Referendum Implementation

Similar documents
Cazenovia Central Schools Proposed Building Project Information Session December 17, 2013

BALLOU SENIOR HIGH SCHOOL

COMPANY. Critical Facility Upgrades 2018 Progress Update GREATER ALBANY PUBLIC SCHOOLS. Investments in Existing Capital Assets: Safe Warm - Dry

MOORESTOWN HIGH SCHOOL REFERENDUM PROJECTS

2007 Projects: MEDFORD SCHOOL DISTRICT 549C Bond Funded Construction Projects Updated: September 4, North Medford High School:

FEASIBILITY STUDY SEPTEMBER 1 8,

10 Year Plan. Facilities Planning Guide. December 15, 2014

RAYMOND EDUCATION CAMPUS

REBUILDING. OUR SCHOOLS with the ESIP & Referendum. Toms River Regional School District BEACHWOOD * PINE BEACH * SOUTH TOMS RIVER * TOMS RIVER

NALLE ELEMENTARY SCHOOL

ROD Grant Round 4 Presentation June 9, 2014

PATTERSON ELEMENTARY SCHOOL

GFW Schools Task Force Meeting 1/23/19 R.A. MORTON & ASSOCIATES GLT ARCHITECTS 1

BUILDING FOR OUR FUTURE

PLUMMER ELEMENTARY SCHOOL

Biddeford School Department

LANSDOWNE HIGH SCHOOL RENOVATION PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent

a collaborative process

Addendum to Agenda Item: SUPERINTENDENT S PROPOSED CAPITAL IMPROVEMEMT PLAN

Oconomowoc Area School District Facility Construction Update July 27, 2018

DAVIS ELEMENTARY SCHOOL

Architect and Engineer: Friar Associates inc.

STUART-HOBSON MIDDLE SCHOOL

SEATON ELEMENTARY SCHOOL

Bend La Pine Schools 2016 Sites and Facilities Project Needs List

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017

NOYES EDUCATION CAMPUS

CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan. Community Information Meeting

Cherry Hill School District Building Project Summary. August 8, 2018

BARNARD ELEMENTARY SCHOOL

Frost Technical Center

DENNIS TOWNSHIP FEASIBILITY STUDY

Our Students. Our Schools. Our Future.

PRESENTATION JANUARY 24, 2017

Coos Bay Best Bond Cost Breakdowns

Madison School District. Strategic Five-Year Facility Maintenance Plan

Revised Central Scheme 1 Existing Building Exterior Upgrades Interior Renovation Areas: Scope of Interior Renovation: 100% Three Story Academic Additi

EASTERN HIGH SCHOOL. Site Plan East Capitol Street, N.E., Washington, DC INITIAL YEAR BUILT 1923

WATKINS ELEMENTARY SCHOOL

Health Life Safety Survey and Master Facilities Plan

LASALLE - BACKUS EDUCATION CAMPUS

COOLIDGE SENIOR HIGH SCHOOL

Priority 1 Maintenance Projects Total Investment Needed: $54,875,317. Elementary Schools

Upper Adams School District Facility Study Presentation Part 2 November 17, 2016

BOND CONSTRUCTION UPDATE

WILKINSON ELEMENTARY SCHOOL

MAURY ELEMENTARY SCHOOL

6 Holub Middle School Overall Site Plan Gymnasium Floor Plan Exterior Perspective Before Exterior Perspective - After

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000

Guam Adequate Education Act Trust Account - CIP/STEM: Formerly SFSF Federal ARRA Grant Year End Report FY

LECKIE ELEMENTARY SCHOOL

LEWIS ELEMENTARY SCHOOL

Oconomowoc Area School District Facility Construction Update June 29, 2018

FACILITIES Summer Projects. September 8, 2015 Board Meeting

WARREN CONSOLIDATED SCHOOLS 2016 BOND PROJECT UPDATE M a y

SHEPHERD ELEMENTARY SCHOOL

SOUTH COLONIE CENTRAL SCHOOL DISTRICT FACILITY ESTIMATED EXPENSES FORM UPDATED

Birmingham Public Schools

Darien Public Schools. Master Plan Discussion Review of Elementary Schools Board of Education Meeting March 14, 2018

City High Middle School pre-design recommendations. March 29, 2017

GEORGETOWN ISD 2010 BOND PROGRAM UPDATE. Huckabee APRIL 2012

Al Behrman Elementary School

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

School Without Walls

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data

The Report: Priority 1 thru 5 $ 2,124,417 Lifecycle Years 1 thru 3 ½ $ 384,097 New Construction $ 2,451,568 Less Redlined Items $ 43,534

BLIND BROOK-RYE UFSD SCHOOL FACILITIES PLANNING SECOND UPDATE ON RECOMMENDED PROJECTS

SCHOOL DISTRICT OF LA CROSSE CAPITAL MAINTENANCE & IMPROVEMENT PROJECTS

HILLSIDE ELEMENTARY SCHOOL. Overview: Livingston School District Hillside Elementary School

Building Excellence IV Capital Levy Projects Under Construction

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2

A Report to the Board of Education: Ten-Year Health/Life Safety Review. February 12, 2018

Board Meeting Presentation FEASIBILITY STUDY South Montgomery Community School Corporation. June 13, 2016

Board Work Session Feasibility Study. January 9, 2017

Bond Levy Expenditures Monthly Detail With expenditure data through August, 2010 (updated )

January 2017 Project Update

BUILDINGS AND GROUNDS BOARD OF SCHOOL ESTIMATES CAPITAL IMPROVEMENT PROJECTS

BRUCE-MONROE ELEMENTARY SCHOOL AT PARK VIEW MODERNIZATION HISTORIC PRESERVATION REVIEW

Franklin Pierce School District Capital Construction Bond Candidate Projects

Edmonton Public School District No. 7

2014 MASTER PLANNING PORT ARTHUR INDEPENDENT SCHOOL DISTRICT Revised, August 5, 2014

N o v e m b e r

Project Status Report Property and Finance Committee Meeting August 6, 2013

Building Excellence IV Capital Levy Projects Under Construction

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

BOYERTOWN AREA SCHOOL DISTRICT February 28, Boyertown West Middle School Renovation Project

Belington Elementary School Grades PK 5

School Board Approved Capital Improvements Program. Fiscal Years

POWELL ELEMENTARY SCHOOL

38% 62% Project Funding. TPS Systems and Infrastructure needs

Project Scope & Budget Breakdown. Mandatory Scope Recommended Additional Scope Wish List Scope

School District of Pittsburgh Facilities and Maintenance Summer Update 2018

KEY ELEMENTARY SCHOOL

Bethlehem Central School District

2016 BOND INFORMATION

CENTENNIAL SCHOOL DISTRICT

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS

Part I: Summary PHA Name/Number WV004 The Huntington WV Housing Authority

La Conner School District

New Hall High School Project Summary Report to the Board of Education June 3, 2015

Transcription:

SPACE Net Gain (new) Classrooms Claremont = +47 Hillcrest & Elizabeth = +20 Utilization Gain SGS = +25 at 6-8 MS level SAFETY Annex Connection To Franklin Park Repair Parking Lots, Sidewalks & Outdoor Lighting Expanding Fire Alarm & Security Systems To Match Capacity Growth EDUCATION ES & MS Grade Reconfiguration after Claremont comes online in Fall 2018 OPERATION Upgrade Classrooms & Science Labs Renovate Bathrooms & Replace Fixtures and Ventilation Improve Handicap Access Repair & Update Unit Vents Repair Exterior Walls/Masonry Replace Aging & Energy-Inefficient Windows Upgrade Electrical Service & Power Distribution Replace & Upgrade Aging Interior Doors & Hardware Repair/Replace Aging Ceilings & Aging Floors Replace Aging Boilers with High Efficiency Equipment Referendum Implementation

ADDITIONS/ALTERATIONS SGS for conversion to middle school Elizabeth Avenue & Hillcrest Pine Grove Manor Elevator NEW CONSTRUCTION Claremont Elementary School CAPITAL/GRANT WORK Windows @ Hillcrest, Conerly & MacAfee Doors @ Pine Grove Manor & Hillcrest Unit Ventilators @ Elizabeth Windows @ SGS Doors @ SGS & FMS Paving and Site Work @ SGS & FMS Toilet Rooms @ SGS & FMS Unit Ventilators @ SGS

Capital/Grant Projects Annual Budget & State Grants Capital/Grant Projects Annual Budget & State Grants ESIP Projects Energy Savings Improvement Bond Referendum Projects Voter Approval Dec 2014 Funding Resources

DESIGN ESIP CAPITAL START CONSTRUCTION CONTINUE CONSTRUCTION COMPLETE CONSTRUCTION PRESENT TO 2 RD QTR 2016 1ST QTR 2016 TO 3RD QTR 2016 2ND QTR 2016 TO 3RD QTR 2017 2ND QTR 2016 TO 3RD QTR 2018 Continuation of Design Process: Additions/Alterations for all schools & New Claremont School Continuation of Capital Work Windows at Conerly & Hillcrest Complete Hillcrest & PGM Complete SGS Additions/Alterations and Misc. Capital Elizabeth Ave. Claremont New School Complete ESIP Implementation Bid, Award, and Start Construction @ Hillcrest, PGM and Elizabeth Ave. Interior Renovations at FMS Grade Reconfiguration HVAC Capital Work Bid, Award, and Start Construction @ SGS & Claremont Site Project Focus

Bleachers @ SGS, FMS Main Gym and Auxiliary Gym Summer 2015 Work Completed

Lighting Controls Boiler Room Upgrades

Weekly Design Meetings Alternating Focus Rotating Between New School Design & MS Conversion With SGS/FMS Involvement Field Visits and Building Tours Plus On-site Meetings Input From BOE, Administration, Principals, Maintenance And Curriculum Staff

Additions & Renovations to convert SGS into a Grade 6-8 Middle School with target 871-968 FES Middle School capacity

MISSION STATEMENT To build environmentally friendly, healthy, learning spaces. In a way that is supportive of the school district s academic mission. So that the building will serve as a model of innovative strategies for conserving resources. GOALS Energy Star 90 (26.9 Kbtu/Sf) 50% Water Use Reduction 100% Daylighting In All Instructional Spaces Provide High Air Quality Low VOC Materials Displacement Ventilation Monitor CO2 Maintain High Acoustical Quality Of School Project Goals

New 128,000 SQ.FT. PreK-5 ES I Targeted design for LEED GOLD I 43.8 acres previously farmed land with environmental educational opportunities

New PreK-5 Elementary School located on BOE Claremont Road property with target FES capacity of 853-948 (based on 6cr/grade plus 2 PK, 3 PKSE, and 6 SE CRs = Total 47 CRs) NEW Site Plan

SKYLIGHT After Before Roof Projects (Architect of Record)

Hillcrest Elementary School Roof Projects (Architect of Record)

Middle School Roof Projects (Architect of Record)

HVAC over Kitchen and Auditorium HVAC Projects (Architect of Record)

New Equipment Middle School ROOFTOP HVAC Existing Equipment HVAC Projects (Architect of Record)

Conerly Road Franklin Park Annex (Franklin Park School) Pine Grove Manor Hillcrest MacAfee Fire Alarms (Referendum)

Pine Grove Manor School PAVEMENT AND STRIPING RESTORATION Before After Site Work (Referendum)

Conerly Road School PAVEMENT AND STRIPING RESTORATION After Site Work (Referendum)

MacAfee Road School PAVEMENT, RESTRIPING, AND SITE LIGHTING Site Work (Referendum)

Pine Grove Manor Elementary School Original Site Plan

Pine Grove Manor Elementary School ELEVATOR ADDITION Overall Floor Plan

Pine Grove Manor Elementary School Elevator Addition Plan Lower level floor plan Elevator Addition Plan Second level floor plan

Hillcrest Elementary School Original Site Plan

Hillcrest Elementary School STORAGE AND I.T. CLOSET Floor Plan

Hillcrest Elementary School Special Ed. Classroom Newly Developed Addition Floor Plan (Without Mechanical RM) Classroom Rendered Plan (Special Education Classroom) Floor Plan

Elizabeth Avenue Elementary School Original Site Plan

Elizabeth Avenue Elementary School Original Floor Plan

Elizabeth Avenue Elementary School New Site Plan

Elizabeth Avenue Elementary School NEW 1 ST FLOOR PLAN NEW 2ND FLOOR PLAN Floor Plan

Elizabeth Avenue Elementary School North Classroom Addition

Elizabeth Avenue Elementary School West Classroom and Gymnasium Additions

Elizabeth Avenue Elementary School 3D Arial

Summer 2015 Remainder of Capital & ESIP Work Spring/Fall/Winter 2015 Design Process Winter/Spring 2016 Bidding & Award Summer 2016 to Summer 2017 Additions/ Alterations @ SGS Summer 2016 to Summer 2018 Claremont Hillcrest Elizabeth Bus Routes (Planning 2017-18 for Fall 2018 Implementation) Grade Reconfiguration (Planning 2015-18 for Fall 2018) ONE LESS MOVE Successful FALL 2018