INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
|
|
- Antony Garrett
- 6 years ago
- Views:
Transcription
1 INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: June 10, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Brazil Project Name: Brasilia Environmentally Sustainable Pro Estimated Appraisal Date: January 27, 2005 Managing Unit: LCSEN Sector: General water, sanitation and flood protection sector (100%) Project ID: P Task Team Leader: Paula Dias Pini Estimated Board Date: May 20, 2005 Report No.: AC902 Lending Instrument: Specific Investment Loan Theme: Pollution management and environmental health (P);Other social development (S);Other urban development (S);Environmental policies and institutions (S);Water resource management (S) Safeguard Policies Specialists in the task team: Paula Pini, A.J. Glauber Loan amount ($m.): IBRD: 57.5 Other financing amounts by source: B. Project Objectives [from section 2 of PCN] To ensure quality water resources to meet the growing needs of the Federal District and the Brasília Metropolitan Region, through environmental planning and management activities implemented at the regional level, integrated with poverty reduction interventions and environmental rehabilitation in the most critical watersheds. C. Project Description [from section 3 of PCN] Total project cost is estimated at US$ 115 million. A Specific Investment Loan (SIL) of US$57.5 million is proposed. The FD proposed project has two complementary axes: (i) regional development policies, regulation and planning, including enhancing institutional capacity; and (ii) targeted interventions focusing on poverty alleviation associated with rehabilitating, restoring and protecting strategic environmentally sensitive areas. Targeted interventions focus on two river basins: (i) Descoberto, which produces 60 % of the water supplied to the FD and (ii) Lago Paranoá, a landmark reservoir with recreational value and climate control attributes. The main pollution source of the Descoberto reservoir is the Aguas Lindas poor settlement, located in Goiás but draining into the FD territory. Vila Estrutural and the Joquei Clube dumpsite (serving ($m)
2 the entire FD population) put pressure on the contiguous National Park of Brasília, created to protect the Cerrado Biome, as well as many springs that feed into the Lago Paranoá. These low income settlements have unsatisfactory water supply services and inexistent sanitation resulting in a high negative impact on the Descoberto and Lago Paranoá. These services would be provided by under the project through the DF water utility, in association with the Goiás water utility. An institutional arrangement has already been set with the Municipality of Águas Lindas. Component 1- Policy and institutional development: The component would: (i) support regional development and improve technical and legal tools for effectively implementing regionally integrated management; (ii) strengthen WRM management capacities; (iii) enhance environmental management capacity through improvements in institutional arrangements and technical tools at the regional level, and (iv) promote institutional development in key FD agencies such as BELACAP, which manages the city solid waste collection and disposal, SEDUH, responsible for the territory planning, and SEMARH, charged with natural resources management. Institution building activities would include modernization of information and administrative systems to include regional integration duties, training; introduction of new organizational schemes for regional planning and management activities and coordination. Component 2 - Social inclusion and poverty reduction: This component directly addresses poverty, urban services and environmental quality issues in unregulated settlements. Urban development, services and works will be designed and implemented in Vila Estrutural, with the active participation of community members in the decision-making and implementation process. Focused poverty reduction interventions include employment and income generation specially to the population involved with scavenging activities in the Joquei Clube open waste dumpsite. Development of entrepreneurial capacities in recycling and small business will be supported. Component 3 - Water resource management and protection: This component would (i) provide access to improved water and sanitation services to Aguas Lindas; (ii) phase out and remediate the Joquei Clube solid waste dumpsite; (iii) implement a 25-year solid waste management program for Brasília, including construction of sanitary landfill facilities and (iv) finance environmental conservation subprojects in key watersheds to recover degraded areas. Other activities include modeling of private-public partnerships and microenterprise development for waste recycling activities. Component 4 - Project management, Monitoring and Evaluation: Project management, monitoring and evaluation would focus on the establishment of the project management unit and corresponding planning and management support systems, including administrative, financial, procurement, reporting and monitoring systems needed for successful project implementation. D. Project location (if known) Brazil, Federal District of Brasília. The institutional actions are intended to apply to the entire territory of the Federal District, while the physical improvements target only two critical river basins within the Federal District. A small area of one of these river basins extends to the territory of the state of Goiás.
3 E. Borrower s Institutional Capacity for Safeguard Policies [from PCN] The Federal District of Brasilia invests an average of US$ 100 million per year with own resources and external financing. To execute these investments, the FD have been complying with the national and international safeguards, mainly regarding the environmental and resettlement safeguards. II. SAFEGUARD POLICIES THAT MIGHT APPLY Applicable? Safeguard Policy If Applicable, How Might It Apply? [X] Environmental Assessment (OP/BP 4.01) [X] Natural Habitats (OP/BP 4.04) [ ] Pest Management (OP 4.09) [X] Involuntary Resettlement (OP/BP 4.12) [ ] Indigenous Peoples (OD 4.20) [ ] Forests (OP/BP 4.36) [ ] Safety of Dams (OP/BP 4.37) [ ] Cultural Property (draft OP OPN 11.03) [ ] Projects in Disputed Areas (OP/BP/GP 7.60) * [ ] Projects on International Waterways (OP/BP/GP 7.50) Environmental Assessment Category: [X] A [ ] B [ ] C [ ] FI [ ] TBD (to be determined) III. SAFEGUARD PREPARATION PLAN A. Target date for the Quality Enhancement Review (QER), at which time the PAD-stage ISDS would be prepared. November 04. B. For simple projects that will not require a QER, the target date for preparing the PAD-stage ISDS * By supporting the proposed project, the Bank does not intend to prejudice the final determination of the parties claims on the disputed areas
4 C. Time frame for launching and completing the safeguard-related studies that may be needed. The specific studies and their timing 1 should be specified in the PAD-stage ISDS. 3 EA will be disclosed 120 days prior to Board date. 3 A RAP or a Resettlement Framework will be prepared accordingly to the level of detail achieved at the PAD stage for the activity triggering resettlement. IV. APPROVALS Signed and submitted by: Task Team Leader: Paula Dias Pini Date Approved by: Regional Safeguards Coordinator: Name Date Comments Sector Manager: Name Date Comments 1 Reminder: The Bank s Disclosure Policy requires that safeguard-related documents be disclosed before appraisal (i) at the InfoShop and (ii) in-country, at publicly accessible locations and in a form and language that are accessible to potentially affected persons.
5
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB972 Project Name. Brasilia Environmentally Sustainable Pro Region
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB972 Project Name Brasilia Environmentally Sustainable Pro Region LATIN AMERICA AND CARIBBEAN Sector General water, sanitation and flood protection
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: November 14, 2003 I. BASIC INFORMATION A. Basic Project Data Country: China Project Name: LIUZHOU ENVIRONMENT MANAGEMENT PROJECT
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: October 21, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Western Africa Project Name: Africa Emergency Locust Project
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: August 2, 2003 I. BASIC INFORMATION A. Basic Project Data Country: Peru Project ID: P082625 Project Name: Vilcanota Valley Task
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: September 13, 2004 I. BASIC INFORMATION A. Basic Project Data Country: Mali Project Name: Second Transport Sector Project Estimated
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Report No.: 47875 INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: February 6, 2008 I. BASIC INFORMATION A. Basic Project Data Country: Brazil Project ID: P096337 Additional Project
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5832. Date ISDS Prepared/Updated: 12/22/2010 I. BASIC INFORMATION. A. Basic Project Data
Date ISDS Prepared/Updated: 12/22/2010 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5832 Country: Uruguay Project ID: P110965 Project Name: Sustainable
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC1974. Date ISDS Prepared/Updated: 02/06/2006 I. BASIC INFORMATION. A. Basic Project Data
Date ISDS Prepared/Updated: 02/06/2006 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC1974 Country: Africa Project ID: P094916 Project Name: WAPP
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2668. Date ISDS Prepared/Updated: 02/09/2007 I. BASIC INFORMATION. A. Basic Project Data
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 02/09/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC4437. Date ISDS Prepared/Updated: 08/18/2009 I. BASIC INFORMATION. A. Basic Project Data
Date ISDS Prepared/Updated: 08/18/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC4437 Country: Papua New Guinea Project ID: P116521 Project
More informationPublic Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (ISDS) Section I Basic Information Date ISDS Prepared/Updated:
More informationI Managing Unit: EASRE
Date ISDS PreparedNpdated: 08/06/07 I. BASIC INFORMATION INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE A. Basic Project Data I Country: Indonesia I Project ID: PI04022 Project Name: Makassar Landfill
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3763. Date ISDS Prepared/Updated: 07/11/2008 I. BASIC INFORMATION. A. Basic Project Data
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 07/11/2008 I. BASIC INFORMATION A. Basic Project Data INTEGRATED
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6042. Date ISDS Prepared/Updated: 01/26/2011 I. BASIC INFORMATION. A. Basic Project Data
Date ISDS Prepared/Updated: 01/26/2011 I. BASIC INFORMATION A. Basic Project Data INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6042 Country: South Asia Project ID: P115767 Project Name:
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 13-Dec-2012
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No.: 38582 Date ISDS Prepared/Updated: 16 January 2007 I. BASIC INFORMATION A.
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/28/2009 INTEGRATED SAFEGUARDS DATASHEET
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Peru Second Rural Electrification
Project Name Region Sector Project ID GEF Focal Area Global Supplemental ID Borrower(s) Implementing Agency PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Peru Second Rural Electrification Latin America
More informationC. Project Description [from section 3 of PCN] The proposed project would comprise of the following three components:
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 02/17/2012 I. BASIC INFORMATION A. Basic Project Data INTEGRATED
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3947. Date ISDS Prepared/Updated: 04/20/2009 I. BASIC INFORMATION. A. Basic Project Data
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 04/20/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC3946. Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION. A. Basic Project Data
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 01/26/2009 I. BASIC INFORMATION A. Basic Project Data INTEGRATED
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5229. Date ISDS Prepared/Updated: 04/15/2010 I. BASIC INFORMATION. A. Basic Project Data
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 04/15/2010 I. BASIC INFORMATION A. Basic Project Data INTEGRATED
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 02-Nov-2011 I. BASIC INFORMATION A. Basic Project Data INTEGRATED
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
I. Basic Information Date prepared/updated: 04/13/2006 INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Report No.: AC2194 1. Basic Project Data Country: Burkina Faso Project ID: P098956 Project Name: Post-Primary
More informationINTEGRATED SAFEGUARDS DATA SHEET INITIATION/CONCEPT STAGE
Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET INITIATION/CONCEPT STAGE Report.: 121880 Date ISDS Prepared/Updated: 4 December 2017 Public Disclosure Authorized Public Disclosure Authorized
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 11/14/2009 Report.: AC4826 1. Basic Project Data Country: Sudan Project ID: P111061 Project Name: Southern Sudan
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized o Date ISDS Prepared/Updated: 19-Jan-2016 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 30-May-2013
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 06/05/2006 INTEGRATED SAFEGUARDS DATASHEET
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: ISDSC13230 Date ISDS Prepared/Updated: 13-Jul-2015 Date ISDS Approved/Disclosed: 14-Jul-2015 I. BASIC INFORMATION A. Basic Project Data Country:
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 09/26/2008 INTEGRATED SAFEGUARDS DATASHEET
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC5623. Date ISDS Prepared/Updated: 09/22/2010 I. BASIC INFORMATION. A. Basic Project Data
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 09/22/2010 I. BASIC INFORMATION A. Basic Project Data INTEGRATED
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: AB4706. Project Name
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project Borrower(s) Implementing Agency PROJECT INFORMATION
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 10-Feb-2015 Report No.: ISDSC 141 Date ISDS Approved/Disclosed: 18-Feb-2015 Public Disclosure Authorized
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE. 10-Oct-2014
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: I BASIC INFORMATION A Basic Project Data INTEGRATED SAFEGUARDS
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated:
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/03/2006 INTEGRATED SAFEGUARDS DATASHEET
More informationSafeguard Requirements And the Framework Process
Safeguard Requirements And the Framework Process The World Bank Europe & Central Asia Region Biskek,Tblisi March/April 2008 1 Role of Bank and Borrower Bank Screens and Sets EA Category Advises Borrower
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 04-Dec-2014
More informationIntegrated Safeguards Data Sheet (Initial)
THE WORLD BANK GROUP U---- _ InfoShop Date Prepared/Updated: 02/24/2003 Section I - Basic Information A. Basic Project Data Country: BRAZIL Project: RF Support of Scientific Research for the Amazon II
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: April 12, 2006 1. Basic Project Data INTEGRATED
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE,2 Date ISDS Prepared/Updated: 03-Sep-2015 Report No.: ISDSC14552 Date ISDS Approved/Disclosed: 04-Sep-2015 Public Disclosure
More informationINTEGRATED SAFEGUARDS DATA SHEET. Costa Rica FCPF READINESS PREPARATION GRANT CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET Costa Rica FCPF READINESS PREPARATION GRANT CONCEPT
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE I. Basic Information Date prepared/updated: 06/20/2007 Report No.: AC2252 1. Basic Project Data Country: Tunisia Project ID: P095012 Project Name: Tunisia:
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE,2 Date ISDS Prepared/Updated: 22-Jul-2015 Report.: ISDSC13452 Date ISDS Approved/Disclosed: 06-Aug-2015 Public Disclosure Authorized
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 06/03/2008 INTEGRATED SAFEGUARDS DATASHEET
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 20-Apr-2015
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2501. Date ISDS Prepared/Updated: 03/01/2007 I. BASIC INFORMATION. A. Basic Project Data
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 03/01/2007 I. BASIC INFORMATION A. Basic Project Data INTEGRATED
More informationAC431. Integrated Safeguards Data Sheet (Updated)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Updated) Section I - Basic Information Date Prepared/Updated:
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC2388. Date ISDS Prepared/Updated: 07/12/2006 I. BASIC INFORMATION. A. Basic Project Data
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 07/12/2006 I. BASIC INFORMATION A. Basic Project Data INTEGRATED
More informationIntegrated Safeguards Data Sheet Identification / Concept Stage (ISDS)
Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet Identification / Concept Stage (ISDS) Concept Stage Date ISDS Prepared/Updated:
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Tsunami Disaster Recovery in India
Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Tsunami Disaster Recovery in India Report No.: AB1770 Region SOUTH ASIA Sector General agriculture, fishing and forestry sector (90%);Other
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
I. Basic Information Date prepared/updated: 03/08/2007 INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Report No.: AC2566 1. Basic Project Data Country: Lesotho Project ID: P088544 Project Name: Private
More informationINTEGRATED SAFEGUARDS DATA SHEET
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET IDENTIFICATION / CONCEPT STAGE Date ISDS Prepared/Updated:
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3758 Project Name. Senegal SLM supplemental to PSAOP2 Region
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB3758 Project Name Senegal
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 11-Jun-2014 Report No.: ISDSC9465 Date ISDS Approved/Disclosed: 09-Dec-2014 Public Disclosure Authorized
More informationINTEGRATED SAFEGUARDS DATA SHEET
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET Date ISDS Prepared/Updated: 21 March 2005 I. BASIC INFORMATION
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 01/21/2011 INTEGRATED SAFEGUARDS DATASHEET
More informationReport No.: ISDSA1037
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 0 o INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Date ISDS Prepared/Updated: 07-May-2015
More informationFinancing (In USD Million) Financing Source
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 05-Aug-2012 I. BASIC INFORMATION 1. Basic Project Data INTEGRATED
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 19-Oct-2012
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC4308. Date ISDS Prepared/Updated: 01/11/2010 I. BASIC INFORMATION. A. Basic Project Data
INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC4308 Date ISDS Prepared/Updated: 01/11/2010 I. BASIC INFORMATION A. Basic Project Data Country: Africa Project ID: P113138 Project Name: Lake
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 27-Oct-2016
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Parent Project
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/29/2008 INTEGRATED SAFEGUARDS DATASHEET
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/24/2007 INTEGRATED SAFEGUARDS DATASHEET
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE
. Date ISDSPrepared/Updated: 11-Jul-2017 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Report.:ISDSA21485 I. BASIC INFORMATION 1. Basic Project Data Country: Africa Project ID: P161265 Project Name:
More informationIntegrated Safeguards Data Sheet (Initial)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Initial) Report No: AC124 Section I - Basic Information
More informationIntegrated Safeguards Data Sheet (Updated)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THE WORLD BANK GROUP InfoShop Date Prepared/Updated: 02/10/2003 Section I - Basic Information
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 12-Feb-2014
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No.: Date prepared/updated: April 29, 2013 I. Basic Information 1. Basic Project
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 23-Mar-2015 Report No.: ISDSC 12226 Date ISDS Approved/Disclosed: 06-Apr-2015 Public Disclosure Authorized
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: I. BASIC INFORMATION 1. Basic Project Data INTEGRATED SAFEGUARDS
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE. Project ID:
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 05-Mar-2014
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 03/08/2012 INTEGRATED SAFEGUARDS DATASHEET
More informationIntegrated Safeguards Data Sheet (Updated)
THE WORLD BANK GROUP AWorld Free of Poverty ilnfoshop 24623 Date Prepared/Updated: 07/31/2002 Section I - Basic Information Integrated Safeguards Data Sheet (Updated) A. Basic Project Data Country: UGANDA
More informationIntegrated Safeguards Data Sheet (Updated)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Integrated Safeguards Data Sheet (Updated) Section I - Basic Information Date Prepared/Updated:
More informationInfoShop. Integrated Safeguards Data Sheet (Initial) Date ISDS Prepared/Updated: 10/21/2002. Section I - Basic Information
Public Disclosure Authorized THE WORLD BANK GROUP InfoShop Integrated Safeguards Data Sheet (Initial) 25030 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date Prepared/Updated:
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 21-Apr-2014
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 23-Jul-2012
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Report No.: 89787 Date prepared/updated: July 28, 2014 I. Basic Information 1. Basic
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 10/14/2010 INTEGRATED SAFEGUARDS DATASHEET
More informationInfoShop. Integrated Safeguards Data Sheet (Initial) Report No: AC85. Section I - Basic Information. A. Basic Project Data Country: INDIA
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized THfE WORLD BANK GROUP InfoShop Date Prepared/Updated: 05/22/2003 Section I - Basic Information
More informationPROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Metro Manila Wastewater
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/15/2015 INTEGRATED SAFEGUARDS DATASHEET
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 28-Jul-2013
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: AC6530. Date ISDS Prepared/Updated: 03/14/2012 I. BASIC INFORMATION. A. Basic Project Data
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 03/14/2012 I. BASIC INFORMATION A. Basic Project Data INTEGRATED
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Date ISDS Prepared/Updated: 29-Sep-2015 Report No.: ISDSC14538 Date ISDS Approved/Disclosed: 15-Oct-2015 Public Disclosure Authorized
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 06-Feb-2013
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 19-Feb-2014
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name Region Country Sector(s) Theme(s) Lending Instrument Project ID Borrower(s) Implementing Agency Environmental Category Date PID Prepared/ Updated
More informationPROJECT INFORMATION DOCUMENT (PID) ADDITIONAL FINANCING Report No.: PIDA Project Name. Parent Project Name. Region Country Sector(s) Theme(s)
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Parent Project Name Region Country Sector(s) Theme(s) Lending Instrument
More informationIntegrated Safeguards Data Sheet (Initial)
THE WORLD BANK GROUP,.,.,. InfoShop Integrated Safeguards Data Sheet (Initial) AWorld Frcs7 ol Poverty Date Prepared/Updated: 12/19/2002 25318 Section I - Basic Information December 19, 2002 A. Basic Project
More informationINTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE
Public Disclosure Authorized INTEGRATED SAFEGUARDS DATA SHEET CONCEPT STAGE Report No.: ISDSC14152 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. BASIC INFORMATION
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 04/14/2011 1. Basic Project Data Original
More informationPROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Project Name LB: PCB Management in the
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Date ISDS Prepared/Updated: 16-October-2012 I. BASIC INFORMATION 1. Basic Project Data
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 07/27/2011 1. Basic Project Data Original
More informationINTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/09/2011 1. Basic Project Data Original
More informationINTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Copy Public Disclosure Copy Date ISDS Prepared/Updated: 08-Jul-2013
More information