City of Des Moines. Activity ID: Bridge Rehabilitation: Court Avenue over the Des Moines River

Size: px
Start display at page:

Download "City of Des Moines. Activity ID: Bridge Rehabilitation: Court Avenue over the Des Moines River"

Transcription

1 5525 Merle Hay Road Suite 200 Johnston, IA Main Fax H R G R E E N. C O M City of Des Moines Activity ID: Bridge Rehabilitation: Court Avenue over the Des Moines River Schedule Submit for final SHPO, USACE and DNR Permits in June 2017 Submit 50% preliminary plans in July 2017 Letting currently planned for February 20, 2018 Opinion of Probable Construction Cost The estimated cost as submitted with the 2016 TIGER Application was $7,000,000. This cost is based on 2016 dollars, so the construction costs are expected to increase with construction planned for Scope of Repairs The Court Avenue Bridge was built in The bridge is listed on the National Register of Historic Places and therefore is a vital element in the Civic Center Historic District. The structure was reconstructed in The reconstruction project included the replacement of the entire superstructure above the arches and replacement of the ornamental limestone railing. The current condition of the bridge warrants repairs to replace damaged elements, improve the appearance and durability of the limestone portions, and prolong the life of the structure. The recommended repairs to the structure are divided into three categories. The repairs to the concrete portions of the structure will include the following: 1. Remove existing overlay and repair and re-overlay the deck 2. Remove and replace sidewalks 3. Remove and replace the bridge expansion joints. 4. Repair abutments, piers, arch ribs, spandrel walls, columns and floor beams 5. Remove and replace portions of the approach pavement The repairs to the limestone portions of the bridge will include the following: 1. Remove the entire existing barrier rail and replace with either a precast concrete replica of the railing or a railing made from alternative materials. 2. Remove damaged limestone on the bridge fascia and replace with new limestone. 3. Remove and reset misaligned limestone on the bridge fascia. 4. Point the opened and multicolor mortar joints to reset the aging process and realign the mortar color between limestone elements. 5. Use a cleaning system to remove biogrowth soiling and limestone discoloration. Lighting photometrics are being analyzed and will be discussed with the City as lighting concepts are further explored. The options to replace the lighting being evaluated for cost include the following: 1. Removing existing light fixtures and consider replacing with similar style light poles incorporating LED source luminaires. 2. Considering the ability to provide LED light fixtures to provide feature lighting of the railing and bridge fascia. The repairs will not change the visual appearance of the bridge and it is not anticipated that the roadway and sidewalk dimensions will be changed.

2 Court Avenue Bridge Rehabilitation City of Des Moines

3 Existing Limestone Condition Ornamental Railing Section Loss Biogrowth and Discoloration Damage and Movement

4 Existing Topside Condition Deteriorated Bridge Deck Overlay Widespread Spalling of Curbs Water Ponding on Sidewalks

5 Existing Underside Condition Concrete Arch Deterioration Spalls with Exposed Reinforcement Leaking Expansion Joints

6 Existing Lighting Condition High Pressure Sodium Type Light Sources Damaged and Corroded Light Pole Bases Not All Light Fixtures Working Likely Doesn t Meet City Illumination Policy

7 Proposed Railing Repair/Replacement Options: Replace Deteriorated Rail Elements Completely Replace In-Kind Use Precast Concrete and Match Color Alternative Materials like Granite

8 Proposed Sidewalk Replacement Completely Remove 6 Thick Sidewalks Replace with 8 Thick Sidewalk Designed to Carry an Underbridge Inspection Snooper Truck Insure Sidewalk Properly Drains Away from Railing to Curb

9 Proposed Lighting Challenge is to Meet Current Lighting Standards Consider Similar Style Poles with Decorative LED Lights Consider Supplementing Decorative Lights with Standard Street Lights Consider Feature Lighting of Limestone Railing and Façade LED Striplighting or Periodic Downlighting Highlight Bridges Downtown Presence at Night

10 Deck Roadway Cross-Section Keep Existing Lane, Parking, and Sidewalk Geometry

11 Summary of Proposed Repairs Remove Existing Overlay and Repair and Re-Overlay the Deck Remove and Replace Sidewalks Remove and Replace Expansion Joints Repair Abutments, Piers, Arch Ribs, Spandrel Walls, Columns and Floor Beams Remove and Replace Ornamental Railing Repair or Replace Damaged Limestone and Point the Mortar Joints Clean Stains and Biogrowth from the Limestone Façade Remove and Replace Light Fixtures Consider Feature Lighting of Railing and Fascia

12 Questions?

Scott Avenue Bridge Rehabilitation Scott Avenue over Des Moines River

Scott Avenue Bridge Rehabilitation Scott Avenue over Des Moines River Scott Avenue Bridge Rehabilitation Scott Avenue over Des Moines River Previous UDR Meetings: - January 24, 2017: General overview of TIGER Grant Projects - May 16, 2017: Preliminary review of all 4 bridge

More information

Bridge Asset Management City of Battle Creek Planning and Projects

Bridge Asset Management City of Battle Creek Planning and Projects Bridge Asset Management City of Battle Creek Planning and Projects Michigan Bridge Conference, March 20, 2013 Gregory B. Rickmar P.E., Public Works Department, City of Battle Creek Alan Halbeisen, P.E.

More information

PUBLIC INFORMATION MEETING June 24, 2015

PUBLIC INFORMATION MEETING June 24, 2015 Gallows Road (RTE. 650) over Arlington Boulevard (RTE. 50) Fairfax County Bridge Rehabilitation, Preventive Maintenance and Pier Repairs Phase 1 - Project No. 0650-029-235; UPC 106956, Pier Repair Phase

More information

SAN ANTONIO STREET BRIDGE AT COMAL RIVER. Open House

SAN ANTONIO STREET BRIDGE AT COMAL RIVER. Open House SAN ANTONIO STREET BRIDGE AT COMAL RIVER Open House May 1, 2018 SAN ANTONIO STREET BRIDGE AT COMAL RIVER, NEW BRAUNFELS COMAL COUNTY OPEN HOUSE MAY 1, 2018 5:00 P.M 7:00 P.M. New Braunfels Civic/Convention

More information

Clinton Street Bridge over the Maumee River. ODOT Project DEF December 2, 2014 Stakeholder s Meeting

Clinton Street Bridge over the Maumee River. ODOT Project DEF December 2, 2014 Stakeholder s Meeting Clinton Street Bridge over the Maumee River ODOT Project DEF-15-14.77 December 2, 2014 Stakeholder s Meeting Purpose of Stakeholder Meeting Discuss the project and why it s happening Describe the process

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 10/01/2017 to 10/07/2017

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 10/01/2017 to 10/07/2017 AECOM Field Office 3550 Water Street, NW Under the Key Bridge North Abutment REHABILITATION OF FRANCIS SCOTT KEY BRIDGE FROM ROSSLYN, ARLINGTON, VIRGINIA TO GEORGETOWN WASHINGTON, DC. DC Contract No.:

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 06/04/2017 to 06/10/2017

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 06/04/2017 to 06/10/2017 AECOM Field Office Water Street, NW Under Key Bridge along Water Street, NW REHABILITATION OF FRANCIS SCOTT KEY BRIDGE FROM ROSSLYN, ARLINGTON, VIRGINIA TO GEORGETOWN WASHINGTON, DC. DC Contract No.: DCKA-2014-C-0074

More information

Virginia Concrete Conference March, Open Spandrel Concrete Arches New and Old

Virginia Concrete Conference March, Open Spandrel Concrete Arches New and Old Virginia March, 2006 Open Spandrel Concrete Arches New and Old Introduction William M. (Bill) Davidge IV, P.E. Vice President - Wiley & Wilson, Inc. Education B.S. Civil Engineering - 1973 University of

More information

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure. Route 15/29 SBL Bridge Superstructure Replacement & Widening Existing Structure Scope Accelerated Procedure Staging (Superstructure) Preparatory Work (Substructure) NOVA District Questions EXISTING STRUCTURE

More information

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016

Rehabilitation of West Main Street Culvert and Shirley Street Bridge. Town of Ayer. November 22, 2016 Rehabilitation of West Main Street Culvert and Shirley Street Bridge Town of Ayer November 22, 2016 Agenda Outline Introductions Project Goals and Objectives Existing Conditions Review Design Considerations

More information

Roadway Surfaces and Traffic Control Elements

Roadway Surfaces and Traffic Control Elements Roadway Surfaces and Traffic Control Elements Lines of Business: General Liability, Public Officials Liability www.tridentinsurance.net Risk Control Strategy/Key Issues: To establish and document a program

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 04/09/2017 to 04/15/2017

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 04/09/2017 to 04/15/2017 AECOM Field Office Water Street, NW Under Key Bridge along Water Street, NW REHABILITATION OF FRANCIS SCOTT KEY BRIDGE FROM ROSSLYN, ARLINGTON, VIRGINIA TO GEORGETOWN WASHINGTON, DC. DC Contract No.: DCKA-2014-C-0074

More information

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN

2016 STRUCTURE INSPECTION APPRAISAL REPORT. Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN 2016 STRUCTURE INSPECTION APPRAISAL REPORT Prepared For: THE CORPORATION OF THE TOWNSHIP OF AMARANTH COUNTY OF DUFFERIN by K. SMART ASSOCIATES LIMITED 8 McIntyre Drive Kitchener ON N2R 1H6 August 2016

More information

APPENDIX G WHITTIER BRIDGE TYPE STUDY EVALUATION OF BRIDGE ALTERNATIVES

APPENDIX G WHITTIER BRIDGE TYPE STUDY EVALUATION OF BRIDGE ALTERNATIVES APPENDIX G WHITTIER BRIDGE TYPE STUDY EVALUATION OF BRIDGE ALTERNATIVES Massachusetts Department of Transportation Highway Division I-95 / Whittier Bridge Replacement Type Study Report 6. Evaluation of

More information

Cast in place concrete parapet and Ministry standard sidewalk railing.

Cast in place concrete parapet and Ministry standard sidewalk railing. BRIDGE INSPECTION BRIDGE NO./NAME 62-003A: Farwell Canyon FSR (21.00 KM) Inspection Date: September 12 th 2012 Inspected By: D. Chen, J. Rupar Gilliatt Year Built: 2007 Number of Spans: 3 Span Lengths:

More information

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information

Project Overview. Wilson Boulevard over Route 50 Bridge Rehabilitation. Get Involved. Public Information Meeting. Contact Information Get Involved VDOT representatives will review and evaluate any information received as a result of the public information meeting. The comment sheet in this brochure is provided to assist in making your

More information

S.P TH 65 (3rd Avenue Bridge) Industry Informational Meeting October 31, 2017

S.P TH 65 (3rd Avenue Bridge) Industry Informational Meeting October 31, 2017 S.P. 2710-47 TH 65 (3rd Avenue Bridge) Industry Informational Meeting October 31, 2017 Outline o o o o o o o o o o Introductions Disclaimers Ground Rules Project Overview Consultant Contracts CMGC RFP

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 08/12/2018 to 08/18/2018

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 08/12/2018 to 08/18/2018 AECOM Field Office 3550 Water Street, NW Under the Key Bridge North Abutment REHABILITATION OF FRANCIS SCOTT KEY BRIDGE FROM ROSSLYN, ARLINGTON, VIRGINIA TO GEORGETOWN, WASHINGTON, DC. DC Contract No.:

More information

REHABILITATION PACKAGE 4-a

REHABILITATION PACKAGE 4-a 4-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 4-a Rehab option 4-a is a rehabilitation package whereby all spans of the existing steel truss structure would be rehabilitated and strengthened.

More information

High Bridge Re-Deck Project

High Bridge Re-Deck Project High Bridge Re-Deck Project MnDOT Contract No. 1000532 Presented to: Minnesota Department of Transportation Bridge Repair Recommendations - September 22, 2016 Bridge Overview 11 Total Spans, 2755-0 Long

More information

Deterioration of Structural Concrete in Indiana

Deterioration of Structural Concrete in Indiana Deterioration of Structural Concrete in Indiana D. W. L ewis Research Engineer Joint Highway Research Project Purdue University IN TR O D U CTIO N This paper presents the results of a general performance

More information

SIAMA. SIAMA Asset Management Technologies Level-2 Bridge Condition Inspection

SIAMA. SIAMA Asset Management Technologies Level-2 Bridge Condition Inspection Prolonging Infrastructure Assets Life Asset Management Technologies Level-2 Bridge Condition Inspection CONTENTS Background of Bridge Condition Inspection Purpose of inspection Examples of Defects External

More information

Mondol Fabrics Ltd. Nayapara,kasimpur, Gazipur ( N, E0) 8th March 2014

Mondol Fabrics Ltd. Nayapara,kasimpur, Gazipur ( N, E0) 8th March 2014 Mondol Fabrics Ltd Nayapara,kasimpur, Gazipur (23.990028N, 90.317336E0) 8th March 2014 1 2 Observations 3 Column Stresses in Toilet Area North of Building Cursory calculations indicate that column size

More information

Appendix A. Sample Inspection Report

Appendix A. Sample Inspection Report Appendix A Sample Inspection Report This page intentionally left blank. PORT AUTHORITY OF ALLEGHENY COUNTY PITTSBURGH, PENNSYLVANIA REPORT ON THE INITIAL NBIS INSPECTION OF CHARTIERS CREEK BRIDGE BMS No.

More information

CITY OF SAVANNAH HISTORIC DISTRICT BOARD OF REVIEW REQUEST FOR CERTIFICATE OF APPROPRIATENESS

CITY OF SAVANNAH HISTORIC DISTRICT BOARD OF REVIEW REQUEST FOR CERTIFICATE OF APPROPRIATENESS CITY OF SAVANNAH HISTORIC DISTRICT BOARD OF REVIEW REQUEST FOR CERTIFICATE OF APPROPRIATENESS STAFF RECOMMENDATION PETITIONER: FILE NUMBER: ADDRESS: Brenda K. Pearson Neil Dawson Architects, PC 1020 Bryan

More information

Specification Changes and Their Effect on Plans. Bridge Construction Issues. BRG VTC April, 2010

Specification Changes and Their Effect on Plans. Bridge Construction Issues. BRG VTC April, 2010 Specification Changes and Their Effect on Plans Bridge Construction Issues BRG VTC April, 2010 Brian D. Merrill, P.E. BRG Construction & Maintenance Branch Also: Common Plan Review Items Revised Specifications

More information

May 17, Mr. Fred Preuss Oak Park River Forest High School 201 North Scoville Avenue Oak Park, IL 60302

May 17, Mr. Fred Preuss Oak Park River Forest High School 201 North Scoville Avenue Oak Park, IL 60302 Larson Engineering, Inc. 118 S. Clinton Street, Suite 250 Chicago, IL 60661-5775 312.345.0540 Fax: 312.332.1484 www.larsonengr.com May 17, 2016 Mr. Fred Preuss Oak Park River Forest High School 201 North

More information

6 th STREET VIADUCT SIESMIC IMPROVEMENT PROJECT

6 th STREET VIADUCT SIESMIC IMPROVEMENT PROJECT 6 th STREET VIADUCT SIESMIC IMPROVEMENT PROJECT Project Location The 6 th Street Viaduct (Bridge No. 53C-1880) and Sixth Street Overcrossing (Bridge No. 53-0595) comprise a single structure, which spans

More information

Cochran Mill Road Bridge over Tuscarora Creek

Cochran Mill Road Bridge over Tuscarora Creek Cochran Mill Road Bridge over Tuscarora Creek July 15, 2014 Brian Morrison, P.E. NOVA District Senior Structural Engineer (703) 259-2606 brian.morrison@vdot.virginia.gov Purpose & Need Purpose Update project

More information

Engineering & Capital Improvements. Shore Acres Civic Association August 21 st, 2017

Engineering & Capital Improvements. Shore Acres Civic Association August 21 st, 2017 Engineering & Capital Improvements Shore Acres Civic Association August 21 st, 2017 40 th Avenue N Bridge 34 th Avenue NE Storm Drainage Improvements Resiliency Planning Continued Maintenance 40 th Avenue

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 10/23/2016 to 10/29/2016

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 10/23/2016 to 10/29/2016 AECOM Field Office Water Street, NW Under Key Bridge along Water Street, NW REHABILITATION OF FRANCIS SCOTT KEY BRIDGE FROM ROSSLYN, ARLINGTON, VIRGINIA TO GEORGETOWN WASHINGTON, DC. DC Contract No.: DCKA-2014-C-0074

More information

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening March 5, 2009 Nicholas J. Roper NOVA District Bridge Engineer Robert F. Price Resident Administrator of Loudoun/ Prince William Construction

More information

Concrete Arch Bridge Rehabilitation Challenges. Kris Lammi Thompson PennDOT Districts 4-0 & 5-0

Concrete Arch Bridge Rehabilitation Challenges. Kris Lammi Thompson PennDOT Districts 4-0 & 5-0 Concrete Arch Bridge Rehabilitation Challenges Kris Lammi Thompson PennDOT Districts 4-0 & 5-0 Rehabilitation vs. Replacement? Purpose & Need Condition Long crossings-rehab can be more cost-effective Small

More information

WELCOME. QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street. Public Information Centre Round #1 October 2017

WELCOME. QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street. Public Information Centre Round #1 October 2017 WELCOME QEW Credit River Bridge Detail Design Assignment from Mississauga Road to Hurontario Street Public Information Centre Round #1 October 2017 Please Sign In PURPOSE OF THIS MEETING The Ontario Ministry

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 03/05/2017 to 03/11/2017

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 03/05/2017 to 03/11/2017 AECOM Field Office Water Street, NW Under Key Bridge along Water Street, NW REHABILITATION OF FRANCIS SCOTT KEY BRIDGE FROM ROSSLYN, ARLINGTON, VIRGINIA TO GEORGETOWN WASHINGTON, DC. DC Contract No.: DCKA-2014-C-0074

More information

The Norwich Street Bridge

The Norwich Street Bridge The Norwich Street Bridge Class Environmental Assessment Open House May 17, 2017 6:30-8 p.m. Guelph City Hall Phase 1 Phase 2 Project File Our Study Process: This study is being undertaken as a Schedule

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 02/26/2017 to 03/04/2017

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 02/26/2017 to 03/04/2017 AECOM Field Office Water Street, NW Under Key Bridge along Water Street, NW REHABILITATION OF FRANCIS SCOTT KEY BRIDGE FROM ROSSLYN, ARLINGTON, VIRGINIA TO GEORGETOWN WASHINGTON, DC. DC Contract No.: DCKA-2014-C-0074

More information

System Preservation in Louisiana

System Preservation in Louisiana System Preservation in Louisiana LA Transportation Conference Baton Rouge, LA January 9, 2009 Danny Tullier, P.E. Bridge Preventive Maintenance LA DOTD How Louisiana Obtained Highway Bridge Program Funding

More information

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees

Year Pre Total County Debt (Bonds & BANS) Mitigation Fees CR 9 (Bradt Hollow Road) Over Fox Creek Bridge Replacement Project Replacement of a 156 ft. long x 32ft. wide, 3 span pre stressed concrete box beam bridge over Fox Creek in the Town of Berne. The bridge

More information

STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION LOAD RATING REPORT GENERAL SULLIVAN BRIDGE - DOVER 200/023 OVER THE LITTLE BAY

STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION LOAD RATING REPORT GENERAL SULLIVAN BRIDGE - DOVER 200/023 OVER THE LITTLE BAY STATE OF NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION LOAD RATING REPORT GENERAL SULLIVAN BRIDGE - DOVER 200/023 OVER THE LITTLE BAY NEWINGTON-DOVER, 11238S August 15, 2016 Vanasse Hangen Brustlin, Inc.

More information

State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY

State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY 08625-0600 BRIDGE RE-EVALUATION SURVEY REPORT STRUCTURE NO. 3XXX-XXX ROUTE I-287 SB OVER

More information

Chapter 4 Bridge Program Drawings

Chapter 4 Bridge Program Drawings Chapter 4 Bridge Program Drawings Section 4.10-Bridge Railing Introduction Steel bridge railing and concrete bridge barrier rail are installed along the edge of the bridge roadway to keep errant vehicles

More information

Canadian Consulting Engineering Awards 2016 CANADIAN NIAGARA POWER FOREBAY BRIDGE RECONSTRUCTION

Canadian Consulting Engineering Awards 2016 CANADIAN NIAGARA POWER FOREBAY BRIDGE RECONSTRUCTION Canadian Consulting Engineering Awards 2016 CANADIAN NIAGARA POWER FOREBAY BRIDGE RECONSTRUCTION April 2016 ELLIS Engineering Inc. 214 Martindale Road, Suite 201 St. Catharines, Ontario L2S 0B2 www.ellis.on.ca

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 12/11/2016 to 12/17/2016

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 12/11/2016 to 12/17/2016 AECOM Field Office Water Street, NW Under Key Bridge along Water Street, NW REHABILITATION OF FRANCIS SCOTT KEY BRIDGE FROM ROSSLYN, ARLINGTON, VIRGINIA TO GEORGETOWN WASHINGTON, DC. DC Contract No.: DCKA-2014-C-0074

More information

Mn/DOT BRIDGE INSPECTION REPORT

Mn/DOT BRIDGE INSPECTION REPORT 08/13/2007 Page 1 of 5 County: City: Township: WINONA DRESBACH Section: 33 Township: 105N Range: 04W Span Type: NBI Deck: 5 Super: 6 Sub: 6 Chan: 8 Culv: N Location: Route: Control Section: AT MINN/WISC

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION NBI INSPECTION DWCJ Inspector Name Agency / Company Name Insp. Freq. Insp. Date Evan Currie Great Lakes Engineering Group 12 07/31/2017 GENERAL NOTES Posting Signs in Place DECK 1. Surface (SIA-58A) 2.

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION STR 7004 MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY INSPECTION REPORT Facility Latitude / Longitude MDOT Structure ID Structure Condition 4 3/4 MILE RD 43.5688 / -84.3455 56314H00009B010 Good

More information

STRUCTURAL EVALUATION REPORT

STRUCTURAL EVALUATION REPORT STRUCTURAL EVALUATION REPORT Pedestrian Bridge Structural Evaluation Activity ID 01-2014-023 PREPARED FOR CITY OF DES MOINES ENGINEERING DEPARTMENT OCTOBER 2015 TABLE OF CONTENTS EXECUTIVE SUMMARY SECTION

More information

MINISTRY OF TRANSPORTATION ONTARIO MANAGING OUR ASSETS

MINISTRY OF TRANSPORTATION ONTARIO MANAGING OUR ASSETS MINISTRY OF TRANSPORTATION ONTARIO MANAGING OUR ASSETS Financial Management Institute of Canada November 19, 2008 Ministry s Assets Mature network - large inventory Over 16,500 km Over 2,800 bridges 8

More information

AESTHETIC AND TECHNOLOGICAL CONCEPTS FOR THE NEW ROUTE 9 SOUTHBOUND BRIDGE AND THE REHABILITATION OF THE EDISON BRIDGE

AESTHETIC AND TECHNOLOGICAL CONCEPTS FOR THE NEW ROUTE 9 SOUTHBOUND BRIDGE AND THE REHABILITATION OF THE EDISON BRIDGE Over the Raritan River, New Jersey 29 AESTHETIC AND TECHNOLOGICAL CONCEPTS FOR THE NEW ROUTE 9 SOUTHBOUND BRIDGE AND THE REHABILITATION OF THE EDISON BRIDGE After 62 years of service without a major reconstruction,

More information

The East River Esplanade

The East River Esplanade The Located on the East River between East 62nd Street and East 125th Street In the borough of Manhattan Town Hall Meeting September 19, 2017 Erik Linsalata, PE, Gabrielle Czernik, PE Parks Capital Design

More information

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS, CENTER FOR ENVIRONMENTAL EXCELLENCE, HISTORIC BRIDGES COMMUNITY OF PRACTICE HISTORIC BRIDGE REHABILITATION AND MAINTENANCE CASE STUDY

More information

Road M3 Chisinau Giurgiulesti/ Romanian Border Extension and Rehabilitation Project Draft Feasibility Study (December 2008)

Road M3 Chisinau Giurgiulesti/ Romanian Border Extension and Rehabilitation Project Draft Feasibility Study (December 2008) BRIDGE INSPECTION MANUAL Preface The aim of the bridge inspection is to produce a report of the structure which gives a clear and accurate description of its condition at the time for comparison with earlier

More information

TENDER BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 1

TENDER BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 1 TENDER 2334-2019 BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 1 This addendum shall be read in conjunction with and considered as an integral part of the Tender Contract 2334-2019. Revisions

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO TRUNK HIGHWAY NO. 3 rd Avenue/Central Avenue OVER THE MISSISSIPPI RIVER

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO TRUNK HIGHWAY NO. 3 rd Avenue/Central Avenue OVER THE MISSISSIPPI RIVER UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 2440 TRUNK HIGHWAY NO. 3 rd Avenue/Central Avenue OVER THE MISSISSIPPI RIVER DISTRICT M HENNEPIN COUNTY OCTOBER 23, 2008 PREPARED FOR THE MINNESOTA DEPARTMENT

More information

BRIDGE RATING. Prepared for MASSACHUSETTS DEPARTMENT OF TRANSPORTATION HIGHWAY DIVISION BOSTON. ST Monsignor William Casey Highway.

BRIDGE RATING. Prepared for MASSACHUSETTS DEPARTMENT OF TRANSPORTATION HIGHWAY DIVISION BOSTON. ST Monsignor William Casey Highway. BRIDGE RATING Prepared for MASSACHUSETTS DEPARTMENT OF TRANSPORTATION HIGHWAY DIVISION BOSTON ST 203 - Monsignor William Casey Highway over Washington Street & Amtrak/MBTA Rail Road BRIDGE NO. B-16-367

More information

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities

PCL Definitions for the Local Program J01 3R Policy J04 3P Policy J06 Local Bridges and Township Bridge Program Bridge Work Activities PCL Definitions for the Local Program Projects that are administered by the Central Bureau of Local Roads. Engineering, utilities and land acquisition are coded with the PCL for the type of construction

More information

Berkshire Region TIP Project Data Form

Berkshire Region TIP Project Data Form BASIC INFORMATION: 1. TIP ID #: 2. MUNICIPALITY: 3. ROUTE# AND/OR NAME: Berkshire Region TIP Project Data Form 4. PROJECT TYPE (CHECK BEST DEFINITION OF PROJECT): Intersection Improvement Road Resurfacing

More information

Town of South Bruce Peninsula Bridge and Culvert Inspections OSIM Inspection Report

Town of South Bruce Peninsula Bridge and Culvert Inspections OSIM Inspection Report Town of South Bruce Peninsula OSIM Inspection Report Prepared By: R.J. Burnside and Associates Limited 3 Ronell Crescent, Collingwood L9Y 4J6 Prepared for: Town of South Bruce Peninsula January 2015 File

More information

9 Conclusion. 9.1 Introduction

9 Conclusion. 9.1 Introduction 9 Conclusion 9.1 Introduction This final chapter presents a synthesis of the evaluation criteria leading to conclusions and recommendations. Also included is a summary of the current status of the Tappan

More information

MISENER DAM. Site Number LYNN STREET, PORT DOVER km N of Highway 6

MISENER DAM. Site Number LYNN STREET, PORT DOVER km N of Highway 6 NORFOLK COUNTY MISENER DAM Site Number 980501 LYNN STREET, PORT DOVER 0.65 km N of Highway 6 Ontario Structure Inspection Manual - Inspection Form Site Number: 980501 Inventory Structure Name Misener Dam

More information

Curb and Gutter Replacement Project Phase I

Curb and Gutter Replacement Project Phase I Phase I Prepared for: Prepared by: Cheyenne Downtown Development Authority / Main Street 1601 Capitol Avenue Cheyenne, WY 82001 307 433 9730 BenchMark Engineers, PC 1920 Thomes Avenue, Suite 620 Cheyenne,

More information

State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY

State of New Jersey NEW JERSEY DEPARTMENT OF TRANSPORTATION 1035 PARKWAY AVENUE P.O. Box 600 TRENTON, NEW JERSEY State of ew Jersey EW JERSEY DEPARTMET OF TRASPORTATIO 103 PARKWAY AVEUE P.O. Box 00 TRETO, EW JERSEY 082-000 STRUCTURE O. 0910-13 J ROUTE 7 (BELLEVILLE TURPIKE) OVER CORAIL (EWARK BRACH) TOW OF KEARY

More information

Joseph Gladke with Hennepin County Public Works Charlene Roise with Hess Roise. Fremont Avenue Bridge. Not applicable.

Joseph Gladke with Hennepin County Public Works Charlene Roise with Hess Roise. Fremont Avenue Bridge. Not applicable. Property Location: Project Name: HERITAGE PRESERVATION APPLICATION SUMMARY Fremont Avenue bridge over the Midtown Greenway Fremont Avenue Bridge (L8901) Replacement Prepared By: Hilary Dvorak, Principal

More information

BRIDGE JOINT PERFORMANCE IN CALIFORNIA

BRIDGE JOINT PERFORMANCE IN CALIFORNIA BRIDGE JOINT PERFORMANCE IN CALIFORNIA TONY BRAKE, M.S, P.E. Tony_Brake@dot.ca.gov Senior Bridge Engineer CA State Dept. of Trans. MAY 2016 Salt Lake City, UT CALIFORNIA STATE DEPARTMENT OF TRANSPORTATION

More information

Baseline Document Change Announcement

Baseline Document Change Announcement BDC16D-01 Page 1 of 7 New Jersey Department of Transportation 1035 Parkway Avenue, PO Box 600, Trenton, New Jersey 08625-0600 Baseline Document Change Announcement ANNOUNCEMENT: BDC16D-01 DATE: September

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $3,379,844.00 Scott Construction Corporation - Portland, ME $3,572,184.50 CPM Constructors - Freeport, ME $3,732,667.25 Page 1 of 16 Wyman

More information

HOAN BRIDGE REHABILITATION

HOAN BRIDGE REHABILITATION 5/11/2013 HOAN BRIDGE REHABILITATION Presentation Overview Project Overview History Project Background In-Depth Inspection Structural Design Elements WSPE Discovery Conference 2013 PROJECT OVERVIEW Project

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014

More information

ATHABASCA RIVER BRIDGE REHABILITATION PROJECT

ATHABASCA RIVER BRIDGE REHABILITATION PROJECT ATHABASCA RIVER BRIDGE REHABILITATION PROJECT PROJECT INFORMATION Project Name Athabasca River Bridge Rehabilitation Project Location Highway 40 (over the Athabasca River), Entrance, Alberta Year Completed

More information

Maine Turnpike Authority

Maine Turnpike Authority Company Name Total Bid Amount Wyman & Simpson Inc. - Richmond, ME $984,032.05 Gordon Contracting - Sangerville, ME $985,607.00 CPM Constructors - Freeport, ME $1,177,689.54 Page 1 of 7 Wyman & Simpson

More information

National Roads Authority

National Roads Authority Project nr 2008-1/049 Belfast: 22-23 June 2009 Presentation to Trans-national Workshop NRA: Maintenance and repair of bridges Albert Daly National Roads Authority, IRELAND Investing in our common future

More information

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction

Chapter 1. General Design Information. Section 1.02 Structure Selection and Geometry. Introduction Chapter 1 Bridge Design Manual General Design Information Section 1.02 Selection and Geometry Introduction Selection or Rehabilitation Report This section of the design manual provides guidance on the

More information

Crossing Type: Heritage Designation:

Crossing Type: Heritage Designation: Inventory Data: City Site Number 81 Structure Name Old Mill Road Bridge Main Hwy/Road On Under Crossing Type: Navig. Water Non-Navig. Water Rail Road Ped. Other Hwy/Road Name Structure Location Old Mill

More information

APPENDIX G Enviromental Documents

APPENDIX G Enviromental Documents APPENDIX G Enviromental Documents CACHE CREEK APN 060-230-007 LOWREY KATHERINE A ETAL 5.20 ACRES APN 060-230-009 FACCIUTO VINCENT R & VICTORIA 7.78 ACRES APN 060-251-001 LLOYD TRUST ETAL & LLOYD FAM REV

More information

Widening the Harrods Creek Arch Bridge

Widening the Harrods Creek Arch Bridge Approaches to Historic Bridge Rehabilitation Case Study #1 Widening the Harrods Creek Arch Bridge Richard Sutherland, P.E. Daryl Carter, P.E. Presenter s Logo 1 Case Study #1 Harrods Creek Arch Bridge

More information

MICHIGAN BRIDGE CONFERENCE REHABILITATION OF HISTORIC BRIDGES. Known Since Roman Times Portland Cement Discovery Need For Reinforcing Steel

MICHIGAN BRIDGE CONFERENCE REHABILITATION OF HISTORIC BRIDGES. Known Since Roman Times Portland Cement Discovery Need For Reinforcing Steel MICHIGAN BRIDGE CONFERENCE Mount Pleasant, Michigan March 19, 2008 Michigan s Local Technical Assistance Program REHABILITATION OF HISTORIC BRIDGES Joseph J. Pullaro. P.E. Vice President TranSystems/Lichtenstein

More information

TENDER BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 2

TENDER BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 2 TENDER 2334-2019 BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 2 This addendum shall be read in conjunction with and considered as an integral part of the Tender Contract 2334-2019. Revisions

More information

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 6 - RICE COUNTY

UNDERWATER BRIDGE INSPECTION REPORT DISTRICT 6 - RICE COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 66532 227 th STREET (TWP 45) OVER THE STRAIGHT RIVER DISTRICT 6 - RICE COUNTY SEPTEMBER 12, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION

More information

ATTACHMENT F EXAMPLE SIMPLE CONCEPTUAL CTD (CONTRACT TIME DETERMINATION) FOR 25% DESIGN STAGE

ATTACHMENT F EXAMPLE SIMPLE CONCEPTUAL CTD (CONTRACT TIME DETERMINATION) FOR 25% DESIGN STAGE ATTACHMENT F EXAMPLE SIMPLE CONCEPTUAL CTD (CONTRACT TIME DETERMINATION) FOR 25% DESIGN STAGE DEVELOPED FOR CONSTRUCTION PLANNING DURING THE DESIGN PHASE REV2 10JAN14 CONTENT ATTACHMENT F SIMPLE/CONCEPTUAL

More information

Introduction.» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring

Introduction.» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring Location of Project Introduction» Demolition Concepts» Concept Design» Final Design» Construction» Health Monitoring Existing Bridge» Built in 1928» 255-foot Open Spandrel Concrete Arch Bridge» 24-foot

More information

Bridge Preventative Maintenance.Act now before this happens to you! Keith Cooper, P.E. Local Bridge Program Manager

Bridge Preventative Maintenance.Act now before this happens to you! Keith Cooper, P.E. Local Bridge Program Manager Bridge Preventative Maintenance.Act now before this happens to you! Keith Cooper, P.E. Local Bridge Program Manager 1 Local Bridge Program Asset Management for Local Bridges 2008 started approving Rehabilitation

More information

Maine Turnpike Authority

Maine Turnpike Authority PAVEMENT REHABILITATION & CLEAR ZONE IMPROVEMENTS MM 80.7 TO MM 88.6 202.121 Removing Existing Concrete (6CY) 1.00 LS 202.127 Removing of Existing Bituminous Pavement (470 SY) 1.00 LS 202.202 Removing

More information

Zinc Rich Paint in a Pigeon Rich Environment

Zinc Rich Paint in a Pigeon Rich Environment Zinc Rich Paint in a Pigeon Rich Environment Achieving Bridge Rehab without Going to Rehab Louisville Bridge Rehabilitation Lea Joyner Bridge Rehabilitation US 80 / Ouachita River Monroe/West Monroe Ouachita

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION STR 6947 MICHIGAN DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY INSPECTION REPORT Facility Latitude / Longitude MDOT Structure ID Structure Condition 9 MILE ROAD 43.5362 / -84.4294 56200055000B010 Fair Condition(6)

More information

Fargo, ND HEI No. 8675_001 October 31, 2017 PELICAN RIVER DAM CONCRETE SPILLWAY ASSESSMENT REPORT. Pelican Rapids, Minnesota

Fargo, ND HEI No. 8675_001 October 31, 2017 PELICAN RIVER DAM CONCRETE SPILLWAY ASSESSMENT REPORT. Pelican Rapids, Minnesota Fargo, ND HEI No. 8675_001 October 31, 2017 PELICAN RIVER DAM CONCRETE SPILLWAY ASSESSMENT REPORT Pelican Rapids, Minnesota PELICAN RIVER DAM CONCRETE SPILLWAY ASSESSMENT REPORT Pelican Rapids, Minnesota

More information

I-91 Viaduct Public Information Briefing

I-91 Viaduct Public Information Briefing I-91 Viaduct Public Information Briefing Project File No. 607731 MassDOT Contract No. 85020 Briefing no. 10 December 18, 2017 Agenda Welcome Update on Construction Activities (Full Beneficial Use) Next:

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 15 OVER THE ARCOLA CHANNEL HENNEPIN COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 15 OVER THE ARCOLA CHANNEL HENNEPIN COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 27510 CSAH NO. 15 OVER THE ARCOLA CHANNEL HENNEPIN COUNTY MAY 21, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY COLLINS ENGINEERS, INC.

More information

workin' bridges Mary Street Bridge Project for Pennsylvania Transportation and Heritage

workin' bridges Mary Street Bridge Project for Pennsylvania Transportation and Heritage Prepared For Mary Street Bridge 1894 Builder Unknown Township Route 439 over Reading Blue Mountain & Northern Railroad. Length Width Deck Width Project for Pennsylvania Transportation and Heritage 44'

More information

Feasibility Assessment Study

Feasibility Assessment Study August 19, 2010 Feasibility Assessment Study Historic Sites Council Meeting Today s Agenda Historic Overview Project Overview Barrier Issues Concrete Parapet Recommendations Steel Parapet Recommendations

More information

INVITATION TO TENDER ITT / NO. PS BURRARD BRIDGE REHABILITATION QUESTIONS AND ANSWERS NO. 4

INVITATION TO TENDER ITT / NO. PS BURRARD BRIDGE REHABILITATION QUESTIONS AND ANSWERS NO. 4 ISSUED ON JANUARY 19, 2016 Q1 Can the City provide the Tenderers with a best known timeframe for when the Provisional items of work might take place and when that decision would be made? A1 Q2 A2 Q3 A3

More information

BRIDGE INSPECTION REPORT

BRIDGE INSPECTION REPORT NC DEPARTMENT OF TRANSPORTATION ATTENTION DIVISION OF HIGHWAYS BRIDGE MANAGEMENT UNIT BRIDGE INSPECTION REPORT INSPECTION TYPE: Routine Inspection COUNTY IREDELL BRIDGE NUMBER 480596 INSPECTION CYCLE 2

More information

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 5 (FRANKLIN AVENUE) OVER THE MISSISSIPPI RIVER HENNEPIN COUNTY

UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO CSAH NO. 5 (FRANKLIN AVENUE) OVER THE MISSISSIPPI RIVER HENNEPIN COUNTY UNDERWATER BRIDGE INSPECTION REPORT STRUCTURE NO. 2441 CSAH NO. 5 (FRANKLIN AVENUE) OVER THE MISSISSIPPI RIVER HENNEPIN COUNTY OCTOBER 29, 2012 PREPARED FOR THE MINNESOTA DEPARTMENT OF TRANSPORTATION BY

More information

HUNT STREET BRIDGE. Site Number HUNT STREET, SIMCOE. 0.2 km North of Highway 3

HUNT STREET BRIDGE. Site Number HUNT STREET, SIMCOE. 0.2 km North of Highway 3 NORFOLK COUNTY HUNT STREET BRIDGE Site Number 983502 HUNT STREET, SIMCOE 0.2 km North of Highway 3 Ontario Structure Inspection Manual - Inspection Form Site Number: 983502 Inventory Data: Structure Name

More information

Historic Downtown District Design Guidelines for Commercial Properties

Historic Downtown District Design Guidelines for Commercial Properties Historic Downtown District Design Guidelines for Commercial Properties The Historic Downtown District includes the entirety of the B-3 zoned district, the contiguous R-4 zoned district which extends North

More information

Seismic strengthening of historic concrete arch bridges S.E. Thomasen Wiss, Janney, Elstner Associates, Inc., 2200 Powell Street, Suite

Seismic strengthening of historic concrete arch bridges S.E. Thomasen Wiss, Janney, Elstner Associates, Inc., 2200 Powell Street, Suite Seismic strengthening of historic concrete arch bridges S.E. Thomasen Wiss, Janney, Elstner Associates, Inc., 2200 Powell Street, Suite Abstract The most common historic bridge type in California is the

More information

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE

EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE EXISTING ROADWAY CONDITION ASSESSMENT REPORT (ERCAR) SAMPLE OUTLINE The Existing Roadway Condition Assessment Report (ERCAR) should include the evaluation of all elements against new construction criteria.

More information

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION

INFO. ON SPECIFIC QUANTITIES IS AVAILABLE WITH AN APC SPECIAL SERVICE BULLETIN SUBSCRIPTION Updated November 17, 2008 PHILADELPHIA COUNTY SR 30(ADA) PROPOSAL:$14.40 The description and location of the project is as follows: For the design and construction of ADA compliant concrete curb ramps

More information

Examples of Repairs to Concrete in Bridges

Examples of Repairs to Concrete in Bridges Examples of Repairs to Concrete in Bridges VERB P. MAUN and HAROLD BRITTON, respectively. Associate Civil Engineer (Design) and Senior Structural l^ecifications Writer, New York State Department of Public

More information

WALKER RESTORATION CONSULTANTS: CONDITION APPRAISAL REPORT APPENDIX A: ESTIMATE IN PROBABLE CONSTRUCTION COST.. 316

WALKER RESTORATION CONSULTANTS: CONDITION APPRAISAL REPORT APPENDIX A: ESTIMATE IN PROBABLE CONSTRUCTION COST.. 316 CIP WALKER RESTORATION CONSULTANTS: CONDITION APPRAISAL REPORT... 287 APPENDIX A: ESTIMATE IN PROBABLE CONSTRUCTION COST.. 316 APPENDIX B: PHASING AND ASSET MANAGEMENT PLAN. 322 CITY OF SANTA ROSA PARKING

More information