Emerg. Contact: EMERGENCY CONTACT INFORMATION Fire Department Info: Municipal Police Info: County Sheriff Info: Dept Name: Dept Name: Dept Name:

Similar documents
Your Company Name. Hospital Phone: (318) Do cell phones work at the site? Yes No If no, location of the nearest landline:

Date Prepared: Location: Time: Approximate Temperature (degrees F): Weather Conditions: Project Name:

Subpart P. Trenching & Excavating CLIENT SAFETY SERVICES

WHITMAN COLLEGE TRENCHING AND SHORING PLAN

Safe Work Method Statement. 14/4/16 Approved by (Snr Management Rep):

XXVI. Contractor Safety & Environmental Guidelines (For General Contractors and Sub-Contractors)

JHA Number 1a. Job Description Hanging new ductwork. Step 1 Unloading of ductwork

Risk Control at United Fire Group

OUTLAW AUTOMATION INC. Safety Management System

Project Safety Orientation and Procedures

CONTRACTOR SAFETY & HEALTH RULES

NCCER Progress Blvd, Alachua, Florida Phone: (888)

Doc No: SUBCON Midland Engineering Co., Inc. Initial Issue Date 12/04/15 Safety Management System

SafetyVideos Topic Name Run Time

CONSULTING OFFICE OF MORRIS S. FARKAS PROFESSIONAL SAFETY ENGINEER

REFURBISHMENT DEMOLITION

Excavation and Trenching Program. Tampa Electric Company. Energy Supply

Property and Public Protection Plan

Canadian National Contractor Safety Orientation Canadian Based Operating Companies Course Exam

Site Specific Safety Plans (SSSP)

Excavations. OSHA Office of Training and Education 1

Barricades. Preparer: Owner: Approver: EHS Specialist EHS Team Leader Site Director J. Walker (Electronic Signature on File)

Subcontractor Project Management Plan

I. Introduction/Welcome to MAPP

MVDC F041 Safety Inspection Checklist

Jobsite Specifications The A standard provides jobsite specifications for each of the following hazards:

Iron Ore Company of Canada Health, Safety & Environment

Cover Page / Revision Status

CAL/OSHA ELECTRICAL HIGH VOLTAGE

Excavation & Trench Safety 1

TITLE: CONTRACTOR SAFETY. Safety Procedures and Policies. Issuing Authority: Multi-Color Corporation, Page Number: 1 of 5. Date Effective: 4/1/2011

Lockheed Martin Space (LMS)

Construction, Demolition & Excavation Works Doc Reference: DoMN-WHSMS 3.14 Version Number: 2.2

MUNICIPALITY PERMIT Issued by the City of Holyoke 63 Canal Street, Holyoke, MA Phone (413) FAX (413)

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

Marshall Municipal Utilities EXCAVATIONS AND TRENCHING Effective August 1, 2011 Revised August 17, 2017

JOB SAFETY ANALYSIS PROGRAM. Owner: Risk Management Revision No: 01. Document number: Q-001 Date last revised:

Daily Work Permit and Safety Checklist (C7007) Purpose. Scope. Roles and Responsibilities. Colonial Pipeline Company Safety Awareness Manual

Management Plan for Walking/Working Surfaces & Fall Protection (29 CFR , 23, 66 App.C; 29 CFR ) ISD #535

Fall Protection Safety Program and Training Materials

How Basic Orientation Plus 2010 revision works with a company s safety program to meet OSHA requirements:

Excavation Monitoring and Observation

CONTRACTOR SAFETY PRE-QUALIFICATION CHECKLIST. Name of Contractor: Date: Business Address: Telephone No.:( ) Fax No.:( )

Excavation Safety Program

INTERNAL USE ONLY- REQUIRED DOCUMENTATION SUBMITTED:

Central Washington University

RRP Form Checklist. Prior to the Job Beginning. During the Job. After the Job

Fall Protection Program For Working on Flat Roofs

The Corporation of The City of London

All employees who perform work which requires the removal of material that exceeds a depth of 1.2 meters (4 feet).

IMPORTANT: Please record the following information in a safe and secure location (do not place links/access codes where accessible by the public).

To establish the Panama Canal Authority (ACP) occupational safety requirements for excavations.

LOADING UNLOADING OPERATIONS

Environmental, Health and Safety Policy for Contractors

Excavation and trenching safety

Excavations. Department of Consumer & Business Services Oregon Occupational Safety & Health Division (OR-OSHA)

Applying for a Kinder Morgan Cochin Canada / UTOPIA Canada Proximity & Crossing Permit. Design and Construction Guidelines

Effective Date: 10-January Table of Contents

JOB SITE AUDIT CHECKLIST

Chapter 26. Tim Foster - dba MPC (Maintenance Projects & Construction) Company Policy for Subcontractor Management Plans & Management of Change

This document sets out the rules applicable to all contract companies and their personnel when working on a CF Fertilisers UK Limited (CF) site.

If a new residence s electrical service is not located within 200 feet of existing

2014 SAFETY EXCELLENCE AWARD SAFETY SURVEY FORM FINAL EVALUATION FOR GENERAL & HARD/SOFT CRAFT CONTRACTORS

Document Revision Change Table Revision Number

United Water Idaho Contractor Orientation Program

Basic Service. This Section provides information regarding a. Introduction

Jobsite Layout Considerations

Contractor EHS Program Attachments

Fixed Mounted Guardrails with Bracket Mounts

MANAGING PROJECT SAFETY. Alternatives in a Changing Market

INSTALLING METEOROLOGICAL MONITORING TOWER AT PROPOSED AND EXISTING NUCLEAR FACILITIES

Overhead Power Lines. Corporate Safety Policy Overhead Power Lines. (Cont.)

29 CFR 1926 Construction Subpart P

Excavation General Awareness Safety Training Presentation Red Willow Production Co.

Owners List of Known Workplace Hazards CONTRACT TITLE LIBRARY SQUARE ELEVATORS #10-#11 MODERNIZATION (OCT20/16)

Operate a dozer (wheeled and tracked)

ETELÄ KARJALAN JÄTEHUOLTO OY DRY DIGESTION FACILITY AND BIOGAS UPGRADING AND FILLING STATION DESIGN AND TURN KEY CONTRACT

The Hong Kong Polytechnic University Facilities Management Office

GEORGETOWN RING FIBER CONSTRUCTION PHASE 2

+/0'-/12!"&21'1/345$1.1/3!6#''-7-! 8#9!:!;<;=!

Excavation and Trenching

MMM MASONRY, INC. Employee Safety Guidelines

Contractor EHS Program Attachments

CPM Constructors. Project Safety Inspection Form. Project Number: Project Location: Project Superintendent: Safety Inspector:

Work involving excavations

FASHION INSTITUTE OF TECHNOLOGY OUTLINE FOR PREPARING WORK-SPECIFIC ENVIRONMENT, HEALTH AND SAFETY (EHS) PLAN

INDUCTION INFORMATION

BAY CITIES PAVING & GRADING, INC

CONTRACTOR SAFETY AUDIT GUIDELINES. We Will Utilize an Observation and Feedback Program

YOUR SPLASH PAD RESOURCE

FASHION INSTITUTE OF TECHNOLOGY OUTLINE FOR PREPARING WORK-SPECIFIC ENVIROMENT, HEALTH AND SAFETY (EHS) PLAN

Freeport Site Standard

Contractor Safety Compliance Program. Maryville, Missourii 2010

Employer Safety and Health Program Self-Assessment EMPLOYER SAFETY AND HEALTH. Program Self-Assessment S April S-866 April 2018.

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

Field Instruction. All Horizon Power workers who work in and around excavations.

Employees receive OSHA Safety training - on-demand any time and at their own pace.

Risk Assessment & Safe Working Practice

Captain Stephen M. Hardesty Howard County Department Of Fire & Rescue Services Special Operations

Roadway Surfaces and Traffic Control Elements

Transcription:

JOB DETAILS Company Name: Customer: Project Manager: Job Address: Nearest Intersection: Latitude: Date: Job Name: Job Supervisor: Emerg. Contact: Longitude: EMERGENCY CONTACT INFORMATION Fire Department Info: Municipal Police Info: County Sheriff Info: Dept Name: Dept Name: Dept Name: Phone: Phone: Phone: Utility Company: Do cell phones work at the site? If no, directions to nearest landline: EMERGENCY MEDICAL FACILITY Hospital Name: Hospital Address: Hospital Phone: Directions to Hospital (see attached map) : NON EMERGENCY CARE Clinic Name: Clinic Phone: Clinic Address: WirelessEstimator.com JHA - NON Elevated - Version 2.1, April 2012 Page 1

Typical Job Hazard Analysis (JHA) FORM (no elevated work 6ft or more AGL) The purpose of this form is to assist in reviewing the hazards on a job site and any nearby hazards that personnel may be exposed to while completing a job. Part 1 Jobsite Information Type of Structure: Monopole SST Guyed Rooftop/Side of Building Water Tank Metal Light Pole DAS Structure Highway Sign Structure Other Type of Work: (Check all that apply) TOWER: CIVIL: ELECTRICAL: OTHER: Construction Reinforcement Excavation Site Development Conduit Meter/Panel Wiring Maintenance Line/Antenna Work Testing Tower Foundation Slab Testing Grounding Obstruction Lighting Testing Job/Tasks: (List jobs in sequential steps) Potential Hazards: (List hazards for each step) Preventative Measures: (List each control for each hazard)

Part 2 Structural Hazard Check List Are there any structural hazards on site? Yes No NA Describe: Part 3 Overall Hazard Check List Have you checked for overhead power lines? Yes No NA Do you have the proper PPE for the hazards on site? Yes No NA Have you inspected the site for fall protection hazards and do you have the applicable equipment on site to mitigate those hazards? Yes No NA Do you have a documented site specific rescue plan on site? Yes No NA Have you reviewed the RF & EME hazards of the site? Yes No NA Are there First Aid/CPR certified individuals on site? Yes No NA Job Site Exposures and Hazard Identification (Check the Hazards): Items checked below relate to existing conditions or may be a result of site operations. Physical Hazards Health Hazards Heavy Equipment Electrical Shock Heat Stress Cold Stress Underground Utilities Slips, Trips, or Falls High Noise (> 85 dba) Chemical Exposure Vehicle Traffic Overhead Utilities Silica Exposure (Concrete Cutting) Other Workers on Site Elevation/Site Terrain RF/EME Lifting Hazard Holes and Trenches Fire Hazards Biological Lead Paint Trash, Debris, Dunnage Confined Space Birds / Animals / Insects / Reptiles / Plants Welding Lacerations, Abrasions Asbestos Containing Materials Confined Space High Crime Area Lifting, Pulling Intrusive Activity Falling Objects Have you reviewed MSDSs for hazardous substances that might be present at the job site? Hazard Control Measures (Check the Control Measures): Required PPE Inspections Safety Training/ Programs Site Security Head Protection Tools/Equipment Tailgate Meeting Inner City Foot Protection Rigging Site Signage Rural Eye Protection Housekeeping RF Safety Awareness Night Work Hearing Protection Ground Fault Protection Lockout / Tagout Locked Fences and Acces Hand Protection Call Before Digging Equipment Operation Lighting RF Monitors Provided Building/Rooftop RF Suits Barricades Face/Dust Mask Work Clothing First Aid Required Permits and/or Plan Requirements for your Company or Client Crane Lift Data Sheet and Layout Capstan (Cat-Head) Confined Space Excavation Hot Work Lockout/Tagout Have all applicable notifications related to permits been made Yes No NA WirelessEstimator.com JHA - NON Elevated - Version 2.1, April 2012 Page 3

Hazard Control Measures (continued): Electrical Electrical Tools Electrical Test Equip GFCI Lockout/Tagout ALL TASKS Elec Equip Inspection Electrical PPE Describe the elevation, site terrain and environmental hazards: Rooftop Personal Fall Arrest Warning Line System Guard Rails / Parapet Anchoarge System Skylight Barricades Describe hazards with site/vehicle access (i.e. boom and cranes/electrical lines) and storage of materials: Describe the overhead and underground electrical hazards: Describe other: Complete for Civil Work Describe cave-in control measures for personnel in excavations greater than 5' deep Sloping Benching Shoring Shield Box Ladder System (if 4 feet deep or greater) every 25 feet of length. Must extend 36 inches above landing. Describe other: THE LAST 5 MINUTES The "Last Five Minutes" is intended to be a quick assessment of the site before leaving. Check the box next to each item if it is satisfactory. As You Leave the Site: Is the log book signed and NOC notified (if applicable)? Is the construction area secured (i.e., fenced, barrier tape, warning signs, etc.)? Are all trenches covered and/or barriers in place? Is any material or equipment left in a suspended condition (i.e., hanging off of the tower or over an edge of the s Are the shelter, gang boxes, and/or equipment doors closed and secured/locked? Are the warning/no trespassing signs visible? FINALLY; Did I lock the gate when I left the site? The Last Five Minutes sets the stage for how the client and others will view the site when they arrive. A SITE FREE OF ACCIDENTS WAITING TO HAPPEN AND FREE OF DEFECTS, SPEAKS FOR ITSELF. WirelessEstimator.com JHA - NON Elevated - Version 2.1, April 2012 Page 4

Personnel CPR/ First Name Company Aid Initials Trained Job Hazard Analysis discussed and reviewed with all crew and other contractors on site? Yes No Supervisor Signature Date Development of this JHA: At the request and assistance of many of the country's leading companies in the wireless infrastructure industry, WirelessEstimator.com developed this best practices document to cover the most commonly required disciplines in wireless construction. Use of this JHA: By using this JHA, you acknowledge and agree that there may be other hazards that must be evaluated and you shall hold harmless and indemnify Wireless Estimator, Inc. against any losses, liabilities and claims arising out of or relating to the use of this document. WirelessEstimator.com JHA - NON Elevated - Version 2.1, April 2012 Page 5

Job Name: RoadRunner Project Hospital Name: St Mary's Medical Center Hospital Address: 407 E 3RD ST DULUTH, MN 55805 Hospital Phone: (218) 786-4000 Hospital Latitiude: 46.792877 Hospital Longitude: -92.096375 WirelessEstimator.com JHA - NON Elevated - Version 2.1, April 2012 Page 6