PRELIMINARY ENGINEERING DESIGN REPORT WATER AND SANITATION
|
|
- Everett Hawkins
- 6 years ago
- Views:
Transcription
1 JOHANNESBURG EMALAHLENI 128 Beyers Naudé Dr. Cnr. Mendelssohn Rd. Roosevelt Park, 2195 Johannesburg, Gauteng PO Box Roosevelt Park, 2129 Johannesburg Gauteng Tel: Fax: Our ref: 972/001 PRELIMINARY ENGINEERING DESIGN REPORT WATER AND SANITATION DEVELOPMENT OF FORT WEST PHASE 2 IPW-PRT2011/08/0107 Date: 21 June 2012 Client: Gauteng Department of Local Government and Housing. Contact: Mr. P Booyens Tel: philip@scip.co.za ISO 9001:2008 Certified A member of CESA Directors: JD Booyens; NM Mjodi; C Meyer; P Booyens. Reg. No. 1996/15526/07 Vat No
2 PRELIMINARY ENGINEERING DESIGN REPORT: WATER & SANITATION. FORT WEST PHASE 2 EXECUTIVE SUMMARY The Preliminary Feasibility Report completed under IPW-PRT2011/08/0107 indicated that 181 ha of land identified for developments in the west of Pretoria, just north of lotus gardens, is suitable for the development of approximately 3500 residential units. The proposed development falls across two reservoir zones, namely Lotus Gardens and Pretoria West HL reservoir zones. Furthermore, within the Lotus Gardens reservoir zone, part of the development falls in the PRV sub zone as well. A 250mm diameter main waterline is required to supply the northwestern part of the proposed development, from the Lotus Gardens reservoir. The southeastern section of the development will be fed by a 315mm pipeline from the Pretoria West HL reservoir. The total cost for new bulk water infrastructure is estimated to be R3,325, and the internal network will be approximately R14,494, The existing 225mm diameter sewer line is not sufficient to service Fort West Phase 2. Both Phase 1 and Phase 2 will require upgrading the bulk sewer pipeline. Therefore, collaboration should be done between the two developments. The total estimated cost for bulk sewer upgrade is R10,346, and the internal network will be approximately R20,936,500.00
3 PRELIMINARY ENGINEERING DESIGN REPORT: WATER & SANITATION. FORT WEST PHASE 2 CONTENTS 1 INTRODUCTION Project Description Locality SCOPE OF THE REPORT TOWN PLANNING STATUS BULK WATER Existing Reservoirs Existing Pipelines Residential Water Demand Proposed Bulk Pipelines SANITATION Generated Sewer Wastewater Treatment Works (wwtw) New Main Outfall Sewers LEVEL OF SERVICE: INTERNAL SERVICE Type of Development and Appropriate Level of Service Water Supply: Design Standards Sanitation: Design Standards SERVICE CONTRIBUTIONS COST ESTIMATE i
4 PRELIMINARY ENGINEERING DESIGN REPORT: WATER & SANITATION. FORT WEST PHASE 2 LIST OF FIGURES Figure1: Preliminary Town Planning Layout 2 LIST OF TABLES Table1: Calculated Water Demands 4 Table 2: Cost Estimate Bulk Infrastructure 8 Table 3: Cost Estimate Internal Networks 8 ANNEXURES ANNEXURE A ANNEXURE B ANNEXURE C ANNEXURE D ANNEXURE E ANNEXURE F Locality Plan GLS Water and Sewer Master Plans Existing and Proposed Water Network Existing and Proposed Outfall Sewers Network Standard Water Details Standard Sewer Details ii
5 1 INTRODUCTION SCIP (Pty) Ltd was appointed by Gauteng Department of Local Government and Housing for the water and sanitation preliminary engineering design report for Fort West Phase 2 (Farm Fort 464 IQ). This development falls within the jurisdiction of the City of Tshwane. 1.1 PROJECT DESCRIPTION The project is referred to as the development of Fort West Phase 2 in the west of Pretoria, north of Lotus Gardens. The area forms part of the City of Tshwane Spatial Development Framework, and is located in region 3 of City of Tshwane. The SDF earmarked this area as residential development zone with supporting services. 1.2 LOCALITY The proposed areas of development are located west of Pretoria CBD, north of the N4- Hartbeespoort dam direction bordering Lotus Gardens to the north, and Danville to the west. The locality plan is attached in Annexure A. 2 SCOPE OF THE REPORT The report addresses the full scope of work required for the preliminary design of the water and sanitation for the Fort West Phase 2 development. Differentiation is made between the internal reticulation service (that is to be financed by the DOLG&H) and the link and bulk service (to be financed by the Municipal Infrastructure Grants). 3 TOWN PLANNING STATUS A feasibility study was conducted indicating possible land use per block as described by the city of Tshwane s SDF. The potential housing developments in Fort West will consist of a few parks, some heritage areas and 3221 households. The heritage areas consist of the former West Fort Leprosy hospital and associated buildings (kitchen complex, theatre, stores etc.). These buildings are in an ill state of repair and are illegally occupied. 3
6 Proposed town planning layouts for this development have been completed and submitted for application of township establishment. The town planning layout is indicated in Figure 1, below. Figure 1: Preliminary Town Planning Layout (Fort West Phase2) 4
7 4 BULK WATER 4.1 EXISTING RESERVOIRS The proposed development falls across two reservoir zones, namely Lotus Gardens and Pretoria West HL reservoir zones. Furthermore, within the Lotus Gardens reservoir zone, part of the development falls in the Lotus Gardens PRV sub zone. The northwestern part of the proposed development will be serviced from the Lotus Gardens reservoir and the southeastern section will be serviced by the Pretoria West HL reservoir. The capacity analysis done by GLS Consulting, shows that these reservoirs will be sufficient to supply the development see Annexure B for the sewer and water master plan. 4.2 EXISTING PIPELINES The existing Lotus Gardens development is serviced by the Lotus Gardens and Pretoria West HL reservoirs. The western part of the Lotus Gardens development is fed by two parallel pipelines that run from the Lotus Gardens reservoir. These pipelines are 350mm and 400mm in diameter, with a pressure reducing valve (PRV) situated on the 400mm pipeline. The eastern part of the Lotus Gardens development is fed by a 350mm pipeline from the Pretoria West HL reservoir. The existing and proposed bulk water lines are shown in Annexure C (Existing and Proposed Water Network). 4.3 RESIDENTIAL WATER DEMAND The average annual daily demand (AADD) is used to determine the size of the bulk pipelines for the new development. The AADD was calculated using the CoT Guidelines for the Design and Construction of Water and Sanitation Systems, as well as the Guidelines for Human Settlement Planning and Design ( The Red Book ). The following AADDs were used in the calculations: Land Use AADD Unit Residential Type kl/erf/day Residential Type kl/unit/day Residential Type kl/unit/day Parks (size 2ha) 15 kl/day Parks (2ha<size 10ha) 12.5 kl/day 5
8 Table 1, below, show the calculated water demands for Fort West Phase 2. It is important to note that the heritage areas were not included in this calculation. Table 1: Calculated Water Demands Land Use Units/ha ha Dwelling Units Total AADD (kl/d) Residential Type 1 - n/a Residential Type Residential Type Parks (size varies) Total The AADD is calculated as 2197 kl/d. The AADD that falls within the Lotus Gardens reservoir zone is approximately 1000 kl/d. The Lotus gardens reservoir has enough capacity to accommodate Fort West Phase 2, however, Fort West Phase 1 is also in the planning stage. Phase 1 will definitely push the water demand too high for the reservoir, and a second Lotus Gardens reservoir will be required. 4.4 PROPOSED BULK PIPELINES The analysis done by GLS Consulting, shows that the following bulk pipelines are required to accommodate Fort West Phase 2: A 250mm diameter pipeline supplying water from the Lotus Gardens reservoir, running from west to east. This pipeline will connect to the 400mm existing pipeline, after the PRV. A 315mm diameter pipeline (which reduces to 250mm), supplying water from the Pretoria West HL reservoir. For more detail on these pipelines, see Annexure B (GLS Water and Sewer Master Plans) and Annexure C (Existing and Proposed Water Network). It is recommended that a 24-hour onsite pressure test should be conducted before any design is finalized. This is done to ensure that the required pressure is in range with the standard residential pressures required, and to determine if any pressure reducing valves are needed (the master planning only deals with theoretical pressures). 6
9 5 SANITATION 5.1 GENERATED SEWER The peak daily dry weather flow (PDDWF) for the proposed development area is calculated as 1974kl/d. However, a flow of 13.74Ml/d (159l/s) was used for the design of the bulk sewage system. This design flow is the instantaneous peak wet weather flow (IPWWF) as calculated by GLS Consulting, and it includes future developments upstream of Fort West Phase WASTEWATER TREATMENT WORKS (WWTW) The generated sewer flows will be accommodated at the Daspoort WWTW and excessive flow would be accommodated at the Rooiwal 2 WWTW. Currently Rooiwal is being upgraded and refurbished, to accommodate overflow from the Daspoort WWTW. In the GLS Master Plan no changes or recommendations were made with regard to the wastewater treatment works. 5.3 NEW MAIN OUTFALL SEWERS A new main gravity line is proposed for the development which will start at a diameter of 450mm and will increase to 525m - see Annexure B (GLS Water and Sewer Master Plans) and Annexure D (Existing and Proposed Outfall Sewers Network). It is important to note that the bulk sewer line should be upgraded (enlarged to 525mm diameter) up to the point where it connects to the existing 825mm diameter pipeline. 7
10 6 LEVEL OF SERVICE: INTERNAL SERVICE 6.1 TYPE OF DEVELOPMENT AND APPROPRIATE LEVEL OF SERVICE Fort West represents a subsidized integrated housing development consisting of smaller sized Residential 1 erven as well as larger Residential 2 and 3 erven. In terms of the CoT Guidelines for the Design and Construction of Water and Sanitation Systems it is proposed that each property be provided with a full-pressure unrestricted conventional water house connection. It is also proposed that each individual erf be provided with full waterborne sanitation. This will consist of a 100mm diameter house connection which is connected to the sewer lines at a distance of 500mm inside the erf boundary and not less than 1m from the side boundary at the lowest point of the boundary. 6.2 WATER SUPPLY: DESIGN STANDARDS An internal distribution network with individual connection points is proposed with underground pipes laid in road reserves. Water meters will be installed for each individual property. The standard water details applicable to projects in the supply area of City of Tshwane are indicated in Annexure E. These details are the standard required details of the City of Tshwane. The following will be considered during the detail design of the water reticulation network: Hydraulic design of the pipeline network will be done to achieve a minimum head of 25 m under peak demand and a maximum head of 60m. Fire demand: Group 1, low risk with 8m residual head at peak flow. Velocities in pipes will generally not exceed the following under peak demand: o o 3,5 m/sec for pipe diameters smaller than 150 mm, and 2.5 m/sec for pipe diameters bigger than 200 mm. Isolating valves will be provided to isolate any section of pipeline: o o o using no more than 4 valves; and the total length of main included in an isolated section will not exceed a nominal 600 m; and no more than 60 dwellings will be isolated at a given time (low costing housing development). Fire Hydrant spacing to be 240m on 75mm diameter and larger pipes. 8
11 The minimum pipe size in the network will be 75mm diameter. Pipe material to be used will be Class 12 upvc/mpvc, SABS 966 approved. Trenching, bedding and backfilling shall conform to SANS 1200 LB and SANS 1200 DB and to class B bedding, backfilled to 93% of Mod. AASHTO density. House connections will consists of 40mm diameter class 12 HDPE pipes, reducing to 25mm diameter. 6.3 SANITATION: DESIGN STANDARDS An internal reticulation network with connection points to each property is proposed with underground pipes laid in mid block servitudes or road reserves. The standard sewer and manhole details to be used for this project are indicated in Annexure F. These details are the standard required details from the CoT. The following guidelines will be used in the detail design of the sewer network: Hydraulic design of the sewers will be done with the following minimum pipe slopes: 1 : 80 at head 1 : 80 for 160mm dia pipe 1 : 120 for 200mm dia pipe 1 : 1600 for 250mm dia pipe 1 : 200 for 300mm dia pipe Minimum velocity of flow in a rising main should be 0.75m/s at 70% full Inspection manholes will be placed at convenient positions. Maximum manhole spacing shall not be more than 80 meters. Minimum manhole diameter will be 1250 mm constructed of dolomitic type aggregate. Heavy duty manhole cover slabs with an opening of 750 mm will be used in road reserves together with a frame and cover of nominal diameter 560 mm. Medium duty manhole cover slabs with an opening of 750 mm together with a frame and cover of nominal diameter 560mm will be used in all other locations besides road reserves. Manholes shall protrude above ground level by not less than 150mm. Minimum pipe size for the rising main sewers will be 160 mm diameter (NB) and 110 mm diameter for house connections. 9
12 Pipe material will be specified as 400KPa PVC with slip on couplings. Trenching, bedding and backfilling shall conform to SANS 1200 LB and SANS 1200 DB, backfilling compaction to 90% Mod AASHTO density in servitudes and 93% in road reserves. Sewer reticulation will be tested in accordance with the relevant requirements of SANS SERVICE CONTRIBUTIONS Service contributions are usually not applicable to subsidized housing developments and Fort West Phase 2 will therefore be eligible to be excluded from services contributions. 8 COST ESTIMATE The tables below show the cost estimate for the water and sewage systems for Fort West Phase 2. Table 2: Cost Estimate Bulk Infrastructure Item Description Length (m) Diameter (mm) Amount Bulk Water Pipeline W R 37, W R 1,088, W R 166, W R 478, W R 1,098, W R 457, Total (Bulk Water) R 3,325, Outfall Sewer S R 3,426, S R 6,920, Total (Outfall Sewer) R 10,346, Table 3: Cost Estimate Internal Networks Item Description Amount 1 Water Network (3221@ R4500/erf) R 14,494, Sewer Network R6500/erf) R 20,936, Total R 35,431,
13 The cost estimates are based on 2011 construction costs and exclude professional fees and VAT. We trust that you find this report in order and should you have any queries please feel free to contact us. Sincerely, P Booyens SCIP Engineering Group 11
... 4... 7... 7... 7 - - - - o o o ᶟ Our reference: Your reference: Bretagna Estate - Electrical Bretagna Estate - Electrical Services Report 15 February 2018 Kabod Development Group (Pty) Ltd
More informationCIVIL ENGINEERING SERVICES REPORT (WATER AND SANITATION) DOORNVALLEI EXT 5
1 CIVIL ENGINEERING SERVICES REPORT (WATER AND SANITATION) DOORNVALLEI EXT 5 August 2015 Revision 0 PREPARED FOR: PREPARED BY: CITY OF TSHWANE: SERVICES INFRASTRUCTURE DEPARTMENT WATER & SANITATION DIVISION
More informationGANSEVALLEI RETIREMENT ESTATE, PLETTENBERG BAY Engineering Services Report
GANSEVALLEI RETIREMENT ESTATE, PLETTENBERG BAY Engineering Services Report Prepared for: Shelfplett (Pty) Limited PO Box 101 Sunninghill 2157 Prepared by: Royal HaskoningDHV Suite 101, Bloemhof Building
More informationOUTLINE SERVICES SCHEME REPORT (WATER AND SEWER)
OUTLINE SCHEME REPORT (WATER AND SEWER) 327043 HOLDING 263, WILLOWGLEN AGRICULTURAL HOLDINGS Issue 1 SHELL SUMMIT ROAD PROPOSED FILLING STATION ON THE REMAINING EXTENT OF PORTION 123 (A PORTION OF PORTION
More informationPRELIMINARY DESIGN REPORT FOR THE CIVIL ENGINEERING SERVICES TO SERVE THE INFORMAL SETTLEMENT AREA OF: HLALANI, KNYSNA
PRELIMINARY DESIGN REPORT FOR THE CIVIL ENGINEERING SERVICES TO SERVE THE INFORMAL SETTLEMENT AREA OF: HLALANI, KNYSNA MAY 2013 REVISION A PREPARED FOR: THE MANAGER: INTERGRATED HUMAN SETTLEMENT KNYSNA
More informationPROPOSED RESIDENTIAL 3 DEVELOPMENT ON ERF 502, SANDRINGHAM ROADS AND CIVIL ENGINEERING SERVICES
ON ERF 502, SANDRINGHAM ROADS AND CIVIL ENGINEERING SERVICES PRELIMINARY DESIGN REPORT DATE REF. 0927R001 rev 00 CLIENT WEINPROP INVESTMENTS ConsulTauri Design (Pty) Ltd Reg No. 2001/006172/07 Directors:
More informationRIVERSIDE VIEW EXT 13; EXT 15; EXT 16; (RIVERSANDS DEVELOPMENT PHASE
RIVERSIDE VIEW EXT 13; EXT 15; EXT 16; (RIVERSANDS DEVELOPMENT PHASE 1) Situated On Portion 7, Part of Portion 38 & Portion 121 Of The Farm Diepsloot 388-JR OUTLINE SCHEME REPORT ON THE PROVISION OF CIVIL
More informationUBC Technical Guidelines Section Edition Sanitary Sewerage Utilities Page 1 of 6
Page 1 of 6 1.0 GENERAL 1.1 Related UBC Guidelines.1 338201s CCTV Pipeline Inspection (see http://energy.ubc.ca/communityservices/contractors-developers/).2 330130.41s Cleaning of Sewers (link as above)
More informationPRELIMINARY WASTEWATER CAPACITY STUDY
PRELIMINARY WASTEWATER CAPACITY STUDY Tentative Tract Map No. 18955 CITY OF HESPERIA Prepared for: HESPERIA VENTURES I, LLC 10410 Roberts Road Calimesa, CA 92320 Tel (714) 785 2381 Mr. John Ohanian Prepared
More informationCONFIRMATION OF ZONING/SERVICES (EMFULENI LOCAL MUNICIPALITY)
The South African Breweries (Pty) Limited ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR A GLASS BOTTLE MANUFACTURING PLANT PROPOSED BY SAB AND PARTNERS File name: 2019-01-30_Glass Bottle Manufacturing Plant_EIAR-Final
More informationDesign Checklist for Water and Sewer for Extensions and Subdivisions
Design Checklist for Water and Sewer for Extensions and Subdivisions The proponent s hydraulic engineer/designer is required to complete this checklist and submit to Services Development, when submitting
More informationWATER MAIN EXTENSION DESIGN REQUIREMENTS
This guideline provides minimum requirements for the design of new water main extensions. This guide is not to be used as a substitution for the detailed design of the water system. The Developer s Engineer
More informationDOORNVALLEI EXT 5 & 6
DOORNVALLEI EXT 5 & 6 Proposed township establishment on portion 107 the farm Doornkloof 391 JR Sewer Pipe Crossings - Sesmylspruit Construction Method Statement April 2016 Revision 3 PREPARED FOR: PREPARED
More informationUSING TECHNOLOGY AT THE RUSTENBURG LOCAL MUNICIPALITY TO ADDRESS THE ULTIMATE BASIC PRINCIPLE: FAILURE TO PLAN IS PLANNING TO FAIL PAPERS ABSTRACT
USING TECHNOLOGY AT THE RUSTENBURG 14 LOCAL MUNICIPALITY TO ADDRESS THE ULTIMATE BASIC PRINCIPLE: FAILURE TO PLAN IS PLANNING TO FAIL Paula Haupt and Pieter Wessels Civil Engineer: GLS Consulting ABSTRACT
More informationReview & Design of the Apia Pressure Sewer System. Presented by Jammie Saena - Samoa Water Authority & Paul Edwards Urban Water Solutions
Review & Design of the Apia Pressure Sewer System Presented by Jammie Saena - Samoa Water Authority & Paul Edwards Urban Water Solutions 1 Contents Project Background Project Team Data Collection Physical
More informationReview & Design of the Apia Pressure Sewer System
Review & Design of the Apia Pressure Sewer System Presented by Tainau Moefaauo Taputoa Titimaea - Samoa Water Authority & Paul Edwards Urban Water Solutions 1 Contents Project Background Project Team Data
More informationD. B. G R A Y E N G I N E E R I N G I N C.
SERVICING BRIEF 2200 Prince of Wales Drive Ottawa, Ontario Report No. 11068-SB February 3, 2012 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary
More information215 Sanders Street, Unit 1 (613) Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613)
Civil Geotechnical Structural Environmental 215 Sanders Street, Unit 1 (613) 860-0923 210 Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 December 17, 2013 130208 2343065
More informationDERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN
DERRY GREEN BUSINESS PARK WATER AND WASTEWATER SERVICING AREA SERVICING PLAN Submitted to: Town of Milton Regional Municipality of Halton Submitted by: AMEC Earth & Environmental 3215 North Service Road
More informationENGINEERING SERVICES INVESTIGATIONS OVER THE FARMS ELANDSKUIL 205 IP AND 206 IP NW 405 IN VENTERSDORP, NORTH WEST PROVINCE.
January 2018 ENGINEERING SERVICES INVESTIGATIONS OVER THE FARMS ELANDSKUIL 205 IP AND 206 IP NW 405 IN VENTERSDORP, NORTH WEST PROVINCE. Prepared By: Address: 1109 Justice Mahomed Street, Brooklyn, Pretoria
More informationAgua Consulting Inc. Engineered Water Solutions
Agua file: 023-01.340 District of Summerland 9215 Cedar Avenue Box 159 Summerland, BC V0H 1Z0 Attention: Mr. Devon van der Meulen, Manager of Utilities Dear Devon: RE: Banks Crescent Proposed 346 Unit
More informationCity of Logan Sanitary Sewer Design Standards
City of Logan Sanitary Sewer Design Standards 2011 http://www.loganutah.org/public_works/engineering/stdsspecsdesign.cfm Table of Contents PART 1. CITY OF LOGAN SANITARY SEWER SYSTEM DESIGN STANDARDS FOR
More information2010 Utility Plan Amendment Boxelder Sanitation District
2010 Utility Plan Amendment Boxelder Sanitation District For inclusion of the Harmony Ridge Development November 7, 2014 1612 Specht Point Rd. Ste. 105 Fort Collins, Colorado 80525-9770 p 970.484.7477
More informationSanitary Sewer Design. Sanitary Sewers, Page 1
Sanitary Sewer Design Sanitary Sewers, Page 1 Sanitary Sewers, Page 2 Sanitary Sewer Design sanitary sewers collect and transport domestic and industrial wastes via gravity flow the ultimate destination
More information215 Sanders Street, Unit 1 (613) Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613)
Civil Geotechnical Structural Environmental 215 Sanders Street, Unit 1 (613) 860-0923 210 Prescott Street, Unit 1 P.O. Box 189 Kemptville, Ontario K0G 1J0 FAX: (613) 258-0475 March 29, 2016 2343065 Ontario
More informationD. B. G R A Y E N G I N E E R I N G I N C.
SERVICING BRIEF 406-408 Bank Street Ottawa, Ontario Report No. 10015-SB December 13, 2011 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage - Storm & Sanitary Sewers
More informationPermit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System
Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System INSTRUCTIONS: This form shall be completed and submitted (in duplicate)
More informationBACKGROUND INFORMATION DOCUMENT FOR A PROPOSED SEWER IN GROOT DRAKENSTEIN, WESTERN CAPE
Purpose of this Document The purpose of this Background Information Document (BID) is to provide Interested and Affected Parties (I&APs) with background information about the proposed project and to introduce
More informationRefurbishment of Emalahleni Bulk Scheme
Refurbishment of Emalahleni Bulk Scheme Sedimentation tank Rapid Gravity Sand Filter Hartbeespoort Dam Integrated Biological Remediation Programme CLIENT: DWA Gauteng SCOPE: Rand Water is appointed by
More informationFoul Water Drainage Strategy Monkton Road Minster CT12 4EE
66-68 Monkton Road Minster CT12 4EE RMB Consultants (Civil Engineering) Ltd May 2016 RMB Consultants (Civil Engineering) Ltd 39 Cossington Road Canterbury Kent CT1 3HU Tel 01227 472128 www.rmbconsultants.co.uk
More informationKUM & GO 300 SUBDIVISION THORNTON, COLORADO
FINAL UTILITY STUDY KUM & GO 300 SUBDIVISION THORNTON, COLORADO PREPARED FOR: KUM & GO, L.C. 6400 WESTOWN PARKWAY WEST DES MOINES, IOWA 50266 PH: (515) 457-6232 CONTACT: RYAN J. HALDER PREPARED BY: OLSSON
More informationDOLOMITE RISK MANAGEMENT PROCEDURE FOR IRENE GLEN HOMEOWNERS ASSOCIATION
DOLOMITE RISK MANAGEMENT PROCEDURE FOR IRENE GLEN HOMEOWNERS ASSOCIATION INDEX 1. INTRODUCTION 1 2. INFRASTRUCTURE MANAGEMENT PLAN 1 3. RESIDENCE MANAGEMENT PLAN 3 4. EMERGENCY REACTION PLAN 6 5. MONITORING
More informationCHANGES TO D12 SEWERAGE DESIGN
CHANGES TO D12 SEWERAGE DESIGN This document outlines significant change (not all changes) to Rev K Jul 2018 Version Clause numbers listed are as per the most recent document unless specified otherwise.
More informationUMLALAZI-NKANDLA SMART GROWTH DEVELOPMENT CENTRE PROVISION OF CIVIL ENGINEERING SERVICES
UMLALAZI-NKANDLA SMART GROWTH DEVELOPMENT CENTRE PROVISION OF CIVIL ENGINEERING SERVICES PROPOSED STORMWATER RETICULATION DESIGN AND MANAGEMENT DATE: OCTOBER 2011 PREPARED FOR: PREPARED BY: DEPARTMENT
More informationSilver Seven Corporate Centre Phase 1
SERVICING BRIEF Silver Seven Corporate Centre Phase 1 15 & 19 Frank Nighbor Place and 737 & 777 Silver Seven Road Kanata, Ontario Report No. 12022-SB May 31, 2012 Revised October 23, 2012 D. B. G R A Y
More informationGRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14
Planning and Building Department 525 San Anselmo Avenue Building Division San Anselmo, CA 94960 Phone: (415) 258-4616 Fax: (415) 454-4683 GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter
More informationCERTIFICATION AND FINANCING PROPOSAL
CONSTRUCTION OF A WASTEWATER COLLECTOR NUEVO CASAS GRANDES, CHIHUAHUA Submitted: May 31, 2013 CERTIFICATION PROPOSAL CAP GRANT, NUEVO CASAS GRANDES, CHIH. CONSTRUCTION OF A WASTEWATER COLLECTOR NUEVO CASAS
More informationD. B. G R A Y E N G I N E E R I N G I N C.
SERVICING BRIEF Mutchmor Public School Addition 185 Fifth Avenue Ottawa, Ontario Report No. 12073-SB February 15, 2013 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage
More informationTHE GREAT DROUGHT OF 1895
THE GREAT DROUGHT OF 1895 VISION; To be a provider of sustainable, universally competitive water and sanitation solutions for Africa MISSION; To deliver and supply world class affordable, reliable and
More information3.9 times the average 3.8 times the average 3.6 times the average
ARTICLE VI DESIGN OF SANITARY SEWERS M'RSMIN. VOL.281 JA 2 4 2001 IMAGE; Section 601 Determination of the Amount of Sewage for Sanitary Sewers A. MSD Design Standards for estimating sanitary sewage flow
More informationSECTION 3.0 SPECIFICATIONS FOR DRINKING WATER DISTRIBUTION SYSTEMS DESIGN
3.1 GENERAL SECTION 3.0 SPECIFICATIONS FOR DRINKING WATER DISTRIBUTION SYSTEMS DESIGN 3.1.1 The following specifications cover the general design, review of plans and specifications, and acceptance of
More informationFORM 1 S Design Certification List - Wastewater Agreements
FORM 1 S Design Certification List - Wastewater Agreements Job Description Location Developer / Owner Developer / Owner Contact Details Consultant Gippsland Water Drawing Numbers Notes: 1 Where the word
More informationSECTION WASTEWATER FORCE MAINS
SECTION 02732 WASTEWATER FORCE MAINS PART - GENERAL 1.01 GENERAL: A. This section includes the general requirements for design and installation of force main systems serving wastewater lift stations. B.
More informationContact the Jurisdictional Engineer for materials allowed by each jurisdiction.
Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the
More informationWater supply components
Water supply components Water sources structures (Dams, wells, reservoirs) Surface water Groundewater Pipelines from source Water treatment plant components Pumping stations Storage (elevated tanks) Distribution
More informationPROCEDURE F-6-1 (formerly referenced by 08-02) Procedures to Govern Separation of Sewers and Watermains
PROCEDURE F-6-1 (formerly referenced by 08-02) Procedures to Govern Separation of Sewers and Watermains PROCEDURE F-6-1 PROCEDURES TO GOVERN THE SEPARATION OF SEWERS AND WATERMAINS 1. Sewers/sewage works
More information401 Sanitary Sewer System Design Criteria. The following additional design requirements shall also apply:
SECTION 400 SANITARY SEWER SYSTEM The design of sanitary sewers shall be in conformance with the applicable sections of the State of Washington, Department of Ecology manual, Criteria for Sewage Works
More informationPublic Information Centre No. 1
Public Information Centre No. 1 City of Timmins Schedule B Class Environmental Assessment for the WHITNEY TISDALE SANITARY SYSTEM UPGRADES Welcome Please Sign In Class EA Process & Public Consultation
More informationU R B A N D E S I G N S E R V I C E S
P.O. Box 3209, Houghton, 2041 Block A, Riviera Office Park, 6-10 Riviera Road, Riviera U R B A N D E S I G N S E R V I C E S RFP/FS/023 PROPOSALS TO BE SUBMITTED BY NOT LATER THAN 20 MARCH 2015 AT 12H00
More informationAPPENDIX I. Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer
APPENDIX I Conceptual Design - Salem Road and McKay Road Trunk Watermain and Sanitary Sewer THE CITY OF BARRIE PROJECT NO. 15M-00594-01 CONCEPTUAL DESIGN SALEM ROAD AND MCKAY ROAD TRUNK WATERMAIN AND SANITARY
More informationI P E L I N E : M I D M A R I D M A R D A M T O M I D M A R
7. 4 M G E N I G E N I S Y S T E M 7. 4. 1 2 5 1 R A W A W W A T E R P I P E L I N E Planning No. 105.0 Project No. Project Status Design (as at January 2011) I P E L I N E : M I D M A R I D M A R W T
More information**RESPONSES TO COMMENTS MUST BE RETURNED WITH REVISED PLANS FOR FINAL PLAN APPROVAL.** Approved as submitted X Needs attention N/A Non-Applicable
PLAN REVIEW CHECKLIST FOR WATER MAINS AND SANITARY SEWERS CITY OF ANDERSON / ELECTRIC CITY UTILITIES ************************************************************************************* Project Name:
More informationNOTICE OF INTENT TO USE THE GENERAL PERMIT FOR CONSTRUCTION OF WATER MAIN EXTENSIONS FOR PWSs
NOTICE OF INTENT TO USE THE GENERAL PERMIT FOR CONSTRUCTION OF WATER MAIN INSTRUCTIONS: This notice shall be completed and submitted by persons proposing to construct projects permitted under the "General
More informationWastewater Master Facility Report. (Project Name) (Project Basin Location)
Wastewater Master Facility Report For (Project Name) (Project Basin Location) The Wastewater Master Facility Report for (Project name) dated (Date); located in the (Basin Name) Basin has been completed
More informationPENNSYLVANIA STANDARDS FOR RESIDENTIAL SITE DEVELOPMENT: APRIL 2007 CHAPTER 8: OTHER UTILITIES
CHAPTER 8: OTHER UTILITIES Sections Page # 8.0 INTRODUCTION 4 8.1 GENERAL 4 8.1.1 Act 287: PA OneCall 4 8.2 LOCATION 4 8.3 TRENCHING AND BACKFILL STANDARDS 4 8.4 EASEMENTS 6 8.5 PETROLEUM AND NATURAL GAS
More informationSECTION 1 SUMMARY, CONCLUSIONS AND RECOMMENDATIONS
SECTION 1 SUMMARY, CONCLUSIONS AND RECOMMENDATIONS This Combined Sewer Overflow (CSO) Master Plan was prepared to meet the conditions set forth in Special Condition A, Paragraph 4 of the February 6, 2009
More informationDevelopment of an urban water requirement and return flow model
Development of an urban water requirement and return flow model L.C. Hattingh 1, C.F.B. Havenga 2, P.J. Laubscher 3, P.G. van Rooyen 1 1 WRP Consulting Engineers (Pty) Ltd, Pretoria, South Africa 2 Department
More informationPRELIMINARY ENGINEERING DESIGN REPORT ROADS AND STORMWATER
JOHANNESBURG EMALAHLENI 128 Beyers Naudé Dr. Cnr. Mendelsshn Rd. Rsevelt Park, 2195 Jhannesburg, Gauteng PO Bx 48550 Rsevelt Park, 2129 Jhannesburg Gauteng Tel: 011 888 1425 Fax: 011 888 1075 jburg@scip.c.za
More informationJob Order Sewer Repair Services
Job Order Sewer Repair Services Bid Addendum No. 1 October 10, 2018 All Contractual Requirements as defined within the Contract Documents shall remain in full force to the extent that they are not modified
More informationFUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY 405 TWEEDSMUIR AVENUE
FUNCTIONAL SERVICING AND STORMWATER MANAGEMENT STUDY FOR CITY OF OTTAWA PROJECT NO.: 11-532 FOR TABLE OF CONTENTS 1.0 INTRODUCTION... 1 1.1 Existing Conditions... 2 1.2 Required Permits / Approvals...
More informationSection 8 System Evaluation and Capacity Assurance Plan (SECAP)
System Evaluation and Capacity Assurance Plan (SECAP) The WDR requires owners and operators of sewer collection systems to have a (SECAP). This component involves preparing and implementing a Capital Improvement
More informationType of Area Density (persons/ha) Large lots 5-7 Small lots, single family 75 Small lots, two family 125 Multistory apartments min.
Design of Sanitary Sewer System Key components Service connections, Manholes and pump stations Design Flows 1. Infiltration and interflow (71 to 14 m 3 /d/km). Flow from the service connections Type of
More informationPERC-RITE DRIP DISPERSAL DESIGN SUBMITTAL American Manufacturing Company, Inc
PERC-RITE DRIP DISPERSAL DESIGN SUBMITTAL American Manufacturing Company, Inc. 1-800-345-3132 www.americanonsite.com ASD152-S122 ASD153-S124 ASD154-S124 ASD153-D124 ASD154-D124 2 ZONE DRIP W/ SIMPLEX 2
More informationQuiver Tree News. 1 P a g e. April 2016 Volume 4. To our residents and esteemed visitors. In this Edition. EDITOR; Dawn Kruger
Quiver Tree News April 2016 Volume 4 To our residents and esteemed visitors The newly elected council recently started their In this Edition entrusted duties as custodians of the community. Newly elected
More informationDebrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH
JULY 2013 DOCUMENT CONTROL Client: Project Name: Report Title: IBI Reference: 25528 Cityview Drive Version: JULY 2013 Digital Master: Originator: Reviewer: Authorization: [File Location] Scott MacDonald,
More informationDR MARK C WEBB. Managing Director. SSIS Sahara (Pty) Ltd. South Africa
DR MARK C WEBB Managing Director SSIS Sahara (Pty) Ltd South Africa LEAK DETECTION TECHNOLOGY PRECISE LEAK DETECTION TECHNOLOGY FOR ASSESSING THE CONDITION OF BULK WATER PIPELINES Outline 1. Pipeline Inspection
More informationCOTTONWOOD IMPROVEMENT DISTRICT SALT LAKE COUNTY SERVICE AREA #3 SOLITUDE IMPROVEMENT DISTRICT TOWN OF ALTA WATERSHED SERVICE LINE SPECIFICATIONS
COTTONWOOD IMPROVEMENT DISTRICT SALT LAKE COUNTY SERVICE AREA #3 SOLITUDE IMPROVEMENT DISTRICT TOWN OF ALTA WATERSHED SERVICE LINE SPECIFICATIONS WATERSHED AREA: The entire area in any canyon above the
More informationSTANDARD SPECIFICATIONS FOR CONSTRUCTING UTILITY FACILITIES DIVISION II - DESIGN CRITERIA
STANDARD SPECIFICATIONS FOR CONSTRUCTING UTILITY FACILITIES DIVISION II - DESIGN CRITERIA A. PURPOSE The purpose of these guidelines is to establish technical and design specifications for the Utilities
More informationServices Infrastructure Report
CG140997 Prepared for Wincity Development Pty Ltd 19 November 2015 Document Information Prepared for Wincity Development Pty Ltd Project Name File Reference CG140997Services Report ver 4.docx Job Reference
More informationCULINARY WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix B
CULINARY WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix B RIVERDALE CITY CAPITAL FACILITIES PLAN CULINARY WATER Engineer's Cost Estimate January 2009 Project Name: Culinary Water Reservoir - Tank
More informationIrrigation Rehabilitation Program Design and Construction Standards
Irrigation Rehabilitation Program Design and Construction Standards Prepared by the IRP Standards Review Committee For Alberta Agriculture and Rural Development, Irrigation Secretariat April 26, 2010 Adopted
More informationSECTION PUBLIC WATER SERVICE CONNECTIONS
SECTION 33 14 14 PUBLIC WATER SERVICE CONNECTIONS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe and fittings for water service connections to small commercial, light industrial, and residential
More informationWater and Sewer connections application form. Section 1. 1a. Applicant details
Water and Sewer connections application form Application for new connections to the existing water and/or sewer network. Please use this application to apply for a new water connection(s) and/or sewer
More informationEPA Waste Water Discharge Licence Application
Duleek Waste Water Treatment Works EPA Waste Water Discharge Licence Application ARTICLE 16 COMPLIANCE REQUIREMENTS Meath County Council EPA Document Ref: D0133-01 Section A: Non-Technical Summary Update
More informationWATER SUPPLY ENGINEERING
1 WATER SUPPLY ENGINEERING (RESERVOIRS AND DISTRIBUTION SYSTEM) Compiled and Prepared By: Abhash Acharya Central Campus, Pulchowk 2 7.1 Systems of Supply: 7.1.1 Continuous System: The system of supply
More informationCommon Septic System Installation Mistakes
Common Septic System Installation Mistakes Inspection Tips for Health Agents Chris Sparages, P.E. Principal at Williams & Sparages LLC Learning Objectives Review Title 5 Regulations Governing the Design,
More informationGEORGE MUNICIPALITY. Annual Water Services Development Plan Performance - and Water Services Audit Report FY: 2016/2017.
GEORGE MUNICIPALITY Annual Water Services Development Plan Performance - and Water Services Audit Report as directed by the Water Services Act (Act 108 of 1997) and the Regulations relating to Compulsory
More informationSewage Compliance Form Instructions
CITY OF JOHNSTOWN DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT 401 MAIN STREET ROOM 200 JOHNSTOWN, PA 15901 814-533-2017 FAX 814-539-5816 RENEE K. DALY DIRECTOR Sewage Compliance Form Instructions 1)
More information10 LOUISA STREET - THORNBURY
10 LOUISA STREET - THORNBURY Town of The Blue Mountains Functional Servicing Report prepared by: C.C. Tatham & Associates Ltd. 115 Sandford Fleming Drive, Suite 200 Collingwood, ON L9Y 5A6 Tel: (705) 444-2565
More informationCompany Focus. Company History. Company Directors. An EOH Company
Company Focus CSVwater Consulting Engineers (Pty) Ltd is a consulting engineering practice wholly owned by EOH Mthombo (Pty) Ltd focusing on the science and engineering of water. Specific areas of focus
More informationSECTION WASTEWATER FORCE MAINS
SECTION 02732 WASTEWATER FORCE MAINS PART 1 GENERAL 1.01 GENERAL: A. This section includes the general requirements for design and installation of force main systems serving wastewater lift stations. B.
More informationDISTRIBUTED BY EMPIRE INFRASTRUCTURE PTY LTD
DISTRIBUTED BY EMPIRE INFRASTRUCTURE PTY LTD Contents Introduction Applications Standards Quality Classification Product Range Jacking Pipes Relining Pipes Introduction The company The process We are proud
More informationMason s Training Programme on Onsite Treatment Systems
Mason s Training Programme on Onsite Treatment Systems Session: 2 Design of septic tank Do s & Don ts November 18, 2016 TECHNICAL SUPPORT UNIT: IN ASSOCIATION WITH: Groundwater table is high Which onsite
More informationPRELIMINARY MUNICIPAL SERVICING REPORT NORTHWOODS SUBDIVISION. Prepared for: North Grassie Properties Inc.
PRELIMINARY MUNICIPAL SERVICING REPORT SUBDIVISION Prepared for: North Grassie Properties Inc. Prepared by: Stantec Consulting Ltd. 905 Waverley St. Winnipeg, MB R3T 5P4 July 2012 File: 116808030 SUBDIVISION
More informationSanitary Sewer Service Alternatives. Presented by Paul Dietz, III, PE PD Cubed LLC Prepared in cooperation with Value Engineering Inc
Sanitary Sewer Service Alternatives Presented by Paul Dietz, III, PE PD Cubed LLC Prepared in cooperation with Value Engineering Inc Discussion of Sanitary Sewer Options for the proposed Melbourne Hill
More informationFunctional Servicing Report. Winston Park West Proposed Business Park Development Project. Infrastructure Ontario (IO) September MU1
Functional Servicing Report Winston Park West Proposed Business Park Development Project (IO) September 2011 14-11208-001-MU1 Winston Park West 2 TABLE OF CONTENTS Page 1.0 INTRODUCTION... 3 1.1 SITE DESCRIPTION...
More informationDESIGN STANDARDS SECTION DS 6 SANITARY SEWER SYSTEM
DESIGN STANDARDS SECTION DS 6 SANITARY SEWER SYSTEM DS 6-01 GENERAL: A. INTENT: The intent of these Design Standards is to provide minimum standards for the design of a wastewater system that will dependably
More informationPortsmouth Flood Alleviation Scheme part of Southern Water s 50m programme of improvements to the sewer network in Portsmouth
www.projectsonline.com water & Sewerage Portsmouth Flood Alleviation Scheme part of Southern s 50m programme of improvements to the sewer network in Portsmouth by Robert McTaggart BEng CEng CIWEM P ortsmouth
More informationSERVICE BY EXCELLENCE. Empyreal Construction (Pty) Ltd Corporate Profile April 2018
SERVICE BY EXCELLENCE { Empyreal Construction (Pty) Ltd Corporate Profile April 2018 { CORPORATE INFO Name of Business: Empyreal Construction Format of Business: Private Company Company Registration Number:
More informationSupplementary Manual to Water Services
Supplementary Manual to Water Services VERSION CONTROL Issue Date Version Issue Issued To Prepared By Reviewed By 27/02/15 0 1 General B Griffiths D Wharton 20/08/15 1 2 General B Griffiths D Wharton 08/06/16
More informationDominion Road Sewage Pumping Station and Force Main Replacement. Doug Pease, P. Eng. April 8, 2013 WEAO
Dominion Road Sewage Pumping Station and Force Main Replacement Doug Pease, P. Eng. April 8, 2013 WEAO 2031-13 Overview Background existing PS and force main Condition assessment Design of new station
More informationRural Servicing Guidelines
Rural Servicing Guidelines for Low-Pressure Sanitary Sewer System and Trickle Feed Water Distribution System FOREWORD This manual is intended to provide information to Developers, Engineering and Geotechnical
More informationMEMORANDUM Managing Water for Life Date: 15 September 2016
MEMORANDUM Managing Water for Life Date: 15 September 2016 Subject: WARTBURG TO BRUYNSHILL PIPELINE INFORMATION 1. BACKGROUND Umgeni Water is a Bulk Water Provider to Umgungundlovu District Municipality
More informationTHE CORPORATION OF THE TOWNSHIP OF SOUTH GLENGARRY BY-LAW NO FOR THE YEAR 2014
THE CORPORATION OF THE TOWNSHIP OF SOUTH GLENGARRY BY-LAW NO 28-14 FOR THE YEAR 2014 BEING A BY-LAW FOR THE PURPOSE OF REGULATING THE OBSTRUCTING, ENCUMBERING, INJURING OR FOULING OF HIGHWAYS AND BRIDGES
More informationCITY OF SASKATOON DESIGN AND DEVELOPMENT STANDARDS MANUAL SECTION FOUR WATER DISTRIBUTION SYSTEM
CITY OF SASKATOON DESIGN AND DEVELOPMENT STANDARDS MANUAL SECTION FOUR WATER DISTRIBUTION SYSTEM 2018 TABLE OF CONTENTS Section Four Water Distribution System SECTION PAGE NUMBER 1. Objective...1 2. Submissions
More informationSection V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES
Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES A. GENERAL 1. The following water system design guidelines are based on Federal, State and local health requirements and the Hilton Head No. 1 Public
More information255 NORTHFIELD DRIVE EAST
255 NORTHFIELD DRIVE EAST Fire Flow/Water Demand Analysis Project Location: 255 Northfield Drive East Waterloo, Ontario Prepared for: Abbey Ridge Developments Inc. 22 King Street South, Suite 300 Waterloo,
More informationCORRUGATED HDPE PIPES FOR SEWER AND STORMWATER
50 corrugated pipes CORRUGATED HDPE PIPES FOR SEWER AND STORMWATER TECHNICAL SPECIFICATIONS SANS 21138-3 ISO 9001/2008 The pipe is black outside and blue on the inside Supplied in lengths of 6 meters.
More informationT a b l e o f C o n t e n t s
C i t y o f G l a d s t o n e P u b l i c W o r k s D e s i g n S t a n d a r d s T a b l e o f C o n t e n t s SECTION THREE SANITARY SEWER REQUIREMENTS... 1 3.0000 SANITARY SEWERS... 1 3.0010 General
More informationTwo complete sets of plans that are legible and drawn to conventional scale are required to be submitted with the Building Permit Application Form.
The Homeowner s Building Application Checklist for Constructing a Residential Accessory Building This checklist provides homeowners a summary of the Building Permit submission requirements for constructing
More information