1 Received: Project # Pre-App Final App (to be completed by IMEA) ILLINOIS MUNICIPAL ELECTRIC AGENCY ELECTRIC EFFICIENCY PROGRAM INCENTIVES FOR IMEA MEMBER MUNICIPALITIES AND GOVERNMENTAL ENTITIES GUIDELINES AND APPLICATION Program Year FY Start Date: May 1, 2015 Program Contact: Rodd Whelpley Program & Communications Administrator Illinois Municipal Electric Agency 3400 Conifer Drive Springfield, IL Ph: Cell: rwhelpley@imea.org

2 1

3 Table of Contents General Information and Guidelines Application Checklist Appendix A - Application for Standard and Custom Incentives Application. 7 Certifications. 8 Appendix B - Standard Incentive Specifications and/or Worksheets for Lighting, HVAC & Ground Source Heat Pump, Refrigeration and Premium Motors Measures Lighting HVAC & Ground Source Heat Pump Refrigeration Motors Appendix C - Application for Custom Incentive Projects Appendix D - Application for Small Renewable Generation Solar or Wind Projects Appendix E - Instructions for Applying for (and Calculation of) Optional Peak Reduction Bonus and Optional Power Factor Correction Bonus

4 SECTION 1 GENERAL INFORMATION Overview. This Energy Efficiency and Energy Conservation program is available to the membership (and its member s retail customers) of the Illinois Municipal Electric Agency (IMEA). It is administered and funded through IMEA. FY of the program runs from May 1, 2015 through April 30, Funds are allocated to IMEA members based on a prorated share of their electric purchases from the IMEA. Members and public agencies with facilities served by members can apply for funds using this form from May 1, 2015 until this form is superseded by a subsequent revision or until the program ends. The process for applying, completing and receiving incentives for electric efficiency projects is described by the flow chart on page 1. SECTION 2 ELIGIBILITY CRITERIA Eligible projects must be located in Illinois and receive electric service from the IMEA or an IMEA member. Projects must produce electricity savings through efficiency improvements in municipal or governmental buildings, equipment, or processes. Ineligible projects include repairs of existing equipment, fuel switching, projects solely related to demand response or demand control, or new electric generation (except as authorized under small renewable solar and wind measures available to IMEA member municipalities and coops for projects sited at and for the benefit of municipal-owned or coop-owned facilities or as authorized as a custom project). Project paybacks must occur before the projected end of the equipment life. Incentive Awards. The total incentive cannot exceed 75 percent of the total project cost. The incentive amounts for each program are listed in the attached worksheets. For customized incentives and "Smart Grid" applications, funding will be based on $.30 per kwh for one year's worth of estimated electric savings (see Appendix C). New breakthrough equipment and devices for exterior lighting will be based on 75% of total project costs (see Appendix C). Geothermal projects may be funded at $1, per ton. Maximum funding cannot exceed monies available under the allotment to the member by the IMEA. IMEA reserves the right to review applications, withhold funding or negotiate incentive levels. Bid prices must be in line with current market conditions for similar projects/conditions. See also Incentives for Specific Measures on pages 4-5. Payment Schedule/Reporting and Project Monitoring. The Notice to Proceed (sent upon approval of the pre-application) will specify the conditions of payment and the payment schedule. Grantees will allow officials from the IMEA Member and IMEA officials access to their site to verify project issues. Energy savings numbers will be shared with IMEA (for public release unless specifically noted as confidential or proprietary). Ownership/Use of Equipment. Equipment must remain in place for the lesser of five years or useful life. IMEA Not Liable. Grantee shall hold the IMEA Member and the IMEA harmless from any and all claims, demands, and actions based upon or arising out of any services performed by Grantee or by their agents or employees under a grant agreement. Indemnity. The Grantee agrees to assume all risks of loss and to indemnify and hold the IMEA Member and the IMEA, their officers, agents and employees, harmless from and against any and all liabilities, demands, claims, damages, suits, costs, fees, and expenses, incidents thereto, for injuries or death to persons and for loss of, damage to, or destruction of property because of the Grantee's negligence, 3

5 intentional acts or omissions. In the event of any demand or claim, the IMEA may elect to defend any such demand or claim against the IMEA and will be entitled to be paid by the Grantee for all damages. Term and Application. Applications under this program will be accepted on an ongoing basis, subject to funding availability. Applications shall be printed or typed on the current approved forms and/or worksheets included in this document. Applications must be complete (see the Pre-Application and Final Application checklists on page 6) to receive consideration. Subject to a programmatic change enacted by the IMEA Board of Directors, approved projects will have reserved funds until April 30, Final application, reflecting the measures and equipment actually installed, must be submitted within 45 days of project completion. Project documentation, such as copies of dated invoices for the purchase and installation of the measures and/or product specification sheets, is required (see the Final Application checklist on page 6). Applications must initially be screened by the Member community and the IMEA. The IMEA member will have final say as to the priority of project funding in its community. Decisions on project priority and funding awarded to any project will be communicated to the IMEA through the IMEA Board Member representing the Member community. Incentive Payments. Final application, reflecting the measures and equipment actually installed, must be submitted within 45 days of project completion. Project documentation, such as copies of dated invoices for the purchase and installation of the measures and/or product specification sheets, is required (see the Final Application checklist on page 6).The IMEA will review the final application. Applications that satisfy the review will be processed upon IMEA approval. The incentive will be the amount for which the project qualifies up to the amount that was obligated for the project in the project s Notice to Proceed, subject to funding availability. SECTION 3 INCENTIVES FOR SPECIFIC MEASURES 1.0 New Technology Lighting Program New Technology Lighting (LEDs, Induction, Plasma, etc.) shall receive up to 75% of total project costs to include equipment, labor and engineering. Funding is available to switch out existing exterior lighting or to install exterior lighting in new subdivisions, parking lots, etc. Apply using Appendix C (page 22). 2.0 Geothermal Systems Geothermal units shall receive $1,000 per ton. Geothermal installations will be capped at 75% of total project cost to include equipment, labor and engineering. Apply using Appendix C (page 22). 3.0 VSD or High Efficiency Motors Variable Speed Drive, Variable Frequency Drive and High Speed Motors shall receive up to 75% of total project costs to include equipment, labor and engineering. Apply using Appendix C (page 22). 4.0 Custom Incentive/Smart Grid and Distribution Upgrades Custom incentive, Smart Grid, Distribution upgrade, Power Factor Correction etc. shall receive $.30 per annual kwh reduced, up to 75% of total project costs. Apply using Appendix C (page 22). 4

6 5.0 Small Renewable Generation Solar and Wind Projects IMEA Member municipalities and coops that have in place a net metering policy may apply for electric efficiency incentives for small solar or wind generation projects to benefit - and be installed at - facilities owned by the member municipality or coop. Projects must be in full compliance with the Illinois Municipal Electric Agency Small Renewable Generation Resource Policy effective May 1, 2009 and with any subsequent amendments thereto that are in effect at the time of pre-application (see pages for reference). Solar generation projects shall be eligible to receive $3.00 per Watt up to 50% of total project cost. Wind generation projects shall be eligible to receive $2.50 per Watt up to 50% of total project cost. Apply using Appendix D (see pages 24-28). SECTION 4 OPTIONAL BONUS INCENTIVES FOR PEAK SHAVING AND POWER FACTOR CORRECTION Applicants may apply for bonus incentives for peak shaving and for power factor correction. The bonus rate for peak shaving is $50.00 per kw saved at time of city peak. (Assume the city peaks in the summer on a weekday between 4:00 and 6:00 p.m.) The bonus rate for power factor correction can be calculated two ways. The applicant may choose to request a bonus that is $2.00 per kvar improved. Or, the applicant can request a $350 bonus for a power factor correction project that raises the power factor from anything below 0.95 to 0.95 or better. See Appendix E (pages 29-30) for instructions for applying for these bonuses and note the bonus amount requests in Appendix A (page 7) of this application. NOTE: Bonuses are optional, meaning they are granted solely at the discretion of the IMEA Member Electric Utility. The IMEA Electric Utility may grant all, part or none of the bonus requested. 5

7 IMEA ELECTRIC EFFICIENCY PROGRAM APPLICATION CHECKLISTS Pre-Approval Application Checklist Pre-Approval Application must include: Completed Pre-Approval Application Copy of applicant s electric bill Signed Certification (page 8) Manufacturer spec sheets Applicable Lighting*, HVAC, Motors and/or Refrigeration Standard Incentive Worksheet(s) or Custom Incentive Application Schedules (e.g., a spread sheet) supporting any calculated connected watt reductions or connected watts controlled claimed on the lighting worksheet (page 10) (Note: These schedules are generated by the applicant.) A schedule (e.g., a spread sheet) showing the calculation of the estimated annual kwh savings attributable to the project (Note: This schedule is generated by the applicant.) A schedule (e.g., a spread sheet) showing the estimated kw reduction attributable to the project at time of city peak. Assume the city peaks in summer at 4:00 p.m. to 6:00 p.m. on a week day. (Note: This schedule is generated by the applicant. This schedule is required for all applications, whether or not the applicant is seeking the peak shaving bonus.) A schedule (e.g., a spread sheet) showing the estimated kvar reduction attributable to the project or showing how the Power Factor will improve to.95 or better. (Note: This schedule is generated by the applicant. This schedule is only required for those applicants wishing to apply for the power factor correction bonus. See page 5 and Appendix E, pages ) A project budget For lighting projects, submit a Light Survey* For small renewable generation solar and wind projects, a copy of the municipality or coop s net metering ordinance A schedule showing estimated annual kwh generated for small solar and wind generation projects For wind projects, documentation showing that the project site is suitable for wind generation Final Application Checklist Final Application must include: Completed Final Application Signed Certification (page 8) Manufacturer spec sheets, unless submitted with Pre-Approval or if equipment updated Updated Lighting, HVAC, Motors and/or Refrigeration Standard Incentive Worksheet(s) or Custom Incentive Application Updated Schedules (e.g., a spread sheet) supporting any calculated connected watt reductions or connected watts controlled claimed on the lighting worksheet (page 10) (Note: These schedules are generated by the applicant.) Updated schedules (e.g., a spread sheet) showing annual kwh savings, kw peak reduction and/or kvar reduction (or Power Factor improvement) attributable to the project. Invoices and receipts For lighting projects, submit a Final Light Survey* Before and after images, if requested by Program Administrator *Light Survey for new fixtures to include: room/area, quantity of existing fixtures, description and wattage of existing fixtures, quantity of new fixtures, description and wattage of new fixtures. *Light Survey for all lighting retrofits to include: room/area, quantity, description of existing fixtures, number of lamps in existing fixtures and number of lamps in retrofit fixtures. Lamp total shall match number of lamps indicated in the Lighting Incentive Worksheet. *Light Survey for Occupancy Sensors to include: room/area, wattage of fixtures controlled. 6

8 APPENDIX A: APPLICATION FOR STANDARD AND CUSTOM INCENTIVE PROGRAMS Check one: Pre-approval Final Application Name of Applicant: * Proposed Start Date: Planned Completion Date: Address where measures installed, if different from authorized signature address below: (Attach list if multiple locations) Address: City: Zip: Project Manager: Telephone #: Fax #: Address: IMEA Electric Efficiency Incentive Requested** $ (From EE measures sum of totals on pages 10, 14, 15, 18, 20 and from Appendices C and D, as applicable) + $ (Peak shaving bonus see page 5 and Appendix E) + $ (Power factor bonus see page 5 and Appendix E) = Contractor Information (if known) Contact Name: Company: Phone: $ TOTAL IMEA Incentive Requested** Address: Other Public Incentive Funds $ Specify Other Public Funds *** Total Project Cost**** $ Complete this form along with the all required ancillary schedules, budgets, spec sheets, utility bills. *Applicant means a customer receiving wholesale electric service from IMEA or electric service from an IMEA Member utility. ** Incentive cannot exceed 75 percent of total project cost. Incentives from IMEA and other incentive programs cannot exceed 100% of total project cost. ***Such as Energy Efficiency and Conservation Block Grant (EECBG), Illinois Clean Energy Community Foundation (ICECF). ****Total Project Cost = Equipment + Labor + Engineering & Design. A project budget must accompany the application. 7

9 APPLICANT CERTIFICATIONS FOR STANDARD AND CUSTOM INCENTIVE PROGRAMS NOTE: If this project is approved and completed, then IMEA will send an incentive check to the address listed on this page and in care of the signatory. Applicant hereby certifies that: The project receives wholesale electric service from IMEA or electric delivery service from an IMEA member municipality or power purchaser. All authorizations required to perform the project described in this application have either been obtained or will be obtained no later than 90 days following the project beginning date set forth in the Notice to Proceed Letter issued by the IMEA. It has not been barred from contracting with a unit of state or local government as a result of a violation of Section 33E-3 or 33E-4 of the Criminal Code of 1961 (720 ILCS 5/33 E-3 and 5/33 E-4). I understand that the Illinois Prevailing Wage Act (820 ILCS 130/0.01) may apply and that Grantees are responsible for determining if their projects will trigger compliance. As of the submittal date, the information provided in its application is accurate, and the individuals signing below are authorized to submit this application. Authorized Official (signature*) Typed/Printed Name Telephone Fax Title Date -- FEIN Number (9 digits, Federal Employment Id Number, does not start with E ) Applicant Authorized Signature Address Authorized Signature City, 9 Digit Zip (find 9-Digit Zip at Authorized Signature Address *Electronic signatures not acceptable. Please supply Certifications (this page) with original signature via mail, fax or electronically (scanned document) 8

10 APPENDIX B: STANDARD INCENTIVE SPECIFICATIONS AND/OR WORKSHEETS FOR LIGHTING, HVAC & GROUND SOURCE HEAT PUMP, REFRIGERATION AND PREMIUM MOTORS MEASURES (STARTS WITH THE LIGHTING INCENTIVE WORKSHEET ON THE FOLLOWING PAGE) 9

11 Lighting Incentive Worksheet - Illinois Municipal Electric Agency Electric Efficiency Program FY Equipment Type Incentive Unit # of Units Compact Fluorescent Lamps (Screw-in) 15 W or Less $1.50 Lamp 16 W - 26W $1.50 Lamp 27 W or Greater $2.00 Lamp Hardwired Compact Fluorescent Fixtures 29 W or Less $45.00 Fixture 30 W or Greater $82.00 Fixture Delamp, Permanent Lamp Removal (Pre-approval application is required) Delamp, 4-foot Lamp, Ballast, Holders $12.00 Lamp Delamp, 8-foot Lamp, Ballast, Holders $15.00 Lamp Delamp, 4-foot Lamp, add Reflector $22.00 Lamp Delamp, 8-foot Lamp, add Reflector $29.00 Lamp High Performance or Reduced Wattage 4-foot T8 4-foot Lamp and Ballast $13.00 Lamp 4-foot Reduced Watt Lamp Only $1.50 Lamp Reduced Wattage 8-foot T8 8-foot Lamp and Ballast $22.00 Lamp 8-foot Lamp Only $2.50 Lamp Specialty T8 Lamps and Ballasts 4-foot U Tube and Ballast $7.00 Lamp 2-foot Lamp and Ballast $7.00 Lamp 3-foot Lamp and Ballast $12.00 Lamp LED Lighting LED T-1 Electroluminescent Exit Signs $25.00 Signs Metal Halide Integrated Ballast Ceramic Metal Halide Lamps $7.50 Fixture Pulse Start or Ceramic, 100W or Less $33.00 Fixture Pulse Start or Ceramic, 101W 200W $57.00 Fixture Pulse Start or Ceramic, 102W 350W $66.00 Fixture Induction Lighting Interior Induction Fixture 160W or less $45.00 Fixture Interior Induction Fixture Greater than 160W $90.00 Fixture Controls Occupancy Sensors* $0.16 T8/T5 New Fluorescent Fixtures with Electronic Ballast or LEDs* (Pre-approval application is required) Incentive Per Watt Reduced Connected Watts Controlled Connected Watts Reduced Incentive Subtotal Total Existing Fixture Watts less total New Fixture Watts $0.75 Connected Watt Reduction Total Existing Fixture Watts less total New Fixture Watts $0.75 LED traffic signal modules. LED Signal Head consists of 1 red, 1 green and 1 yellow ball module. Arrow and Pedestrian LED Modules consist of 1 module (any color). Pedestrian Combo consists of walk/hand/countdown. 8" Traffic LED Signal Head $ Module 12" Traffic LED Signal Head $ Module 8" Arrow LED Module $33.00 Module 12" Arrow LED Module $57.00 Module 8"-9" Pedestrian LED Module $49.00 Module 12" Pedestrian LED Module $57.00 Module 16"x18" Pedestrian Combo $57.00 Module Total NOTE: Incentives will be paid on a per unit basis or on a per watt reduced basis, but not both. Also a schedule (e.g. spread sheet) showing the calculation of connected Watts reduced or controlled by occupancy sensor must accompany the application. 10

12 Lighting Specifications All lighting projects are expected to comply with the Illuminating Engineering Society of North America (IESNA) recommended lighting levels or the local code. Compact Fluorescent Lamps (Screw-in) This incentive applies to screw-in compact fluorescent lamps (CFLs) and applies only if an incandescent or high intensity discharge (HID) lamp is being replaced. All screw-in CFLs must be ENERGY STAR -rated. The lamp/ballast combination must have an efficacy of 40 lumens per Watt (LPW). For screw-in CFLs, electronic ballasts are required for lamps 18 Watts. Hardwired Compact Fluorescent Fixtures Incentive applies to new or retrofit hardwired interior CFL fixtures, only complete new fixtures or modular hardwired retrofits with hardwired electronic ballasts qualify. The CFL ballast must be programmed start or programmed rapid start with a power factor (PF) 90 and a total harmonic distortion (THD) 20%. De-lamp, Permanent Lamp Removal Incentives are paid for de-lamping, permanent removal, of existing fluorescent lamps. De-lamp is the net reduction in the number of lamps in a fixture. Applicants are responsible for determining whether or not to use reflectors in combination with lamp removal in order to maintain adequate lighting levels. Lighting levels are expected to meet the Illuminating Engineering Society of North America (IESNA) recommended light levels. Unused lamps, lamp holders, and ballasts must be permanently removed from the fixture and disposed of in accordance with local regulations. This measure is applicable when retrofitting from T12 lamps to T8 lamps or reconfiguring a T8 fixture to reduce the number of lamps. Removing lamps from a T12 fixture that is not being retrofitted with T8 lamps are not eligible for this incentive. High Performance 4-foot T8 Lamps and Ballast This measure consists of replacing existing T12 lamps and magnetic ballasts with high performance T8 lamps and electronic ballasts. A manufacturer's specification sheet must accompany the application. Reduced Wattage 4-foot T8 Lamps and Ballasts Incentives are available for replacing T12 systems with reduced wattage lamp and electronic ballast systems. Incentives are calculated per lamp installed. A manufacturer s specification sheet must accompany the application. Reduced Wattage 4-foot T8 Lamp Only Incentives are available when replacing 32 Watt T8 lamps with reduced wattage T8 lamps when an electronic ballast is already present. The nominal wattage of new lamps must be 28W ( 2585 Lumens) or 25W ( 2400 Lumens) to qualify. A manufacturer s specification sheet must accompany the application. Reduced Wattage 8-foot T8 Lamps and Ballast This measure is for the replacement of existing T12 lamps and magnetic ballasts with reduced wattage 8-foot T8 lamps and electronic ballasts. Lamps must have a minimum mean lumen per watt (MLPW) of 90 and must have a nominal wattage of less than 57W. A manufacturer s specification sheet must accompany the application. Reduced Wattage 8-foot T8 Lamps Only Incentives are available for replacing 59 Watt T8 lamps with reduced wattage 8-foot T8 lamps. Lamps must have a minimum mean lumen per watt (MLPW) of 90 and must have a nominal wattage of less than 57W. The incentive level is calculated on a per lamp basis and ballast replacement is not necessary. A manufacturer s specification sheet must accompany the application. U-tube T8 Lamps Qualified Ballasts This measure consists of replacing existing U-tube T12 lamps and magnetic ballasts with U-tube T8 lamps and CEE qualified electronic ballasts. The lamp must have a color rendering index (CRI) > 80. A manufacturer s specification sheet must accompany the application. 2 and 3 foot T8 Lamps and Ballasts This measure consists of replacing existing T12 lamps and magnetic ballasts with T8 lamps and electronic ballasts. The lamp must have a color rendering index (CRI) > 80 and the ballast must have a total harmonic distortion (THD) < 32% at full light output, and the power factor (PF) must be > A manufacturer s specification sheet must accompany the application. 11

13 Exit Signs Incentive applies for the replacement or retrofit of an existing incandescent or fluorescent exit sign with a high efficiency electroluminescent, photoluminescent, T1 cold cathode and light-emitting diode (LED) exit sign. All new exit signs or retrofit exit signs must be UL 924 listed, have a minimum lifetime of 10 years, and have an input wattage 5 Watts per face. LED Lamps and Lighting LED recessed downlight luminaries up to 18 Watts or screw-in base lamps qualify. The LED recessed downlight must have a minimum efficacy of 35 lumens per Watt. The product must meet ENERGY STAR version 1.1 criteria. LED lamps with ANSI sockets will qualify based on the July, 2009 ENERGY STAR specification. See for more information. LED lamps and downlight luminaries over 18 Watts may qualify for custom incentives. Incentive also applies for the replacement or retrofit of existing interior light fixtures with LED. LED retrofits can qualify as long as the retrofit kits replace all reflectors and optical systems of existing fixture (not just lamps and ballasts). LED Channel Signs LED channel sign incentives are available for retrofitting or replacing incandescent, HID, argon-mercury or neon-lighted channel letter signs. Replacement signs cannot use more than 20% of the actual input power of the sign that is replaced. Maximum letter height determines incentive category. LED Open Sign LED open signs must replace an existing neon open sign. Replacement signs cannot use more that 20% of the actual input power of the sign that is replaced. Integrated Ballast Ceramic Metal Halide Lamps Qualifying lamps are 25 watt or less integrated ballast ceramic metal halide PAR lamps with a rated life of 10,500 hours or greater. Metal Halide Fixtures - Pulse Start or Ceramic This incentive applies to retrofits of high intensity discharge fixtures with either pulse start metal halide or ceramic metal halide fixtures. Total replacement wattage must be lower than existing wattage to insure energy savings. Retrofit kits may be used on existing mercury vapor, standard metal halide or high pressure sodium fixtures only. Interior Induction Fixtures New or retrofit hard-wired induction fixtures qualify. New fixtures must replace, one for one, existing incandescent, mercury vapor, T12/High Output fluorescent, T12/Very High Output fluorescent, standard metal halide, or high pressure sodium fixtures in interior installations. The new or retrofit fixtures must be lower than the wattage of the fixture being replaced. The wattage range is complete fixture wattage, not nominal lamp wattage. The retrofit must not void the fixture UL listing. Base case Wattage Replacement Fixture Wattage (Maximum) > 400 Watt 399W Watt 249W Watt 160W < 100 Watt 95W Cathode All Cold Cathode Fluorescent lamps (CCFLs) must replace incandescent lamps of greater than or equal to 10 Watts and not greater than 40 Watts. Cold cathode lamps may be medium (Edison) or candelabra base. Product must be rated for at least 18,000 average life hours. Occupancy Sensors Passive infrared, ultrasonic detectors and fixture-integrated sensors or sensors with a combination thereof are eligible. All sensors must be hardwired and control interior lighting fixtures. The incentive is per Watt controlled. To assist in rebate processing, please provide the inventory of the controlled fixtures with the Application. New T8/T5 Fluorescent Fixtures with Electronic Ballast (Pre-Approval Required) This measure consists of replacing one or more existing fixtures with new fixtures containing T8 or T5 lamps and electronic ballasts. The T8 or T5 lamps must have a color rendering index (CRI) 80. The electronic ballast must be high frequency ( 20 khz), UL listed, and warranted against defects for 5 years. Ballasts must have a power factor (PF) Ballasts for 4-foot lamps must have total harmonic distortion (THD) 20% at full light output. For 2- and 3-foot lamps, ballasts must have THD 32% at full light output. High output T5/T8 lamps also qualify for this rebate. 12

14 Incentives for this measure are calculated based on the reduction in connected watts. Specifications of the new fixtures must accompany the final application. Incentives are only available for new fixtures. Retrofit Kits are not considered new fixtures. Note: PCB ballasts and lamps are hazardous materials and should be disposed of properly. LED Traffic and Pedestrian Signals Each lamp must have a maximum LED module wattage of 25. Incentives are not available for spare lights. Lights must be hardwired and single lamp replacements are not eligible, with the exception of pedestrian hand signals. The traffic signal LED modules shall fully comply with the Institute of Transportation Engineers (ITE) latest adopted specifications. 13

15 HVAC Incentive Chart Electric Equipment Type Code Size Category Qualifying Efficiency Incentive EH0 < 65,000 Btuh (5.4 tons) 15 SEER $100 per ton Unitary and Split System Air EH1 65,000 Btuh and < 240,000 Btuh 12 EER $100 per ton Conditioning and Air Source Heat ( Tons) Pump EH2 240,000 Btuh and < 760,000 Btuh 10.8 EER $100 per ton (21-63 Tons) EH3 760,000 Btuh (63 tons) 10.2 EER $100 per ton Water-Cooled Chillers Air-Cooled Chillers EH4 All Level 1 (see specifications) EH 5 All Level 2 (see specifications) EH 6 All Level 1 (see specifications) EH 7 All Level 2 (see specifications) $33.00 per ton $66.00 per ton $50 per ton $ per ton Room Air Conditioners EH 8 All See Specifications $83.00 per ton PTAC/PTHP Packaged Terminal Air Conditioners or Heat Pumps EH 9 All EER > ( x Btuh Capacity/1000) $50 per ton HVAC Incentive - Calculation Equipment type Code Make & Model Unit Efficiency (A) Unit Size (tons) (B) Quantity (C) Incentive per unit (ton) (AxBxC) Incentive $ PLUS Unit Incentive ($250 per unit x number of units being installed) TOTAL HVAC Incentive 14

16 Ground Source Heat Pump Incentive Chart and Calculation Worksheet Baseline GSHP Make and Model GSHP Efficiency (EER) All Electric Electric HVAC and Natural Gas Heating Existing GSHP 13 EER (A) Unit Size (Tons) (B) Incentive $ per Ton = (50* (EER-15)) = (50* (EER-15)) $200 (A X B) Incentive $ PLUS Unit Incentive ($250 per unit x number of units being installed) TOTAL GSHP Incentive Geothermal Systems Geothermal units shall receive $1,000 per ton. Geothermal installations will be capped at 75% of total project cost to include equipment, labor and engineering. Apply using Appendix C (page 22). 15

17 Specifications for HVAC and GSHP Measures Unitary and Split Air Conditioning Systems and Air Source Heat Pumps New unitary air conditioning units or air source heat pumps that meet or exceed the qualifying cooling efficiency shown in the HVAC Incentive Worksheet Table are eligible for an incentive. They can be either split systems or single package units. Water-cooled systems, evaporative coolers, and water source heat pumps do not qualify under this program, but may qualify under the Custom Incentive Program. The efficiency of split systems is based on an AHRI reference number. All packaged and split system cooling equipment must meet AHRI standards (210/240, 320 or 340/360), and be UL listed. The refrigerant must comply with all local codes. All required efficiencies are based on the Consortium for Energy Efficiency (CEE) high efficiency commercial air conditioning and heat pump specifications ( A manufacturer s specification sheet indicating the system efficiency must accompany the application. Disposal of the existing unit must comply with local codes and ordinances. Water- and Air-cooled Chillers Chillers are eligible for an incentive if they have a rated kw/ton for the Integrated Part Load Value (IPLV) that is less than or equal to the qualifying Level 1 and Level 2 efficiency shown in the table below. The chiller efficiency rating must be based on AHRI Standard 550/ for IPLV conditions and not based on full-load conditions. The chillers must meet AHRI standards 550/ and be UL listed. The refrigerant must comply with local codes. The AHRI net capacity value should be used to determine the chiller tons. A manufacturer specification sheet with the rated kw/ton-iplv or COP-IPLV must accompany the application. Qualifying efficiencies for chillers are summarized below. Chiller type Size (Tons) Level 1 kw/ton IPLV Level 2 kw/ton IPLV < Scroll or Helical-Rotary 150 to >= < Centrifugal 300 to >= Reciprocating ALL Air-Cooled ALL Room Air Conditioners Incentive applies for new through-the-wall (or built-in) self-contained room air conditioning units that are 2 tons or less. Room air conditioners must meet either the ENRGY STAR or CEE Tier 1 minimum efficiency specifications listed below. Disposal of existing unit must comply with local codes and ordinances. Incentive applies for new through the < 8,000 (0.67 tons) to 13,999 ( tons) ,000 to 19,999 ( tons) 11.2 >= 20,000 (>1.7 tons) 9.8 Package Terminal AC and Heat Pump Units (PTAC/PTHP) Incentive applies for new through-the-wall self-contained package terminal air conditioners and heat pumps that are 2 tons (24,000 Btuh) or less. Only units that have an EER greater than or equal to ( * Capacity / 1000), where capacity is in Btuh, qualify for the incentive. All EER values must be rated at 95 F outdoor dry-bulb temperature. Variable-Speed Drives on HVAC Motors Variable-speed drives (VSDs) which are installed on existing chillers, HVAC fans, HVAC pumps and packaged units are eligible for this incentive. New chillers with integrated VSDs are eligible under the chiller incentive. VSDs on new equipment are not eligible. The installation of a VSD must accompany the permanent removal or disabling of any throttling devices such as inlet vanes, bypass dampers, and throttling valves. VSDs for non-hvac applications may be eligible for a custom incentive. The incentive is per controlled HP. Ground Source Heat Pumps Incentive applies for new or retrofit Ground Source Heat Pump (GSHP) systems with Energy Efficiency Ratio (EER) 15 and Coefficient of Performance (COP) 3.4, based on the existing system: 1. Existing System: all electric HVAC 2. Existing System: Electric Cooling, Gas Heating 3. Existing System: A previously installed GSHP with an EER of 13 or lower 16

18 Incentive applies for closed loop heat exchanger system including vertical closed loop field, horizontal closed loop field, slinky closed loop field, and closed pond loop. Other heat exchangers such as boiler/chiller water loop systems and direct expansion may be eligible under the Custom Incentive Program. Heat pump EER will be the published full load values at standard test conditions in accordance with ANSI/AHRI/ASHRAE ISO Standard , 2: 1998 (Ground Loop Heat Pump). (Entering water temperature from ground loop: 77 ºF cooling, 32 ºF heating). A manufacturer s specification sheet indicating the EER and COP must accompany the application. 17

19 Refrigeration Incentive Worksheet Refrigeration Measures Measure Incentive Unit Quantity Incentive/Unit Incentive Anti-Sweat Heater Control Per Linear Foot $35.00 EC Motor for Walk-in* Per Motor $75.00 EC Motor for Reach-in* Per Motor $52.00 Refrigeration Economizer Per Compressor HP $ Evaporative Fan Control Per Motor $90.00 Automatic Door Closers for Walk-in Freezers Per Door $ Beverage Machine Control Per Unit $ Snack Machine Control Per Unit $45.00 ENERGY STAR Refrigerated Vending Machine Per Unit $ LED Refrigeration Case Lighting Per Door $60.00 Energy Star Solid Door Freezers Per Cubic Foot $5.00 Energy Star Glass Door Refrigerators Per Cubic Foot $6.00 Energy Star Solid Door Refrigerators Per Cubic Foot $6.00 Total ** *EC= Electrically Commutated ** Incentive cannot exceed 75 percent of total project cost. 18

20 Specifications for Refrigeration Measures Anti-Sweat Heater Controls For this measure, a device is installed that senses the relative humidity in the air outside of the display case and reduces or turns off the glass door (if applicable) and frame anti-sweat heaters at low-humidity conditions. Technologies that can turn off anti-sweat heaters based on sensing condensation (on the inner glass pane) also qualify. Rebate is based on the total linear footage of the case. Electrically Commutated (EC) Evaporator Fan Motor (Refrigerated Cases or Walk-ins) This measure is applicable to the replacement of an existing standard-efficiency shaded-pole evaporator fan motor in refrigerated display cases or fan coil in walk-ins. The replacement unit must be an Electronically Commutated Motor (ECM). This measure cannot be used in conjunction with the Evaporator Fan Controller measure. Refrigeration Economizer The incentive is for installing economizers and controls for walk-in coolers at least 1,000 cu ft. in size. The outdoor air and exhaust dampers must close automatically when the outside air temperature exceeds 34 o F. Evaporative Fan Controls This measure is for the installation of controls in medium temperature walk-in coolers. The controller reduces airflow of the evaporator fans when there is no refrigerant flow. The measure must control a minimum of 1/20 HP where fans operate continuously at full speed. The measure also must reduce fan motor power by at least 75% during the off cycle. This measure is not applicable if any of the following conditions apply: 1) The compressor runs all the time with high duty cycle 2) The evaporator fan does not run at full speed all the time 3) The evaporator fan motor runs on poly-phase power 4) The evaporator fan motor is not shaded-pole or permanent split capacitor (PSC) 5) Evaporator does not use off-cycle or time-off defrost. Automatic Door Closer for Walk-in Freezers This measure is for installing an auto-closer to the main insulated opaque door(s) of a walk-in freezer. The auto-closer must firmly close the door when it is within one inch of full closure. Beverage and Snack Machine Controls Incentive applies for the installation of beverage machine (assumed to be a refrigerated vending machine that contains only non-perishable bottled and canned beverages) controls. Controllers for beverage and snack machines must include a passive infrared occupancy sensor to turn off fluorescent lights and other vending machine systems when the surrounding area is unoccupied for 15 minutes or longer. For the beverage machine, the control logic should power up the machine at 2-hour intervals to maintain product temperature and provide compressor protection. The incentive does not apply to ENERGY STAR Qualified vending machines as they are eligible under the incentive below. ENERGY STAR Refrigerated Beverage Vending Machine ENERGY STAR beverage vending machines qualify for an incentive. Qualifying machines can be found at LED Refrigeration Case Lighting Incentives are for replacing fluorescent refrigerated case lighting with light emitting diode (LED) source illumination. Fluorescent lamps, ballasts, and associated hardware are typically replaced with pre-fabricated LED light bars and LED driver units. ENERGY STAR Solid Door Freezers (for replacement only) Incentive applies for replacement commercial food-grade ENERGY STAR listed refrigerator or freezer. Outer doors on all sides of the unit must be solid doors, doors may be sliding or hinged. Specifications for qualifying products can be found at under high efficiency commercial refrigerators and freezers key product criteria. ENERGY STAR Glass Door Freezers and Refrigerators (for replacement only) Incentive applies for replacement ENERGY STAR listed refrigerator or freezer. Outer doors on at least one side of the unit are glass doors, doors may be sliding or hinged. Specifications for qualifying products can be found at under high efficiency commercial refrigerators and freezers key product criteria. 19

21 Motors Incentive Worksheet NEMA Premium-Efficiency Motors Minimum Qualifying Efficiencies Horse Power 3600 RPM 1800 RPM 1200 RPM Incentive per Motor Open Closed Open Closed Open Closed % 91.7% 93.6% 93.6% 93.0% 93.0% % 91.7% 94.1% 93.6% 93.6% 93.0% % 92.4% 94.1% 94.1% 94.1% 94.1% % 93.0% 94.5% 94.5% 94.1% 94.1% % 93.6% 95.0% 95.0% 94.5% 94.5% % 93.6% 95.0% 95.4% 94.5% 94.5% % 94.1% 95.4% 95.4% 95.0% 95.0% % 95.0% 95.4% 95.4% 95.0% 95.0% % 95.0% 95.8% 95.8% 95.4% 95.8% % 95.4% 95.8% 96.2% 95.4% 95.8% $4.50 per HP $4.00 per HP Motor Make/Model (A) Quantity (B) Motor Size (HP) RPM RPM RPM (Check one for each motor) Open Closed (Check one) Motor Efficiency (C) Incentive per HP (listed above) Incentive (A x B x C) Total 20

22 Specifications for Premium Motors In order to qualify for the incentive, new motors must replace old motors that would have been rewound instead of being replaced. Motors eligible for an incentive are three-phase AC induction motors, HP, of open drip-proof (open) and totally enclosed fan-cooled (closed) classifications. Rewound motors do not qualify. Incentives are based on the motor's Nominal Full Load Efficiencies, tested in accordance with IEEE (Institute of Electrical and Electronics Engineers) Standard 112, method B, that meet or exceed the NEMA premium efficiency standards on the Motors Incentive Worksheet. The application must include the manufacturer's performance data sheet that at least shows equipment type, equipment size, model number, and efficiency rating. Applicants should consider matching RPMs of the existing pump or fan when installing energy efficient motors that inherently have higher speeds (less slip), which may affect electric energy use. NOTE: Variable Speed Drive, Variable Frequency Drive and High Speed Motors may receive up to 75% of total project costs to include equipment, labor and engineering. Apply using Appendix C (page 22). 21

23 APPENDIX C: APPLICATION FOR CUSTOM INCENTIVE PROGRAM Facility Type The project will be (please check all that apply): Part of new facility Addition to existing facility Replacement for existing equipment Is equipment operational? Yes No Project Description Existing Equipment: Describe existing equipment and current operation strategy (i.e., operating hours, efficiency, etc.) Proposed Equipment: Describe proposed equipment and current operation strategy (i.e., operating hours, efficiency, etc.) Calculation Method: Briefly describe the method used to calculate annual electric energy savings in kwh (attach documentation if available.) Total Project Cost (Dollars) Expected Measure Life (Years): Annual Electric Savings (kwh): Estimated Annual Electric Savings (Dollars): Payback* Total Project Costs : Estimated Annual Electric Savings Incentive Amount* (Dollars): * Incentive amounts are up to 75% of total project costs. For lighting projects, Smart Grid, distribution upgrades, and power factor correction, incentive amount equals 30 cents per annual kwh saved in year one. Exterior lighting and VSD motors incentive amounts are up to 75% of total project cost. Geothermal units may receive $1,000 per ton. 22

24 ADDITIONAL DOCUMENTATION FOR CUSTOM PROJECTS The method and assumption used by the applicant to calculate the annual savings will be reviewed by IMEA. IMEA is solely responsible for the final determination of the annual energy savings to be used in calculating the incentive amount. IMEA also reserves the right to require specific measurement and verifications activities such as monitoring both before and after the retrofit and to base the incentive payment on the results of these activities. The following information should be provided as supporting documentation along with the information required in this application. IMEA reserves the right to request additional documentation if necessary to determine or verify the energy savings. Description of the affected facility (i.e., building type, facility size, major business activities performed) Concise project description: Describe BOTH the existing (pre-retrofit or base case ) system and the proposed (post-retrofit or efficient-case ) system. Be as precise, yet concise as possible in the descriptions - include specific quantities and equipment descriptions. Provide the quantity, make, model number and rated capacity of BOTH the existing and the new equipment that is being installed, including condition and age of existing equipment. Also provide other nameplate information like operating voltage and rated full load amps where appropriate. The scope of work from the proposal to the client is often helpful to describe the new equipment. Provide copies of the manufacturer s specifications and/or performance rating sheets and the website address where further technical information about the equipment performance might be found. Identify equipment using the terminology or numbering system used by the Client. (e.g. Replace compressor #3 with a new variable speed compressor or, install a VFD on VAV AHU #3,5,7,8,9 ). Provide copies of sketches, drawings, equipment lists, or inventories that help to clarify the scope. Describe the locations where the equipment is installed. Describe BOTH the facility operating hours and the equipment operating schedule for each day of the week. Where equipment operation varies with days of the week or seasons, be sure to provide a description of the operation for all days of the week and all seasons. Electronic files containing monitoring and trending data used to determine the savings. Operation schedule of the facility or the affected process. Describe the fractional loading of the equipment during the hours that it operates. Description and documentation of any model used to estimate electric energy consumption (provide the actual model with its various input files if possible). Annotate all assumptions or constants used in engineering calculations. List of all assumptions utilized in estimating the savings and the source for these assumptions. Provide the name of the person(s) who did the savings calculations so that staff can discuss questions. Use accepted engineering algorithms and procedures from recognized technical organizations such as ASHRAE, SMACNA, ANSI, etc. Use rated performance factors tested under accepted procedures specified by recognized rating agencies such as ARI, AGA, ANSI, ASTM, etc. Provide an explanation when equipment performance rating conditions vary from standard conditions. 23

25 APPENDIX D: APPLICATION FOR SMALL RENEWABLE GENERATION: SOLAR OR WIND PROJECTS Type of Project Solar Photovoltaic Wind energy Affidavits By checking the following, I affirm: This project will be sited at a municipally-owned or coop-owned facility located in Illinois and will generate electricity solely for the use of that facility for which the municipality or coop provides electric service. The municipality or coop has a net metering ordinance in place and a copy of that ordinance has been included with this application. Upon completion, this project, taken together with all other small renewable generation projects in this municipality or coop will comply with and will keep the municipality or coop in compliance with the Illinois Municipal Electric Agency Small Renewable Generation Resource Policy effective May 1, 2009 and with any subsequent amendments thereto that are in force at the time of pre-application (see pages for reference). NOTE: For each Participating Member, the total nameplate kilowatt (kw) rating of all installed renewable energy generation equipment qualifying as Small Renewable Generation Resources shall not exceed 150 kw. Multiple renewable energy sites can be installed within a Member municipality, but the total combined rating cannot exceed 150 kw. Project Description System Information: Make and Model (include spec sheets with application): Area per Collector (square feet) Total Number of Collectors (solar projects only): Warranty Period Year of Manufacture: Proposed Date of Purchase: Proposed Date of System Installation: Name, Address, and Telephone Number of the Installer: Installer s Business License Number and Proof of Insurance: 24

26 APPENDIX D: APPLICATION FOR SMALL RENEWABLE GENERATION: SOLAR OR WIND PROJECTS (continued) Incentive Calculation: NOTE: Solar generation projects shall be eligible to receive $3.00 per Watt up to 50% of total project cost. Wind generation projects shall be eligible to receive $2.50 per Watt up to 50% of total project cost. Incentive Amount* (Dollars): Total Project Cost (Dollars) Expected Measure Life (Years): Est. Annual Electric Generation (kwh) (Show calculation below or on separate schedule): Value of Annual Electric Generation (Dollars): Payback period Total Project Costs Value of Est. Annual Electric Generation 25

27 Guidelines and Specifications for Small Renewable Generation: Solar or Wind Projects IMEA Member municipalities and coops that have in place a net metering policy may apply for electric efficiency incentives for small solar or wind generation projects to benefit and be installed at facilities owned by the member municipality or coop and for which the municipality or coop serves electric power. Solar generation projects shall be eligible to receive $3.00 per Watt (DC rating) up to 50% of total project cost. Wind generation projects shall be eligible to receive $2.50 per Watt (DC rating) up to 50% of total project cost. MAXIMUM REBATE AMOUNT: The rebate is based solely on actual, documented project costs of equipment and installation. The IMEA may provide up to, but not more than, a rebate award equal to 50 percent of eligible project costs for a single solar or wind energy system. PROJECT LOCATION: Eligibility is limited to projects physically located at a facility in the State of Illinois owned by an IMEA member municipality or coop and for which the IMEA member municipality or coop serves electric power. ELIGIBLE PROJECTS/EQUIPMENT: Eligibility is limited to costs associated with the purchase and installation of a solar or wind energy system purchased and installed on or after May 1, Photovoltaic Power Systems eligible for incentives include any new solar photovoltaic power system that is Underwriters Laboratories (UL) listed or any new solar photovoltaic power system that has successfully completed at least one year of field testing and has a rated design capacity up to 150 kw. Any remanufactured equipment must have a warranty that meets or exceeds OEM warranty. Documentation must be submitted with the application. All eligible systems must be sited in compliance with all federal, state and local regulations. Wind Power Systems eligible for incentives include any new small wind energy system with a nameplate capacity of up to 150 kw. Eligible systems must be sited in compliance with all federal, state and local regulations. The applicant must demonstrate that the project location is suitable for wind generation by providing documentation including, but not limited to, wind resource maps (such as those available at airport or weather station data, topographical maps, and any additional information as directed by the IMEA. While not required, IMEA strongly encourages applicants to consider an independent wind site assessment by a certified wind site assessor (certified by the Midwest Renewable Energy Association, go to this website for a directory of assessors - to ensure the site is suitable for a wind turbine. INELIGIBLE PROJECT COSTS: The following costs are not eligible for rebate under these guidelines: Costs associated with the repair and/or replacement of parts for existing solar or wind energy systems. Costs associated with the expansion of an existing system, including new pumps, storage, or any other balance-of-system components that are not explicitly eligible per these guidelines. NET METERING POLICY REQUIRED: All IMEA member municipalities and coops applying for wind or solar project funding must submit a copy of their net metering ordinance. COMPLIANCE WITH IMEA SMALL RENEWABLE GENERATION RESOURCES POLICY: Applicants must be in full compliance with the Illinois Municipal Electric Agency Small Renewable Generation Resource Policy effective May 1, 2009 (see pages for reference) and with any subsequent amendments thereto that are in effect upon the date of the applicant s pre-application for funding. NOTE: For each Participating Member, the total nameplate kilowatt (kw) rating of all installed renewable energy generation equipment qualifying as Small Renewable Generation Resources shall not exceed 150 kw. Multiple renewable energy sites can be installed within a Member municipality, but the total combined rating cannot exceed 150 kw. IMEA ACTION: The IMEA shall review all solar and wind energy rebate applications to determine whether all program requirements have been met and whether the applicant is eligible for funding. The IMEA reserves the right to reject any application. The submission of an application under these guidelines confers no right upon any applicant. The IMEA is not obligated to provide rebate funding, or to pay any costs incurred by the applicant in the preparation and submission of the application. The IMEA is under no obligation to provide rebate funding for applicants that proceed with project installation prior to receipt of a Notice to Proceed from the IMEA. All guidelines are subject to review and revision by the IMEA. Applicants are responsible for submitting requests for funding using the current version of the IMEA Electric Efficiency Program application. 26

Prescriptive Program. Terms And Conditions General Eligibility. Commercial and Industrial Customers. Rebate Checklist

Prescriptive Program. Terms And Conditions General Eligibility. Commercial and Industrial Customers. Rebate Checklist Prescriptive Program Industrial Customers Rebate Checklist Get your rebate check faster by checking off these easy steps before mailing your application form. Incomplete applications may be delayed. q

More information

Customer Benefits. Why Energy Efficiency? Consumers Energy Business Solutions. What Business Solutions Incentives Are Available?

Customer Benefits. Why Energy Efficiency? Consumers Energy Business Solutions. What Business Solutions Incentives Are Available? Why an Energy Efficiency Program? Business Solutions Energy Efficiency Incentive Program MPSC 21st Century Electric Energy Plan More electricity is needed as soon as practicable. One way of achieving this

More information

Policies & Procedures Manual

Policies & Procedures Manual Policies & Procedures Manual Ver. 4.0 Rev. 9-01-13 1/2/2014 9:53 AM Table of Contents 1. Program Overview... 4 1.1 Incentive Types... 4 2. Program Effective Dates... 5 3. Customer Eligibility... 5 4. Project

More information

Policies & Procedures Manual

Policies & Procedures Manual Policies & Procedures Manual Ver. 4.2 Rev. 4-01-15 Table of Contents 1. Program Overview... 4 1.1 Incentive Types... 4 2. Program Effective Dates... 5 3. Customer Eligibility... 5 4. Project Requirements...

More information

2018 Commercial Rebate Program

2018 Commercial Rebate Program Black Hills Energy offers Colorado Commercial and Industrial electric customer rebates for some of the most commonly installed efficiency projects. Follow the checklist below to determine if you are eligible

More information

2016 Commercial Rebate Program

2016 Commercial Rebate Program 2016 Commercial Rebate Program Colorado Electric Commercial and Industrial Customers Black Hills Energy offers Colorado Commercial and Industrial electric customers rebates for some of the most commonly

More information

2017 Lighting Program Colorado: Commercial and Industrial Electric Customers

2017 Lighting Program Colorado: Commercial and Industrial Electric Customers Black Hills Energy offers Colorado Commercial and Industrial electric customers rebates for some of the most commonly installed lighting projects. We offer commercial customers two options to receive rebates.

More information

COMMERCIAL & INDUSTRIAL

COMMERCIAL & INDUSTRIAL Energy-Smart Solutions from Your Local Electric Cooperative 2018 COMMERCIAL & INDUSTRIAL PROGRAM APPLICATION HAVE QUESTIONS OR NEED HELP COMPLETING YOUR APPLICATION? CALL 877.653.8288 OR EMAIL APPLY@POWERMOVES.COM.

More information

Capacity-Based Load Response

Capacity-Based Load Response Capacity-Based Load Response Reduce energy on demand and earn significant financial benefits Businesses with the flexibility to manage interruptions can earn savings with our market-based compensation

More information

What products are eligible for the rebate? < 149 tons > 150 tons

What products are eligible for the rebate? < 149 tons > 150 tons If you have questions while completing this form, please contact Energy Management Solutions, Inc. weekdays during business hours for assistance. Phone: 952-767-7450 Fax: 952-556-9171 Send your completed

More information

Application Center Equipment Guide. Product Type Category Name Product. Heating & Cooling Equipment Unitary Packaged Heating & Cooling Air Conditioner

Application Center Equipment Guide. Product Type Category Name Product. Heating & Cooling Equipment Unitary Packaged Heating & Cooling Air Conditioner HVAC TECHNICAL SHEET GENERAL INFORMATION SMECO s Business Solutions program is designed to help commercial and industrial customers maximize energy efficiency and manage energy costs. With cost-saving

More information

SUMMARY OF SERVICES & INCENTIVES

SUMMARY OF SERVICES & INCENTIVES SMALL BUSINESS PROGRAM 2017 SUMMARY OF SERVICES & INCENTIVES Effective through December 31, 2017 Last updated February 1, 2017 EFFICIENCY INCENTIVES SUMMARY The Focus on Energy Small Business Program offers

More information

Heating and Cooling Incentive Application for Residential Customers

Heating and Cooling Incentive Application for Residential Customers 2019 Heating and Cooling Incentive Application for Residential Customers A Cash Incentive Energy Efficiency Program brought to you by: Instructions for Use: For complete instructions, please refer to the

More information

Heating and Cooling Incentive Application for Business Customers

Heating and Cooling Incentive Application for Business Customers 2019 Heating and Cooling Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: IMPORTANT INSTRUCTIONS: Step 1: Determine Eligibility: Pre-approval is

More information

Heating and Cooling Incentive Application for Business Customers

Heating and Cooling Incentive Application for Business Customers 2019 Heating and Cooling Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: IMPORTANT INSTRUCTIONS: Step 1: Determine Eligibility: Pre-approval is

More information

Heating and Cooling Incentive Application for Residential Customers

Heating and Cooling Incentive Application for Residential Customers 2019 Heating and Cooling Incentive Application for Residential Customers A Cash Incentive Energy Efficiency Program brought to you by: Instructions for Use: For complete instructions, please refer to the

More information

Heating and Cooling Incentive Application for Residential Customers

Heating and Cooling Incentive Application for Residential Customers 2019 Heating and Cooling Incentive Application for Residential Customers A Cash Incentive Energy Efficiency Program brought to you by: Instructions for Use: For complete instructions, please refer to the

More information

Heating and Cooling Incentive Application for Business Customers

Heating and Cooling Incentive Application for Business Customers 2019 Heating and Cooling Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: IMPORTANT INSTRUCTIONS: Step 1: Determine Eligibility: Pre-approval is

More information

Heating and Cooling Incentive Application for Residential Customers

Heating and Cooling Incentive Application for Residential Customers 2019 Heating and Cooling Incentive Application for Residential Customers A Cash Incentive Energy Efficiency Program brought to you by: Instructions for Use: For complete instructions, please refer to the

More information

Heating and Cooling Incentive Application for Residential Customers

Heating and Cooling Incentive Application for Residential Customers 2018 Heating and Cooling Incentive Application for Residential Customers A Cash Incentive Energy Efficiency Program brought to you by: Instructions for Use: For complete instructions, please refer to the

More information

Heating and Cooling Incentive Application for Residential Customers

Heating and Cooling Incentive Application for Residential Customers 2019 Heating and Cooling Incentive Application for Residential Customers A Cash Incentive Energy Efficiency Program brought to you by: Instructions for Use: For complete instructions, please refer to the

More information

Heating and Cooling Incentive Application for Business Customers

Heating and Cooling Incentive Application for Business Customers 2019 Heating and Cooling Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: IMPORTANT INSTRUCTIONS: Step 1: Determine Eligibility: Pre-approval is

More information

e.catalog Product Acceptance Criteria April 2008

e.catalog Product Acceptance Criteria April 2008 e.catalog Product Acceptance Criteria April 2008 TABLE OF CONTENTS E.CATALOG PRODUCT ACCEPTANCE CRITERIA...4 E.CATALOG ENERGY EFFICIENCY CRITERIA...4 LAMPS...6 COMPACT FLUORESCENT LAMPS...6 SCREW-IN COLD

More information

LIGHTING DISTRIBUTOR INSTANT REBATE PROGRAM

LIGHTING DISTRIBUTOR INSTANT REBATE PROGRAM Lighting Distributor Instant Rebate Program Program Year 2016 (July 1, 2016 June 30, 2017) The Hawaii Public Utilities Commission has contracted with Leidos Engineering, LLC to administer the Hawaii Energy

More information

Heating and Cooling Incentive Application for Business Customers

Heating and Cooling Incentive Application for Business Customers 2019 Heating and Cooling Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: IMPORTANT INSTRUCTIONS: Step 1: Determine Eligibility: Pre-approval is

More information

Heating and Cooling Incentive Application for Business Customers

Heating and Cooling Incentive Application for Business Customers 2015 Heating and Cooling Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: Instructions for Use: For complete instructions, please refer to the

More information

2019 Lighting Retrofit Rebate Instructions. City of Winthrop

2019 Lighting Retrofit Rebate Instructions. City of Winthrop Rebate Instructions By participating in the We Save program, you can save energy and earn a rebate when you replace existing lighting with qualifying, energy-efficient lighting. What Rebate Can I Earn?

More information

1 Project Information. 2 Building Type. 3 Trade Ally/Contractor Information. HVAC Rebate Worksheet. Retrofit New Construction

1 Project Information. 2 Building Type. 3 Trade Ally/Contractor Information. HVAC Rebate Worksheet. Retrofit New Construction HVAC Rebate Worksheet Before you start Instructions: Complete all relevant information for your project. Include with complete application package. The HVAC Worksheet should be completed for new construction

More information

2019 Lighting Retrofit Rebate Instructions. City of Le Sueur

2019 Lighting Retrofit Rebate Instructions. City of Le Sueur Rebate Instructions By participating in the We Save program, you can save energy and earn a rebate when you replace existing lighting with qualifying, energy-efficient lighting. What Rebate Can I Earn?

More information

Minnesota Conservation

Minnesota Conservation Program Information MN Minnesota Conservation Programs Summary We offer solutions for business customers in a suite of energy conservation and energy management products that will help you increase your

More information

2019 Lighting Retrofit Rebate Instructions. City of Brownton

2019 Lighting Retrofit Rebate Instructions. City of Brownton Rebate Instructions By participating in the We Save program, you can save energy and earn a rebate when you replace existing lighting with qualifying, energy-efficient lighting. What Rebate Can I Earn?

More information

Pepco & Delmarva Power. Commercial & Industrial Energy Savings Program Hotels and Restaurants October 18, 2012

Pepco & Delmarva Power. Commercial & Industrial Energy Savings Program Hotels and Restaurants October 18, 2012 Pepco & Delmarva Power Commercial & Industrial Energy Savings Program Hotels and Restaurants October 18, 2012 Housekeeping The presentation will be emailed to you after the webinar. If you have technical

More information

DTE Energy Commercial & Industrial Energy Optimization Program. Trade Ally Meeting. Guardian Plumbing & Heating January 20, 2011

DTE Energy Commercial & Industrial Energy Optimization Program. Trade Ally Meeting. Guardian Plumbing & Heating January 20, 2011 DTE Energy Commercial & Industrial Energy Optimization Program Trade Ally Meeting Guardian Plumbing & Heating January 20, 2011 Agenda Introduction DTE Energy Your Energy Savings Program Overview 2011 Program

More information

Heating and Cooling Incentive Application for Business Customers

Heating and Cooling Incentive Application for Business Customers 2014 Heating and Cooling Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: Instructions for Use: For complete instructions, please refer to the

More information

Clean Energy Ally Program Orientation

Clean Energy Ally Program Orientation Clean Energy Ally Program Orientation PRESENTED BY Lisa Harmon B USINESS A L L IANCES M ANAGER 2 WHAT WE DO Help you make smart energy choices. Because smart energy choices reduce energy use save money

More information

Commercial & Industrial Energy Optimization Programs

Commercial & Industrial Energy Optimization Programs SP Energy and Water Work Group Breakfast Meeting Commercial & Industrial Energy Optimization Programs May 2, 2011 Agenda Introduction DTE Energy Your Energy Savings Program Overview 2011 Program Changes

More information

DEEMED SAVINGS TECHNICAL ASSUMPTIONS

DEEMED SAVINGS TECHNICAL ASSUMPTIONS Product: Description: Prescriptive rebates will be offered for replacement lighting equipment. New Construction rebates will be offered for new facilities or spaces overhauled for a new purpose. Custom

More information

2018 Smart Energy New Homes Program Manual

2018 Smart Energy New Homes Program Manual 2018 Smart Energy New Homes Program Manual Reduce the Use: Residential Table of Contents Section 1 Introduction... 1-1 1.1 Program Overview... 1-1 1.2 Program Administrator... 1-1 1.3 Program Contact Information...

More information

05/14/2012. How to Get Started with the Ameren Illinois ActOnEnergy Program. How to Get Started with ActOnEnergy Program

05/14/2012. How to Get Started with the Ameren Illinois ActOnEnergy Program. How to Get Started with ActOnEnergy Program How to Get Started with the Ameren Illinois ActOnEnergy Program Eric Kruzan, CEM How to Get Started with ActOnEnergy Program Getting Started... 1. Start with Where you use Energy your Systems 2. Where

More information

DEEMED SAVINGS TECHNICAL ASSUMPTIONS

DEEMED SAVINGS TECHNICAL ASSUMPTIONS Product: Description: Prescriptive rebates will be offered for replacement lighting equipment. New Construction rebates will be offered for new facilities or spaces overhauled for a new purpose. Custom

More information

Grays Harbor PUD Energy Services. Commercial, Industrial, Agricultural Incentive Program Catalog IT S YOUR PUD!

Grays Harbor PUD Energy Services. Commercial, Industrial, Agricultural Incentive Program Catalog IT S YOUR PUD! Grays Harbor PUD Energy Services Commercial, Industrial, Agricultural Incentive Program Catalog IT S YOUR PUD! This catalog outlines the available incentives for making energy efficient improvements at

More information

New Jersey s Clean Energy Program 2010 Program Descriptions and Budget

New Jersey s Clean Energy Program 2010 Program Descriptions and Budget New Jersey s Clean Energy Program 2010 Program Descriptions and Budget Commercial & Industrial Energy Efficiency Programs Managed by TRC as C&I Market Manager 2010 Revised Program & Budget Filing June

More information

Appendix E-1f: Small Building Methodology for Pre-SB2030 Projects

Appendix E-1f: Small Building Methodology for Pre-SB2030 Projects Appendix E-1f: Small Building Methodology for Pre-SB2030 Projects Prescriptive Bundle Option Method for Office Buildings less than 30,000 GSF This section describes energy strategy requirements for three

More information

Business Energy Rebates Application

Business Energy Rebates Application Business Energy Rebates Application Business Energy Rebates make it easy and affordable for you to select energy efficient products for your business. and mail-in rebates are available for energy efficient

More information

ANNUAL STAKEHOLDER MEETING

ANNUAL STAKEHOLDER MEETING ANNUAL STAKEHOLDER MEETING 2015 Technical Reference Manual High Impact C&I Measure Updates July 11, 2014 Presented by the Statewide Evaluation Team: MEETING AGENDA MEETING AGENDA Weather Mapping Lighting

More information

New Construction Lighting Application. Application Process. Details & Instructions

New Construction Lighting Application. Application Process. Details & Instructions New Construction Lighting Application Details & Instructions PSO provides technical assistance and rebates to assist businesses in making energy saving upgrades. Review details and requirements* at PowerForwardWithPSO.com.

More information

Pepco C&I Energy Savings Program. AOBA Briefing April 27, 2011

Pepco C&I Energy Savings Program. AOBA Briefing April 27, 2011 Pepco C&I Energy Savings Program AOBA Briefing April 27, 2011 Program Eligibility Pepco s Maryland commercial and industrial customers are eligible for CASH incentives for projects that reduce electric

More information

What products are eligible for the rebate? Fixtures & Lamps: LED Commercial Fixtures LED Lamps

What products are eligible for the rebate? Fixtures & Lamps: LED Commercial Fixtures LED Lamps If you have questions while completing this form, please contact Energy Management Solutions, Inc. weekdays during business hours for assistance. Phone: 952-767-7450 Fax: 952-556-9171 Send your completed

More information

Lighting Rebates 2017 New Construction Rebate Application

Lighting Rebates 2017 New Construction Rebate Application 2017 New Construction Rebate Application Business Member Information Business Name Installation Address City, State, Zip Contact Name Email Phone Number Account Number Application Check List Rebate application

More information

DEEMED SAVINGS TECHNICAL ASSUMPTIONS

DEEMED SAVINGS TECHNICAL ASSUMPTIONS Product: Prescriptive rebates will be offered for replacement lighting equipment. New Construction rebates will be offered for new facilities or spaces overhauled for a new purpose. Custom rebates are

More information

Pennsylvania Watt Watchers. Business Programs

Pennsylvania Watt Watchers. Business Programs Pennsylvania Watt Watchers Business Programs Why does a utility company want me to reduce electricity usage? Pennsylvania Act 129 Signed into law by Governor Rendell - October 2008. Establishes new requirements

More information

Custom Incentive Application for Business Customers

Custom Incentive Application for Business Customers 2018 Custom Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: Instructions for Use: For complete instructions, please refer to the Terms and Conditions

More information

is consciousness and action

is consciousness and action Kaua`i Renewable Energy Conference Miles Kubo President/COO September 8, 28 Energy Conservation is consciousness and action Turn off a light Walk a flight of stairs Shut down computers Unplug phantom loads

More information

Fifteen Year Plan for Energy Efficiency and Conservation Projects

Fifteen Year Plan for Energy Efficiency and Conservation Projects Fifteen Year Plan for Energy Efficiency and Conservation Projects Presented to the Board of Trustees of the Northeastern Ohio Universities Colleges of Medicine and Pharmacy, December, 2008, in accordance

More information

Permanent Load Shifting Program

Permanent Load Shifting Program 1. Program Description Permanent Load Shifting (PLS) can help reduce system peak load by storing energy produced during off-peak period and shifting electricity use from on-peak to off-peak periods on

More information

2016 Commercial Efficiency Program

2016 Commercial Efficiency Program Existing Building Rebate Application, Version 2.0 The Commercial Efficiency Program offers rebates to commercial, industrial, institutional, educational, municipal or multi-family building customers who

More information

November 19, Financing Efficiency. Greg Swiss Energy Engineer University of Illinois

November 19, Financing Efficiency. Greg Swiss Energy Engineer University of Illinois November 19, 2011 Financing Efficiency Greg Swiss Energy Engineer University of Illinois IASB JOINT ANNUAL CONFERENCE Chicago, Illinois Financing Energy Efficiency State-based Funding: Energy Efficiency

More information

PECO Smart Ideas for Your Business

PECO Smart Ideas for Your Business Follow This Easy Process: Step 1: Verify your Eligibility Applicant must verify that they are a business customer of PECO (commercial, industrial, governmental, institutional, and non-profit). Multifamily

More information

Wakulla Chamber of Commerce July Place your cover photo here. Size and crop it to 4 high x 9.6 wide. Presented by Derick Farfan

Wakulla Chamber of Commerce July Place your cover photo here. Size and crop it to 4 high x 9.6 wide. Presented by Derick Farfan Wakulla Chamber of Commerce July 2017 Commercial Energy Efficiency Programs Place your cover photo here. Size and crop it to 4 high x 9.6 wide. Presented by Derick Farfan Energy Efficiency Incentives Question:

More information

GreenStep Cities Workshop Xcel Energy Rebates: Commercial Program Overview

GreenStep Cities Workshop Xcel Energy Rebates: Commercial Program Overview GreenStep Cities Workshop Xcel Energy Rebates: Commercial Program Overview Mike Meyers, Xcel Energy Commitment from Leadership Our energy conservation programs are especially valuable because they give

More information

Custom Application 2018 Retrofit Program

Custom Application 2018 Retrofit Program The Retrofit Program is designed for Commercial and Industrial (C&I) customers to help replace aging and inefficient equipment and systems with more energy efficient technologies. Tailored to a customer's

More information

Efficiency Works Business Programs Guide 2019

Efficiency Works Business Programs Guide 2019 Efficiency Works Business Programs Guide 2019 Revised: January 11, 2019 TABLE OF CONTENTS EFFICIENCY WORKS BUSINESS OVERVIEW... 3 CONTACT INFORMATION... 3 UTILITY SERVICE TERRITORY... 4 GENERAL PARTICIPATION

More information

3% Energy Savings 4.5% Peak Demand Reduction

3% Energy Savings 4.5% Peak Demand Reduction 2 3% Energy Savings 4.5% Peak Demand Reduction May 31, 2013 3 Incentive Equipment Cost 4 Non-Standard Lighting Program Street Lighting Program, OAL, Traffic Lights Motors & Drives Program HVAC Program

More information

Heating, Ventilation & Air Conditioning Systems ( Member Information Page )

Heating, Ventilation & Air Conditioning Systems ( Member Information Page ) 2017 Commercial Program Heating, Ventilation & Air Conditioning Systems ( Member Information Page ) WrightHennepin Cooperative Electric Assn., P.O. Box 330, Rockford, MN 55373 Ph: 7634773000 Business Member

More information

Exhibit A Program Descriptions, Historical Changes and Proposed Changes

Exhibit A Program Descriptions, Historical Changes and Proposed Changes Exhibit A Program Descriptions, Historical Changes and Proposed Changes Exhibit A Program Descriptions, Historical Changes and Changes Reflected in Forecasts Home Energy Savings The Home Energy Savings

More information

New Jersey Board of Public Utilities Clean Energy Program Incentives and Proposed Hurricane Sandy Storm Response

New Jersey Board of Public Utilities Clean Energy Program Incentives and Proposed Hurricane Sandy Storm Response New Jersey Board of Public Utilities Clean Energy Program Incentives and Proposed Hurricane Sandy Storm Response Energy Efficient Equipment and Building Upgrades February 2013 Program Goals Save energy

More information

Danville Utilities Home$ave Program Manual

Danville Utilities Home$ave Program Manual 2017-2019 Danville Utilities Home$ave Program Manual Version 063017 This Program Manual is intended to serve as a reference manual for the residential customers of Danville Utilities that are interested

More information

Reducing Costs with Energy Efficiency

Reducing Costs with Energy Efficiency Reducing Costs with Energy Efficiency Presented to Pennsylvania Demand Side Response Working Group February 9, 2007 2/9/2007 1 Austin Energy Municipally-owned 700,000 population Area > 400 sq. miles Generation

More information

Type of Business: Office Restaurant Retail Government Grocery Other Health Lodging School Church Industrial Multifamily Facility Size (ft 2 )

Type of Business: Office Restaurant Retail Government Grocery Other Health Lodging School Church Industrial Multifamily Facility Size (ft 2 ) 2016 Business Lighting Application LIMITED FUNDING: Before purchasing your equipment, contact your local utility for rebate availability. CUSTOMER INFORMATION Location Name Company Name Tax ID Website

More information

Compressed Air Incentive Application for Business Customers

Compressed Air Incentive Application for Business Customers 2018 Compressed Air Incentive Application for Business Customers A Cash Incentive Energy Efficiency Program brought to you by: Instructions for Use: For complete instructions, please refer to the Terms

More information

Retrofit Lighting. Program Details & Instructions

Retrofit Lighting. Program Details & Instructions Retrofit Lighting Program Details & Instructions AEP-PSO s High Performance Business Program (HPB) is designed to help non-residential customers replace aging, inefficient equipment and systems with energy-efficient

More information

Business Energy Rebates Application

Business Energy Rebates Application Business Energy Rebates Application Business Energy Rebates make it easy and affordable for you to select energy efficient products for your business. In-store and mail-in rebates are available for energy

More information

PROGRAM GUIDELINES & APPLICATION

PROGRAM GUIDELINES & APPLICATION PROGRAM GUIDELINES & APPLICATION PROGRAM YEAR: 2017 START DATE: JUNE 1, 2017 PUBLIC SECTOR NEW CONSTRUCTION PROGRAM PRESCRIPTIVE AND CUSTOM INCENTIVES FOR LOCAL GOVERNMENT, PUBLIC SCHOOLS, COMMUNITY COLLEGES,

More information

2017 Application Specifications

2017 Application Specifications 2017 Application Specifications Table of Contents General requirements for all lighting projects: 3 Non-LED Lighting 3 LED Lighting 5 New Construction Lighting 8 Controls 10 Energy Management Systems (EMS)

More information

Energy Efficiency Portfolio Standard (EEPS)

Energy Efficiency Portfolio Standard (EEPS) Jack Lavin, Director Rod R. Blagojevich, Governor Energy Efficiency Portfolio Standard (EEPS) In 2007, legislation that amended the Illinois Public Utilities Act required that the State s largest utility

More information

2016 Residential HVAC Rebate Application

2016 Residential HVAC Rebate Application Instructions for Use STEP1 Determine Eligibility Verify the utility company listed on the rebate application is your electric utility. Applications for other participating utility service providers can

More information

2019 MA Commercial & Industrial Energy Efficiency Offerings & Incentives

2019 MA Commercial & Industrial Energy Efficiency Offerings & Incentives 2019 MA Commercial & Industrial Energy Efficiency Offerings & Incentives P a g e 2 The Massachusetts Program Administrators (PAs) offer their business customers a wide array of financial incentives (1)

More information

HEATING, COOLING AND AIR-CONDITIONING MEASURES

HEATING, COOLING AND AIR-CONDITIONING MEASURES HEATING, COOLING AND AIR-CONDITIONING MEASURES FOR BUSINESS CUSTOMERS The following information is provided as part of the PowerSavers conservation program to encourage non-residential customers to select

More information

FirstEnergy s Pennsylvania Utilities. Energy Efficiency Programs for Business

FirstEnergy s Pennsylvania Utilities. Energy Efficiency Programs for Business FirstEnergy s Pennsylvania Utilities Energy Efficiency Programs for Business 2018 TODAY S AGENDA Introduction to Sodexo Summary of Pennsylvania Act 129 Overview of program website Overview of Application

More information

ILLINOIS ENERGY NOW Energy Efficiency Incentives for State Facilities. December 2016

ILLINOIS ENERGY NOW Energy Efficiency Incentives for State Facilities. December 2016 ILLINOIS ENERGY NOW Energy Efficiency Incentives for State Facilities December 2016 1 ILLINOIS OFFICE OF ENERGY & RECYCLING Business Development Community Development Illinois Department of Commerce &

More information

Conservation First Framework LDC Tool Kit Final v2.1 July 1, 2017

Conservation First Framework LDC Tool Kit Final v2.1 July 1, 2017 Program Name: Save on Energy Heating and Cooling Program 1. Program Description The Heating and Cooling Program encourages individuals and businesses to replace or retrofit existing heating and cooling

More information

INCENTIVE ESTIMATOR HVAC USER GUIDE CONTENTS FLORIDA CUSTOM INCENTIVE PROGRAM

INCENTIVE ESTIMATOR HVAC USER GUIDE CONTENTS FLORIDA CUSTOM INCENTIVE PROGRAM INCENTIVE ESTIMATOR HVAC USER GUIDE FLORIDA CUSTOM INCENTIVE PROGRAM CONTENTS 1. Getting Started... 2 2. Measure Tool Description... 3 2.1. Appropriate Use of the Tool... 3 2.2. Applicable Types of Air

More information

DEEMED SAVINGS TECHNICAL ASSUMPTIONS

DEEMED SAVINGS TECHNICAL ASSUMPTIONS Product: Prescriptive rebates will be offered for replacement lighting equipment. New Construction rebates will be offered for new facilities or spaces overhauled for a new purpose. Custom rebates are

More information

Retrofit Lighting Rebate Application. Application Process. Details & Instructions. Equipment Eligibility

Retrofit Lighting Rebate Application. Application Process. Details & Instructions. Equipment Eligibility Retrofit Lighting Rebate Application Details & Instructions PSO provides technical assistance and rebates to assist businesses in making energy saving upgrades. Review details and requirements* at PowerForwardWithPSO.com.

More information

Local Government Energy Audit:

Local Government Energy Audit: Local Government Energy Audit: i Energy Audit Report Lift Station #1, 3, 5, 6, 7, 8, and 9 Copyright 2018 TRC Energy Services. All rights reserved. Reproduction or distribution of the whole, or any part

More information

Electric Association Annual Conference January 25, 2018

Electric Association Annual Conference January 25, 2018 Electric Association Annual Conference January 25, 2018 Teri Lewand CEM, LEED AP ComEd, Business Programs Mgr. C O N F I D E N T I A L Origin of Energy Efficiency Programs Illinois energy legislation passed

More information

LIGHTING TECHNICAL SHEET

LIGHTING TECHNICAL SHEET GENERAL INFORMATION LIGHTING TECHNICAL SHEET SMECO's Business Solutions program is designed to help commercial and industrial customers maximize energy efficiency and manage energy costs. With cost-saving

More information

MidAmerican Energy 2017 Trade Ally Meeting

MidAmerican Energy 2017 Trade Ally Meeting MidAmerican Energy 2017 Trade Ally Meeting Agenda 2017 EE Program Performance insight IA 2019-2023 Energy Efficiency Plan IL 2019-2023 Energy Efficiency Plan 2018 Program Changes Experience the Trade Ally

More information

Commercial & Industrial Custom Incentive Program

Commercial & Industrial Custom Incentive Program About This Application UGI Electric offers incentives for cost-effective custom energy efficiency improvements to help businesses reduce energy use by improving the efficiency of their equipment and facility.

More information

BOARD OF PUBLIC WORKS 1600 O Street Auburn, NE Rebate Program

BOARD OF PUBLIC WORKS 1600 O Street Auburn, NE Rebate Program BOARD OF PUBLIC WORKS 1600 O Street Auburn, NE 68305 2018 Rebate Program Effective for new equipment installed after January 1, 2018. This program is subject to change at the sole discretion of the Auburn

More information

DEEMED SAVINGS TECHNICAL ASSUMPTIONS

DEEMED SAVINGS TECHNICAL ASSUMPTIONS Product: Prescriptive rebates will be offered for replacement lighting equipment. New Construction rebates will be offered for new facilities or spaces overhauled for a new purpose. Custom rebates are

More information

wattsmart Business Wyoming

wattsmart Business Wyoming Incentives for lighting retrofits Measure Category Eligibility Requirements Lighting retrofits See note 4 Customer Incentive $0.10/kWh annual Interior Lighting TLED relamp Lamp wattage reduction 10 watts,

More information

A change can do you good.

A change can do you good. RETROFIT INCENTIVES A change can do you good. Let s turn the answers on. FinAnswer Express California Is it costing more to run your facility than it should? Meek s branch manager Sandy Johnson (pictured

More information

REVISION NO.: 8 EFFECTIVE: 03/26/18

REVISION NO.: 8 EFFECTIVE: 03/26/18 Distributed Generation Interconnection Process for Residential and Small General Service OVERVIEW REVISION NO.: 8 EFFECTIVE: 03/26/18 Required Steps for ED3 s Distributed Generation Interconnection Process

More information

Electric Sign Energy Certification Service To California Energy Commission Title 24 Technical Requirements and Audit Instructions (ENVS) Lighting

Electric Sign Energy Certification Service To California Energy Commission Title 24 Technical Requirements and Audit Instructions (ENVS) Lighting Electric Sign Energy Certification Service To California Energy Commission Title 24 Technical Requirements and Audit Instructions (ENVS) Lighting Electric Sign Energy Certification Service To California

More information

Program Guide. NB Power Commercial Buildings Retrofit Program. Version 5.5 August 2016

Program Guide. NB Power Commercial Buildings Retrofit Program.  Version 5.5 August 2016 NB Power Commercial Buildings Retrofit Program Version 5.5 August 2016 www.nbpower.com TABLE OF CONTENTS 1.0 PROGRAM INTRODUCTION... 1 2.0 ELIGIBILITY AND REQUIREMENTS... 1 2.1 ELIGIBLE BUILDING TYPES...

More information

The Participants in this GreenON Rebates Program are homeowners and landlords.

The Participants in this GreenON Rebates Program are homeowners and landlords. Program Name: GreenON Rebates Program 1. Program Description The GreenON Rebates Program is designed to encourage homeowners to invest in building envelope and HVAC upgrades to help reduce energy costs,

More information

Tennessee Valley Authority

Tennessee Valley Authority Tennessee Valley Authority Technical Resource Manual Version 4 Prepared by DNV KEMA Energy & Sustainability October 2015 Copyright 2015, DNV GL (KEMA, Inc.) This document, and the information contained

More information

SINGLE PACKAGED VERTICAL AIR-CONDITIONERS AND HEAT PUMPS CERTIFICATION PROGRAM

SINGLE PACKAGED VERTICAL AIR-CONDITIONERS AND HEAT PUMPS CERTIFICATION PROGRAM SINGLE PACKAGED VERTICAL AIR-CONDITIONERS AND HEAT PUMPS CERTIFICATION PROGRAM AHRI SPVA AND SPVH OM JANUARY 2018 2111 Wilson Blvd, Suite 500 Arlington, Virginia 22201 (703) 524-8800 Sponsored and administered

More information

WELCOME 2018 Commercial Programs Basic and Custom Presentation

WELCOME 2018 Commercial Programs Basic and Custom Presentation WELCOME 2018 Commercial Programs Basic and Custom Presentation January 10, 2018 1 Oncor s Energy Efficiency Team Michael Stockard Director Garry Jones Manager EE Program Implementation Mike Baker Manager

More information