1 ETHIOIAN ELECTRIC OWER CORORATION NOW & IN THE FOLLOWING YEARS April 4, April 2011

2

3 rojects under construct ion 2090 MW Capacity in MW rogress in Generation Capacity Capacity in 2009/ MW rojects under initial stage 6000MW ower plants incorporated in to the system since 1992 Tis Abay II Fincha 4 th unit Gilgel Gibe I Awash 7 kilo Thermal Kaliti Diesel Diredawa Diesel Tekeze I Gilgele Gibe II Beles rojects under construction Fincha Amerti Neshe Ashegoda Wind Gibe III HE 4/4/2011

4 Transmission line progress 2009/ From we may have additional transmission line: 500 kv D.C.434 km 400 kv 945 km 230kv 3475 km 132 kv 1262 km The total length will be >17000 km 4/4/2011

5 Substations /4/2011

6 Distribution Lines In 1992 distribution line length by the voltage category kv - 2,692 km 220/400 kv - 7,280 km kv - 34,235 km 33 kv - 11,741 km 220/400 kv - 80,023 km 4/4/2011

7 ,841 Number of Customers 2010 The growth not only in number but also in consumption pattern The total consumption in 1992 is now the domestic consumption share The share of consumption of industries and commercial reached to 70% of the total consumption. 1,896,000 4/4/2011

8 Demand Forecast ctd. Target and Moderate forecast Analysis made on historical sales and GD data for the period 1973 to 2007 reveals that the electricity demand has an elasticity of 2.15 to changes in the overall GD. If an economic growth rate of 7-10% can be achieved in the coming years, it could be translated to an electric energy demand growth rate of about 17%(as projected in the target scenario) based on the above elasticity estimate. April 11

9 Looking at the most determinant factors of energy demand growth factors GD and opulation,the recent good economic performance of the country as demonstrated in the three consecutive years GD growths of more than 10%.The coming five years growth assumed to be same. Similarly population growth expected to be 2.2 to 1.8 %

10 25.00% Yearly Demand Growth 25% 20.00% 15.00% 10.00% 6.07% 11.56% 7.86% 5.00% 0.00% 1999/ / / / / / / / / /09 21% 10.48% 13.14% 9.98% 15.04% 16.54%

11 Areas In which ower Supply was requested in 2009 and 2010 Gebreguracha & Surrounding 400 MW Diredawa & Surrounding 120 MW Bishoftu & Surrounding 150 MW Muger, Addis Alem & Surrounding 110 MW Addis Ababa, Sebeta & Surrounding 200 MW Other laces 410 MW It is clearly shown that due to the suppressed demand we have for the next tow years estimated to become more than 30%

12 Generation Expansion lan In compliance with prescribed reliability and system reserve criteria, an updated schedule for implementation of new generating plants and transmission additions is designed, to meet the projected demand. The generation development plan consists mainly of hydro projects. Generation from Wind and Geothermal power plants are foreseen to compliment the hydro.

13 Hydro ower rojects No. roject CA MW Energy GWH Commissioni ng Year 1FAN 67% completed GIBE III 40% completed GENALE 3 rd Contract signed HELELE 4WERABESA MO signed CHEMOGA YEDA Contract signed GIBE 4 TH MO signed GENALE 6 TH feasibility completed GEBA I & II feasibility completed

14 Hydro ower rojects under study No. roject 1TEKEZE II 2BEKO ABO 3BORDER 4MENDEYA Estimated Completion year of the Study Status CA MW Energy GWH.Feasibility Study Feasibility Study Feasibility Study Feasibility Study GIBE 5 TH.Feasibility Study WABI SHEBELE nder studty BIRBIR reliminary study LOWER DEDESSA reliminary study DABS reliminary study TAMS reliminary study GENALE DAWA 11 5 th reliminary study April 11 April 2010 Commissioning year According to their feasibility result these projects will be commissioned upto 2020

15 Wind rojects No. roject CA MW Energy GWH Estimated commissionin g year 1 Ashegoda wind Construction on the way Adama Wind Contract Signed Messobo Wind Mo Signed Ayisha Wind Feasibility under way Debre Birhan Wind Feasibility under way Assela Wind MO nderway nder Feasibility 7 Adama II Study April 11 January 2009

16 Geothermal rojects No. roject CA MW Energy GWH Estimated commissionin g year Aluto Langano 1Geothermal re feasibility Tendaho Geothermal re feasibility Corbetti Geothermal re feasibility Abaya Geothermal re feasibility Tulu Moya 5Geothermal re feasibility Dofan Geothermal re feasibility G.Total April 11 January 2009

17 Energy Geration (GWh) Energy Capablity versus Energy Demand GD Growth=11%, Demand Growth= 24% Ethiopia-Djibouti *Ethiopia-Sudan inerconnection year Figure --- Year E.C Finchaa Co-Generation =20MW Oct, 2014 Metehara Co-Generation =20MW Oct, 2013 Tendaho Co-Generation =20MW Oct, 2012 Wonji Co-Generation =20MW Oct, 2011 Adama/Nazereth Wind Turbine 34*1.5MW Mesobo/Harena Wind Turbine 34*1.5MW Ashegoda Wind Turbine 125*0.8MW Assela Wind Turbine 64*1.6MW Debre Birhan Wind Turbine 63*1.6MW Ayish Wind Turbine 200*1.5MW ICS Diesel Debre Zeit ICS Diesel Nazereth ICS Diesel Adwa Aluto Langano II (75MW) Border Mandaya Chemoga Yeda-2 Chemoga Yeda-1 Geba-2 Geba-1 Gibe IV Halle Werabessa hase II Halle Werabessa hase I Genale Dawa-6 Genale Dawa-3 Gilge Gibe III Amerti Neshi Beles Tekeze Gilge Gibe II Aluto Langano Dire Dawa Diesel (Containerized) Kaliti I Diesel (Containerized) Awash 7 Killo Diese (Containerized) ICS Diesel MW G.Gibe-I Melka Wakena Finchaa including Finchaa-IV T.Abay-II T.Abay-I Awash III Awash II Koka Own Demand (GWh)

18 Demand/Supply (MW) Installed Capacity versus eak Demand GD Growth=11%, Demand Growth= 24% Ethiopia-Djibouti *Ethiopia-Sudan inerconnection year Figure Nehasie meskerem Tikimt Hidar Tahisas Tir Yekatit Megabit Miyaziya Ginbot Sene 2003 Nehasie meskerem Tikimt Hidar Tahisas Tir Yekatit Megabit Miyaziya Ginbot Sene 2004 Nehasie meskerem Tikimt Hidar Tahisas Tir Yekatit Megabit Miyaziya Ginbot Sene 2005 Nehasie meskerem Tikimt Hidar Tahisas Tir Yekatit Megabit Miyaziya Ginbot Sene 2006 Nehasie meskerem Tikimt Hidar Tahisas Tir Yekatit Megabit Miyaziya Ginbot Sene 2007 Nehasie meskerem Tikimt Hidar Tahisas Tir Yekatit Megabit Miyaziya Ginbot Sene Year Koka Awash II Awash III T.Abay-I T.Abay-II Finchaa including Finchaa-IV Melka Wakena G.Gibe-I ICS Diesel MW Kaliti I Diesel (Containerized) Dire Dawa Diesel (Containerized) (4 x 9.5MW) Aluto Langano Gilge Gibe II Tekeze Beles Amerti Neshi Gilge Gibe III Genale Dawa-3 Genale Dawa-6 Halle Werabessa Chemoga Yeda-1 Chemoga Yeda-2 Gibe IV Geba-1 Geba-2 Border Mandaya Aluto Langano II (75MW) Ayish Wind Turbine 200*1.5MW Debre Birhan Wind Turbine 63*1.6MW Assela Wind Turbine 64*1.6MW ICS Diesel Adwa ICS Diesel Nazereth ICS Diesel Debre Zeit Ashegoda Wind Turbine 125*0.8MW Mesobo/Harena Wind Turbine 34*1.5MW Adama/Nazereth Wind Turbine 34*1.5MW Wonji Co-Generation =20MW Oct, 2011 Tendaho Co-Generation =20MW Oct, 2012 Metehara Co-Generation =20MW Oct, 2013 Finchaa Co-Generation =20MW Oct, 2014 Own Demand (MW)

19 Stacked Energy output from all Combination of lants (Dispatched) ENRGY ( GWh) YEAR Total Coal (GWh) Total Thermal (GWh) Total Wind Total Hydro (GWh) Total Geothermal (GWh) April 11 January 2009

20 Transmission Systems Expansion Requirement From we may have additional transmission line: 500 kv D.C.434 km 400 kv 945 km 230kv 3475 km 132 kv 1262 km The total length will be >17000 km

21 April 11 January 2009

22 s s 3 s ` 2 s s s s 2 2 EXISTING & LANNED OWER SYSTEM SCHEMATIC ARRANGEMENT TOTAL MW AFTER 10 YEARS TIME FROM ALL ENERGY SORCES HYDRO = MW WIND = 740 MW RED SEA GEOTHERMAL = 450 MW TOTAL = MW E R I T R E A To (Sudan) Metema Humera s.s Adwa D Axum s.s (3 MW) Adigrat s.s &S.S Enda Silasse s.s Dallol Wukro s.s MESOBE (WE) 50 MW Tekeze II ( HE) 450 MW Mesobo S.S Tekeze I ( HE) Mekele S.S 300 MW ASHEGODA (WE) 120MW Lake Afrra Dabat S.S Shehedi s.s Maychew S.S Sekota S.S Gonder s.s Alamata s.s LAKE TANA Nefas Mewcha s.s Lalibela s.s Woldiya S.S OF ADEN BELES (HE) Gashen S.S 460 MW BAHRDAR S.S TIS ABAY I (HE) 12 MW Dangla S.S TIS ABAY II (HE) BORDER (HE) 72 MW 1200 MW Dessie S.S Injibara S.S awe S.S Aksta S.S Mota S.S Finote Selam S.S Bitchena S.S Combolcha S.S Tendaho Graben G 100 MW Semera S.S Ditchato S.S Teo Lake Abehe AYSHA (WE) 300 MW DJIBOTI GLF Gambela S.S Asosa S.S DEBS (HE) 425 MW BIRBIR (HE) 467 MW Mendi S.S Dembi Dolo S.S BARO 1&2 (HE) TAMS (HE) 1000 MW MENDIA (HE) 2000 MW Ghimbi S.S GEBA 1&2 (HE) 366 MW SOR (HE) 5 MW Metu S.S Yayu Coal Gutin S.S Nekemte S.S Agaro S.S Jimma S.S CHEMOGA YEDA (HE) 278 MW NESHE (HE) 97 MW FINCHAA (HE) 134 MW DEDESSA (HE) 613 MW WERABESA (HE) Bedele S.S 326 MW BEKO ABO (HE) 1600 MW Gehedo S.S HALELE (HE) 96 MW GILGEL GIBE I (HE) 184 MW Debre Markos S.S Guder S.S Addis Alem S.S 2 Woliso S.S Wolkite S.S Fitche S.S Muger S.S Gedja S.S Butajira S.S Aba Samuael(HE) 5MW ADAMI TL S.S GILGEL GIBE II (HE) 420 MW Hosana S.S Alem Ketema S.S Addis Ababa Elala S.S Geda Shoa Robit S.S ALELT (HE) 1000 MW Sululta S.S Dukem S.S ASSELA (WE) 100 MW Asela S.S ALTO (G) 7 MW Debre Berhan S.S Debre zeit I& II S.S Modjo S.S TL MOYA (G) 100 MW & DOFAN G 60 MW Metehara S.S Awash7 D (35 MW) &S.S Nazereth S.S ADAMA I & II (WE) 104 MW KOKA (HE) 42 MW AWASH II (HE) 32 MW Gobesa S.S D.BIRHAN (WE) 100 MW Meteka Amibara S.S AWASH III (HE) 32 MW Nuraera S.S Asebe Teferi S.S Bedessa S.S Chelenko S.S Danab Dire Dawa D (40 MW) &S.S Alemaya S.S To (Dijbouti) Babile S.S Harar S.S Fik S.S Jijiga S.S Degehabur S.S Geothermal power plant under study and implementation Wind power plant under study Wind power plant under construction Tepi S.S Bonga S.S Aba S.S GOJEB (HE) 150 MW Alaba S.S CORBETTI G (75 MW) ALTO II (G) 75 MW Mizan S.S DEMBI (SH) Delbi Moye Coal Welaita Sodo S.S Shashamene S.S MELKA WAKENA Awasa S.S (HE) 153 MW GIBE III (HE) 1870 MW 3 GIBE IV (HE) 1472 MW Abaya G 100 MW Sawla S.S ARBA Minch S.S Yirgalem S.S Dilla S.S GENALE 1&2 (HE) 366 MW YADOT (SH) Ramo S.S WABI SHEBELE (HE) 87 MW Gode S.S Kebridehar S.S CALB Hagere Shakiso S.S Mariam S.S GENALE 3 (HE) 258 MW KeyAfer S.S GIBE V (HE) 650 MW Negele Borena S.S GENALE 5 (HE) 100 MW Bokoluguma S.S To (Kenya) 500 KVDC Line GENALE 6 (HE) 256 MW GANDA

23 Investment plan Year Total Local Costs Foreign Costs Total Costs Financing lan Own Source Customer Contribution Government Foreign Loan & Grant Local Loan Total

24 Generation rojects coming into the Tekeze system for the past year

25 Gilgel Gibe III Gilgel Gibe II Hydro Electric

26 Beles HE During Construction Beles during construction

27 Tekeze Mekele, 230 kv March,2011

28 Regional Interconnection The development of regional infra-structure projects (power system interconnection projects) is important for most African countries as they are typically very small to generate the economies of scale that can be found in larger markets. In light of the present world energy crisis, interconnection of the regional electric energy networks is the best alternative to displace expensive thermal generation in regional as well as international power markets. In harmony with this belief Ethiopia has devised a strategy for accelerating cross-border electricity trading with the neighboring countries and further to other nearby countries to spur regional economic growth through developments of the untapped hydro resources for electricity. April 11

29 Regional Interconnection Ctd. Benefits to be expected from developing regional interconnections and operating as a power pool, when considering further strategic links such as South African power pool (SA), East African power pool( EA), North African power pool (NA) and West African power pool (WA) include:- 1.Strategic partnership among the parties, which will have significant contribution for regional economic cooperation and stability. 2.Lower unit energy costs for the receiving system (s) from displacement of more expensive and environment unfriendly thermal generation. April 11

30 EGYT Aswan Cairo ossible Interconnection Lines with Neighboring Countries Merowe SDAN April 11 Khartoum Roseries LEGEND 220 kv 230 kv 230 kv Sub-marine Cable 400 kv 500 kv HVDC Link Gedaref 157 km 37 km Border awie Mandaya Beles Asmara Humera Shehedi Finchaa GG-I ELDORET GG-II 80 km GG-III Shire Gonder B.Dar K.Dobi 120 km KENYA Tekeze Nairobi ERITREA 500 km 590 km 100 km Mekele Addis Ababa Koka GD-03 D.Dawa M.Wakena 225 km Mega 82 km 201 km 185 km GD-06 GD km Djibouti DJIBOTI 80 km 465 km Kisimayou 90 km SOMALIA Hargessa Berbera SOMALILAND Mogadishu 370 km LEGEND Substation at 230 kv and above Substation with Generation Facility (Switchyard at 230 kv and above) Town 170 km YEMEN AC/DC Station (Converter/Inverter)

31

ETHIOPIAN POWER SECTOR DEVELOPMENT & REGIONAL INTERCONNECTION FOR POWERING ARICA FORUM

ETHIOPIAN POWER SECTOR DEVELOPMENT & REGIONAL INTERCONNECTION FOR POWERING ARICA FORUM ETHIOPIA ALONG THE DEVELOPMENT OF RENEWABLE POWER ETHIOPIAN POWER SECTOR DEVELOPMENT & REGIONAL INTERCONNECTION FOR POWERING ARICA FORUM MEKURIA LEMMA 12/3/2013 EEPCO CORPORATE PLANNING DIRECTOR esplanning469@gmail.com

More information

ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR INVESTMENT OPPORTUNITIES

ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR INVESTMENT OPPORTUNITIES ETHIOPIAN ELECTRIC POWER THE ETHIOPIAN ENERGY SECTOR INVESTMENT OPPORTUNITIES UK-ETHIOPIA TRADE & INVESTMENT FORUM 2015 October 21st 2015 LONDON, UK Azeb Asnake, CEO, Ethiopian Electric Power 1. INSTITUTIONAL

More information

Appendix II Nationally Appropriate Mitigation Actions of Developing Country Parties

Appendix II Nationally Appropriate Mitigation Actions of Developing Country Parties Appendix II Nationally Appropriate Mitigation Actions of Developing Country Parties Non-Annex I Federal Democratic Republic of Ethiopia Actions 1. Electricity Generation from Renewable Energy for the Grid

More information

Planning Development of Ethiopia s Hydropower Resources

Planning Development of Ethiopia s Hydropower Resources Planning Development of Ethiopia s Hydropower Resources Timothy Wyatt 1 Andrew J. Pearce 2 David Thorn 3 Power & Water Systems Consultants Ltd 3 Ridge Road WSP Parsons Brinckerhoff 1 Paper Mews Falmer

More information

ETHIOPIA. Investment Opportunities G20 Compact with Africa. ETHIOPIA Compact with Africa

ETHIOPIA. Investment Opportunities G20 Compact with Africa. ETHIOPIA Compact with Africa ETHIOPIA Investment Opportunities G20 Compact with Africa ETHIOPIA Compact with Africa COUNTRY CONTEXT 32 E Fastest growing economy: ue Asayita Asayita Nile Debre Markos Ha ng er 46 E d e n G u l f o f

More information

INNOVATIVE FINANCING OF GRID CONNECTIONS BY ETHIOPIAN ELECTRIC POWER CORPORATION

INNOVATIVE FINANCING OF GRID CONNECTIONS BY ETHIOPIAN ELECTRIC POWER CORPORATION PK-1 GEBA 1& Zeit 1& BARO 1& ABA Gedemsa KOKA AWASH II Tullu AWASH III Gobesa Sawla Injibara Welaita ARBA I Abaya Yirgalem Mesobo WAKANA Wukro &3 INNOVATIVE FINANCING OF GRID CONNECTIONS BY ETHIOPIAN ELECTRIC

More information

List of Proclamations and Regulations. Enacted in the Period between August 2016 and December 2017

List of Proclamations and Regulations. Enacted in the Period between August 2016 and December 2017 List of s and Regulations Enacted in the Period between August 2016 and December 2017 No. Year and No. or Regulation Title or Content. Number 1 23 rd Year No. 1 No. 1/2016 State of Emergency for the Maintenance

More information

For more information about this bulletin, contact VAM Unit: or

For more information about this bulletin, contact VAM Unit: or 60.0 50.0 40.0 30.0 20.0 10.0 0.0 D F A J AOD F A J AOD F A J AOD F A J AOD F A J AOD F A J AOD F -10.02011 2012 2013 2014 2015 2016 2017 2018 June 2018 HIGHLIGHTS Inflation: Inter annual inflation stood

More information

Ethiopian National Energy Policy 2012

Ethiopian National Energy Policy 2012 ETHIOPIAN NATIONAL ENERGY POLICY (2 ND DRAFT) Feb 2013 Addis Ababa i Table of Contents TABLE OF CONTENTS... I ACRONYMS AND ABBREVIATIONS... 3 RATIONALE FOR UPDATING NATIONAL ENERGY POLICY... 4 INTRODUCTION...

More information

Geothermal Exploration and Development in Ethiopia

Geothermal Exploration and Development in Ethiopia Proceedings World Geothermal Congress 2005 Antalya, Turkey, 24-29 April 2005 Geothermal Exploration and Development in Ethiopia Meseret Teklemariam and Kibret Beyene Geological Survey of Ethiopia P.O.Box

More information

Joint ICTP-IAEA Workshop on Vulnerability of Energy Systems to Climate Change and Extreme Events April 2010

Joint ICTP-IAEA Workshop on Vulnerability of Energy Systems to Climate Change and Extreme Events April 2010 2138-27 Joint ICTP-IAEA Workshop on Vulnerability of Energy Systems to Climate Change and Extreme Events 19-23 April 2010 Reducing energy sector vulnerability to climate change and extreme events Ephrem

More information

Mapping of Energy Institutions and Initiatives in Ethiopia

Mapping of Energy Institutions and Initiatives in Ethiopia Mapping of Energy Institutions and Initiatives in Ethiopia Contents 1. Introduction...4 2. Energy Policy and Strategy...6 3. Ethiopian Energy Potentials...9 4. Major Institutions in the Ethiopian Energy

More information

What Cost Ethiopia s Dam Boom? A look inside the Expansion of Ethiopia s Energy Sector

What Cost Ethiopia s Dam Boom? A look inside the Expansion of Ethiopia s Energy Sector What Cost Ethiopia s Dam Boom? A look inside the Expansion of Ethiopia s Energy Sector Terri Hathaway February 2008 Contents Page Report Summary 3 1. Introduction 4 2. Ethiopia s Energy Sector 6 3. Organization

More information

Current Capacity Building Initiatives in Ethiopia for Water Resources Development and Management

Current Capacity Building Initiatives in Ethiopia for Water Resources Development and Management Current Capacity Building Initiatives in Ethiopia for Water Resources Development and Management ABITI GETANEH GEBREMESKEL Ministry of Water and Energy_ Ethiopia P.O.Box 5744 abitigetaneh@yahoo.com Addis

More information

HARNESSING THE NILE TO INCREASE ACCESS TO ELECTRICITY

HARNESSING THE NILE TO INCREASE ACCESS TO ELECTRICITY HARNESSING THE NILE TO INCREASE ACCESS TO ELECTRICITY Nile Basin Initiative Increased electricity supply will raise economic productivity in cities like Bahir Dar in Ethiopia (Photo: NBI) Background 145,000

More information

Ethiopian Railways Corporation (ERC) Project Brief Outline

Ethiopian Railways Corporation (ERC) Project Brief Outline Ethiopian Railways Corporation (ERC) Project Brief Outline ERC Project Brief Outline Contents of the Presentation Background/Rationale Vision for Standard Gauge Railway Development Project Description:

More information

GEOTHERMAL EXPLORATION AND DEVELOPMENT IN ETHIOPIA

GEOTHERMAL EXPLORATION AND DEVELOPMENT IN ETHIOPIA GEOTHERMAL TRAINING PROGRAMME 30 th Anniversary Workshop Orkustofnun, Grensásvegur 9, August 26-27, 2008 IS-108 Reykjavík, Iceland GEOTHERMAL EXPLORATION AND DEVELOPMENT IN ETHIOPIA Berhanu Gizaw Geological

More information

THE FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA

THE FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA THE FEDERAL DEMOCRATIC REPUBLIC OF ETHIOPIA ABBAY BASIN AUTHORITY The Great Ethiopian Rennaisance Dam The Magnificen t Dedesa River The Breathtaking Tisisat Fall June 2016 Lake Tana 1 MISSION To contribute

More information

INVESTMENT AND BUSINESSES OPPORTUNITIES. And INDUSTRIALIZATION IN ETHIOPIA

INVESTMENT AND BUSINESSES OPPORTUNITIES. And INDUSTRIALIZATION IN ETHIOPIA INVESTMENT AND BUSINESSES OPPORTUNITIES And INDUSTRIALIZATION IN ETHIOPIA April 25, 2017 National Vision Joining Middle Income Group by 2025 Sector vision Making the country Africa s leading in light manufacturing

More information

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT APPRAISAL DOCUMENT ON A PROPOSED CREDIT

Document of The World Bank FOR OFFICIAL USE ONLY PROJECT APPRAISAL DOCUMENT ON A PROPOSED CREDIT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT APPRAISAL DOCUMENT ON A PROPOSED

More information

VULNERABILITY ANALYSIS AND MAPPING (VAM), WORLD FOOD

VULNERABILITY ANALYSIS AND MAPPING (VAM), WORLD FOOD The nominal retail prices of food commodities across district markets were stable and further decreased in some markets where the belg crop production shows good performance and root crops are being consumed.

More information

Federal Democratic Republic of Ethiopia Ministry of Capacity Building in Collaboration with PSCAP Donors

Federal Democratic Republic of Ethiopia Ministry of Capacity Building in Collaboration with PSCAP Donors Federal Democratic Republic of Ethiopia Ministry of Capacity Building in Collaboration with PSCAP Donors "Woreda and City Administrations Benchmarking Survey III Supply Side Report Survey of Service Delivery

More information

NBI Role in Facing Energy Security Challenges in the Nile Basin

NBI Role in Facing Energy Security Challenges in the Nile Basin NBI Role in Facing Energy Security Challenges in the Nile Basin Wael Khairy, Ph.D. Wael Khairy, Ph.D. Executive Director Nile Basin Initiative Secretariat Entebbe, Uganda Mekong 2 Rio+20 Int l l Conference

More information

NS Ethiopia's National Railway Network and Addis Ababa Light Rail Transit (LRT) NAMA

NS Ethiopia's National Railway Network and Addis Ababa Light Rail Transit (LRT) NAMA NS-172 - Ethiopia's National Railway Network and Addis Ababa Light Rail Transit (LRT) NAMA Ethiopia NAMA for Recognition A.1 Party Ethiopia A Overview A.2 Title of Mitigation Ethiopia's National Railway

More information

Application of the Water Evaluation And Planning (WEAP) Model to Simulate Current and Future Water Demand in the Blue Nile

Application of the Water Evaluation And Planning (WEAP) Model to Simulate Current and Future Water Demand in the Blue Nile Application of the Water Evaluation And Planning (WEAP) Model to Simulate Current and Future Water Demand in the Blue Nile Matthew McCartney 1, Yosif A. Ibrahim 2, Yilma Sileshi 3 and Seleshi Bekele Awulachew

More information

Eastern Nile Basin Water System Simulation Using Hec-ResSim Model

Eastern Nile Basin Water System Simulation Using Hec-ResSim Model City University of New York (CUNY) CUNY Academic Works International Conference on Hydroinformatics 8-1-2014 Eastern Nile Basin Water System Simulation Using Hec-ResSim Model Azeb Belachew Zelalem Mekonen

More information

Development of Alternative Scenario for Ethiopias Electricity Sector by LEAP Software

Development of Alternative Scenario for Ethiopias Electricity Sector by LEAP Software Global Journal of Researches in Engineering Electrical and Electronics Engineering Volume 13 Issue 4 Version 1.0 Year 2013 Type: Double Blind Peer Reviewed International Research Journal Publisher: Global

More information

Energy Policy of Ethiopia. Ministry of Water and Energy. Country Report. Japan International Cooperation Agency. Tokyo International Center

Energy Policy of Ethiopia. Ministry of Water and Energy. Country Report. Japan International Cooperation Agency. Tokyo International Center Energy Policy of Ethiopia IEEJ : July 2011 Ministry of Water and Energy Country Report Japan International Cooperation Agency Tokyo International Center July, 5, 2011 Outline Background Energy situation

More information

Water and Energy Resource Potential of Ethiopia Status of Development and Investment Opportunities. Ethiopian Investment Forum 07 June, 2011

Water and Energy Resource Potential of Ethiopia Status of Development and Investment Opportunities. Ethiopian Investment Forum 07 June, 2011 Water and Energy Resource Potential of Ethiopia Status of Development and Investment Opportunities Ethiopian Investment Forum 07 June, 2011 Resource Potential Water Resource Potential Intensive study on

More information

EASTERN AFRICA POWER POOL (EAPP)

EASTERN AFRICA POWER POOL (EAPP) EASTERN AFRICA POWER POOL (EAPP) EAPP REGIONAL POWER SYSTEM MASTER PLAN EXECUTIVE SUMMARY December 2014 Published by: EAPP, Eastern Africa Power Pool Kirkos sub city, House No.513 P.O Box 100644 Addis

More information

Key words: Ethiopia, country update, geothermal exploration, development, pilot power plant

Key words: Ethiopia, country update, geothermal exploration, development, pilot power plant GEOTHERMAL DEVELOPMENT IN ETHIOPIA Meseret Teklemariam, Kibret Beyene, Yiheyis AmdeBerhan, Zewde Gebregziabher Ethiopian Institute of Geological Surveys Hydrogeology, Engineering geology and Geothermal

More information

Parcel Post Compendium Online Ethiopian Postal Service. ET - Ethiopia ETA

Parcel Post Compendium Online Ethiopian Postal Service. ET - Ethiopia ETA Basic Services 1 Maximum weight limit admitted 1.1 Surface parcels (kg) 31.5 1.2 Air (or priority) parcels (kg) 31.5 2 Maximum size admitted 2.1 Surface parcels 2.1.1 2m x 2m x 2m (or 3m length & greatest

More information

ETHIOPIA MONTHLY MARKET WATCH

ETHIOPIA MONTHLY MARKET WATCH Highlights ETHIOPIA MONTHLY The year-on-year overall inflation rate in the country stood at 11.60 percent in, as food inflation increased to 14.7 percent from 13.9 percent in the previous month. This means

More information

ETHIOPIA MONTHLY MARKET WATCH

ETHIOPIA MONTHLY MARKET WATCH Highlights The year-on-year overall country level inflation and food inflation rate increased by 29.84% and 36.64%. Cereal inflation rate rose by 45.8%. Local maize and wheat price at Addis Ababa stood

More information

Presentation to EAPIC Conference. by Eng. Joel Kiilu On 28 th August 2015

Presentation to EAPIC Conference. by Eng. Joel Kiilu On 28 th August 2015 BUILDING COLLABORATION BETWEEN EAST AFRICAN NATIONS VIA TRANSMISSION INTERCONNECTORS Presentation to EAPIC Conference by Eng. Joel Kiilu On 28 th August 2015 1. Potential Power Sources in East Africa 2.

More information

LONG TERM PLANNING, PRINCIPLES & PRACTICAL ANALYSES TURKISH ELECTRICITY TRANSMISSION CORPORATION

LONG TERM PLANNING, PRINCIPLES & PRACTICAL ANALYSES TURKISH ELECTRICITY TRANSMISSION CORPORATION LONG TERM PLANNING, PRINCIPLES & PRACTICAL ANALYSES TURKISH ELECTRICITY TRANSMISSION CORPORATION www.teias.gov.tr CONTENT Overview of Turkish Transmission System Load and Generation Forecasts Preparing

More information

On Opportunities and Potential in Ethiopia for Production of Fruits and Vegetable

On Opportunities and Potential in Ethiopia for Production of Fruits and Vegetable On Opportunities and Potential in Ethiopia for Production of Fruits and Vegetable Kassa Melese Ashebre Haramaya University, School of Graduate Studies Po.Box:138 Dredawa, Ethiopia Abstract Fruits and vegetables

More information

KEY WATER ISSUES IN AFRICAN AND ETHIOPIAN PERSPECTIVES AMID WATER RELATED SUSTAINABLE DEVELOPMENT CHALLENGES. Water Catalyst Award Lecture

KEY WATER ISSUES IN AFRICAN AND ETHIOPIAN PERSPECTIVES AMID WATER RELATED SUSTAINABLE DEVELOPMENT CHALLENGES. Water Catalyst Award Lecture KEY WATER ISSUES IN AFRICAN AND ETHIOPIAN PERSPECTIVES AMID WATER RELATED SUSTAINABLE DEVELOPMENT CHALLENGES Water Catalyst Award Lecture Hamilton, ON, Canada Seleshi Bekele Awulachew, Ph.D. Minister:

More information

HYDROPOWER DEVELOPMENT IN NORTH AFRICA

HYDROPOWER DEVELOPMENT IN NORTH AFRICA HYDROPOWER DEVELOPMENT IN NORTH AFRICA H.E. KAMAL ALI MOHAMED SUDAN 1- GENERAL 1-1 The population of Africa are about 700 Million people, and the energy consumption in Africa constitutes less than 3% of

More information

Federal Democratic Republic of Ethiopia

Federal Democratic Republic of Ethiopia Federal Democratic Republic of Ethiopia Country Report Hangzhou, November 12, 2017 Facts and Figures Established in 2011as a research university focusing on Science & Technology to lead the industrialization

More information

O n e R i v e r O n e P e o p l e O n e V i s i o n

O n e R i v e r O n e P e o p l e O n e V i s i o n O n e R i v e r O n e P e o p l e O n e V i s i o n 2011 Edition: Please send your feedback to the NBI Secretariat Disclaimer: While every care has been exercised in compiling and publishing the information

More information

Hydropower for sustainable water and energy development in Ethiopia

Hydropower for sustainable water and energy development in Ethiopia Sustain. Water Resour. Manag. (2015) 1:305 314 DOI 10.1007/s40899-015-0029-0 ORIGINAL ARTICLE Hydropower for sustainable water and energy development in Ethiopia Dagmawi Mulugeta Degefu 1 Weijun He 1,2

More information

CONCEPTUAL MODELS AIMING TO PROTECT FROM PESTICIDE CONTAMINATION DRINKING WATER PRODUCTION FROM GROUNDWATER

CONCEPTUAL MODELS AIMING TO PROTECT FROM PESTICIDE CONTAMINATION DRINKING WATER PRODUCTION FROM GROUNDWATER CONCEPTUAL MODELS AIMING TO PROTECT FROM PESTICIDE CONTAMINATION DRINKING WATER PRODUCTION FROM GROUNDWATER Engida ZA Hydrogeology Sub Process Manager Water Works Design and Supervision Enterprise WATER

More information

COUNTRY OVERVIEW Territory 582,646 Sq. Kilometres Capital Nairobi 46.3 with over 65% youth Population (m, 2017) growth rate 2.1% Urban pop 24% GDP Gro

COUNTRY OVERVIEW Territory 582,646 Sq. Kilometres Capital Nairobi 46.3 with over 65% youth Population (m, 2017) growth rate 2.1% Urban pop 24% GDP Gro KENYA By Mungai Kihara Ministry of Energy Renewable Energy Directorate 1 COUNTRY OVERVIEW Territory 582,646 Sq. Kilometres Capital Nairobi 46.3 with over 65% youth Population (m, 2017) growth rate 2.1%

More information

OVERVIEW OF GEOTHERMAL RESOURCE EXPLORATION AND DEVELOPMENT IN THE EAST AFRICAN RIFT SYSTEM

OVERVIEW OF GEOTHERMAL RESOURCE EXPLORATION AND DEVELOPMENT IN THE EAST AFRICAN RIFT SYSTEM Presented at Short Course VII on Exploration for Geothermal Resources, organized by UNU-GTP, GDC and KenGen, at Lake Bogoria and Lake Naivasha, Kenya, Oct. 27 Nov. 18, 2012. GEOTHERMAL TRAINING PROGRAMME

More information

A Cat PROJECTS OVERVIEW AND ACTIVITIES. African Union

A Cat PROJECTS OVERVIEW AND ACTIVITIES. African Union el op ment al A Cat ys t fo rg eother mal v De PROJECTS OVERVIEW AND ACTIVITIES African Union 2 African Union Commission Department of Infrastructure and Energy Roosevelt Street, W21K19 P.O. Box 3243 Addis

More information

First Meeting of Task Force 2 on Advance Transmission System Interconnections

First Meeting of Task Force 2 on Advance Transmission System Interconnections First Meeting of Task Force 2 on Advance Transmission System Interconnections 21-22 August 2013 Thimpu, Bhutan K.L.R.C.Wijayasinghe Deputy Director Ministry of Power and Energy Sri Lanka Sri Lanka Population

More information

Towards the optimization of water resource use in the Upper Blue Nile river basin

Towards the optimization of water resource use in the Upper Blue Nile river basin European Water 60: 61-66, 2017. 2017 E.W. Publications Towards the optimization of water resource use in the Upper Blue Nile river basin A.-T. Stamou * and P. Rutschmann Technical University of Munich,

More information

Tigray Region Bureau of Trade, Industry and Urban Development

Tigray Region Bureau of Trade, Industry and Urban Development Tigray Region Bureau of Trade, Industry and Urban Development Investment Promotion Core Process General Description of the Region Location Astronomically, Tigray region is located between 12 o 15 o north

More information

Trends and spatial distribution of annual and seasonal rainfall in Ethiopia

Trends and spatial distribution of annual and seasonal rainfall in Ethiopia INTERNATIONAL JOURNAL OF CLIMATOLOGY Int. J. Climatol. (28) Published online in Wiley InterScience (www.interscience.wiley.com) DOI: 1.12/joc.1623 Trends and spatial distribution of annual and seasonal

More information

Trends and spatial distribution of annual and seasonal rainfall in Ethiopia

Trends and spatial distribution of annual and seasonal rainfall in Ethiopia INTERNATIONAL JOURNAL OF CLIMATOLOGY Int. J. Climatol. 28: 1723 1734 (28) Published online 5 March 28 in Wiley InterScience (www.interscience.wiley.com) DOI: 1.12/joc.1623 Trends and spatial distribution

More information

Hydropower Sustainability Forum Oslo, Norway 4-6 September 2017

Hydropower Sustainability Forum Oslo, Norway 4-6 September 2017 New Frontiers in Sustainable Hydropower Development Hydropower Sustainability Forum Oslo, Norway 4-6 September 2017 Water and Hydropower Development - the Role of Transboundary Cooperation Fekahmed Negash

More information

Surface water harvesting using small-scale dams in northern Ethiopia: Challenges and opportunities

Surface water harvesting using small-scale dams in northern Ethiopia: Challenges and opportunities Surface water harvesting using small-scale dams in northern Ethiopia: Challenges and opportunities Kifle Woldearegay (PhD) (Department of Earth Science, Mekelle University, P.O.Box 231, Mekelle, Ethiopia;

More information

¾ =ƒäåá ¾Ów` U`U` = e+ƒ ƒ Ethiopian Institute of Agricultural Research

¾ =ƒäåá ¾Ów` U`U` = e+ƒ ƒ Ethiopian Institute of Agricultural Research ¾ =ƒäåá ¾Ów` U`U` = e+ƒ ƒ Ethiopian Institute of Agricultural Research UNEP/ GEF Removing Barriers to Invasive Plant Management in Africa (RBIPMA) Project DESCRIPTIONS OF PILOT SITES ETHIOPIA 1.1. Amibara

More information

ETHIOPIA Food Security Outlook April to September 2010

ETHIOPIA Food Security Outlook April to September 2010 An estimated 5.23 million people will continue to require emergency food assistance up to December 2010 with the net food requirement including TSF needs being 290,271 MT, estimated to cost around USD

More information

ETHIOPIA MONTHLY MARKET WATCH

ETHIOPIA MONTHLY MARKET WATCH ETHIOPIA MONTHLY MARKET Highlights The country level general inflation and food inflation rate increased by 39.2% and 50.3% respectively as compared to 2010. However, month to month general and food inflation

More information

ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT GEOTHERMAL SECTOR DEVELOPMENT PROJECT FOR ALALOBAD GEOTHERMAL SITE DEVELOPMENT

ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT GEOTHERMAL SECTOR DEVELOPMENT PROJECT FOR ALALOBAD GEOTHERMAL SITE DEVELOPMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT OF GEOTHERMAL SECTOR DEVELOPMENT PROJECT FOR

More information

What kind of energy production do we need to industrialize Sudan?

What kind of energy production do we need to industrialize Sudan? Republic of the Sudan Ministry of Water Resources, Irrigation & Electricity What kind of energy production do we need to industrialize Sudan? 11 th German-African Energy Forum-Hamburg, April 25-26 th 2017

More information

Ethiopia: Policies for productivity growth and structural transformation. G-24 Technical Group Meeting, Addis Ababa, February 27, 2017

Ethiopia: Policies for productivity growth and structural transformation. G-24 Technical Group Meeting, Addis Ababa, February 27, 2017 Ethiopia: Policies for productivity growth and structural transformation G-24 Technical Group Meeting, Addis Ababa, February 27, 2017 Outline of presentation Country context Reorientation in political

More information

Ministry of Industry and Trade General Directorate of Energy. Viet Nam s Power Development Plan

Ministry of Industry and Trade General Directorate of Energy. Viet Nam s Power Development Plan Ministry of Industry and Trade General Directorate of Energy Viet Nam s Power Development Plan Ha Noi, April 2017 Structure 1. Power Development Plan 2. Renewable Development 1. Power Development Plan

More information

Geographic distribution of cattle and shoats populations and their market supply sheds in Ethiopia

Geographic distribution of cattle and shoats populations and their market supply sheds in Ethiopia Geographic distribution of cattle and shoats populations and their market supply sheds in Ethiopia M. Jabbar, A. Negassa and T. Gidyelew INTERNATIONAL LIVESTOCK RESEARCH INSTITUTE Discussion Paper No.

More information

ER IT RE A YEMEN SUDAN DJIBOUTI. Addis Ababa SOUTH SUDAN SOMALIA UGANDA. TIGRAY Mekele AFAR AMHARA. BENESHANGUL GUMU Asosa OROMIA SOMALI SNNPR.

ER IT RE A YEMEN SUDAN DJIBOUTI. Addis Ababa SOUTH SUDAN SOMALIA UGANDA. TIGRAY Mekele AFAR AMHARA. BENESHANGUL GUMU Asosa OROMIA SOMALI SNNPR. Ethiopia: Dashboard - Sector Response and Contextual Indicators (ember 6) The Agriculture sector started delivering seeds from mid-il for the meher season planting, which took place from e to September.

More information

Oahu Wind Integration Study

Oahu Wind Integration Study Oahu Wind Integration Study May 2, 2011 Honolulu, HI Rick Rocheleau Hawaii Natural Energy Institute Hawaiian Electric Company GE Energy U.S. Department of Energy Hawaii Island Integration Studies HIIS

More information

Economic evaluation of the proposed alternatives of inter-basin water transfer from the Baro Akobo to Awash basin in Ethiopia

Economic evaluation of the proposed alternatives of inter-basin water transfer from the Baro Akobo to Awash basin in Ethiopia Sustain. Water Resour. Manag. (2016) 2:313 330 DOI 10.1007/s40899-016-0058-3 ORIGINAL ARTICLE Economic evaluation of the proposed alternatives of inter-basin water transfer from the Baro Akobo to Awash

More information

Procurement Plan -Consultancy

Procurement Plan -Consultancy Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Country/Organization:Ethiopia-EEPCO Project/Program: ELECTRICITY NETWORK REINFOCEMENT

More information

Protection of Basic Services (PBS) Piloting Social Accountability in Ethiopia.

Protection of Basic Services (PBS) Piloting Social Accountability in Ethiopia. 1 Protection of Basic Services (PBS) Piloting Social Accountability in Ethiopia www.ethiosap.org 2 Social Accountability - anchored in the Constitution Constitution of the Federal Democratic Republic of

More information

COUNTRY REVIEW / SMARTFISH PROGRAMME / ETHIOPIA. Fisheries in the ESA-IO Region: Profile and Trends COUNTRY REVIEW 2014 ETHIOPIA

COUNTRY REVIEW / SMARTFISH PROGRAMME / ETHIOPIA. Fisheries in the ESA-IO Region: Profile and Trends COUNTRY REVIEW 2014 ETHIOPIA COUNTRY REVIEW / SMARTFISH PROGRAMME / ETHIOPIA Fisheries in the ESA-IO Region: Profile and Trends COUNTRY REVIEW 2014 ETHIOPIA COUNTRY REVIEW / SMARTFISH PROGRAMME / ETHIOPIA Breuil, Christophe. Grima,

More information

March Prepared for: The Ministry of Economy, Trade and Industry

March Prepared for: The Ministry of Economy, Trade and Industry STUDY ON ECONOMIC PARTNERSHIP PROJECTS IN DEVELOPING COUNTRIES IN FY2009 STUDY ON GEOTHERMAL POWER DEVELOPMENT PROJECT IN THE ALUTO LANGANO FIELD, ETHIOPIA FINAL REPORT March 2010 Prepared for: The Ministry

More information

Model-Based Optimization for Operating the Ethiopian Renaissance Dam on the Blue Nile River

Model-Based Optimization for Operating the Ethiopian Renaissance Dam on the Blue Nile River Model-Based Optimization for Operating the Ethiopian Renaissance Dam on the Blue Nile River Abbas M. Sharaky, Khaled H. Hamed, and Ahmed B. Mohamed Contents 1 Introduction 2 Problem Statement 3 Objectives

More information

Green Mini Grid Market Development Programme SEforALL Africa Hub African Development Bank

Green Mini Grid Market Development Programme SEforALL Africa Hub African Development Bank Green Mini Grid Market Development Programme SEforALL Africa Hub African Development Bank Mini Grid Market Opportunity Assessment: Ethiopia April 2017 Prepared by UNEP List of Acronyms AETDPD Alternative

More information

GHG Accounting for Electricity Transmission and Distribution Projects

GHG Accounting for Electricity Transmission and Distribution Projects GHG Accounting for Electricity Transmission and Distribution Projects Marcelino Madrigal Sr. Energy Specialist, ETWEN The World Bank Randal Spalding-Fecher Pöyry Energy Management Consulting June 2010

More information

International Power Summit Rome 2017

International Power Summit Rome 2017 International Power Summit Rome 2017 Rome: 23-24 February 2017 By: Eng. S.Mohamad ALAYA Member of Generation and Panning Committee at Arab Union Of Electricity Trends, Visions and challenges for the power

More information

A farming system framework for investment planning and priority setting in Ethiopia

A farming system framework for investment planning and priority setting in Ethiopia A farming system framework for investment planning and priority setting in Ethiopia ACIAR TECHNICAL REPORTS 90 A farming system framework for investment planning and priority setting in Ethiopia Tilahun

More information

A COMPARATIVE ANALYSIS: THE SUSTAINABLE DEVELOPMENT IMPACT OF TWO WIND FARMS IN ETHIOPIA

A COMPARATIVE ANALYSIS: THE SUSTAINABLE DEVELOPMENT IMPACT OF TWO WIND FARMS IN ETHIOPIA YANNING CHEN A COMPARATIVE ANALYSIS: THE SUSTAINABLE DEVELOPMENT IMPACT OF TWO WIND FARMS IN ETHIOPIA WORKING PAPER 7 November 2016 SAIS China-Africa Research Initiative Working Paper Series Abstract This

More information

At the close of the last millennium, Ethiopia

At the close of the last millennium, Ethiopia WATER SECTOR DEVELOPMENT PROGRAM Chapter 6 Irrigation Development Program At the close of the last millennium, Ethiopia was irrigating fewer than 00,000 hectares (ha) of farmland, although a total of.7

More information

A Review of Distributed Generation Technologies And Their Applicability in Ethiopia

A Review of Distributed Generation Technologies And Their Applicability in Ethiopia Western Michigan University ScholarWorks at WMU International Conference on African Development Archives Center for African Development Policy Research 8-2001 A Review of Distributed Generation Technologies

More information

The Geothermal Exploration Project Geothermal Development in East African Rift Valley Countries

The Geothermal Exploration Project Geothermal Development in East African Rift Valley Countries The Geothermal Exploration Project Geothermal Development in East African Rift Valley Countries Jointly funded by the Icelandic International Development Agency (ICEIDA) and the Nordic Development Fund

More information

Water-Irrigation for Food Security in Amhara National Regional State

Water-Irrigation for Food Security in Amhara National Regional State Water-Irrigation for Food Security in Amhara National Regional State Mamaru Tsediku Head, Bureau of Water Resources Development e-mail: mamtesd@yahoo.com, Cell: +251918340252 Bahir Dar/Ethiopia 1. Introduction

More information

Energy Efficiency in Ethiopia Planning and Goals

Energy Efficiency in Ethiopia Planning and Goals USAID/NARUC/Ethiopia Bilateral Partnership Exchange Energy Efficiency in Ethiopia Planning and Goals Addis Ababa, Ethiopia 10 th December 2014 EEA Ethiopian Energy Authority 1 Presentation Outline The

More information

Document Version Publisher s PDF, also known as Version of Record (includes final page, issue and volume numbers)

Document Version Publisher s PDF, also known as Version of Record (includes final page, issue and volume numbers) Ethiopian power grid Gärtner, H.J.; Stamps, A.M.J.P. Published: 01/01/2014 Document Version Publisher s PDF, also known as Version of Record (includes final page, issue and volume numbers) Please check

More information

Document Version Publisher s PDF, also known as Version of Record (includes final page, issue and volume numbers)

Document Version Publisher s PDF, also known as Version of Record (includes final page, issue and volume numbers) Ethiopian power grid Gärtner, H.J.; Stamps, A.M.J.P. Published: 01/01/2014 Document Version Publisher s PDF, also known as Version of Record (includes final page, issue and volume numbers) Please check

More information

South Asia Energy Security : Challenges And Opportunities

South Asia Energy Security : Challenges And Opportunities South Asia Energy Security : Challenges And Opportunities Dr Bhupendra Kumar Singh Confederation of Indian Industry South Asia Energy Security South Asia energy security emanates from the growing imbalance

More information

A Review of Distributed Generation Technologies And Their Applicability in Ethiopia

A Review of Distributed Generation Technologies And Their Applicability in Ethiopia A Review of Distributed Generation Technologies And Their Applicability in Ethiopia Haeran Fisseha, IONA Corporation, Mountain View, CA hfisseha@iona.com Yared Mengistu GM Powertrain, Wixom, MI ymengistu@yahoo.com

More information

Country Presentation Bangladesh

Country Presentation Bangladesh Country Presentation Bangladesh Mohammad Hossain Director General Power Cell 2 Bangladesh At a Glance Official Name Political System Population Area Time Zone : People s Republic of Bangladesh : Parliamentary

More information

Assessment of the Corridor Potentia l

Assessment of the Corridor Potentia l Assessment of the Corridor Potentia l Dolf Gielen Abu Dhabi, 22 June 2013 IRENA Africa Energy Pla nning Progra mme Inventory of existing power plant Projections of electricity demand and supply for 2030

More information

ETHIOPIA MONTHLY MARKET WATCH

ETHIOPIA MONTHLY MARKET WATCH ETHIOPIA MONTHLY MARKET Highlights Compared to 2013, country level general inflation rate increased by 9.1%; food inflation by 8% and non-food by 10.3%. Of the food index components, higher increase in

More information

SREP/SC.IS.2/4 February 16, Intersessional Meeting of the SREP Sub-Committee Nairobi, Kenya March 8-9, Agenda Item 4 INVESTMENT PLAN

SREP/SC.IS.2/4 February 16, Intersessional Meeting of the SREP Sub-Committee Nairobi, Kenya March 8-9, Agenda Item 4 INVESTMENT PLAN SREP/SC.IS.2/4 February 16, 2012 Intersessional Meeting of the SREP Sub-Committee Nairobi, Kenya March 8-9, 2012 Agenda Item 4 INVESTMENT PLAN FOR ETHIOPIA Proposed Decision by SREP Sub-Committee The SREP

More information

Expand Win-Win Cooperation; Promote Sino-African Mutual Development

Expand Win-Win Cooperation; Promote Sino-African Mutual Development Expand Win-Win Cooperation; Promote Sino-African Mutual Development Wei Zhaofeng, Vice President, China Electricity Council Ladies and Gentlemen, Good afternoon! It is my pleasure to be a part of the 17

More information

Matthew P. McCartney a & Michael Menker Girma b a International Water Management Institute, Vientiane, Lao PDR

Matthew P. McCartney a & Michael Menker Girma b a International Water Management Institute, Vientiane, Lao PDR This article was downloaded by: [18.7.29.240] On: 30 September 2013, At: 17:43 Publisher: Routledge Informa Ltd Registered in England and Wales Registered Number: 1072954 Registered office: Mortimer House,

More information

UNM ME 217 Energy, Environment & Society. Renewable Energy and the Need for Energy Storage. November 8, 2011 Steve Willard, P.E

UNM ME 217 Energy, Environment & Society. Renewable Energy and the Need for Energy Storage. November 8, 2011 Steve Willard, P.E UNM ME 217 Energy, Environment & Society Renewable Energy and the Need for Energy Storage November 8, 2011 Steve Willard, P.E Renewable Energy and the Need for Energy Storage Where we get our energy from,

More information

Hydropower Potential and the Region s Rising Energy Demand

Hydropower Potential and the Region s Rising Energy Demand 0 Chapter 6 Hydropower Potential and the Region s Rising Energy Demand 120,000 100,000 80,000 60,000 40,000 20,000 2010 2015 2020 2025 2030 2035 2040 2045 163 KEY MESSAGES Power/electricity is a critical

More information

A Sustainable Development in the Mediterranean Area Basilica di San Giovanni Maggiore - Naples, By: Jamila Matar Director, Energy Department -LAS

A Sustainable Development in the Mediterranean Area Basilica di San Giovanni Maggiore - Naples, By: Jamila Matar Director, Energy Department -LAS AEIT annual International Conference 2015 A Sustainable Development in the Mediterranean Area Basilica di San Giovanni Maggiore - Naples, 14-16 October 2015 By: Jamila Matar Director, Energy Department

More information

Developing an Integrated Energy Model for the Eastern African Power Pool (EAPP)

Developing an Integrated Energy Model for the Eastern African Power Pool (EAPP) Developing an Integrated Energy Model for the Eastern African Power Pool (EAPP) Jarrad Wright PrEng MSc Energy Exemplar (Africa) (Pty) Ltd jarrad.wright@energyexemplar.com Outline Introduction The Energy

More information

Discussion on Remote Community Connection Concepts

Discussion on Remote Community Connection Concepts Discussion on Remote Community Connection Concepts February 1, 2012 Presentation Overview 1. Northwest Ontario First Nation Transmission Planning Committee Overview 2. Strategic energy supply options 3.

More information

COUNTRY OFFICE MONTHLY REPORT EMERGENCY AND HUMANITARIAN ACTION (EHA) / ETHIOPIA PROGRAMME. Month of September 2009

COUNTRY OFFICE MONTHLY REPORT EMERGENCY AND HUMANITARIAN ACTION (EHA) / ETHIOPIA PROGRAMME. Month of September 2009 WORLD HEALTH ORGANISATION Regional Office for Africa HIGH LIGHTS: COUNTRY OFFICE MONTHLY REPORT EMERGENCY AND HUMANITARIAN ACTION (EHA) / ETHIOPIA PROGRAMME Month of September 2009 According to official

More information

Solid waste management in Ethiopia

Solid waste management in Ethiopia 25th WEDC Conference Addis Ababa, Ethiopia, 1999 INTEGRATED DEVELOPMENT FOR WATER SUPPLY AND SANITATION Solid waste management in Ethiopia Yami Birke, Ethiopia THE BOOMING GROWTH of cities of the developing

More information

15 TH ANNUAL EAST AFRICAN POWER INDUSTRY CONVENTION

15 TH ANNUAL EAST AFRICAN POWER INDUSTRY CONVENTION 15 TH ANNUAL EAST AFRICAN POWER INDUSTRY CONVENTION Safari Park Hotel Nairobi, Kenya 10 th September, 2013 Development Plans and Goals for Energy Supply in East Africa: Making the Vision a Reality: The

More information

ESP ENERGY SYSTEM PLANNING (PTY) LTD COMPANY EXPERIENCE (PROJECTS) Cons ulting Group

ESP ENERGY SYSTEM PLANNING (PTY) LTD COMPANY EXPERIENCE (PROJECTS) Cons ulting Group ENERGY SYSTEM PLANNING (PTY) LTD COMPANY EXPERIENCE (PROJECTS) Suite 2B, 08 Arnold Road, Rosebank, 2196, Johannesburg, South Africa Tel: +27 11 447 9852; Website: http://www.espcg.com Transaction advisory

More information

Ethiopia s Water Security and the State of Water Resource Management

Ethiopia s Water Security and the State of Water Resource Management Ethiopia s Water Security and the State of Water Resource Management Tena Alamirew Water and Land Resource Centre (WLRC) Addis Ababa, Ethiopia tena.a@wlrc-eth.org 10th Alexander von Humboldt Conference

More information

BREAKING THE POVERTY CYCLE? Cash Distribution and Safety Nets in Ethiopia

BREAKING THE POVERTY CYCLE? Cash Distribution and Safety Nets in Ethiopia Three Asosa Metekel Kemash Bebig West Wellega Two One Siekicho Four Bench Illubabor Maji Keficho West North Gondar Agew South Gondar W.Gojjam E.Gojjam North West East Wellega Shewa Jima North Omo West

More information