1 EUROPEAN COMMISSION Communications Networks Content & Technology Directorate-General Electronic Communications Networks & Services Spectrum Brussels, 23 November 2012 DG CONNECT/B4 RSCOM12-46 PUBLIC DOCUMENT RADIO SPECTRUM COMMITTEE Working Document Subject: Interferences with GSM-R (contribution from ERA) This is a Committee working document which does not necessarily reflect the official position of the Commission. No inferences should be drawn from this document as to the precise form or content of future measures to be submitted by the Commission. The Commission accepts no responsibility or liability whatsoever with regard to any information or data referred to in this document European Commission, DG Communications Networks Content & Technology, 200 Rue de la Loi, B-1049 Bruxelles RSC Secretariat, Avenue de Beaulieu 33, B-1160 Brussels - Belgium - Office BU33 7/09 Telephone: direct line (+32-2) / switchboard (+32-2) Fax: (+32-2) cnect-rsc@ec.europa.eu

2 Input document for Radio Spectrum Committee (RSC#42) Interferences with GSM-R time for action Prepared by the European Railway Agency, ERTMS Unit, reviewed by DG MOVE. Valenciennes, 21 st of November 2012 The concern on interferences to GSM-R is increasing in the railway world. The urgency is very high for some of the Infrastructure Managers and Railway Undertakings, especially in regions where UMTS 900 is in service or planning a massive deployment in areas close to the rail tracks. On the one hand, the deployment of European Rail Traffic Management System (ERTMS)(including GSM-R) is a priority for transport policy and is mandatory in Europe according to the Railway Interoperability Directive 2008/57/EC and to the ERTMS European Deployment Plan 1. It implies the replacement of legacy train communication systems with GSM-R. Interferences from both UMTS 900, GSM and the future LTE networks are therefore a crucial matter. Indeed, the deployment of the European Rail Traffic Management System "Level 2" requires that the GSM-R coverage allows maintaining an uninterrupted data call between the train and the control center from the start to the end of the trip. The lack of coverage in an area has a double impact: the train controlled by ERTMS Level 2 will react breaking until a new call can be established (with the corresponding losses in terms of efficiency, punctuality and possibly payments to passengers impacted) and there would be no possibility of being alerted in case of emergency via the Railway Emergency Call (which is the main safety related application of the voice GSM-R system). On the other hand, the deployment of wide band technologies to allow citizens and passengers in the trains a seamless communication is also a priority. Therefore, it is clear that the coexistence of both communication means has to be ensured by all the involved actors. In this regard, the RSC and the Commission are invited to take note of the issue of interferences with GSM-R and to respond to the urgent need to define harmonised maximum levels of wanted/unwanted (cumulative) emissions (i.e. by giving a mandate to ECC to review the ECC report 162 and issue a new report). Summary of activities in the past months Many activities have been developed in this direction in the past months: Studies for the characterisation of interferences done by some railway infrastructure managers (i.e. UK, Belgium) Decisions taken by some Member States to agree on an immediate way forward to their situation (i.e. Sweden) Measurement campaigns in the railway environment (i.e. ISPRA campaign in Italy) UIC working group on Frequency Management (with meetings in Paris, London, Copenhagen and Munich) and documents, such as the Final Report of the ad-hoc group for Frequency Interferences (O-8700) 1 European Commission, DG Communications Networks Content & Technology, 200 Rue de la Loi, B-1049 Bruxelles RSC Secretariat, Avenue de Beaulieu 33, B-1160 Brussels - Belgium - Office BU33 7/09 Telephone: direct line (+32-2) / switchboard (+32-2) Fax: (+32-2) cnect-rsc@ec.europa.eu

3 Some railway infrastructure managers are increasingly raising their concerns on the cases of interferences that they are experiencing. They are requesting their National Radio Spectrum Regulatory body to exercise their mandate to coordinate and foster the resolution of conflicts amongst radio services providers. In UK, several new UMTS sites have been installed by public operators. There are differences measured between the different operators: the spectrum of one operator seems to be reduced by the installation in the public BTS of additional filters, whereas other base stations appear with strong signals in the GSM-R band. The tests done together with Ofcom showed big differences: the results measured in the lab showed no influence, whereas the field results showed what railways are claiming, that they are strongly disturbed. ORR planned to start active negotiations with Ofcom to find a common solution. In Belgium, a proactive approach has been taken to solve the current and the potential GSM- R interference problems before the actual implementation of ERTMS Level 2 on the conventional rail network. They are ready to modify some configuration in their GSM-R network, and to make a planning in agreement with the plans of the public operators. However, for the current cases that have appeared, they have requested the National Radio Spectrum Regulator to chair the coordination activities and to act as a referee in the allocation of responsibilities. Sweden has a different radio situation: UMTS 900 is installed and has a restriction in the power emitted that will disappear in a few years (2015). It is imperative in this situation to protect the interests of both parties: the different authorities (transport and IT) together with the industries (railway and telecommunication) have studied the possible solutions and they have found a way forward: they propose to install filters on the UMTS BTSs in the areas close to the tracks to reduce unwanted emissions, and to install filters on board of the (incumbent/national) trains to reduce the effect of the in-band noise produced by the broadband signals in the GSM-R band. This solution, that may be effective in this environment, is not in line with the concept of non-discrimination to the vehicles inherent to the opening of the European railway market (not all of them may be, then, in the same conditions to travel through that area). Problems have been also reported in other countries. It is just a start. UIC has been deeply involved in the activities of raising awareness and characterisation of the interferences to GSM-R networks. During the end of the last year (2011), a specific testing campaign took place in Italy (at the European Commission s Joint Research Centre, JRC), to demonstrate the real blocking behaviour of GSM-R radio modules, using market available GSM-R radios. Unwanted emissions from UMTS or LTE base stations to the GSM-R downlink, which are additional factors causing interferences to GSM-R, were outside the scope of these tests (they may be subject for further testing). The tests checked the blocking with one interferer, the effect of the selectivity when more than one interferer is present. UIC has also organized an ad-hoc group and issued the report O-8700 to help the understanding of different aspects of the problems seen. The UIC Frequency Management Group regularly meets and studies the information available from different countries and technical evolution that would be an improvement. The European Railway Agency (ERA) is aware of the activities above and has been involved in most of them, with the target to assist the European Commission (DG Move) in order to find solutions at E.U. level (requested by the railway actors and ministries) to achieve the coexistence of all the technologies. Interference Workshop 3

4 The European Commission (DG Move) and the European Railway Agency (ERA) have organised the 1 st Interference Workshop in Lille. Organisations involved in frequency issues have been invited to participate at this workshop which took place in the premises of ERA on the 5th of November The event focussed on the status, possible technical solutions, their impact and the way forward. The workshop allowed an open and dynamic exchange of views and understanding of the impact in railway operation and legislation. The workshop was divided in 4 parts: Interference status presented by some railways Catalogue of possible solutions Legal impact of the different solutions (railway/telecom legislation ) How to progress ( short term/long term) The first session gave an overview about the impact of the interferences in the operational conditions of railways. Today, more than km of lines equipped with GSM-R are in in operation; Km are planned to be covered by this system. During the first years, no disturbances have been registered along the railway lines; the impact started with the new licenses for the E Band and this became a new dimension with the development of broadband systems like UMTS and LTE. These new technologies are now been implemented in the 900MHz band. The implementation of such new systems is foreseen nearby the railway lines, so that the passengers can get access to the broadband systems. This creates potential ground for interference into the GSM-R band. In the old ECC Recommendations REC0802 and REC0508, only the coordination at the borders was described; in the last EC decisions 676/2002/EC, 2009/766/EC, coordination by MS is mentioned in the following way: (7th Whereas): [ ] Member States should take whatever measures are necessary to protect the continued operation of GSM systems from harmful interference. Art 5.2 Member States shall ensure that other systems [ ] give appropriate protection to systems in adjacent bands. It was stated that the majority of MS are not taking into account this activity; neither giving any feedback in the timeframe of max 4 months declared in the Directive 2002/21/EC (article 20) and Directive 2009/140/EC, with the modified article 20. During this first part of the workshop, railways reported about their disturbances (location, length, kind of, etc.), activities performed to solve these problems, negotiations with public operator and discussions with National Frequency Regulators. In some MS, the introduction of so called "round table meetings has been initiated and some activities have been registered. The second part of the workshop showed the different possible solutions to be used by all involved parties. The session started with an explanation of intermodulation of 3rd order and blocking. This was followed by presentations about the technical solutions that could be implemented in the cab of the locomotive. The following solutions were presented Coordination by frequency regulator Implementation of Filter in the cabin radio New GSM-R module with better linearity to avoid production of IM 3 rd order products 4

5 Filter implementation at the BTS of the public operator to reduce the unwanted emissions Network planning and network optimisation (public and railways) At the end of the session, it was clear for all participants that the solution by implementing a filter in the cab will not solve all the problems. For new sites, a better coordination by the regulator is unavoidable. This means that in order to take a decision, a complete tool set is needed. The existing report 162 should be reviewed and a new report is required to include unwanted emission values. The planning phase should be coordinated and network optimisation including frequency coordination is a must. For existing problem sites, a common coordination approach between the public operators and railway infrastructure managers is needed (network optimisation, filter implementation in the public BTS, shifting the handover point in the GSM-R network, adding additional BTS etc.) As a long term solution, the upgrading of the GSM-R module in the cab radio seems to be a possibility. It was proposed to test the new developed modules together with the filter solution in a real railway environment to confirm the lab values presented during the workshop. Conclusion of this part: there is no single solution; a bundle of measures has to be taken. In the 3rd part of the workshop, railway and telecom legislation was presented and discussed. The existing EC Decisions and Regulations for the telecom part are available and unambiguous. However, application seems to be a problem. Moreover, the tools (ECC reports) are considered not sufficient to tackle problems in real life and they are not compulsory (not included in a law) but are simple recommendations. Their update is urgently needed. The existing ERTMS Commission Decision 2012/88/EC (CCS TSI) does not prescribe the filter solution describe above. It is therefore not a legal solution and may not be imposed on infrastructure managers and railway undertakings. Modification of this Decision has a big impact on railway actors (time and money). In the last session, the way forward and measures to be taken have been discussed. Action points suggested have been noted to create solutions for the short and long term period. The start of a field test with filters and improved modules has been decided to create possible solutions, change requests to the documents in the CCS TSI will be prepared, studies and analysis have been agreed.the different proposed action points are now bundled in an action list prepared by all participants at the end of the workshop. The action point list has been distributed for review and completion to define the final dates and responsible organisations. This list will be placed on the ERA WEB site together with all presentations done during the workshop. The Commission services (DG MOVE and DG CNNECT) agreed to follow-up the action point list with stakeholders. Practical details have still to be agreed. These documents can be found under the following link: 5

RADIO SPECTRUM POLICY GROUP. Commission activities related to radio spectrum policy

RADIO SPECTRUM POLICY GROUP. Commission activities related to radio spectrum policy EUROPEAN COMMISSION Directorate-General for Communications Networks, Content and Technology Electronic Communications Networks and Services Radio Spectrum Policy Group RSPG Secretariat Brussels, 15 October

More information

RADIO SPECTRUM POLICY GROUP. Progress Report of the RSPG Working Group

RADIO SPECTRUM POLICY GROUP. Progress Report of the RSPG Working Group EUROPEAN COMMISSION Directorate-General for Communications Networks, Content and Technology Electronic Communications Networks and Services Radio Spectrum Policy Group RSPG Secretariat Brussels, 08 June

More information

RADIO SPECTRUM POLICY GROUP

RADIO SPECTRUM POLICY GROUP EUROPEAN COMMISSION Directorate-General for Communications Networks, Content and Technology Electronic Communications Networks and Services Spectrum Brussels, 24 February 2016 DG CONNECT/B4 RSPG16-013

More information

Managing The Evolution Of Railway Radio Communication SUMMARY 1 A BIT OF HISTORY. Chiel Spaans, ERA

Managing The Evolution Of Railway Radio Communication SUMMARY 1 A BIT OF HISTORY. Chiel Spaans, ERA Managing The Evolution Of Railway Radio Communication Chiel Spaans, ERA SUMMARY In the last decade of the previous century, railways have adopted the GSM technology to create a railway specific radio system,

More information

RSPG Opinion on EU coordination at ITU-R Radiocommunication Conferences

RSPG Opinion on EU coordination at ITU-R Radiocommunication Conferences EUROPEAN COMMISSION Directorate-General for Communications Networks, Content and Technology Electronic Communications Networks and Services Radio Spectrum Policy Group RSPG Secretariat Brussels, 30 January

More information

Guide for the application of the TSI for the Subsystems Control-Command and Signalling Track-side and On-board

Guide for the application of the TSI for the Subsystems Control-Command and Signalling Track-side and On-board CCS TSI Application Making the railway system work better for society. European Union Agency for Railways for the application of the TSI for the Subsystems Control-Command and Signalling Track-side and

More information

RADIO SPECTRUM POLICY GROUP

RADIO SPECTRUM POLICY GROUP EUROPEAN COMMISSION Directorate-General for Communications Networks, Content and Technology Electronic Communications Networks and Services Radio Spectrum Policy Group RSPG Secretariat Brussels, 16 December

More information

UITP EU Committee Position on the ERA Draft Final Report. IU-ExtScope FinalReport. on the Extension of field of application of TSIs

UITP EU Committee Position on the ERA Draft Final Report. IU-ExtScope FinalReport. on the Extension of field of application of TSIs Brussels, 22 April 2009 UITP EU Committee Position on the ERA Draft Final Report IU-ExtScope-20090320-FinalReport dated 20th March 2009 on the Extension of field of application of TSIs The UITP European

More information

Memorandum of Understanding (MoU)

Memorandum of Understanding (MoU) EUROPEAN COMMISSION Memorandum of Understanding (MoU) Between the European Commission and the European Railway Associations (CER UIC UNIFE EIM GSM-R Industry Group ERFA) concerning the strengthening of

More information

ANNUAL ACTIVITY REPORT OF COORDINATOR KAREL VINCK ERTMS PROJECT. Brussels. August 2008

ANNUAL ACTIVITY REPORT OF COORDINATOR KAREL VINCK ERTMS PROJECT. Brussels. August 2008 ANNUAL ACTIVITY REPORT OF COORDINATOR KAREL VINCK ERTMS PROJECT Brussels August 2008 This report only represents the opinion of the European coordinator and does not prejudge the official position of the

More information

Impact of interoperability on the global railway network. L. Tordai, UIC, Paris, France

Impact of interoperability on the global railway network. L. Tordai, UIC, Paris, France Impact of interoperability on the global railway network L. Tordai, UIC, Paris, France Introduction There are big changes happening in Europe s railways. Interoperability is already becoming a reality.

More information

Member State Ireland. Account of the Planned Implementation. Command and Control Systems for the Irish Rail (Iarnród Éireann) Network

Member State Ireland. Account of the Planned Implementation. Command and Control Systems for the Irish Rail (Iarnród Éireann) Network Member State Ireland Account of the Planned Implementation Command and Control Systems for the Irish Rail (Iarnród Éireann) Network 22 December 2017 Account of the Planned Implementation of the Command

More information

TAP TSI Update and Masterplanning. Brussels 26 January TAF/ TAP Masterplanning kick-off 1

TAP TSI Update and Masterplanning. Brussels 26 January TAF/ TAP Masterplanning kick-off 1 TAP TSI Update and Masterplanning TAF/ TAP Masterplanning Kick-off Brussels TAF/ TAP Masterplanning kick-off 1 Contents 1. General update on TAP TSI 2. Overall TAP TSI masterplanning approach 3. Focus

More information

Boosting International Rail Freight. Sector Statement on Rail Freight Corridors

Boosting International Rail Freight. Sector Statement on Rail Freight Corridors Boosting International Rail Freight Sector Statement on Rail Freight Corridors Brussels, 20 May 2016 1 Sector Statement on Rail Freight Corridors: Boosting International Rail Freight 20 May 2016 - final

More information

ETNO Expert Contribution in response to the Consultation to develop an RSPG Opinion on World Radiocommunication Conference 2007

ETNO Expert Contribution in response to the Consultation to develop an RSPG Opinion on World Radiocommunication Conference 2007 May 2004 ETNO Expert Contribution in response to the Consultation to develop an RSPG Opinion on World Radiocommunication Conference 2007 Executive Summary: ETNO is pleased to provide its early views on

More information

The Voice of European Railways POSITION PAPER

The Voice of European Railways POSITION PAPER POSITION PAPER Commission proposal 2013/0297 (COD) amending Regulation EC 91/2003 of 16 December 2002 on rail transport statistics as regards the collection of data on goods, passenger, and accidents November

More information

DRAFT RSPG 2010 WORK PROGRAMME

DRAFT RSPG 2010 WORK PROGRAMME EUROPEAN COMMISSION Information Society and Media Directorate-General Electronic Communications Policy Radio Spectrum Policy Group RSPG Secretariat Brussels, 28 January 2010 DG INFSO/B4/RSPG Secretariat

More information

Benefits of harmonized regulations for placing in service of railway equipment - European experiences. Peter Mihm Head of Technical Cooperation

Benefits of harmonized regulations for placing in service of railway equipment - European experiences. Peter Mihm Head of Technical Cooperation Benefits of harmonized regulations for placing in service of railway equipment - European experiences Peter Mihm Head of Technical Cooperation General presentation Railway Safety Interoperability ERTMS

More information

from other domains than the usual actors from the rail business e.g. start-ups or small or medium companies

from other domains than the usual actors from the rail business e.g. start-ups or small or medium companies SHIFT²RAIL: The Future Advanced Traffic Management And Control Systems For All Rail Applications Jacques Poré, HonFIRSE, IRSE Past President 2005-2006, Alstom SUMMARY Shift²Rail is a European Commission

More information

The Fourth Railway Package Completing the Single European Railway Area to foster European Competitiveness and Growth

The Fourth Railway Package Completing the Single European Railway Area to foster European Competitiveness and Growth The Fourth Railway Package Completing the Single European Railway Area to foster European Competitiveness and Growth Why do we need to act? Improve competitiveness of rail with other modes in order to

More information

STRIA stakeholder workshop on R&I initiatives and actions for connected and automated road transport

STRIA stakeholder workshop on R&I initiatives and actions for connected and automated road transport STRIA stakeholder workshop on R&I initiatives and actions for connected and automated road transport Guidance Document for Participants 17 May 2018 European Commission DG Research & Innovation Square Frère

More information

The ERTMS in 10 questions

The ERTMS in 10 questions MEMO/05/235 Brussels, 4 July 2005 The ERTMS in 10 questions 1. Sometimes we talk about the ERTMS and sometimes the ETCS. Are they one and the same? The ERTMS (European Rail Traffic Management System) currently

More information

The TAP TSI Legal Framework and implementation strategy

The TAP TSI Legal Framework and implementation strategy Twelfth UIC ebusiness Conference - Passenger Workshop The TAP TSI Legal Framework and implementation strategy by Ugo Dell Arciprete Paris, 23 October 2008 TAP TECHNICAL STANDARDS INTEROPERABILITY COMPETITION

More information

RECOMMENDATION FOR USE RFU-CCS-077

RECOMMENDATION FOR USE RFU-CCS-077 Page 1 of 9 TITLE CERTIFICATES WITH RESTRICTIONS AND CONDITIONS FOR USE ORIGINATOR ALTRAN, CERTIFER, SINTEF, VŮŽ SUBJECT RELATED TO SUBSYSTEM CCO AND CCT DESCRIPTION AND BACKGROUND EXPLANATION Introduction

More information

Evaluation of the implementation of Regulation (EC) No 881/2004 of 29 April 2004 establishing the European Railway Agency

Evaluation of the implementation of Regulation (EC) No 881/2004 of 29 April 2004 establishing the European Railway Agency Evaluation of the implementation of Regulation (EC) No 881/2004 of 29 April 2004 establishing the European Railway Agency Results of the stakeholder analysis Public seminar Friday, 10 th December 2010

More information

Satellite services for a modern EU railway system. Roma, April 18 th 2013 Angelo Chiappini

Satellite services for a modern EU railway system. Roma, April 18 th 2013 Angelo Chiappini Satellite services for a modern EU railway system Roma, April 18 th 2013 Angelo Chiappini Overview What is the European Railway Agency Main objectives for a modern railway system Opportunities for space

More information

Draft RSPG Work Programme for 2018 and beyond

Draft RSPG Work Programme for 2018 and beyond EUROPEAN COMMISSION Directorate-General for Communications Networks, Content and Technology Electronic Communications Networks and Services Radio Spectrum Policy Group RSPG Secretariat Brussels, 21 November

More information

Railways in Europe quo vadis? TRAKO Gdańsk, 27 September Andrzej Harassek Head of Fixed Installations Sector, Interoperability Unit

Railways in Europe quo vadis? TRAKO Gdańsk, 27 September Andrzej Harassek Head of Fixed Installations Sector, Interoperability Unit Railways in Europe quo vadis? TRAKO Gdańsk, 27 September 2017 Andrzej Harassek Head of Fixed Installations Sector, Interoperability Unit The European railway industry is under threat Outside world (automotive,

More information

DTI/HMT Review on Concurrent Competition Powers in Sectoral Regulation

DTI/HMT Review on Concurrent Competition Powers in Sectoral Regulation 12 January 2007 Emma Campbell Assistant Director Economic Regulation Team Consumer and Competition Policy Directorate Department of Trade and Industry 1 Victoria Street LONDON SW1H 0ET DAVID STEWART Director

More information

Wagon noise and EU Rail Noise Policy Sian Prout, Head of Unit, Single European Rail Area, DG MOVE 29 May 2013

Wagon noise and EU Rail Noise Policy Sian Prout, Head of Unit, Single European Rail Area, DG MOVE 29 May 2013 Wagon noise and EU Rail Noise Policy 29013 Sian Prout, Head of Unit, Single European Rail Area, DG MOVE 29 May 2013 Objectives of European rail noise policy.noise reduction without jeopardising the competitiveness

More information

International Corridor Rhine-Alpine Conference

International Corridor Rhine-Alpine Conference A cooperation between Supported by International Corridor Rhine-Alpine Conference 2014 2014 18. September 2014 Guus de Mol PMO International Corridor Rhine-Alpine Conference (Genoa, 18/09/2014) Chairman

More information

How should national and EU rail market legislation evolve to safeguard better performance Alice Polo Senior Manager

How should national and EU rail market legislation evolve to safeguard better performance Alice Polo Senior Manager How should national and EU rail market legislation evolve to safeguard better performance Alice Polo Senior Manager 2 Mai 2016, Florence Overview UNIFE in brief How to achieve better performances by the

More information

European Railway Agency SIAFI

European Railway Agency SIAFI European Railway Agency SIAFI 2007 23.04.2007 At the beginning Establishment of the Agency The first proposal for establishment of the European Railway Agency was made by the Commission on 23 January 2002

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DECISION

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT DECISION Ref. Ares(2018)4510586-03/09/2018 EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT Director-General DECISION authorising the use of unit costs for the retrofitting of noisy wagons under

More information

RECOMMENDATION FOR USE

RECOMMENDATION FOR USE Page 1 of 11 CONTENT OF THE TECHNICAL FILE TITLE ORIGINATOR SUBJECT RELATED TO NB-RAIL STRATEGY SG Directive 2008/57/EC (incl. all amendments esp. 2014/106/EU), Recommendation 2014/897/EU, Decision 2010/713/EU

More information

18C044-0C WHITE PAPER REFERENCE CCS ARCHITECTURE BASED ON ERTMS. Date: Introduction

18C044-0C WHITE PAPER REFERENCE CCS ARCHITECTURE BASED ON ERTMS. Date: Introduction 18C044-0C WHITE PAPER REFERENCE CCS ARCHITECTURE BASED ON ERTMS Date: 12-07-2018 Introduction In 1989, the European Union, together with the railway organisations, decided to develop a standard European

More information

Evaluation of the way in which national safety rules are published and made available Annex 26 Country report for United Kingdom

Evaluation of the way in which national safety rules are published and made available Annex 26 Country report for United Kingdom EUROPEAN RAILWAY AGENCY Safety Unit Evaluation of the way in which national safety rules are published and made available Reference: /INF/04-2009/SAF Version: 1.0 Date: 22 November 2010 Status: Final Author:

More information

Economic benefits from making the GHz band available for mobile broadband services in Pakistan. Report for the GSM Association

Economic benefits from making the GHz band available for mobile broadband services in Pakistan. Report for the GSM Association Economic benefits from making the 2.72.9GHz band available for mobile broadband services in Pakistan Report for the GSM Association Final report 29 July 2014 Benefits from making the 2.72.9GHz available

More information

Achieving a Single European Railway Area and reinforcing the attractiveness of the rail sector: The vision of the European Rail Supply Industry

Achieving a Single European Railway Area and reinforcing the attractiveness of the rail sector: The vision of the European Rail Supply Industry Achieving a Single European Railway Area and reinforcing the attractiveness of the rail sector: The vision of the European Rail Supply Industry Philippe Citroën, UNIFE Director General APTA Rail Conference,

More information

EUROPEAN COMMISSION. The new Universal service and Users rights Directive

EUROPEAN COMMISSION. The new Universal service and Users rights Directive EUROPEAN COMMISSION The new Universal service and Users rights Directive Alexandre de Streel DG Information, Brussels ITU, Seminar on Universal Service access and service Bratislava, 6 March 2002 1 OUTLINE

More information

ETCS Migration and the Impacts on Railway Transport Markets

ETCS Migration and the Impacts on Railway Transport Markets ETCS Migration and the Impacts on Railway Transport Markets Dipl.-Wirtsch.-Ing. Miroslav Obrenovic ETCS Migration > 06 October 2006 > 1 Content Railway research at the German Aerospace Center (DLR) Initial

More information

The rail sector associations have jointly reflected upon the current framework within which safety and interoperability legislation is produced.

The rail sector associations have jointly reflected upon the current framework within which safety and interoperability legislation is produced. Mr Siim Kallas Vice President of the European Commission European Commission B 1049 Brussels Belgium Brussels, 11 March 2010 Dear Mr Vice President, The rail sector associations have jointly reflected

More information

Dissemination of the Commission Regulation (EC) No 352/2009/EC on Common Safety Method on Risk Evaluation and Assessment

Dissemination of the Commission Regulation (EC) No 352/2009/EC on Common Safety Method on Risk Evaluation and Assessment Dissemination of the Commission Regulation (EC) No 352/2009/EC on Common Safety Method on Risk Evaluation and Assessment Maria Antova, Dragan Jovicic, and Thierry Breyne European Railway Agency, Safety

More information

ERTMS/ETCS DMI National Requirements

ERTMS/ETCS DMI National Requirements ERTMS/ETCS DMI National Synopsis This document mandates requirements for ERTMS/ETCS Driver Machine Interface (DMI) equipment if a speed display in miles per hour is required and/or alphanumeric train running

More information

Innovation & Safety interaction

Innovation & Safety interaction Innovation & Safety interaction FOSTERING sustainable mobility across europe EasyWay focuses on the deployment of core services (95% of the budget) which aim to provide European travellers with harmonised

More information

PRIME Meeting no 8 24 th October 2014 Madrid (E)

PRIME Meeting no 8 24 th October 2014 Madrid (E) PRIME Meeting no 8 24 th October 2014 Madrid (E) Annex 8 Future challenges for infrastructure management - For Discussion and Decision - Context: According to the Declaration of Intent (DoI) signed between

More information

WELCOME TO THE ERFA STRATEGY DAY

WELCOME TO THE ERFA STRATEGY DAY WELCOME TO THE ERFA STRATEGY DAY Brussels, 21st November 2018 www.erfarail.eu ERFA main message: WE WANT TO CREATE THE RIGHT CONDITIONS TO BOOST RAIL GROWTH WE NEED AN ATTRACTIVE ENVIRONMENT FOR RAIL

More information

POSITION PAPER ON NOISE

POSITION PAPER ON NOISE INTRODUCTION The International Union of Wagon Keepers (UIP) recognises that noise is the most significant environmental burden of rail that affects not only society, but also the performance and perspectives

More information

TSI OPERATION AND TRAFFIC MANAGEMENT FINAL REPORT ON THE MERGING OF CONVENTIONAL RAIL AND HIGH SPEED TSIS

TSI OPERATION AND TRAFFIC MANAGEMENT FINAL REPORT ON THE MERGING OF CONVENTIONAL RAIL AND HIGH SPEED TSIS INTEROPERABILITY UNIT RATION AND TRAFFIC MANAGEMENT FINAL REPORT ON THE MERGING OF CONVENTIONAL RAIL AND HIGH SPEED TSIS Reference: ERA/CON/2011-02/INT Document type: Final report Version : 0.8 Date :

More information

3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES:

3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES: 3. OBJECTIVES PURSUED BY THIS WORK PROGRAMME AND THE FUNDING PRIORITIES: 3.1.3. Rail interoperability including interoperability of the Rail Freight Corridors Priority open only to the Cohesion Member

More information

Ernest Godward, EU Agency for Railways. Rail Freight in the European Union

Ernest Godward, EU Agency for Railways. Rail Freight in the European Union Ernest Godward, EU Agency for Railways Rail Freight in the European Union A European Rail Freight is facing multiple challenges Organising rail freight is time-consuming Rail freight customers often experience

More information

Network Rail Infrastructure Limited. Additional comments:

Network Rail Infrastructure Limited. Additional comments: Network Rail Infrastructure Limited Additional comments: The railway, in common with other critical national infrastructure, relies on high-quality, highly reliable telecommunications. The quantity and

More information

RSPG opinion on the process for EU assistance in bilateral negotiations with third countries and between EU countries

RSPG opinion on the process for EU assistance in bilateral negotiations with third countries and between EU countries EUROPEAN COMMISSION Information Society and Media Directorate-General Electronic Communications Policy Radio Spectrum Policy Brussels, 21 February 2012 DG INFSO/B4/RSPG Secretariat RSPG12-409 Final RSPG

More information

Rolling stock approval process

Rolling stock approval process Rolling stock approval process Presentation to SEETO Working Group by Frank Walenberg Skopje 9 November 2010 1 Overview Need for the approval process RST approval process in the past Interoperability:

More information

European Rail Infrastructure Managers Handbook for International Contingency Management

European Rail Infrastructure Managers Handbook for International Contingency Management European Rail Infrastructure Managers Handbook for International RailNetEurope Oelzeltgasse 3/8 AT-1030 Vienna Phone: +43 1 907 62 72 00 Fax: +43 1 907 62 72 90 mailbox@rne.eu www.rne.eu Version 1.5, 23.03.2018

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL EUROPEAN COMMISSION Brussels, 30.3.2017 COM(2017) 151 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL On the Implementation of the Environmental Noise Directive in accordance

More information

UIC ERTMS Conference 2004 ERTMS Planning for the Future. M. Pottendorfer Alcatel TSD Austria December 2004

UIC ERTMS Conference 2004 ERTMS Planning for the Future. M. Pottendorfer Alcatel TSD Austria December 2004 UIC ERTMS Conference 2004 ERTMS Planning for the Future M. Pottendorfer Alcatel TSD Austria December 2004 > Business Aspects > ERTMS General aspects > Migration Presentation Outline > ERTMS benefits Railways

More information

Redesign of the International Timetabling Process (TTR) Project results

Redesign of the International Timetabling Process (TTR) Project results Redesign of the International Timetabling Process (TTR) Project results (Version 0.6) RailNetEurope Oelzeltgasse 3/8 AT-1030 Vienna Phone: +43 1 907 62 72 00 Fax: +43 1 907 62 72 90 mailbox@rne.eu www.rne.eu

More information

Economic benefits from making the GHz band available for mobile broadband services in Saudi Arabia. Report for the GSM Association

Economic benefits from making the GHz band available for mobile broadband services in Saudi Arabia. Report for the GSM Association Economic benefits from making the 2.72.9GHz band available for mobile broadband services in Saudi Arabia Report for the GSM Association Final report 6 October 2014 Benefits from making the 2.72.9GHz available

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

COMMISSION OF THE EUROPEAN COMMUNITIES COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 04.07.2005 COM(2005) 298 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the deployment of the European rail signalling

More information

SOUTH EAST EUROPE TRANSNATIONAL CO-OPERATION PROGRAMME

SOUTH EAST EUROPE TRANSNATIONAL CO-OPERATION PROGRAMME SOUTH EAST EUROPE TRANSNATIONAL CO-OPERATION PROGRAMME 3 rd Call for Proposals Terms of reference Network of (Hub) cities for an increased access and mobility of people in the SEE region March 2011 1.

More information

3. OBJECTIVES AND PRIORITIES:

3. OBJECTIVES AND PRIORITIES: 3. OBJECTIVES AND PRIORITIES: 3.1. Priorities related to bridging missing links, removing bottlenecks, enhancing rail interoperability, and, in particular, improving cross-border sections 3.1.4. European

More information

An EU coordinated approach to R&I in the rail sector under H2020

An EU coordinated approach to R&I in the rail sector under H2020 An EU coordinated approach to R&I in the rail sector under H2020 EC DG MOVE Open Stakeholder Hearing Brussels, 12 September 2013 Agenda State of play General context Objectives of the initiative General

More information

CID Book 1. Generalities

CID Book 1. Generalities CID Book 1 Generalities Harmonised text proposal 2019 timetable year Version control Version Chapter changed Changes compared to the previously published version X marks which part in the chapter concerned

More information

European Data Economy

European Data Economy CER position Brussels, 26 April 2017 1 CER aisbl - COMMUNITY OF EUROPEAN RAILWAY AND INFRASTRUCTURE COMPANIES Avenue des Arts, 53-1000 Bruxelles T: +32 (0)2 213 08 70 F: +32 (0)2 512 52 31 @CER_railways

More information

RECOMMENDATIONS. (Text with EEA relevance) (2014/897/EU)

RECOMMENDATIONS. (Text with EEA relevance) (2014/897/EU) 12.12.2014 L 355/59 RECOMMDATIONS COMMISSION RECOMMDATION of 5 December 2014 on matters related to the placing in service and use of structural subsystems and vehicles under Directives 2008/57/EC and 2004/49/EC

More information

Vehicle authorisation for broad gauge railways

Vehicle authorisation for broad gauge railways Brussels, 21 December 2016 Vehicle authorisation for broad gauge railways 1 CER aisbl - COMMUNITY OF EUROPEAN RAILWAY AND INFRASTRUCTURE COMPANIES Avenue des Arts 53-1000 Bruxelles T: +32 (0)2 213 08 70

More information

Getting new trains on track

Getting new trains on track Fourth railway package Getting new trains on track Dr. Josef Doppelbauer, Executive Director, European Union Agency for Railways (ERA), Valenciennes, France At the end of the three-year implementation

More information

The potential of Licensed Shared Access for the wireless broadband growth - Regulatory aspects of LSA

The potential of Licensed Shared Access for the wireless broadband growth - Regulatory aspects of LSA Research and Innovation The potential of Licensed Shared Access for the wireless broadband growth - Regulatory aspects of LSA Emmanuel Faussurier ANFR Chairman CEPT/WGFM Project Team FM53 faussurier@anfr.fr

More information

Light Impact Assessment

Light Impact Assessment EUROPEAN UNION AGENCY FOR RAILWAYS O11REC1O28 V1.O Making the railway system work better for society. Light Impact Assessment 4th Railway Package Revision of CCS TSI 120 Rue Marc Lefrancq I BP 20392 ER-59307

More information

Towards an integrated European Railway Area

Towards an integrated European Railway Area Towards an integrated European Railway Area Anders Lundström Oslo, 17 October 2007 Organisation chart of the Agency n 2 The legal basis for the Agency s work The Agency s tasks and, hence, its organisational

More information

Further information on the legislation can be found in all EU languages on EUR-LEX website:

Further information on the legislation can be found in all EU languages on EUR-LEX website: Making the railway system work better for society. 4 th Railway Package What is the 4 th Railway Package and its technical pillar? The 4 th Railway Package is a set of legislative texts designed to complete

More information

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL 17 NOVEMBER 2009 1 EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL Industrial policy and economic reforms Sustainable Industrial Policy ENTR/B/1, LB-ME, D(2009) MINUTES OF MEETING Subject:

More information

GE/GN8640. Risk Evaluation and Assessment. Guidance on Planning an Application of the Common Safety Method on. Rail Industry Guidance Note

GE/GN8640. Risk Evaluation and Assessment. Guidance on Planning an Application of the Common Safety Method on. Rail Industry Guidance Note GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited GE/GN8640 Method on Risk Evaluation and Assessment Issue One; June 2014 Rail

More information

Chiel Spaans UIC. UIC Conference September 2013 Paris

Chiel Spaans UIC. UIC Conference September 2013 Paris Future Railway Mobile Communication Solutions Chiel Spaans, UIC Projectleader FRMCS project GSM-R: What s in the box? 90 s: GSM-R standards were developed based on GSM technology, and included all railways

More information

Assessment of Route Compatibility of Vehicles and Infrastructure

Assessment of Route Compatibility of Vehicles and Infrastructure Compatibility of Vehicles and Synopsis This document sets out requirements and responsibilities for the assessment of route compatibility of vehicles and infrastructure. Copyright in the s is owned by

More information

GLOBAL SYMPOZIUM FOR REGULATORS (GSR-18)

GLOBAL SYMPOZIUM FOR REGULATORS (GSR-18) GLOBAL SYMPOZIUM FOR REGULATORS (GSR-18) Contribution to consultation process from National Regulatory Agency for Electronic Communications and Information Technology of the Republic of Moldova I. Emerging

More information

EasyWay Project An overview

EasyWay Project An overview EasyWay Project An overview Andreas Arnaoutis 26-06-09, Thessaloniki www.easyway-its.eu EasyWay : from systems to services 2 Background EasyWay follows on from the success of the TEMPO programme (MIP I),

More information

Action Plan RFC North Sea - Mediterranean

Action Plan RFC North Sea - Mediterranean Action Plan RFC North Sea - Mediterranean G Confais Morieux 16 April 2018 Agenda 1. Reminder The 10 priorities of the Sector 2. Action Plan RFC North Sea - Med 2/20 2/23 Opening RFC Strategy Sessions -

More information

E-Bilbao: provision of telecommunication services 2012/S Contract notice. Services

E-Bilbao: provision of telecommunication services 2012/S Contract notice. Services 1/5 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:69165-2012:text:en:html E-Bilbao: provision of telecommunication services 2012/S 43-069165 Contract notice Services Directive 2004/18/EC

More information

Eurailspeed Parallel Session D.1. Carlo Carganico Director Approval and Certification, RFI

Eurailspeed Parallel Session D.1. Carlo Carganico Director Approval and Certification, RFI Eurailspeed Parallel Session D.1 Carlo Carganico Director Approval and Certification, RFI 1 Approval process of the Italian High Speed Railway System Eurailspeed, November 8th 2005 Carlo Carganico Issues

More information

A CER Statement on Brexit

A CER Statement on Brexit Brussels, 13 October 2017 A CER Statement on Brexit 1 CER aisbl - COMMUNITY OF EUROPEAN RAILWAY AND INFRASTRUCTURE COMPANIES Avenue des Arts, 53-1000 Bruxelles T: +32 (0)2 213 08 70 F: +32 (0)2 512 52

More information

Intelligent Transport Systems Action Plan - Key questions and answers

Intelligent Transport Systems Action Plan - Key questions and answers MEMO/08/789 Brussels, 16 December 2008 Intelligent Transport Systems Action Plan - Key questions and answers Summary Typical and well known ITS application are the so-called "GPS" navigation systems in

More information

Commission initiatives for a better railway in Europe

Commission initiatives for a better railway in Europe Commission initiatives for a better railway in Europe TRAKO Vision of the Railway 2020 Gdansk 25 September 2013 Dr. Gerhard Troche European Commission DG MOVE-B2 Single European Rail Area 1 Key challenges

More information

RADIO SPECTRUM POLICY GROUP. Commission activities related to radio spectrum policy

RADIO SPECTRUM POLICY GROUP. Commission activities related to radio spectrum policy EUROPEAN COMMISSION Directorate-General for Communications Networks, Content and Technology Electronic Communications Networks and Services Radio Spectrum Policy Group RSPG Secretariat Brussels, 08 June

More information

1 Introduction. 2 Abbreviations and Definitions

1 Introduction. 2 Abbreviations and Definitions 1 Introduction This Guideline is intended to give guidance and explanation on the related European legal provisions for the Certification of ECMs. It cannot replace additional self study of the applicable

More information

Position Paper on MFF. A Sufficient EU Budget for the best Rail System in Europe

Position Paper on MFF. A Sufficient EU Budget for the best Rail System in Europe Position Paper on MFF A Sufficient EU Budget for the best Rail System in Europe 8 February 2018 Executive Summary In order to remain competitive and continue meeting the expectations of its customers,

More information

Network Statement NETWORK STATEMENT. Annex A.1 Glossary. 1. Definitions. Applicant (article 3, 11 of the Rail Code)

Network Statement NETWORK STATEMENT. Annex A.1 Glossary. 1. Definitions. Applicant (article 3, 11 of the Rail Code) NETWORK STATEMENT Annex A.1 Glossary 1. Definitions Applicant (article 3, 11 of the Rail Code) Area Asset Management -Infrabel Area Traffic Management & Services - Infrabel Auxiliary company of a railway

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION STAFF WORKING DOCUMENT. accompanying document to the COMMUNICATION FROM THE COMMISSION

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION STAFF WORKING DOCUMENT. accompanying document to the COMMUNICATION FROM THE COMMISSION EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 16.12.2008 SEC(2008) 3084 COMMISSION STAFF WORKING DOCUMENT accompanying document to the COMMUNICATION FROM THE COMMISSION Action Plan for the

More information

TAF1(2004)02 18 January 2005 Page 1 of 18. CEN/ISSS Workshop TAF. Business Plan

TAF1(2004)02 18 January 2005 Page 1 of 18. CEN/ISSS Workshop TAF. Business Plan 18 Page 1 of 18 Business Plan CEN/ISSS Workshop Coding Structures in Support of Freight Telematics for Interoperability of the Trans-European Conventional Rail System 18 Page 2 of 18 TABLE OF CONTENTS

More information

Guide to the GSM-R System. networkrail.co.uk

Guide to the GSM-R System. networkrail.co.uk Guide to the GSM-R System networkrail.co.uk Contents What it is What is the GSM-R System? Encompassing the combined resources of technology, processes and people, the GSM-R System delivers secure and reliable

More information

Revision of the Energy Efficiency Directive. Position Paper. Brussels, 05 April 2017

Revision of the Energy Efficiency Directive. Position Paper. Brussels, 05 April 2017 Position Paper Brussels, 05 April 2017 Revision of the Energy Efficiency Directive 1 CER aisbl - COMMUNITY OF EUROPEAN RAILWAY AND INFRASTRUCTURE COMPANIES Avenue des Arts, 53-1000 Bruxelles T: +32 (0)2

More information

Banedanmark TMS. ETCS as the foundation for attractive and efficient railway service

Banedanmark TMS. ETCS as the foundation for attractive and efficient railway service Banedanmark TMS ETCS as the foundation for attractive and efficient railway service Outline 1. Introduction: ETCS ERTMS 2. Banedanmark TMS 3. How does Banedanmark TMS work? 4. Service Intentions and Production

More information

Guidelines concerning Non-RU Applicants. Version 1.0

Guidelines concerning Non-RU Applicants. Version 1.0 Guidelines concerning Non-RU Applicants Version 1.0 Version control VERSION AUTHOR DATE CHANGES 0.1 RNE Project Group 2014-11-12 Creation 0.2 RNE Project Group 2015-01-20 Addition of Section 8 0.3 RNE

More information

Comments on the BEREC Work Programme for 2010

Comments on the BEREC Work Programme for 2010 Comments on the BEREC Work Programme for 2010 1. Preliminary Remarks by VON Europe The Voice on the Net Coalition Europe ( VON ) welcomes the opportunity to comment on the Draft BEREC Work Programme for

More information

Implications of the proposed interoperability measures for Railway Undertakings and Infrastructure Managers

Implications of the proposed interoperability measures for Railway Undertakings and Infrastructure Managers European University Institute Florence School of Regulation 6th European Rail Transport Regulation Forum Florence, 27 th May 2013 The technical pillar of the 4th Railway Package: Challenges for Standardisation

More information

Vienna Declaration Progress on boosting rail freight

Vienna Declaration Progress on boosting rail freight Vienna Declaration Progress on boosting rail freight Statement of the Austrian Presidency as follow-up of the Ministerial Rotterdam Declaration 6 December 2018 Seizing the opportunity of the Presidency

More information

Rail Freight Corridor North Sea -Mediterranean - Corridor Information Document - Book 1 Generalities Timetable 2018

Rail Freight Corridor North Sea -Mediterranean - Corridor Information Document - Book 1 Generalities Timetable 2018 Rail Freight Corridor North Sea -Mediterranean - Corridor Information Document - Book 1 Generalities Timetable 2018 RFC North Sea Med is co-financed by the European Union's CEF. The sole responsibility

More information