ATHABASCA RIVER BRIDGE REHABILITATION PROJECT

Similar documents
REHABILITATION PACKAGE 4-a

PRECAST CONCRETE GIRDER ERECTION

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening

Winnipeg River Bridge on PR313 at Lac du Bonnet. June 2014

Introduction.» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring

SEGMENTAL CONTRUCTION IN THE INNER CITY: THE BQE CONNECTOR RAMP TO WILLIAMSBURG BRIDGE

ABRAHAM LINCOLN BRIDGE

MILTON-MADISON BRIDGE REPLACEMENT

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

Replacing the Aging US 52 Mississippi River Bridge

b. Include an evaluation of maintenance of traffic for ramps, local roads and cross streets.

The FHWA Long-Term Bridge Performance Program

Indiana ABC Experience

Traffic Technical Memorandum: Hickman Road over Tuolumne River Bridge Replacement Project, Stanislaus County (BRLO-5938(199))

SINGLE STEEL BOX GIRDER BRIDGES FOR THE TERMINAL DEVELOPMENT PROJECT AT TORONTO PEARSON INTERNATIONAL AIRPORT. Srdjan Brasic, M.Sc., P.Eng.

How to Review SI&A Data

Northeast Bridge Preservation Partnership Meeting

Canadian Consulting Engineering Awards 2016 CANADIAN NIAGARA POWER FOREBAY BRIDGE RECONSTRUCTION

Jane Addams Memorial Tollway (I 90) Fox River Bridge Traffic Needs Drive Innovative Solutions

The Norwich Street Bridge

2.0 Purpose. 3.0 Work Plan. Page 1 of 7

RESILIENT INFRASTRUCTURE June 1 4, 2016

Ex-Ante Evaluation (for Japanese ODA Loan)

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

STRUCTURE AND BRIDGE DIVISION

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

WARWICK TRIANGLE VIADUCT: OUTBOUND COMMENDATION Technical Excellence category Submitted by the SAICE Durban Branch

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

The Pattullo Bridge Emergency Repair. David Woolford, P.Eng., TransLink Darryl Matson, P.Eng., Buckland & Taylor Ltd.

Norfolk Southern s Online Rebuild of the Coosa River Bridge

Engineering & Capital Improvements. Shore Acres Civic Association August 21 st, 2017

Design Challenges and Construction Benefits of Precast Segmental Rail Bridges

Ironton Russell Bridge Project

Pattullo Bridge Replacement Project. Cost Report

SCCRTC- MP San Lorenzo River Bridge Walkway Widening Feasibility Report

In Service Replacement of Box Girder Bottom Slab

Ironton Russell Bridge Project

PUBLIC INFORMATION MEETING June 24, 2015

West Virginia s First ABC Deck Replacement Project Bill Manuel & Johann Aakre HNTB Corporation

Displayed with permission The American Surveyor October Copyright 2008 Cheves Media

Federal Highway Administration s Role in Bridge Preservation. Anwar S. Ahmad 1

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE

District Department of Transportation ABC in DC (Accelerated Bridge Construction in Washington, DC) Paul Hoffman October 26, 2016

Chapter 13 Bridge Load Rating

APPENDIX G WHITTIER BRIDGE TYPE STUDY EVALUATION OF BRIDGE ALTERNATIVES

Progressive Erection Applied to Box Girder with Strutted Wing Slab

Case-history Steel Tubular Pile Cofferdam Foundations in Bangladesh

Bonner Bridge Replacement Update:

Red Wing Bridge Alternates

I-91 Viaduct Public Information Briefing

Conceptual Design Report

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE

Bridge Asset Management City of Battle Creek Planning and Projects

VDOT s Strategic Approach to Bridge Management and Maintenance

Ironton Russell Bridge Project

Chapter 4 Bridge Program Drawings

Ironton Russell Bridge Project

MEMORANDUM. From: Moffatt & Nichol. Date: April 3, Subj: Wharf J-10 Evaluation of Structure for EIR Document. M&N File No:

Folsom Lake Crossing by Hans Strandgaard, Alex Harrison, Jeff Aldrich, and Jeff Thomure, CH2M HILL

ASCE STRUCTURAL ENGINEERING CONFERENCE. Ames Iowa

Faced with the prospect of

Accelerated and Innovative Bridge Construction In Washington State

Ironton Russell Bridge Project

Design of the IL 127 Kaskaskia River Bridge Illinois Transportation and Highway Engineering Conference February 24, 2015 University of Illinois at

9 Conclusion. 9.1 Introduction

GEOMETRIC DESIGN CRITERIA for Non-freeway Resurfacing, Restoration, and Rehabilitation Projects

PROJECT UPDATE SOUTH NORFOLK JORDAN BRIDGE CITIES OF PORTSMOUTH AND CHESAPEAKE, VIRGINIA. April 2012

ACCELERATED BRIDGE CONSTRUCTION IN NEW ZEALAND THE DESIGN PROCEDURE

Feasibility Assessment Study

Town of South Bruce Peninsula Bridge and Culvert Inspections OSIM Inspection Report

Innovative Bridge Designs in Colorado by Pete Chomsrimake, P.E. ABC Project SME, CDOT Staff Bridge

Narrow Margin BY KEN SAINDON, SE, PE, AND ALEX WHITNEY, PE

Executive Summary RPT-SPE December 21. Old Spences Bridge No Inspection Report

Accelerated Bridge Construction Award

Ironton Russell Bridge Project

St. Anthony Falls I-35W Bridge Replacement. ASHE National Conference June 13, Dustin Thomas, P.E. I-35W Bridge Construction Engineer

Applications of Ultra High Performance Concrete and Prefabricated Concrete Elements in Accelerated Bridge Construction

Chapter 1. General Design Information. Section 1.03 Loads and Load Factors. Introduction. Load Modifying Factors

Ontario Structure Inspection Manual Inspection Form Structure Number: 12

INTRODUCTION: DESIGN AND CRAFTSMANSHIP:

APPROACHES AND BRIDGE OVER TYE RIVER (RTE. 29 NBL) RFP QUESTIONS AND ANSWERS-REVISION 2

Dundas Street Crossing of Sixteen Mile Creek A Field Spliced, Post-tensioned Precast Concrete Girder Bridge

Nancy Daubenberger, MnDOT Assistant Commissioner Engineering Services

Maryland Transportation Authority (MDTA)

PRESERVING LOUISIANA S INFRASTRUCTURE: US190 MISSISSIPPI RIVER BRIDGE

MOVABLE SPAN BRIDGES. Bridge of Lions, St. Augustine, Florida

US 36 Truss Bridge Rehabilitation Schedule-Critical Deadline Met with Teamwork and Innovation

Design and Construction of the SH58 Ramp A Flyover Bridge over IH70. Gregg A. Reese, PE, CE, Summit Engineering Group, Inc.

MARTA Rapid Transit Bridges

2010 STATE BRIDGE ENGINEERS QUESTIONNAIRE

EXTENDING THE LIFE OF THE ANGUS L. MACDONALD SUSPENSION BRIDGE

City of Des Moines. Activity ID: Bridge Rehabilitation: Court Avenue over the Des Moines River

Recent Major Cable-Stayed Bridges in Shanghai

KANSAS. Crossover. The Kansas Department of Transportation finds a new solution for stream crossings.

We have engaged Beacon Construction Consultants to act as the price estimate reviewer.

Owner, Consultant, and Contractor Collaboration for Rapid Delivery of the Marine Drive Transit Priority Project

Steve Haines, P.E., Parsons, (303) , James Studer, Kiewit, (926) ,

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT)

Economical Design / Case Studies

LRFD Bridge Design Manual Changes

Transcription:

ATHABASCA RIVER BRIDGE REHABILITATION PROJECT

PROJECT INFORMATION Project Name Athabasca River Bridge Rehabilitation Project Location Highway 40 (over the Athabasca River), Entrance, Alberta Year Completed 2014 Category B. Transportation Entering Firms COWI North America Ltd. (formerly Buckland & Taylor) Role of Entering Firm Prime Consultant - Structural Engineer Contact Names Shahab Afhami, P.Eng. - Project Manager (Engineering inquires) Hannah Price - Communications/Marketing Administration (Submittal/Gala inquiries) Winning Project Team Contractor: Alberco Construction Engineer: COWI North America Ltd PROJECT OUTLINE PROJECT SUMMARY Alberta Transportation needed to rehabilitate the Athabasca River Bridge to safely extend its service life by another ten years, providing time to secure funding for a replacement. COWI North America Ltd (COWI Bridge) proposed innovative rehabilitation measures that would restore the bridge capacity, widen it to modern standards and extend the life for 20 to 30 years. This came at less than 25% of the cost of replacement and was constructed within a year.

PROJECT HIGHLIGHTS Innovation The Athabasca River Bridge was constructed in 1913 as a deck truss railway bridge. In 1969 is was improved to a two-lane highway bridge with a clear roadway of 8.23m and a total length of 203.4m. It is a life-line bridge for emergency access to communities west and north of Athabasca River. By 2003, the remaining life of the bridge was estimated to be ten years. Traffic volumes had increased to warrant a wider deck and a replacement bridge was designed. However, due to competing economic circumstances, the design was shelved until funding could be secured. In 2012, Alberta Transportation engaged COWI Bridge to determine what measures were required to safely extend the life of the existing bridge by ten years. This would buy time to secure the necessary funding for a replacement bridge. The assessment revealed serious deck deterioration, which resulted in confining traffic to a single lane. It found that 240 precast concrete HC stringers were in various stages of deterioration. 1. We identified serious deterioration of 90 HC stringers: a. 60 exterior HC stringers were beyond repair b. 30 interior HC stringers required urgent repair or replacement 2. The remaining 150 stringers deterioration was not as extensive, but required accurate load evaluation. This project included two key innovations: Replacing all 240 stringers would have been costly and required another construction season. To determine if any stringers could be saved, we developed an innovative approach to load capacity evaluation of reinforced concrete stringers. This method considers the effect of code nonconformities and material deterioration, providing a more in-depth evaluation while satisfying all requirements of the Canadian Highway Bridge Design Code. This significantly saved on construction cost and duration by eliminating the need for the strengthening or replacing 150 stringers. This was the first implementation of this technique, but it can be applied to most types of reinforced concrete stringers, beams, and girders to determine if costly strengthening/replacement is truly required, or if it can be safely avoided. Replacing the remaining 90 stringers with similar stringers would have been a slow, impractical rehabilitation approach and required the closure of the narrow bridge. COWI Bridge s innovative solution was a custom designed precast deck, which was the first use of this replacement option to the HC stringer. This out-of-the-box design solution provided a wider deck and was crucial for the accelerated construction while keeping the bridge open to traffic.

INSTALLATION OF NEW PRECAST PANELS Complexity The main complexity of this project was the combination of a tight schedule and limited funding for a rehabilitation of this scale. Designing the rehabilitation, tendering the job, fabricating the specialized custom panels and installing all new panels and traffic barriers within a year was a challenging feat. To stay on track and on budget, the team worked closely with the client to compile a comprehensive list of all rehabilitation items and prioritized them based on safety, benefits they would provide and impact to the schedule. This design strategy was a complete success and the bid price matched the estimated tender price. One of the most challenging aspects of the design and construction was the removal of the existing concrete barriers (20-ton) and installation of the new exterior precast units (also 20-tons) while maintaining traffic. Typical crane operation was not feasible at this site. To overcome this, a truck mounted crane was used to remove the existing barriers, and a 110-ton crane was used to install the new precast panels. As an alternative to a gantry, this heavy crane would install the panels consequentially, one at a time, then move longitudinally onto the installed panel to lift the next one into place. Provisions were developed by the consultant and implemented by the Contractor to ensure the panels and all other bridge elements could safely support the combined weight of the crane and a panel during its entire operation. This successful one of a kind operation reduced the construction length noticeably.

Social and/or Economic Benefits In the assessment report, COWI Bridge presented three solutions to Alberta Transportation that addressed the project objective of repairing and extending the life of the existing bridge another ten years. However, we also proposed an informal, innovative fourth alternative, which was chosen. While COWI Bridge s alternative came at a higher cost compared to the ten year solutions, it provided another important advantage; the widened deck could function as an alternative to bridge replacement at only 25% of the replacement cost. Alberta Transportation was in favour of this alternative solution, providing that the bridge widening could be completed and the bridge open to traffic by the end of 2013. This $7M rehabilitation and widening project was designed, tendered, and substantially complete in just ten months, providing the bridge users with an economical solution that improved the functionality of the bridge and extended its service life by at least 20 years at a fraction of the replacement cost. COWI Bridge s innovative design meant that the bridge remained open to traffic during the construction period, minimizing the interruption to bridge users. Also, COWI Bridge s findings from their innovative load rating method meant that a reduced amount of stringers had to be replaced and, as such, the construction period was limited to just one season. This saved on time, cost and delays to the bridge users on this arterial road. SETTING FORMS FOR WING WALL WIDENING

REMOVAL OF EXISTING HC STRINGERS Environmental Benefits The environmental footprint of the rehabilitation design was minimal, and significantly less than a bridge replacement alternative. This would have involved significant in-stream activity, energy usage for the fabrication of new parts and demolition of the old structure. Furthermore, the original replacement bridge that was designed (and shelved) intended on using an adjacent alignment. This would have required significant roadway work, including rock blasting and substantial tree removal, within a mountain topography. During our inspection of the bridge, we took an underwater survey of the piers within the river. This found deterioration of the pier concrete (such as large holes and scour in the concrete) at some locations. Repairing these would have involved creating a berm to provide access which would have required in-stream activity, relocation of soil and extensive energy expenditure through the use of heavy equipment. Thus, rather than repairing the piers, COWI Bridge have implemented a monitoring program to avoid any unnecessary in-stream activity or to minimize the environmental impact if repairs become crucial.

Meeting the Client s Needs PLACING CONCRETE OVERLAY Alberta Transportation had two project goals to temporarily extend the life of the Athabasca River Bridge by ten years in a short timeframe, and to permanently replace it after those ten years had passed. COWI Bridge provided an innovative option that surpassed Alberta Transportation s project goals with an economically long term solution to the preservation of the bridge at this site at 25% of the cost of a bridge replacement. We solved an urgent need for structural repairs and improved traffic safety on Highway 40 years in advance of a bridge replacement. With the rehabilitation, the bridge superstructure was widened and its structural capacity was improved. The widened deck is expected to have a service life of approximately 20 to 30 years. COWI Bridge kept the project on track despite the extensive project challenges and completed it within just ten months. The design started in January 2013, was tendered in May 2013, and the contract awarded to Alberco Construction in early June 2013. The bridge was restored to two lane traffic on a full 10m wide deck on November 15, 2013. The success of this challenging project can be accredited to the innovative design solution and evaluation techniques performed by COWI Bridge as well as the agreement and collaborative approach implemented by Alberta Transportation. It is an example of what can be achieved when the knowledge of Alberta Transportation is integrated with consulting engineering and construction excellence.