Integrated Safeguards Data Sheet (Initial)

Size: px
Start display at page:

Download "Integrated Safeguards Data Sheet (Initial)"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Initial) Report No: AC124 Section I - Basic Information Date Prepared/Updated: 06/17/2003 A. Basic Project Data (from PDS) I.A.1. Project Statistics Country: EGYPT, ARAB REPUBLIC OF Project ID: P Project: EGYPT-Integrated Irrigation Improvement and Task Team Leader: Usaid I. El-Hanbali Management Project Authorized to Appraise Date: January 20, 2004 IBRD Amount ($m): Bank Approval: July 29, 2004 IDA Amount ($m): Managing Unit: MNSRE Lending Instrument: Specific Investment Loan (SIL) Status: Lending Sector: Irrigation and drainage (100%) Theme: Rural services and infrastructure (P); Civic engagement, participation and community driven development (P); Rural policies and institutions (S); Gender (S); Decentralization (S) I.A.2. Project Objectives (From PDS): Project Scope and Objectives: In line with the GOE s development strategy and the planned reforms in the water sector, the World Bank s Country Assistance Strategy (CAS, 2001) and MNA Strategy (2002) which has water as one of the key focus areas; the proposed project will assist in the implementation of measures aimed at ensuring the efficient and sustainable use of the country s water and land resources. The proposed project would provide for introduction of a framework for integrated water resources management, support planned institutional reforms, together with support for the rehabilitation of irrigation, drainage and pumping stations and removal of system bottlenecks in the major canals in three command areas in the Nile Delta (Mahmoudia, Meet Yazid and Bahr Tanah), one in Middle Egypt (Serry Canal Area) and one in Upper Egypt (Tomas and Afia). The total areas benefiting these five commands is expected to be about 500,000 feddans. The following are the broad objectives of the project reviewed and agreed with the Project Preparation Team (PPT) and the Ministry of Water Resources and Irrigation's (MWRI's) Steering Committee: (a) develop a framework for integrated water management plan and program in selected command areas, combining water quantity and quality management through inter-agency and stakeholder consensus; (b) improve institutional, financial, and environmental sustainability of water services through intensive user and private sector participation in the investment, and operation and maintenance at the district/branch canal levels and below and improved water quality management practices; and (c) increase farm incomes through improved agricultural production based on efficient, more equitable and sustainable use and management of water and land resources.

2 2 I.A.3. Project Description (From PDS): Project Components: The following are the components of the proposed project that were discussed and tentatively agreed with the Project Preparation Team and the MWRI's Steering Committee during the identification mission: (a) Preparation and implementation of integrated water management plans in selected command areas. This component would include support for irrigation, drainage, pumping stations and groundwater sub-sectors of the MWRI, for piloting integrated plans and coordinated implementation arrangements for the project areas including technical assistance and training and supply of equipment, materials, vehicles and office equipment; (b) Establishment and expansion of Water User Associations (WUAs) and the Water Boards in line with Government policy of integrated irrigation and drainage water management. This would include support for WUAs at the tertiary level and up scaling them to branch canal level and their incorporation in the Water Boards at the district level; (c) Improvement and modernization of irrigation and drainage infrastructure. This component would include the implementation of improvements, modernization of main, branch canals, tertiary systems, drains, irrigation and drainage pumping stations, implementation of new, and rehabilitation of existing sub-surface field drainage systems, their subsurface collectors and open drains, covering a total area of about 500,000 feddans; (d) Environmental Management Plan: GEF support would be sought to address environmental assessment and mitigation measures focusing on water quality for integrated irrigation and drainage in the three regional project areas which have distinctive ecological systems, and would build on site-specific pilots under the ongoing IIP, NDPII, and Pump III projects. The GEF component would be fully developed during project preparation; and (e) On-Farm demonstration program: The project would support the establishment of about 50 on-farm demonstrations spread over the five project areas during the five years of project implementation to demonstrate proven technologies for improved water use. Component (a) Preparation of integrated plans and related institutional support for sub-sectors of the MWRI including preparation of WQ management plan, TA, Training, logistical support. Indicative Costs (US$M) Bankfinancing (US$M) % of Bankfinancing % of Total (b) Support for integrated WUAs and Water Boards (c) Improvement and Modernization (c1) Irrigation improvement for 500,000 feddans (c2) Rehabilitation of the drainage system and the irrigation and drainage pump stations in the command areas associated with IIP component in (c1) above

3 3 (c3) Improvement to bottlenecks in the major irrigation canalization, and aspects related to groundwater use for supplementary irrigation requirements (d) Environmental Management Plan. (e) On-farm Demonstration Total Project Costs Front-end fee Total Financing Required I.A.4. Project Location: (Geographic location, information about the key environmental and social characteristics of the area and population likely to be affected, and proximity to any protected areas, or sites or critical natural habitats, or any other culturally or socially sensitive areas.) The three command areas are located in: (i) Northern parts of the Delta Region (Mahmoudia, Meet Yazid and Bahr Tanah; (ii) Middle Egypt( Serry Canal area); and (iii) Upper Egypt (Tomas and Afia areas). The demographic, social and environmental data required will be determined as part of the project preparation work. B. Check Environmental Classification: B (Partial Assessment) Comments: For the purposes of O.D on Environmental Assessment, the project has been classified as Category B, and will be subject to field-based review. An Environmental Assessment will be carried out for the three project regional areas which have distinctive ecological system and reviewed at pre-appraisal. The recommended actions will be incorporated into an Environmental Management Plan (EMP). The EA and EMP will be carried out with full consultation with the concerned stakeholders. While the overall environmental impact of the proposed project are expected to be positive, an environmental screening process will provide detailed information with regards to the impacts of construction and operation stages for project components. The proposed Integrated Irrigation Improvement and Management Project (IIIMP) follows and

4 4 builds on a series of successful World Bank's financed projects over the last three decades, all of which have had significant positive impact on the irrigation, drainage and pumping stations infrastructure and water delivery systems. The lessons learned from the implementation of EMPs in the on-going relevant projects, as well as other environmental donor initiatives in the water sector indicated that the issue of water quality management remains a very high priority in relation to the improvement of irrigation management. This includes: (i) regulations, standards and enforcement concerning the reuse of drainage water for irrigation; (ii) uncontrolled discharge of domestic pollution loads into irrigation and drainage systems and their impacts on public health; (iii) water quality monitoring results at the national and localized levels and their utilization as a decision-making tool; and (iv) problems of cross-sectoral coordination for water quality management. In addition, the issue of environmental assessment capacity and enforcement is important both at the different sectors and the ministry as a whole. Overall, the project is expected to generate a number of positive environmental impacts through contributing to improved land and water management in the irrigated agricultural sector of Egypt. The rehabilitation of the infrastructure will help maintain the water tables at low levels, and thus prevent water logging and soil salinization. The on-farm irrigation component will lead to a more efficient and thus reduced use of irrigation water, as well as to increased yields due to the introduction of on-demand irrigation. The project will seek to secure GEF grant financing to support the capacity building, institutional set-up and potential pilot infrastructure for integrated water quality and environmental management in the water sector. This will fit within the integrated approach adopted for the IIIMP bringing together the different stakeholders within and outside the ministry, including beneficiaries. The project preparation will review earlier environmental assessments undertaken by USAID and IIP, as well as results from on-going World Bank, METAP and other donor operations to determine the scope of the TOR for the preparation of an Environmental Management Plan (EMP) for the project. The EMP will address: (i) strengthening of the environmental assessment and management capacity of MWRI and its different relevant sectors; (ii) setting-up of successful coordination and implementation mechanisms for water quality management, including monitoring; (iii) reporting and enforcement; (iv) supporting for small-scale infrastructure to mitigate potential adverse impacts of water quality deterioration; and (v) final disseminating of the lessons learned to benefit other areas with similar problems at the basin or regional levels. Finally, the EMP is envisaged to include clear mechanisms for monitoring of successful implementation with the full participation of all relevant stakeholders. Extensive consultation on the EA and the EMP would take place with all concerned stakeholders during project preparation and before project appraisal. C. Safeguard Policies Triggered (from PDS) (click on for a detailed desciption or click on the policy number for a brief description) Policy Triggered Environmental Assessment (OP 4.01, BP 4.01, GP 4.01) Yes No TBD Natural Habitats (OP 4.04, BP 4.04, GP 4.04) Yes No TBD Forestry (OP 4.36, GP 4.36) Yes No TBD Pest Management (OP 4.09) Yes No TBD Cultural Property (OPN 11.03) Yes No TBD Indigenous Peoples (OD 4.20) Yes No TBD

5 5 Involuntary Resettlement (OP/BP 4.12) Yes No TBD Safety of Dams (OP 4.37, BP 4.37) Yes No TBD Projects in International Waters (OP 7.50, BP 7.50, GP 7.50) Yes No TBD Projects in Disputed Areas (OP 7.60, BP 7.60, GP 7.60)* Yes No TBD Section II - Key Safeguard Issues and Their Management D. Summary of Key Safeguard Issues. Please fill in all relevant questions. If information is not available, describe steps to be taken to obtain necessary data. II.D.1a. Describe any safeguard issues and impacts associated with the proposed project. Identify and describe any potential large scale, significant and/or irreversible impacts. OP 4.01 has been triggered on account of the potential adverse impacts of project works related to irrigation and drainage infrastructure. This will be assessed through an environmental assessment to be completed prior to appraisal. Safeguard issues related to natural habitat (OP 4.04) will be assessed to verify any significant impacts not already covered under OP As the target population which will benefit from the project is estimated at about 220,000 farm households which is based on the prevailing land ownership and cropping patterns, most of the farmers in the project area are smallholders who have an average size of land holding of two feddans. As 63% of the poor and 74% of the ultra poor in Egypt live in rural areas, increasing productivity of agriculture remains an important prerequisite for increasing the income of the rural poor in a sustainable manner. As mentioned earlier in the PCD, the alleviation of rural poverty, in particular, is cited in the CAS as the most relevant target for the coming years. II.D.1b. Describe any potential cumulative impacts due to application of more than one safeguard policy or due to multiple project component. The environmental impact of the project are expected to be minor and there are no irreversible adverse environmental impacts generated by the proposed project since all its individual and integrated components have been the subject of highly successful World Bank cofinanced projects in the last three decades. Overall, the project is expected to have a positive environmental impact and contribute to improved land and water management in the irrigated agricultural sector in Egypt. In particular, the on-farm irrigation improvement will lead to a more optimum use of water thus resulting in more produce for less irrigation water. The project will also help improve the drainage of irrigated areas, thus reducing the possibilities of water logging and soil salinization in addition to monitoring the reuse of drainage water in mixing with irrigation water in addition to effects of agricultural, industrial and domestic vast pollution in the irrigation and drainage conveyance channels. II.D.1c Describe any potential long term impacts due to anticipated future activities in the project area. No potential long-term or cumulative impacts on the ecosystem are expected to result from the project. However, this will be verified during the environmental assessment. II.D.2. In light of 1, describe the proposed treatment of alternatives (if required) If alternatives are required, then they will be identified and included in the project preparation. II.D.3. Describe arrangement for the borrower to address safeguard issues Generally speaking, a minimum of pesticides is used in Egypt with the main reliance being on Integrated

6 6 Pest Management (IPM) where the use of pesticides is reduced considerably. This will however need to be further verified during the preparation stage. II.D.4. Identify the key stakeholders and describe the mechanisms for consultation and disclosure on safeguard policies, with an emphasis on potentially affected people. The project would expand the coverage and role of participatory WUAs and coordinate their activities with other agencies on a command area basis, where they exist in the same area. In addition, beneficiaries in 'basic units' would be represented on pilot Water Boards in the project area, which will be determined during project preparation, in coordination with the management of the ongoing Water Boards Project. The Social Assessment, which will be part of the project preparation stage, will include : (a) the assessment and incorporation of the social lessons of the ongoing IIP and also ongoing NDP and Pumping Stations Rehabilitation Project; (b) ensure that farmers' needs are taken into consideration in project design; (c) identify social constraints or problems that could put the execution of the proposed project at risk; and (d) provide recommendations for effective farmer involvement. The SA will also ascertain whether any of the social safeguards will apply. Workshops will be organized as part of project preparation to solicit user views and concerns. E. Safeguards Classification (select in SAP). Category is determined by the highest impact in any policy. Or on basis of cumulative impacts from multiple safeguards. Whenever an individual safeguard policy is triggered the provisions of that policy apply. [ ] S1. Significant, cumulative and/or irreversible impacts; or significant technical and institutional risks in management of one or more safeguard areas [X] S2. One or more safeguard policies are triggered, but effects are limited in their impact and are technically and institutionally manageable [ ] S3. No safeguard issues [ ] SF. Financial intermediary projects, social development funds, community driven development or similar projects which require a safeguard framework or programmatic approach to address safeguard issues.

7 7 F. Disclosure Requirements Environmental Assessment/Analysis/Management Plan: Expected Actual Date of receipt by the Bank 12/1/2003 Date of in-country disclosure 1/15/2004 Date of submission to InfoShop 2/17/2004 Date of distributing the Exec. Summary of the EA to the Executive Directors (For category A projects) Not Applicable Not Applicable Resettlement Action Plan/Framework: Expected Actual Indigenous Peoples Development Plan/Framework: Expected Actual Pest Management Plan: Expected Actual Dam Safety Management Plan: Expected Actual If in-country disclosure of any of the above documents is not expected, please explain why. Signed and submitted by Name Date Task Team Leader: Usaid I. El-Hanbali 06/09/2003 Project Safeguards Specialists 1: Allan Rotman/Person/World Bank 06/16/2003 Project Safeguards Specialists 2: Concepcion Esperanza Del Castillo/Person/World 06/10/2003 Bank Project Safeguards Specialists 3: Approved by: Name Date Regional Safeguards Coordinator: Hocine Chalal 06/16/2003 Sector Manager/Director Sherif Kamel F. Arif 06/17/2003

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:

More information

4 foshop ThtWd ILj^ ik

4 foshop ThtWd ILj^ ik Public Disclosure Authorized THE WORLD BANK GROUP 4 foshop ThtWd ILj^ ik Integrated Safeguards Data Sheet (Updated) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 11/14/2009 Report.: AC4826 1. Basic Project Data Country: Sudan Project ID: P111061 Project Name: Southern Sudan

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 05-Mar-2014

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/28/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No.: 38582 Date ISDS Prepared/Updated: 16 January 2007 I. BASIC INFORMATION A.

More information

Large Marine Ecosystem Management Activities (US$5.62)

Large Marine Ecosystem Management Activities (US$5.62) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No: I048795

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 12/27/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: June 10, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Brazil Project Name: Brasilia Environmentally Sustainable Pro

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/27/2011 1. Basic Project Data Original

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/14/2011 1. Basic Project Data Original

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 14-Apr-2014

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATA SHEET Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Date ISDS Prepared/Updated:

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 23-Mar-2015 Report No.: ISDSC 12226 Date ISDS Approved/Disclosed: 06-Apr-2015 Public Disclosure Authorized

More information

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name. Parent Project Name. Region Country Sector(s) Theme(s)

PROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name. Parent Project Name. Region Country Sector(s) Theme(s) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument

More information

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE

INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 29-Sep-2015 Report No.: ISDSC14538 Date ISDS Approved/Disclosed: 15-Oct-2015 Public Disclosure Authorized

More information

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS)

Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) te to Task Teams: The following sections are system generated and can only be edited online in the Portal. Project Information Document/ Integrated Safeguards Data Sheet (PID/ISDS) Concept Stage Date Prepared/Updated:

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA Project Name. Region. Country Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: PIDA14823 Project Name

More information

OPERATIONAL GUIDLINES OF BOAD

OPERATIONAL GUIDLINES OF BOAD ARID AND SEMI-ARID ZONES 1. The West Africa arid zone is a natural environment with low productivity, the main factor limiting biological production in general is the lack of water. If we can overcome

More information

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name Balochistan Small Scale Irrigation Project Region SOUTH ASIA

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s) Implementing Agency Environmental Category Date PID Prepared/ Updated

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s)

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/06/2011 INTEGRATED SAFEGUARDS DATASHEET

More information

Appendix 1: Scoping Techniques

Appendix 1: Scoping Techniques Appendix 1: Scoping Techniques 1 Scoping Techniques Checklist technique Checklist technique is used for identifying the project impacts. Such lists usually cover all possible impacts of the project. In

More information

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-72910) ON A LOAN IN THE AMOUNT OF US$120 MILLION TO THE ARAB REPUBLIC OF EGYPT FOR AN

IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-72910) ON A LOAN IN THE AMOUNT OF US$120 MILLION TO THE ARAB REPUBLIC OF EGYPT FOR AN Public Disclosure Authorized Document of The World Bank Report No: ICR00003931 Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IBRD-72910) ON A LOAN

More information

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify)

PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION. GEF: OTHER(S) (Specify) PROJECT CONCEPT PRELIMINARY QUESTIONAIRE PART I: GENERAL INFORMATION Interested Organization Name: Project Location: Projected amount of required project funding ($ /USD): TOTAL: Project Sector or Similar:

More information

Environmental and Social Management Framework (ESMF)

Environmental and Social Management Framework (ESMF) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic Of Yemen Presidency of the Council of Ministers Social Fund for Development

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 03/17/2010 INTEGRATED SAFEGUARDS DATASHEET

More information

DEMOCRACTIC REPUBLIC OF CONGO Implementing Agency Democratic Republic of Congo Congo, Democratic Republic of

DEMOCRACTIC REPUBLIC OF CONGO Implementing Agency Democratic Republic of Congo Congo, Democratic Republic of Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB2795 Regional

More information

Middle East and North Africa

Middle East and North Africa IWMI Research Middle East and North Africa Groundwater Revitalizing canal irrigation Sustainability of the Nile Delta and its water and salt balances Reusing saline water and restoring salt-affected land

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 04-Apr-2014

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.:51272 Project Name Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report.:51272 Project Name CBF Sidi

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name CBF Sidi Daoud Wind Farm

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. West Africa Agricultural Productivity Program APL (WAAPP-1B) Region

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. West Africa Agricultural Productivity Program APL (WAAPP-1B) Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE West Africa Agricultural

More information

Ancha Srinivasan, Ph.D. Asian Development Bank

Ancha Srinivasan, Ph.D. Asian Development Bank MDB-Country Collaboration, Programmatic Approach and Integration into National REDD+ Agenda: A Few Insights from Preparing the Investment Plan for Indonesia Ancha Srinivasan, Ph.D. Asian Development Bank

More information

Liberia Development Forestry Sector Management Project

Liberia Development Forestry Sector Management Project Questions & Answers Q1: What has been the World Bank s role in the Liberia forestry sector and what has been the impact of the Liberia Development Forestry Sector Management Project? Since 2004, the Bank

More information

World Bank Group Recruitment Drive (TOR for Future Vacancies)

World Bank Group Recruitment Drive (TOR for Future Vacancies) World Bank Group Recruitment Drive (TOR for Future Vacancies) The World Bank Group is launching a recruitment drive aimed at attracting qualified candidates to fill positions in selected areas. Employment

More information

MILLENNIUM DEVELOPMENT GOALS AND CLIMATE CHANGE ADAPTATION

MILLENNIUM DEVELOPMENT GOALS AND CLIMATE CHANGE ADAPTATION MILLENNIUM DEVELOPMENT GOALS AND CLIMATE CHANGE ADAPTATION THE CONTRIBUTION OF UNDP-GEF ADAPTATION INITIATIVES TOWARDS MDG1 Issue No.1: Eradicate Extreme Poverty and Hunger - from Climate Change United

More information

Pro-Poor Interventions in Irrigated Agriculture in Andhra Pradesh

Pro-Poor Interventions in Irrigated Agriculture in Andhra Pradesh Pro-Poor Interventions in Irrigated Agriculture in Andhra Pradesh C. Sithapathi Rao * IRRIGATION IN ANDHRA PRADESH Andhra Pradesh (AP) is the fifth largest State in India with a geographical area of 2.75

More information

Distribution: Restricted EB 99/68/R November 1999 Original: English Agenda Item 9(c) English

Distribution: Restricted EB 99/68/R November 1999 Original: English Agenda Item 9(c) English Distribution: Restricted EB 99/68/R.32 10 November 1999 Original: English Agenda Item 9(c) English IFAD Executive Board Sixty-Eighth Session Rome, 8-9 December 1999 REPORT AND RECOMMENDATION OF THE PRESIDENT

More information

General agriculture, fishing and forestry sector (60%);General water, sanitation and flood protection sector (40%) Project ID

General agriculture, fishing and forestry sector (60%);General water, sanitation and flood protection sector (40%) Project ID Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4235 Eastern

More information

IGF Geneva 2016 MPF-SDG Comparative Analysis. Perrine Toledano CCSI, Head: Extractive Industries

IGF Geneva 2016 MPF-SDG Comparative Analysis. Perrine Toledano CCSI, Head: Extractive Industries IGF Geneva 2016 MPF-SDG Comparative Analysis Perrine Toledano CCSI, Head: Extractive Industries SDG and MPF: Can they connect? The Sustainable Development Goals (SDGs) form the post-2015 global development

More information

RURAL FINANCE

RURAL FINANCE RURAL FINANCE General Useful Resources Organizations and events Rural Finance Learning Center Rural Finance is about providing financial services for people living in rural areas. This Learning Centre

More information

I Fifth Power System Development Project SOUTH ASIA Power (100%) P POWERGRID CORPORATION OF INDIA LIMITED

I Fifth Power System Development Project SOUTH ASIA Power (100%) P POWERGRID CORPORATION OF INDIA LIMITED I Project Name Region Sector Project ID Borrower(s) Implementing Agency Environment Category Date PID Prepared Date of Appraisal Authorization Date of Board Approval PROJECT INFORMATION DOCUMENT (PID)

More information

Drainage to sustain irrigated agriculture in North-Africa

Drainage to sustain irrigated agriculture in North-Africa Drainage to sustain irrigated agriculture in North-Africa Henk Ritzema and Safwat Abdel-Dayem Reprint chapter 7 of Alterra Report 2227 (ISSN 1566-7197): Knowledge compendium, Dialogue on bridging water,

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name. EGAT And PEA Advancing Clean Energy Investment - CTF Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name. EGAT And PEA Advancing Clean Energy Investment - CTF Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5800 Project Name EGAT

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Document of The World Bank FOR OFFICIAL USE ONLY PROJECT APPRAISAL DOCUMENT ON A PROPOSED

More information

Participatory rural planning processes

Participatory rural planning processes Rural Transport Training Materials Module 2: Planning, Design, Appraisal and Implementation Participatory rural planning processes Session 2.1 Part 1 Presentation 2.1a The Training Modules Module1. Policies

More information

Peru, Guarantee Facility Project

Peru, Guarantee Facility Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Peru, Guarantee Facility Project Environmental and Social Management Framework (ESMF)

More information

INTEGRATED SAFEGUARDS DATA SHEET

INTEGRATED SAFEGUARDS DATA SHEET Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET Date ISDS Prepared/Updated: 21 March 2005 I. BASIC INFORMATION

More information

Proposed development of training in BMPs (Better Management Practices) for smallholders producing oil palm in Sumatra

Proposed development of training in BMPs (Better Management Practices) for smallholders producing oil palm in Sumatra Proposed development of training in BMPs (Better Management Practices) for smallholders producing oil palm in Sumatra Abstract The International Finance Corporation (IFC), which is the private sector finance

More information

Understanding Mesqa and Marwa Water Management Practices in IIP areas of the Nile Delta. Siraj Dutta. Final Report

Understanding Mesqa and Marwa Water Management Practices in IIP areas of the Nile Delta. Siraj Dutta. Final Report Understanding Mesqa and Marwa Water Management Practices in IIP areas of the Nile Delta Siraj Dutta Final Report 2013 Water and salt management in the Nile Delta: Report No. 3 2 Understanding Mesqa and

More information

Report No.: ISDSA13100

Report No.: ISDSA13100 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized o Date ISDS Prepared/Updated: 10-Sep-2015 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

WEC IWRM Seminar Sana a March 2010

WEC IWRM Seminar Sana a March 2010 Components of IWRM study program at WEC and its relevance to water sector in Yemen by Prof. Dr.Abdulla Babaqi WEC IWRM Seminar Sana a 15-16 March 2010 Outline Current situation of the water sector Needs

More information

SESA Terms of Reference FOREST CARBON PARTNERSHIP FACILITY (FCPF) INDONESIA: STRATEGIC ENVIRONMENTAL AND SOCIAL ASSESSMENT (SESA) 1

SESA Terms of Reference FOREST CARBON PARTNERSHIP FACILITY (FCPF) INDONESIA: STRATEGIC ENVIRONMENTAL AND SOCIAL ASSESSMENT (SESA) 1 SESA Terms of Reference Updated Draft subject to final consultation FOREST CARBON PARTNERSHIP FACILITY (FCPF) INDONESIA: STRATEGIC ENVIRONMENTAL AND SOCIAL ASSESSMENT (SESA) 1 May 25, 2011 These TORs are

More information

Rural Restructuring Agency LIVESTOCK SECTOR DEVELOPMENT PROJECT IN THE REPUBLIC OF UZBEKISTAN. Environmental and Social Management Framework

Rural Restructuring Agency LIVESTOCK SECTOR DEVELOPMENT PROJECT IN THE REPUBLIC OF UZBEKISTAN. Environmental and Social Management Framework Rural Restructuring Agency LIVESTOCK SECTOR DEVELOPMENT PROJECT IN THE REPUBLIC OF UZBEKISTAN Environmental and Social Management Framework February 2017 Content LIST OF ABBREVIATIONS AND ACRONYMS 3 SUMMARY

More information

ZIMBABWE CASE STUDY ZIMBABWE: COPING WITH DROUGHT AND CLIMATE CHANGE DECEMBER Country. Region. Key Result Area. UNDP Project ID 3785

ZIMBABWE CASE STUDY ZIMBABWE: COPING WITH DROUGHT AND CLIMATE CHANGE DECEMBER Country. Region. Key Result Area. UNDP Project ID 3785 ZIMBABWE: COPING WITH DROUGHT AND CLIMATE CHANGE DECEMBER 2010 Country Zimbabwe [http://www.adaptationlearning.net/country-profiles/zw] Region Eastern Africa Key Result Area Agriculture/Food Security Disaster

More information

REQUIRED DOCUMENT FROM HIRING UNIT

REQUIRED DOCUMENT FROM HIRING UNIT Terms of reference GENERAL INFORMATION Title: GEF Biodiversity Mainstreaming and Project Design Specialists (International Consultant) Project Name : PPG Strengthening Forest Area Planning and Management

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan 1.Name of the Project Country: The Republic of Indonesia Project: Upper Citarum Basin Flood Management Sector Loan Loan Agreement: March 28,

More information

& Watershed Management Practices. 4 Sustainable Watershed Management

& Watershed Management Practices. 4 Sustainable Watershed Management Module 2 (L4) Sustainable Watershed Approach & Watershed Management Practices 4 Sustainable Watershed Management 1 1 L4 Sustainable Watershed Management Topics Covered Introduction to the concept of sustainable

More information

Report and Recommendation of the President to the Board of Directors. Proposed Grant Nepal: Water Resources Project Preparatory Facility

Report and Recommendation of the President to the Board of Directors. Proposed Grant Nepal: Water Resources Project Preparatory Facility Report and Recommendation of the President to the Board of Directors Project Number: 45206 June 2012 Proposed Grant Nepal: Water Resources Project Preparatory Facility CURRENCY EQUIVALENTS (as of 30 May

More information

The IEG report How Effective Have Poverty and Social Impact Analyses Been? was discussed by CODE on June 3, 2009

The IEG report How Effective Have Poverty and Social Impact Analyses Been? was discussed by CODE on June 3, 2009 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized FAST TRACK BRIEF June 3, 2009 The IEG report How Effective Have Poverty and Social Impact

More information

Poverty and Social Impact Analysis (PSIA): common themes and issues arising from five pilot studies.

Poverty and Social Impact Analysis (PSIA): common themes and issues arising from five pilot studies. Poverty and Social Impact Analysis (PSIA): common themes and issues arising from five pilot studies. Prepared for the Joint World Bank/IMF/DFID PSIA Workshop, October 15-17, 2002 Lucia Hanmer & Barbara

More information

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India ENVIRONMENTAL IMPACT ASSESSMENT (EIA) Dr. B. K. Bindhani Assistant Professor KIIT School of Biotechnology KIIT University, Bhubaneswar, Orissa, India Review: Definition of EIA Environmental Impact Assessment

More information

Ex-ante Evaluation - 1 -

Ex-ante Evaluation - 1 - Ex-ante Evaluation 1. Name of the Project Country: The Socialist Republic of Vietnam Project: Hue City Water Environment Improvement Project (Loan Agreement: March 31, 2008; Loan Amount: 20,883 million

More information

Analysis of the final version of Cameroon s R-PP

Analysis of the final version of Cameroon s R-PP Analysis of the final version of Cameroon s R-PP CAMEROON presented its Readiness Preparation Proposal (R-PP) for assessment by the FCPF Participants Committee (PC) at its 13 th meeting held in October

More information

Food and Agriculture Organization of the United Nations in Lebanon

Food and Agriculture Organization of the United Nations in Lebanon Projects Brief Lebanon 2015 Projects Brief Lebanon 2015 Contribute to the promotion of rural development and poverty alleviation, through supporting to the agricultural production systems to overcome agricultural

More information

E2586. Environmental and Social Management Framework for Afghanistan On-Farm Water Management Project

E2586. Environmental and Social Management Framework for Afghanistan On-Farm Water Management Project Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Environmental and Social Management Framework for Afghanistan On-Farm Water Management

More information

National Drainage Program Project in Pakistan

National Drainage Program Project in Pakistan National Drainage Program Project in Pakistan IRN Comment on the Inspection Panel Report and the Management Response Prepared by Ann Kathrin Schneider, International Rivers Network, email: akschneider@irn.org,

More information

Improving Agricultural Productivity, Water Use Efficiency and Strengthening Rural Livelihoods

Improving Agricultural Productivity, Water Use Efficiency and Strengthening Rural Livelihoods Improving Agricultural Productivity, Water Use Efficiency and Strengthening Rural Livelihoods M A Akmall Hossain Azad Additional Secretary, Ministry of Agriculture Government of the People s Republic of

More information

Honduras experience on NAP

Honduras experience on NAP Honduras experience on NAP Climate Change in Honduras Climate vulnerability is composed of three main components: exposure, sensitivity and adaptive capacity. In addition to the climatic conditions and

More information

BURKINA FASO FOREST INVESTMENT PROGRAMME. GENERAL PRESENTATION FIP/REDD+ Ministry of Environment and Sustainable Development of Burkina Faso

BURKINA FASO FOREST INVESTMENT PROGRAMME. GENERAL PRESENTATION FIP/REDD+ Ministry of Environment and Sustainable Development of Burkina Faso BURKINA FASO FOREST INVESTMENT PROGRAMME GENERAL PRESENTATION FIP/REDD+ Ministry of Environment and Sustainable Development of Burkina Faso CUIABA, 20-25 October 2014 BRAZIL PRESENTATION PLAN RATIONAL

More information

REVISED TERMS OF REFERENCE

REVISED TERMS OF REFERENCE REVISED TERMS OF REFERENCE Revised sections are highlighted in red Consultancy: Baseline study for the Enhancing crop yields and profitability in Kenya through biological plant protection project 1. Background

More information

BOSNIA AND HERZEGOVINA

BOSNIA AND HERZEGOVINA Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Adriatic Sea Environmental Pollution Control Project (I) Croatia and Bosnia and Herzegovina

More information

( ) Page: 1/10 NOTIFICATION

( ) Page: 1/10 NOTIFICATION 20 September 2016 (16-4994) Page: 1/10 Committee on Agriculture Original: Spanish NOTIFICATION The following submission, dated 12 September 2016, is being circulated at the request of the delegation of

More information

REPUBLIC OF UZBEKISTAN

REPUBLIC OF UZBEKISTAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized REPUBLIC OF UZBEKISTAN Horticulture Development Project (HDP) Environmental Management

More information

Stakeholders Analysis Report City of Alexandria Egypt. By: Center for Environment and Development in the Arab Region and Europe (CEDARE)

Stakeholders Analysis Report City of Alexandria Egypt. By: Center for Environment and Development in the Arab Region and Europe (CEDARE) Stakeholders Analysis Report City of Alexandria Egypt By: Center for Environment and Development in the Arab Region and Europe (CEDARE) October 2007 TABLE OF CONTENTS List of Acronyms...3 1. Introduction...4

More information

Sowing opportunities to reap the fruits of development.

Sowing opportunities to reap the fruits of development. The Emilia-Romagna Rural Development Programme 2014-2020 The Emilia-Romagna Rural Development Programme 2014-2020 The European Agricultural Fund for Rural Development Europe investing in rural areas Sowing

More information

Overall Planning and Preparation Process. BAU Business as Usual NAMA Nationally Appropriate Mitigation Actions

Overall Planning and Preparation Process. BAU Business as Usual NAMA Nationally Appropriate Mitigation Actions Lebanon Acknowledgments 2016 International Bank for Reconstruction and Development/The World Bank 1818 H Street NW Washington DC 20433, U.S.A. Internet: www.worldbank.org Introduction In response to a

More information

Bhutan Country Environmental Safeguard Review

Bhutan Country Environmental Safeguard Review Report No. 43785-BT Bhutan Country Environmental Safeguard Review May 22, 2008 Social, Environment and Water Resources Management Unit Sustainable Development Department South Asia Region Document of the

More information

Annex XX. Demonstration Projects, scope, selection criteria s and location

Annex XX. Demonstration Projects, scope, selection criteria s and location Annex XX. Demonstration Projects, scope, selection criteria s and location The full development of the demonstration projects were not foreseen during the Project Preparation Phase, due to the lack of

More information

MINISTÈRE DES AFFAIRES ÉTRANGÈRES ET EUROPÉENNES 20 December /5 6th World Water Forum Ministerial Process Draft document

MINISTÈRE DES AFFAIRES ÉTRANGÈRES ET EUROPÉENNES 20 December /5 6th World Water Forum Ministerial Process Draft document MINISTÈRE DES AFFAIRES ÉTRANGÈRES ET EUROPÉENNES 20 December 2011 1/5 6th World Water Forum Ministerial Process Draft document 1. We the Ministers and Heads of Delegations assembled in Marseille, France,

More information

Water Supply Water Quality Water Reuse and Conservation Watershed Management Interagency Coordination

Water Supply Water Quality Water Reuse and Conservation Watershed Management Interagency Coordination WATER ELEMENT INTRODUCTION Water is one of the most critical resources for the Merced County economy and for the quality of life of its residents. Both surface water and groundwater supplies are an important

More information

Incorporating Climate Change Considerations into an Agriculture Investment Project. - A Case Study from the WB funded IMAD Project in China

Incorporating Climate Change Considerations into an Agriculture Investment Project. - A Case Study from the WB funded IMAD Project in China Incorporating Climate Change Considerations into an Agriculture Investment Project - A Case Study from the WB funded IMAD Project in China Outlines 1 2 3 4 5 IMAD Background The Way of Incorporating CC

More information

Permits To Take Water (PTTW)

Permits To Take Water (PTTW) Permits To Take Water (PTTW) Presentation to: CTC Source Protection Committee Provided by: Harald Schraeder Ministry of the Environment Operations Division Program Specialist (Water) April 7, 2009 1 Objectives

More information

Post Harvest / Linking Farmers to the Market FAO-GFAR /AARINENA

Post Harvest / Linking Farmers to the Market FAO-GFAR /AARINENA Organic Farming: Realizing a market growth opportunity: Utilization and Enhancement of Organic Agriculture in the AARINENA Region in Dates, Olives, Medicinal Herbs and Cotton Sub-sectors. Post Harvest

More information

Page 1 of 6. (As adopted during the last session of UNFF10 on Saturday 20 April 2013)

Page 1 of 6. (As adopted during the last session of UNFF10 on Saturday 20 April 2013) Resolution of Working Group One on Progress in implementation of the non-legally binding instrument on all types of forests (Item 3), Regional and subregional inputs (Item 4), Forests and economic development

More information

Presentation to the National Climate Change Country Team and Other Stakeholders. Suva, 29 March, John E. Hay (GOPA Team Leader)

Presentation to the National Climate Change Country Team and Other Stakeholders. Suva, 29 March, John E. Hay (GOPA Team Leader) Presentation to the National Climate Change Country Team and Other Stakeholders Suva, 29 March, 2011 John E. Hay (GOPA Team Leader) Presentation to the National Climate Change Country Team and Other Stakeholders

More information

Farmers Perception about the Extension Services and Extension Workers: The Case of Organic Agriculture Extension Program by PROSHIKA

Farmers Perception about the Extension Services and Extension Workers: The Case of Organic Agriculture Extension Program by PROSHIKA American Journal of Agricultural and Biological Sciences 4 (4): 332-337, 2009 ISSN 1557-4989 2009 Science Publications Farmers Perception about the Extension Services and Extension Workers: The Case of

More information

MONCONSULT Ltd. Consulting Staffing Support. A Better Service For Good Results

MONCONSULT Ltd. Consulting Staffing Support. A Better Service For Good Results MONCONSULT Ltd Consulting Staffing Support A Better Service For Good Results Letter from the Managing Director Proposed Consulting Services Development and Poverty Alleviation Community Led Development

More information

LIVESTOCK SECTOR DEVELOPMENT PROJECT

LIVESTOCK SECTOR DEVELOPMENT PROJECT SFG3255 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Rural Restructuring Agency LIVESTOCK SECTOR DEVELOPMENT PROJECT IN THE REPUBLIC

More information

POLICY BRIEF. Vol 1 Issue 2. Land Resources Management Policy and Strategy

POLICY BRIEF. Vol 1 Issue 2. Land Resources Management Policy and Strategy POLICY BRIEF Vol 1 Issue 2 Land Resources Management Policy and Strategy Acknowledgement and Disclaimer This Policy Brief has been produced with the financial assistance of the Development Fund of Norway,

More information

Combined Project Information Documents / Integrated Safeguards Datasheet (PID/ISDS)

Combined Project Information Documents / Integrated Safeguards Datasheet (PID/ISDS) Note to Task Teams: The following sections are system generated and can only be edited online in the Portal. Combined Project Information Documents / Integrated Safeguards Datasheet (PID/ISDS) Appraisal

More information

Terms of Reference (ToR) End-of-the Programme Evaluation UNDP Support to Inclusive Participation in Governance May 2013

Terms of Reference (ToR) End-of-the Programme Evaluation UNDP Support to Inclusive Participation in Governance May 2013 Terms of Reference (ToR) End-of-the Programme Evaluation UNDP Support to Inclusive Participation in Governance May 2013 1. Introduction In April 2007, the United Kingdom, Department for International Development

More information

REQUEST FOR PROJECT/PROGRAMME FUNDING FROM THE ADAPTATION FUND

REQUEST FOR PROJECT/PROGRAMME FUNDING FROM THE ADAPTATION FUND REQUEST FOR PROJECT/PROGRAMME FUNDING FROM THE ADAPTATION FUND The annexed form should be completed and transmitted to the Adaptation Fund Board Secretariat by email or fax. Please type in the responses

More information

This project will support the development of a sewerage service targeting districts not

This project will support the development of a sewerage service targeting districts not Ex-Ante Evaluation 1. Name of Project Country: The Republic of Indonesia Project: Denpasar Sewerage Development Project (II) Loan Agreement: March 28, 2008 Loan Amount: 6,004 million yen Borrower: The

More information

Arab Republic of Egypt

Arab Republic of Egypt Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Arab Republic of Egypt Safeguards Diagnostic Review For Piloting the Use of Egyptian

More information