If I can be of any assistance, please contact me at or (501)

Size: px
Start display at page:

Download "If I can be of any assistance, please contact me at or (501)"

Transcription

1 January 19, 2016 James Travis, Mill Manager West Fraser, Inc. PO Box 39 Mansfield, AR RE: Mansfield, a Division of West Fraser, Inc. Inspection (Scott Co) AFIN: NPDES Permit No.: AR Dear Mr. Travis: On December 29, 2015, I performed a Compliance Evaluation Inspection and an Industrial Stormwater Inspection of the above-referenced facility in accordance with the provisions of the Federal Clean Water Act, the Arkansas Water and Air Pollution Control Act, and the regulations promulgated thereunder. Copies of the inspection reports are enclosed for your records. Please refer to the Summary of Findings section of each of the attached inspection reports and provide a written response for each violation that was noted. This response should be mailed to the attention of the Water Division Inspection Branch at the address at the bottom of this letter or ed to Water-Inspection-Report@adeq.state.ar.us. This response should contain documentation describing the course of action taken to correct each item noted. This corrective action should be completed as soon as possible, and the written response with all necessary documentation (i.e., photos) is due by February 5, If I can be of any assistance, please contact me at mccabe@adeq.state.ar.us or (501) Sincerely, Kerri McCabe Inspector Supervisor Water Division cc: James Travis, Mill Manager, West Fraser, Inc., james.travis@westfraser.com Joey Henderson, EHS Supervisor, West Fraser, Inc., joey.henderson@westfraser.com Page 1 of 15

2 Inspection Report: Mansfield, a Division of West Fraser, Inc., AFIN: , Permit #: AR FACILITY INFORMATION NAME: Mansfield, a Division of West Fraser, Inc. LOCATION: 700 Hwy 71 South CITY: Mansfield, AR RESPONSIBLE OFFICIAL NAME: / TITLE James Travis / Mill Manager COMPANY: West Fraser, Inc. MAILING ADDRESS: PO Box 39 CITY, STATE, ZIP: Mansfield AR PHONE & EXT: / FAX: / WATER DIVISION INSPECTION REPORT AFIN: PERMIT #: AR DATE: 12/29/2015 COUNTY: 64 Scott PDS #: MEDIA: WN GPS LAT: LONG: LOCATION: Entrance FACILITY TYPE: 2 - Industrial FACILITY EVALUATION RATING: 2 - Marginal INSPECTION INFORMATION INSPECTOR ID#: S - State DATE(S): ENTRY TIME: EXIT TIME: 12/29/ :45 14:00 FAYETTEVILLE SHALE RELATED: N INSPECTION TYPE: Compliance Evaluation PERMIT EFFECTIVE DATE: 2/1/2010 PERMIT EXPIRATION DATE: 1/31/2017 FAYETTEVILLE SHALE VIOLATIONS: N INSPECTION PARTICIPANTS NAME/TITLE/PHONE/FAX/ /ETC.: James Travis/Mill Manager/(479) /james.travis@westfraser.com Joey Henderson/EHS Supervisor/(479) /joey.henderson@westfraser.com Alana Sullivan/District 4 Water Inspector james.travis@westfraser.com CONTACTED DURING INSPECTION: Yes AREA EVALUATIONS (S=Satisfactory, M=Marginal, U=Unsatisfactory, N=Not Applicable/Evaluated) S PERMIT U FLOW MEASUREMENT N STORMWATER M RECORDS/REPORTS S LABORATORY M FACILITY SITE REVIEW M OPERATION & MAINTENANCE M EFFLUENT/RECEIVING WATER M SELF-MONITORING PROGRAM M SAMPLING M SLUDGE HANDLING/DISPOSAL N PRETREATMENT ** OTHER: SUMMARY OF FINDINGS The following violations were noted during the inspection: 1.) Flow is not being measured at the frequency/type specified in the permit. Personnel are monitoring flow one month out of the quarter and reporting qualitative readings. The only flow data being supplied on DMRs are measured and reported when the contract lab collects samples of the discharge. This is a violation of Part I, Section A of the permit. Flow is to be monitored/measured five times per week and reported quantitatively in MGD. The type is instantaneous, which requires a means of measuring head and utilizing a formula to calculate flow. 2.) Two Total Suspended Solids (TSS) samples were collected in November, 2015 (November 5 and 16). The Monthly Average and Daily Max for TSS effluent limitations were exceeded for the quarter (see DMR calculation sheet). This is a violation of Part I, Section A of the permit. A Non-Compliance Report (NCR) is due to the Department with the 4Q 2015 DMR by Jan 25, ) The two-stage recirculating system utilized for wastewater treatment consists of two ponds. The depth of solids (mainly sediment) is unknown in the two ponds. Accumulation of solids in the ponds reduces retention time and design volume. This is a violation of Part II, Condition #3 of the permit. Solids accumulation should be managed to reduce pollution to waters of the State. 4.) The two ponds of the treatment system did not have adequate freeboard. This is a violation of Part II, Condition #5 of the permit. 5.) The following items violate Part III, Section B.1.A of the permit: Inspection Report Page 2 of 15

3 Inspection Report: Mansfield, a Division of West Fraser, Inc., AFIN: , Permit #: AR Vegetation and debris are built up in the outfall structure. The structure needs to be clean and free of vegetation/debris. Pond levees show signs of erosion particularly around the truck/equipment wash area. Levees need to be protected to reduce erosion. 6.) The Dissolved Oxygen (DO) sample for June 17, 2015 exceeded holding time. Per 40 CFR 136, DO is to be analyzed immediately. This is a violation of Part III, Section C.3 of the permit. The permittee needs to instruct the contract lab to utilize a field DO meter during sample collection or the permittee needs to purchase a DO meter for onsite analysis. 7.) The permittee did not have all required records onsite for review. Specifically, there were no Chain of Custody (COC) forms or lab analyses sheets provided by the contract lab. This is a violation of Part III, Section C.7 of the permit. The permittee has requested all required records from the contract lab and has supplied the requested documents to the inspector. The permittee must retain three (3) years of records onsite per Part III, Section C.7 of the permit. No further response required for this item. 8.) The contract lab is not completely filling out the COC forms with the information required by Part III, Section C.8.A F of the permit. Specifically, the June 17, 2015 COC is missing exact place and the November 5, 2015 COC is missing individual who performed the sampling/measuring, preservatives, and sample matrix. This is a violation of Part III, Section C.8 of the permit. Also, the permittee will need to review this section for records maintained onsite for flow and debris and incorporate any missing information into applicable forms. Please be advised that a DO sample was not collected or analyzed for in November, 2015 with the other sample parameters. Failure to sample/analyze for DO for 4Q 2015 is a violation of Part I, Section A of the permit. Permittee needs to update the contact information for the permit. Specifically, mailing address and contact phone number. Please submit updates and corrected information to the Water Division Permits Branch at Water-permit-application@adeq.state.ar.us. Inspection Report Page 3 of 15

4 Inspection Report: Mansfield, a Division of West Fraser, Inc., AFIN: , Permit #: AR GENERAL COMMENTS On Tuesday, Dec 29, 2015 I met with the above-mentioned inspection participants to conduct inspections of the facility s wastewater treatment pond and industrial stormwater program (separate report). Inspection consisted of a site assessment and a records review. Site assessment: Treatment consists of a two-stage recirculating system with a recirculating pond (0.023 acre; surface area) and a sedimentation pond (1.0 acre; surface area). Waste streams consist of wet-deck runoff, boiler blowdown, boiler water softener backwash, equipment wash water, and stormwater. A permit modification request was received by the Department Oct 2015 for the addition to discharge kiln condensate from the permitted outfall. The wastewater treatment system has primarily been used for stormwater runoff, and Mr. Travis stated that the wet-deck has not been used to wet stored lumber in several years. However, there are plans to begin utilizing the wet-deck in early The treatment system has no freeboard and was discharging via Outfall 001 during the inspection, and the depth of solids (mainly sediment) in the ponds is unknown. Vegetation of the levees was controlled, but erosion rills/gullies were noted along the interior levees. The outfall structure consists of a trapezoid weir plate with a 4 PVC pipe installed below the plate. Discharge from both the weir plate and PVC pipe flows to two rectangular weir plates downstream, which then flows to a manmade conveyance converging with Coop Creek. There was no staff gauge mounted at the outfall structure, and the contract lab is measuring head from the 4 PVC pipe and using it in conjunction with the Manning formula. Records review: Flow is not being measured at the frequency/type as outlined in Part I, Section A of the permit. Personnel are using a flow sheet one month out of the quarter and using a check mark to indicate qualitative flow (check mark means yes and line through space means no ). Debris is also being measured like this. There were no Chains of Custody (COCs) or lab analyses sheets available for review; however, Mr. Henderson contacted the lab and supplied the requested documents. There were minor issues noted with the contract lab s COCs. INSPECTOR S SIGNATURE: Kerri McCabe DATE: 1/19/2016 SUPERVISOR S SIGNATURE: Jason Bolenbaugh DATE: Inspection Report Page 4 of 15

5 Inspection Report: Mansfield, a Division of West Fraser, Inc., AFIN: , Permit #: AR SECTION A: PERMIT VERIFICATION PERMIT SATISFACTORILY ADDRESSES OBSERVATIONS S M U NA NE DETAILS: 1. CORRECT NAME AND MAILING ADDRESS OF PERMITTEE: Need to update mailing address to PO Box 39, Mansfield, AR Y N NA NE 2. NOTIFICATION GIVEN TO EPA/STATE OF NEW DIFFERENT OR INCREASED DISCHARGES: Increase from kiln condensate (Oct 2015). Y N NA NE 3. NUMBER AND LOCATION OF DISCHARGE POINTS AS DESCRIBED IN PERMIT: Y N NA NE 4. ALL DISCHARGES ARE PERMITTED: Y N NA NE SECTION B: RECORDKEEPING AND REPORTING EVALUATION RECORDS AND REPORTS MAINTAINED AS REQUIRED BY PERMIT S M U NA NE DETAILS: Facility uses contract lab for all sampling, analyses, and DMR reporting; all records from contract lab need to remain at facility. 1. ANALYTICAL RESULTS CONSISTENT WITH DATA REPORTED ON DMRS: Y N NA NE 2. SAMPLING AND ANALYSES DATA ADEQUATE AND INCLUDE: S M U NA NE a. DATES AND TIME(S) OF SAMPLING: Y N NA NE b. EXACT LOCATION(S) OF SAMPLING: Y N NA NE c. NAME OF INDIVIDUAL PERFORMING SAMPLING: Y N NA NE d. ANALYTICAL METHODS AND TECHNIQUES: Y N NA NE e. RESULTS OF CALIBRATIONS: Y N NA NE f. RESULTS OF ANALYSES: Y N NA NE g. DATES AND TIMES OF ANALYSES: Y N NA NE h. NAME OF PERSON(S) PERFORMING ANALYSES: Y N NA NE 3. LABORATORY EQUIPMENT CALIBRATION AND MAINTENANCE RECORDS ADEQUATE: S M U NA NE 4. PLANT RECORDS INCLUDE SCHEDULES, DATES OF EQUIPMENT MAINTENANCE AND REPAIR: S M U NA NE 5. EFFLUENT LOADINGS CALCULATED USING DAILY EFFLUENT FLOW AND DAILY ANALYTICAL DATA: Y N NA NE SECTION C: OPERATIONS AND MAINTENANCE TREATMENT FACILITY PROPERLY OPERATED AND MAINTAINED DETAILS: Two-stage recirculating system; recirculating pond and sedimentation pond. S M U NA NE 1. TREATMENT UNITS PROPERLY OPERATED: S M U NA NE 2. TREATMENT UNITS PROPERLY MAINTAINED: Solids depth is unknown in both ponds; inadequate depth can result in shortcircuiting and reduced retention time. Flow from recirculating pond is directly in front of outfall structure in sedimentation S M U NA NE pond. 3. STANDBY POWER OR OTHER EQUIVALENT PROVIDED: No mechanical parts. S M U NA NE 4. ADEQUATE ALARM SYSTEM FOR POWER OR EQUIPMENT FAILURES AVAILABLE: S M U NA NE 5. ALL NEEDED TREATMENT UNITS IN SERVICE: S M U NA NE 6. ADEQUATE NUMBER OF QUALIFIED OPERATORS PROVIDED: S M U NA NE 7. SPARE PARTS AND SUPPLIES INVENTORY MAINTAINED: S M U NA NE 8. OPERATION AND MAINTENANCE MANUAL AVAILABLE: Y N NA NE 9. STANDARD OPERATING PROCEDURES AND SCHEDULES ESTABLISHED: Y N NA NE 10. PROCEDURES FOR EMERGENCY TREATMENT CONTROL ESTABLISHED: Must maintain freeboard; ponds above freeboard limit. Y N NA NE 11. HAVE BYPASSES/OVERFLOWS OCCURRED AT THE PLANT OR IN THE COLLECTION SYSTEM IN THE LAST YEAR: Y N NA NE 12. IF SO, HAS THE REGULATORY AGENCY BEEN NOTIFIED: Y N NA NE 13. HAS CORRECTIVE ACTION BEEN TAKEN TO PREVENT ADDITIONAL BYPASSES/OVERFLOWS: Y N NA NE 14. HAVE ANY HYDRAULIC OVERLOADS OCCURRED AT THE TREATMENT PLANT: Y N NA NE 15. IF SO, DID PERMIT VIOLATIONS OCCUR AS A RESULT: Y N NA NE Inspection Report Page 5 of 15

6 Inspection Report: Mansfield, a Division of West Fraser, Inc., AFIN: , Permit #: AR SECTION D: SAMPLING PERMITTEE SAMPLING MEETS PERMIT REQUIREMENTS DETAILS: Contract lab conducts all sampling, analyses, and reporting of DMRs. S M U NA NE 1. SAMPLES TAKEN AT SITE(S) SPECIFIED IN PERMIT: Y N NA NE 2. LOCATIONS ADEQUATE FOR REPRESENTATIVE SAMPLES: Y N NA NE 3. FLOW PROPORTIONED SAMPLES OBTAINED WHEN REQUIRED BY PERMIT: Y N NA NE 4. SAMPLING AND ANALYSES COMPLETED ON PARAMETERS SPECIFIED IN PERMIT: No DO for Nov Y N NA NE 5. SAMPLING AND ANALYSES PERFORMED AT FREQUENCY SPECIFIED IN PERMIT: Flow is not being monitored or sampled at frequency/type specified in permit; facility personnel is monitoring one month out of the quarter and not reporting by quantitative Y N NA NE means. 6. SAMPLE COLLECTION PROCEDURES ADEQUATE: Y N NA NE a. SAMPLES REFRIGERATED DURING COMPOSITING: Y N NA NE b. PROPER PRESERVATION TECHNIQUES USED: Y N NA NE c. CONTAINERS AND SAMPLE HOLDING TIMES CONFORM TO 40 CFR 136: DO for June 2015 exceeded holding time of instantaneous. Y N NA NE 7. IF MONITORING IS PERFORMED MORE OFTEN THAN REQUIRED ARE RESULTS REPORTED ON THE DMR: TSS collected twice for Nov 2015; DMR is due by Jan 25, Y N NA NE SECTION E: FLOW MEASUREMENT PERMITTEE FLOW MEASUREMENT MEETS PERMIT REQUIREMENTS S M U NA NE DETAILS: Permittee is not measuring flow at frequency/type specified; recording is not quantitative. 1. PRIMARY FLOW MEASUREMENT DEVICE PROPERLY INSTALLED AND MAINTAINED: N TYPE OF DEVICE: Trapezoid weir (length unknown); 4 PVC pipe; rectangular weir with end contractions (length unknown); rectangular weir w/o end contractions (length unknown); no staff gauge. Vegetation/debris in weir boxes. 2. FLOW MEASURED AT EACH OUTFALL AS REQUIRED: Flow is being measured by contract lab when collecting samples; not at frequency/type specified in permit. Y N NA NE Y N NA NE 3. SECONDARY INSTRUMENTS (TOTALIZERS, RECORDERS, ETC.) PROPERLY OPERATED AND MAINTAINED: Y N NA NE 4. CALIBRATION FREQUENCY ADEQUATE: Y N NA NE 5. RECORDS MAINTAINED OF CALIBRATION PROCEDURES: Y N NA NE 6. CALIBRATION CHECKS DONE TO ASSURE CONTINUED COMPLIANCE: Y N NA NE 7. FLOW ENTERING DEVICE WELL DISTRIBUTED ACROSS THE CHANNEL AND FREE OF TURBULENCE: Vegetation/debris in weir boxes. Y N NA NE 8. FLOW MEASUREMENT EQUIPMENT ADEQUATE TO HANDLE EXPECTED RANGE OF FLOW RATES: Need to install staff gauge at each primary device. Y N NA NE 9. HEAD MEASURED AT PROPER LOCATION: Head measured at 4 PVC pipe; calculate flow (cfs) using Manning equation. Y N NA NE SECTION F: LABORATORY PERMITTEE LABORATORY PROCEDURES MEET PERMIT REQUIREMENTS S M U NA NE DETAILS: Contract lab conducts all sampling, analyses, and reporting of DMRs. 1. EPA APPROVED ANALYTICAL PROCEDURES USED (40 CFR FOR LIQUIDS, 503.8(B) FOR SLUDGES): DO for June 2015 exceeded holding time. Y N NA NE 2. IF ALTERNATIVE ANALYTICAL PROCEDURES ARE USED, PROPER APPROVAL HAS BEEN OBTAINED: Y N NA NE 3. SATISFACTORY CALIBRATION AND MAINTENANCE OF INSTRUMENTS AND EQUIPMENT: Y N NA NE 4. QUALITY CONTROL PROCEDURES ADEQUATE: Y N NA NE 5. DUPLICATE SAMPLES ARE ANALYZED >10% OF THE TIME: Y N NA NE 6. SPIKED SAMPLES ARE ANALYZED >10% OF THE TIME: Y N NA NE 7. COMMERCIAL LABORATORY USED: Y N NA NE a. LAB NAME: Data Testing, Inc. b. LAB ADDRESS: 3434 Country Club, Fort Smith, AR c. PARAMETERS PERFORMED: Flow, COD, TSS, Temp, Debris, DO, O&G, and ph 8. BIOMONITORING PROCEDURES ADEQUATE: Y N NA NE a. PROPER ORGANISMS USED: Y N NA NE b. PROPER DILUTION SERIES FOLLOWED: Y N NA NE c. PROPER TEST METHODS AND DURATION: Y N NA NE d. RETESTS AND/OR TRE PERFORMED AS REQUIRED: Y N NA NE Inspection Report Page 6 of 15

7 Inspection Report: Mansfield, a Division of West Fraser, Inc., AFIN: , Permit #: AR SECTION G: EFFLUENT/RECEIVING WATERS OBSERVATIONS BASED ON VISUAL OBSERVATIONS ONLY S M U NA NE DETAILS: Discharging from 4 PVC pipe below trapezoid weir; low flow. OUTFALL #: OIL SHEEN GREASE TURBIDITY VISIBLE FOAM FLOATING SOLIDS COLOR OTHER 001 NO NO YES NO YES BROWN LOW FLOW SECTION H: SLUDGE DISPOSAL SLUDGE DISPOSAL MEETS PERMIT REQUIREMENTS S M U NA NE DETAILS: Depth of solids (mainly sediment) is unknown; can affect retention time and design volume. 1. SLUDGE MANAGEMENT ADEQUATE TO MAINTAIN EFFLUENT QUALITY: S M U NA NE 2. SLUDGE RECORDS MAINTAINED AS REQUIRED BY 40 CFR 503: S M U NA NE 3. FOR LAND APPLIED SLUDGE, TYPE OF LAND APPLIED TO: (E.G., FOREST, AGRICULTURAL, PUBLIC CONTACT SITE): N/A SECTION I: SAMPLING INSPECTION PROCEDURES SAMPLE RESULTS WITHIN PERMIT REQUIREMENTS S M U NA NE DETAILS: 1. SAMPLES OBTAINED THIS INSPECTION: Y N NA NE 2. TYPE OF SAMPLE: GRAB: COMPOSITE: METHOD: FREQUENCY: 3. SAMPLES PRESERVED: Y N NA NE 4. FLOW PROPORTIONED SAMPLES OBTAINED: Y N NA NE 5. SAMPLE OBTAINED FROM FACILITY'S SAMPLING DEVICE: Y N NA NE 6. SAMPLE REPRESENTATIVE OF VOLUME AND NATURE OF DISCHARGE: Y N NA NE 7. SAMPLE SPLIT WITH PERMITTEE: Y N NA NE 8. CHAIN-OF-CUSTODY PROCEDURES EMPLOYED: Y N NA NE 9. SAMPLES COLLECTED IN ACCORDANCE WITH PERMIT: Y N NA NE SECTION J: STORM WATER POLLUTION PREVENTION PLAN STORM WATER MANAGEMENT MEETS PERMIT REQUIREMENTS S M U NA NE DETAILS: Part II, Condition #3 requires BMPs; stormwater inspected under ARR00A SWPPP UPDATED AS NEEDED: DATE OF LAST UPDATE: Y N NA NE 2. SITE MAP INCLUDING ALL DISCHARGES AND SURFACE WATERS: Y N NA NE 3. POLLUTION PREVENTION TEAM IDENTIFIED: Y N NA NE 4. POLLUTION PREVENTION TEAM PROPERLY TRAINED: Y N NA NE 5. LIST OF POTENTIAL POLLUTANT SOURCES: Y N NA NE 6. LIST OF POTENTIAL SOURCES AND PAST SPILLS AND LEAKS: Y N NA NE 7. ALL NON-STORM WATER DISCHARGES ARE AUTHORIZED: Y N NA NE 8. LIST OF STRUCTURAL BMPS: Y N NA NE 9. LIST OF NON-STRUCTURAL BMPS: Y N NA NE 10. BMPS PROPERLY OPERATED AND MAINTAINED: Y N NA NE 11. INSPECTIONS CONDUCTED AS REQUIRED: Y N NA NE Inspection Report Page 7 of 15

8 Inspection Report: Mansfield, a Division of West Fraser, Inc., AFIN: , Permit #: AR DMR Calculation Check Reporting Period: From To Year Month Day Year Month Day Parameter Checked: Oil & Grease Loading Concentration Mass (lbs/day) (mg/l) Mo Avg / Daily Max Mo Avg Daily Max Reported Value: <0.003 / <0.003 <1.4 <1.4 Calculated Value: / Permit Value: 10 / If calculated value does not equal reported value, explain: Used Daily Max flow provided by contract lab for Loading = 1.4 mg/l x MGD x 8.34 = lbs/day. Used Mo Avg flow provided by contract lab for Loading = 1.4 mg/l x MGD x 8.34 = lbs/day. Inspection Report Page 8 of 15

9 Inspection Report: Mansfield, a Division of West Fraser, Inc., AFIN: , Permit #: AR DMR Calculation Check Reporting Period: From To Year Month Day Year Month Day Parameter Checked: TSS Loading Concentration Mass (lbs/day) (mg/l) Mo Avg / Daily Max Mo Avg Daily Max Reported Value: N/A / N/A Calculated Value: N/A / N/A Permit Value: N/A / N/A If calculated value does not equal reported value, explain: DMR is due to the Department by Jan 25, 2016; two TSS samples collected for Nov Concentration Mo Avg = /2 = mg/l. This is an effluent limitation exceedance and requires a Noncompliance Report to be submitted with DMR. Inspection Report Page 9 of 15

10 Inspection Report: Mansfield, a Division of West Fraser, Inc., AFIN: , Permit #: AR Water Division Photographic Evidence Sheet Location: Mansfield, a Division of West Fraser, Inc. Photographer: Kerri McCabe Date: Dec 29, 2015 Time: 11:13 Witness: Alana Sullivan Photo #: 1 Description: Outfall structure; series of weirs with a 4 PVC pipe at bottom of trapezoid weir. Photographer: Kerri McCabe Date: Dec 29, 2015 Time: 11:16 Witness: Alana Sullivan Photo #: 2 Description: Sedimentation pond; note lack of freeboard and general turbidity of water. Inspection Report Page 10 of 15

11 Inspection Report: Mansfield, a Division of West Fraser, Inc., AFIN: , Permit #: AR Water Division Photographic Evidence Sheet Location: Mansfield, a Division of West Fraser, Inc. Photographer: Kerri McCabe Date: Dec 29, 2015 Time: 11:16 Witness: Alana Sullivan Photo #: 3 Description: Sedimentation pond looking toward truck/equipment wash area. Photographer: Kerri McCabe Date: Dec 29, 2015 Time: 11:21 Witness: Alana Sullivan Photo #: 4 Description: Recirculating pond discharges to sedimentation pond via pipe directly in front of outfall structure. Inspection Report Page 11 of 15

12 Inspection Report: Mansfield, a Division of West Fraser, Inc., AFIN: , Permit #: AR Water Division Photographic Evidence Sheet Location: Mansfield, a Division of West Fraser, Inc. Photographer: Alana Sullivan Date: Jan 6, 2016 Time: 9:42 Witness: Joey Henderson Photo #: 5 Description: Wash bay for truck/equipment washing; built to discharge directly to sedimentation pond. Photographer: Alana Sullivan Date: Jan 6, 2016 Time: 9:44 Witness: Joey Henderson Photo #: 6 Description: Slots to discharge to sedimentation pond. Inspection Report Page 12 of 15

13 Inspection Report: Mansfield, a Division of West Fraser, Inc., AFIN: , Permit #: AR Water Division Photographic Evidence Sheet Location: Mansfield, a Division of West Fraser, Inc. Photographer: Alana Sullivan Date: Jan 6, 2016 Time: 9:44 Witness: Joey Henderson Photo #: 7 Description: Erosion caused by runoff from wash bay. Photographer: Alana Sullivan Date: Jan 6, 2016 Time: 9:44 Witness: Joey Henderson Photo #: 8 Description: Erosion caused by runoff from wash bay. Inspection Report Page 13 of 15

14 Inspection Report: Mansfield, a Division of West Fraser, Inc., AFIN: , Permit #: AR Water Division Photographic Evidence Sheet Location: Mansfield, a Division of West Fraser, Inc. Photographer: Alana Sullivan Date: Jan 6, 2016 Time: 9:43 Witness: Joey Henderson Photo #: 9 Description: Cleaner/degreaser used for truck/equipment wash; SDS provided. Inspection Report Page 14 of 15

15 Inspection Report: Mansfield, a Division of West Fraser, Inc., AFIN: , Permit #: AR Figure 1. Google Earth image dated Oct 5, 2013 showing major structures of the treatment system at West Fraser, Inc. Mansfield. Inspection Report Page 15 of 15

16 McConnell, Melissa From: Sent: To: Cc: Subject: Attachments: McCabe, Kerri Wednesday, December 30, :59 PM Sullivan, Alana West Fraser, Inc. - Mansfield Plant Info outfall_modification_form.pdf Mr. Travis and Mr. Henderson, It was nice to meet you two yesterday. I am including some info to clarify my inspections: AR ) Flow should be measured five times per week (per Part I, Sec A of the individual permit). You will need to verify how and where the contract lab is measuring flow. Flow is not measured qualitatively (as in YES/NO). It is to be represented in MGD. The lab should supply you their justification. Since there is an overflow pipe installed below the trapezoid weir, flow will need to be measured at the rectangular weir that is directed in the same direction as the stream channel. I suggest a mounted staff gauge for easier measuring and viewing. The form used by the facility contains all required info. Please start keeping one of these for every month regardless of discharge. Report No Discharge when there is no flow at the weir. This is a link to a flow measuring mobile app: calculation app for ios and android/ 2.) Copies of the Chains of Custody (COCs) must be supplied and retained onsite for inspection. You need to contact your contract lab and have them supply the last three (3) years of COCs for your records and to start supplying them from this moment forward. For my inspection report, I need COCs for the June 2015 Pond Discharge, Nov 2015 Pond Discharge (2), and Nov 2015 Stormwater sample events. Please have Data Testing, Inc. supplies those to you. 3.) BMPs referenced in Part II, Cond 3 are going to be addressed in the IGP inspection. ARR00A473 The biggest concern to address for this inspection is identifying all outfalls to the stream that runs through the property. I have included an Outfall Modification form. You will need to identify where any water from your facility enters the creek. Start upstream (east side of the property) and work your way downstream (west side of the property). Decide what is to be considered similar and what is not based on what the stormwater is exposed to; sample accordingly. Once outfalls are identified, you will need to implement structural controls and/or behavioral practices at these areas. For this facility, minimizing exposure by asphalting/paving/concreting high traffic areas is an excellent idea. Most of the issues that are contributing to benchmark exceedances for COD/TSS are sediment and woody debris. If you have any questions, feel free to contact me. I have to have the report submitted by Jan 10, 2016 for review/process. You should have it before that timeframe. Thank you. 1

17 Kerri McCabe Inspector Supervisor ADEQ Water Division Field Services Inspection Branch Office (501) Work Cell (501) Fax (501) Northshore Drive North Little Rock, AR

18 OUTFALL MODIFICATION FORM The enclosed form may be used to request modifications of outfalls covered under NPDES general permit ARR for discharges of stormwater associated with industrial activity (except from construction activity). The numbering of outfalls should be sequential and begin with Outfall 001 (i.e. if Outfall 001 is deleted, Outfall 002 will become Outfall 001). Attach additional pages to modify more than one outfall. Outfall Modification Type: Add (Skip Section II) Remove (Skip Section III) Move Permit Tracking No. ARR00 AFIN: I. FACILITY INFORMATION: Permittee: Contact Name: Facility Name: Phone Number: Facility City: Zip: Address: Mailing Address: City: State: Zip: II. CURRENT OUTFALL INFORMATION: Outfall: Outfall Latitude: degrees minutes seconds Outfall Longitude: degrees minutes seconds Receiving Stream: III. NEW OUTFALL INFORMATION: Outfall: Outfall Latitude: degrees minutes seconds Outfall Longitude: degrees minutes seconds Receiving Stream: IV. CONSULTANT INFORMATION (if applicable): Consultant Contact Name: Consultant Phone Number: Company: Address: V. SIGNATORY REQUIREMENTS: I certify under penalty of law that this document and all attachments were prepared under my direction, or supervision, in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Responsible/Cognizant Official Printed Name: Title: Responsible/Cognizant Official Signature: Date: ATTACH A SITE MAP SHOWING THE NAME AND LOCATION OF EVERY OUTFALL THAT WILL BE COVERED UNDER YOUR EXISTING GENERAL PERMIT AFTER THIS MODIFICATION. ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY 5301 NORTHSHORE DRIVE / NORTH LITTLE ROCK / ARKANSAS / TELEPHONE / FAX

19 McConnell, Melissa From: Sent: To: Subject: McCabe, Kerri Wednesday, December 30, :02 PM List of Certified Contract Labs Mr. Travis, Since you asked about labs yesterday, I am including a link to the list of certified labs. Kerri McCabe Inspector Supervisor ADEQ Water Division Field Services Inspection Branch Office (501) Work Cell (501) Fax (501) Northshore Drive North Little Rock, AR

20 McConnell, Melissa From: Sent: To: Subject: Attachments: Joey Henderson Wednesday, January 06, :58 AM McCabe, Kerri; SDS for vehicle wash XL pdf Joey Henderson Environmental Health & Safety West Fraser Mansfield EOP This message and any attachments are confidential. Any dissemination or use of this information by a person other than the intended recipient is unauthorized. If you are not the intended recipient, please notify me by return , do not open any attachment and delete this communication and any copy. Thank you 1

21

22

23

24

25

26

27

28

29

30

31

32

33

34 March 8, 2016 James Travis, Mill Manager West Fraser, Inc. PO Box 39 Mansfield, AR RE: Response to Inspections (Scott Co) AFIN: NPDES Permit No.: AR ARR00A473 Dear Mr. Travis: I have reviewed the response pertaining to my December 29, 2015 inspections of the Mansfield, a Division of West Fraser, Inc. facility. The information provided sufficiently addresses the violations referenced in my inspection reports. At this time, the Department has no further comment concerning these particular inspections. Acceptance of this response by the Department does not preclude any future enforcement action deemed necessary at this site or any other site. Please be advised regarding the Corrective Action Plan (CAP) for permit ARR00A473, the CAP is not a working document. It is to be implemented within 30 days of a benchmark exceedance per Part of the general permit. Best Management Practices (BMPs) are to be constantly evaluated for effectiveness, and parameter benchmark exceedances are indications that the SWPPP needs to be reevaluated and BMPs improved. If we need further information concerning this matter, we will contact you. Thank you for your attention to this matter. Should you have any questions, feel free to contact me at (501) or you may me at mccabe@adeq.state.ar.us. Sincerely, Kerri McCabe Inspector Supervisor Water Division

35 From: To: Subject: Date: Attachments: McCabe, Kerri McConnell, Melissa FW: West Fraser Friday, March 18, :24:40 AM image001.png Melissa, Please attach this to WID Thank you. Kerri McCabe Inspector Supervisor ADEQ Water Division Field Services Inspection Branch Office (501) Work Cell (501) Fax (501) Northshore Drive North Little Rock, AR From: Pennye Bray Sent: Friday, March 18, :27 AM To: McCabe, Kerri Cc: Dannia Wilson Subject: RE: West Fraser Ms. McCabe, I do not believe they are installing a collection system to the pond. It is my understanding that they are tying into existing pipelines but I will check, thanks for the heads up on that. We have actually already submitted a modification application to add the discharge to the permitted sources. Pennye From: McCabe, Kerri [mailto:mccabe@adeq.state.ar.us] Sent: Friday, March 18, :22 AM To: Pennye Bray <PBray@ecci.com> Cc: Dannia Wilson <DWilson@ecci.com>; McWilliams, Clark <mcwilliamsc@adeq.state.ar.us> Subject: RE: West Fraser

36 Ms. Bray, Thank you for your attention to this matter and for assisting West Frasher, Inc. (Mansfield). I will forward this information to the Permits Branch because Ms. Casey Vickerson is no longer with the Department, and the facility may have been assigned a new Permit Engineer. Please be advised that if the facility is installing a collection system from the new kiln area to the wastewater treatment pond (wet deck pond) it may need to be included with the State Construction permit (modification). I have copied Mr. Clark McWilliams if you have any direct questions or comments concerning this aspect of the inspection. Thank you again, Kerri McCabe Inspector Supervisor ADEQ Water Division Field Services Inspection Branch Office (501) Work Cell (501) Fax (501) Northshore Drive North Little Rock, AR From: Pennye Bray [mailto:pbray@ecci.com] Sent: Friday, March 18, :14 AM To: McCabe, Kerri Cc: Dannia Wilson Subject: West Fraser Good Morning Ms. McCabe, I am working with West Fraser to assist them in complying with the corrective actions developed in response to the findings of your inspection conducted on December 29, I wanted to provide a progress report for your records. The preliminary design drawings for the outfall redesign and berm stabilization to provide the required retention time and freeboard have been delivered to West Fraser for their review. We anticipate that they will approve the design early next week and then we will complete the NPDES Construction Permit Application. We anticipate that the application will be submitted to ADEQ by the March 31, 2016 date we included in the compliance schedule. Please feel free to call me with any questions that you may have regarding the project.

37 Sincerely, Pennye L. Bray Senior Project Manager ECCI Cantrell Road Little Rock, AR (501) Phone (501) Fax

September 26, RE: Waste Water Treatment System. Dear Mr. Starks:

September 26, RE: Waste Water Treatment System. Dear Mr. Starks: September 26, 2008 Leon Starks, Director of Maintenance Arkansas Department of Correction East Arkansas Regional Unit 7800 Correction Circle Pine Bluff, Arkansas 71603 RE: Waste Water Treatment System

More information

NPDES Permit No: AR , Routine Compliance Inspection

NPDES Permit No: AR , Routine Compliance Inspection May 26, 2009 Dallas Ray Goad, Superintendent City Of Bradford 308 B, W. Walnut St Bradford, AR 72020 AFIN: 73-00072 NPDES Permit No: AR0050911, Routine Compliance Inspection Dear Mr. Goad: On May 20, 2009,

More information

Custom Wood Recycling, Inc. Inspection (Yell Co) Permit No.: AR and ARR000421

Custom Wood Recycling, Inc. Inspection (Yell Co) Permit No.: AR and ARR000421 November 22, 2013 Tony Childers, President Custom Wood Recycling, Inc. P.O. Box 9 Centerville, AR 72833 RE: Custom Wood Recycling, Inc. Inspection (Yell Co) AFIN: 75-00315 Permit No.: AR0051195 and ARR000421

More information

February 17, Jon Myhre Enerco Operating Corporation 6237 Tulip Lane Dallas, TX Fouke # D-3 SWD System Inspection (Miller Co)

February 17, Jon Myhre Enerco Operating Corporation 6237 Tulip Lane Dallas, TX Fouke # D-3 SWD System Inspection (Miller Co) February 17, 2015 Jon Myhre Enerco Operating Corporation 6237 Tulip Lane Dallas, TX 75230 RE: Fouke # D-3 SWD System Inspection (Miller Co) AFIN: 46-00279 State Permit No.: 0572-WG-SW-2 Dear Mr. Myhre:

More information

Please refer to the Summary of Findings section of the attached inspection report and provide a written response for each violation that was noted.

Please refer to the Summary of Findings section of the attached inspection report and provide a written response for each violation that was noted. January 13, 2014 Mr. Joe Stewart, General Manager Valley View Golf Course, L.L.C. Washington County Property Improvements District #5 11520 Clubhouse Parkway Farmington, Arkansas 72730 RE: Reconnaissance

More information

If you have any questions please contact Richard Healey, Enforcement Branch Manager, at or

If you have any questions please contact Richard Healey, Enforcement Branch Manager, at or CERTIFIED MAIL: 9489 0090 0027 6022 2427 07 October 25, 2017 Pat Sanders, Property Owner Route 1 Box 238 Western Grove, AR 72685 RE: Reconnaissance Inspection (Newton County) AFIN: 51-00000 NPDES Permit

More information

James Ferrell 10/3/07 Page 2

James Ferrell 10/3/07 Page 2 October 15, 2007 James Ferrell 103 Sandal Court Hot Springs, Arkansas 71913 RE: Construction Site at 5552 Central Avenue NPDES Permit No.: ARR150000 Dear Mr. Ferrell: On October 8, 2007,, I performed a

More information

AFIN: PDS #: LABORATORY

AFIN: PDS #: LABORATORY NAME: Van Buren, City of WWTP - Main LOCATION: 1401 Port Road CITY: Van Buren NAME: / TITLE Steve Dufresne / COMPANY: Van Buren Municipal Utilities MAILING ADDRESS: PO Drawer 1269 CITY, STATE, ZIP: Van

More information

RE: AFIN: Permit Tracking No.: 0487-WG-SW-1

RE: AFIN: Permit Tracking No.: 0487-WG-SW-1 March 2, 2012 Mr. John R. Reynolds Dan Reynolds Company P. O. Box 457 Camden, AR 71701 RE: AFIN: 52-00598 Permit Tracking No.: 0487-WG-SW-1 Dear Mr. Reynolds: On, February 28, 2012, Chris Voss, ADEQ Inspector,

More information

ADEQ Water NPDES Inspection AFIN: «AFIN» Permit #: «Permit_»

ADEQ Water NPDES Inspection AFIN: «AFIN» Permit #: «Permit_» November 5, 2009 Mr. Charles Clark, Vice President Smackover, AR 71762 RE: Compliance Inspection AFIN: 70-00039 NPDES Permit No.: AR0000591 Dear Mr. Clark: On 10/15/2009, I performed an inspection of the

More information

RE: Complaint Investigation at Highway 282 near Mountainburg in Crawford County

RE: Complaint Investigation at Highway 282 near Mountainburg in Crawford County October 8, 2010 Mr. Jimmy Johnson, Engineer City of Fort Smith Utilities Department 3900 Kelley Highway Fort Smith, AR 72904 RE: Complaint Investigation at Highway 282 near Mountainburg in Crawford County

More information

Caterpillar Inc. North Little Rock is applying for coverage under the NPDES General Permit ARROOOOOO for stormwater discharge.

Caterpillar Inc. North Little Rock is applying for coverage under the NPDES General Permit ARROOOOOO for stormwater discharge. WLB&L CITERPILLAR. Justin R. Ganschow 9201 Faulkner Lake Rd., AR 72117 Office: (501)228-2764 Ganschow_Justin_R@cat.com Arkansas Department of Environmental Quality Permits Branch, Water Division 5301 Northshore

More information

RE: AFIN: PERMIT NO.: 0751-WG-SW-4 FACILITY: Squires SWD Facility/Jessica 1-4 SWDW COUNTY: Conway Co.

RE: AFIN: PERMIT NO.: 0751-WG-SW-4 FACILITY: Squires SWD Facility/Jessica 1-4 SWDW COUNTY: Conway Co. January 4, 2013 Billy Staton Terra Renewal, LLC 201 South Denver, Suite B Russellville, AR 72811 RE: AFIN: 15-00605 PERMIT NO.: 0751-WG-SW-4 FACILITY: Squires SWD Facility/Jessica 1-4 SWDW COUNTY: Conway

More information

The Solution to Pollution is Dilution

The Solution to Pollution is Dilution The Solution to Pollution is Dilution The cornerstone of surface water quality protection in the United States gave EPA the authority to implement pollution control programs and... established the basic

More information

PERMIT APPLICATION FOR RECLAIMED WATER REUSE (RWR)

PERMIT APPLICATION FOR RECLAIMED WATER REUSE (RWR) PERMIT APPLICATION FOR RECLAIMED WATER REUSE (RWR) ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION-MUNICIPAL SECTION PO BOX 301463 MONTGOMERY, ALABAMA 36130-1463 INSTRUCTIONS: APPLICATIONS

More information

RE: AFIN: Permit No.: 5025-W

RE: AFIN: Permit No.: 5025-W October 28, 2009 Billy Staton Terra Renewal Services, Inc. P.O. Box 3036 Russellville, AR 72811 RE: AFIN: 60-04274 Permit No.: 5025-W Dear Mr. Staton: On October 23, 2009, Eric Fleming and I performed

More information

STORM WATER PLAN (SWP) GUIDANCE TEMPLATE

STORM WATER PLAN (SWP) GUIDANCE TEMPLATE STORM WATER PLAN (SWP) GUIDANCE TEMPLATE Name of Facility: Address: Phone Number: Date: INTRODUCTION This Storm Water Plan (SWP) is written in accordance with the State of Delaware Regulations Governing

More information

August 6, James McClung, Owner JM Oilfield Services 4 Melody Lane Quitman, AR RE: Complaint. Dear Mr. McClung:

August 6, James McClung, Owner JM Oilfield Services 4 Melody Lane Quitman, AR RE: Complaint. Dear Mr. McClung: August 6, 2009 James McClung, Owner 4 Melody Lane Quitman, AR 72131 RE: Complaint Dear Mr. McClung: On July 31, 2009 I performed an investigation of your facility in response to a complaint. The complaint

More information

LOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum

LOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum LOUISIANA URBAN STORMWATER COALITION EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum SWPPP NOTIFICATION SIGN Post sign at entrance of site or areas where the public can easily access.

More information

Public Notice. Issuance of Industrial Waste Discharge Permit

Public Notice. Issuance of Industrial Waste Discharge Permit Public Notice Issuance of Industrial Waste Discharge Permit LASA s regulations [ 60-16 (I)(1)] require public notification of the issuance of Industrial Waste Discharge Permits. LASA publishes this notice

More information

Maryland Department of Environment Water Management Administration Compliance Program 1800 Washington Blvd, Baltimore, MD

Maryland Department of Environment Water Management Administration Compliance Program 1800 Washington Blvd, Baltimore, MD Maryland Department of Environment Water Management Administration Program 1800 Washington Blvd, Baltimore, MD 21230 410-537-3510 AI ID: 13670 Inspector: Brenden Hogan Site Name: Quarantine Road Municipal

More information

Pretreatment Streamlining Rule

Pretreatment Streamlining Rule Pretreatment Guidance 2 Final Pretreatment Streamlining Rule Statutory references: ORC 6111.03(Q) and 6111.042 Rule references: OAC 3745-3; 40 CFR 403 Ohio EPA, Division of Surface Water Revision 0, October

More information

Application for Renewal Industrial Wastewater Discharge Permit

Application for Renewal Industrial Wastewater Discharge Permit Application for Renewal Industrial Wastewater Discharge Permit An Application for Renewal for Industrial Wastewater Discharge Permit must be completed and submitted to the Industrial Pretreatment office

More information

ADEQ. Site Visit Report. Date of Site Visit: August 9,2012. Facility Name: Hot Spring Power Company. Permit Numbers: AR

ADEQ. Site Visit Report. Date of Site Visit: August 9,2012. Facility Name: Hot Spring Power Company. Permit Numbers: AR Date of Site Visit: August 9,2012 Facility Name: Hot Spring Power Company Permit Numbers: AR0049611 Site Visit Report Front Gate Coordinates: Latitude: 34 25' 48"; Longitude: 92 50' 03" Names and Numbers

More information

15-MM & 16-MA NOI and SWPPP Overview

15-MM & 16-MA NOI and SWPPP Overview Maryland Department of the Environment 15-MM & 16-MA NOI and SWPPP Overview General Permit for Mineral Mines, Concrete and Asphalt Plants (15MM / NPDES MDG49) and General Permit for Marinas (16MA / NPDES

More information

Public Notice. Issuance of Industrial Waste Discharge Permit

Public Notice. Issuance of Industrial Waste Discharge Permit Public Notice Issuance of Industrial Waste Discharge Permit LASA s regulations [ 60-16 (I)(1)] require public notification of the issuance of Industrial Waste Discharge Permits. LASA publishes this notice

More information

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN: 2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO. 0199-S3N-R3 AFIN: 35-00110 JANUARY 15, 2016 ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING

More information

MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT

MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT SUBMITTED BY: TREATMENT FACILITY: NPDES #: MUNICIPALITY: COUNTY: CONTACT PERSON: Responsible Official Title Telephone #: Fax #: Email Address:

More information

INDUSTRIAL USER WASTEWATER DISCHARGE PERMIT APPLICATION FORM

INDUSTRIAL USER WASTEWATER DISCHARGE PERMIT APPLICATION FORM Page 1 of 10 INDUSTRIAL USER WASTEWATER DISCHARGE PERMIT APPLICATION FORM S A N F R A N C I S C O P U B L I C U T I L I T I E S C O M M I S S I O N Wastewater Enterprise/Collection System Division 3801

More information

Water Quality Permitting Program Monitoring Matrix 1,2,3

Water Quality Permitting Program Monitoring Matrix 1,2,3 State of Oregon Department of Environmental Quality Water Quality Permitting Program Monitoring Matrix 1,2,3 ITEM OR PARAMETER Total Flow (influent and/or effluent) 4 Flow Meter Calibration 5 (influent

More information

Stormwater Construction General Permit CGP-2013

Stormwater Construction General Permit CGP-2013 Stormwater Construction General Permit CGP-2013 Stormwater Construction General Permit (CGP) Stormwater Outreach for Regional Municipalities MS4 Statewide Summit June 18, 2013 Prepared by Chris Henninger

More information

Form 2L - Land Application of Industrial Wastewater and/or Sludge

Form 2L - Land Application of Industrial Wastewater and/or Sludge Return to: Oklahoma Department of Environmental Quality Industrial Permits Section Water Quality Division 707. N. Robinson P.O. Box 1677 Oklahoma City, OK 73101-1677 Revised July 2016 Oklahoma DEQ Application

More information

WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR

WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR WELCOME TO THE CONSTRUCTION STORMWATER PERMIT WEBINAR All the documents shown today are in the MN Stormwater Manual on the page titled 2018 Construction Stormwater Permit Public Notice and Public Informational

More information

Storm Water Pollution Prevention Plan (SWPPP) for Small Construction Sites

Storm Water Pollution Prevention Plan (SWPPP) for Small Construction Sites for Small Construction Sites *(Please note this document is intended for guidance only and does not ensure permit compliance.) PROJECT NAME: Single Family Residence PROJECT SITE: XXXX Subdivision LOT #

More information

N.J.A.C. 7:14A-1 POLLUTANT DISCHARGE ELIMINATION SYSTEM SUBCHAPTER 21. REQUIREMENTS FOR INDIRECT USERS

N.J.A.C. 7:14A-1 POLLUTANT DISCHARGE ELIMINATION SYSTEM SUBCHAPTER 21. REQUIREMENTS FOR INDIRECT USERS N.J.A.C. 7:14A-1 POLLUTANT DISCHARGE ELIMINATION SYSTEM SUBCHAPTER 21. REQUIREMENTS FOR INDIRECT USERS Statutory authority: N.J.S.A. 13:1B-3 et seq., 13:1D-1 et seq., 13:1E-1 et seq., 26-2C-1 et seq.,

More information

City: Stormwaterville Zip Code: County: Addison. City: Stormwaterville Zip Code: County: Addison

City: Stormwaterville Zip Code: County: Addison. City: Stormwaterville Zip Code: County: Addison NOTICE OF INTENT TO USE GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II MUNICIPAL SEPARATE STORM SEWER SYSTEMS (RULE 62-621.300(7)(b), F.A.C.) For FDEP Internal Use Only Permit : FLR INSTRUCTIONS:

More information

NPDES/SDS Stormwater Permit Program for Construction Activity Inspection Report Corrective Actions. ( ) - ext. ( ) - ext. Owner Name Telephone Fax

NPDES/SDS Stormwater Permit Program for Construction Activity Inspection Report Corrective Actions. ( ) - ext. ( ) - ext. Owner Name Telephone Fax NPDES/SDS Stormwater Permit Program for Construction Activity Inspection Report Corrective Actions MPCA use only White-MPCA Canary-Site copy Delta record Project Name / Location MN R100001-C000 Stormwater

More information

EPA s 2015 Multi-Sector General Permit (MSGP)

EPA s 2015 Multi-Sector General Permit (MSGP) EPA s 2015 Multi-Sector General Permit (MSGP) August 13, 2015 Suzanne Warner U.S. EPA, Region 1 617-918-1383 warner.suzanne@epa.gov David Gray, P.E. U.S. EPA, Region 1 617-918-1577 gray.davidj@epa.gov

More information

General Permit No.: OHR Page 53 of 146

General Permit No.: OHR Page 53 of 146 Page 53 of 146 Part 8 Sector-Specific Requirements for Industrial Activity Subpart J Sector J Non-Metallic Mineral Mining and Dressing. You shall comply with Part 8 sector-specific requirements associated

More information

MEDIA: WN PDS #: LOCATION: Forrest City WWTP. System. of SFC 209 CITY: Forrest City, AR 8/1/20122 RESPONSIBL LE OFFICIAL 7/31/2017 PERMIT WATER

MEDIA: WN PDS #: LOCATION: Forrest City WWTP. System. of SFC 209 CITY: Forrest City, AR 8/1/20122 RESPONSIBL LE OFFICIAL 7/31/2017 PERMIT WATER AME: Forrest City WWTP LOCATIO: Approximately 3 miles West of Forrest City, at the end of SFC 209 CITY: Forrest City, AR 72336 AME: / TITLE W. H. Calvin Murdock, / Manager COMPAY: Forrest City WWTP MAILIG

More information

Notice of Violations and Intent to File Suit under the Federal Water Pollution Control Act

Notice of Violations and Intent to File Suit under the Federal Water Pollution Control Act VIA CERTIFIED MAIL RETURN RECEIPT REQUESTED Rick Mitchell, Plant Manager Douglas Fierce 15700 South McKinley Ave. Lathrop, CA 95330 Will Crenshaw, Chairman/CEO Casey Crenshaw, President Douglas Fierce

More information

Rainy Days Newsletter

Rainy Days Newsletter SCS Engineers - Your Protection from the Stormwater Permitting Storm Rainy Days Newsletter Welcome to the Rainy Days - SCS Engineers newsletter on everything Stormwater! We have shared some information

More information

Stormwater Pollution Prevention Plan for:

Stormwater Pollution Prevention Plan for: Stormwater Pollution Prevention Plan for: Lemon Creek Valley Juneau, Alaska Under the NPDES 2008 Multi-Sector General Permit for Stormwater Discharges Associated with Industrial Activities: Permit No.

More information

INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT We Protect Hoosiers and Our Environment.

INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT We Protect Hoosiers and Our Environment. INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT We Protect Hoosiers and Our Environment. 100 N. Senate Avenue Indianapolis, IN 46204 (800) 451-6027 (317) 232-8603 www.idem.in.gov Michael R. Pence Governor

More information

STORMWATER PROGRAM MANAGEMENT PLAN FOR TOWN OF CAPE ELIZABETH, MAINE

STORMWATER PROGRAM MANAGEMENT PLAN FOR TOWN OF CAPE ELIZABETH, MAINE I Bob STORMWATER PROGRAM MANAGEMENT PLAN FOR TOWN OF CAPE ELIZABETH, MAINE Permit Years 1through 5 (June 1, 2013 to June 1, 2018) Submitted to Maine DEP December 2013 Revised April 2014 Table of Contents

More information

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW SUBCHAPTER 8 STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW 7:45-8.1 Purpose and scope of review Except for those projects expressly exempted by this chapter or waived by the Commission, the Commission

More information

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR050000 Storm Water Pollution Prevention Plan Worksheet Instructions The TCEQ Small Business and Local Government Assistance

More information

Knowledge, Skills Abilities -- Gap Analysis Tool

Knowledge, Skills Abilities -- Gap Analysis Tool Environmental Compliance Inspector Grade I 101. Use, as directed, appropriate sampling locations, equipment and procedures; collect representative samples in accordance with the District's quality assurance

More information

.. / '\1 r.;... ~ -.. ~ /\ c~v TEXAS COMMISSION ON ENVIRONMENTAL QUALITY. Protecting Texas by Reducing and Preventing Pollution.

.. / '\1 r.;... ~ -.. ~ /\ c~v TEXAS COMMISSION ON ENVIRONMENTAL QUALITY. Protecting Texas by Reducing and Preventing Pollution. B1yan W. Shaw, Ph.D., P.E., Chairman Toby Baker, Commissioner Zak Covar, Commissioner Richard A. Hyde, P.E., Executive Director.. / ~ '\1 r.;... ~ -.. ~ /\ c~v TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

More information

Ceriodaphnia Chronic Whole Effluent Toxicity Test Report NPDES Permit Program

Ceriodaphnia Chronic Whole Effluent Toxicity Test Report NPDES Permit Program Ceriodaphnia Chronic Whole Effluent Toxicity Test Report NPDES Permit Program Doc Type: Effluent Limit Standards Review Please read all instructions carefully before completing each section of the report.

More information

Recycling And The New Virginia Stormwater Management Program Regulations VIRGINIA RECYCLING ASSOCIATION 2014 ANNUAL CONFERENCE

Recycling And The New Virginia Stormwater Management Program Regulations VIRGINIA RECYCLING ASSOCIATION 2014 ANNUAL CONFERENCE Recycling And The New Virginia Stormwater Management Program Regulations VIRGINIA RECYCLING ASSOCIATION 2014 ANNUAL CONFERENCE Agenda Overview of regulatory program Specific guidance on: Mulching Composting

More information

Stormwater Pollution Prevention Plan (SWPPP) For Single Family Residential Construction within a larger plan of development

Stormwater Pollution Prevention Plan (SWPPP) For Single Family Residential Construction within a larger plan of development COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Tel. (434) 296-5832 Fax (434) 972-4126 Stormwater Pollution Prevention Plan (SWPPP)

More information

New Division of Water Stormwater Regulations

New Division of Water Stormwater Regulations New Division of Water Stormwater Regulations General Permit for Stormwater Discharge in Kentucky KPDES No.: KYR000000 Handouts today: Copy of General Permit Notice of Intent Form Notice of Intent You are

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS SERIES 1 MISCELLANEOUS WATER POLLUTION CONTROL RULES 35-1. General. 1.1. Scope. -- This legislative

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

County: City: State: Zip: Phone#: Person Permit Issued To: Farm Physical Address: Phone#:

County: City: State: Zip: Phone#: Person Permit Issued To: Farm Physical Address: Phone#: PROGRAM YEAR 2011 GEORGIA DEPARTMENT OF AGRICULTURE LIVESTOCK/POULTRY FIELD FORCES AFO/CAFO INSPECTIONS NPDES D S CL GENERAL INFORMATION: Inspector's Name: Inspector's Number: GDA Est #: Landowner's Name:

More information

2008 ANNUAL ENGINEERING INSPECTION REPORT

2008 ANNUAL ENGINEERING INSPECTION REPORT 2008 ANNUAL ENGINEERING INSPECTION REPORT EMS Class 3T Landfill Permit #0269-S3T-R1 PREPARED FOR: Eaton-Moery Environmental Services 1784 Hwy. 1 North Wynne, Arkansas 72396 PREPARED BY: Fields & Associates,

More information

WASTEWATER DISCHARGE PERMIT APPLICATION SHORT FORM

WASTEWATER DISCHARGE PERMIT APPLICATION SHORT FORM WASTEWATER DISCHARGE PERMIT APPLICATION SHORT FORM * * * * * * * * * * * RETURN TO: NARRAGANSETT BAY COMMISSION PRETREATMENT SECTION 2 ERNEST STREET PROVIDENCE, RHODE ISLAND 02905 (401) 461-8848 (401)

More information

KANSAS STORMWATER 2016 ANNUAL REPORT FORM FOR MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4s)

KANSAS STORMWATER 2016 ANNUAL REPORT FORM FOR MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4s) KANSAS STORMWATER 2016 ANNUAL REPORT FORM FOR MUNICIPAL SEPARATE STORM SEWER SYSTEMS (MS4s) Permittee Information Check box if this is a new name, address, phone, etc. Permittee (Agency Name) Mailing Address

More information

Stormwater Management Program Plan (SWMPP) NPDES Permit ALR Revised May 31, Prepared By:

Stormwater Management Program Plan (SWMPP) NPDES Permit ALR Revised May 31, Prepared By: City of Fultondale 1210 Walker Chapel Road P.O. Box 699 Fultondale, Al 35068 Stormwater Management Program Plan () Revised May 31, 2017 Prepared By: 7110 University Court, Montgomery, Alabama 36117 (THIS

More information

Clean Water Act Industrial Stormwater Applicability Flowchart. July 2009

Clean Water Act Industrial Stormwater Applicability Flowchart. July 2009 Clean Water Act Industrial Stormwater Applicability Flowchart July 2009 Office of Compliance Office of Enforcement and Compliance Assurance U.S. Environmental Protection Agency 1200 Pennsylvania Avenue,

More information

Environmental Plans and Procedures

Environmental Plans and Procedures REDI ROCK Environmental Plans and Procedures OMM and SWPPP Permit # VAG110327 900 N Bayard Ave. Waynesboro, Va. 22980 Contents OMM... 2 O&M practices for wastewater treatment... 2 Chemical and material

More information

STATE OF MINNESOTA. Industrial Division. National Pollutant Discharge Elimination System (NPDES)/ State Disposal System (SDS) Permit MN

STATE OF MINNESOTA. Industrial Division. National Pollutant Discharge Elimination System (NPDES)/ State Disposal System (SDS) Permit MN DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT DRAFT STATE OF MINNESOTA Minnesota Pollution Control Agency Industrial Division National Pollutant Discharge Elimination System (NPDES)/ State Disposal System (SDS)

More information

Acute Whole Effluent Toxicity Test Report NPDES Permit Program

Acute Whole Effluent Toxicity Test Report NPDES Permit Program Acute Whole Toxicity Test Report NPDES Permit Program Doc Type: Limit Standards Review Please read all instructions carefully before completing each section of the report. Instructions are found on Page

More information

BASELINE MONITORING REPORT (BMR)

BASELINE MONITORING REPORT (BMR) BASELINE MONITORING REPORT (BMR) I. Company Information Centralized Waste Treatment (Part 437) Point Source Category Regulations (Please print or type) Name: Tel: ( ) Situs Address: Zip Mailing Address:

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED LESTER PRAIRIE WASTEWATER TREATMENT FACILITY EXPANSION

More information

VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION. FORM B - ANIMAL FEEDING OPERATIONS (AFOs)

VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION. FORM B - ANIMAL FEEDING OPERATIONS (AFOs) VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION FORM B - ANIMAL FEEDING OPERATIONS (AFOs) Department of Environmental Quality Rev. 02-2013 VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION FORM

More information

STORMWATER MANAGEMENT PROGRAM. Table of Contents

STORMWATER MANAGEMENT PROGRAM. Table of Contents STORMWATER MANAGEMENT PROGRAM Yakima Valley College March 1st, 0 1 0 1 Table of Contents INTRODUCTION... PROGRAM COMPONENTS... S.D.1: PUBLIC EDUCATION AND OUTREACH... Label Storm Drain Inlets:... Public

More information

AK Steel Corp 9227 Centre Point Drive West Chester, OH 45069

AK Steel Corp 9227 Centre Point Drive West Chester, OH 45069 COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF POINT AND NON-POINT SOURCE MANAGEMENT AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM

More information

Richland County Industrial and High Risk Runoff Program. Alan Trim BP Barber

Richland County Industrial and High Risk Runoff Program. Alan Trim BP Barber Richland County Industrial and High Risk Runoff Program Alan Trim Industrial and High Risk Runoff Program Program Components: Richland County Storm Water Ordinance. Industrial and High Risk Facility Database.

More information

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT 901.1 DESCRIPTION Design, implement, inspect and maintain appropriate best management practices to minimize or eliminate erosion, sediment and other pollutants

More information

Key Requirements of the Construction General Permit Scott Taylor, P.E. Tanya Bilezikjian, P.E.

Key Requirements of the Construction General Permit Scott Taylor, P.E. Tanya Bilezikjian, P.E. Key Requirements of the Construction General Permit Scott Taylor, P.E. Tanya Bilezikjian, P.E. Learning Objectives Course participants shall be able to: Recognize basic permit elements Recognize the need

More information

STORMWATER POLLUTION PREVENTION PLAN (SWP3)

STORMWATER POLLUTION PREVENTION PLAN (SWP3) City of Moore, Oklahoma Community Development Department 301 North Broadway Moore, Oklahoma 73160 STORMWATER POLLUTION PREVENTION PLAN (SWP3) The SWP3 is a written narrative describing the site, potential

More information

POLLUTION PREVENTION AFTER CONSTRUCTION

POLLUTION PREVENTION AFTER CONSTRUCTION POLLUTION PREVENTION AFTER CONSTRUCTION..CHAPTER.. 10 This chapter describes the pollution prevention measures to be taken once the site has been permanently and finally stabilized and no additional construction

More information

Landfills And The New Virginia Stormwater Management Program Regulations

Landfills And The New Virginia Stormwater Management Program Regulations Landfills And The New Virginia Stormwater Management Program Regulations Agenda Overview of regulatory programs Specific guidance from DEQ Quiz Questions and Answers Why Is this such a hot topic? NEW REGULATIONS

More information

Small Site Stormwater Quality Permit Application

Small Site Stormwater Quality Permit Application Small Site Stormwater Quality Permit Application PUBLIC WORKS ADMINISTRATION BUILDING (PWA) STORMWATER DIVISION 2525 WEST FIRST STREET LOVELAND, CO 80537 GENERAL INFORMATION (970) 962-2772 www.cityofloveland.org/stormwater

More information

c. Sites subject to regulation under Subtitle D of RCRA. The following discharges are not authorized by this permit:

c. Sites subject to regulation under Subtitle D of RCRA. The following discharges are not authorized by this permit: Page 1 of 6 Permit No: MNR050000 PART VII. SECTOR-SPECIFIC REQUIREMENTS The Permittee shall comply with Part VII (sector-specific requirements) for any primary SIC code and/or narrative activity and co-located

More information

Operations Report. September 10, 2015

Operations Report. September 10, 2015 Operations Report September 1, 215 Plant Loading and Operations Summary August 215 Biochemical Oxygen Demand, 5-Day (Avg. 2,151 lb./day) Total Suspended Solids (Avg. 33,197 lb./day) Average Daily Flow

More information

NPDES PUBLIC NOTICE. Application for National Pollutant Discharge Elimination System (NPDES) Permit to Discharge to State Waters

NPDES PUBLIC NOTICE. Application for National Pollutant Discharge Elimination System (NPDES) Permit to Discharge to State Waters NPDES PUBLIC NOTICE Application for National Pollutant Discharge Elimination System (NPDES) to Discharge to State Waters Southwest Regional Office: Regional Water Management Program Manager, 400 Waterfront

More information

Storm Water Pollution Prevention Plan. Wastewater Treatment Facility and Streets & Parks Facility. Village of Fox River Grove, Illinois

Storm Water Pollution Prevention Plan. Wastewater Treatment Facility and Streets & Parks Facility. Village of Fox River Grove, Illinois Storm Water Pollution Prevention Plan Wastewater Treatment Facility and Streets & Parks Facility Village of Fox River Grove, Illinois Village of Fox River Grove, Illinois Storm Water Pollution Prevention

More information

Small Quantity Generator (SQG) of Hazardous Waste

Small Quantity Generator (SQG) of Hazardous Waste Small Quantity Generator (SQG) of Hazardous Waste Iowa Waste Reduction Center / University of Northern Iowa 319-273-8905 or 1-800-422-3109 40 CFR Part 262 September 21, 2015 Do these regulations apply

More information

ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY

ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY ARKASAS DEPARTMET OF EVIROMETAL QUALITY MEMORADUM TO: Eric Fleming, Technical Assistance Manager THRU: Dale Washam, Inspector Supervisor FROM:, District Field Inspector DATE: December 16, 2008 SUBJECT:

More information

NPDES COMPLIANCE MONITORING STRATEGY AND ANNUAL COMPLIANCE INSPECTION PLAN OCTOBER 1, SEPTEMBER 30, 2018

NPDES COMPLIANCE MONITORING STRATEGY AND ANNUAL COMPLIANCE INSPECTION PLAN OCTOBER 1, SEPTEMBER 30, 2018 NPDES COMPLIANCE MONITORING STRATEGY AND ANNUAL COMPLIANCE INSPECTION PLAN OCTOBER 1, 2017 - SEPTEMBER 30, 2018 Introduction This document serves as the Pennsylvania Department of Environmental Protection

More information

Phillips 66 Company 4101 Post Road Trainer, PA

Phillips 66 Company 4101 Post Road Trainer, PA COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATER STANDARDS AND FACILITY REGULATION AUTHORIZATION TO DISCHARGE UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM

More information

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT (ADEM) NOTICE OF INTENT NPDES GENERAL PERMIT NUMBER ALG850000

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT (ADEM) NOTICE OF INTENT NPDES GENERAL PERMIT NUMBER ALG850000 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT (ADEM) NOTICE OF INTENT NPDES GENERAL PERMIT NUMBER ALG850000 Instructions: This form should be used to submit a Notice of Intent for coverage under NPDES

More information

Wyoming Department of Environmental Quality Water Quality Division WYPDES (Wyoming Pollutant Discharge Elimination System) Program STATEMENT OF BASIS

Wyoming Department of Environmental Quality Water Quality Division WYPDES (Wyoming Pollutant Discharge Elimination System) Program STATEMENT OF BASIS Wyoming Department of Environmental Quality Water Quality Division WYPDES (Wyoming Pollutant Discharge Elimination System) Program STATEMENT OF BASIS RENEWAL APPLICANT NAME: U.S. Department of the Interior,

More information

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II MUNICIPAL SEPARATE STORM SEWER SYSTEMS May 1, 2003 1 Generic Permit for Discharge of Stormwater

More information

Reissuance of OPDES Multi-Sector General Permit OKR05 for Stormwater Discharges Associated with Industrial Activity within the State of Oklahoma

Reissuance of OPDES Multi-Sector General Permit OKR05 for Stormwater Discharges Associated with Industrial Activity within the State of Oklahoma Oklahoma Department of Environmental Quality Water Quality Division Reissuance of OPDES Multi-Sector General Permit OKR05 for Stormwater Discharges Associated with Industrial Activity within the State

More information

Final Report DMR-QA 36. NPDES Permit: IL DMR-QA Study. Open Date: 03/18/16. Close Date: 07/01/16. Report Issued Date: 07/29/16

Final Report DMR-QA 36. NPDES Permit: IL DMR-QA Study. Open Date: 03/18/16. Close Date: 07/01/16. Report Issued Date: 07/29/16 Keith Richard Decatur Sanitary District Decatur, IL 62522-1842 USA DMR-QA 36 Final Report NPDES Permit: IL0028321 DMR-QA Study Open Date: 03/18/16 Close Date: 07/01/16 Report Issued Date: 07/29/16 Study

More information

ARG Notice of Intent for Operators Engaged in Hydrostatic Testing Located within the State of Arkansas

ARG Notice of Intent for Operators Engaged in Hydrostatic Testing Located within the State of Arkansas ARG670000 Notice of Intent for Operators Engaged in Hydrostatic Testing Located within the State of Arkansas version 1.25 (Submission #: 2QY A8ZZ HYT5, version 1) PRINTED ON 5/8/2017 Summary Submission

More information

STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES PERMIT TO DISCHARGE STORMWATER UNDER THE

STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES PERMIT TO DISCHARGE STORMWATER UNDER THE DRAFT NCS000589 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES PERMIT TO DISCHARGE STORMWATER UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION

More information

Wastewater Flow Monitoring Services

Wastewater Flow Monitoring Services Wastewater Flow Monitoring Services For San Gabriel, CA July 13, 2015 through July 21, 2015 Revised October 9, 2015 Leaders in Sewer Flow Monitoring Services 601 N. Parkcenter Dr., Suite 209 Santa Ana,

More information

Joshua Balentine Tetra Tech, Inc. CWEA Conference Napa, CA February 3, 2015

Joshua Balentine Tetra Tech, Inc. CWEA Conference Napa, CA February 3, 2015 Joshua Balentine Tetra Tech, Inc. CWEA Conference Napa, CA February 3, 2015 EPA Industrial User Permitting Guidance Manual 833-R-12-001, September 2012 Update of the September 1989 manual Control Mechanisms

More information

Illinois EPA update to DuPage County Watershed Management Section Bureau of Water

Illinois EPA update to DuPage County Watershed Management Section Bureau of Water Illinois EPA update to DuPage County Watershed Management Section Bureau of Water Amy Walkenbach Coordinator, Financial and Technical Assistance Program, Bureau of Water, Illinois EPA Amy.walkenbach@illinois.gov

More information

Group Stormwater Compliance Program Sampling Instructions

Group Stormwater Compliance Program Sampling Instructions 2016-2017 Group Stormwater Compliance Program Sampling Instructions Read these instructions completely to ensure a thorough understanding of the sampling process before attempting to collect samples of

More information

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS 8.1 INTRODUCTION To minimize the detrimental effects of erosion and sedimentation, Henrico County requires that those individuals responsible for

More information

Overall Instructions

Overall Instructions Farm Evaluation Survey Overall Instructions This Farm Evaluation Survey is prepopulated with member information you provide to the Coalition. If any information is incorrect, please indicate the correct

More information

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN: 2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO. 0200-S3N-R2 AFIN: 32-00042 JANUARY 15, 2016 ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING

More information

Guideline for Bridge Safety Management February 2012

Guideline for Bridge Safety Management February 2012 Guideline for Bridge Safety Management February 2012 Table of Contents Foreword Part A General 0.1 Definitions 0.2 Scope 0.3 Application 0.4 Responsibility Part B Bridge Safety Assurance 1.1 Scope 1.2

More information