Kozienice Power Plant - ENEA Group

Size: px
Start display at page:

Download "Kozienice Power Plant - ENEA Group"

Transcription

1 Kozienice Power Plant - ENEA Group - Basic engineering, Construction Permit Designs (substitutes), detailed design (cooling water system, raw water system, coal supply and power output system) and as-built documentation for the construction of a 1075 MWe supercritical power unit, fired with hard coal ( ) - Multi-discipline detailed design for the modernization of furnace wastes yard (2016) - Multi-discipline detailed design for upgrade / reconstruction of the Main Building (2011) - Technical concept and multi-discipline detailed design for the modernization of slag and ash landfill (2011) - Multi-variant conceptual and detailed design for the modernization of the Main Building regarding, in particular, fire fighting requirements (2009) - Multi-discipline technical documentation (concepts, basic and detailed engineering) necessary for the performance of gradual, comprehensive modernization of the 200 MW power units ( ) - Multi-discipline technical documentation (concepts, basic and detailed engbineering) necessary for the performance of comprehensive modernization of the 2 x 500 MW power units ( ) - Design concept and Construction Permit Design related to the project Construction of the Water Demineralisation Station DEMI II for raw water pipelines 2 DN 350 from the pumping station to the new building, and feed pipelines DN 300 evacuating industrial waste from the designed Station to slurry pumping stations ( ) - Multi-discipline technical documentation necessary to perform comprehensive modernization of the coal handling system for the 8 x 200 MW power units ( ) - Multi-discipline technical documentation (concepts, Construction Permit Design and detailed engineering) for the replacement of electrostatic precipitators at the 200 MW power units no. 3, 7, 8 ( ) Bełchatów Power Plant - PGE GiEK S.A. - Construction Permit Design and multi-discipline design for an existing air compressor building and a new air driers building in the scope of reconstruction of air compressor system for the ash removal installation (2016) - Basic engineering, Construction Permit Design and comprehensive detailed design for the modernization of a FGD plant for the power units Nos. 5 & 6 ( ) - Detailed design to adapt the "Zwałowisko" combustion waste dump for operation at the 2nd and 3rd stages (2013, 2015) - Construction Permit Design, multi-discipline detailed designs and as-built documentation for the modernization of flue gas reheating system of a FGD System for the power unit Nos. 8, 11, 12 ( ) - Multi-discipline technical documentation (Construction Permit Design and detailed engineering for selected buildings and engineering structures) for the construction of a 858 MW supercritical power unit ( ) - Construction Permit Design (2010) and detailed design (electrical part and site 1 / 8

2 arrangement) for the construction of a FGD System for power units No. 1 & 2 ( ) - Construction Permit Design upgrade for the construction of a FGD System for a 858 MWe supercritical power unit (2010) - Multi-discipline technical documentation (basic engineering, detailed engineering and as-built engineering) for the construction of a FGD System for a 858 MW supercritical power unit ( ) - Multi-discipline technical documentation (Construction Permit Design and detailed engineering) for the redevelopment of the coal dumping building P I/6 and coal sorting building P III/10 (2009) - Multi-discipline technical documentation (basic engineering, detailed engineering and as-built documentation) for the modernization of live steam pipelines, reheated steam pipelines, flue gas reheating steam pipelines and feed water pipelines for boiler BB-1150 of a 360 MW power unit ( ) - Multi-discipline technical documentation (detailed engineering, documentation for licenses, workshop designs and as-built documentation) for the modernization of HP and MP pipelines of 18K370 turbine at a 360 MW power unit no. 3 ( ) - Multi-discipline technical documentation (Construction Permit Design, detailed engineering and as-built documentation) for the project Construction of the water intake on Krasówka river for the needs of the power plant water management ( ) - Multi-discipline technical documentation (Construction Permit Design, detailed engineering and as-built documentation) for the modernization of the Water Treatment Station for boiler cycle at the power plant ( ) - Multi-discipline technical documentation (concepts, basic engineering, Construction Permit Design and detailed engineering) required to perform the modernization of the existing and construction of the new system of furnace ash hydraulic evacuation to the new landfill ( ) Pątnów Adamów Konin Power Plants Group - Multi-variant conceptual and detailed designs for the modernization of transformer cooling and insulation oil drip pans at the Adamów Power Plant (2009) - Multi-discipline technical documentation (concepts, Construction Permit Design, detailed engineering and as-built documentation) for the construction of a 464 MW supercritical power unit at the Pątnów Power Plant ( ) - Modernization of the central cooling water pumping stations no. 1 and 2 for the 200 MW power units at the Pątnów Power Plant ( ) Połaniec Power Plant GDF Suez Energia Polska Group - Detailed engineering in the electrical part, regarding the start-up of a complete CFB boiler for a 190 MWe power unit ( ) - Detailed engineering in the electrical part for the modernization of the 6 kv and 0.4 kv switchgears ( ) 2 / 8

3 - Detailed engineering (electrical part) for the replacement of six 6 kv switchgears (2009) - Multi-discipline technical documentation (concept, Construction Permit Design and detailed engineering) for the construction of central control room and the guaranteed power supply system ( ) Warsaw CHP Plants - PGNiG Termika S.A. - Technical documentation (required for agreements with the Office of Technical Inspection) of condensate evacuation from a flue gas denitrification system and a boiler soot blower system at the Siekierki CHP Plant (2012). - Detailed design for the needs of upgrading a EP25 feed water pump drive at the Żerań CHP Plant (2012). - Construction Permit Design for the construction of a 480 MWe supercritical power unit at the Siekierki CHP Plant (2009). - Multi-discipline detailed design for the upgrading of a live steam header and connecting a new turbine set Tz12 at the Żerań CHP Plant (2009). - Multi-discipline technical documentation (Construction Permit Design and detailed engineering), including the preparation and acquiring of official permits for the construction of a heat accumulator system at the Siekierki CHP Plant ( ). - Multi-discipline technical documentation (basic engineering, detailed engineering and as-built documentation) for the modernization of district heating water pumps system at the Siekierki CHP Plant (2005). - Multi-discipline technical documentation (Construction Permit Design and detailed engineering) for the construction of fluidized bed boilers A & B at the Żerań CHP Plant ( ). - Complete design of retention tank ZRP-3 (V = 2800 m 3 ) for a fly ash from the fluidized bed boilers A & B at the Żerań CHP Plant ( ). Elektrownia Północ Power Plant - Basic engineering and Construction Permit Design for the construction of a 2 x 1000 MWe supercritical power plant, fired with hard coal ( ). ENERGA Ostrołęka Power Plants - Construction Permit Design and detailed design for the construction of an emergency 3 / 8

4 power supply system for selected devices, in case of a "black-out" at the Elektrownia "B" Power Plant (2013). - Basic engineering and comprehensive detailed design for the modernization of a 0.4 kv switchgear at the Elektrownia "B" Power Plant (2013). - Construction Permit Design of the biomass supply logistics and combustion waste collection yard from the designed Ostrołęka "C" Power Plant with a capacity of 1000 MWe (2012). - Concept and basic engineering for emergency power supply system of devices installed at the Ostrołęka "B" Power Plant (2012). - Construction Permit Design for the construction of combustion wastes emergency landfill for Ostrołęka "C" Power Plant (2011). - Construction Permit Design for the construction of a 1000 MWe supercritical power unit, fired with hard coal (2010). - Multi-discipline technical documentation (Construction Permit Design, detailed engineering and as-built documentation) for the construction of a FGD System at the Ostrołęka B Power Plant ( ). Lublin Wrotków CHP Plant - PGE GiEK S.A. Construction of a gas and steam combined cycle unit with an output of 235 MW el and 150 MW t h at the CHP plant ( ). The work scope included: - pre-feasibility study, - feasibility study in the technical part along with the environmental impact assessment, - management, on behalf of the Investor, of a tender for the selection of General Contractor of a gas and steam combined cycle unit, - Construction Permit Design, detailed engineering and as-built documentation, - consultancy regarding the operation and economical and finance monitoring of a gas and steam combined cycle unit. Rzeszów CHP Plant - PGE GiEK S.A. Construction of a gas and steam combined cycle unit with an output of 101 MW el and 76 MW th at the CHP plant ( ). The work scope included: - pre-feasibility study, - feasibility study, - management, on behalf of the Investor, of a tender for the selection of General Contractor 4 / 8

5 of a gas and steam combined cycle unit, along with the development of Terms of Reference, bids completeness evaluation and bidder s selection, as well as preparation of the contract with the General Contractor, - Construction Permit Design, detailed engineering and as-built documentation (thermal-process part in the scope of steam and water systems as well as gas and oil pipelines). Pomorzany Power Plant - PGE GiEK S.A. - Construction Permit Design for the construction of a 240 MW el gas - steam combined cycle unit (2012). ANWIL S.A. - ORLEN Group - Detailed design for selected buildings and engineering structures of a 463 MW el gas - steam combined cycle unit (2013). Tychy CHP Plant - TAURON Ciepło S.A. - Construction Permit Design and comprehensive detailed design for the construction of a BC 50 thermal power unit with fluidized bed boiler and heating condensing turbine ( ). Żychlin Heating Plant - Basic engineering, construction permit design for installation of two gas engines of combined power of 4 MW el/3.75 MW th and biomass-fired boiler with discharge and condensing turbine 2.7 MW el/5.2 MW th (2014). NOWA CHP Plant - Detailed electrical design for a power output system from 50 MW pass-out and condensing turbine generator set (2014). Rybnik Power Plant - EDF Group 5 / 8

6 - Construction Permit Design for ammonia water tanks (construction of a Low NOx installation for boilers K7 & K8) (2013). - Basic engineering for the cooling water pipelines inside a turbine hall of a 900 MWe supercritical power unit, fired with a hard coal (2012). Opole Power Plant - PGE GiEK S.A. - Detailed design for the upgrade of a common power center (2011). - Construction Permit Design and multi-discipline detailed design for the Main Control Center (2008). - Detailed design in the electrical part for the upgrading of control and protection systems in 6 kv and 0.4 kv common switchgears (2007). Zofiówka CHP Plant - Spółka Energetyczna Jastrzębie S.A. - Preliminary design and Construction Permit Design for the construction of a 70 MW el power unit with fluidized bed boiler (2012). Wybrzeże CHP Plants - EDF Group - Basic engineering, Construction Permit Design and comprehensive detailed design for the construction of a FGD plant (wet method) at the Gdańsk CHP Plant ( ). - Multi-discipline technical documentation (detailed engineering and as-built documentation) for the redevelopment and extension of water and waste management at the Gdańsk CHP Plant ( ). - Development of the concept and detailed engineering of the safe unit shutdown system at the Gdańsk CHP Plant in case of emergency disconnection from the national power grid (2003). Wrocław CHP Plant KOGENERACJA S.A. - EDF Group - Basic engineering, Construction Permit Design and comprehensive detailed design for the construction of a FGD plant ( ). 6 / 8

7 Kraków CHP Plant - EDF Group - Multi-discipline detailed design including priced bills of quantities for the construction of a ventilation system for a coal supply gallery in the boiler building (2011). - Multi-discipline technical documentation (Construction Permit Design and detailed design) for the construction of a heat accumulator system (2009) Białystok CHP Plant - ENEA Group - Multi-discipline technical documentation (basic engineering, Construction Permit Design, detailed design and as-built documentation) for the construction of a biomass-fuelled system for renewable energy generation ( ). NIKOLA TESLA B Power Plants (Obrenovac - Serbia) - Preliminary design, basic engineering, detailed design, assembly documentation and documentation for agreements with the Office of Technical Inspection related to the feed water pipeline feeding ECO1A superheater (modernization of a BB-1880 boiler ( ). National Centre for Nuclear Research - Construction permit design, detailed design for the modernization of a secondary circuit cooling system for MARIA nuclear reactor ( ). Ignalina Nuclear Power Plant (Lithuania) - Multi-discipline technical documentation (Construction Permit Design, detailed engineering and as-built documentation) in the scope of works concerning the Visaginas heating boiler station ( ). Gorzów CHP Plant - PGE GiEK S.A. - Technical documentation regarding the needs to adapt the devices and systems in explosion risk zones for the current requirements (2012). - Comprehensive technical documentation (basic engineering, detailed engineering and as-built documentation) for the electric systems of a gas and steam combined cycle unit at the Gorzów GHP Plant ( ). Frantschach Świecie Paper Mill 7 / 8

8 - Construction Permit Design for the construction of a circulating fluidized bed boiler (Q = 234 t/h), biomass-fuelled as part of the extension of the existing Polish Energy Partners S.A. CHP Plant with an output of 550 MWth (2002). 8 / 8

Our Realization POLAND

Our Realization POLAND Project Zabrze Assembly boiler CFB Client : EC. Fortum Zabrze Employer: EC. Fortum Zabrze Site : EC. Zabrze Work od scope: Transport and assembly of the drum Transport and assembly installation of walls

More information

Reference list SELECTED PROJECTS FOR POLISH POWER SECTOR. References in the energy sector. Baltic Green I ongoing

Reference list SELECTED PROJECTS FOR POLISH POWER SECTOR. References in the energy sector. Baltic Green I ongoing Baltic Green I 2017- ongoing RADPEC S.A. 2017 PGNiG Termika 2017 Building Design and Building Permit for a biomass power plant The project involves developing a complete technical documentation and other

More information

First Operating Experiences of 55 MWe Konin and 205 MWe Polaniec CFB Boilers Firing 100% Biomass

First Operating Experiences of 55 MWe Konin and 205 MWe Polaniec CFB Boilers Firing 100% Biomass First Operating Experiences of 55 MWe Konin and 205 MWe Polaniec CFB Boilers Firing 100% Biomass Marko Natunen Timo Jäntti Damian Goral Kalle Nuortimo Foster Wheeler Energia Oy Presented at PowerGen Europe

More information

Environmentally Sound Technology Biomass Fuelled Energy Plants. Combined Heat and Power Supply. Biomass Fired Steam Generator

Environmentally Sound Technology Biomass Fuelled Energy Plants. Combined Heat and Power Supply. Biomass Fired Steam Generator Environmentally Sound Technology Biomass Fuelled Energy Plants BONO SISTEMI can boast 50 years experience, gained in the design and production of biomass fired steam generators and thermal fluid heaters

More information

Babcock Borsig Steinmüller GmbH. Bełchatów - Retrofitting the EU s Largest Power Plant Site

Babcock Borsig Steinmüller GmbH. Bełchatów - Retrofitting the EU s Largest Power Plant Site Bełchatów - Retrofitting the EU s Largest Power Plant Site Dr. Christian Storm, Dr. Georg Gasteiger, Dr. Bernhard Pinkert, Frank Adamczyk, Krzysztof Matyskiewicz 31.10.2012 Worldwide new trends in energy

More information

The WTA technology An advanced method of processing and drying lignite

The WTA technology An advanced method of processing and drying lignite Position: January 2008 RWE Power Aktiengesellschaft Essen Köln www.rwe.com The An advanced method of processing and drying lignite RWE Power With all our power RWE Power Energy is life. It is the nervous

More information

Energy reforms in Poland

Energy reforms in Poland Energy reforms in Poland RECCOMENDATION FOR UKRAINE Milestones of the country s energy sector development - State price deregulation State price deregulation - 1998 - The Minister of Finance/ The Ministry

More information

Power Engineering II. Technological circuits of thermal power plants

Power Engineering II. Technological circuits of thermal power plants Technological circuits of thermal power plants Lay out scheme of coal power plant climatetechwiki.com Technological circuits 2 Coal and ash circuit Air and gas circuit Feed water and steam circuit Cooling

More information

BRIEF MARKET REPORT FOCUS: DISTRICT HEATING/CHP AND ELECTRICITY MARKET IN POLAND PREPARED FOR: Date Our ref. Case No.

BRIEF MARKET REPORT FOCUS: DISTRICT HEATING/CHP AND ELECTRICITY MARKET IN POLAND PREPARED FOR: Date Our ref. Case No. BRIEF MARKET REPORT FOCUS: DISTRICT HEATING/CHP AND ELECTRICITY MARKET IN POLAND PREPARED FOR: Date 16.11.2012 File No. Rrxxx Our ref. KW Case No. Table of content I. Introduction... 3 I. Executive Summary...

More information

Foster Wheeler Advanced Bio CFB Technology for Large Scale Biomass & Peat Firing Power Plants

Foster Wheeler Advanced Bio CFB Technology for Large Scale Biomass & Peat Firing Power Plants Foster Wheeler Advanced Bio CFB Technology for Large Scale Biomass & Peat Firing Power Plants Timo Jäntti Kalle Nuortimo Foster Wheeler Energia Oy Varkaus, Finland Presented at Russia Power Moscow, Russia

More information

EUROPEAN BIOMASS CHP IN PRACTICE

EUROPEAN BIOMASS CHP IN PRACTICE EUROPEAN BIOMASS CHP IN PRACTICE Kati Veijonen, Technical Research Centre of Finland Anders Evald, FORCE Technology, Janet Witt, Institute for Energy and Environment, Germany Harrie Knoef, BTG Biomass

More information

Welcome to. Kendal Power Station

Welcome to. Kendal Power Station Welcome to Kendal Power Station Technical Overview of the power station Scope General Overview Coal Handling Milling Plant Boiler Plant Turbine Train Steam Flow Path Ash Handling Generator HV Yard Cooling

More information

Cleaner Production and Energy Efficiency in Industry. With Focus on the Electricity Supply

Cleaner Production and Energy Efficiency in Industry. With Focus on the Electricity Supply Cleaner Production and Energy Efficiency in Industry With Focus on the Electricity Supply 1 Cleaner Production (CPEE) Prevent or reduce pollution and waste by implementing measures that are: Environmentally

More information

Water-Saving Technologies for Coal-Fired Power Plant N. HU, Y.F. PEI

Water-Saving Technologies for Coal-Fired Power Plant N. HU, Y.F. PEI Water-Saving Technologies for Coal-Fired Power Plant N. HU, Y.F. PEI Northeast Electric Power Design Institute Co., Ltd. of China Power Engineering Consulting Group, Changchun, China KEYWORD: Water saving;

More information

Nuclear power program in Poland

Nuclear power program in Poland Global Supply Chain and Localization Nuclear Supplier and Customer Countries Engagement Group NSCCEG Paris, 7-8 November 2017 Andrzej SIDŁO Chief Expert Department of Nuclear Energy, Poland Polish Power

More information

Acquisition of heating assets and Rybnik power plant and prospects for development of heat and cogeneration segment within PGE Group.

Acquisition of heating assets and Rybnik power plant and prospects for development of heat and cogeneration segment within PGE Group. Acquisition of heating assets and Rybnik power plant and prospects for development of heat and cogeneration segment within PGE Group May 19, 2017 2 Agenda Summary of the transaction PGE Group after the

More information

Oxy-fuel combustion integrated with a CO 2 processing unit

Oxy-fuel combustion integrated with a CO 2 processing unit POLISH STRATEGIC PROGRAM ADVANCED TECHNOLOGIES FOR ENERGY GENERATION Oxy-fuel combustion integrated with a CO 2 processing unit coordinator: Wojciech Nowak AGH University of Science and Technology Kraków,

More information

DIRECTORS REPORT ON THE OPERATIONS OF THE RAFAKO GROUP IN 2016

DIRECTORS REPORT ON THE OPERATIONS OF THE RAFAKO GROUP IN 2016 DIRECTORS REPORT ON THE OPERATIONS OF THE RAFAKO GROUP IN 2016 Racibórz, March 21st 2017 Table of contents Page I. General information... 4 II. Organisation of the RAFAKO Group... 7 1. Structure of the

More information

NEW TECHNOLOGIES IN COAL-FIRED THERMAL POWER PLANTS FOR MORE EFFECTIVE WORK WITH LESS POLLUTION

NEW TECHNOLOGIES IN COAL-FIRED THERMAL POWER PLANTS FOR MORE EFFECTIVE WORK WITH LESS POLLUTION UDK 621.311.22:502.174 Dip.el.eng. Igor SEKOVSKI NEW TECHNOLOGIES IN COAL-FIRED THERMAL POWER PLANTS FOR MORE EFFECTIVE WORK WITH LESS POLLUTION Abstract Today people make a lot of analysis, of work of

More information

COAL WATER SLURRY FUEL Alternate Fuel for Thailand

COAL WATER SLURRY FUEL Alternate Fuel for Thailand COAL WATER SLURRY FUEL Alternate Fuel for Thailand Power-Gen Asia 2014 Royal Daniel Managing Director RDaniel@roe.com Contents Introduction of POWER Burns and Roe Coal Water Slurry (WS) Fuel in General

More information

Techno-Economic Evaluation of. with Post Combustion Capture

Techno-Economic Evaluation of. with Post Combustion Capture Techno-Economic Evaluation of Biomass Fired or Co-Fired Power Plant with Post Combustion Capture Stanley Santos IEA Greenhouse Gas R&D Programme Cheltenham, UK Regional Workshop for the Baltic Sea and

More information

The way forward for CCS in Poland

The way forward for CCS in Poland The way forward for CCS in Poland Giles Dickson, VP Global Public Affairs 18 November 2014 Alstom = tom = low-caon infrastructure Alstom Thermal Power Alstom Grid Alstom Renewable Power Alstom Transport

More information

CHAPTER 8 CONCLUSIONS

CHAPTER 8 CONCLUSIONS 181 CHAPTER 8 CONCLUSIONS To carry out thermodynamic analysis of steam power plants, a software program capable of generating different properties of the steam in supercritical/ultra supercritical/advanced

More information

Adoption of USC CFB Technology to Achieving Lower Cost Generation and Environmental Sustainability. Gerd Heiermann & Douglas Spalding

Adoption of USC CFB Technology to Achieving Lower Cost Generation and Environmental Sustainability. Gerd Heiermann & Douglas Spalding Adoption of USC CFB Technology to Achieving Lower Cost Generation and Environmental Sustainability. Gerd Heiermann & Douglas Spalding 14 November 2014 EEC Conference Delhil Doosan and India a Total Solution

More information

Coupling of power generation with syngas-based chemical synthesis

Coupling of power generation with syngas-based chemical synthesis Coupling of power generation with syngas-based chemical synthesis Clemens Forman, Matthias Gootz, Christian Wolfersdorf, Bernd Meyer Institute of Energy Process Engineering and Chemical Engineering, TU

More information

Technical solutions for energy recovery

Technical solutions for energy recovery Technical solutions for energy recovery We are Uniper We are a leading international energy company with operations in more than 40 countries and around 13,000 employees. We combine a balanced portfolio

More information

Energy Projects in Poland Last Update October 2017

Energy Projects in Poland Last Update October 2017 Energy s in Poland Last Update October 2017 Investor ENERGA combined cycle power plant in Grudziądz Est. net value: unknown 420-600 MWe - Gas - - The project has been frozen. Investor analyses different

More information

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN

SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN (EXECUTIVE SESSION) November, 2007 JAPAN EXTERNAL TRADE ORGANIZATION JAPAN CONSULTING INSTITUTE SOME ENERGY-EFFICIENT TECHNOLOGIES IN JAPAN 1. Power Generation

More information

Advanced Coal Power Plant Water Usage

Advanced Coal Power Plant Water Usage CoalFleet for Tomorrow Advanced Coal Power Plant Water Usage Ronald L. Schoff (rschoff@epri.com) Project Manager Advanced Coal Generation Options Charlotte, North Carolina July 8 9, 2008 CoalFleet for

More information

BFB (bubbling fluidized bed) Power Plants (CHP) Fuel: RDF or Biomass CHP

BFB (bubbling fluidized bed) Power Plants (CHP) Fuel: RDF or Biomass CHP BFB (bubbling fluidized bed) Power Plants (CHP) Fuel: RDF or Biomass CHP BFB power plant project (CHP) BFB plant is a ready-made, functional power plant. The project is handled from design through to commissioning

More information

Nuclear power program in Poland

Nuclear power program in Poland 9th International School on Nuclear Power Warsaw, 15th November 2017 Dr Józef Sobolewski Director Department of Nuclear Energy Ministry, Poland Polish Power System Ministry The total maximum capacity in

More information

Your partner for the right solution

Your partner for the right solution Your partner for the right solution Project engineering of power stations Environment protection in energy sector Equipment supplying Supervision of installation of the equipment supplied Commissioning

More information

Topics Covered. Expert Course Faculty Leader APRIL 2019, KUALA LUMPUR, MALAYSIA. Thermal Plant Performance Testing

Topics Covered. Expert Course Faculty Leader APRIL 2019, KUALA LUMPUR, MALAYSIA. Thermal Plant Performance Testing Major Equipment Performance Testing, Boilers, Turbines, Condensers, Pumps, Fans, Test Methodology and Code Requirements, Equipment Efficiency, Heat Rate Calculations, Correction Factors Topics Covered

More information

Topics Covered. Expert Course Faculty Leader APRIL 2019, KUALA LUMPUR, MALAYSIA. Thermal Plant Performance Testing

Topics Covered. Expert Course Faculty Leader APRIL 2019, KUALA LUMPUR, MALAYSIA. Thermal Plant Performance Testing Major Equipment Performance Testing, Boilers, Turbines, Condensers, Pumps, Fans, Test Methodology and Code Requirements, Equipment Efficiency, Heat Rate Calculations, Correction Factors Topics Covered

More information

BC HYDRO AND POWER AUTHORITY BIOENERGY PROJECTS TECHNOLOGY REVIEW

BC HYDRO AND POWER AUTHORITY BIOENERGY PROJECTS TECHNOLOGY REVIEW C O N T E N T S 1.0 INTRODUCTION...1 2.0 STEAM-BASED PLANTS...2 2.1 General...2 2.2 Conventional Steam Boiler Types...3 2.3 Conventional Steam Boiler Performance...3 2.4 Steam Turbine Generator Performance...4

More information

Development of High Efficiency CFB Technology to Provide Flexible Air/Oxy Operation for Power Plant with CCS FLEXI BURN CFB

Development of High Efficiency CFB Technology to Provide Flexible Air/Oxy Operation for Power Plant with CCS FLEXI BURN CFB Development of High Efficiency CFB Technology to Provide Flexible Air/Oxy Operation for Power Plant with CCS FLEXI BURN CFB 2 nd International Workshop on Oxyfuel FBC Technology Antti Tourunen VTT Technical

More information

Impact of biomass co-firing on selected parameters of a 225 MW power unit

Impact of biomass co-firing on selected parameters of a 225 MW power unit Open Access Journal Journal of Power Technologies 95 (Polish Energy Mix) (2015) 84 90 journal homepage:papers.itc.pw.edu.pl Impact of biomass co-firing on selected parameters of a 225 MW power unit Mieczysław

More information

Case Study from Nikola Tesla A, Serbia.

Case Study from Nikola Tesla A, Serbia. Large Rehabilitation Projects Case Study from Nikola Tesla A, Serbia. D Spalding and J Beaton Power Plants 2010, Serbia Nikola Tesla A4 A6 Boiler Rehabilitations Doosan Power Systems have participated

More information

GE solutions for NOx compliance and increased availability for WtE / Biomass plants

GE solutions for NOx compliance and increased availability for WtE / Biomass plants GE solutions for NOx compliance and increased availability for WtE / Biomass plants Gerhard Heinz Panndagarna 6 April 2017 GE Power Global technology provider with strong roots in Sweden GE Power: Alstom

More information

DIRECTORS REPORT ON THE OPERATIONS OF THE RAFAKO GROUP. for the 6-month period ended 30 June 2016

DIRECTORS REPORT ON THE OPERATIONS OF THE RAFAKO GROUP. for the 6-month period ended 30 June 2016 DIRECTORS REPORT ON THE OPERATIONS OF THE RAFAKO GROUP for the 6-month period ended 30 June 2016 Racibórz, 31 August 2016 Table of contents Page I. General information 3 II. Organisation of the RAFAKO

More information

Empowering operations with PI System

Empowering operations with PI System Empowering operations with PI System Presented by Marcin Błasiak Chief Production Management Systems Specialist Agenda About PGNiG Termika PI System at PGNiG Termika business case Examples of PI applications

More information

Power Generation from Solid Fuels 4) Springer

Power Generation from Solid Fuels 4) Springer Hartmut Spliethoff Power Generation from Solid Fuels 4) Springer Contents 1 Motivation... 1 1.1 Primary Energy Consumption and CO2 Emissions... 1 1.1.1 Development of Primary Energy Consumption in the

More information

OUTOTEC ENERGY SOLUTIONS BENEFITS

OUTOTEC ENERGY SOLUTIONS BENEFITS OUTOTEC ENERGY SOLUTIONS Outotec energy solutions encompass technologies and services for both renewable and conventional energy production. Our flexible technologies can use a wide variety of different

More information

NTPC O&M Conference Performance and Optimization of Water Utilisation Increase of Existing Power Plants. Speaker Name; Tufani Ram 13-14/02/2013

NTPC O&M Conference Performance and Optimization of Water Utilisation Increase of Existing Power Plants. Speaker Name; Tufani Ram 13-14/02/2013 NTPC O&M Conference 2013 Performance and Optimization of Water Utilisation Increase of Existing Power Plants Speaker Name; Tufani Ram 13-14/02/2013 Introduction Water is a vital Resource Irrigation Potable

More information

Towards New Milestones In CFB Boiler Technology CFB 800MWe

Towards New Milestones In CFB Boiler Technology CFB 800MWe Towards New Milestones In CFB Boiler Technology CFB 800MWe Arto Hotta, Kari Kauppinen, Ari Kettunen Foster Wheeler Energia Oy Finland Presented at Coal Gen Europe Warsaw, Poland February 14 16, 2012 ABSTRACT

More information

DIRECTORS REPORT ON THE OPERATIONS OF THE RAFAKO GROUP and RAFAKO S.A. for the six months ended June 30th 2018

DIRECTORS REPORT ON THE OPERATIONS OF THE RAFAKO GROUP and RAFAKO S.A. for the six months ended June 30th 2018 DIRECTORS REPORT ON THE OPERATIONS OF THE RAFAKO GROUP and RAFAKO S.A. for the six months ended June 30th 2018 Racibórz, September 6th 2018 Table of contents Page I. General information 4 II. Organisation

More information

Foster Wheeler Energia Oy P.O.BOX 201, FI Varkaus, Finland

Foster Wheeler Energia Oy P.O.BOX 201, FI Varkaus, Finland INITIAL OPERATING EXPERIENCES OF THE 135 MWe KLADNO LIGNITE FIRED POWER PLANT Riku Parkkonen, Kalle Nuortimo, Timo Jäntti Foster Wheeler Energia Oy P.O.BOX 201, FI-78201 Varkaus, Finland riku.parkkonen@fwfin.fwc.com

More information

COMBINED HEAT AND POWER by KARA

COMBINED HEAT AND POWER by KARA COMBINED HEAT AND POWER by KARA ELECTRICITY AND HEAT IN ONE INSTALLATION Renewable Electricity The market for renewable electricity production is on the move in Europe due to new EC rules, national subsidies,

More information

Low temperature cogeneration using waste heat from research reactor as a source for heat pump

Low temperature cogeneration using waste heat from research reactor as a source for heat pump National Centre for Nuclear Research in Poland Low temperature cogeneration using waste heat from research reactor as a source for heat pump Anna Przybyszewska International Atomic Energy Agency 14-16

More information

Combined Cycle Gasification Plant

Combined Cycle Gasification Plant Combined Cycle Gasification Plant Kenneth Jørgensen and Robert Heeb Babcock & Wilcox Vølund A/S Abstract: The gasification technology promises many technological advantages compared to traditional steam

More information

Smart CHP from Biomass and Waste

Smart CHP from Biomass and Waste Smart CHP from Biomass and Waste It Cost Money to Throw Energy Away Gasification Technology Conference William (Bill) Partanen, P.E October 13-16, 2013 Colorado Springs, CO. SRF and RDF and recycled wood

More information

Clean Energy. from. Renewables Biomass & Waste

Clean Energy. from. Renewables Biomass & Waste Clean Energy from Renewables Biomass & Waste Agenda 1 Valmet brief introduction 2 EfW world overview 3 Fluidized bed combustion for EfW 4 Waste gasification 5 Summary 2 2 Radhakrishnan Contact information

More information

Improvement of power plant flexibility by coupling of power generation

Improvement of power plant flexibility by coupling of power generation 11 th ECCRIA University of Sheffield Improvement of power plant flexibility by coupling of power generation with syngas-based chemical synthesis Clemens Forman, Matthias Gootz, Christian Wolfersdorf, Bernd

More information

Post Combustion CO 2 Capture Scale Up Study

Post Combustion CO 2 Capture Scale Up Study Post Combustion CO 2 Capture Scale Up Study Prachi Singh and Mike Haines International Greenhouse Gas R&D programme 6 th International Conference on Clean Coal Technologies (CCT 2013) 12-16 th May 2013

More information

Module 2: Conventional Power Generation I

Module 2: Conventional Power Generation I Lecture 7 Module 2: Conventional Power Generation I Canada's Electricity Generating Capacity was 126,000 MW in 2007 Hydro 58.7% Coal 16.6% Fuel Oil 1.2% natural gas 6.6% Nuclear 15.5% Other (e.g., Wind,Tidal

More information

Fuel Flexible CFBs are the Future of Solid Fuel Power Generation

Fuel Flexible CFBs are the Future of Solid Fuel Power Generation Fuel Flexible CFBs are the Future of Solid Fuel Power Generation By Robert Giglio, VP of Strategy and Business Development, Sumitomo SHI FW New wind and solar projects continue to dominate recent global

More information

Available online at Energy Procedia 4 (2011) Energy Procedia 00 (2010)

Available online at   Energy Procedia 4 (2011) Energy Procedia 00 (2010) Available online at www.sciencedirect.com Energy Procedia 4 (2011) 1925 1932 Energy Procedia 00 (2010) 000 000 Energy Procedia www.elsevier.com/locate/procedia www.elsevier.com/locate/xxx GHGT-10 Evaluation

More information

Polish-British Nuclear Supply Chain Forum Warsaw, 14 November Polimex Mostostal Group

Polish-British Nuclear Supply Chain Forum Warsaw, 14 November Polimex Mostostal Group Polish-British Nuclear Supply Chain Forum Warsaw, 14 November 2017 Polimex Mostostal Group About the Group market position Polimex-Mostostal S.A. is the largest construction and engineering company with

More information

Attractiveness of gas-fuelled power generation investments

Attractiveness of gas-fuelled power generation investments Attractiveness of gas-fuelled power generation investments May 2012 Table of Contents 1. Introduction 6 2. The present position of the Polish gas energy sector 9 3. The most important factors determining

More information

Ⅰ. Introduction of Samcheok Green Power

Ⅰ. Introduction of Samcheok Green Power Ⅰ. Introduction of Samcheok Green Power Construction for the Samcheok Green Power Project Name : Samcheok Green Power Unit 1,2 Location : East Coast of Korea Before construction 호산항 작진항 Under construction

More information

DONGFANG ELECTRIC CORPORATION LIMITED. Dr. Harry Chen, Vice President April 20 th, 2012

DONGFANG ELECTRIC CORPORATION LIMITED. Dr. Harry Chen, Vice President April 20 th, 2012 DONGFANG ELECTRIC CORPORATION LIMITED Dr. Harry Chen, Vice President April 20 th, 2012 General Introduction China Central Government 100% 50.03% Listed in Shanghai Stock Exchange Code: 600875 Hong Kong

More information

Mayo Renewable Power IPPC Licence Application. ATTACHMENT No. A NON- TECHNICAL SUMMARY TABLE OF CONTENTS

Mayo Renewable Power IPPC Licence Application. ATTACHMENT No. A NON- TECHNICAL SUMMARY TABLE OF CONTENTS Mayo Renewable Power IPPC Licence Application Attachment No. A ATTACHMENT No. A NON- TECHNICAL SUMMARY TABLE OF CONTENTS A.1. Installation and its Activities... 2 A.2. Raw and Auxilliary Materials... 2

More information

Integration and Onsite System Aspects of Industrial Post-Combustion CCS

Integration and Onsite System Aspects of Industrial Post-Combustion CCS Integration and Onsite System Aspects of Industrial Post-Combustion CCS V. Andersson T. Berntsson Department of Energy and Environment Chalmers University of Technology, Sweden Process flowsheet System

More information

Circulating Fluidized Bed Technology for Large Scale Power Generation Using Coal and Petroleum Coke

Circulating Fluidized Bed Technology for Large Scale Power Generation Using Coal and Petroleum Coke Circulating Fluidized Bed Technology for Large Scale Power Generation Using Coal and Petroleum Coke Timo Jäntti Kalle Nuortimo Foster Wheeler Energia Oy Finland Presented at Russia Power Moscow, Russia

More information

Sp. z o.o Rudy, ul. Kozielska 2a, GPS: N , E ; tel./fax , mobile:

Sp. z o.o Rudy, ul. Kozielska 2a, GPS: N , E ; tel./fax , mobile: Sp. z o.o. 47-430 Rudy, ul. Kozielska 2a, GPS: N 50 11 36, E 18 26 47 ; tel./fax +48 32 4179521, mobile: +48 602397886 http://www.mokrosz.pl e-mail MOKROSZ@MOKROSZ.PL KRS: 0000288485, NIP: 639 191 63 43,

More information

Metropolitan Community College COURSE OUTLINE FORM LEC: 4.5 LAB:

Metropolitan Community College COURSE OUTLINE FORM LEC: 4.5 LAB: Course Title: Steam Plant Operation II Course Prefix & No.: PROT 2320 LEC: 4.5 LAB: 0 Credit Hours: 4.5 (Page 1 of 8) COURSE DESCRIPTION: This course introduces students to skills generally required for

More information

3. POWER PLANTS. TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 street Belgrade Serbia ŠEĆERANA 4 NOEMBRI BITOLJ OHIS SKOPLJE

3. POWER PLANTS. TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 street Belgrade Serbia ŠEĆERANA 4 NOEMBRI BITOLJ OHIS SKOPLJE 3. POWER PLANTS TERMOENERGO INŽENJERING Bulevar Kralja Aleksandra 298 street 11 000 Belgrade Serbia Tel: +381 11 6557 717 +381 11 3806 173 Fax: +381 11 3806 251 E-mail: office@termoenergo.com www.termoenergo.com

More information

Management Board s report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 6-month period

Management Board s report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 6-month period Management Board s report on activities of the Capital Group of PGE Polska Grupa Energetyczna S.A. for the 6-month period ended Table of contents 1. Description of activity of the Capital Group 5 1.1.

More information

Optimising Power Generation Maintenance using Thermal and CFD modelling Warwick Ham Boiler Process Engineering Group Leader Steinmüller Africa,

Optimising Power Generation Maintenance using Thermal and CFD modelling Warwick Ham Boiler Process Engineering Group Leader Steinmüller Africa, Optimising Power Generation Maintenance using Thermal and CFD modelling Warwick Ham Boiler Process Engineering Group Leader Steinmüller Africa, Bilfinger Power Systems South Africa Summary Introduction

More information

Biomass Power Plants

Biomass Power Plants State-of-the-Art CFB Technology for Utility-Scale Biomass Power Plants Vesna Barišić 1*, Edgardo Coda Zabetta 1, and Bogusław Krztoń 2 1 Foster Wheeler R&D Department, Finland 2 Foster Wheeler Energia

More information

Advanced AQCS for Oxy-fuel Combustion System; Controlling Mercury & SO3

Advanced AQCS for Oxy-fuel Combustion System; Controlling Mercury & SO3 Special Workshop on SO2, SO3, Hg and Boiler Corrosion Issue Under Oxyfuel Combustion Condition Advanced AQCS for Oxy-fuel Combustion System; Controlling Mercury & SO3 Babcock-Hitachi K.K. Hirofumi Kikkawa

More information

Han MK, Business Development (Power Generation), 23rd March 2010 ABB Power and Automation Days ABB in Power Generation

Han MK, Business Development (Power Generation), 23rd March 2010 ABB Power and Automation Days ABB in Power Generation Han MK, Business Development (Power Generation), 23rd March 2010 ABB Power and Automation Days ABB in Power Generation Content ABB Power Generation ABB Solutions for Power Generation ABB Solutions for

More information

INCENTIVES FOR GAS-BASED COGENERATION IN COAL-INTENSIVE COUNTRIES

INCENTIVES FOR GAS-BASED COGENERATION IN COAL-INTENSIVE COUNTRIES INCENTIVES FOR GAS-BASED COGENERATION IN COAL-INTENSIVE COUNTRIES Adam Rajewski Maciej Skwara (Warsaw University of Technology) 1 Agenda Why support? Why it is needed? Why does it need support? How (not)

More information

PORTFOLIO OF PRODUCTS AND SERVICES

PORTFOLIO OF PRODUCTS AND SERVICES PORTFOLIO OF PRODUCTS AND SERVICES MAIN ACTIVITIES TURN-KEY SUPPLY OF BOILER ROOMS Designs, supply, assembly, tests and commissioning Conventional power plants; Energy centres for refineries, sugar refineries,

More information

As an engineering and trading company, we offer:

As an engineering and trading company, we offer: As an engineering and trading company, we offer: Equipment for natural ventilation Engineering calculations for natural ventilation in facilities of high thermal load Assembly of a delivered equipment

More information

Retrofit of Rodenhuize 4 power station: The Max Green and Cold Back-up-projects

Retrofit of Rodenhuize 4 power station: The Max Green and Cold Back-up-projects Retrofit of Rodenhuize 4 power station: The Max Green and Cold Back-up-projects Dr. Stefan Hamel, Babcock Borsig Steinmüller GmbH Dr. Christian Storm, Babcock Borsig Steinmüller GmBH Peter Goorden, Project

More information

Challenges in Designing Fuel-Fired sco2 Heaters for Closed sco2 Brayton Cycle Power Plants

Challenges in Designing Fuel-Fired sco2 Heaters for Closed sco2 Brayton Cycle Power Plants 5th International Supercritical CO 2 Power Cycles Symposium March 29-31, 2016, San Antonio, Texas Challenges in Designing Fuel-Fired sco2 Heaters for Closed sco2 Brayton Cycle Power Plants David Thimsen

More information

Water and Process Services Division

Water and Process Services Division Water and Process Services Division Sustainable Efficiency Improvements for Power Industry through Innovative Solutions Minimize Environmental Impact Reduce Total Cost of Operation Assets Risk Control

More information

sco 2 Cycle as an Efficiency Improvement Opportunity for Air-Fired Coal Combustion

sco 2 Cycle as an Efficiency Improvement Opportunity for Air-Fired Coal Combustion March 27, 2017 sco 2 Cycle as an Efficiency Improvement Opportunity for Air-Fired Coal Combustion Charles W. White, Walter W. Shelton, Nathan T. Weiland, Travis R. Shultz 6 th International Supercritical

More information

Concepts of Thermal Sewage Sludge Utilisation

Concepts of Thermal Sewage Sludge Utilisation S2E sludge2energy by HUBER & WTE Concepts of Thermal Sewage Sludge Utilisation WORLDWIDE Thermal waste utilisation plant Dürnrohr, Austria Upstream facility Dürnrohr, Austria Thermal waste utilisation

More information

Biomass Combustion Technology

Biomass Combustion Technology Lecture-6 Biomass Combustion Technology Combustion Biomass combustion is a complex process that consists of consecutive heterogeneous and homogeneous reactions. The main process steps are drying, devolatilization,

More information

Ms.P.Aileen Sonia Dhas

Ms.P.Aileen Sonia Dhas SUBJECT CODE SUBJECT NAME STAFF NAME : ME8792 : Power Plant Engineering : Prof.V.Tamil Selvi Ms.P.Aileen Sonia Dhas UNIT- I COAL BASED THERMAL POWER PLANTS Rankine cycle - improvisations, Layout of modern

More information

THERMAL POWER PLANT SIMULATOR TPP 200 LABORATORY EXERCISE TUTORIAL N4: INTRODUCTION TO THE HEAT PRODUCTION SYSTEM

THERMAL POWER PLANT SIMULATOR TPP 200 LABORATORY EXERCISE TUTORIAL N4: INTRODUCTION TO THE HEAT PRODUCTION SYSTEM EKV THERMAL POWER PLANT SIMULATOR TPP 200 LABORATORY EXERCISE TUTORIAL N4: INTRODUCTION TO THE HEAT PRODUCTION SYSTEM Master of Science Thesis Division of Heat and Power Technology 2003 Department of Energy

More information

1 st Renewable Energy Technologies, LP. Organic Rankine Cycle

1 st Renewable Energy Technologies, LP. Organic Rankine Cycle 11/18/2010 1 st Renewable Energy Technologies, LP 8147 Clear Shade Drive, Windber, PA 15963 Phone: (814) 467-0431 Fax: (814) 467-8675 Email: Sales@1stRET.com Web: www.1stret.com Organic Rankine Cycle The

More information

Incineration (energy recovery through complete oxidation) Mass Burn Refuse Derived Fuel Pyrolysis Gasification

Incineration (energy recovery through complete oxidation) Mass Burn Refuse Derived Fuel Pyrolysis Gasification Incineration (energy recovery through complete oxidation) Mass Burn Refuse Derived Fuel Pyrolysis Gasification WPC Plasma Gasification Reactor Cross Section Technology proven in 1989 at General Motors,

More information

Welcome to the ÅF Group. Gunnar Bark ÅF Industry AB Senior Consultant Heat & Power February 23 rd 2012

Welcome to the ÅF Group. Gunnar Bark ÅF Industry AB Senior Consultant Heat & Power February 23 rd 2012 Welcome to the ÅF Group 1 Gunnar Bark ÅF Industry AB Senior Consultant Heat & Power February 23 rd 2012 Services for.. the energy sector processes of the Industry infrastructural projects Development of

More information

AIR IMPACT ASSESSMENT OPERATION DUE CET IŞALNIŢA

AIR IMPACT ASSESSMENT OPERATION DUE CET IŞALNIŢA AIR IMPACT ASSESSMENT OPERATION DUE CET IŞALNIŢA Cristinel Racoceanu, Constantin Brâncuşi University,Târgu Jiu, ROMÂNIA Luminiţa Georgeta Popescu, Constantin Brâncuşi University,Târgu Jiu, ROMÂNIA ABSTRACT:

More information

Circulating Fluidized Bed Technology Towards 800 MWe Scale Lagisza 460 MWe Supercritical CFB Operation Experience

Circulating Fluidized Bed Technology Towards 800 MWe Scale Lagisza 460 MWe Supercritical CFB Operation Experience Circulating Fluidized Bed Technology Towards 800 MWe Scale Lagisza 460 MWe Supercritical CFB Operation Experience Timo Jäntti, Kimmo Räsänen Foster Wheeler Energia Oy Varkaus, Finland Presented at Power

More information

Balance of Plant Requirements and Concepts for Tokamak Reactors

Balance of Plant Requirements and Concepts for Tokamak Reactors Balance of Plant Requirements and Concepts for Tokamak Reactors Edgar Bogusch EFET / Framatome ANP GmbH 9 th Course on Technology of Fusion Tokamak Reactors Erice, 26 July to 1 August 2004 1 Contents Introduction

More information

The 34 th Congress of Euroheat & Power

The 34 th Congress of Euroheat & Power Varese Risorse An intelligent way to increase cogeneration and energy savings Fabio Fidanza Director Varese Risorse S.p.a. INTRODUCTION Varese Risorse is the company which manages the district heating

More information

Development of CFBC concepts and problem solution with the aid of simulation programs

Development of CFBC concepts and problem solution with the aid of simulation programs Development of CFBC concepts and problem solution with the aid of simulation programs CFB Workshop 24.9.2014, Jyväskylä Hannu Mikkonen, VTT Technical Research Centre of Finland 2 Why to invest for modelling?

More information

The Latest CFB Technology Developments for Flexible Large Scale Utility Power Production

The Latest CFB Technology Developments for Flexible Large Scale Utility Power Production The Latest CFB Technology Developments for Flexible Large Scale Utility Power Production Ari Kettunen, Jenö Kovács, Kalle Nuortimo, Riku Parkkonen, Timo Jäntti Presented at PowerGen Europe June 3-5, 2014

More information

DERL Overview 3 January DERL Overview. January 2011 DERL - 1 -

DERL Overview 3 January DERL Overview. January 2011 DERL - 1 - Overview January 2011-1 - Inputs - Waste Municipal Solid Waste Includes some commercial and civic amenity waste streams DCC, Angus and others. Up to 2,200 T per week Clinical Waste (currently not in use)

More information

Co-control of CO 2 and Local Air Pollutants in the Electric Power Industry of China: Application of Co-control Methodology. March 14, 2012, CEF 1

Co-control of CO 2 and Local Air Pollutants in the Electric Power Industry of China: Application of Co-control Methodology. March 14, 2012, CEF 1 Co-control of CO 2 and Local Air Pollutants in the Electric Power Industry of China: Application of Co-control Methodology MAO Xianqiang HU Tao March 14, 212, CEF 1 Background on Power Industry Coal-dominated

More information

The CFB Technology Benefits in Comparison with Conventional Solid Fuel Generation Technologies for Utility and Cogeneration Applications

The CFB Technology Benefits in Comparison with Conventional Solid Fuel Generation Technologies for Utility and Cogeneration Applications The CFB Technology Benefits in Comparison with Conventional Solid Fuel Generation Technologies for Utility and Cogeneration Applications Kalle Nuortimo Harry Lampenius Anna Khryashcheva Tobias Boensel

More information

Roadmap on the Development of District Heating in Azerbaijan until 2020 INOGATE Technical Secretariat & Integrated Programme Klaus Fafner

Roadmap on the Development of District Heating in Azerbaijan until 2020 INOGATE Technical Secretariat & Integrated Programme Klaus Fafner Roadmap on the Development of District Heating in Azerbaijan until 2020 INOGATE Technical Secretariat & Integrated Programme Klaus Fafner B U I L D I N G P A R T N E R S H I P S F O R E N E R G Y S E C

More information

From clean coal power plants to the zero emissions power plants: 10 years of experiences of ENEL

From clean coal power plants to the zero emissions power plants: 10 years of experiences of ENEL A New Age for coal with Carbon Capture and Storage(CCS) Organized by SCI s Science and Enetrprise and Process Engineering Groups From clean coal power plants to the zero emissions power plants: 10 years

More information

National technical University Kharkov polytechnic institute. Faculty Power Mechanical Engineering Department. Department of Turbomachinery

National technical University Kharkov polytechnic institute. Faculty Power Mechanical Engineering Department. Department of Turbomachinery National technical University Kharkov polytechnic institute Faculty Power Mechanical Engineering Department Department of Turbomachinery Areas of studying: Specialty "Power engineering" specialization

More information

Circulating fluidized bed technology for utility-scale lignite power plants

Circulating fluidized bed technology for utility-scale lignite power plants Circulating fluidized bed technology for utility-scale lignite power plants Vesna Barišić 1, Kalle Nuortimo 1, Bogusław Krzton 2 1 Foster Wheeler Energia Oy, Varkaus, Finland 2 Foster Wheeler Energia Polska,

More information

A MODEL DEVELOPMENT ON USC-CFB BOILER SYSTEM FOR DYNAMIC SIMULATION OF COAL-FIRED POWER PLANT

A MODEL DEVELOPMENT ON USC-CFB BOILER SYSTEM FOR DYNAMIC SIMULATION OF COAL-FIRED POWER PLANT Proceedings of the Asian Conference on Thermal Sciences 2017, 1st ACTS March 26-30, 2017, Jeju Island, Korea ACTS-P00140 A MODEL DEVELOPMENT ON USC-CFB BOILER SYSTEM FOR DYNAMIC SIMULATION OF COAL-FIRED

More information