255 NORTHFIELD DRIVE EAST

Size: px
Start display at page:

Download "255 NORTHFIELD DRIVE EAST"

Transcription

1 255 NORTHFIELD DRIVE EAST Fire Flow/Water Demand Analysis Project Location: 255 Northfield Drive East Waterloo, Ontario Prepared for: Abbey Ridge Developments Inc. 22 King Street South, Suite 300 Waterloo, ON N2J 1N8 Prepared by: MTE Consultants Inc. 520 Bingemans Centre Drive Kitchener, ON N2B 3X9 November 8, 2017 MTE File No.:

2 TABLE OF CONTENTS 1.0 INTRODUCTION WATER DISTRIBUTION ANALYSIS OF ON-SITE FIRE PROTECTION CONCLUSIONS AND RECOMMENDATIONS... 3 TABLES TABLE 2.1 RESULTS OF FLOW TESTS COMPLETED (Sept. 19, 2017)... 1 TABLE 3.1 WATER DEMAND... 2 APPENDICES APPENDIX A APPENDIX B APPENDIX C FLOW TEST RESULTS FIRE FLOW CALCULATIONS WATER DEMAND CALCULATIONS DRAWINGS Functional Servicing Plan I MTE Drawing No C Encl. Functional Servicing Plan II MTE Drawing No C Encl. M:\34780\500\Reports\Fire Flow\ _rpt_ _Fire Flow.doc

3 1.0 INTRODUCTION MTE Consultants Inc. was retained by Urban Legend Developments to conduct a fire flow analysis for the proposed development at 255 Northfield Drive East located in Waterloo, Ontario. The proposed development for the site will include construction of three apartment buildings, one retail building, and three restaurant pads complete with associated parking areas and driveways off of Northfield Drive East and Bridge Street West. Servicing works include the installation of sanitary, storm and water services for the proposed buildings as well as three private hydrants located adjacent to Building C, Building B and the restaurant pads. The purpose of this report is to confirm the available fire flows and residual pressure from the existing 300 mm diameter watermain along Bridge Street West. 2.0 WATER DISTRIBUTION The proposed development will be serviced from an existing 300 mm diameter watermain located within the Bridge Street West right-of-way. A proposed 250 mm diameter watermain will service the site. Refer to Drawings C2.3 and C2.4 for the water servicing layout. For firefighting purposes, two onsite hydrants are proposed to be installed along the proposed 250 mm watermain and the third onsite hydrant is proposed to be installed along the reduced 200 mm watermain. The pressures and flows must be sufficient for fire fighting conditions as established by the Ontario Building Code (2012). The minimum residual pressure under fire fighting conditions is 140 kpa (20.3 psi) per OBC 2012 A (b). C&H Fire Suppression Systems Inc. completed a hydrant flow test on September 19, The municipal hydrants used in the flow test are located at the intersection of Bridge Street West and Labrador Drive, and the intersection of Bridge Street West and Northfield Drive East. The following table illustrates the results of the testing completed by C&H Fire Suppression Systems Inc. TABLE RESULTS OF FLOW TESTS COMPLETED (September 19, 2017) Results of Flow Tests Completed (September 19, 2017) Test # Outlet Inside Dia. (in.) Number of Outlets Pitot Pressure (PSI) Residual Pressure (PSI) Residual (gal/min) 1 n/a n/a n/a 62 n/a , ,926 Refer to Appendix A for the information obtained by C&H Fire Suppression Systems Inc. Fire Flow Analysis -1- MTE File No.: Northfield Drive East November 8, 2017

4 3.0 ANALYSIS OF ON-SITE FIRE PROTECTION Building C was analyzed as it is considered the worst case building on site. It is the largest building and is located furthest from the municipal watermain connection on Bridge Street West. The analysis was completed using OBC 2012 for fire water supply requirements. The analysis determines if the theoretical pressure of the proposed onsite fire hydrants are acceptable for firefighting. Using the OBC 2012: Building Classification: Building C (worst case): Group C Calculate: Q = KVS tot (Table 1 of OBC 2012 Appendix A (3) & Table 2) K = water supply coefficient (A Table 1) V = volume of building (m 3 ) S tot = 1 + total spatial coefficients TABLE WATER DEMAND Water Demand Building Building Area (m²) Building Volume (m³) K S tot Q (litres) Required min. water supply flow rate (litres/min)* PAD , ,800 PAD , ,800 PAD , ,800 Building A ,968 9,000 Building B ,968 9,000 Building C ,968 9,000 * From Table 2 of OBC 2012 Appendix A Therefore, the required minimum water supply flow rate is 9,000 litres/min for the proposed building. This is the maximum flow rate specified by the Ontario Building Code. The residual pressure at the proposed hydrant adjacent to Building C was calculated to be kpa for a flow rate of 9,000 litres/min. This is greater than the minimum allowable pressure of 140 kpa per OBC Therefore, it can be concluded that the additional two hydrants proposed on site also have adequate pressure and flow rates as they are serviced by the same watermain. Refer to Appendix B for calculations. Fire Flow Analysis -2- MTE File No.: Northfield Drive East November 8, 2017

5

6 FIRE FLOW RESULTS APPENDIX A

7 Hydrant Flow Test WO# Northfield Drive Waterloo Static Hydrant at **Corner of Bridge St West & Northfield Drive East** Flowing Hydrant at **Corner of Bridge St West & Labrador Drive** Static Pressure (Psi) Pitot Reading 1 49 # of Outlets Flowed Outlet Size # of Outlets Flowed 2 2 Residual Pressure 1 (Psi) Pitot Reading # of Outlets Flowed Outlet Size Graph Data: Residual Pressure 2 (Psi) Pitot Reading 3 Pressure Values (y-axis) Flow Values (x-axis) 58 Outlet Size Residual Pressure 3 (Psi) Flow 1 Calculated Flow 2 Calculated Time of Test : Co efficient value Flow 3 Calculated 19-Sep-17 9:15am Performed by: L.M Water Graph Pressure (Psi) psi 1175USGPM 1926USGPM Flow (USGPM)

8 FIRE FLOW CALCULATIONS APPENDIX B

9 255 Northfield Drive FIRE FLOW ANALYSIS Waterloo, Ontario Project Number: Date: 10/2/2017 Design By: CAH File: M:\34780\500\Reports\Fire Flow\ _Fire Flow_ xls CALCULATION OF RESIDUAL PRESSURE AT ON-SITE HYDRANT 1. Boundary Conditions (Based on Fire Flow Test Results): Metric Imperial P0 - Starting Pressure m 62 psi P1 - Pressure at Q m 58 psi 0 Q1 - From Fire Flow Test 7291 L/min 1926 U.S. gal/min Q2 - Required Flow 9000 L/min 2378 U.S. gal/min From: Table 2 A OBC 2006 P-loss m 4 psi P-loss m 6 psi P2 - Residual Pressure m 56 psi Extrapolated from Fire Flow Test Results 2. Friction Losses Through Water Service: Hazen-Williams Equation C hw = Pipe Friction Factor Metric 140 Imperial 140 k = conversion factor n = constant m = constant Q = Flow 9000 L/min Q = Flow 0.15 m 3 /s 2378 U.S. gal/min d = Pipe Diameter 250 mm 9.84 in 0.25 m p = Loss/Length m/m psi/ft Length 255 m 837 ft Loss 7.36 m 10.5 psi 72 kpa 3. Friction Losses Through Apurtenances: Apurtenances Number K Velocity Head Loss 250mm Tee (run) 250mm Tee (branch) Valve - 250mm dia. 45 deg - 250mm dia. Total Minor Losses Total Loss m/s m m psi Elevation - Elevational differences from existing hydrant to proposed hydrant Metric Imperial Elevation at Boundary (i.e. Residual Hydrant): m 1105 ft Elevation at Site Hydrant: m 1112 ft Elevation Difference = Loss/Gain 2.2 m 3.1 psi ANALYSIS SUMMARY Total Losses Residual Pressure after Losses m kpa 16.1 psi m 276 kpa 40.1 psi PASS Allowable Residual Pressure 140 kpa 20.3 psi

10 WATER DEMAND CALCULATIONS APPENDIX C

11 255 Northfield Drive WATER DISTRIBUTION ANALYSIS Kitchener, Ontario Project #: Date: November 3, 2017 Date Printed: By: CAH Node ID / Area ID / Building # Development Information - Proposed Development 1 F.F.E. (m.a.s.l.) Description # of Units Population 2 Bldg Area (1 st Floor) Total Bldg Area 8 Ontario Building Code Building Volume 5 K V S tot Q F F C A F Fire Flow Fire Underwriters Survey # of people m 2 m 2 m 3 m 3 L L/min L/s m 2 L/min L/min L/s L/s L/s L/s L/s L/s L/s L/s 1 Building C - Residential ,675 30, , ,000 9, ,513 7,000 0% % 55% 8, Sum of Maximum Day Flows + Largest Fire Flow (L/s) = 151 (2) Occupancy Reduction (3) Sprinkler Protection (4) Building Exposure F F Fire Flow (Max OBC/FUS) MOE Guidelines 7 Domestic Flow 3,4 Average Day Max Day Peak Hour Minimum Hour Max Day + Fire Flow TOTALS FOR SITE ,675 30,150 Max Fire Flow = 150 Max Fire Flow = 146 Largest Demand For The Entire Site (L/s) = 151 Assumptions: 1 All building areas are based on the conceptual Site Plan by MHBC Planning 2 Residential population is calculated using a Persons Per Unit (PPU) count taken from "Region of Waterloo Water and Wastewater Monitoring Report " (WWWMR) (Region of Waterloo, May 2015) Residential = 1.77 PPU for apartment buildings 3 Average Daily Demands for each residential building are taken from "Tri City Water Distribution Master Plan Final Report " by AECOM, Dated May 2009 : Residential = 225 L/cap/day Average Daily Demands the commercial buildings are taken from "Design Guidelines for Drinking-Water Systems " (MOE, 2008) and "Region of Waterloo Water and Wastewater Monitoring Report " (WWWMR) (Region of Waterloo, May 2015) Commercial = 28 m 3 /ha/day or m 3 /cap/day 4 Peaking Factors taken from "Design Guidelines for Drinking-Water Systems " (MOE, 2008): Average Day = 1 Maximum Day = 2.75 Peak Hour = 4.13 Minimum Hour = It is assumed that the buildings are constructed from fire-resistive materials. This allows for the coefficient related to the type of construction "C" to be reduced to its minimal value of 0.6. The other coefficient values are: 0.8 for non-combustible construction, 1.0 for ordinary construction, and 1.5 for wood frame construction. 6 Total building area (used for FUS calculation purposes) is drastically reduced from the actual total building area due to the fact that the building is considered to be fully fire-resistive. In addition to being constructed from fire-resistive materials, the vertical openings and exterior vertical communications must be properly protected with a minimum one hour fire rating. If these requirements are met, the reduced area is calculated as the sum of the largest floor plus 25% of each of the two immediately adjoining floors. 7 The buildings are categorized as combustible low fire hazard occupancies, attributing no charge to the "Occupancy Reduction". 8 The buildings are assumed to be sprinklered with an adequately designed system conforming to NFPA 13 and other NFPA sprinkler standards. This generates a 30% reduction to the "Sprinkler Protection" parameter of the FUS calculation.

12 C2.3 FUNCTIONAL SERVICING PLAN I NORTHFIELD DRIVE EAST CITY OF WATERLOO SITE C2.3

13 C2.4 FUNCTIONAL SERVICING PLAN II NORTHFIELD DRIVE EAST BRIDGE STREET WEST CITY OF WATERLOO SITE C2.4

Julia Bahen, Urban Strategies Inc.

Julia Bahen, Urban Strategies Inc. THE MUNICIPAL INFRASTRUCTURE GROUP LTD. 8800 Dufferin Street, Suite 200 Vaughan, Ontario L4K 0C5 T 905.738.5700 F 905.738.0065 www.tmig.ca TECHNICAL MEMORANDUM DATE June 13, 2017 TO CC SUBJECT FROM PROJECT

More information

D. B. G R A Y E N G I N E E R I N G I N C.

D. B. G R A Y E N G I N E E R I N G I N C. SERVICING BRIEF Mutchmor Public School Addition 185 Fifth Avenue Ottawa, Ontario Report No. 12073-SB February 15, 2013 D. B. G R A Y E N G I N E E R I N G I N C. Stormwater Management - Grading & Drainage

More information

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART. January 2016

PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG ROAD OTTAWA, ONTARIO ENGINEERING REPORT SHOPPERS DRUG MART. January 2016 The Odan/Detech Group Inc. P: (905) 632-3811 F: (905) 632-3363 5230 SOUTH SERVICE ROAD, UNIT 107 BURLINGTON, ONTARIO, L7L 5K2 www.odandetech.com PROPOSED SHOPPERS DRUG MART RIVER ROAD AND EARL ARMSTRONG

More information

SCHAEFFERS FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT LAKESHORE ROAD WEST TOWN OF OAKVILLE

SCHAEFFERS FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT LAKESHORE ROAD WEST TOWN OF OAKVILLE FUNCTIONAL SERVICING REPORT PROPOSED RESIDENTIAL DEVELOPMENT 346 362 LAKESHORE ROAD WEST TOWN OF OAKVILLE PROJECT 2016-4442 JULY 2017 REVISED: APRIL 2017 C O N S U L T I N G E N G I N E E R S 64 Jardin

More information

4 Water Distribution System

4 Water Distribution System 4 Water Distribution System 4.1 Introduction 4.1.1 Overview The Former CFB Rockcliffe site is located north of Montreal Road between the Aviation Parkway and the NRC lands, and generally south of the Rockcliffe

More information

Water supply components

Water supply components Water supply components Water sources structures (Dams, wells, reservoirs) Surface water Groundewater Pipelines from source Water treatment plant components Pumping stations Storage (elevated tanks) Distribution

More information

Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES

Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES A. GENERAL 1. The following water system design guidelines are based on Federal, State and local health requirements and the Hilton Head No. 1 Public

More information

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES 4.1 GENERAL REQUIREMENTS 4.1.1 Water and fire protection distribution facilities are to be provided solely for the purpose of supplying potable

More information

Piping layout for fire sprinkler system: An overview

Piping layout for fire sprinkler system: An overview Piping layout for fire sprinkler system: An overview Kshitiz Vishnoi Abstract In today s times, the designing of piping systems has become an important field. With increased urbanization, and construction

More information

Environmental Engineering-I

Environmental Engineering-I Environmental Engineering-I Prof. Dr. Muhammad Zulfiqar Ali Khan Engr. Muhammad Aboubakar Farooq Water Distribution Systems & Analysis 1 Water Distribution Systems & Analysis References Water Supply &

More information

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH JULY 2013 DOCUMENT CONTROL Client: Project Name: Report Title: IBI Reference: 25528 Cityview Drive Version: JULY 2013 Digital Master: Originator: Reviewer: Authorization: [File Location] Scott MacDonald,

More information

Blackstone Community Phase 4-8 Functional Servicing Report

Blackstone Community Phase 4-8 Functional Servicing Report Blackstone Community Phase 4-8 Functional Servicing Report Project #160401130 Prepared for: 2129786 Ontario Inc. Prepared by: Stantec Consulting Ltd. Sign-off Sheet This document entitled Blackstone Community

More information

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS DESIGN STANDARDS SECTION 2 INDEX ITEM DESCRIPTION 2.00 GENERAL STATEMENT 2.01 WATER DISTRIBUTION

More information

Proposed Residential Development Snow Valley Uplands Cameron Estates Township of Springwater Functional Servicing Report

Proposed Residential Development Snow Valley Uplands Cameron Estates Township of Springwater Functional Servicing Report 453211 Ontario Ltd. Proposed Residential Development Snow Valley Uplands Cameron Estates Township of Springwater Functional Servicing Report Prepared by: AECOM 55 Cedar Pointe Drive, Suite 620 705 721

More information

Stantec Consulting Ltd Clyde Avenue, Ottawa ON K2C 3G4

Stantec Consulting Ltd Clyde Avenue, Ottawa ON K2C 3G4 Stantec Consulting Ltd. 400-1331 Clyde Avenue, Ottawa ON KC 3G4 February 3, 017 File: 1604010159 Attention: Kimberly Baldwin Development Review Urban Services Branch 110 Laurier Avenue West Ottawa, ON.

More information

FOR SALE STATE-OF-THE-ART MANUFACTURING/WAREHOUSE STATE-OF-THE-ART MANUFACTURING/WAREHOUSE. 950 South Service Rd. Stoney Creek, ON

FOR SALE STATE-OF-THE-ART MANUFACTURING/WAREHOUSE STATE-OF-THE-ART MANUFACTURING/WAREHOUSE. 950 South Service Rd. Stoney Creek, ON STATE-OF-THE-ART MANUFACTURING/WAREHOUSE STATE-OF-THE-ART MANUFACTURING/WAREHOUSE FOR SALE 950 South Service Rd. Stoney Creek, ON For further details contact: Nick Holzinger Senior Vice President Sales

More information

Ontario s 2012 Building Code Division B, Part 7 Ontario Regulation 332/12

Ontario s 2012 Building Code Division B, Part 7 Ontario Regulation 332/12 Ontario s 2012 Building Code Division B, Part 7 Ontario Regulation 332/12 Notice: This e-learning module is intended for general information purposes only. It only highlights certain provisions of the

More information

CHAPTER 4 HYDRAULIC ANALYSIS

CHAPTER 4 HYDRAULIC ANALYSIS CHAPTER 4 HYDRAULIC ANALYSIS This chapter presents information on the computer hydraulic model of the City s water system and the results of hydraulic analyses. The purpose of the hydraulic analysis is

More information

Types of Water Resource Systems. Types of Water Resource Systems. Design of Water Resource Systems. Design for Public Water-Supply

Types of Water Resource Systems. Types of Water Resource Systems. Design of Water Resource Systems. Design for Public Water-Supply Types of Water Resource Systems Water Use Provide specified level of service to meet societal need Capacity dictated by population of service area, commercial and industrial requirements, economic design

More information

Hydrologic Study Report for Single Lot Detention Basin Analysis

Hydrologic Study Report for Single Lot Detention Basin Analysis Hydrologic Study Report for Single Lot Detention Basin Analysis Prepared for: City of Vista, California August 18, 2006 Tory R. Walker, R.C.E. 45005 President W.O. 116-01 01/23/2007 Table of Contents Page

More information

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON

6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON 6 STOREY CONDOMINIUM 7480 DERRY ROAD WEST, MILTON STORM WATER MANAGEMENT DESIGN BRIEF NEW DEVELOPMENT DRAINAGE SYSTEM REV 0 August 29, 2017 PREPARED BY: HALLEX PROJECT #170532 HALLEX NIAGARA HALLEX HAMILTON

More information

Sag Pipe (depressed sewers, or Inverted siphons) Dr. Sataa A. Al-Bayati(10-11)

Sag Pipe (depressed sewers, or Inverted siphons) Dr. Sataa A. Al-Bayati(10-11) بسم هللا الرحمن الرحيم Sag Pipe (depressed sewers, or Inverted siphons) Dr. Sataa A. Al-Bayati(10-11) A sewer that drops below the hydraulic gradient to pass under an obstruction, such as a railroad cut,

More information

SECTION 3.0 SPECIFICATIONS FOR DRINKING WATER DISTRIBUTION SYSTEMS DESIGN

SECTION 3.0 SPECIFICATIONS FOR DRINKING WATER DISTRIBUTION SYSTEMS DESIGN 3.1 GENERAL SECTION 3.0 SPECIFICATIONS FOR DRINKING WATER DISTRIBUTION SYSTEMS DESIGN 3.1.1 The following specifications cover the general design, review of plans and specifications, and acceptance of

More information

Preferred Elevated Tank Site

Preferred Elevated Tank Site Preferred Elevated Tank Site Preferred Site No. 3 is on private property owned by Hopewell Developments. Approximately 5 acres of land will be required, including lands required for a permanent access

More information

Servicing and Stormwater Management Brief 4450 Limebank Road Residential Development

Servicing and Stormwater Management Brief 4450 Limebank Road Residential Development Servicing and Stormwater Management Brief 4450 Limebank Road Residential Development Project # 160401232 Prepared for: Urbandale Corporation Prepared by: Stantec Consulting Ltd. Submission 3: Oct. 20,

More information

Public Information Centre No. 2

Public Information Centre No. 2 Public Information Centre No. 2 Wednesday April 20, 2011 4:00 pm to 7:00 pm City of Welland City Hall Area 2 Welland, Pelham, and Port Colborne Welcome to Public Information Centre No. 2 Please sign in

More information

PRELIMINARY ENGINEERING DESIGN REPORT WATER AND SANITATION

PRELIMINARY ENGINEERING DESIGN REPORT WATER AND SANITATION JOHANNESBURG EMALAHLENI 128 Beyers Naudé Dr. Cnr. Mendelssohn Rd. Roosevelt Park, 2195 Johannesburg, Gauteng PO Box 48550 Roosevelt Park, 2129 Johannesburg Gauteng Tel: 011 888 1425 Fax: 011 888 1075 joburg@scip.co.za

More information

PART VII - WATER SYSTEM DESIGN CRITERIA

PART VII - WATER SYSTEM DESIGN CRITERIA PART VII - WATER SYSTEM DESIGN CRITERIA A. Water Distribution, General 1. The water system layout shall be approved by the City Engineer. The fire hydrant layout shall be approved by the Redwood City Fire

More information

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction. Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the

More information

PRESSURIZED IRRIGATION SYSTEM MASTER PLAN

PRESSURIZED IRRIGATION SYSTEM MASTER PLAN PRESSURIZED IRRIGATION SYSTEM MASTER PLAN (HAL Project No.: 314.04.100) FINAL REPORT January 2009 ACKNOWLEDGMENTS Successful completion of this study was made possible by the cooperation and assistance

More information

FUN NCTIONAL SER RVICING AN ND STO R MA ORMWATER ANAGEMENT PREPARED FOR: CITY O 333 AN REET EAST ND 351 KING STR OF TORONTO VICTORIA PA

FUN NCTIONAL SER RVICING AN ND STO R MA ORMWATER ANAGEMENT PREPARED FOR: CITY O 333 AN REET EAST ND 351 KING STR OF TORONTO VICTORIA PA FUN NCTIONAL SER RVICING AN ND STO ORMWATER R MA ANAGEMENT T RE PORT 333 AN ND 351 KING STR REET EAST P PREPARED FOR: CITY O OF TORONTO F IRST GULF COR PORATION 3 751 VICTORIA PA ARK AVENUE T TORONTO,

More information

ASSESSMENT OF ADEQUACY OF PUBLIC SERVICES BRIGIL 460 ST. LAURENT BOULEVARD

ASSESSMENT OF ADEQUACY OF PUBLIC SERVICES BRIGIL 460 ST. LAURENT BOULEVARD ASSESSMENT OF ADEQUACY OF PUBLIC SERVICES FOR BRIGIL 460 ST. LAURENT BOULEVARD CITY OF OTTAWA PROJECT NO.: 11-538 MAY 2012 REV 1 DSEL ASSESSMENT OF ADEQUACY OF PUBLIC SERVICES FOR BRIGIL 460 ST. LAURENT

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to:

Learning objectives. Upon successful completion of this lecture, the participants will be able to: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to: Describe and perform the required step for designing sewer system networks Outline Design

More information

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm

More information

CEE 371 May 14, 2009 Final Exam

CEE 371 May 14, 2009 Final Exam CEE 371 May 14, 2009 Final Exam Closed Book, two sheets of notes allowed Please answer questions 3, 6 and 7. In addition, answer either question 1 or 2, and answer either question 4 or 5. The total potential

More information

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION PROFESSIONAL CONSULTING, LLC. Octagon 10, Office Center 1719 Route 10, Suite 225 Parsippany,

More information

4A General Information A. Concept... 1 B. Conditions... 1

4A General Information A. Concept... 1 B. Conditions... 1 Design Manual Chapter 4 - Water Mains Table of Contents TOC Table of Contents Chapter 4 - Water Mains 4A General Information 4A-1---------------------------------General Information A. Concept....... 1

More information

DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services)

DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services) DEVELOPMENT ENGINEERING REVIEW MANUAL (Regional Services) FEBRUARY, 2005 PLANNING AND TRANSPORTATION SERVICES PLANNING AND PUBLIC WORKS DEPARTMENT TABLE OF CONTENTS Introduction 1 Application Review 1.1

More information

Calculate the Costs of Piping System Elements

Calculate the Costs of Piping System Elements Calculate the Costs of Piping System Elements by Ray Hardee, Engineered Software, Inc. Last month s column described the process of creating an energy cost balance sheet for a piping system (see Figure

More information

Ivins City Standard Specifications for Design and Construction Part 2 Engineering and Design Standards

Ivins City Standard Specifications for Design and Construction Part 2 Engineering and Design Standards 2.9. WATER SYSTEM DESIGN Ivins City Standard Specifications for Design and Construction All culinary water mains and appurtenances shall be designed to provide for adequate future service for all contiguous

More information

Traffic Impact Analysis Guidelines. Town of Queen Creek

Traffic Impact Analysis Guidelines. Town of Queen Creek Traffic Impact Analysis Guidelines Town of Queen Creek January 2016 1. INTRODUCTION The purpose of this document is to outline the procedures and requirements for preparing a Transportation Impact Analysis

More information

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD Fire Water Supply without a Purveyor Residential & Commercial STANDARD #D-003 EFFECTIVE 01-04-2016 1. PURPOSE 1.1. The California Fire Code (CFC) requires

More information

Corridor Pressurization System Performance in Multi-Unit Residential Buildings

Corridor Pressurization System Performance in Multi-Unit Residential Buildings Corridor Pressurization System Performance in Multi-Unit Residential Buildings Lorne Ricketts Student Member ASHRAE John Straube, PhD, P.Eng. Associate Member ASHRAE ABSTRACT Corridor pressurization based

More information

Site Design Analysis Report 21 Willowcrest Avenue Brandon, MB R7A 7K9

Site Design Analysis Report 21 Willowcrest Avenue Brandon, MB R7A 7K9 City of Brandon Planning & Building Safety Department 638 Princess Avenue Brandon, B R7A 4A9 Site Design Analysis Report 21 Willowcrest Avenue Brandon, B R7A 7K9 Submitted by: Burns aendel Consulting Engineers

More information

CHAPTER 4 MINIMUM DESIGN CRITERIA

CHAPTER 4 MINIMUM DESIGN CRITERIA 4.1 INTRODUCTION CHAPTER 4 MINIMUM DESIGN CRITERIA Establishing realistic design criteria is paramount to evaluation of the existing water system s adequacy and planning for future water system improvements.

More information

APPLICATION NUMBER:, TAX MAP KEY: STREET ADDRESS:, PRPOJECT: APPLICANT:, PHONE NO: MAILING ADDRESS:, FAX NO:

APPLICATION NUMBER:, TAX MAP KEY: STREET ADDRESS:, PRPOJECT: APPLICANT:, PHONE NO: MAILING ADDRESS:, FAX NO: COUNTY OF KAUAI BUILDING DIVISION, DEPARTMENT OF PUBLIC WORKS 4444 RICE STREET, SUITE 175, LIHUE, HAWAII 96766 Telephone: (808) 241-6655 Fax Number: (808) 241-6806 BUILDING CODE COMMERCIAL CHECKLIST APPLICATION

More information

3. Sanitary Plumbing Single Stack System

3. Sanitary Plumbing Single Stack System 3. Sanitary Plumbing Single Stack System On completion of this section, students should be able to: Design, install and develop bills of quantities for the Single Stack Systems for domestic, commercial

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant

More information

Session 2 Pump Selection. Mark Markham, P.E. Gresham, Smith and Partners September 14, 2017

Session 2 Pump Selection. Mark Markham, P.E. Gresham, Smith and Partners September 14, 2017 Session 2 Pump Selection Mark Markham, P.E. Gresham, Smith and Partners September 14, 2017 Quick Refresh System Curves graphically show the relationship between flow rates and associated total dynamic

More information

BUILDING CODE COMMISSION

BUILDING CODE COMMISSION Ruling No. 02-22-877 Application No. 2002-19 BUILDING CODE COMMISSION IN THE MATTER OF Subsection 24(1) of the Building Code Act, S.O. 1992, c. 23, as amended. AND IN THE MATTER OF Sentences 3.3.1.2.(3),

More information

RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016

RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016 April 12, 2016 Mr. Craig Perl, P.E. Senior Engineer City of Aurora Public Works Department 15151 E. Alameda Parkway Aurora, CO 80012 RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016

More information

Development in the City of Toronto

Development in the City of Toronto Development in the City of Toronto Water Infrastructure Challenges and Opportunities Graham Harding, P.Eng. Toronto Water, City of Toronto Urban Land Institute Leadership Program February 16, 2017 Toronto

More information

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1 TRANSPORTATION IMPACT STUDY (TIS) GUIDELINES FOR DEVELOPMENT APPLICATIONS Transportation and Works Department The Regional Municipality of York 17250 Yonge Street Newmarket, Ontario L3Y 6Z1 August, 2007

More information

STUDY OF WATER DISTRIBUTION NETWORK USING EPANET

STUDY OF WATER DISTRIBUTION NETWORK USING EPANET STUDY OF WATER DISTRIBUTION NETWORK USING EPANET Darshan Mehta 1, Krunal Lakhani 2, Divy Patel 3, Govind Patel 4 Assistant Professor, Civil Engg. Dept., S.S.A.S.I.T, Surat, Gujarat, India 1 UG Student,

More information

Screening, Definition: The unit involved is called a screen.

Screening, Definition: The unit involved is called a screen. Screening, Definition: Screening is a unit operation that separates materials in and/or on water (found in different sizes) from water and from entering water treatment facilities and mains. The unit involved

More information

Section 7 Hydraulic Model Development and Evaluation Criteria

Section 7 Hydraulic Model Development and Evaluation Criteria Section 7 Hydraulic Model Development and Evaluation Criteria The hydraulic evaluation conducted to develop this master plan was performed using a computer model of the reclaimed water distribution system.

More information

Site Utility Study. Prepared By: Rodolfo Ibarra, PE, PA SW 117 th Avenue Unit #3 Miami, Florida 33177

Site Utility Study. Prepared By: Rodolfo Ibarra, PE, PA SW 117 th Avenue Unit #3 Miami, Florida 33177 WEST BRICKELL CENTRE Major Use Special Permit 290 SW 10 th Street, 245 SW 11 th Street,240-270 SW 10 th Street, 251-253 SW 11 th Street, 255 SW 11 th Street, and 267 SW 11 th Street Site Utility Study

More information

Installation of sanitary sewers, storm sewers and water piping requires the issuance of a Building Permit prior to commencement of installation.

Installation of sanitary sewers, storm sewers and water piping requires the issuance of a Building Permit prior to commencement of installation. Development and Infrastructure Department 50 Dickson St., 3rd Floor, P.O. Box 669 Cambridge, Ontario. N1 R 5W8 519.621.0740; TTY 519.623.6691 Site Service Installation - Rational Sampling Program RE: Building

More information

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility:

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility: Oklahoma Department of Environmental Quality Water Quality Division Phone: 405-702-8100 Construction Permitting Section 707 N. Robinson, OKC, OK 73102-6010 P.O. Box 1677, OKC, OK 73101-1677 Sanitary Sewer

More information

SECTION : FIRE WALL AND FIRE SUPPRESSION REGULATIONS FOR R1-Z, R-2, R-3 ZONING AND PDD CATEGORIES

SECTION : FIRE WALL AND FIRE SUPPRESSION REGULATIONS FOR R1-Z, R-2, R-3 ZONING AND PDD CATEGORIES SECTION 500.110: FIRE WALL AND FIRE SUPPRESSION REGULATIONS FOR R1-Z, R-2, R-3 ZONING AND PDD CATEGORIES A. Purpose. The intent of this regulation is to amend the current adopted edition of the International

More information

Facilities Development Manual

Facilities Development Manual State of Wisconsin Department of Transportation Facilities Development Manual ORIGINATOR Director, Bureau of Highway Development PROCEDURE 13-25-35 CHAPTER 13 Drainage SECTION 25 Storm Sewer Design SUBJECT

More information

Amendment to OPSS 493 (Nov 2015) Construction Specification for Temporary Potable Water Supply Services

Amendment to OPSS 493 (Nov 2015) Construction Specification for Temporary Potable Water Supply Services Engineering & Construction Services Division Standard Specifications for Sewers and Watermains TS 493 September 2017 Amendment to OPSS 493 (Nov 2015) Construction Specification for Temporary Potable Water

More information

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System

Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System Permit for Construction of an Extension to a JEA Drinking Water Distribution System and/or JEA Wastewater Collection/Transmission System INSTRUCTIONS: This form shall be completed and submitted (in duplicate)

More information

Section 5 - Planning Criteria. Section 5

Section 5 - Planning Criteria. Section 5 Section 5 - Planning Criteria Section 5 SECTION 5 PLANNING CRITERIA This section presents the design criteria and methodologies for analysis used to evaluate the existing distribution system and its facilities

More information

SAWEA Workshop 2010 Innovative Water and Wastewater Networks Presented by Greg Welch, AECOM

SAWEA Workshop 2010 Innovative Water and Wastewater Networks Presented by Greg Welch, AECOM SAWEA Workshop 2010 Innovative Water and Wastewater Networks Presented by Greg Welch, AECOM Basic Hydraulic Principles Open channel flow Closed conduit / pressurized flow systems Orifices, weirs and flumes

More information

Municipal Stormwater Ordinances Summary Table

Municipal Stormwater Ordinances Summary Table APPENDIX F Municipal Ordinances Summary Table Municipality Abington Bryn Athyn Borough Hatboro Borough Ordinance, SALDO Runoff equals pre post Erosion Sediment Control Water Quality Requirements Any which

More information

Task 5. Christopher Mack Zack Kaldy MET 330 Fluid Mechanics November 8, Purpose

Task 5. Christopher Mack Zack Kaldy MET 330 Fluid Mechanics November 8, Purpose Purpose Task 5 Christopher Mack Zack Kaldy MET 330 Fluid Mechanics November 8, 2015 For the fifth task of this project we are asked to specify the layout of the piping system, the material type and sizes

More information

Module 8: Ontario Building Code Fire and Spatial Separations

Module 8: Ontario Building Code Fire and Spatial Separations Ontario Building Code (OBC) 1. Fire Separations 2. Fire Resistance Ratings By Classification 3. Fire Resistance Ratings By Adjacent Use 4. Fire Resistance Ratings By Specific Space 5. Fire Resistance Ratings

More information

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Storm Sewer Design Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg Major floods are dramatic and water flow routes must be recognized when minor drainage systems fail. These types

More information

23 Supply Drinking Water Without Power

23 Supply Drinking Water Without Power REQUIRED UPGRADE 23 Supply Drinking Water Without Power I. Summary Issue: During a power failure, residential buildings using electric pumps lose their supply of potable water. Water may be present below

More information

Water Pipeline Design Guidelines

Water Pipeline Design Guidelines Water Pipeline Design Guidelines June 2015 EPB 276 Foreword This design guide is a supplement to EPB 501 Waterworks Design Standard. This guide applies to all water pipelines regulated by The Waterworks

More information

Index. Composition and Order of Plan Set. Utility Plan... 5

Index. Composition and Order of Plan Set. Utility Plan... 5 City of Des Plaines Public Works and Engineering Department Revised-October 5, 2012 Index Composition and Order of Plan Set Title Page Number Cover Sheet... 1 Requirements for Site Development... 2 Grading

More information

October 31, Attn: Architects, professional engineers. Design of hazardous areas

October 31, Attn: Architects, professional engineers. Design of hazardous areas B u i l d i n g S e r v i c e s N O T I C E October 31, 2016 Attn: Architects, professional engineers Re: Design of hazardous areas The design of hazardous areas requirements in the Building Code apply

More information

Condominium Project Profile and General Review Form

Condominium Project Profile and General Review Form Condominium Project Profile and General Review Form This form must be completed, signed and returned to Tarion by a vendor/builder proposing to sell and/or build a condominium project. All references to

More information

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008

ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6. BEST PRACTICE SUMMARY REPORT February, 2008 ONTARIO CENTRE FOR MUNICIPAL BEST PRACTICES 200 University Ave., Suite 801, Toronto, Ontario, M5H 3C6 BEST PRACTICE SUMMARY REPORT February, 2008 Water and Wastewater BULK WATER STRATEGY Abstract: The

More information

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT Engineering Division 550 Landa Street New Braunfels, Texas 78130 (830) 221-4020 1. Subdivision Plat Name: Location Description/ Nearest Intersection: Acreage:

More information

The purpose of distribution system is to deliver water to consumer with appropriate quality, quantity and pressure. Distribution system is used to

The purpose of distribution system is to deliver water to consumer with appropriate quality, quantity and pressure. Distribution system is used to Water Distribution System INTRODUCTION The purpose of distribution system is to deliver water to consumer with appropriate quality, quantity and pressure. Distribution system is used to describe collectively

More information

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL INTRODUCTION The District developed a hydraulic model of the sanitary sewer system as part the 2000 Wastewater Comprehensive Plan. The output from this model

More information

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management Husam Al-Najar Storm water management : Collection System Design principles The Objectives

More information

DESIGN OF PRESSURIZED LIQUID DISTRIBUTION SYSTEM FOR LANDFILL LIQUIDS ADDITION AND AUGMENTATION

DESIGN OF PRESSURIZED LIQUID DISTRIBUTION SYSTEM FOR LANDFILL LIQUIDS ADDITION AND AUGMENTATION DESIGN OF PRESSURIZED LIQUID DISTRIBUTION SYSTEM FOR LANDFILL LIQUIDS ADDITION AND AUGMENTATION Xianda Zhao, Ph.D., P.E. CTI and Associates, Inc., Brighton, Michigan USA Morgan Subbarayan, P.E. CTI and

More information

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW Chapter 8 Building and Building Regulations, Article XIII Grading and Drainage and Article XV Soil Erosion and Sedimentation

More information

11.1.2* Adjacent Hazards or Design Methods. For buildings with two or more adjacent hazards or design methods, the following shall apply:

11.1.2* Adjacent Hazards or Design Methods. For buildings with two or more adjacent hazards or design methods, the following shall apply: 10 of 474 11/7/2013 12:33 PM First Revision No. 260-NFPA 13-2013 [ Section No. 11.1.2 ] 11.1.2* Adjacent Hazards or Design Methods. For buildings with two or more adjacent hazards or design methods, the

More information

EXETER TOWNSHIP HOOD AND DUCT SYSTEMS FOR COMMERCIAL KITCHENS

EXETER TOWNSHIP HOOD AND DUCT SYSTEMS FOR COMMERCIAL KITCHENS HOOD AND DUCT SYSTEMS FOR COMMERCIAL KITCHENS POLICY STATEMENT This policy applies to NEW Hood and Duct systems. The Authority Having Jurisdiction will not waive major criteria in the applicable standards

More information

GREEN THREAD Piping Systems

GREEN THREAD Piping Systems Bulletin No. A1300 February 15, 2006 SMITH FIBERCAST GREEN THREAD Piping Systems PRODUCT GREEN THREAD pipe is filament wound using an amine cured epoxy resin and fiberglass and has a resin-rich liner reinforced

More information

The Homeowner s Building Application Checklist for Constructing a Residential Addition

The Homeowner s Building Application Checklist for Constructing a Residential Addition The Homeowner s Building Application Checklist for Constructing a Residential Addition This checklist provides homeowners a summary of the Building Permit submission requirements for constructing a residential

More information

Ontario s Building Code

Ontario s Building Code Ministry of Municipal Affairs and Housing Ontario s Building Code ONTARIO ONLY PROPOSED CHANGE TO THE 2006 BUILDING CODE CHANGE NUMBER E-B-12-03-05 CODE REFERENCE Div. B 12.3.4.1. 12.3.4.2. DESCRIPTION

More information

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION CITY OF GENEVA, NEW YORK The purpose of the site plan and architectural review process is to secure compliance with the City s Zoning Ordinance and to promote

More information

PANERA BREAD BAKERY-CAFE # EAST EAU GALLIE BLVD. INDIAN HARBOUR BEACH, FL BREVARD COUNTY

PANERA BREAD BAKERY-CAFE # EAST EAU GALLIE BLVD. INDIAN HARBOUR BEACH, FL BREVARD COUNTY SHEET INDEX. CONSTRUCTION DOCUMENTS (DRIVE-THRU ADDITION) GENERAL G-CS COVER SHEET G-ADA ACCESSIBILITY GUIDELINES G-SL SYMBOLS, LEGEND, & ABBREVIATIONS LSP-1 LIFE SAFETY PLAN ARCHITECTURAL SP-1.0 SITE

More information

ÉCOLE SECONDAIRE CATHOLIQUE SECTEUR ORLÉANS 6401 RENAUD ROAD DEVELOPMENT SERVICING STUDY AND STORMWATER MANAGEMENT REPORT

ÉCOLE SECONDAIRE CATHOLIQUE SECTEUR ORLÉANS 6401 RENAUD ROAD DEVELOPMENT SERVICING STUDY AND STORMWATER MANAGEMENT REPORT ÉCOLE SECONDAIRE CATHOLIQUE SECTEUR ORLÉANS 641 RENAUD ROAD DEVELOPMENT SERVICING STUDY AND STORMWATER MANAGEMENT REPORT Prepared by: NOVATECH ENGINEERING CONSULTANTS LTD. Suite 2, 24 Michael Cowpland

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

Hydrology Study. For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021

Hydrology Study. For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021 Hydrology Study For Bella Terrazza Portion of Lot 1, Block 39, Subdivision of S Tract, Rancho El Cajon El Cajon, CA 92021 Prepared for Daryl Priest - Priest Development Corporation 124 West Main Street,

More information

4. Number of drawings required: ( ) Locations of nearest streets

4. Number of drawings required: ( ) Locations of nearest streets CITY OF MANSFIELD BUREAU OF BUILDING AND CODES 30 NORTH DIAMOND STREET 3RD FLOOR MANSFIELD, OHIO 44902 Phone (419) 755-9688 Fax (419) 755-9453 www.ci.mansfield.oh.us COMMERCIAL BUILDING PLAN REQUIREMENTS

More information

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following:

CONSTRUCTION SURVEY. Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: CONSTRUCTION SURVEY PART 1 - GENERAL 1.01 SECTION INCLUDES Construction survey includes personnel, equipment, and supplies required for, but not limited to, the following: A. Construction Survey: 1. Project

More information

Extended Coverage Sprinklers

Extended Coverage Sprinklers Extended Coverage Sprinklers Agenda Why Extended Coverage History Extended Coverage Products Concept of Extended Coverage Sprinklers Summary 2 WHY EXTENDED COVERAGE? 3 Hazard / Occupancy Classification

More information

The Building Codes A.R.E. Building Design and Construction Exam Prep

The Building Codes A.R.E. Building Design and Construction Exam Prep Know Thy Codes! The Building Codes Building Codes The Code of Hammurabi 4000bc Developed 19 th and 20 th c. Codes define what you can and can t do Allowable area and height based on degree of danger Fire

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Envie Champagne Avenue

Envie Champagne Avenue Envie - 101 Champagne Avenue Site Servicing and Stormwater Management Report Type of Document Site Plan Submission Project Name Envie - 101 Champagne Avenue Project Number 00219439-A0 Prepared By: J. Fitzpatrick,

More information

SEISMIC CONTROL MEASURES By Richard Lévesque, ing., P.Eng., LEED AP

SEISMIC CONTROL MEASURES By Richard Lévesque, ing., P.Eng., LEED AP SEISMIC CONTROL MEASURES By Richard Lévesque, ing., P.Eng., LEED AP Outline What and Why of Seismic Restraint Applicable Codes & Standards for Seismic Restraint Where and When of Seismic Restraint General

More information

DZR Commissioning Set. Flow Data and Installation Instructions

DZR Commissioning Set. Flow Data and Installation Instructions ART & 7 DZR Commissioning Set Flow Data and Installation Instructions This datasheet is designed as a guide and should not be regarded as wholly accurate in every detail.we reserve the right to amend the

More information

ENGINEERING INFRASTRUCTURE REPORT 32 & 34 TENNYSON AVE, TAKAPUNA ISSUED FOR RESOURCE CONSENT

ENGINEERING INFRASTRUCTURE REPORT 32 & 34 TENNYSON AVE, TAKAPUNA ISSUED FOR RESOURCE CONSENT ENGINEERING INFRASTRUCTURE ENGINEERING INFRASTRUCTURE REPORT 32 & 34 TENNYSON AVE, TAKAPUNA ISSUED FOR RESOURCE CONSENT Job No 37240R#C Date May 17 Level 1, 12 14 Como Street, PO Box 33 426, Takapuna,

More information