THE MANPOWER SUPPLY PLANNING AND SHIFT SETTING FOR MASS RAPID TRANSIT CARRIAGE MAINTENANCE IN SHORT-TERM OPERATIONS

Size: px
Start display at page:

Download "THE MANPOWER SUPPLY PLANNING AND SHIFT SETTING FOR MASS RAPID TRANSIT CARRIAGE MAINTENANCE IN SHORT-TERM OPERATIONS"

Transcription

1 Journal of Marine Science and Technology, Vol. 16, No. 4, (2008) 301 THE MANPOWER SUPPLY PLANNING AND SHIFT SETTING FOR MASS RAPID TRANSIT CARRIAGE MAINTENANCE IN SHORT-TERM OPERATIONS Shangyao Yan*, Chia-Hung Chen**, and Miawjane Chen*** Key word: carriage maintenance, manower uly, mixed integer rogram, flexible trategy. ABSTRACT An effectie carriage maintenance lan cannot only reduce the ma raid tranit ytem oerating cot, but i alo directly related to it afety and chedule unctuality. Traditionally, the arrangement of the carriage maintenance manower uly ha been baed on taff exerience, and ha been erformed manually following imle rule. Thi i not only time-conuming but often ineffectie. Therefore, in thi reearch, we incororate flexible management trategie, different combination of rincile, and the related oerating contraint, to deelo a baic carriage maintenance manower uly lan model. Furthermore, we contruct an integrated model by modifying the baic model, which can hel an MRT lant more effectiely manage it maintenance manower. To ealuate the model in ractice, a cae tudy uing real oeration data from a Taiwan MRT maintenance facility i erformed, with the aitance of C comuter rogram and a mathematical rogramming oler. The reliminary reult are good, howing that the model could be ueful for lanning hort-term carriage maintenance manower uly. I. INTRODUCTION An effectie carriage maintenance lan cannot only reduce the ma raid tranit ytem (MRT) oerating cot, but i alo directly related to it afety and chedule unctuality. A good carriage maintenance manower uly lan not only meet all the afety requirement but will alo hel better manage maintenance reource and imroe erice quality. A a reult, it i a ery imortant iue to an MRT in determining a good carriage maintenance manower uly lan. Generally, the carriage maintenance manower uly lan Paer ubmitted 11/19/07; acceted 12/18/07. Author for correondence: Chia-Hung Chen ( chiahung@mail.tu.edu.tw). *Deartment of Ciil Engineering, National Central Unierity, Chung-Li 32001, Taiwan, R.O.C. **Deartment of Logitic Management, Shu-Te Unierity, Yen Chau 82445, Taiwan, R.O.C. ***Deartment of Finance, National United Unierity, Miao-Li, 36003, Taiwan, R.O.C. are claified into hort- and long-term one. The hort-term one, which inole the current MRT oeration, i uually erformed before the beginning of the next eriod (a eriod contain a coule of month). On the other hand, the long-term one i uually erformed at the beginning of the year (or eeral year in adance), according to the redicted carriage maintenance/manower demand baed on hitorical information. The contraint in thee two tye of lan are different. In articular, the carriage maintenance manower aailable for a hort-term lan i contrained by current carriage maintenance manower reource. How to et a good carriage maintenance manower uly lan for hort-term oeration i more difficult than for long-term one. Therefore, in thi reearch we focu on a hort-term carriage maintenance manower uly lan. Uing a Taiwan MRT maintenance facility (called X MRT hereinafter) a an examle, we introduce the rocedure for determining hort-term carriage maintenance manower uly lan in ractice. In the X MRT, two deartment are reonible for carriage maintenance, which are the reentie maintenance deartment () and the breakdown maintenance deartment (). The ha to deal with the reentie carriage maintenance, uch a daily and monthly check; while the i reonible for maintenance work after carriage breakdown occur. The demand for i a fixed demand, but that for may fluctuate from time to time, deending on unexected eent. In current ractice, an aerage demand i etimated and i ued for lanning. Furthermore, thee two deartment normally ue 3 hift and 2 hift (although ometime from 2 to 6 hift are occationally ued). In addition, a flexible working hour trategy allow X MRT to hire both full-time and half-time emloyee, although they uually hae full-time emloyee, mot often diided into 6 eole to a team/crew (occationally from 3 to 6 eole team are ued). In theory, more hift would increae the degree of freedom in cheduling, thu conering manower, but would of coure reult in a more comlicated manower uly lan. Therefore, for eae of cheduling, X MRT imlifie it maintenance manower uly lan to hae 3 hift and 2 hift. In current ractice, X MRT deend on taff exerience in etablihing the carriage manower uly lan, which i outlined a follow. The lanning rocedure for carriage man-

2 302 Journal of Marine Science and Technology, Vol. 16, No. 4 (2008) ower uly tyically conit of three tage: (1) the initial carriage maintenance demand etimation, (2) MRT maintenance manower uly lanning, and (3) crew aignment. Of the three tage, the firt tage i tyically imle, a tatitical work. The econd tage i comlicated and it reult ere a the bai of the third tage. In other word, crew aignment i handled after the manower uly roblem i oled. Not only doe a good MRT maintenance manower uly lan make crew aignment eaier, but alo reduce the MRT maintenance manower crew cot. Howeer, X MRT currently utilize a trial-and-error exerience-baed method with a rojected demand for carriage manower uly lan, without otimization from a ytem erectie. Such a trial-and-error method i neither efficient nor effectie. Therefore, thi reearch focue on lanning hort-term carriage maintenance manower uly lanning, which correond to the econd tage of the oerall lanning rocedure mentioned aboe. To hel the reader undertand the background, we now dicu ome of the at reearch on eronnel cheduling and flexible management trategie that are related to our. Much reearch ha already been deoted to eronnel cheduling roblem. For examle of recent reearch, ee Bruco and John [5], Lau [10], Naraimhan [11], Langerman and Ehler [9], Carara et al. [7], Beaumont [3], Bruco [6], Alfare [1], Higgin [8], Teodoroi and Lu i [12], Aykin [2], Yan and Tu [13], Yan et al. [16], Yan et al. [14], and Yan et al. [15]. Howeer, their roblem characteritic are not the ame a thoe needed for a carriage maintenance manower uly lan, meaning that the aboe model or olution are not alicable or can not be directly alied to our roblem. In addition, the flexible management trategie hae been widely recognized in the indutry and the reult indicate that flexible management trategie can increae the different degree of freedom in the chedule, thu conering manower (Blyton and Morri, [4]). The flexible management trategy, howeer, ha not yet been alied to MRT carriage maintenance manower uly lan. A a reult, we did not find any that addreed MRT carriage maintenance manower uly lanning roblem, with flexible management trategie in articular. An effectie combination of hift tarting time, the number of hift, and the number of crew i the key to a ucceful carriage maintenance manower uly lan. Therefore, in thi reearch, a baic carriage maintenance manower uly lan model (for conenience, hereinafter called the BM), incororating flexible management trategie, different combination of rincile, and the related oerating contraint, i deeloed. Moreoer, an integrated model (for conenience, hereinafter called the IM) i further deeloed by modifying the BM according to the imilar characteritic of the and the, which can hel X MRT lant more effectiely manage it maintenance manower. The model are formulated a mixed integer linear rogram and are oled uing a mathematical rogramming oler. Finally, to ealuate how the model erform in ractice, a cae tudy uing real oeration data from X MRT maintenance facility i erformed, with the aitance of C comuter rogram and a mathematical rogramming oler. The coe of thi reearch i confined to the ubject of MRT carriage maintenance manower uly and hift etting, gien the rojected manower demand, the uer/lower bound of the hift tarting time, the working hour for each hift, the team member for a work tye, and other related cot data. In addition, ince the X MRT timetable i rotated weekly, the lanning cycle i one week (een day). For the lanning week, hift tarting time hae to be the ame eery day of the week. It hould be mentioned that, in ractice, the alary tructure arie according to eronnel exerience, length of emloyment, education and other factor. It would be too comlicated to model minimum alary exene a an objectie function in the lanning tage, o for eae of modeling, thi tudy focue on the minimization of the maintenance manower uly in man-hour. The remainder of the aer i organized a follow. We firt decribe the roblem, and then formulate the model. Thereafter, we erform numerical tet to ealuate the erformance of the model. Finally we gie ome concluion. II. THE MODELS In thi ection, the modeling concet i firt dicued according to the X MRT current ractice. Then a baic model (BM) i formulated incororating three flexible management trategie. According to the imilar characteritic of the and the and the ue of exce maintenance manower between the two deartment, the BM i modified to further deelo an integrated model (IM). 1. Modeling Concet The tudy focue on modeling a comlicated hort-term carriage maintenance manower uly lan. According to the X MRT oeration, demand i gien and fixed in adance. The demand i gien by an exectedly aerage demand. Thee demand tyically ary in a week. Sometime in off-eak hour there may een be no demand which make flexible trategie a good idea for imroing efficiency of X MRT maintenance manower lanning. Taking into conideration X MRT ractice, three flexible trategie can be rooed baed on numerical and temoral concet: flexible hift, flexible team member, and flexible working hour. The flexible hift trategy allow an emloyer to chooe the referred number of hift tarting time er day and the hift tarting time. Thee need not be limited to the conentional three fixed hift (i.e., 0:00-8:00, 8:00-16:00, and 16:00-0:00) for the nor the two fixed hift for the (i.e., 8:00-16:00, and 16:00-0:00) currently utilized by X MRT. In the flexible team member trategy the number of team member can be adjuted in reone to change (from 3 to 6 in thi reearch) in demand in different time lot. The flexible working hour trategy allow X MRT to hire both full-time and half-time emloyee. Two tye of flexibility are introduced in our model: full-time (eight hour) hift and half-time (four hour) hift. Traditionally, the lanner only conider matching it main-

3 S. Yan et al.: The Manower Suly Planning and Shift Setting for Ma Raid Tranit Carriage Maintenance in Short-Term Oeration 303 tenance manower uly to the demand, neglecting the ue of exce maintenance manower. Howeer, in actual ractice, urlu maintenance manower may be hifted to other deartment, to further enhance efficiency. In addition, if the and the exected demand for continuou time lot fluctuate dratically (e.g., at the boundarie between eak and off-eak eriod), then ulying too much maintenance manower to meet the highet demand would reult in urlu manower and a wate of human reource, though they can be of ue in ome way. One way to deal with dratic fluctuation in maintenance manower demand in continuou time lot i to temorarily ulement manower from another maintenance deartment or off-duty eronnel, een if the unit man-hour cot i normally higher than the regular unit man-hour cot. Howeer, to determine what trade-off between urlu and inufficient maintenance manower i mot aroriate for each lot for each work tye i too comlicated to be oled without a ytematic model. We rooe two ytematic model that incororate three flexible trategie and two combination of manower uly rincile in order to roide effectie MRT maintenance manower uly lan. The lan are not only reonie to wide ariation in maintenance manower demand but can alo hel the X MRT maintenance facility manage it manower reource more effectiely, and conequently reduce it oerating cot. 2. BM Incororating flexible management trategie, different combination of rincile, and the related oerating contraint, the baic model (BM) i formulated. The notation for arameter and ariable ued in the model formulation are lited below. Parameter: D : the et of day in a week. Since our lanning eriod i one week (een day), D {0: Sunday, 1: Monday, 2: Tueday, 3: Wedneday, 4: Thurday, 5: Friday, 6: Saturday}. d : the th d day in a week; d D. S : the et of hift tarting time in one day. The length of a time lot i et to be one hour. Since there are 24 hour in a day; S {0, 1, 2, 3, 4, 5,, 23}. t : th the t time lot in a day; t S. : th the hift tarting time; S. A hift tarting time indicate when the hift (of different tye) tart. According to real ractice, the hift tarting time i the ame each day of the week. If an MRT garage doe not refer to ecify the tarting time (for examle, to reent the yielding of hift that tart too cloe together), then thee hift tarting time can be remoed from S. On the contrary, if the maximum number of hift tarting time i contrained due to ractical concern, then a contraint hould be imoed. P : the et of different team ize (i.e., different number of crew member). : tye maintenance team; P. m : the number of eron in a tye maintenance team. W : the et of different tye of work, to differentiate between full-time and art-time emloyee. w : tye w work; w W. h w : the working hour for tye w work. rc rc, : term oeration, ince the crew alary (the main art) ha already been aid, rc and rc are tyically not large. the regular manower cot er man-hour for the and for the, reectiely. In hort ec ec, : the, reectiely, which could be ued by the other deartment, and i thu in the form of the alue er urlu man-hour for manower uly exceeding demand for the and for a negatie cot. In ractice, ec i maller than rc, becaue ec i a deriatie alue. Similarly, ec i maller than rc, becaue ec i a deriatie alue. Note that if the exce manower i not well lanned in adance in hort-term oeration, then and ec are mall. ec ic, ic : the cot er temorary man-hour uly for inufficient manower for the and for the, reectiely. Inufficient manower may be ulemented temorarily from the other maintenance deartment or be trainee without qualification. In ractice, ic and ic are greater than rc and rc, reectiely, in hort-term oeration. u, u : the uer bound of the total number of hift in one day for both the and the. d : the maintenance manower demand in time lot t on It i meaured a the number of eron. bd : the maintenance manower demand in time lot t on It i meaured a the number of eron. : the uer bound of the manower which can be ulied in time lot t on b : the uer bound of the manower which can be ulied in time lot t on M : a ery large alue for eae of modeling.

4 304 Journal of Marine Science and Technology, Vol. 16, No. 4 (2008) H w : the et of all hift ulying tye w work in time lot t on The uroe of H i to rereent the relationhi between w the manower uly of hift for different work tye and the working time lot. Uing H, we can identify all the hift of w tye w work that will be on duty in time lot t on Variable: dw : the number of tye team for tye w work for tarting at hift on dw : the number of tye team for tye w work for tarting at hift on x : x = 1 if there are hift for tarting at, and 0 otherwie. x : x = 1 if there are hift for tarting at, and 0 otherwie. e, i : the exce manower and inufficient manower (in eron) for in time lot t on e, i : the exce manower and inufficient manower (in eron) for in time lot t on The BM i formulated a a mixed integer linear rogram a follow: Min z = rc h m H w H w w dw d D S + rc h m w dw d D S ST (1) m e + i = d, d D, t S (2) dw m e + i = bd, d D, t S (3) dw d D d D H w S S x u (4) x u (5) Mx, S (6) dw Mx, S (7) dw m, d D, t S (8) dw dw dw H w m b, d D, t S (9) dw x = 0 or 1, S (10) x = 0 or 1, S (11) 0 & I, d D, S, P, (12) dw 0 & I, d D, S, P, (13) dw e 0 & i 0, d D, t S (14) e 0 & i 0, d D, t S (15) Equation (1) i the objectie function that minimize the total ytem cot that include the regular manower cot for the two deartment, the negatie urlu alue of exce manower, and the temorary manower uly cot for inufficient manower. It hould be mentioned that the cot reulted from different number of hift tarting time i not ignificant in the current X MRT oeration and therefore can be neglected. If thi cot i ignificant in other alication, then the objectie function can be modified and the cot ( a x + b x ) S added to the objectie function, to reflect thi concern, where a and b denote the cot for the and the, reectiely, for etting the hift tarting time. Equation (2) and (3) tate that for the and for the, reectiely, the aigned crew member, ubtracting exce manower and adding temorary ulied manower, mut be able to meet the manower demand in eery time lot during their hift. Equation (4) and (5) contrain the maximum number of hift tarting time in each day for the and the, reectiely. Note that if the leat number of hift tarting time need to be conidered in other alication, then Equation (4) and (5) can be modified to become l S x u S l x u and, reectiely, where l and l de- note the leat number of hift tarting time for the and the, reectiely. Equation (6) and (7) enure that and maintenance team are aigned to a hift only when that hift exit. Equation (8) and (9) enure that the amount of and manower in eery time lot during the hift doe not exceed the aailable amount of manower. Equation (10), (11), (12) and (13) are integer contraint for the ariable. Equation (14) and (15) are ariable nonegatiity contraint. Note that e, i, e and e are not contrained to be integer. Howeer, due to contraint (2) and (3) and the integrality of d and bd, they are naturally integer. Gien the required demand and the maximum uly of manower for each time lot of each day, the work tye, the feaible range of hift and the related cot, the model determine the bet et of hift, each with a number of work tye, and the exce or temorary ulied manower in each time

5 S. Yan et al.: The Manower Suly Planning and Shift Setting for Ma Raid Tranit Carriage Maintenance in Short-Term Oeration 305 lot, in each day of the week. The model i oled uing the mathematical rogramming oler, CPLEX. 3. IM According to the imilar characteritic of the and the in the current X MRT ractice, we further contruct an integrated model, IM. With the IM not only can we etablih thee two deartment manower uly lan earately, but we can alo allow them to uort each other, thereby increaing the flexibility of eronnel arrangement. Howeer, there are ome difference between the and the, in term of the leel of exertie and the ability. Therefore, to conform to real ractice, a manower reduction coefficient hould be incororated into the IM. In addition, the amount of manower aailable to uort the other deartment hould not exceed the maximum aailable manower. More effectie ue of manower reource lead to reduction in the IM cot. Additional arameter/ariable for the IM are defined below. a : the maximum number of manower unit aailable for uorting the in time lot t on a : the maximum number of manower unit aailable for uorting the in time lot t on k : the reduction coefficient for uing the manower to uort the demand. The alue i 1 between 0 and 1. k : the reduction coefficient for uing the manower to uort the demand. Similar to k, 2 1 the alue i between 0 and 1. The IM i formulated a a mixed integer linear rogram a follow: Min z = rc h m H w w dw d D S + rc h m w dw d D S ST m a + k1 a e + i = d, dw d D, t S (16) H w m a + k a e + i = bd, 1 dw d D, t S (17) H w H w (1) m a, d D, t S (18) dw m a, d D, t S (19) dw a a 0 & a I, d D, t S (20) 0 & a I, d D, t S (21) and equation (4) to (15). To ae ace, we only introduce below thoe IM equation which are different from the BM one. Equation (16) tate that the aigned crew member, minu the manower for uorting, lu manower ulied from, that i ubtracting exce manower and adding temorary ulied manower, mut be enough to meet the manower demand in eery time lot during thi hift. Similar to Equation (16), equation (17) tate that the aigned crew member, minu the manower for uorting, lu manower ulied from, that i ubtracting exce manower and adding temorary ulied manower, mut be enough to meet the manower demand in eery time lot during the hift. Equation (18) and (19) indicate that the total number of and manower unit in eery time lot ha to be enough to atify the larget amount required. Equation (20) and (21) are contrained to be integer ariable. Gien the required demand and the maximum uly of manower for each time lot of each day, the work tye, the feaible range of hift and the related cot, the model determine the bet et of hift, each with a number of work tye, the exce or temorary ulied manower in each time lot and the uorting manower in each time lot, in each day of the week. The model i oled uing the mathematical rogramming oler, CPLEX. III. NUMERICAL TESTS To tet how well the model may be alied in the real world, numerical tet mainly uing oerating data from X MRT maintenance facility are erformed. The aitance of C comuter language and the mathematical rogramming oler, CPLEX 8.1, are ued to build the model and to ole the roblem. The tet are erformed on a Pentium 4 2G with 1Gb of RAM in the enironment of Microoft Window XP. 1. Data Analyi The maintenance demand of the X MRT two maintenance deartment during Setember of 2006 are ued a our tet data. The inut, uch a the uer bound of maintenance manower uly in each time lot, the working hour of different work tye, and the uer/lower bound of the hift tarting time, are rimarily adoted from actual oerating data. According to the real ractice, two different work tye are et to make for a more flexible trategy (full-time and half-time). In addition, the normal number of hift tarting time ued in X MRT i three, although a many a ix hift tarting time may occationally be ued. Therefore, the feaible range i et from three to ix hift tarting time. Furthermore, the team ize ued in X MRT i ix, although ometime from three to ix eole team are occationally ued. Therefore, the team ize range i et from three to ix eole team. The three cot arameter alue, which are relatie to each other, for the BM and the IM are a follow:

6 306 Journal of Marine Science and Technology, Vol. 16, No. 4 (2008) Table 1. Tet reult. TAEM BM IM OBJ (NT$) Comutation time (econd) NA Required manower (man-hour) Suly demand (man-hour) Exce manower (man-hour) 190* 131* Inufficient manower (man-hour) 0** 0** Suorting manower (man-hour) 0** 0** Number of hift Shift tarting time 09,10,23 07,15 02,03,09,10,23 07,11,15 *The exce manower for the and the for TAEM i externally calculated to be 190 and 131, reectiely. **The inufficient and the uorting manower for the and the for TAEM are both 0 by definition. 00,02,09,10,2 3 07,11,1 5 The regular maintenance manower cot er man-hour rc, rc ) i et to be 10. The alue er urlu man-hour ( for maintenance manower uly exceeding demand ec, ec ) i et to be zero, becaue X MRT doe not con- ( ider the ue of exce maintenance manower in their hort-term manower uly lan. Since it i not eay to imort temorary maintenance manower from the other maintenance deartment or from outide the comany in hort-term oeration, the cot er temorary man-hour uly for inufficient man-ower ( ic, ic ) i et to be 250, a the cloet reflec- tion of real ractice. Note that the three cot alue are adjutable to meet the requirement of other MRT. Excet for the aboe etting, in the IM model mutual uort i taken into account to increae the flexibility of eronnel arrangement. Howeer, there are ome difference between the and the, uch a the leel of exertie and the training of maintenance eronnel. Therefore, to conform to real ractice, a manower reduction coefficient i conidered in the IM. The leel of exertie and the training of the maintenance eronnel are better than thoe of the eronnel. Therefore, we et the manower reduction coefficient for the ( k 1 ) to be 0.9 and that of the ( k ) to be The two reduction coefficient are adjutable to meet other MRT oerating requirement. 2. Tet Reult Table 1 how the tet reult. Note that to reliminarily ealuate the rooed model, the reult are comared to thoe obtained uing the current X MRT trial-and-error exerience-baed method (denoted a TAEM). A hown in Table 1, OBJ rereent the ytem cot for the otimal olution obtained by CPLEX. The IM yield the bet olution, with an objectie alue of The BM erform lightly wore, with an objectie alue of The TAEM erformed the wort, with an objectie alue of The reult how that the two model outerformed the current trial-and-error method by a reduced cot of at leat 4.94% (=( )/21040). Moreoer, for the BM, the exce and inufficient manower for the are 130 and 0 man-hour, reectiely, while the exce and inufficient manower for the are 87 and 0 man-hour, reectiely. For the IM, the exce and inufficient manower for the are and 0.4 man-hour, reectiely, while the exce and inufficient manower for the are 80.6 and 0 man-hour, reectiely. From the aboe reult it can be een that the IM allowed for mutual uort between thee two deartment to comenate for inufficient manower. More ecifically, by uitably trading off the exce and inufficient manower for each lot of eery work tye and allowing the two deartment to uort each other mutually, the IM could hel manage manower more effectiely than the BM. For the number of hift, we ary the number of hift from 3 to 6, with tarting time that could be any time lot in a day for the two model. In theory, more hift would increae the degree of freedom in cheduling. Howeer, a hown in Table 1, all the model do not ue the uer bound of the hift tarting time. The reaon i that there i no demand in ome time lot in a day for the and the. For the comutation time, they are ery efficient, 1.31 econd for the BM and econd for the IM. From the tet reult, both the BM and the IM could imroe oer the current manual trial-and-error method. The IM wa better than the BM in term of flexibility. In ummary, both the BM and the IM are efficient and effectie for X MRT carriage maintenance manower uly lanning and hift etting in hort-term oeration. IV. CONCLUSION Thi tudy incororate flexible management trategie, different combination of rincile, and the related oerating contraint to deelo a baic carriage maintenance manower uly lan model (the BM). By uitably modifying the BM, an integrated model (the IM) i further deeloed. The model are formulated a mixed integer linear rogram that are oled uing a mathematical rogramming oler. A cae tudy util-

7 S. Yan et al.: The Manower Suly Planning and Shift Setting for Ma Raid Tranit Carriage Maintenance in Short-Term Oeration 307 izing real oerating data from a Taiwan MRT i conducted to reliminarily ealuate the model and the olution algorithm in the real world. The reult how that both the BM and the IM are an imroement oer the trial-and-error method ued in actual oeration. Moreoer, the IM i better than the BM in term of flexibility. In ummary, both the BM and the IM are efficient and effectie for the MRT carriage maintenance manower uly lanning and hift etting in hort-term oeration. Although the reliminary tet reult how that the model are otentially ueful for manower uly lanning and hift etting, eecially for the Taiwan MRT oeration, more tet or cae tudie hould be conducted, o that uer may gra their limitation, before utting them to ractical ue. The model and the cae tudy hould all be ueful reference for the MRT when determining the mot otimal hort-term maintenance manower chedule. Finally, in actual oeration, ome of the model arameter, uch a manower demand for, are tochatic. How to modify the determinitic model to become mixed determinitic and tochatic model for a cloer match of actual oeration could alo be a toic of future reearch. ACKNOWLEDGEMENTS Thi reearch wa uorted by a grant (NSC E ) from the National Science Council of Taiwan. We would like to thank the Taiwan MRT for roiding the tet data and it aluable oinion on thi reearch. We alo thank Tung-Sheng Yeh for heling collect and analyze the data. Finally, we would like to thank the editor and the anonymou reiewer for their helful uggetion which greatly imroed the reentation of thi aer. REFERENCES 1. Alfare, H. K., An efficient two-hae algorithm for cyclic day-off Scheduling, Comuter and Oeration Reearch, Vol. 25, (1998). 2. Aykin, T., A comaratie ealuation of modeling aroache to the labor hift cheduling roblem, Euroean Journal of Oerational Reearch, Vol. 125, No. 2, (2000). 3. Beaumont, N., Scheduling taff uing mixed integer rogramming, Euroean Journal of Oerational Reearch, Vol. 98, (1997). 4. Blyton, P. and Morri, J., HRM and the limit of flexibility. in Blyton, P. and Turnbull, P. (ed.), Reaeing Human Reource Management, (1992). 5. Bruco, M. J. and John, T. R., A equential integer rogramming method for dicontinuou labor tour cheduling, Euroean Journal of Oerational Reearch, Vol. 95, No. 3, (1996). 6. Bruco, M. J., Soling eronnel tour cheduling roblem uing the dual all-integer cutting lane, IIE Tranaction, Vol. 30, (1998). 7. Carara, A., Fichetti, M., Toth, P., Vigo, D., and Guida, P. L., Algorithm for railway crew management, Mathematical Programming, Vol. 79, (1997). 8. Higgin, A., Scheduling of railway track maintenance actiitie and crew, Journal of the Oerational Reearch Society, Vol. 49, (1998). 9. Langerman, J. J. and Ehler, E. M., Agent-baed airline cheduling, Comuter and Indutrial Engineering, Vol. 33, No. 3-4, (1997). 10. Lau, H. C., On the comlexity of manower hift cheduling, Comuter and Indutrial Engineering, Vol. 23, No. 1, (1996). 11. Naraimhan, R., An algorithm for ingle hift cheduling of hierarchical workforce, Euroean Journal of Oerational Reearch, Vol. 96, No. 1, (1996). 12. Teodoroi, D. and Lu i, P., A fuzzy et theory aroach to the aircrew rotering roblem, Fuzzy Set and Sytem, Vol. 95, (1998). 13. Yan, S. and Tu, Y. P., A network model for terminal cabin crew cheduling, Euroean Journal of Oerational Reearch, Vol. 140, No. 3, (2002). 14. Yan, S., Chen, C. H., and Chen, C. K., Long-term manower uly lanning for air cargo terminal, Journal of Air Tranort Management, Vol. 12, No. 4, (2006). 15. Yan, S., Chen, C. K., and Chen, C. H., Cargo terminal hift etting and manower ulying in hort-term oeration, Journal of Marine Science and Technology, Vol. 14, No. 2, (2006). 16. Yan, S., Yang, T. H., and Chen, H. H., Airline hort-term maintenance manower uly lanning, Tranortation Reearch Part A, Vol. 38, (2004).

Identifying Scrap Friendly Alloys using Chance Constrained Modeling

Identifying Scrap Friendly Alloys using Chance Constrained Modeling 5 th International Symoium on Recycling of Metal and Engineered Material (TMS) The eral, Metal & Material Society, 2007 Identifying Scra Friendly Alloy uing Chance Contrained Modeling Gabrielle

More information

CARGO TERMINAL SHIFT SETTING AND MANPOWER SUPPLYING IN SHORT-TERM OPERATIONS

CARGO TERMINAL SHIFT SETTING AND MANPOWER SUPPLYING IN SHORT-TERM OPERATIONS Journal of Marine Science and Technology, Vol. 14, No. 2, pp. 109-118 (2006) 109 CARGO TERMINAL SHIFT SETTING AND MANPOWER SUPPLYING IN SHORT-TERM OPERATIONS Shangyao Yan*, Chung-Kai Chen**, and Chia-Hung

More information

Quality Competition and Social Welfare in Markets with Partial Coverage: New Results

Quality Competition and Social Welfare in Markets with Partial Coverage: New Results Feruary, 00 Quality Cometition and Social Welfare in Market with Partial Coverage: New Reult Gregory S. Amacher 1 Erkki Kokela Markku Ollikainen 1 Deartment of Foretry, Virginia Commonwealth Univerity,

More information

The Role of Termination in Employment Contracts: Theory and Evidence from Film Directors Careers

The Role of Termination in Employment Contracts: Theory and Evidence from Film Directors Careers The Role of Termination in Emloyment Contract: Theory and Evidence from Film Director Career Koe John a S. Abraham Ravid b and Jayanthi Sunder c Firt Draft: January 001 Thi Verion: January 00 Preliminary.

More information

Numerical Analysis of a Gravity Substructure for 5 MW Offshore Wind Turbines Due to Soil Conditions

Numerical Analysis of a Gravity Substructure for 5 MW Offshore Wind Turbines Due to Soil Conditions Journal of Energy and Power Engineering 10 (2016) 150-158 doi: 10.17265/1934-8975/2016.03.002 D DAVID PUBLISHING Numerical Analyi of a Gravity Subtructure for 5 MW Offhore Wind Turbine Due to Soil Condition

More information

Supplier selection requires full transparency

Supplier selection requires full transparency Sulier election reuire full tranarency Jan Telgen * Fredo Schotanu Univerity of Twente NEVI Profeor of Public Procurement Caitool 5 P.O. Box 7 7500 AE Enchede the Netherland j.telgen@utwente.nl tel.: +3

More information

INVESTIGATION OF THERMOSTAT-SET CONTROL AS A NEW DIRECT LOAD CONTROL METHOD

INVESTIGATION OF THERMOSTAT-SET CONTROL AS A NEW DIRECT LOAD CONTROL METHOD INVESTIGATION OF THERMOSTAT-SET CONTROL AS A NEW DIRECT LOAD CONTROL METHOD Canbolat Uçak canbolat@elk.itu.edu.tr Gökçe Dokuyucu gokce776@uperonline.com Department of Electrical Engineering Electrical

More information

Magneto-forming studies

Magneto-forming studies Loughborough Univerity ntitutional Reoitory agneto-forming tudie Thi item wa ubmitted to Loughborough Univerity' ntitutional Reoitory by the/an author. Citation: ALOTAB, F.T....et al., 217. agneto-forming

More information

Development of By-pass Blending Station System

Development of By-pass Blending Station System Develoment of By-a Blening Station Sytem. Liu Ph.D., P.E., Ph.D., D. Barne K. Bunz N. Ronerry Architectural Engineering Univerity of Neraka Omaha, Neraka ABSTRACT A new uiling lening tation ytem name y-a

More information

SIMULATION OF THE GAIN CHARACTERISTICS OF EDFA

SIMULATION OF THE GAIN CHARACTERISTICS OF EDFA SIMUTIO OF THE GI CHRCTERISTICS OF EDF guyen Hong Suong and Pham Quoc Ho Deartment of Telecommunication, Pot and Telecommunication Intitute of Technology (PTIT), Ho Chi Mh City, Vietnam BSTRCT In thi tudy,

More information

The Process-Value Model: A Systems View of the IST Value Chain

The Process-Value Model: A Systems View of the IST Value Chain Aociation for Information Sytem AIS Electronic Library (AISeL) SAIS 2007 Proceeding Southern (SAIS) 3-1-2007 The Proce-Value Model: A Sytem View of the IST Value Chain William L. Lomeron lomeronw@nula.edu

More information

Modeling Suspended Sediments in Dez Basin (Case Study: The Tale Zang Hydrometric Station)

Modeling Suspended Sediments in Dez Basin (Case Study: The Tale Zang Hydrometric Station) International Reearch Journal of Applied and Baic Science. Vol., 3 (2), 402-407, 2012 Available online at http://www.irjab.com ISSN 2251-838X 2012 Modeling Supended Sediment in Dez Bain (Cae Study: The

More information

Patent races, me-too drugs, and generics: A developing-world perspective. Alka Chada and Åke Blomqvist, National University of Singapore

Patent races, me-too drugs, and generics: A developing-world perspective. Alka Chada and Åke Blomqvist, National University of Singapore atent race me-too drug and generic: deeloping-world perpectie lka Chada and Åke Blomqit National Unierity of Singapore Introduction In thi paper we conider an iue that ha been ery important for deeloping

More information

Akira Takeuchi 1, Budaraju Srinivasa Murty 2, Masashi Hasegawa 1, Srinivasa Ranganathan 3 and Akihisa Inoue 1

Akira Takeuchi 1, Budaraju Srinivasa Murty 2, Masashi Hasegawa 1, Srinivasa Ranganathan 3 and Akihisa Inoue 1 Material Tranaction, Vol. 8, No. (007). 10 to 11 Secial Iue on Material Science of Bulk Metallic Glae-VII #007 The Jaan Intitute of Metal Analyi of Bulk Metallic Gla Formation Uing a Tetrahedron Comoition

More information

The research of simplified method of calculating wind and rain loads and its validation

The research of simplified method of calculating wind and rain loads and its validation The reearch of implified method of calculating wind and rain load and it validation Xing FU 1) and Hong-Nan LI 2) 1), 2) Faculty of Infratructure Engineering, Dalian Univerity of Technology, Dalian 116024,

More information

Model of Integrated Production and Delivery Batch Scheduling Under JIT Environment to Minimize Inventory Cost

Model of Integrated Production and Delivery Batch Scheduling Under JIT Environment to Minimize Inventory Cost Proceeding of the 2014 International Conference on Indutrial Engineering and Operation Management Bali, Indoneia, January 7 9, 2014 Model of Integrated Production and Delivery Batch Scheduling Under JIT

More information

6/6/2012. HR Training and Development. Content. Training: concept. Training: concept. Training: concept. Training and Development: Concept

6/6/2012. HR Training and Development. Content. Training: concept. Training: concept. Training: concept. Training and Development: Concept HR Training and Development UNIT 5 Content Concept and need of HR training and development Training need aement HR training: objective and method (on-the-job and off-the-job). Evaluation of training program

More information

Course Evaluation Validation using Data Envelopment Analysis. Joseph Sarkis Clark University. Inshik Seol Clark University

Course Evaluation Validation using Data Envelopment Analysis. Joseph Sarkis Clark University. Inshik Seol Clark University THE ACCOUNTING EDUCATORS JOURNAL Volume XX 2010 pp. 21-32 Coure Evaluation Validation uing Data Envelopment Analyi Joeph Sarki Clark Univerity Inhik Seol Clark Univerity Abtract In thi paper we detail

More information

Value intensity of water used for electrical energy generation in the Western U.S.; an application of embedded resource accounting

Value intensity of water used for electrical energy generation in the Western U.S.; an application of embedded resource accounting Value intenity of water ued for electrical energy generation in the Wetern U.S.; an application of embedded reource accounting Elizabeth A. Martin and Benjamin L. Ruddell Abtract Thi tudy evaluate the

More information

There are two principles which are fundamental to economic analysis: a) the optimisation principle b) the equilibrium principle

There are two principles which are fundamental to economic analysis: a) the optimisation principle b) the equilibrium principle Microeconomic I. Antonio Zabalza. Univerity of Valencia 1 Leon 9: Market Euilibrium 9.1 Market euilibrium There are two rincile which are funamental to economic analyi: a) the otimiation rincile b) the

More information

Customer migration, campaign budgeting, revenue estimation: the elasticity of Markov Decision Process on customer lifetime value

Customer migration, campaign budgeting, revenue estimation: the elasticity of Markov Decision Process on customer lifetime value AMO - ADVANCED MODELING AND OPTIMIZATION VOLUME 6 NUMBER 00 Customer migration camaign budgeting reenue estimation: the elasticity of Marko Decision Process on customer lifetime alue Wai-Ki Ching Deartment

More information

Strategic decision making under climate change: a case study on Lake Maggiore water system

Strategic decision making under climate change: a case study on Lake Maggiore water system doi:10.5194/piah-364-532-2014 532 Eoling Water Reource Sytem: Undertanding, Predicting and Managing Water Society Interaction Proceeding of ICWRS2014, Bologna, Italy, June 2014 (IAHS Publ. 364, 2014).

More information

AN INTEGRATED SIMULATION AND OPTIMIZATION APPROACH FOR SEASIDE TERMINAL OPERATIONS

AN INTEGRATED SIMULATION AND OPTIMIZATION APPROACH FOR SEASIDE TERMINAL OPERATIONS AN INTEGRATED IMULATION AND OTIMIZATION AROACH FOR EAIDE TERMINAL OERATION Daniela Ambroino Elena Tànfani Department of Economic and Quantitative Method (DIEM) Univerity of Genova Via Vivaldi 5, 16126,

More information

Aggregate Supply. MPL i = Y i / L i

Aggregate Supply. MPL i = Y i / L i Aggregate Supply The upply of output depend on the behavior of producer. roducer' chooe the quantity of input to employ. Thee input produce output and we aume that producer chooe their input to maximize

More information

Significant Changes in the 2005 ACI Code Including Changes Affecting Precast/Prestressed Concrete Part 1

Significant Changes in the 2005 ACI Code Including Changes Affecting Precast/Prestressed Concrete Part 1 Significant Change in the 2005 ACI Code Including Change Affecting Precat/Pretreed Concrete Part 1 S. K. Ghoh, Ph.D., FPCI Preident S. K. Ghoh Aociate, Inc. Palatine, Illinoi Significant change made ince

More information

Equilibrium Sediment Transport and Evolution Trend Simulation of the Lower Yellow River

Equilibrium Sediment Transport and Evolution Trend Simulation of the Lower Yellow River Senor & Tranducer, Vol. 21, Special Iue, May 213, pp. 135-141 Senor & Tranducer 213 by IFSA http://www.enorportal.com Equilibrium Sediment Tranport and Evolution Trend Simulation of the Lower Yellow River

More information

Coordinating a Supply Chain Consisted of One Supplier and One Retailer When Demand Disruption Happens

Coordinating a Supply Chain Consisted of One Supplier and One Retailer When Demand Disruption Happens Management Science and Engineering Vol., No., 07, pp. 9-3 DOI:0.3968/947 ISSN 93-034 [Print] ISSN 93-035X [Online] www.ccanada.net www.ccanada.org Coordinating a Supply Chain Conited of One Supplier and

More information

Challenges of Developing ISO Sampling Standards

Challenges of Developing ISO Sampling Standards Challenge of Developing ISO Sampling Standard Ralph Holme CSIRO Mineral Down Under Flaghip Chair ISO/TC 10/SC 1 Sampling Iron Ore Chair ISO/TC 7/SC 4 Sampling Coal and Coke Convenor ISO/TC 183/WG 9 Sampling

More information

Heterogeneity in Producer s Marketing Strategy

Heterogeneity in Producer s Marketing Strategy Heterogeneity in Producer Marketing Strategy Tong Zhang Reearch Aitant Department of Agricultural Economic Oklahoma State Univerity 42C Ag Hall Phone no. 405-744-9797 Email: tong.zhang0@oktate.edu Wade

More information

Unit Commitment in Smart Grid Considering Demand Response and Stochastic Wind Generation

Unit Commitment in Smart Grid Considering Demand Response and Stochastic Wind Generation J. Energy Power Source Vol. 1, No. 6, 2014, pp. 314-320 Received: September 8, 2014, Publihed: December 30, 2014 Journal of Energy and Power Source www.ethanpublihing.com Unit Commitment in Smart Grid

More information

UNIT 2 PROCESS AND FUNCTIONS OF HUMAN RESOURCE PLANNING (HRP)

UNIT 2 PROCESS AND FUNCTIONS OF HUMAN RESOURCE PLANNING (HRP) Baic of Human Reource Planning UNIT 2 PROCESS AND FUNCTIONS OF HUMAN RESOURCE PLANNING (HRP) Objective After reading thi unit, you hould be able to: l the concept and proce of HRP, l the determination

More information

CONSTRUCTION SPECIFICATION FOR COMPACTING

CONSTRUCTION SPECIFICATION FOR COMPACTING ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.MUNI 501 NOVEMBER 2017 CONSTRUCTION SPECIFICATION FOR COMPACTING TABLE OF CONTENTS 501.01 SCOPE 501.02 REFERENCES 501.03 DEFINITIONS 501.0 DESIGN AND SUBMISSION

More information

Abstract. 1 Introduction

Abstract. 1 Introduction Automatic conflict detection and reolution in metrorail ytem: evaluation approach for MARCO EU project G.F. D'Addio, M. Mazzucchelli, S. Savio Dipartimento di Ingegneria Elettrica, Univerita di Genova,

More information

PRECIPITATION CALIBRATION TESTS August 12, 2009

PRECIPITATION CALIBRATION TESTS August 12, 2009 BISHOP PAIUTE TRIBE ENVIRONMENTAL MANAGEMENT OFFICE PRECIPITATION CALIBRATION TESTS Augut 12, 2009 Thi report decribe the reult of everal precipitation calibration tet carried out in July 2009, following

More information

The Use of Swimmer Bars as Shear Reinforcement in Reinforced Concrete Beam

The Use of Swimmer Bars as Shear Reinforcement in Reinforced Concrete Beam American Journal of Engineering and Applied Science, 6 (1): 87-94, 2013 ISSN: 1941-7020 2014 M. Al-Nara et al., Thi open acce article i ditributed under a Creative Common Attribution (CC-BY) 3.0 licene

More information

Indicative simplified baseline and monitoring methodologies for selected small-scale CDM project activity categories

Indicative simplified baseline and monitoring methodologies for selected small-scale CDM project activity categories III.AU./Verion 01 TYPE III - OTHER PROJECT ACTIVITIES Project participant hall apply the general guideline to SSC CDM methodologie, information on additionality (attachment A to Appendix B) and general

More information

International Journal of Mathematical Archive-8(6), 2017, Available online through ISSN

International Journal of Mathematical Archive-8(6), 2017, Available online through   ISSN International Journal of Mathematical Archive-8(6), 27, 33-38 Available online through www.ijma.info ISSN 2229 546 BAYESIAN SPECIAL TYPE DOUBLE SAMPLING PLAN WITH BETA PRIOR DISTRIBTUTION Dr. S. JEYABHARATHI*

More information

A Method to Risk Analysis in Requirement Engineering Using Tropos Goal Model with Optimized Candidate Solutions K.Venkatesh Sharma 1, Dr P.V.

A Method to Risk Analysis in Requirement Engineering Using Tropos Goal Model with Optimized Candidate Solutions K.Venkatesh Sharma 1, Dr P.V. www.ijcsi.org 250 A Method to Rik Analyi in Requirement Engineering Uing Tropo Goal Model with Optimized Candidate Solution K.Venkateh Sharma 1, Dr P.V.Kumar 2 1 Reearch Scholar in JNTUK Kakinada, Andhra

More information

As companies outsource more product design and manufacturing activities to other members of the supply

As companies outsource more product design and manufacturing activities to other members of the supply MANAGEMEN SCIENCE Vol. 55, No. 7, July 2009, pp. 1122 1138 in 0025-1909 ein 1526-5501 09 5507 1122 inform doi 10.1287/mnc.1090.1008 2009 INFORMS Quality Improvement Incentive and Product Recall Cot Sharing

More information

Available online at ScienceDirect. Energy Procedia 48 (2014 )

Available online at   ScienceDirect. Energy Procedia 48 (2014 ) Available online at www.ciencedirect.com ScienceDirect Energy Procedia 48 (2014 ) 806 812 SHC 2013, International Conference on Solar Heating and Cooling for Building and Indutry September 23-25, 2013,

More information

LED IP PRIMER. One World LED 1026 South Road, Edwardstown, SA, 5039 p: (08) e:

LED IP PRIMER. One World LED 1026 South Road, Edwardstown, SA, 5039 p: (08) e: LED IP PRIMER Thi brochure provide a quick overview of the patented innovation by and our partner around the world. The ytem and method invented by patent granted to One World LED how our commitment to

More information

Study on Mechanical Behavior of Thin-walled Member during Precision Straightening Process

Study on Mechanical Behavior of Thin-walled Member during Precision Straightening Process 2014 by IFSA Publihing, S. L. http://www.enorportal.com Study on Mechanical Behavior of Thin-walled Member during Preciion Straightening Proce Ben Guan, Yong Zang, Diping Wu, Qin Qin School of Mechanical

More information

Management Science Letters

Management Science Letters Management Science Letter 2 (2012) 3049 3054 Content lit available at GrowingScience Management Science Letter homepage: www.growingscience.com/ml Identification and prioritization of hazardou material

More information

Simultaneous Synthesis of Multi-Period Heat Exchanger Networks for Multi-Plant Heat Integration

Simultaneous Synthesis of Multi-Period Heat Exchanger Networks for Multi-Plant Heat Integration 757 A publication of CHEMICAL ENGINEERINGTRANSACTIONS VOL. 61 2017 Guet Editor:PetarSVarbanov Rongxin Su Hon Loong Lam Xia Liu Jiří J Klemeš Copyright 2017 AIDIC ServiziS.r.l. ISBN978-88-95608-51-8; ISSN

More information

Online Monitoring of Exhaust Gas Emissions of a Boiler with Diesel/Biodiesel Fuel Blends

Online Monitoring of Exhaust Gas Emissions of a Boiler with Diesel/Biodiesel Fuel Blends Online Monitoring of Exhaut Ga Emiion of a Boiler with Dieel/Biodieel Fuel Blend Andrea Valdman *1, Maurício Bezerra de Souza Jr. 1, Roana Folly 1, Belki Valdman 1 1 School of Chemitry, Chemical Engineering

More information

Discovering Transcription Factor Binding Motif Sequences

Discovering Transcription Factor Binding Motif Sequences Dicovering Trancription Factor Binding Motif Sequence I Department of Biology, Stanford Univerity, CA, 94305 Introduction In biology, equence motif are hort equence pattern, uually with fixed length, that

More information

EXTENSION OF EOQ MODEL

EXTENSION OF EOQ MODEL EXTENSION OF EO MOEL WITH EMERGENCY ORERS AN EXPLICIT ENERGY COST CONSIERATIONS A Mater Tei reented to te Faculty of te Graduate Scool at te Univerity of Miouri In Partial Fulfillment Of te Requirement

More information

(12) Patent Application Publication (10) Pub. No.: US 2003/ A1

(12) Patent Application Publication (10) Pub. No.: US 2003/ A1 US 20030204424A1 (19) United State (12) Patent Application Publication (10) Pub. No.: US 2003/0204424 A1 Koller et al. (43) Pub. Date: Oct. 30, 2003 (54) MANAGEMENT BY OBJECTIVES (52) U.S. Cl.... 705/7

More information

Transportation of Hazardous Wastes in Arizona: Development of a Data Base Management System for Basic Analysis

Transportation of Hazardous Wastes in Arizona: Development of a Data Base Management System for Basic Analysis Tranportation Reearch Record Tranportation of Hazardou Wate in Arizona: Development of a Data Bae Management Sytem for Baic Analyi A. ESSAM RADWAN, K. DAVD PJAWKA, ANDY SOESLO, and FURE-YOW SHEH ABSTRACT

More information

European Advertising Consumer Research Report 2015

European Advertising Consumer Research Report 2015 RESEARCH REPORT European Advertiing Conumer Reearch Report 2015 Conumer Awarene & Impact of European Self-Regulatory Programme for OBA Independent reearch conducted by Ipo MORI on behalf of TRUSTe and

More information

STRONG FAILURE OF SEABED INDUCED BY GAS HYDRATE DISSOCIATION

STRONG FAILURE OF SEABED INDUCED BY GAS HYDRATE DISSOCIATION Proceeding of the 7th International Conference on Ga Hydrate (ICGH 211), Edinburgh, Scotland, United Kingdom, July 17-21, 211. STRONG FAILURE OF SEABED INDUCED BY GAS HYDRATE DISSOCIATION Xiaobing Lu Xu

More information

Optimizing Empty Containers Distribution among Ports

Optimizing Empty Containers Distribution among Ports Journal of Mathematics and tatistics 7 (3): 26-22, 20 IN 549-3644 20 cience ublications Otimizing Emty Containers Distribution among orts Mohammed A. Hajeeh and Weam Behbehani Techno-Economics Division,

More information

MoST - Business Finland Joint Funding Call

MoST - Business Finland Joint Funding Call MoST - Buine Finland Joint Funding Call I. AGREEMENT Memorandum of Undertanding for China-Finland Science & Technology Innovation Cooperation between the Department of International Cooperation of the

More information

Establishment and evaluation of operation function model for cascade hydropower station

Establishment and evaluation of operation function model for cascade hydropower station Water Science and Engineering, 2010, 3(4):443-453 doi:10.3882/j.in.1674-2370.2010.04.007 http://www.waterjournal.cn e-mail: we2008@vip.163.com Etablihment and evaluation o operation unction model or cacade

More information

Working Party on Agricultural Policies and Markets

Working Party on Agricultural Policies and Markets Unclaified AGR/CA/APM(2001)24/FINAL AGR/CA/APM(2001)24/FINAL Unclaified Organiation de Coopération et de Développement Economique Organiation for Economic Co-operation and Development 22-Jul-2002 Englih

More information

An Optimal Real-time Pricing Algorithm for the Smart Grid: A Bi-level Programming Approach

An Optimal Real-time Pricing Algorithm for the Smart Grid: A Bi-level Programming Approach An Optimal Real-time Pricing Algorithm for the Smart Grid: A Bi-level Programming Approach Fan-Lin Meng and Xiao-Jun Zeng School of Computer Science, Univerity of Mancheter Mancheter, United Kingdom mengf@c.man.ac.uk,

More information

JOURNAL OF THE. Agricultural Economics Council. L Northeastern 0,/IA-<- '-'-". ~. ' ) VOLUME Ill, NUMBER 2 OCTOBER 1974 NOV

JOURNAL OF THE. Agricultural Economics Council. L Northeastern 0,/IA-<- '-'-. ~. ' ) VOLUME Ill, NUMBER 2 OCTOBER 1974 NOV C i.; ' I FOUNDI.\T!ON OF AGRICULTURAL ECONOMICS LIBRARY NOV 6 974 JOURNAL OF THE - L Northeatern Agricultural Economic Council ~ 0,/IA-

More information

Examining the tradeoff between fixed pay and performance-related pay: A choice experiment approach

Examining the tradeoff between fixed pay and performance-related pay: A choice experiment approach Examining the tradeoff between fixed pay and performance-related pay: A choice experiment approach JUNYI SHEN * Reearch Intitute for Economic and Buine Adminitration, Kobe Univerity KAZUHITO OGAWA Faculty

More information

Area, Sahibabad Ghaziabad, Uttar Pradesh Jharkhand India

Area, Sahibabad Ghaziabad, Uttar Pradesh Jharkhand India Thermal Analyi Of A Silicagel Methanol Adortion Refrigeration Sytem Mr.Anirban Sur 1 Dr.Randi.K.Da 2 1 Aitent Profeor Mechanical Engg. Deartment Inderraatha Engineering College Plot No:63, Site 4, Indutrial

More information

Abstract Title:An investigation of time buffer into the fundamentals of critical chain project management: A behavioral perspective

Abstract Title:An investigation of time buffer into the fundamentals of critical chain project management: A behavioral perspective Abstract Number:008-0056 Abstract Title:An investigation of time buffer into the fundamentals of critical chain roject management: A behavioral ersective Authors information : Name: Min Zhang Organization:

More information

Enhanced Biofilter Treatment of Urban Stormwater by Optimizing the Hydraulic Residence Time in the Media

Enhanced Biofilter Treatment of Urban Stormwater by Optimizing the Hydraulic Residence Time in the Media Enhanced Biofilter Treatment of Urban Stormwater by Optimizing the Hydraulic Reidence Time in the Media Redahegn Silehi 1, Robert Pitt 2 and Shirley Clark 3 1 Graduate tudent, Dept. of Civil, Contruction,

More information

1. Introduction. School of. appearance often with. entry section function to prevent. temperature. implementation of. plan consists of the

1. Introduction. School of. appearance often with. entry section function to prevent. temperature. implementation of. plan consists of the THE INDONESIAN JOURNAL OF BUSINESS ADMINISTRATION Vol. 2, No. 10, 2013:1131-11433 REDUCING COIL BREAK REJECTION AT HOT SKIN PASS MILL PT KRAKATAU STEEL Dicky Mardiana and Muryid Haan Bari School of Buine

More information

Measurement of air pressure fluctuations at lower levels in a high-rise drainage stack

Measurement of air pressure fluctuations at lower levels in a high-rise drainage stack Measurement of air ressure fluctuations at lower levels in a high-rise drainage stack W.L. Woo(), K.W. Mui(2), C.L. Cheng(3), L.T. Wong(4), W.J. Liao(5) (4) beltw@olyu.edu.hk (),(2),(4) Deartment of Building

More information

Up or Out? Economic-Engineering Theory of Flood Levee Height and Setback

Up or Out? Economic-Engineering Theory of Flood Levee Height and Setback Up or Out? Economic-Engineering Theory of Flood Levee Height and Setback Tingju Zhu 1 and Jay R. Lund 2 Abtract: Levee etback location and height are important iue in flood levee ytem deign and modification.

More information

environment of the Poyang Lake of the department of Education, Nanchang University, Nanchang330031, China

environment of the Poyang Lake of the department of Education, Nanchang University, Nanchang330031, China doi:10.21311/002.31.10.20 Cot - Benefit Analyi of Green Building Baed on Input - Output Theory Liu Wei 1, 2, 3, Wu zhijiang 1 1 Eat China Jiaotong Univerity, Nanchang330013, China 2 The School of economic

More information

Effectiveness and Exergy Destruction Analysis of Evaporator in Organic Rankine Cycle

Effectiveness and Exergy Destruction Analysis of Evaporator in Organic Rankine Cycle Effectivene and Exergy Detruction Analyi of Evaporator in Organic Rankine Cycle Kyoung Hoon Kim, and Chul Ho Han Abtract---Thi paper carrie out a performance analyi baed on the firt and econd law of thermodynamic

More information

A model for grain growth based on the novel description of dendrite shape

A model for grain growth based on the novel description of dendrite shape ARCHIVES of FOUNDRY ENGINEERING Publihed quarterly a the organ of the Foundry Commiion of the Polih Academy of Science ISSN (1897-3310) Volume 7 Iue 4/2007 183 188 36/4 A model for grain growth baed on

More information

Modeling Available Soil Moisture Application Note

Modeling Available Soil Moisture Application Note Modeling Availale Soil Moiture Application Note Gaylon Campell, Ph.D METER Group, Inc. (Formerly Decagon Device, Inc.) Pullman, WA Both the amount and the availaility of water in oil i important to plant

More information

VEHICLE DISPATCHING PROBLEM AT THE CONTAINER TERMINAL WITH TANDEM LIFT QUAY CRANES. A Dissertation YAO XING

VEHICLE DISPATCHING PROBLEM AT THE CONTAINER TERMINAL WITH TANDEM LIFT QUAY CRANES. A Dissertation YAO XING VEHICLE DISPATCHING PROBLEM AT THE CONTAINER TERMINAL WITH TANDEM LIFT QUAY CRANES A Diertation by YAO XING Submitted to the Office of Graduate Studie of Texa A&M Univerity in partial fulfillment of the

More information

An Improved Void-Resistance Model for Abandoned Coal Mine Gas Reservoirs

An Improved Void-Resistance Model for Abandoned Coal Mine Gas Reservoirs n Imroved Void-Reitance Model for bandoned Coal Mine Ga Reervoir Ji-Quan Shi 1, Ruben Martinez Rubio, Sevket Durucan 1 1 Deartment of Earth Science and Engineering, Royal School of Mine, Imerial College

More information

About the Authors. Your Shortcuts Might Become Expensive Detours. Dr. Andreas Krueger. Felipe Nogueira

About the Authors. Your Shortcuts Might Become Expensive Detours. Dr. Andreas Krueger. Felipe Nogueira L ea eadmi ni t r a onbynaki a MakeYourDeadl i newi t houtcompr omi i ngqual i t y I FRS16Rapi ddepl oymentgui de naki a. c om About the Author Dr. Andrea Krueger Andrea i a Senior Solution Expert for

More information

Fatigue Crack Repair Using Drilled Holes and Externally Bonded CFRP Strips

Fatigue Crack Repair Using Drilled Holes and Externally Bonded CFRP Strips Bridge Maintenance, Safety, Management, Reilience and Sutainability Biondini & Frangopol (Ed) 212 Taylor & Franci Group, London, ISBN 978--415-62124-3 Fatigue Crack Repair Uing Drilled Hole and Externally

More information

Department of Production Engineering, Birla Institute of Technology, Mesra, Ranchi, Jharkhand, India.

Department of Production Engineering, Birla Institute of Technology, Mesra, Ranchi, Jharkhand, India. International Journal of Baic and Applied Science Vol. 4. No. 3 2015. Pp. 118-129 Copyright by CRDEEP. All Right Reerved. Full ength Reearch Paper Supply Chain Optimization Model under Uncertainty Anurag

More information

A Sequential Order Picking and Loading System for Outbound Logistics Operations

A Sequential Order Picking and Loading System for Outbound Logistics Operations A Sequential Order Picking and Loading System for Outbound Logistics Oerations K.L. Choy, G.T.S. Ho, H.Y. Lam, Canhong Lin, T.W. Ng Deartment of Industrial and Systems Engineering, the Hong Kong Polytechnic

More information

Bachelor End Project: Characterization of the constitutive behavior of polymer foams

Bachelor End Project: Characterization of the constitutive behavior of polymer foams Bachelor End Project: Characterization of the contitutive behavior of polymer foam R. van Eijden MT 05.27 Coach: Dr. ir. J.A.W. van Dommelen Eindhoven, April 21t 2005 Content Content Abtract Lit of ymbol

More information

GMACE Pilot #4: Adjusting the National Reliability Input Data

GMACE Pilot #4: Adjusting the National Reliability Input Data INTERBULL BULLETIN NO. 48. Berlin, Germany, May 20 21, 2014 GMACE Pilot #4: Adjuting the National Reliability Input Data P. G. Sullivan 1 and J. H. Jakoben 2 1 Canadian Dairy Network, Guelph, ON, Canada

More information

AGRON 183: Photosynthesis

AGRON 183: Photosynthesis AGRON 183: Photoynthei Dr. Brian Hornbuckle December 1, 2016 Introduction I think I can afely ay that every agronomit i aware of the proce of photoynthei, a decribed by the following chemical equation.

More information

INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN ICED 03 STOCKHOLM, AUGUST 19-21, 2003 EVALUATION OF SOFT REQUIREMENTS DURING PRODUCT DESIGN

INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN ICED 03 STOCKHOLM, AUGUST 19-21, 2003 EVALUATION OF SOFT REQUIREMENTS DURING PRODUCT DESIGN INTERNATIONAL CONFERENCE ON ENGINEERING DESIGN ICED 3 STOCKHOLM, AUGUST 9-, 3 EVALUATION OF SOFT REQUIREMENTS DURING PRODUCT DESIGN Kjell Anderon Abtract Ti paper preent an approac to improve current metod

More information

75th MORSS CD Cover Page UNCLASSIFIED DISCLOSURE FORM CD Presentation

75th MORSS CD Cover Page UNCLASSIFIED DISCLOSURE FORM CD Presentation 75th MORSS CD Cover Page UNCLASSIFIED DISCLOSURE FORM CD Preentation 712CD For office ue only 41205 12-14 June 2007, at US Naval Academy, Annapoli, MD Pleae complete thi form 712CD a your cover page to

More information

Keywords: ILSS, Flexural Strength, Hybrid Polymer Composite, Curing, Epoxy Resin 5052, Vacuum Bagging.

Keywords: ILSS, Flexural Strength, Hybrid Polymer Composite, Curing, Epoxy Resin 5052, Vacuum Bagging. American International Journal Reearch in Science, Technology, Engineering & Mathematic Available online at http://www.iair.net ISSN (Print): 2328-3491, ISSN (Online): 2328-3580, ISSN (CD-ROM): 2328-3629

More information

Management Science Letters

Management Science Letters Management Science Letter 2 (202) 247 252 Content lit available at GrowingScience Management Science Letter homepage: www.growingscience.com/ml An empirical tudy to meaure the impact of loan aignment for

More information

Logistics Service Level Improvement Research and Demonstration Based on Queuing Theory

Logistics Service Level Improvement Research and Demonstration Based on Queuing Theory Management cience and Engineering Vol. 5, No. 3,, pp. -54 DOI:.36/j.me.335X53.z44 IN 3-34[Print] IN 3-35X[Online] www.ccanada.net www.ccanada.org Logitic ervice Level Improvement Reearch and Demontration

More information

Effect of HFTID Controller on the Stability of Thermal Power Generator

Effect of HFTID Controller on the Stability of Thermal Power Generator Effect of HFTID Controller on the Stability of Thermal Power Generator Anhuman Sehgal, Japreet Kaur, Parveen Lehana 2 Department of Electrical Engineering, Baba Banda Singh Bahadur Engineering College,

More information

Research Division Federal Reserve Bank of St. Louis Working Paper Series

Research Division Federal Reserve Bank of St. Louis Working Paper Series Reearch Diviion ederal Reerve Bank of St. Loui Working Paer Serie Biofuel Subidie and International Trade Subhayu Bandyoadhyay Sumon Bhaumik and Howard J. Wall Working Paer 2009-053B htt://reearch.tlouifed.org/w/2009/2009-053.df

More information

Big Data computation for workshop-based planning support

Big Data computation for workshop-based planning support Big Data computation for worhop-baed planning upport Jianguang Tu International School of Software Wuhan Univerity Wuhan, P.R.China Tujg1973@gmail.com Jianquan Cheng * School of Science and the Environment

More information

Modal Response of Hydraulic Turbine Runners

Modal Response of Hydraulic Turbine Runners 1 (9) Modal Repone o Hydraulic Turbine Runner Q.W. LIANG Center o Indutrial Diagnotic and Fluid Dynamic (CDIF), Technical Univerity o Catalonia, Barcelona, Spain, quanwei@m.upc.edu C. G. RODRIGUEZ Center

More information

Water Distribution as a Noncooperative Game

Water Distribution as a Noncooperative Game Water Ditribution a a Noncooperative Game Ardehir Ahmadi, IHU Univerity,ehran, Iran Ardehir79@yahoo.com ABRAC he water ditribution problem of the Mexican Valley i modeled a a three-peron noncooperative

More information

STUDY THE EFFECT OF WHEAT MARKET LIBERALIZATION ON RURAL WELFARE IN IRAN

STUDY THE EFFECT OF WHEAT MARKET LIBERALIZATION ON RURAL WELFARE IN IRAN 69 STUDY THE EFFECT OF WHEAT MARKET LIBERALIZATION ON RURAL WELFARE IN IRAN Koohar Khaledi, h.d. of Agricultural Economic, Department of Agricultural Economic, Kermanhah Branch, Ilamic Azad Univerity,

More information

TRUST AND GOODWILL AS DRIVERS OF SMALL ENTERPRISE SUCCESS: EVIDENCE FROM KENYAN SERVICE SECTOR INTELLECTUAL CAPITAL PERSPECTIVE

TRUST AND GOODWILL AS DRIVERS OF SMALL ENTERPRISE SUCCESS: EVIDENCE FROM KENYAN SERVICE SECTOR INTELLECTUAL CAPITAL PERSPECTIVE TRUST AND GOODWILL AS DRIVERS OF SMALL ENTERPRISE SUCCESS: EVIDENCE FROM KENYAN SERVICE SECTOR INTELLECTUAL CAPITAL PERSPECTIVE Dr. Roe J S Boit, Emma Serem, Biwott Geoffrey and Thoma Taru Department of

More information

Business-driven decision support for change management: planning and scheduling of changes

Business-driven decision support for change management: planning and scheduling of changes Buine-driven deciion upport for change management: planning and cheduling of change Jacque Sauvé 1, Rodrigo Rebouça 1, Antão Moura 1, Claudio Bartolini 2, Abdel Boulmakoul 3, David Tratour 3 1 Departamento

More information

Enabling Collaborative Data Sharing in Google+

Enabling Collaborative Data Sharing in Google+ Enabling Collaborative Data Sharing in Google+ Hongxin Hu Delaware State Univerity, Dover, Delaware, 19901 hxhu@au.edu Gail-Joon Ahn and Jan Jorgenen Arizona State Univerity, Tempe, Arizona, 85287 {gahn,jan.jorgenen}@au.edu

More information

Carrier-Gas Enhanced Atmospheric Pressure Desalination (Dewvaporation): Economic Analysis and Comparison to Reverse Osmosis and Thermal Evaporation

Carrier-Gas Enhanced Atmospheric Pressure Desalination (Dewvaporation): Economic Analysis and Comparison to Reverse Osmosis and Thermal Evaporation Carrier-Ga Enhanced Atmopheric Preure Dealination (Dewvaporation): Economic Analyi and Comparion to Revere Omoi and Thermal Evaporation Noah Abba and Kehinde Adeoye Chemical Engineering Undergraduate Univerity

More information

REQUEST FOR PROPOSAL RFP No. PS CONSULTANT FOR POND RENEWAL AT DR. SUN YAT-SEN PARK AND CLASSICAL CHINESE GARDEN. AMENDMENT No.

REQUEST FOR PROPOSAL RFP No. PS CONSULTANT FOR POND RENEWAL AT DR. SUN YAT-SEN PARK AND CLASSICAL CHINESE GARDEN. AMENDMENT No. FINANCIAL SERVICES GROUP Supply Management vember 3, 2015 REQUEST FOR PROPOSAL RFP. PS20150769 CONSULTANT FOR POND RENEWAL AT DR. SUN YAT-SEN PARK AND CLASSICAL CHINESE GARDEN AMENDMENT. 2 RE: CLOSING

More information

4 Farmer Perceptions of the Biophysical

4 Farmer Perceptions of the Biophysical 4 Farmer Perception of the Biophyical Contraint to Rice Production in Sub-Saharan Africa, and Potential Impact of Reearch Aliou Diagne,* Didier Y. Alia, Eyram Amovin-Aagba, Marco C.S. Woperei, Kazuki Saito

More information

Environmental Engineering Technologies (2013)

Environmental Engineering Technologies (2013) Directions: (Print on legal size aer) Ga Analysis for 201 s Secondary : Indicate the level the student will be able to erform the standard when leaving the rogram for each of the s Point: Indicate where

More information

M A S O N R Y. Revised Spring Engineering Notes For Design With Concrete Block Masonry

M A S O N R Y. Revised Spring Engineering Notes For Design With Concrete Block Masonry A S O N R Y Revied Spring 007 Engineering Note For Deign With Concrete Block aonry C H R O N I C L E S To rectify the ituation, the Spring 007 article i being reiued. We apologize for any inconvenience

More information

Computer Analysis of In-plane Behavior of Masonry Walls Strengthened by FRP Strips

Computer Analysis of In-plane Behavior of Masonry Walls Strengthened by FRP Strips , 22-24 October, 2014, San Francico, USA Computer Analyi of In-plane Behavior of Maonry Wall Strengthened by FRP Strip J. Szolomicki Abtract The paper concern the trengthening uing FRP compoite of maonry

More information

REHABILITATION OF THE CONCRETE BRIDGE ACROSS HIGHWAY

REHABILITATION OF THE CONCRETE BRIDGE ACROSS HIGHWAY REHABILITATION OF THE CONCRETE BRIDGE ACROSS HIGHWAY Darko Meštrović*, Dean Čizmar* & Angela Nižić** *Faculty of Civil Engineering Univerity of Zagreb ** Lehrtull fuer Maivbau Techniche Univeritaet Muenchen

More information

Use of Geographic Information Systems to Explore and Communicate Transportation and Land Use Relationships in Iowa

Use of Geographic Information Systems to Explore and Communicate Transportation and Land Use Relationships in Iowa Ue of Geographic Information Sytem to Explore and Communicate Tranportation and Land Ue Relationhip in Iowa David J. Plazak, Tranportation Policy Analyt Mark B. elon, Tranportation Specialit Tim R. Strau,

More information

ToP Strategic Planning Design Pattern Application Level

ToP Strategic Planning Design Pattern Application Level The Big Picture ToP Strategic Planning Deign Pattern Application Level ToP Strategic Planning Overview The ToP Strategic Planning method enable a group to create a et of trategie and practical action plan

More information