WI Revision 14 Safety

Size: px
Start display at page:

Download "WI Revision 14 Safety"

Transcription

1 ACCESS CONTROL MAIN GATE WI Revision 14 Safety 1.0 PURPOSE To allow only authorised vehicles, persons or materials to enter or exit the Liberty Onesteel Whyalla Main Security Gate. 2.0 SCOPE These instructions cover the administration of access to SIMEC Mining and Liberty OneSteel Steelworks Main Gate and rotary gate to access the site. 3.0 REFERENCES WI Authorised Removal of Company Property. SA SIMEC Mining and Liberty OneSteel Whyalla Site Conditions FORM Answer sheet for Site Induction for Drivers and Short Term Visitors (controlled access) 4.0 DEFINITIONS Authorised Person A person having legitimate reason to enter the SIMEC Mining and Liberty OneSteel Steelworks area, who has been authorised by a responsible Company officer. Authorised Material Material entering or leaving the works and has the correct Authorisation and documentation (refer WI ). ASCO Card Card issued for use on the swipe card readers in the automatic card entry booms, rotary gates and other areas of the works. Security issue ASCO cards for the following; replacements, new contractors and some new company employees, Human Resources also issue ASCO Cards to some new company employees only. Upgrades of access to ASCO Card must be approved in writing to and by The Senior Advisor of Emergency Services and Injury Management. Security performs all approved access upgrades on ASCO Cards and also the voiding of cards when necessary Site Entry Pass Pass includes a computer generated pin number for the use on key pad readers and is accompanied by a proof of identity card. Any PRINTED copies of this procedure are UNCONTROLLED Page: 1 of 7

2 ACCESS CONTROL MAIN GATE WI Revision 14 Safety 5.0 ACTIONS 5.1 ASCO / Site Entry Cards The Senior Advisor of Emergency Services and Injury Management via the security provider administer the issuing of passes to enter the SIMEC Mining and Liberty OneSteel Steelworks sites, and passes are issued at the Main Gate. All vehicles/persons entering these areas must be authorised to do so... Types of passes available are as follows: ASCO Cards - Employees Site Entry / ASCO cards are issued to all SIMEC Mining and Liberty OneSteel Steelworks employees upon completion of the appropriate inductions and receipt of the results at the Main Gate Authorisation to supply and create an ASCO Card must be received in writing at the Security Gate House from the Human Resource Department prior to the employee presenting themselves at the Security gate. The Security Officer must check the training management system for completion of mandatory induction as per QP The minimum inductions required to authorise the creation of an ASCO Card include; Induction to Arrium Mining and OneSteel and to have been booked into an upcoming class for Red Lock Isolation. All other required inductions will be completed by the employee in the appropriate departments. This pass authorises the applicant to enter the appropriate site for work related purposes, and to park their vehicle in the recognised car park for their area. An ASCO Card is valid for four (4) years. At the conclusion of the four (4) years appropriate inductions will need to be revalidated ASCO Entry Card - Contractors Site Entry / ASCO cards - Contractors are issued to Domicile Contractors that have the SiPass system installed at their work area on the SIMEC Mining and Liberty OneSteel Steelworks sites. An ASCO card is authorised to be created after written proof of employment from the employing contract company has been supplied and once inductions have been completed and checked by Security on the training management system. Induction to SIMEC Mining and Liberty OneSteel Steelworks and Isolation Protected Person (Red Lock) Theory and Practical are the mandatory minimum inductions required that need to be completed prior to entry. All other inductions must be completed prior to undertaking any work on site. Inductions required are outlined in QP This pass authorises the applicant to enter the appropriate site and in the case of private vehicles, park in the authorised car park for the area they will be working in for the contracted working period. An ASCO Card is valid for four (4) years. At the conclusion of the four (4) years appropriate inductions will need to be revalidated. Any PRINTED copies of this procedure are UNCONTROLLED Page: 2 of 7

3 ACCESS CONTROL MAIN GATE WI Revision 14 Safety Site Entry Card - Contractors Site Entry Cards will be issued to employees of contractors who have been contracted to carry out work on any SIMEC Mining and Liberty OneSteel Steelworks or Domicile Contracting Company sites. The Site Entry card is authorised to be created after written proof of employment from the employing contract company has been supplied and once inductions have been completed and checked by Security on the training management system. Induction to SIMEC Mining and Liberty OneSteel Steelworks and Isolation Protected Person (Red Lock) Theory and Practical are the minimum inductions that need to be completed prior to entry. All other inductions must be completed prior to undertaking any work on site. Inductions required are outlined in QP This pass authorises the applicant to enter via the main boom gates using the key pads or rotary gates located at the SIMEC Pelletising area. A Site Entry Card is valid for four (4) years. At the conclusion of the four (4) years appropriate inductions will need to be revalidated Site Entry Card Visitors (Unescorted) Site Entry Cards will be issued to Visitors on a short term basis who will be attending SIMEC Mining and Liberty OneSteel Steelworks or Domicile Contractor Companies located on site. The Site Entry card requires written authorisation by a manager or administrator of SIMEC Mining and Liberty OneSteel Steelworks or domicile contracting company prior to Visitor s arrival. The Site Induction for Short Term Visitor must be completed prior to entering the sites. Induction can be undertaken at the Whyalla Steelworks Main Security office on arrival or in the company of a member of the Safety Department, Training Department or Authorised Manager. This pass authorises the applicant to enter via the main boom gates or rotary gates for the duration of the current individual visit. Depending on the duration and frequency of visits the visitor will be issued a temporary card (irregular visitor) or a Site Entry Card (regular visitor e.g. sales reps). A temporary card is only valid for the duration of the individual visit; however the Visitor induction is valid for two (2) years. A Site Entry Card is valid for the duration of the induction. Visitors cannot conduct any work in or on any SIMEC Mining and Liberty OneSteel Steelworks or domicile contracting company sites. Any PRINTED copies of this procedure are UNCONTROLLED Page: 3 of 7

4 ACCESS CONTROL MAIN GATE WI Revision 14 Safety Site Entry Card Partner / Significant Relative A Site Entry Card Partner / Significant Relative will be issued to the partner / significant relative of an SIMEC Mining and Liberty OneSteel Steelworks or Domicile contracting company employee on approval of application. An application form needs to be completed prior to issue of Site Entry Card Partner / Significant Relative. Applications can be obtained at the Liberty Steelworks Main Security Gate. Approval needs to be granted by the relevant Manager of the department / contracting company. The Site Induction for Short Term Visitor must be completed prior to entering the sites. Induction can be undertaken at the Whyalla Steelworks Main Security office. This pass authorises the applicant to enter via the main boom gates and allows access to main plant / admin car parks only. The Site Entry Card Partner / Significant Relative is only valid for two (2) years Site Entry Card Truck Drivers A Site Entry Card Truck Drivers will be issued to regular drivers entering the SIMEC Mining and Liberty OneSteel Steelworks or Domicile contracting company sites. The LIBERTY Steelworks Store / Supply Departments are required to contact the Security Gate with a list of regular truck drivers to authorise the creation of a Site Entry Card Truck Drivers. Irregular drivers will be issued with a single visit entry card for the duration of the visit. The authority to load information and Road Plan for Pick Ups spread sheet must be sent through to Whyalla Steelworks Security from the Whyalla Steelworks Stores / Supply departments / Saltworks / BASF / Material Handling Despatch prior to truck arrival. All truck drives need to complete the Site Induction for Truck Drivers. This pass authorised the driver to enter via the main boom gates and travel to the appropriate department. The Site Entry card is only valid for the duration of the individual visit however the Visitor induction is valid for two (2) years. 5.2 Site Entry - Fully Escorted Visitors The SIMEC Mining and Liberty OneSteel Steelworks Lead Team members and the Media and Communications Manager are authorised to bring fully escorted visitors on to the site. These visitors are to be under the supervision of the authorised person or their delegate at all times. The Authorised person needs to complete the Site Entry for Fully Escorted Visitors Induction with the visitor before entry. This is valid for the dates on the form only. The visitor needs to sign in to the relevant department, admin block or location tag. Any PRINTED copies of this procedure are UNCONTROLLED Page: 4 of 7

5 ACCESS CONTROL MAIN GATE WI Revision 14 Safety 5.3 Production Services Areas Pass (PSAP) PSAP s can be obtained by contacting the Senior Advisor of Emergency Services and Injury Management 5.4 Records Security will maintain records of Authority, proof of initial training and Whyalla Security Checklist. 5.5 Authorisation review for Contractor Employee Access All new and current vendor contractors will be expected to supply information to the Senior Advisor for Emergency Services and Injury Management and Workforce Development Group of current and terminated employees. This information needs to be supplied every quarter. 5.6 Employees Out Of Hours Site Visits Employees may make out of hours site visits to designated areas of their work site for the purpose of sightseeing. Approval is required from the employee s Manager; approval is to be ed to Security prior to coming onsite. The Emergency Services Officer on duty will ensure inductions are current and make out a Site Entry pass for the visit. This pass is handed back in at the Gate on exiting the sites. Appropriate Personal Protective Equipment (PPE) must be worn if leaving a vehicle. A limited amount of PPE is available at the Main Gate. 5.7 Vehicles with Passengers It is the responsibility of the driver of a vehicle to verify their passengers have valid access to the site and the intended location. 5.8 Authorised Removal of Company Property Refer to WI Authorised Removal of Company Property. Any PRINTED copies of this procedure are UNCONTROLLED Page: 5 of 7

6 ACCESS CONTROL MAIN GATE WI Revision 14 Safety 5.9 Truck Entry / Exit Entry Exit 5.10 Random Searches Trucks entering Liberty OneSteel Steelworks must pull in to the truck park at the rear of the Main Security Office for inspection of vehicle if loaded, confirmation of wearing the correct Personal Protective Equipment (PPE), sign in, carry out inductions, commence the Whyalla Security Checklist and obtain the Authority to Load paperwork as per WI Load restraint will be checked for all HV s and a random selection of LV s entering site. Compliance will be recorded on the Whyalla Security Checklist form. If not compliant 1. Security to ensure driver applies correct load restraint prior to moving vehicle. 2. Advise the following people by . a. Stores and Inventory Manager b. Transport Manager c. Safety Business Partner (Stores) All loaded trucks, covered in trucks and tipper trucks exiting Liberty OneSteel Steelworks must stop in Lane five (5) for further inspection and sign off of paperwork. Unloaded flat top trucks, fuel tankers, and trucks less than 24 tonnes; i.e. service vehicles, can exit via lanes three (3) and four (4) after swiping and contacting Security Gate via PA for exit clearance. This information will be logged by the Security Office on the SiPass computer. On exit the Whyalla Security Checklist will be completed for all trucks required to stop. Load restraint will be checked for all HV s and a random selection of LV s leaving site. Compliance will be recorded on the Whyalla Security Checklist form. If not compliant 1. Security to ensure driver applies correct load restraint prior to moving vehicle. 2. Advise the following people by . a. Stores and Inventory Manager b. Transport Manager c. Safety Business Partner (Stores) Random searches of vehicles exiting the works are carried out to check for the unauthorised removal of Company property, which includes cars, light vehicles and large freight vehicles Any PRINTED copies of this procedure are UNCONTROLLED Page: 6 of 7

7 ACCESS CONTROL MAIN GATE WI Revision 14 Safety 5.11 Random Pass Checks Random pass and driver license checks are made on vehicles entering/leaving the works to check that the owner/driver is in possession of a current license or pass. If a license is not available, then the person has 24 hours or the next shift to produce this or their Site Entry / ASCO pass will be voided Random Alcohol and other Drug testing Random checks are conducted on vehicles entering the works to ensure the driver and/or passenger is not over the designated limit of alcohol specified by SIMEC Mining and Liberty OneSteel Steelworks or with detectable levels of illegal drugs in their system. 6.0 DOCUMENTATION Attachment No.1 Attachment No.2 Attachment No.3 Attachment No.4 Attachment No.5 Attachment No. 6 Attachment No. 7 Attachment No. 8 Attachment No. 9 Attachment No. 10 Copy of Authority for Partner / Significant Relative Site Entry Access Card Copy of Security Checklist Site Entry Requirements for Short Term Visitors Visitors Induction- Assessment Truck Drivers Induction - Assessment Site Induction for Truck Drivers Presentation Site Induction for Temporary Visitors Presentation Site Entry for Fully Escorted Visitors Safety Contact for Bulk Material delivery and collection Sign in Sheet Any PRINTED copies of this procedure are UNCONTROLLED Page: 7 of 7

8 Attachment No.1 AUTHORITY FOR PARTNER / SIGNIFICANT RELATIVE SITE ENTRY ACCESS CARD Please print all information below. COMPANY / DEPARTMENT NAME; EMPLOYEE NAME First name; Surname; PARTNER / SIGNIFICANT RELATIVE NAME First name; Surname; AUTHORISING MANAGER First name; Surname; SIGNATURE; DATE; AUTHORISING SECURITY OFFICER First name; Surname; SIGNATURE; DATE; WI /1 5/05/2015 Page 1 of 1

9 Attachment No.2 WI29.523/2 5/05/2015 Page 1 of 1

10 Site Entry Requirements for Short Term Visitors When you enter this site you agree to our Conditions of Entry Attachment No.3 Driving: The general speed limit on site is 40 kph unless sign posted otherwise Everyone must stop at stop signs (including rail crossings), red traffic lights and flashing railway signals Wear your seatbelt at all times when in a moving vehicle. The use of mobile phones in vehicles by drivers is banned, unless the vehicle is stationary (includes hands free devices) Keep a safe distance of 30 metres from heavy mobile equipment No-one will be on Arrium Mining or OneSteel Whyalla Steelworks sites over the limits for alcohol or with detectable levels of illegal drugs in their system Plant Areas: Remain with your guide at all times (excluding office areas). Do not enter production areas unless you are with your guide. If using your mobile phone on site, you must be in a safe position and be stationary. When walking up or down steps and stairs, you are required to hold onto handrails at all times. Never put yourself in the line of fire of operating plant or equipment. Remain at least 3m clear of operating mobile equipment. Never put any part of your body under a suspended load. Personal Protective Equipment If you are required to enter a plant area, the following minimum requirements apply: Long trousers Long sleeve shirt High visibility vest Safety Footwear Hard hat Safety glasses Gloves In the event of an Emergency Call 4000 from any internal phone or from a mobile phone If you hear an emergency evacuation siren while you are in your vehicle, pull over when it is safe to do so and call your site contact to ascertain if it is safe to enter the area. If you are unable to reach your contact, phone security on and if necessary return to the Main Gate. For a complete list of the Site Conditions see the vendor website; 6/09/2017 WI29.523/3 Page: 1 of 1

11 Visitors Induction Assessment Attachment No.4 1 I do not need a valid driving license if I am driving on OneSteel Whyalla Steelworks property. a) True b) False 2 What is the general speed limit on the OneSteel Whyalla Steelworks site? a) 30 kph b) 40 kph c) 50 kph d) 60 kph 3 I can drive across a railway crossing when lights and bells are operating if I cannot see a train coming? a) True b) False 4 I must stop at all stop signs, red traffic lights and flashing railway signals. a) True b) False 5 If I am entering the site to just drop a person off I will not be required to undertake randomly drug and alcohol tested. a) True b) False 6 How far behind a heavy vehicle must I travel to keep myself safe? a) 15 metres b) 20 metres c) 30 metres d) 50 metres 7 What is the emergency phone number? a) 4000 on internal phones, on mobile phones b) 4444 on internal phones, on mobile phones c) 4192 on internal phones, on mobile phones 8 I can use my mobile phone when I am driving as long as I am using hands free. a) True b) False 9 What do I do if I hear an emergency siren while I am in my vehicle? a) Continue to my destination and adk my site contact if it is safe b) Continue to my destination and stay in my vehicle until the siren goes off c) Pull over when it is safe to do so, call your site contract or Security to ascertain if it is safe to enter the area. 6/09/2017 WI29.523/4 Page: 1 of 2

12 Attachment No.4 (100% required to be deemed competent with all questioned answered) Overall Assessment Decision: Competent Not Yet Competent Comment: I agree that this is a fair representation of the assessment that occurred today and commit to comply with the procedure(s) I have been inducted and assessed in. Driver s Name: Driver s Signature Date: Driver s Organisation: ESO Name: ESO Signature: Date: 6/09/2017 WI29.523/4 Page: 2 of 2

13 Truck Drivers Induction Assessment Attachment No.5 1 I do not need a valid driving license if I am driving on OneSteel Whyalla Steelworks property. c) True d) False 2 What is the general speed limit on the OneSteel Whyalla Steelworks site? e) 30 kph f) 40 kph g) 50 kph h) 60 kph 3 I can drive across a railway crossing when lights and bells are operating if I cannot see a train coming? c) True d) False 4 I must stop at all stop signs, red traffic lights and flashing railway signals. c) True d) False 5 If I am entering the site to just drop a person off I will not be required to undertake randomly drug and alcohol tested. c) True d) False 6 How far behind a Mobile Equipment must I travel to keep myself safe? e) 15 metres f) 20 metres g) 30 metres h) 50 metres 7 What is the emergency phone number? d) 4000 on internal phones, on mobile phones e) 4444 on internal phones, on mobile phones f) 4192 on internal phones, on mobile phones 8 I can use my mobile phone when I am driving as long as I am using hands free. d) True e) False 9 I can stand on the trailer of a truck if I have active fall protection measures in place. a) True b) False 10 What do I do if hear an emergency evacuation sirens while I am in my vehicle? a) Continue to my destination and ask my site contact if it is safe b) Continue to my destination and stay in my vehicle until the siren goes off c) Pull over when it is safe to do so, call site contact or Security to ascertain if it is safe to enter the area 6/09/2017 WI29.523/5 Page: 1 of 3

14 Attachment No.5 11 I need to restrain my load in accordance with the National Transport Commission Load Restraint Guidelines a) True b) False 12 What PPE is required to be worn when on the OneSteel Whyalla Site? a) Long Trousers b) Long Sleeved Shirt c) High visibility vest d) Safety footware e) Hard Hat f) Safety Glasses and Gloves g) All of the above 13 If I need to communicate with the Loader that is loading my vehicle I can: a) Use the provided radio if loading Steel or bulk products b) Walk up to the loader and talk to him 14 I must stay in the designated safe zone during loading and unloading. a) True b) False 15 To safely approach within 3 metres of a forklift, I need to wait for the operator to: a) Halt the forklift, engage neutral, apply the handbrake b) Lower the tynes c) Switch off the forklift d) Be granted permission by the operator before entering e) All of the above 16 The 3 load configurations on this page all have the same mass (weight) 1) Which of these configurations would require the most webbings straps? 2) Why does this configuration require more webbing straps that the other two? 1. m¹ m¹ m¹ 6/09/2017 WI29.523/5 Page: 2 of 3

15 Attachment No.5 17 If I have a non-certified side curtain truck, do I still need to secure the items inside the truck s curtain area? a) True b) False 18 Use the table below to determine the minimum number of lashings required for each load configuration A and B assuming that the load is blocked on timber deck Lashing angle to Horizontal Greater than to 45 8mm Transport Chains 1 Chain per 4.2 t of product 1 Chain per 3.0 t of product 2.0 tonne Webbing Straps 1 Webbing Strap per 1.7 t of product 1 Webbing Strap per 1.2 t of product How many chains are required? How many webbing straps are required? (100% required to be deemed competent with all questioned answered) Overall Assessment Decision: Competent Not Yet Competent Comment: I agree that this is a fair representation of the assessment that occurred today and commit to comply with the procedure(s) I have been inducted and assessed in. Driver s Name: Driver s Signature Date: Driver s Organisation: ESO Name: ESO Signature: Date: 6/09/2017 WI29.523/5 Page: 3 of 3

16 Attachment No.6 Available in Electronic form at the Gate House WI29.523/6 6/09/2017 Page: 1 of 1

17 Attachment No.7 Available in Electronic form at the Gate House WI29.523/7 6/09/2017 Page: 1 of 1

18 Attachment No. 8 Site Entry for Fully Escorted Visitors When you enter this site you agree to our Conditions of Entry Safety is a core value at Arrium Mining and OneSteel Whyalla Steelworks. Everyone s safety is important. We want your visit to be incident and injury free. This induction gives you permission to visit administration buildings only and plant areas when escorted for the dates listed below. You cannot drive or conduct work on the site. Key safety requirements to keep you safe while on our Site: 1. Remain with your guide at all times (excluding office areas). Do not enter production areas unless you are with your guide. 2. No-one is permitted on the site over the legal limit for Alcohol or with detectable levels of illegal drugs. There is a random D&A program. 3. Wear your seatbelt at all times when in a moving vehicle. 4. If using your mobile phone on site, you must be in a safe position and be stationary. 5. When walking up or down steps and stairs, you are required to hold onto handrails at all times. Your guide will need to point out the emergency evacuation point and sign in location that is relevant to the area you are visiting Personal Protective Equipment In the event of an Emergency If you are enter a plant area, the following minimum PPE requirements apply: Long trousers and long sleeve shirt High visibility vest Safety Footwear or enclosed footwear on green walkways Hard hat Safety glasses Gloves Call 4000 from any internal phone or from a mobile phone If you hear an emergency evacuation siren while on site proceed to your nearest evacuation assembly point. If you are unable to reach your guide phone security on My signature on the sign-in log at the site entry gate confirms that I shall obey the site Health and Safety requirements as mentioned above. I confirm that I have read and understood the requirements outlined here for visiting the OneSteel Whyalla Steelworks site. Date: Company: Name: Signature: Guide: Signature: 6/09/2017 WI29.523/8 Page: 1 of 1

19 Attachment No. 9 Safety Contact for Bulk Material delivery and collection When you enter this site you agree to our Conditions of Entry Key safety requirements to keep you safe while on our Site: The Safe Location is in drivers cab while loading. Positive Radio contact is required before entering the Heavy Mobile Equipment (HME) Area. You will be issued with a Radio. To exiting the cab in a HME area you must call the HME (loader) operator and gain permission. If the HME is within 30m the HME (Loader) must stand down (bucket or implement on ground and vehicle stationary) before you can exit. No person will be on the back of any truck or truck trailer without active fall prevention measures in place. Confirm you can tarp off before reaching main gate for exiting. There is platform to assist with levelling load on site. Key Contacts for Assistance: BIS Shift Supervisor Security Main gate Personal Protective Equipment If you are enter a plant area, the following minimum PPE requirements apply: Long trousers and long sleeve shirt High visibility vest Safety Footwear or enclosed footwear on green walkways Hard hat Safety glasses Gloves In the event of an Emergency Call 4000 from any internal phone or from a mobile phone If you hear an emergency evacuation siren while you are in your vehicle, pull over when it is safe to do so and call your site contact to ascertain if it is safe to enter the area. If you are unable to reach your contact, phone security on and if necessary return to the Main Gate. For a complete list of the Site Conditions see the vendor website; Note: Return radio to security at main gate before exiting. 6/09/2017 WI29.523/9 Page: 1 of 2

20 Attachment No. 9 Safety Contact for Bulk Material delivery and collection Site Map of Key Locations Map of Site with key locations and path. 6/09/2017 WI29.523/9 Page: 2 of 2

21 ONESTEEL WHYALLA Attachment No. 10 VISTORS REGISTER Date Pass Number Anticipated Time Onsite Time In Name Company Rego Area Visiting Contract Number Site Induction Time Out Signature WI29.523/10 6/09/2017 Page: 1 of 1

V.2. REFERENCE: G:\Public\OCCUPATIONAL HEALTH & SAFETY\3. INDUCTION\General Site Induction REVIEW DATE: 5/6/2013

V.2. REFERENCE: G:\Public\OCCUPATIONAL HEALTH & SAFETY\3. INDUCTION\General Site Induction REVIEW DATE: 5/6/2013 REFERENCE: G:\Public\OCCUPATIONAL HEALTH & SAFETY\3. INDUCTION\General Site Induction REVIEW DATE: 5/6/2013 V.2 WELCOME TO N.F. McDONNELL & SONS Before working on our site it is a requirement that all

More information

Woolworths Meat Company Driver Induction

Woolworths Meat Company Driver Induction Woolworths Meat Company Driver Induction Introduction Introduction Welcome! Today, you re going to spend some time looking at the types of things you ll need to know to fulfil your role as a driver for

More information

CARRIER ACCESS ARRANGEMENTS QUBE PORT BOTANY EMPTY CONTAINER PARK LAST UPDATED 7 APRIL Overview

CARRIER ACCESS ARRANGEMENTS QUBE PORT BOTANY EMPTY CONTAINER PARK LAST UPDATED 7 APRIL Overview CARRIER ACCESS ARRANGEMENTS QUBE PORT BOTANY EMPTY CONTAINER PARK LAST UPDATED 7 APRIL 2017 1. Overview QUBE LOGISTICS (NSW) PTY LTD ABN 99 123 022 588 Gate B117, Ramp C Off Penrhyn Road Port Botany NSW

More information

Container Transport Operator Access Terms & Conditions

Container Transport Operator Access Terms & Conditions ANL CONTAINER PARK Pty Ltd 11-21 Pinnacle Road Altona North VIC 3025 LAST UPDATED 28 SEPTEMBER 2016 Container Transport Operator Access Terms & Conditions 1) Overview... 2 2) Site safety requirements...

More information

CARRIER ACCESS ARRANGEMENTS QUBE Logistics Brisbane Port Empty Park (BPEP) - formerly FICP

CARRIER ACCESS ARRANGEMENTS QUBE Logistics Brisbane Port Empty Park (BPEP) - formerly FICP CARRIER ACCESS ARRANGEMENTS QUBE Logistics Brisbane Port Empty Park (BPEP) - formerly FICP LAST UPDATED 19 SEPTEMBER 2017 1. Overview QUBE LOGISTICS 1 Bingera Drive Port of Brisbane QLD 4178 PO Box 1088

More information

CARRIER ACCESS ARRANGEMENTS CHALMERS INDUSTRIES PTY LTD, BRISBANE, EMPTY CONTAINER PARK

CARRIER ACCESS ARRANGEMENTS CHALMERS INDUSTRIES PTY LTD, BRISBANE, EMPTY CONTAINER PARK CHALMERS INDUSTRIES PTY LTD ABN 87 004 330 367 BRISBANE OFFICE Whimbrel Street, Port of Brisbane, QLD 4178 Australia Telephone: (07) 3895 6000 Facsimile: (07) 3895 6060 Postal Address: PO Box 677, Hamilton

More information

KENNECOTT UTAH COPPER

KENNECOTT UTAH COPPER 14.5.1 INTRODUCTION 14.51.1 This standard specifies the safety controls associated with freight / cargo loading operations at KUC properties and presents working references supporting KUC standards and

More information

Road Deliveries to MPT

Road Deliveries to MPT Information for Road Carriers delivering to Emerald Logistics Melbourne Port Terminal Road Deliveries to MPT Emerald Grain Logistics (EGL) 0 Contents 1. Reminder to all customers and carrier s delivering

More information

Container Transport Operator Access Terms & Conditions

Container Transport Operator Access Terms & Conditions Last updated 26 September 2017 Container Transport Operator Access Terms & Conditions These Terms & Conditions govern the entry into and use of ACFS Port Logistics, ACFS e-depot ( e-depot ) by Container

More information

SITE SAFETY RULES - SILVERSTONE CLASSIC 2018

SITE SAFETY RULES - SILVERSTONE CLASSIC 2018 SITE SAFETY RULES - SILVERSTONE CLASSIC 2018 The following is an outline of the Safe Working Requirements for all Companies, staff and any other persons for this event. Please note that the terms Company

More information

Container Transport Operator Access Terms & Conditions

Container Transport Operator Access Terms & Conditions Updated 15 August 2017 Container Transport Operator Access Terms & Conditions Address: Telephone: 465-467 Somerville Road Brooklyn Vic 3012 +61 3 9314 5589 After Hours: 0417 261 544 Fax: 9314 1412 Email:

More information

CONTINENTAL FERRY PORT SITE INDUCTION

CONTINENTAL FERRY PORT SITE INDUCTION CONTINENTAL FERRY PORT SITE INDUCTION Port activities As landlord of the Commercial Port, the Port Authority must be informed of all works conducted on these premises The Authority is committed to the

More information

WORK HEALTH AND SAFETY AUDIT STANDARD

WORK HEALTH AND SAFETY AUDIT STANDARD WORK HEALTH AND SAFETY AUDIT STANDARD FORESTRY INDUSTRY South Australia, Victoria and Tasmania Safety Standards 2017 2017 Content I. Introduction... 2 II. Audit Criteria and Indicators... 3 1 PLANNING...

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy Policy statement Brunk is committed to meeting our health and safety goals for all processes, and to maintaining a safe and healthy workplace. It is Brunk s policy to provide a

More information

Safe Work Procedure for installation of

Safe Work Procedure for installation of Safe Work Procedure for installation of external cladding This procedure has been formulated to cover safe systems of work for the installation of external cladding. This instruction will be used to reduce

More information

Network Safeworking Rules and Procedures

Network Safeworking Rules and Procedures Network Safeworking Rules and Procedures Responsibilities of Rail Traffic Crews Rule Number: 2027 Version 1.0, 31 March 2016 Responsibilities of Rail Traffic Crews Rule Number: 2027 Document Control Identification

More information

Driving onto the exhibition grounds during set-up and dismantling of trade fairs. Check-In

Driving onto the exhibition grounds during set-up and dismantling of trade fairs. Check-In Driving onto the exhibition grounds during set-up and dismantling of trade fairs Check-In 1 Why registration and Check-In All vehicles must register to speed up the process at the entry. Pre-registered

More information

GUIDELINES FOR TRAFFIC SAFETY AT INEOS O&P SITES

GUIDELINES FOR TRAFFIC SAFETY AT INEOS O&P SITES GUIDELINES FOR TRAFFIC SAFETY AT INEOS O&P SITES V2 July 2015 FOREWORD It is INEOS Olefins & Polymers (O & P) Europe policy that safety of operation must be paramount. One of the highest risks for accidents

More information

Precip dust. To be transport to

Precip dust. To be transport to AUTHORISED REMOVAL OF COMPANY PROPERTY WI29. 522 Revision 14 Safety 1.0 PURPOSE To ensure that all materials, equipment, property etc., belongingg to SIMEC Mining and Liberty OneSteell Steelworks, exiting

More information

STANDARD OPERATIONAL PROCEDURES

STANDARD OPERATIONAL PROCEDURES VALLETTA GATEWAY TERMINALS LTD STANDARD OPERATIONAL PROCEDURES ----- GUIDELINES TO HEALTH AND SAFETY PRACTICES FOR RO-RO OPERATIONS HEALTH AND SAFETY UNIT - 2007 Forward The main objective of these guidelines

More information

Advanced Water Recycling Plant tour. Excursion Management Plan

Advanced Water Recycling Plant tour. Excursion Management Plan Advanced Water Recycling Plant tour Visit the Water Corporation s Advanced Water Recycling Plant and find out about water recycling and how groundwater replenishment can play a role in sustaining Perth

More information

A-one+ Supply Chain Standards

A-one+ Supply Chain Standards A-one+ Supply Chain Standards A-one+ Page 1 of 12 Introduction We at A-one+ are committed to achieving an incident and accident free environment through our health and safety strategy. We demand Supply

More information

BSWP204: TERMINAL SAFETY AND OPERATING CONDITIONS

BSWP204: TERMINAL SAFETY AND OPERATING CONDITIONS BSWP204: TERMINAL SAFETY AND OPERATING CONDITIONS (Inclusive of Transport Driver Induction) V9 8/5/2014 OBJECTIVE: To provide clear operating instructions to ensure transport operators deliver grain correctly

More information

FAIRCHILD APPLICATION FOR EMPLOYMENT

FAIRCHILD APPLICATION FOR EMPLOYMENT APPLICATION FOR EMPLOYMENT Driver Requirements A driver must meet the following requirements: Be in good health and physically able to perform all duties of a driver. Be at least 21 years of age. Speak

More information

Health, Safety & Wellbeing Absolute Rules

Health, Safety & Wellbeing Absolute Rules Health, Safety & Wellbeing Absolute Rules Breaking our Absolute Rules is unacceptable We must always intervene when we see unsafe acts 2 Global Health, Safety & Wellbeing Background The following six rules

More information

PORT USERS. Forum. Safety & Environmental Protocols for Common User Operational Areas

PORT USERS. Forum. Safety & Environmental Protocols for Common User Operational Areas Page 1 PORT USERS Forum Safety & Environmental Protocols for Common User Operational Areas Mission: To remove, isolate, minimize or mitigate the impact of operations on all staff, users, contractors and

More information

Standard Operating Procedure Procedure Name: Handling of Precast Concrete Elements in Construction

Standard Operating Procedure Procedure Name: Handling of Precast Concrete Elements in Construction 1. Aim of procedure To identify and formalise the control processes for risks involved in the handling and placement of precast concrete elements during construction work. The National Code of Practice

More information

Safety Program. For Packaging, Manufacturing, Distribution

Safety Program. For Packaging, Manufacturing, Distribution Safety Program For Packaging, Manufacturing, Distribution SAFETY PROGRAM Clarification This document is provided only as a guide to assist employers and employees in developing a Safety Program designed

More information

Driving onto the exhibition grounds during set-up and dismantling of trade fairs. Check-in

Driving onto the exhibition grounds during set-up and dismantling of trade fairs. Check-in Driving onto the exhibition grounds during set-up and dismantling of trade fairs Check-in 1 Check-in during set-up and dismantling What is the check-in? Every vehicle that wishes to enter the exhibition

More information

ACT Scaffolding Services LTD METHOD STATEMENT Scaffold erection

ACT Scaffolding Services LTD METHOD STATEMENT Scaffold erection Address: 20 Bole Close, Wombwell, Barnsley, South Yorkshire. S73 8AZ Tel: 07883 780704 Email: enquiries@actscaffold.co.uk Web: www.actscaffold.co.uk Project/Contract Boiler Scaffolding Client Example Comp

More information

Depot Dry Receiving Guidelines. Standard Operating Procedure TABLE OF CONTENTS

Depot Dry Receiving Guidelines. Standard Operating Procedure TABLE OF CONTENTS I s s u e d a t e D o c u m e n t N o. Costco AUS SOP-209 P a g e 1 of 13 Depot Dry Receiving Guidelines Standard Operating Procedure TABLE OF CONTENTS PAGE 1. INTRODUCTION 2 1.1 Key Information 1.1.1

More information

HFM Asset Management Contractor Induction Queens Riverside Apartments

HFM Asset Management Contractor Induction Queens Riverside Apartments HFM Asset Management Contractor Induction Queens Riverside Apartments Contents Purpose About HFM Asset Management HFM Asset Management s Responsibilities Contractors Responsibilities Commencing Work Working

More information

WHS Manual Insert Business Name & Logo

WHS Manual Insert Business Name & Logo WHS Manual Insert Business Name & Logo Version5 Work Health & Safety Manual INDEX OVERVIEW 4 1. WORK HEALTH AND SAFETY POLICY 5 2. PLANNING, REVIEW AND EVALUATION 9 3. HAZARD IDENTIFICATIO, ASSESSMENT

More information

Network Rail Project No: Issue: 002 Date 11/07/2017 Work Package Plan Arena Tunnel LSM773 Prepared by: Start Date: 15/07/17 Finish Date: 23/07/17

Network Rail Project No: Issue: 002 Date 11/07/2017 Work Package Plan Arena Tunnel LSM773 Prepared by: Start Date: 15/07/17 Finish Date: 23/07/17 Work Package Plan Arena Tunnel LSM773 Prepared by: Jimmy Galbraith (Print Name)..... (Signature) Works Manager (Job Title) Approved by the Contractor s Engineering Manager (CEM):...... (Print Name).....

More information

CASUAL EMPLOYEE TERMS & CONDITIONS OF EMPLOYMENT

CASUAL EMPLOYEE TERMS & CONDITIONS OF EMPLOYMENT CASUAL EMPLOYEE TERMS & CONDITIONS OF EMPLOYMENT Belljax Pty Ltd as Trustee for Jeden Trust T/A Midwest Labour Pool 1. The Terms and Conditions in this document form the basis for casual employment with

More information

PS 02 PLANT AND EQUIPMENT

PS 02 PLANT AND EQUIPMENT PS 02 PLANT AND EQUIPMENT PURPOSE AND SCOPE The intent of this document is to eliminate or minimise the risks of fatalities, injuries and incidents arising from mobile powered plant, static plant and equipment

More information

Safe visits to Customer Site for occasional visitors from Industrial Gas Companies

Safe visits to Customer Site for occasional visitors from Industrial Gas Companies Training Package TP 20/16 Safe visits to Customer Site for occasional visitors from Industrial Gas Companies Safe visits to Customer Sites for occasional visitors from Industrial Gas Companies Disclaimer

More information

HOPKINS TRANSPORT AUSTRALIA EMPLOYMENT APPLICATION

HOPKINS TRANSPORT AUSTRALIA EMPLOYMENT APPLICATION HOPKINS TRANSPORT AUSTRALIA EMPLOYMENT APPLICATION In completing this form you should: INFORMATION FOR COMPLETING THIS FORM 1. Read and understand the requirements prior to completion 2. Complete all sections.

More information

Eurobitume UK. Site Inspection for Delivery of Bitumen

Eurobitume UK. Site Inspection for Delivery of Bitumen Eurobitume UK Site Inspection for Delivery of Bitumen June 2015 To be used in conjunction with the UK edition of the Eurobitume Guide to Safe Delivery of Bitumen Introduction and Scope This site inspection

More information

BASF Contractor Pre-Access Checklist

BASF Contractor Pre-Access Checklist BASF Contractor Pre-Access Checklist Purpose The purpose of this document is to ensure that BASF communicates all EHS requirements and expectations to each contractor company and that each contractor company

More information

CODE OF CONDUCT GET-INS, FIT-UPS AND GET-OUTS

CODE OF CONDUCT GET-INS, FIT-UPS AND GET-OUTS CODE OF CONDUCT GET-INS, FIT-UPS AND GET-OUTS May 2010 This code of conduct has been agreed jointly by TMA and BECTU and is intended to set minimum standards to ensure safety for ALL get-ins and get-outs.

More information

Corporate Safety Procedure Grid Mesh, Handrail and Flooring Removal. Table of Contents

Corporate Safety Procedure Grid Mesh, Handrail and Flooring Removal. Table of Contents Table of Contents 1. Purpose... 2 2. Scope... 2 3. Roles and Responsibilities... 2 3.1 Manager/Supervisor... 2 3.2 Workers... 2 3.3 Technical Specialist/Engineer... 2 4. Definitions... 2 5. Procedure...

More information

Xerox Supplier Security Requirements

Xerox Supplier Security Requirements Xerox Supplier Security Requirements Suppliers who are involved in the manufacture, storage, and transportation of Xerox products ( Suppliers ) for Xerox Corporation and / or its subsidiaries under Xerox

More information

Adelaide Airport Limited

Adelaide Airport Limited Induction Pack for Contractors Site Rules and Conditions for Contractors Revision: 7 November 2015 Site Rules and Conditions-Adelaide:Legal 42723757_1 1. GENERAL 1 2. BUILDING CONSENT AND APPROVAL 1 3.

More information

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager

RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager RISK RATING 1 HIGH 2 MEDIUM 3LOW SAFE WORK METHOD STATEMENT Title: : Bridge Inspection Ref No: 1 I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager SIGNATURE: DATE:

More information

Can Process Scrap Specification

Can Process Scrap Specification Rev 3 February 2018 Can Process Scrap Specification Document Manager: Kerry Ward Approved by: Michael Anderson Note: This is considered an uncontrolled document unless it is being viewed on-line from the

More information

RISK ASSESSMENT AND SAFETY METHOD STATEMENT. for. GROUNDWORK PREPARATION AND LAYING OF YORKSTONE SEGMENTAL CIRCLE (3.6m DIAMETER)

RISK ASSESSMENT AND SAFETY METHOD STATEMENT. for. GROUNDWORK PREPARATION AND LAYING OF YORKSTONE SEGMENTAL CIRCLE (3.6m DIAMETER) RISK ASSESSMENT AND SAFETY METHOD STATEMENT for GROUNDWORK PREPARATION AND LAYING OF YORKSTONE SEGMENTAL CIRCLE (3.6m DIAMETER) at Bourne Abbey Church of England Primary School Abbey Road Bourne Lincolnshire

More information

Rail Safety Management Procedure General Engineering and Operational Systems Railway Track Signals - Detonators

Rail Safety Management Procedure General Engineering and Operational Systems Railway Track Signals - Detonators 1/12 General Engineering and Operational Systems Railway Track Signals - Detonators Revision Date Comments 1 January 2007 Initial Document 2 May 2007 Review and Update to incorporate associated forms 3

More information

Applicant s Name: Visit https://ecpic.commissionaires.ca/login/ to get a check done electronically.

Applicant s Name: Visit https://ecpic.commissionaires.ca/login/ to get a check done electronically. Welcome to the T.E.A.M.S. driver application process. Please fill out the application form completely do not leave any blank spaces where information is requested. If information requested does not apply,

More information

ACCIDENT PREVENTION PROGRAM FOR CONTRACT AND CONTRACT-TO-HIRE EMPLOYEES

ACCIDENT PREVENTION PROGRAM FOR CONTRACT AND CONTRACT-TO-HIRE EMPLOYEES ACCIDENT PREVENTION PROGRAM FOR CONTRACT AND CONTRACT-TO-HIRE EMPLOYEES STAFFING DIVISIONS ACCOUNTING COMMERCIAL HEALTHCARE OFFICE TECHNOLOGY Safety and Health Policy Letter Provisional Services, Inc.

More information

TERMS OF AGREEMENT AND TERMINATION. This agreement is made between and MILO TRANSPORTATION INC (MTI) on day of, 20.

TERMS OF AGREEMENT AND TERMINATION. This agreement is made between and MILO TRANSPORTATION INC (MTI) on day of, 20. MILO TRANSPORTATION INC. 525 S. Colfax Suite B. Griffith, IN 46319 PHONE# (888)881-6690 FAX# (219) 207-5635 TERMS OF AGREEMENT AND TERMINATION This agreement is made between and MILO TRANSPORTATION INC

More information

BEHAVIOUR ON SAFE SITES

BEHAVIOUR ON SAFE SITES Page: 1 of 8 P932 (a) Introduction: Black & Veatch has set a target of achieving ZERO incidents and injuries across all of its business operations. At B&V, we believe that zero incidents and injuries are

More information

Cotton Australia Bale Restraint Guide 2013

Cotton Australia Bale Restraint Guide 2013 Cotton Australia Bale Restraint Guide 2013 Last Updated: January 2013 INTRODUCTION The safe loading and transport of cotton bales and cotton modules is vitally important in preventing injury to people

More information

Shell Eastern Petroleum. Pte Ltd.

Shell Eastern Petroleum. Pte Ltd. Shell Eastern Petroleum Pte Ltd www.shell.com/chemicals/transport Version 1 Jan 2016 1. Check the following before departing for PU-4 SILVER Gantry: Valid SCSL issued photo pass, or Valid SJI-SIC card,

More information

Basic ALO knowledge Briefing. RRV Safety Improvement Programme

Basic ALO knowledge Briefing. RRV Safety Improvement Programme Basic ALO knowledge Briefing RRV Safety Improvement Programme 1 Disclaimer In issuing this document for its stated purpose, the RRV Safety Improvement Programme & Network Rail makes no warranties, express

More information

Level 2 NVQ Certificate in Erection of Precast Concrete (Construction)

Level 2 NVQ Certificate in Erection of Precast Concrete (Construction) Level 2 NVQ Certificate in Erection of Precast Concrete (Construction) Qualification Specification ProQual 2016 Contents Introduction 3 Qualification profile 3 Qualification Structure 4 Pathway 1 Flooring

More information

Environmental, Health and Safety Policy for Contractors

Environmental, Health and Safety Policy for Contractors Environmental, Health and Safety Policy for Contractors The attached policy is a tool to help contractors understand and comply with RBC's Environmental, Health and Safety rules. The information that follows

More information

ABSENCE MANAGEMENT POLICY

ABSENCE MANAGEMENT POLICY ABSENCE MANAGEMENT POLICY REFERENCE NUMBER Absence Management Policy VERSION V1.0 APPROVING COMMITTEE & DATE Clinical Executive Committee 17.6.15 REVIEW DUE DATE May 2018 CONTENTS 1. Policy statement 1

More information

Please complete the questionnaire and fax it to

Please complete the questionnaire and fax it to Partners in Protection / C-TPAT Supply Chain Security Questionnaire Dear: Supply Trade Partner As you are aware there have been several changes in the transportation industry over the past few years. One

More information

LOAD RESTRAINT GUIDE

LOAD RESTRAINT GUIDE NATIONAL TRANSPORT COMMISSION & ROADS & TRAFFIC AUTHORITY NSW I n t r o d u c t i o n LOAD RESTRAINT GUIDE Guidelines and Performance Standards for the Safe Carriage of Loads on Road Vehicles SECOND EDITION

More information

Railway Interface Planning Scheme Rules (RIPS Rules)

Railway Interface Planning Scheme Rules (RIPS Rules) Contents 1. Purpose.. 1 2. Scope... 2 3. Scheme Rules.... 3 4. Roles and Responsibilities... 4 5. Management System Requirements... 7 6. Investigating Breaches of the Railway Interface Planning Scheme

More information

Apache / Contractor X. Contractor/Vendor Bridging Document

Apache / Contractor X. Contractor/Vendor Bridging Document Operator Contractor/Vendor Operator Apache Contractor Contractor X Address Phone 2000 Post Oak Drive. Suite 100 Houston, TX 056 Phone: (13)296-6000 Toll free: (00)22-2434 Address Phone *** Phone: Fax:

More information

This Network Rail code of practice contains colour-coding according to the following Red Amber Green classification.

This Network Rail code of practice contains colour-coding according to the following Red Amber Green classification. User information This Network Rail code of practice contains colour-coding according to the following Red Amber Green classification. Red Critical limits No variations, could stop the railway Red indicates

More information

EVENT SAFETY & PLANNING CHECKLIST For UNIVERSITY EVENTS

EVENT SAFETY & PLANNING CHECKLIST For UNIVERSITY EVENTS EVENT SAFETY & PLANNING CHECKLIST For UNIVERSITY EVENTS PLANNING AND PREPARATION The success of an event is measured in many ways but events must also be measured in terms of safety. Event organizers have

More information

SAFE WORK METHOD STATEMENT (SWMS)

SAFE WORK METHOD STATEMENT (SWMS) ABN: 12 345 678 910 ACN: 123 456 789 Address: Your Company Address PH: Your Company Phone E: Your Company Email Web: Your Company Website PROJECT DETAILS: Project: SAFE WORK METHOD STATEMENT (SWMS) Area:

More information

Rhineland. Site Requirements.

Rhineland. Site Requirements. Rhineland Site Requirements www.shell.com/chemicals/transport Version 5 November 2012 1. Name of Installation: Terminal Rhineland, Germany See also General Requirements 2. Physical address of location

More information

Management of Fatigue in Tram Operations Limited - TOL (IA )

Management of Fatigue in Tram Operations Limited - TOL (IA ) INTERNAL AUDIT REPORT HSE & Technical Management of Fatigue in Tram Operations Limited - TOL (IA 17 780) Rory O Neill, Director London Trams, Transport for London 15 September 2017 CONTENTS INTRODUCTION

More information

Powered Industrial Truck/Forklift Operations Standards and Procedures. Disaster Cycle Services Standards & Procedures DCS SP DMWT

Powered Industrial Truck/Forklift Operations Standards and Procedures. Disaster Cycle Services Standards & Procedures DCS SP DMWT Powered Industrial Truck/Forklift Operations Standards and Procedures Disaster Cycle Services Standards & Procedures DCS SP DMWT April 2015 Change Log Date Page(s) Section Change Author: Deploy Materials,

More information

Level 3 Diploma in Warehousing and Storage ( )

Level 3 Diploma in Warehousing and Storage ( ) Level 3 Diploma in Warehousing and Storage (06-07) Candidate logbook 600/3766/0 www.cityandguilds.com January 202 Version.0 About City & Guilds City & Guilds is the UK s leading provider of vocational

More information

Industry guidance for the safe operation of tilt-tray vehicles

Industry guidance for the safe operation of tilt-tray vehicles Industry guidance for the safe operation of tilt-tray vehicles This document provides practical advice on meeting the Duty of Care requirements of the Occupational Safety and Health Act 1984 (the Act)

More information

Work Health and Safety Toolkit for Congregations

Work Health and Safety Toolkit for Congregations Work Health and Safety Toolkit for Congregations Developing your WHS Management System Title Work Health and Safety Toolkit for Congregations Creation Date Dec 2014 Version 1 Last Revised Dec 2014 Approved

More information

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August Double Slide Rail August 2015 1 DOUBLE SLIDE RAIL INSTALLATION METHOD Introduction Slide rail shoring systems can be used for trenches up to 12m wide and 6m deep. Module length is determined by panels

More information

MetroLink Operations 700 South Ewing Street Saint Louis, Missouri

MetroLink Operations 700 South Ewing Street Saint Louis, Missouri Operating Procedure SOP # Date: Page 1 of 10 Classifications: OCC Rail Dispatchers Maintenance of Way - Contractors Other Departments: Real Estate Operation Safety - Risk Management - Engineering & New

More information

HS709 Materials Handling Guideline

HS709 Materials Handling Guideline HS709 Materials Handling Guideline Policy Hierarchy link Responsible Officer Contact Officer Superseded Documents File Number 2016/00370 Work Health and Safety Act 2011 Work Health and Safety Regulation

More information

DRIVER CODE OF CONDUCT FOR TRUCK AND HEAVY VEHICLE OPERATORS PERFORMING WORK FOR OR ASSOCIATED WITH CDM LOGISTICS

DRIVER CODE OF CONDUCT FOR TRUCK AND HEAVY VEHICLE OPERATORS PERFORMING WORK FOR OR ASSOCIATED WITH CDM LOGISTICS DRIVER CODE OF CONDUCT FOR TRUCK AND HEAVY VEHICLE OPERATORS PERFORMING WORK FOR OR ASSOCIATED WITH CDM LOGISTICS 1. INTRODUCTION 1.1. General This driver code of conduct applies to all CDM LOGISTICS personnel

More information

Border & Port of Entry Transit of In-Bond Container Current Operations

Border & Port of Entry Transit of In-Bond Container Current Operations Border & Port of Entry Transit of In-Bond Container Current Operations CBSA authorizes Acme Shipping ocean vessel to be loaded in Rotterdam with containers that are destined for New Yorkand will pass through

More information

Part 7 Managing on-road risk A Fleet Managers Guide

Part 7 Managing on-road risk A Fleet Managers Guide Introduction One of the worst things that can happen to any fleet manager must be to hear that one of his or her vehicles has been involved in a serious accident, and that a colleague has been killed or

More information

Employment Application-Clerical Frost Oil Co.

Employment Application-Clerical Frost Oil Co. Employment Application-Clerical Frost Oil Co. P.O. Box 5632 Liberty Transport LLC 1430 South 28 th Street 479-471-9992 Van Buren, AR 72956 Fax: 479-471-9996 www.frostoilcompany.com Answer all questions

More information

Near Miss and Incident Reporting

Near Miss and Incident Reporting Near Miss and Incident Reporting Road Transport Forum Shell Canada Sr. HSE Specialist Canada Logistics 1 Why are we asking you to report near misses? You re probably concerned with penalties Where do these

More information

Construction Skills Certification Scheme

Construction Skills Certification Scheme Candidate Pack for CSCS Articulated Dumper Please read this document carefully. Further information and clarification may be obtained from the CSCS Operations Unit, phone 01 533 2500 Guidance Notes for

More information

Standards of Performance. Mariane Ewbank Chairperson Standards and Customs WG

Standards of Performance. Mariane Ewbank Chairperson Standards and Customs WG Standards of Performance Mariane Ewbank Chairperson Standards and Customs WG Please hold for instructions to open packs 1 and 2 Can we consider this an official doc???? Second version And this invoice?

More information

Heavy Vehicle Transport Off-Farm Grain Carriers Code of Practice. Mass, Dimension, Load Restraint and Fatigue

Heavy Vehicle Transport Off-Farm Grain Carriers Code of Practice. Mass, Dimension, Load Restraint and Fatigue Heavy Vehicle Off-Farm Grain Carriers Code of Practice Mass, Dimension, Load Restraint and Fatigue PREPARED BY: SARTA AUTHORISED BY: South Australian Road Association, South Australian Farmers Federation,

More information

COUNTY OF SUMMIT. Substance Abuse Policy

COUNTY OF SUMMIT. Substance Abuse Policy COUNTY OF SUMMIT Substance Abuse Policy January 1, 2015 COUNTY OF SUMMIT SUBSTANCE ABUSE POLICY: It is the policy of the County of Summit Human Resource Department (HRD) to comply with Section 169.28 of

More information

How to use card cards to enhance running your Railroad

How to use card cards to enhance running your Railroad How to use card cards to enhance running your Railroad Operations is simulating the day-to-day activities of a real railroad Picking up freight, Assembling trains, Delivering cars to consignees, Sorting

More information

Guidelines for the safe unloading and storage of Polyolefins in packed form V1 August 2012

Guidelines for the safe unloading and storage of Polyolefins in packed form V1 August 2012 Guidelines for the safe unloading and storage of Polyolefins in packed form V1 August 2012 Page 1 CONTENTS CONTENTS...2 INEOS O&P CUSTOMER COMMITMENT...3 1: Purpose of this document...4 2: Driver safety

More information

NORTHWEST RAPID TRANSIT PROJECT INTEGRATED MANAGEMENT SYSTEMS GUIDELINES FOR WORKING ON THE NORTH WEST RAIL LINK OPERATIONS, TRAINS AND SYSTEMS PPP

NORTHWEST RAPID TRANSIT PROJECT INTEGRATED MANAGEMENT SYSTEMS GUIDELINES FOR WORKING ON THE NORTH WEST RAIL LINK OPERATIONS, TRAINS AND SYSTEMS PPP NORTHWEST RAPID TRANSIT PROJECT INTEGRATED MANAGEMENT SYSTEMS GUIDELINES FOR WORKING ON THE NORTH WEST RAIL LINK OPERATIONS, TRAINS AND SYSTEMS PPP DOCUMENT NUMBER NWRLOTS NRT ADM RS PRD 900185 NRT PIMS

More information

Technical Test Theory Industrial Forklift Truck A16

Technical Test Theory Industrial Forklift Truck A16 1 a) What is the minimum distance allowed near open trenches when travelling with a forklift and b) explain why? 2 What are the THREE actions or stages that a forklift operator undertakes during pre-use

More information

SCRRA RIGHT-OF-WAY ENCROACHMENT PROCESS

SCRRA RIGHT-OF-WAY ENCROACHMENT PROCESS SCRRA RIGHT-OF-WAY ENCROACHMENT PROCESS MARCH 2017 SCRRA RIGHT-OF-WAY ENCROACHMENT PROCESS 1.0 General A. All work activities within the SCRRA operating corridor and right-of-way, or work activities that

More information

The factory must establish in writing the persons who are authorized to complete and/or sign shipping documents.

The factory must establish in writing the persons who are authorized to complete and/or sign shipping documents. 5. Procedural Security Security measures must be in place to ensure the integrity and security of processes relevant to the transportation, handling and storage of cargo in the supply chain. Customs and/or

More information

CHEMICAL CONTRACTORS DC WATER CONTRACTOR SAFETY PROGRAM CONTRACT PROVISIONS FOR CHEMICAL DELIVERIES 1. RESPONSIBILITY FOR COMPLIANCE

CHEMICAL CONTRACTORS DC WATER CONTRACTOR SAFETY PROGRAM CONTRACT PROVISIONS FOR CHEMICAL DELIVERIES 1. RESPONSIBILITY FOR COMPLIANCE ATTACHMENT D: SAFETY PLAN REQUIREMENTS FOR CHEMICAL CONTRACTORS 1. RESPONSIBILITY FOR COMPLIANCE DC WATER CONTRACTOR SAFETY PROGRAM CONTRACT PROVISIONS FOR CHEMICAL DELIVERIES A. The contractor shall comply

More information

Night Work Specification

Night Work Specification 1.0 HOURS OF WORK Night Work Specification Night time hours are defined as per the Tender documents. 2.0 TRAFFIC CONTROL PLAN Prior to the start of work the Contractor shall submit 4 bound copies of a

More information

Load Handling (Hoisting) Policy

Load Handling (Hoisting) Policy 1.0 PURPOSE This policy is to promote safe load handling (hoisting) practices and reduce the frequency and severity of incidents. The purpose is to protect personnel from injury, the environment from harm,

More information

SAUDI ARAMCO Policy: HSE 008 DRILLING & WORKOVER OPERATIONS Issued: 4/27/2006 HSE PROCEDURE Revised : 4/27/2006

SAUDI ARAMCO Policy: HSE 008 DRILLING & WORKOVER OPERATIONS Issued: 4/27/2006 HSE PROCEDURE Revised : 4/27/2006 1.0 PURPOSE This procedure illustrates and specifies the sequence, methods, procedures and responsibilities for performing Rig Moves in all Saudi Aramco on-shore rigs. 2.0 SCOPE All SAR & Contractor Rigs

More information

TABLE OF CONTENT: ACOP NO. ALBA SAFETY, HEALTH & ENVIRONMENT MANAGEMENT SYSTEM. ALBA Code of Practice (ACOP) Subject PAGE

TABLE OF CONTENT: ACOP NO. ALBA SAFETY, HEALTH & ENVIRONMENT MANAGEMENT SYSTEM. ALBA Code of Practice (ACOP) Subject PAGE Contractors Safety Health and Environment Management 1 OF 13 TABLE OF CONTENT: 1.0 Introduction... 3 2.0 Purpose... 3 3.0 Responsibilities... 3 4.0 General Requirements... 3 5.0 Training... 4 6.0 Other

More information

Canadian National Contractor Safety Orientation Canadian Based Operating Companies Course Exam

Canadian National Contractor Safety Orientation Canadian Based Operating Companies Course Exam Canadian National Contractor Safety Orientation Canadian Based Operating Companies Course Exam Question 1: Before working on CN property, the contractor must: A. Have a valid right of entry agreement.

More information

Work Instruction Pontiac LOC Version 1.0 WI-B404 Bulk Hi-Lo Picker April, 07

Work Instruction Pontiac LOC Version 1.0 WI-B404 Bulk Hi-Lo Picker April, 07 This section describes the process a Hi-Lo Operator / Picker will go through on a "typical" cycle for Bulk. Equipment: 1. Hi-Lo 2. Pen 3. Marker 4. Clipboard General Guidelines: 1) Seat belts will be used

More information

Operational Traffic Management Plan

Operational Traffic Management Plan Operational Traffic Management Plan Version # 0.5 March 2015 Appendix E E-i Document Information Author: A Robinson Reviewer: S Jones File: Completed: Project ID: PBRP Version: 0.2 Sensitivity: Commercial

More information

Work Instruction Pontiac LOC Version 1.0 WI-B402 Bulk Hi Lo Material Receiving / Stocking APRIL, 07

Work Instruction Pontiac LOC Version 1.0 WI-B402 Bulk Hi Lo Material Receiving / Stocking APRIL, 07 This section describes the process a Shipping & Receiving Hi-Lo Operator will go through on a typical inbound (Receiving) and outbound (Shipping) load and stocking material. Equipment: 1. Hi-Lo 2. Pen

More information

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2)

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2) Installation Manual Orion TL-3 Steel Barrier VHD (v2) 300914 Table of Contents Orion Introduction.......... 3 Limitations & Warnings. 4 Before Installation..... 3 System Design & Design Considerations

More information