 To: From: Trish Rhay, Mark Cuneo Mike Swan, PE, Harvey Gobas, PE and Neha Gajjar, PE Date: Subject: EXECUTIVE SUMMARY The of Beverly Hills (CBH) has ten (10) active reservoirs
More informationFINAL DRAFT WATER MANAGEMENT AND CONSERVATION PLAN. Canby Utility. June DRAFT
FINAL DRAFT WATER MANAGEMENT AND CONSERVATION PLAN Canby Utility June 2010 - DRAFT WATER MANAGEMENT AND CONSERVATION PLAN FOR CANBY UTILITY JUNE 2010 FINAL DRAFT Prepared by: 09-1067.408 MURRAY, SMITH
More informationDRAFT TECHNICAL MEMORANDUM
Stetson Engineers, Inc. Technical Memorandum - New City of Solvang Well Field, May 14, 2010 DRAFT TECHNICAL MEMORANDUM 2171 E. Francisco Blvd., Suite K San Rafael, California 94901 TEL: (415) 457-0701
More informationSection 7 Hydraulic Model Development and Evaluation Criteria
Section 7 Hydraulic Model Development and Evaluation Criteria The hydraulic evaluation conducted to develop this master plan was performed using a computer model of the reclaimed water distribution system.
More informationThis is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.
This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact
More informationWater Utility Science Water Math and Hydraulics 050. Name: Date:
Water Utility Science Water Math and Hydraulics 050 Name: Date: Note: Please show all of your calculations for each problem no matter how simple the problem may seem. Please use the accompanying pieces
More informationCITY OF MILTON PIERCE/KING COUNTY, WASHINGTON WATER SYSTEM PLAN
CITY OF MILTON PIERCE/KING COUNTY, WASHINGTON WATER SYSTEM PLAN G&O #08474 July 2010 EXECUTIVE SUMMARY TABLE OF CONTENTS CHAPTER 1 DESCRIPTION OF THE WATER SYSTEM INTRODUCTION... 1-1 SYSTEM OWNERSHIP
More informationA Balancing Act: Complex Distribution System Planning in the Western North Carolina Foothills Tina Whitfield - HDR
A Balancing Act: Complex Distribution System Planning in the Western North Carolina Foothills Tina Whitfield - HDR 2017 HDR, Inc., all rights reserved. Agenda 01 Overview 02 Approach 03 Findings 04 Alternatives
More informationCITY OF TOPPENISH General Sewer Plan DRAFT FOR AGENCY REVIEW
CITY OF TOPPENISH General Sewer Plan DRAFT FOR AGENCY REVIEW G&O #15039 JUNE 2017 CITY OF TOPPENISH YAKIMA COUNTY WASHINGTON GENERAL SEWER PLAN G&O#l5039 JUNE 2017 Gray & Oshor.n.e~ l.n.c. CONSUL TING
More informationMunicipal Service Review
Willow Creek Community Services District Municipal Service Review May 2008 Prepared by: For the District Sphere of Influence Report TABLE OF CONTENTS Page Local Agency Formation Commission Authority...
More informationNELSONVILLE WATER TREATMENT PLANT IMPROVEMENTS
Location City of Nelsonville, Ohio Environmental Engineering, Design and Bidding, Construction Administration and Observation, Start-up Services Cost $4.25 million Size 1,000 gallon per minute Professional
More informationImproved Membrane Design Addresses Integrity Issues for the City of Yuba City Water Treatment Plant
Improved Membrane Design Addresses Integrity Issues for the City of Yuba City Water Treatment Plant Richard Stratton, PE HDR Engineering Acknowledgements City of Yuba City - John Westhouse, Plant Supervisor
More informationSpringfield Utility Board, Oregon Rainbow Water District, Oregon
WATER MANAGEMENT AND CONSERVATION PLAN Springfield Utility Board, Oregon Rainbow Water District, Oregon August 2012 WATER MANAGEMENT AND CONSERVATION PLAN FOR SPRINGFIELD UTILITY BOARD AND RAINBOW WATER
More informationCity of Palmdale Sewer Master Plan Final Report
City of Palmdale Sewer Master Plan Final Report Prepared by: Water andenvironment In Association with: Larson Consulting September, 2009 City of Palmdale Sewer Master Plan FINAL Table of Contents ES-1
More informationPRESSURIZED IRRIGATION SYSTEM MASTER PLAN
PRESSURIZED IRRIGATION SYSTEM MASTER PLAN (HAL Project No.: 314.04.100) FINAL REPORT January 2009 ACKNOWLEDGMENTS Successful completion of this study was made possible by the cooperation and assistance
More informationVolume 1 Executive Summary
2013 Cheyenne Water and Wastewater Master Plans Final November 27, 2013 Prepared for: City of Cheyenne Board of Public Utilities 2416 Snyder Ave. Cheyenne, WY 82001 Prepared by: HDR Engineering AMEC Earth
More information5.0 Water Supply Element
5.0 Water Supply Element The 2012 Wilsonville Water System Master Plan covers a 20-year planning period from 2010 to 2030. The following pages of this chapter summarize pertinent information contained
More informationChapter 6 STEP System Force Main Velocity Evaluation
Chapter 6 STEP System Force Main Velocity Evaluation \\7348101\TOC.doc CHAPTER 6 STEP System Force Main Velocity Evaluation 6.1 INTRODUCTION The City s existing STEP (septic tank effluent pump) pumps currently
More informationChapter 3 Previous Studies
Chapter 3 Previous Studies The Vista Grande stormwater conveyance system and watershed area has been evaluated in a number of reports and studies for the CCSF, the Daly City and San Mateo County over the
More informationHistory of Augusta s Waterworks Presented for. AUD Leadership Training
History of Augusta s Waterworks Presented for Drew Goins, Interim Director Augusta Utilities Waterworks, like cities, are seldom, if ever, completed. William Phillips, Augusta City Engineer 1865 . 200,000
More information4 EXISTING FACILITIES EVALUATION
4 EXISTING FACILITIES EVALUATION The City is served by a combination of wastewater collection, conveyance, and treatment systems. The City owns and operates the collection system that collects wastewater
More informationSITING AN ELEVATED TANK: NOT IN MY BACKYARD
SITING AN ELEVATED TANK: NOT IN MY BACKYARD Scott Huneycutt, P.E., Union County Public Works Benjamin Cownie, E.I.T., Black & Veatch Jeff Coggins, P.E., Black & Veatch Kevin T. Laptos, P.E., Black & Veatch*
More informationCITY OF ASHLAND EXECUTIVE SUMMARY WATER CONSERVATION AND REUSE STUDY FINAL. June 2011
CITY OF ASHLAND EXECUTIVE SUMMARY WATER CONSERVATION AND REUSE STUDY FINAL June 2011 720 SOUTHWEST WASHINGTON STREET, SUITE 550 PORTLAND, OREGON 97205-3507 (503) 227-1885 FAX (503) 227-1747 pw://carollo/documents/client/or/ashland/8406a00/deliverables/wcrs/executive
More informationAbout Me. Overview. Seattle Regional Water System. Seattle Regional Water System. Water System Analysis and Design at Seattle Public Utilities
About Me Water System Analysis and Design at Seattle Public Utilities Jon C. Ford, P.E. CEE 481 October 1, 8 Senior Civil Engineer, Seattle Public Utilities BSCE, Seattle University MSCE, University of
More informationEnvironmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017
Attachment 1 Environmental Task Force SSSMP Summary, September 18, 2011 Scheduled for City Council Approval September 26, 2017 Sanitary Sewer System Master Plan Summary Points - City s sanitary system
More informationUtility Partner Data Report
Utility Partner Data Report Project Title: Studying Distribution System Hydraulics and Flow Dynamics to Improve Water Utility Operational Decision Making Water Distribution System: Nicholasville, Kentucky
More informationPlanada Community Services District Municipal Service Review
Final Report Planada Community Services District Municipal Service Review Prepared for: Merced County Local Agency Formation Commission Prepared by: April 2015 As Approved by LAFCO April 15, 2015 EPS #141037
More informationFinal - Preliminary Design Report Interstate 10 and Indian Avenue Area Sewer System. Prepared for
Final - reliminary Design Report Interstate 10 and Indian Avenue Area Sewer System repared for Mission Springs Water District July 2012 Mission Springs Water District I-10 & Indian Area Sewer System DR
More informationStart-up of a Secondary Water Supply Company. and First Phase Design of a Regional System
Start-up of a Secondary Water Supply Company and First Phase Design of a Regional System by Stephen W. Smith and Amy L. Johnson Abstract. Highland Ditch Company formed the Highland Secondary Water Company
More informationCity of Hillsboro Water Treatment Plant/System
City of Hillsboro Water Treatment Plant/System City of Hillsboro Water Treatment Plant/System, 130 N. High St., Hillsboro, OH 45133 937-393-1325; Year Established: 1945 Year of Upgrades: 2004 X-2 Reservoirs
More informationSection 9 Distribution System Analysis
Section 9 Distribution System Analysis This section presents the analysis of the City of Sunnyside s (City) distribution system. Hydraulic modeling was performed to evaluate the adequacy of existing facilities
More informationDRINKING WATER CONSTRUCTION PERMIT APPLICATON
DRINKING WATER CONSTRUCTION PERMIT APPLICATON Addition to existing water system New drinking water system Facilities to be added Surface Plant (new or expansion) New Well or Spring Source Booster Pump
More informationThis is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.
This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact
More informationAPPENDIX E. Cost Estimating Assumptions
E.1 OVERVIEW This appendix provides the assumptions used by West Yost Associates (West Yost) to estimate the construction costs for the planning and design of recommended water system facilities for the
More informationUNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report
UNIVERSITY OF OREGON NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT Draft Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report Prepared for: Cameron McCarthy Landscape Architects LLP
More informationPalouse Groundwater Basin Water Supply Alternatives Analysis Report
March 2017 Palouse Basin Aquifer Committee Palouse Groundwater Basin Water Supply Alternatives Analysis Report Prepared for Palouse Basin Aquifer Committee/University of Idaho March 2017 Palouse Basin
More information2.0 Description of Wilsonville s Water System
2.0 Description of Wilsonville s Water System 2.1 SOURCES The City s primary water supply is treated water from the Willamette River. As a back-up supply, the City has maintained eight wells capable of
More informationHorizon 2020 Steering Committee Water and Wastewater Master Plan Overview
Horizon 2020 Steering Committee Water and Wastewater Master Plan Overview August 11, 2014 Let s Look at the Numbers Water System 2 - Raw Water Sources Clinton Reservoir Kansas River 2 - Water Treatment
More information8.4 West Central Brazos Water Distribution System
8.4 West Central Brazos Water Distribution System 8.4.1 Description of Option The West Central Brazos Water Distribution System (WCBWDS) is a relatively unused system that could potentially provide raw
More informationWATER RESOURCES - WATER SUPPLY
EXECUTIVE SUMMARY Sacramento County Water Agency (SCWA) constructs water supply improvement projects to serve both newly developing areas and existing customers. This report summarizes those construction
More informationCHAPTER 4 SYSTEM DESIGN CRITERIA
INTRODUCTION CHAPTER 4 SYSTEM DESIGN CRITERIA Adequate design of the District s wastewater conveyance facilities requires the determination of the quantity of wastewater from contributing sources. The
More informationMAP, PLAN AND REPORT WILLIAMS LAKE WATER DISTRICT WILLIAMS LAKE RESORT TOWN OF ROSENDALE, ULSTER COUNTY, NY
MAP, PLAN AND REPORT WILLIAMS LAKE WATER DISTRICT WILLIAMS LAKE RESORT TOWN OF ROSENDALE, ULSTER COUNTY, NY PREPARED FOR HUDSON RIVER VALLEY RESORTS PO BOX 385 ROSENDALE, NY 12472 PREPARED BY Crawford
More informationCity of Santa Rosa Groundwater Master Plan. Presentation to BPU Study Session June 6, 2013
City of Santa Rosa Groundwater Master Plan Presentation to BPU Study Session June 6, 2013 Presentation Outline Groundwater Policy Background Groundwater Master Plan Objective How Did We Get Here? Key Groundwater
More informationCity of Greenfield Water Treatment Plant/System
City of Greenfield Water Treatment Plant/System General Information County: Highland Counties Served: Highland Type of System: Public: X 6119: Private: Year Established: 1893 Year of Upgrades: 1972, 1977,
More informationVILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY
EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire
More informationApproved Capacity. March 2010
March 2010 Approved Capacity Planning and Design Criteria for Establishing Approved Capacity for: 1) Surface Water And Ground Water Supply Sources, 2) Drinking Water Treatment Plants (WTPs), and 3) Source/WTP
More informationFacilities Plan. Technical Memorandum No. TM-WW-7 Hydraulic Analysis and Effluent Pump Station
City of St. Joseph, Missouri Hydraulic Analysis and Effluent Pump Station By Work Order No. 09-001 B&V Project 163509 May 20, 2010 Table of Contents 1.0 Executive Summary...1 2.0 Purpose of Study...2 3.0
More informationWater Connection Charge Cost Study 2017 Update
Placer County Water Agency Water Connection Charge Cost Study 2017 Update March 17, 2017 Prepared by: Financial Analysis and Contributions by: Contents Background... 1 Recent Changes... 3 West Placer Pipeline...
More informationAquifer Storage and Recovery (ASR) Implementation and Operations in a Water System. Tiffanie Hawley, CFPUA Randy Plummer, HDR
Aquifer Storage and Recovery (ASR) Implementation and Operations in a Water System Tiffanie Hawley, CFPUA Randy Plummer, HDR NC AWWA Spring Conference 2014 Background Data CFPUA Water System Fear Public
More informationEnid Alternate Water Supply
City of Enid, Oklahoma Prepared by: 1016 24 th Ave NW Norman, OK 73069 June 2016 1.0 Introduction The City of Enid, Oklahoma (City) has historically enjoyed an adequate supply of water resources to support
More informationDELTA WASTEWATER TREATMENT PLANT UPGRADES
Delta, Ohio Environmental and Electrical Engineering, Grant Administration Cost $2.6 million $3.2 million OWDA Loan 1,100 SF Admin Building Addition 0.725 MGD Average Daily Flow 1.5 MGD Peak Capacity Professional
More informationOakland Storage. in Oakland. part of the. Water water. being. Demand. Treatment. Required Storage (gallons) Population. Condition.
Oakland Township Southwest Water System Storage & Treatment May 12, 2014 Introduction This memorandum provides the cost opinions for design and construction of water treatment (iron removal) and storage
More informationGlades Reservoir Environmental Impact Statement (EIS)
Glades Reservoir Environmental Impact Statement (EIS) Permit Application #SAS-2007-00388 Public Scoping Meeting Proposed Operational Plan/Scenarios March 2012 Glades Reservoir Environmental Impact Statement
More informationWATER SUPPLY AND DISTRIBUTION PLAN. City of Medina. Adopted November 17, Project Number:
WATER SUPPLY AND DISTRIBUTION PLAN City of Medina Adopted November 17, 2009 Project Number: 000190-07011-0 CITY OF MEDINA WATER SUPPLY AND DISTRIBUTION PLAN Table of Contents Executive Summary...1 Introduction...
More informationSaint Louis Water Supply Replacement Gratiot Area Water Authority
Saint Louis Water Supply Replacement Gratiot Area Water Authority Public Forum October 23, 2013 Introduction Welcome and Introductions Format of Meeting Slide Show Presentation Question and Answer Period
More informationAPPENDIX B THE MUNICIPAL AUTHORITY OF THE TOWNSHIP OF ROBINSON DESCRIPTION OF THE AUTHORITY ' S WATER AND SEWER SYSTEM AND FINANCIAL INFORMATION
APPENDIX B DESCRIPTION OF THE AUTHORITY ' S WATER AND SEWER SYSTEM AND FINANCIAL INFORMATION FOR FISCAL YEAR 2017 DESCRIPTION OF THE AUTHORITY S WATER AND SEWER SYSTEM The existing water distribution system
More information