1 Guidance Note Planning for Special Events Synopsis This Guidance Note provides advice on operational, safety and contingency factors to take into consideration when planning for special events. Applicability This Guidance Note has been prepared for passenger train operating companies. However, its content may also be of use or interest to others. Authorised by James Burt Chair, RDG Train Operators Emergency Planning Group Rail Delivery Group Limited Registered Office, 2nd Floor, 200 Aldersgate Street, London EC1A 4HD Registered in England and Wales No
2 Issue record Issue Date Comments One May 2015 Original version as an ATOC document. Two October 2017 Periodic review and also reformatted as an RDG document Page 2 of 15 RDG
3 Contents Part 1 About this document Responsibilities Explanatory note Guidance Note status Supply... 5 Part 2 Purpose and scope Purpose Scope... 6 Part 3 Introduction Background... 6 Part 4 Early identification of events General plans and processes Liaison with local authorities New and one off events... 7 Part 5 Assessing the risk Introduction Factors to consider... 7 Part 6 Planning for the event Overview Command and control Staffing Crowd management Security Operations Customer care and assistance Emergencies and contingencies Part 7 Plan timelines Content of timeline Part 8 Staff briefing packs Content of briefing pack Part 9 Informing the public Media Content Part 10 Exercising the arrangements Testing the arrangements Part 11 Implementation of the plan Principles RDG Page 3 of 15
4 Part 12 Review Principles APPENDIX Event planning timeline Page 4 of 15 RDG
5 Part 1 About this document 1.1 Responsibilities Copies of this Guidance Note should be distributed by RDG members to persons within their respective organisations for whom its content is relevant. 1.2 Explanatory note RDG produces RDG Guidance Notes for the information of its members. RDG is not a regulatory body and compliance with RDG Guidance Notes is not mandatory RDG Guidance Notes are intended to reflect good practice. RDG members are recommended to evaluate the guidance against their own arrangements in a structured and systematic way. Some or all parts of the guidance may not be appropriate to their operations. It is recommended that this process of evaluation and any subsequent decision to adopt (or not to adopt) elements of the guidance should be documented. 1.3 Guidance Note status 1.4 Supply This document is not intended to create legally binding obligations between railway duty holders and should be binding in honour only Copies of this Guidance Note may be obtained from the RDG members web site. RDG Page 5 of 15
6 Part 2 Purpose and scope 2.1 Purpose 2.2 Scope The purpose of this guidance note is to provide a list of factors to take into consideration, along with suggestions as to how each may be addressed, when planning for special events that are likely to have an impact on a railway undertaking s business. It focuses primarily on operational and safety aspects and associated contingency arrangements it does not seek to address purely commercial considerations such as ticketing or revenue protection arrangements. Its content reflects examples of good practice identified through a review of individual TOC arrangements This guide is produced for the benefit of all member organisations of the RDG Train Operators Operations Scheme. Part 3 Introduction 3.1 Background Major special events such as sporting fixtures, music festivals and royal occasions result in an increase in the number of people using the rail network This is not a new phenomenon, but the growth in the number of customers in recent years means that this is imposed on a much higher level of base demand than was previously the case. Special events impose even greater pressure on trains and stations which are already routinely operating at close to maximum capacity with associated risks, for example those at the Platform Train Interface, made all the more acute It follows that greater resources need to be dedicated to managing special events, both in the planning phase and on the day in order to ensure that these risks are appropriately identified, mitigated and managed. Part 4 Early identification of events 4.1 General plans and processes Many railway undertakings already manage major public events which occur on a regular basis and have established plans and processes for the review and revision of those plans Many railway undertakings have found it helpful to have an event calendar onto which details of forthcoming events with the potential to have an impact on the train/station operations can be recorded. Each event may additionally be categorised to indicate the assessed likely impact on operations from business as usual to major event plan and significantly enhanced train service required. This categorisation may be further subdivided into impact on train planning, crowd management, station staffing, security, road traffic/parking managements on the station approach, etc. Page 6 of 15 RDG
7 4.2 Liaison with local authorities Railway undertakings should endeavour to make sure local authorities are aware of their requirements and limitations with regards to the prevision of train services for special events. The principles of this should be raised by railway undertakings at their respective Local Resilience Forums. 4.3 New and one off events There are also occasions where a new or one off major event is taking place. In such cases railway undertakings need to be involved in initial consultation with event organisers in conjunction with other key stakeholders (such as the British Transport Police (BTP), Network Rail and other agencies) to understand the dynamics of the event and also the crowd profile. Understanding the crowd profile is essential when it comes to assessing potential risk The organisers of such events may not have had previous comparable experience on which to draw and hence may fail to anticipate the impact on the rail system. However it is highly probable that they will have had an early engagement with the local authority concerned and hence it is recommended that railway undertakings develop a good working relationship with local authority special event leads and encourage them to share such details as they have of future events at the earliest possible opportunity Some stakeholders may not be immediately obvious. For example, the annual Army v Navy rugby union fixture at Twickenham involves a Military Police presence in addition to the BTP and Metropolitan Police A timeline should be drawn up for planning and implementing the arrangements with key milestones identified. An example of such a timeline is provided as Appendix A, though it should be noted that this is indicative only and that timescales are necessarily relative rather than absolute as larger/more complex events will require planning to start sooner than those which are smaller/simpler. Part 5 Assessing the risk 5.1 Introduction Assessing the risks that could potentially arise from the holding of a major public event is a key driver for determining necessary control measures which will formulate the basis for the railway undertaking event plan, including the train service plans required to meet the anticipated demand for rail travel to and from the event. 5.2 Factors to consider Major events may significantly increase the level of passenger flow both on trains and at stations. In both cases, specific control measures will be required to provide effective management and prevent the potential for overcrowding and congestion with the consequences of personal injury through crushing and slips, trips and falls, particularly at the Platform Train Interface In addition, the station infrastructure at the nearest railhead to an event may not be capable of dealing with significantly increased customer levels. RDG Page 7 of 15
8 5.2.3 Increased passenger levels may well introduce other hazards and risks, for example the use of road transport between the railhead and event location, antisocial or unlawful behaviour, increased amounts of litter/other rubbish, potential damage to station infrastructure or trains, station security compromised and staff exposure to verbal/physical assault The potential impact of the weather in the day should also be considered this applies not just to extreme weather (hot, cold, wind and rain) but also the potential for a shower or onset of more general rain to trigger a mass exodus rather than a more staggered drift away from open air events Consideration needs to be given to arrangements for the event overrunning (such as a football match going into extra time), being cancelled at short notice or ending early (as a result of such as a safety issue, terrorist alert or bad weather) The risks associated with train service disruption, for example meaning customers may be late for the event, and the consequences of any incident that may happen at the event itself should also be taken into consideration this highlights the importance of communication between the railway undertaking and event organiser Control measures may include delaying event start times for example, though it should be noted that no such flexibility is likely to be available for events that are being televised live The profile of those attending an event should be considered too and the possible implications of opposing people meeting en-route to or from two different events needs to be considered (e.g. rival football supporters) It is recommended that the risks associated with the event are jointly assessed by the lead railway undertaking/network Rail Route involved and all key stakeholders, including other railway undertakings likely to be significantly affected. Part 6 Planning for the event 6.1 Overview A risk assessment should be the basis of any major event plan All risk assessments should be carried out by a person who is suitably qualified and competent in risk assessment Planning should be undertaken in conjunction with the event organiser and the active involvement of all key stakeholders, who will include, as appropriate: i) The BTP ii) iii) iv) Respective Home Office police forces (and other police as appropriate, e.g. Military, etc.) Local emergency services Network Rail v) Other railway undertakings (including operators of charter trains) Page 8 of 15 RDG
9 vi) Local authorities vii) Interfacing transport operators (e.g. bus companies, metro systems, etc.). viii) ix) Contracted crowd management companies Operators of associated venues involved x) Organisations involved (i.e. event promoters, participating sports clubs etc.) The planning process should determine accountabilities and responsibilities both within and outside of the railway boundary to ensure that stakeholder plans are aligned, seamless and where necessary, integrated Control measures to mitigate against the potential risks should be determined at this stage, with any specific actions allocated to the relevant stakeholder. It may be necessary for a railway undertaking to use contractors who specialise in event and crowd management It is essential to determine a robust command, control and communication structure that is easily understood by all parties and is agreed and documented within each stakeholder plan The suggested content of event plans is covered in the following sections 6.2 to 6.8, though their content should not be regarded as exclusive Every organisation responsible for event planning should subject itself to the scrutiny of the respective Safety Advisory Group. Failure to do so is leaving the organisation open to criticism and liability in the event that things go wrong The Safety Advisory Group can also advise and inform other relevant parties of the respective organisations limitations and requirements. 6.2 Command and control Command and control arrangements should be set out, including the communications interface with key stakeholders necessary to ensure there is a clear channel of communication between the relevant railhead and the event site this should include identifying any potential communication blackspots and arrangements to overcome these There should be a robust command and control structure in place to manage the event. Generally accepted best practice is to establish a three tier command structure comprising Strategic, Tactical and Operational levels to implement and manage the arrangements It is usually, but not exclusively, the case that the relevant Control Office undertakes the role of Strategic Command this may involve a specific event team which will deal exclusively with managing the strategic requirements of the event in conjunction with the Tactical Command Team (see below) whilst the remaining personnel in the Control Office manage the rest of the network. RDG Page 9 of 15
10 6.2.4 A manager from the lead railway undertaking should be appointed at Tactical level of command (sometimes identified as the Event Manager ) to oversee the practical implementation of the planned arrangements recognised best practice is to establish a Tactical Command Team at the relevant event railhead, primarily consisting of core rail business stakeholders such as the lead and supporting railway undertakings, Network Rail and the BTP. Local requirements will determine whether other key stakeholders (such as the local police force or event organiser representative) need to be part of that team The planning process should identify the roles required and the resources needed to fulfil them. There will also be a requirement to identify specific rail industry skill sets at the Operational level of command to ensure that both the planned arrangements can be effectively delivered and a timely response to incidents with the potential to seriously disrupt the plan arrangements can be deployed. This may include: i) Network Rail Rail Incident Officer (RIO) ii) iii) iv) Railway undertaking Train Operator Liaison Officer (TOLO) Railway undertaking Station Incident Officer (SIO) this role could be one and the same as the Tactical Commander Railway undertaking fleet engineering staff (for dealing with train faults) v) Station announcer vi) vii) viii) Queue Manager(s) Revenue Manager Platform Manager(s) 6.3 Staffing These roles are representative and not inclusive; the planning arrangements will determine exact requirements. They will undertake their duties at the Operational level of command under the direction of the Event Manager as Tactical Commander Staffing plans should include details of where resources will be positioned and their roles and responsibilities, and the arrangements for the briefing of same. 6.4 Crowd management Crowd management arrangements should include the supplying of relevant information to customers this may include providing leaflets to those on the inbound journey which explain any requirements for queuing into the station on the return journey For major events it may be appropriate to employ Travel Demand Management (TDM), i.e. the application of strategies and policies to reduce travel demand or to redistribute this demand in space or in time. TDM has worked well for some events (e.g. the London Olympics in 2012) but less well for others. Page 10 of 15 RDG
11 6.5 Security Security arrangements should be drawn and include specific references to any changes to DfT Land Transport Security requirements. 6.6 Operations Operational arrangements should be identified, such as the train plan, station specific platform workings and requirements for managing the Platform Train Interface and train dispatch. 6.7 Customer care and assistance Requirements for customer assistance (able bodied and mobility impaired) and including first aid provision should be set out, along with provision of toilet and catering facilities and train and station cleaning arrangements. 6.8 Emergencies and contingencies Contingency arrangements should be drawn up to take account of any reasonably foreseeable emergency or degraded situations affecting the station, infrastructure or train operations. These should include train service and crowd management contingencies along with requirements for the evacuation of the premises and possibly failed trains It should be recognised that the specific nature of some emergencies may require the direct intervention of the BTP or local Police the plan content should reflect this requirement and the arrangements for the transfer of command and control. Part 7 Plan timelines 7.1 Content of timeline The plan should also contain a timeline for implementation of the arrangements, as an example: i) 6 weeks prior to event commence media/public information campaign ii) iii) iv) Not less than 10 days prior to the event undertake table top exercise with all key stakeholders Produce a plan for the implementation of any actions arising from the table top exercise 1 week prior to event carry out deep clean of station(s) v) 2 days prior to event day - close station car park(s) vi) vii) viii) ix) 1 day prior to event day - erect crowd management barriers 1 day prior to event install portable toilets in station car park(s) Early morning on day of event - erect informational signage Early morning on day of event undertake final inspection of premises and arrangements RDG Page 11 of 15
12 x) Early morning on day of event brief early turn staff and volunteers xi) xii) xiii) on day of event brief late turn staff and volunteers End of day of event hold hot debrief' with staff and volunteers Within 5 days of event being held undertake review of arrangements with event planning team Note: The above list is intended to be neither prescriptive nor exhaustive. Part 8 Staff briefing packs 8.1 Content of briefing pack To support the event plan, a staff briefing pack should be compiled for imparting the arrangements to the managers and staff who will be in attendance. The briefing pack should contain as a minimum: i) An overview of the event and plan arrangements ii) iii) iv) The arrangements for command and control and lines of communication Any specific risks associated with the event, and how these will be managed Details of the crowd management plan and staff responsibilities v) What to do in the event of an emergency vi) vii) viii) Contingency arrangements for the event plan Information on train service provision, where to change information, local interfacing details (such as local bus routes and pedestrian routes to the event site) Information on local facilities (such as toilets, ticket purchasing points, catering outlets, cash points, etc.) Note: The above list is intended to be neither prescriptive nor exhaustive. Part 9 Informing the public 9.1 Media It is important that advice of the event is communicated prior to the event occurring. The media used for this purpose will be wide and varied and may include: i) Company and National Rail websites ii) iii) Social media (such as Twitter) Customer Information Systems at stations and on trains Page 12 of 15 RDG
13 iv) Leaflets (given to passengers arriving at the station on their inbound journey) v) Via the promoter, venue or other organisations involved with the event, e.g. football club, music promoter, etc. 9.2 Content This will cover various aspects including: i) Travel advice to customers intending to attend the event itself ii) iii) iv) Travel advice to customers whose normal journey patterns may be affected by the event Changes to the access and egress arrangements at a station Advance warning of potential queuing times back into a station which intending customers should take into account for their journey plan v) Advice of additional or altered train services vi) Advice of any specific facilities being provided at stations for the event Part 10 Exercising the arrangements 10.1 Testing the arrangements The plan arrangements should be tested prior to the event The most common method is the table-top style with participants from all interfacing agencies The exercise should identify any shortcomings or omissions with the planned arrangements, which should be recorded and amendments to the plan agreed. The plan should then be reviewed by stakeholders and signed off for publication. Part 11 Implementation of the plan 11.1 Principles The arrangements to manage the event should be implemented in accordance with the agreed content, including the requirements for briefing all personnel It is important to ensure that the lines of communication for command and control are practically tested on the morning of the event to identify any potential issues Recognised good practice recommends that the Event Manager undertakes periodic time outs with key personnel to ensure arrangements remain fit for purpose, agreeing any adjustments that may be required. It is suggested that a time out should always be held once the event has begun to ensure the arrangements for receiving return traffic are fully understood. RDG Page 13 of 15
14 Part 12 Review 12.1 Principles Recognised good practice recommends that a hot debrief be undertaken with personnel immediately after the event plan arrangements have been officially stood down. This ensures that immediate thoughts and feedback are captured A formal review of the planned arrangements with all key stakeholders should be undertaken within a reasonable timescale of the event date to determine the effectiveness of those arrangements, including areas of concern and development, but also to allow best practice to be identified and built upon The review findings should be published in a written report, with any recommendations being actioned and tracked to conclusion, normally resulting in amendments to the documented arrangements. Page 14 of 15 RDG
15 APPENDIX Event planning timeline RDG Page 15 of 15
ATOC Guidance Note Planning for Special Events
ATOC Guidance Note Planning for Special Events Synopsis This Guidance Note provides advice on operational, safety and contingency factors to take into consideration when planning for special events. Authorised
More informationGuidance Note Emergency Planning - Knowledge, Understanding and Responsibilities
Uncontrolled when printed RDG-GN011 Guidance Note Emergency Planning - Knowledge, Understanding and Responsibilities Synopsis This Guidance Note provides advice on requirements with regard to knowledge,
More informationATOC. ATOC Operational Resilience & Security Forum Competency Assessment of Station Incident Officers (SIOs)
Date: January 2010 ATOC Association of Train Operating Companies ATOC Operational Resilience & Security Forum Competency Assessment of Station Incident Officers (SIOs) Synopsis This Guide sets out recommended
More informationATOC Approved Code of Practice Incident Response Duties of Primary Support Operators
Uncontrolled When Printed ATOC Approved Code of Practice Incident Response Duties of Primary Support Operators Submitted by --------------------------------------------------------- Gary Cooper Director,
More informationATOC Guidance Note Responding to Ill Customers on Trains
ATOC Guidance Note Responding to Ill Customers on Trains Synopsis Submitted by This document provides guidance on developing policies for responding to ill customers on trains. ---------------------------------------------------------
More informationATOC. ATOC Operational Resilience & Security Forum Good Practice Guide Competence of Train Operator Liaison Officers (TOLOs)
ATOC Association of Train Operating Companies ATOC Operational Resilience & Security Forum Good Practice Guide Competence of Train Operator Liaison Officers (TOLOs) Synopsis This Guide sets out recommended
More informationResponse to a Bridge Strike. at a Bridge carrying the Railway. over a Road
Response to a Bridge Strike at a Bridge carrying the Railway over a Road A Protocol for Highway and Road Managers, Emergency Services and Bridge Owners NR/GPG/CIV/008 3 rd March 2009 Note This protocol
More informationIncident Response Planning & Management
Incident Response Planning & Synopsis This standard identifies interface requirements for enabling a consistent, comprehensive and structured process for rail incident response planning and management.
More informationGuidance Note Competence of Train Operator Liaison Officers (TOLOs)
Guidance Note Competence of Train Operator Liaison Officers (TOLOs) Synopsis This Guide sets out recommended criteria for ensuring the competence of persons nominated to act as Train Operator Liaison Officers
More informationATOC. ATOC Guidance Note - Managing the Risk to Passengers and Staff from the Use of Contracted Road Services
Date: April 2012 ATOC Association of Train Operating Companies ATOC Guidance Note - Managing the Risk to Passengers and Staff from the Use of Contracted Road Services Synopsis This Guidance Note provides
More informationCatch22 policy Health and Safety
Catch22 policy Health and Safety Contents 1. Summary 2 2. Who is the policy for? 2 3. Policy statement 2 4. Definitions 2 5. Responsibilities 3 6. Health & Safety Management Arrangements 4 7. Related Policies
More informationPlanning, Reporting and Regulatory Framework
Planning, Reporting and Regulatory Framework Strategic Business Plan 9 February 2018 Planning, Reporting and Regulatory Framework This document describes the key elements and methods of working in our
More informationAsset Management Policy
Asset Management Policy January 2018 Introduction Our Asset Management Policy was last published in 2014. It is being updated to reflect our commitment to regularly review and improve all of our Asset
More informationCAMBRIDGESHIRE COUNTY COUNCIL SAFETY OF SPORTS GROUNDS FUNCTION POLICY DOCUMENT
CAMBRIDGESHIRE COUNTY COUNCIL SAFETY OF SPORTS GROUNDS FUNCTION POLICY DOCUMENT 1. INTRODUCTION 1.1 This policy document has been produced by Cambridgeshire County Council after consultation with Cambridgeshire
More informationResponse to a Bridge Strike over the Railway
Response to a Bridge Strike over the Railway A Protocol for Highway and Road Managers, Police and Bridge Owners NR/GPG/CIV/007 Note This protocol has been produced for the benefit of Network Rail staff
More informationThe purpose of this report is to seek the views of the NSS Board on membership of the Occupational Health and Safety Advisory Committee.
B/17/38 NSS Board Meeting Friday, 7 April 2017 Occupational Health, Safety, Wellbeing Policy Occupational Health and Safety Advisory Committee Board Membership Purpose The purpose of this report is to
More informationAudit and Governance Committee
Audit and Governance Committee Date of Meeting 7 December 2016 Officer Andrew Martin Service Director Highways & Emergency Planning Subject of Report Executive Summary The inaugural Ironman Weymouth event
More informationAdvice on potential fuel shortages and contingency plans for frontline services
APSE briefing 12-18 Advice on potential fuel shortages and contingency plans for frontline services Key issues UNITE The union have received a positive vote for strike action concerning a dispute relating
More informationMetropolitan Police Service (MPS) Health and Safety Policy Version 4.1 Summary
Freedom of Information Act Publication Scheme Protective Marking Official Publication Scheme Y/N Yes Title Metropolitan Police Service (MPS) Health and Safety Policy Version 4.1 Summary MPS Health & Safety
More informationGreat Western Railway
Great Western Railway Passenger Information During Disruption Delivery Plan Version 1.3 September 2015 Introduction Welcome to our Disruption Response Plan. This document has been produced in order to
More informationOFFICIAL JOB DESCRIPTION. Before completing this form, please read the BTP Guide to writing job descriptions for Police Staff roles document.
JOB DESCRIPTION Before completing this form, please read the BTP Guide to writing job descriptions for Police Staff roles document. A. POST DETAILS: Job Title: Resilience Planning Officer Current Grade:
More informationCrowd Management at Stations A good practice guide
Crowd Management at Stations A good practice guide Issue: 01 October 2004 http://www.rssb.co.uk The negative effects of crowds may be more than service delays and unhappy passengers. Crowding can also
More informationRef Domain Standard Detail
Ref Domain Standard Detail Clinical Commissionin Evidence - examples listed below g Group 1 Governance Appointed AEO The organisation has appointed an Accountable Emergency Officer (AEO) responsible for
More informationRugby New Zealand 2011 Limited. Rugby World Cup 2011 Volunteer Programme Strategic Plan
Rugby New Zealand 2011 Limited Rugby World Cup 2011 Volunteer Programme Strategic Plan Terms of Use Documents relating to Rugby World Cup 2011 were produced specifically for the RWC 2011 Volunteer Programme
More informationATOC Guidance Note Competence of Train Operator Liaison Officers (TOLOs)
Document comes into force Supersedes ATOCGN016 Iss 1 as of ATOC Guidance Note Competence of Train Operator Liaison Officers (TOLOs) Synopsis This Guide sets out recommended criteria for ensuring the competence
More informationI write with reference to the meeting between abc concerning your intention to stage a def at ghi..
CORBY BOROUGH COUNCIL CORPORATE HEALTH AND SAFETY ARRANGEMENTS RISK ASSESSMENT & CONTROL MEASURES FOR OUTDOOR EVENTS Author: John Brookes (Safety Officer) Issue Date: 1 ST May 2001 Revised Date: Page 1
More information2016 transit accessibility plan
2016 transit accessibility plan This document is available in alternate formats upon request. 905-864-4141 transit@milton.ca miltontransit.ca Table of Contents Section 1 Executive Summary 3 Section 2 Milton
More informationAgenda 6 ANNUAL SAFETY PERFORMANCE REPORT 2016/17
Agenda 6 ANNUAL SAFETY PERFORMANCE REPORT 216/17 Document Control Version Date Comment Prepared by Checked by Approved by 1 28/4/17 First Issue RP FK 2 3/8/17 Comments received FK ES 3 8/8/17 Document
More informationCustomer Delivery Director
Customer Delivery Director Employer: Reporting to: Department: Transport for Wales Rail Services Chief Operations Officer COO Job Purpose: Lead and direct the Customer Delivery area to create and maintain
More informationBridge Strikes from Road Vehicles or Waterborne Vessels
Railway Group Standard Bridge Strikes from Road Vehicles or Waterborne Vessels Synopsis This document mandates requirements for the management of the risks to the operational railway from road vehicles
More informationGE/GN8640. Risk Evaluation and Assessment. Guidance on Planning an Application of the Common Safety Method on. Rail Industry Guidance Note
GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited GE/GN8640 Method on Risk Evaluation and Assessment Issue One; June 2014 Rail
More informationGuidance Note Responding to Ill/ Injured Passengers on Trains
RDG-GN018 Guidance Note Responding to Ill/ Injured Passengers on Trains Synopsis This document provides guidance on developing policies for responding to passengers taken ill or injured on board trains.
More informationNARU. NHS Ambulance Services Emergency Preparedness, Resilience & Response. Quality Assurance Framework. National Ambulance Resilience Unit
National Ambulance Resilience Unit NARU NHS Ambulance Services Emergency Preparedness, Resilience & Response Quality Assurance Framework Page 1 of 45 Document Name National Ambulance Resilience Unit National
More informationSpecial Events Planning
Special Events Planning Prepared For: Prepared By: April 2010 Table of Contents 1.0 Overview... 1 2.0 Special Events Planning... 1 2.1 Impact of Planned Special Events... 1 2.2 Goals of Managing Travel
More informationPROCEDURE FOR MANAGING WORKFORCE CHANGE
PROCEDURE FOR MANAGING WORKFORCE CHANGE Issued by Department of Human Resources Updated: 06 March 2012 CONTENTS Page Section 1: Introduction 2 Section 2: Scope of the Procedure 2 Section 3: Consultation
More informationA TDM Programme for the Glasgow 2014 Games and beyond the potential for legacy
A TDM Programme for the Glasgow 2014 Games and beyond the potential for legacy. Mott MacDonald on behalf of Glasgow2014 1 Introduction The XX Commonwealth Games will be held from 23. July to 3rd August
More informationRecommended Practice for Security & Emergency Management Aspects of Special Event Service
Final Version 4/1/08 Recommended Practice for Security & Emergency Management Aspects of Special Event Service Approved March 13, 2008 APTA Security Emergency Management Working Group Approved August 4,
More informationSITXEVT606 Develop crowd management plans
SITXEVT606 Develop crowd management plans Release 1 SITXEVT606 Develop crowd management plans Modification History The version details of this endorsed unit of competency set are in the table below. The
More informationHEALTH & SAFETY POLICY
Inspiring Learning Health and Safety Policy Issued: 27/04/16 v.2.2 Ref: H&S-POL-001 HEALTH & SAFETY POLICY Contents: Page No: Statement of Intent 2 Policy Objectives 3 General Arrangements 4 Organisation
More informationPassenger Information During Disruption
Passenger Information During Disruption (PIDD) Local Plan Version 1 May 2018 Introduction Heathrow Express recognises that the provision of information to customers is important in order to ensure a smooth
More informationBowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy.
Bowmer Kirkland & Kirkland & Accommodation Health & Safety Policy December 2013 www.bandk.co.uk Index Policy Statement Page 3 Interaction of Health and Safety Responsibilities Page 5 Organisation Page
More informationSITE SAFETY RULES - SILVERSTONE CLASSIC 2018
SITE SAFETY RULES - SILVERSTONE CLASSIC 2018 The following is an outline of the Safe Working Requirements for all Companies, staff and any other persons for this event. Please note that the terms Company
More information10 The Infrastructure
10 The Infrastructure 10.1 The Engineering Interfaces The Systems involved: There are many engineering interfaces between vehicles and infrastructure that can affect train performance if they don t work
More informationExercise Tangaroa Evaluation Plan. V1.0 4 February 2016
Exercise Tangaroa Evaluation Plan V1.0 4 February 2016 1 Contents Section 1 Introduction... 4 1.1 Introduction... 4 1.2 Audience... 4 1.3 National CDEM and Inter-Agency (AOG) Exercise Programmes... 4 1.4
More informationThe object of this report is to update the Committee on various strategic-level issues currently affecting the west of Scotland transport network.
Agenda Item 5 Strategic Issues Update for the SPT area Committee Strategy and Programmes Date of meeting 18 May 2018 Date of report 25 April 2018 Report by Senior Director 1. Object of report The object
More information3.1 River Learning Trust Health and Safety Management System Manual
HEALTH AND SAFETY MANAGEMENT HEALTH AND SAFETY MANUAL 1 AMENDMENT RECORD Date November 2015 Amendment First Issue 2 DEFINITIONS/ABBREVIATIONS Document Trust Manual Plan Procedure Instruction Guidance Note
More information18 Business Continuity Management
18 Business Continuity Management Business Continuity is the strategic and tactical capability of the organisation to plan for and respond to incidents and business disruptions in order to continue business
More informationCHARGING FOR POLICE SERVICES AT EVENTS
NOT PROTECTIVLEY MARKED CHARGING FOR POLICE SERVICES AT EVENTS Representatives of Police Scotland, the Scottish Police Authority, Event Scotland and the Scottish Government met on 16 July to discuss and
More informationHealth and Safety Policy Standard
Health and Safety Policy Standard Issue Date: 1 st July 2010 Authority: Directors, AES Group Applicability: AES Group covering all business divisions, operating companies and business units throughout
More informationUnless this copy has been taken directly from the Trust intranet site (Pandora) there is no assurance that this is the most up to date version
Policy No: OP89 Version: 1.1 Name of Policy: Emergency Preparedness, Resilience and Response (EPRR) Policy Effective From: 15/11/2016 Date Ratified 12/08/2015 Ratified EPRR Committee Review Date 01/08/2017
More informationLone Working Policy and Procedure. Contents
Contents 1. Lone working policy... 2 2. Defining lone working... 2 3. Note on lone working risk assessment... 2 4. Identify the hazard... 3 4.1 Potential for violence and aggression... 3 4.2 Physical hazards...
More information1.3. Children under 2 years of age do not require a ticket for Sessions and will not be allocated a seat at any Session.
Glasgow 2018 - Ticketing Terms and Conditions In these terms we, us, our and Glasgow 2018 means Glasgow City Council, a local authority constituted under the Local Government etc (Scotland) Act 1994 and
More informationHealth and Safety Management Profile (HASMAP)
Health and Safety Management Profile (HASMAP) Contents Introduction 02 HASMAP overview 03 Getting started 04 Indicator summaries A Leadership 07 B Planning for emergencies 15 C Health and safety arrangements
More informationCORPORATE HEALTH AND SAFETY POLICY
CORPORATE HEALTH AND SAFETY POLICY Foreword Hawthorn Leisure is a pub group overseeing the management of a large group of pubs as well as providing statutory compliance services to tenanted pubs. At Hawthorn
More information2. This policy replaces all existing local Adverse Weather Policies currently in force and is effective immediately.
Page 1 Interim National Arrangements Covering Disruption to Work as a Result of Adverse Weather Policy purpose & principles 1. The purpose of this Adverse Weather policy is to issue clear guidance to all
More informationAccident and Emergency Planning
Accident and Emergency Planning Synopsis This Standard identifies the essential requirements for planning to enable an effective and safe response to Accidents, Incidents and Emergencies. Approved by Michael
More informationConstruction Method Statement
Construction Method Statement Introduction. The project involves the construction of the new Apartment Extra Car Home for Grwp Cynefin in Pothmadog, Gwynedd, Wales. The programme and construction methodology
More informationROSTER AND RESOURCE COORDINATOR
ROSTER AND RESOURCE COORDINATOR Leisure Networks Association Inc. - Connecting people to their communities THE POSITION Position Title: Award: Roster and Resource Coordinator Social, Community, Home Care
More informationAppendix 2 Industry Recommendations and Action Plan
Passenger During Disruption (PIDD) Appendix 2 Industry Recommendations and Action Plan 17 November 2015 MTR Crossrail, 63 St Mary Axe, London EC3A 8NH mtrcrossrail.co.uk Passenger During Disruption (PIDD)
More informationGuidance note. Questions for sports bodies: A Code for Sports Governance Tier 1
Guidance note Questions for sports bodies: April 2017 Introduction These questions are designed to assist in the implementation of Governance (the Code) and to prompt an assessment of governance arrangements
More informationASSESSMENT OF PRACTICAL EXPERIENCE IN THE HANDLING, TRANSPORT AND CARE OF ANIMALS GUIDANCE TO EMPLOYERS
ASSESSMENT OF PRACTICAL EXPERIENCE IN THE HANDLING, TRANSPORT AND CARE OF ANIMALS GUIDANCE TO EMPLOYERS ASSESSMENT OF PRACTICAL EXPERIENCE IN THE HANDLING, TRANSPORT AND CARE OF ANIMALS The Welfare of
More informationExplaining the Delay Attribution Principles and Idiosyncrasies:
Explaining the Delay Attribution Principles and Idiosyncrasies: A guide to why Delay Incidents are attributed the way they are.. This briefing document is intended to assist all parties to understand the
More information29700 POLICY POLICING OPERATIONS
Version 5 Last updated 22/04/2016 Review date 09/05/2018 Equality Impact Assessment Low Owning department Strategic Planning 1. About this Policy 1.1. This policy explains how Hampshire Constabulary will
More informationAustralian Network Rules and Procedures Development
Australian Network Rules and Procedures Development Policy Revision 1-12 9 February 2012 Australian Network Rules and Procedures Development 1 Document Control Status Issue- Date Prepared Reviewed Approved
More informationAssessment Strategy. for. NVQ Qualifications. in Rail Services. based on. GoSkills. National Occupational Standards
Assessment Strategy for NVQ Qualifications in Rail Services based on GoSkills National Occupational Standards 1. Introduction GoSkills, as the Sector Skills Council for the Passenger Transport Sector,
More informationInternal Audit Charter
Internal Audit Charter 1. Purpose The purpose of this Charter is to state clearly the objectives and scope of esure Group s (esure) Internal Audit function. It also serves to outline the function s position
More informationDeterring Unauthorised Access and Vandalism
Railway Group Standard Deterring Unauthorised Access and Synopsis This document mandates requirements for the management of risk that could arise from unauthorised access to Network Rail controlled infrastructure.
More informationGreater Cambridge City Deal Executive Board. A428/A1303 Better Bus Journeys Scheme Public Consultation Outcomes and Next Steps
Report To: Greater Cambridge City Deal Executive Board 3 rd March 2016 Lead Officer: Graham Hughes, Executive Director of Economy, Transport and Environment, Cambridgeshire County Council A428/A1303 Better
More information(Non-legislative acts) REGULATIONS
11.12.2010 Official Journal of the European Union L 327/13 II (Non-legislative acts) REGULATIONS COMMISSION REGULATION (EU) No 1169/2010 of 10 December 2010 on a common safety method for assessing conformity
More informationHEALTH AND SAFETY POLICY AND PROCEDURES
HEALTH AND SAFETY POLICY AND PROCEDURES Relevant Legislation The Health and Safety At Work Act 1974 The Management of Health and Safety At Work Regulations 1999(as amended) All associated Health and Safety
More informationCentre for Rail Skills. National Occupational Standards. for the. Maintenance and Repair of. Traction and Rolling Stock
Centre for Rail Skills National Occupational Standards for the Maintenance and Repair of Traction and Rolling Stock March 2003 Introduction This document sets out the work done on the revised CFRS National
More informationHealth and Safety Policy
Health and Safety Policy Policy Version 1.10 Date for Review December 2016 Approved by The Board of Governors Date: 12 th December 2013 December 2013 Health and Safety Policy Page 1 Contents Section 1
More informationTrain Driver Apprenticeship Standard Typical Job Titles Occupational Profile Knowledge and Understanding Skills
Train Driver Apprenticeship Standard Typical Job Titles Passenger Train Driver, Depot Driver, Freight Train Driver and On-Track Machine Driver Occupational Profile Train Drivers are responsible for driving
More informationLondon 2012 Games: A Mobility Management Legacy. Iain Macbeth Business Engagement Programme Manager Transport 1 for London
London 2012 Games: A Mobility Management Legacy Iain Macbeth Business Engagement Programme Manager Transport 1 for London Transport for London 2012 - a busy summer! 2-5 June Queen s Diamond Jubilee 21
More informationThe International Centre. Site Induction. Construction Design & Management 2015
The International Centre Site Induction Construction Design & Management 2015 Contents Introduction Emergency Evacuation Procedure Traffic Management Procedure Welfare Facilities on site:- Toilets Catering
More informationThe International Centre. Site Induction. Construction Design & Management 2015
The International Centre Site Induction Construction Design & Management 2015 Contents Introduction Emergency Evacuation Procedure Traffic Management Procedure Welfare Facilities on site:- Toilets Catering
More informationNHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY
NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY POLICY 1 AUTHOR/ APPROVAL DETAILS Document Author Written By: Phil Hartwell Authorised Signature Authorised By: Helen Shields Date: 06
More informationOFFICIAL. Date 18 April 2018 Pacific Quay, Glasgow General Data Protection Regulation (GDPR) Police Scotland Preparedness Item Number 11.
Meeting Date Location Pacific Quay, Glasgow Title of Paper General Data Protection Regulation (GDPR) Police Scotland Preparedness Item Number 11.2 Presented By ACC Alan Speirs Recommendation to Members
More informationPASSENGER TRANSPORT DRIVER - BUS, COACH AND TRAM
PASSENGER TRANSPORT DRIVER - BUS, COACH AND TRAM Reference Number: ST0338 Details of standard Typical Job Titles Bus: scheduled, non-scheduled. Coach: scheduled, tour. Tram: scheduled. Occupational Pro
More informationFor personal use only
CORPORATE GOVERNANCE STATEMENT 31 MARCH 2017 Horseshoe Metals Limited s (the Company) Board of Directors (Board) is responsible for establishing the corporate governance framework of the Company and its
More informationWork Related Vehicle Safety Programme
Work Related Vehicle Safety Programme Plan and Priorities for Contents Background to development of the new plan... 4 HSA Strategy Statement... 4 Targeting of new WRVS plan for 2016 to 2018... 5 An evidence-led
More informationResponse to the Transport Committee s Intercity East Coast rail franchise inquiry
Title Paper type Contact Response to the Transport Committee s Intercity East Coast rail franchise inquiry Committee response For enquiries regarding this consultation response, please contact: Anna Pandoulas,
More informationThis paper outlines the proposed community relations strategy to be used by the nominated undertaker during construction of Phase One of HS2.
HIGH SPEED TWO INFORMATION PAPER G2: COMMUNITY RELATIONS This paper outlines the proposed community relations strategy to be used by the nominated undertaker during construction of Phase One of HS2. It
More informationRIVERSIDE SCHOOL. Capability Procedure for Support Staff
RIVERSIDE SCHOOL Capability Procedure for Support Staff APPROVED BY GOVERNORS RESPONSIBLE PERSON HEADTEACHER CONTENTS 1. Purpose and Scope 2. Rights of Representation 3. Definitions and Authority to Initiate
More informationCONSULTANCY GATEWAY STANDARD OPERATING PROCEDURE (SOP)
CONSULTANCY GATEWAY STANDARD OPERATING PROCEDURE (SOP) STANDARD OPERATING PROCEDURE REFERENCE. PROTECTIVE MARKING PORTFOLIO OWNER SOP/210/10 Finance and Corporate Services Director of Finance START DATE
More informationWomen s Empowerment Coordinator Grade 7a
Job Description Women s Empowerment Coordinator Grade 7a Job Purpose The purpose of the Women s Empowerment Coordinator is to provide technical expertise in order to build and develop gender awareness
More informationWashington Metropolitan Area Transit Authority Board Action/Information Summary
Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 200617 Resolution: Yes No TITLE: Incident Management and Communications Update PRESENTATION
More informationTransport Assessment Guidelines November 2015 Cambridgeshire County Council
Transport Assessment Guidelines November 2015 Cambridgeshire County Council Introduction The National Planning Policy Framework (NPPF, March 2012) states that All developments that generate significant
More informationThe Science Museum Group Health & Safety Policy
The Science Museum Group Health & Safety Policy The SMG Health & Safety Policy is structured for the common good of the SMG organisation, which strives for excellence and ongoing improvement in Health
More informationRecommendation Rec (2015) 1 of the Standing Committee on Safety, Security and Service at Football Matches and other Sports Events. ANNEX D Checklists
STANDING COMMITTEE (T-RV) EUROPEAN CONVENTION ON SPECTATOR VIOLENCE AND MISBEHAVIOUR AT SPORTS EVENTS AND IN PARTICULAR AT FOOTBALL MATCHES Strasbourg, 4 August 2015 Rec (2015) 1 ANNEX D Final version
More informationOPERATOR S QUALITY SYSTEM 1.0 PURPOSE
Advisory Circular CAA-AC AWS012 Issue 2 November 2013 OPERATOR S QUALITY SYSTEM 1.0 PURPOSE This Advisory Circular (AC) is issued to provide information and guidance to an air operator on how to develop,
More informationPOSITION DESCRIPTION Venue and Event Operations Supervisor
POSITION DESCRIPTION Venue and Event Operations Supervisor Organisational Context FSPL is a public entity that operates under a Constitution which includes the Civic and Cultural Charter, developed jointly
More informationGuidance on Independent Assessment. Rail Industry Guidance Note. Published by: RSSB Block 2 Angel Square 1 Torrens Street London EC1V 1NY
GN Published by: Block 2 Angel Square 1 Torrens Street London EC1V 1NY Copyright 2014 Rail Safety and Standards Board Limited GE/GN8645 Issue One: June 2014 Rail Industry Guidance Note Issue record Issue
More informationScottish Ambulance Service. Job Description
Scottish Ambulance Service Job Description 1. JOB IDENTIFICATION Job Title: Senior Duty Manager National Overview Department(s): Ambulance Control Centres Reports to: Deputy National Head of Ambulance
More informationJob Description: CMAT Chief Operating Officer
Chief Operating Officer Purpose: To deliver on the clear vision of CMAT to provide high quality and dynamic education for all at the heart of our communities by providing strategic leadership and professional
More informationLone Worker Policy. 19 November 2007 D Daniel. Version Date Comments (i.e. viewed, or reviewed, amended approved by person or committee)
Document Status Final Version: V3.0 DOCUMENT CHANGE HISTORY Initiated by Date Author 19 November 2007 D Daniel Version Date Comments (i.e. viewed, or reviewed, amended approved by person or committee)
More informationTerms of Reference for Mind Committees
Terms of Reference for Mind Committees General notes relating to all committees 1. Committee Structure 1.1. The trustees at a Council of Management meeting in accordance with its Memorandum and Articles
More informationBoard committees. Role of the board
NFP DIRECTOR TOOLS Board committees Role of the board Boards often use committees to increase overall efficiency. Work can be delegated to committees to more effectively deal with complex or specialised
More informationStakeholder Engagement and Communications Manager. Information about the appointment and candidate brief
Stakeholder Engagement and Communications Manager Information about the appointment and candidate brief January 2018 In this briefing pack A letter from the Chief Executive... 3 The role... 4 Role Purpose...
More informationNational Army Museum Trading Ltd (NAMTL) Royal Hospital Road, Chelsea, London SW3 4HT. Post: Venue Sales and Operations Manager Post No: NAMTL 179
National Army Museum Trading Ltd (NAMTL) Royal Hospital Road, Chelsea, London SW3 4HT Post: Venue Sales and Operations Manager Post No: NAMTL 179 Reports to: Assistant Director (Commercial and Visitor
More information