1 Information Resource Committee (IRC) The Information Resource Committee (IRC) moved forward with the recommendations submitted with its Executive Summary Report, addressing the following action items: ACTION ITEM 1: Review, participate and complete the Educause Core Data Services (CDS) Survey Over the course of the Fall 2016 semester, the members of the IRC worked together to complete and submit the Educause Core Data Services (CDS) survey. The CDS survey is highly regarded for providing essential and verifiable data that serve to identify technology benchmarks and trends throughout higher education. It is organized into a set of both required and optional modules: IT Organization, staffing and financing Information Systems and Applications Capability and Technology Deployment Education technology services Information security It Support Services Research Our active participation in this annual survey will provide FGCU with access to critical comparative data from peer institutions of higher learning. The core data allows FGCU information technology to establish benchmarks and identify trends that may be used to soundly inform technology recommendations, strategic planning, management recommendations and administrative decisions within our University. IRC RECOMMENDATIONS ACTION ITEM 1: 1. Review the results of the CDS Survey and report on the findings 2. Complete and submit the CDS Survey Page 1 of 5

2 ACTION ITEM 2: Work with FGCU Human Resources on a pilot project to address IT staffing classifications used at FGCU in relationship to their SUS classifications In November 2014, IRC members met with human resource representatives of FGCU in order to initiate a project to create a new classification system for IT staff. The classifications lacked clarity in describing what job functions IT employees were responsible for, and did not clearly specify minimum requirements, or salary ranges. The IRC, working collaboratively with Human Resources, implemented a new technology job classification system that will aid in future recruitment of staff and give current staff clear career paths. The Directors and Assistant Directors of each of the University s primary technology units contributed to this pilot project: Mary Banks, Sven Hahues and Neal Snyder: Business Technology Services(BTS) Mario Bernardo: Library Technology Systems David Jaeger: e-learning and Academic Web Pat O Connor-Benson: Academic & Event Technology Services (AETS) This Action Item is complete. ACTION ITEM 3: Update Strategic Plan for Technology (SPT). The Strategic Plan for Technology (SPT) was reviewed and updated to accommodate changes for academic year In addition, the plan was updated to align with the goals of the University Strategic Plan FOCUS for 2016 to Listed below is a summary of accomplished goals and progress made on goals that cross AY boundaries or have a multi-year implementation. Priority Technology Funding items completed or progress made on strategic plan: Goal 1 Innovation and Growth of Technology Pilot roll-out of Kaltura video storage and delivery system was started during the Fall semester and completed during Spring, In addition, the migration of Adobe Connect license holders has begun during this time period with associated Adobe Connect videos being transcribed to.mp4 format for use within Kaltura s system. Full launch of Kaltura remains on schedule for Fall, FGCU s lecture capture system (developed in-house) was been deployed to all classrooms located in Reed Hall in time for the Fall, 2016 semester and in an additional 3 Page 2 of 5

3 classrooms in Merwin Hall during the Winter 2016 break. Workshops are continuously scheduled through the Lucas Center for Faculty Development and on-line documentation has been generated for easy access. Funding requests are set to allow further expansion of this technology throughout all classrooms on campus. Faculty Technology Survey was distributed in February, 2017 with responses tallied and distributed by March 30, Virtual Student Lab licenses has been expanded to comply with licensing restrictions of select academic software (e.g., Maple.) BYOD (Bring Your Own Device) project is being slowly deployed as limitations are set by funding to expand needed infrastructure throughout campus. However, select locations are being amplified with needed access points and bandwidth to accommodate those faculty members who specifically request this technology for their course(s.) In response to submitted prioritized technology needs funding request, approximately $1M was allocated to Academic & Event Technology during the Spring, 2016 term. All subsequent expenditures were directly related to Priority 1 (mandatory academic technology licenses, contracts) and Priority 2 (academic instruction technology needs) prior to the fiscal year ending June 30, Student Technology Survey was opened in November, 2016 with responses tallied and distributed by March 30, Improved student success by Implementing the student educational planner (SEP)and associated customized reporting, a student advising scheduling system, the technology needed to support Soar in 4, supporting the University s dashboard, and implementing document imaging for advising Improved business process by implementing a performance management system Implemented MaaS 360 mobile phone management system Implement one additional feature of Office 365, such as Skype for Business or OneDrive Assisted with report creation for student directory information, graduate admissions reports for colleges, parent information report for orientation Implemented Call Management System (CMS) to automate call center reporting for admissions, helpdesk and housing Continued usage of the Online Proctoring tool, Respondus Monitor, after a successful pilot program last year. Summer 2016 (Pilot): 7 sections/128 unique students. Fall 2016: 14 sections/427 unique students. Spring 2017: 15 sections/327 unique students. Development and testing of a beta system for FGCU e-learning support and tracking tool. The purpose is to improve instructional design and technology support to faculty, identifying courses that have received a quality design review and maintaining a record of ID and IT support at the course section level. System will receive ongoing revisions during beta phase. Recommendations related to the implementation of the FL 2025 SP for Online Education will guide further development of this system. Goal 2 Responsive and Agile IT Support and staffing Improved student success by improving the process for selecting students best admissions test score, moving state reporting files into the operational data store, adding multiple attendance periods in the admission process Improved business processes by revising the benefits reporting file, assisted with financial year end closing, and Human Resources open benefits enrollment Page 3 of 5

4 Updated ERP system, Banner through three major upgrade cycles. Other Major upgrades included parking, student recruitment, and check processing systems. Technical support hours were extend to support students in housing after wireless refresh Move R25 scheduling system to the Hosted Environment Collaborated with Human Resources to develop new position classifications for FGCU s technical positions for all technical staff in AETS, WEPS, Library and BTS Worked with Human Resources on becoming part of the New Employee Orientation (NEO) process and deliver updated content on a recurring bases to new employees Upgraded the wired network equipment in Merwin, Reed and Ben Hill Griffin Hall from aging Extremeware equipment to updated XOS equipment Updated wireless equipment in Ben Hill Griffin with newer Cisco AC Wave 2 compatible access points, capable of delivering a much denser client count Completed wireless upgrade plans for Student Union and the Library that will be deployed depending on available funding Upgraded VoIP Endpoint Firmware Replaced 5 VoIP Analog Gateways Completed Call Management System for call center reporting Replaced 300 VoIP Telephones Upgraded VoIP phone registration to native CM Ethernet Upgraded and replaced Code Blue Toolvox PBX Goal 3 Security and Business Continuity Created and updated restricted data inventory for FGCU in accordance to the restricted data policy Completed vulnerability scanning per procedure Implemented SIEM solution for logging and monitoring Implemented server and network equipment log management system Completed quarterly security audits of Network and Banner accounts Completed Banner security review for Human Resources and Finance and accounting Implemented source code repository and updated change management processes Upgraded of remote site Firewalls to new Palo Alto firewalls Performed yearly disaster recovery test of Banner and Raisers Edge Cataloged all business systems and categorized the systems according to the Federal Information Processing Standards (FIPS) Publication No. 199 Provided training classes for enterprise applications such as BDM and Microsoft Office Updated security plan ensured compliance with state regulation Completed risk assessment according to the Agency for State Technology cybersecurity standards. Enhanced functionality of Banner security request forms Goal 4- Improve Institutional Data Management Created a PCI Compliance group consisting of Finance & Accounting and BTS staff in order to define, and assess PCI compliance at FGCU. The correct SAQs have been selected and work has begun to track and complete all objectives. Rolled out secure PC to student services and finished Administrative Services & Finance Page 4 of 5

5 Complete the Banner student revitalization, added new student types, and employee groups, Documented the programs used for create state reporting and tied Banner fields to performance metrics Created data stewardship program and developed roles and responsibilities for data stewards and encourages data stewards to document processes and institute quality controls for critical dada. Started creating Banner training Created business analytics and data integrity white papers Created Banner input standards for names, addresses, phone numbers and buildings. IRC RECOMMENDATIONS ACTION ITEM 3: 1. Update the strategic plan for technology and report on accomplishments. For the Strategic Plan for Technology please see Appendix A Strategic Plan for Technology. ACTION ITEM 4: Submit technology funding priority report The technology funding priority report was submitted to the Budget Committee in April of The report is available in Appendix B IRC's Technology Funding Priority Report 2017 IRC RECOMMENDATIONS ACTION ITEM 4: 1. Update the technology funding priority report in fiscal year Respectfully submitted: Florida Gulf Coast University Information Resources Committee Mary Banks, Co-Chair, Assistant Vice President, Business Technology Services Mario Bernardo, Assistant Director, Library Technology Dr. Robert Beatty, Dean, Lutgert College of Business Sven Hahues, Director, BTS Network Services and Helpdesk David Jaeger, Co-Chair, Director, e-learning and Academic Web Dr. Ken Watanabe, Associate Professor, Department of Physics Faculty Representative Pat O Connor-Benson, Director, Academic & Event Technology Clinton Nitz, BTS Computer Support Specialist SAC Representative Neal Snyder, Director, Telecommunications Robert Vines, Director, Institutional Research and Analysis Alexander Erlenbach, Student Government Representative Page 5 of 5

Goal 1: CONTINUED DEVELOPMENT OF ADVANCED TECHNICAL SERVICES

Goal 1: CONTINUED DEVELOPMENT OF ADVANCED TECHNICAL SERVICES INFORMATION TECHNOLOGY SERVICES University Technology Administration, Infrastructure and Support Computing Technology Support Fiscal Year 2016-2017 Overview Computing Technology Support provides centralized

More information

Technology Strategic Plan

Technology Strategic Plan Rev. Date: 10/26/16 Technology Strategic Plan FY 2015-2018 August 2014 Revised: March 2016 Planning Process The FY 2015-18 Technology Strategic Plan was developed in the spring 2014 by the Chief Information

More information

NECC STRATEGIC THEME: NECC Key Performance Indicator:

NECC STRATEGIC THEME: NECC Key Performance Indicator: DIVISION: Information Technology FISCAL YEAR: 2008 1. Engage Students As Active Learners Continue to improve computer labs & smart classrooms Add smart classrooms, replace & enhance labs Report number

More information

Division of Information Technology Annual Report

Division of Information Technology Annual Report Division of Information Technology 2015-2016 Annual Report Administrative Assistant Applications and Special Projects Vice President Information Technology Division of Information Technology Mission Statement

More information

2013 Academic Leadership Retreat

2013 Academic Leadership Retreat 2013 Academic Leadership Retreat Office of Information Technolo g y Joel Reeves Assistant Vice Chancellor and Chief Information Officer August 29, 2013 Overview Where we are Accomplishments Strategic Trending

More information

Strategic Plan for Technology

Strategic Plan for Technology Strategic Plan for Technology 2010-2015 Introduction The Strategic Plan for Technology 2010-2015 follows the first strategic plan for technology published in 1996. The two documents are quite different.

More information

RONALD E. HENRY, II AREAS OF EXPERTISE EDUCATION

RONALD E. HENRY, II AREAS OF EXPERTISE EDUCATION March 2017 Finance and Administration 9447 Information Technology Services Director, Information Tech Services Assists the VP for Finance and Administration and the Leadership Team in establishing and

More information

Technology Strategic Plan Middlesex Community College 2016_2019

Technology Strategic Plan Middlesex Community College 2016_2019 Technology Strategic Plan Middlesex Community College 2016_2019 Revised 05/23/2016 Brad Yoder Chief Technology Officer 1 I. Executive Summary... 3 II. Technology Operations... 4 A. Governance... 4 1. Cabinet...

More information

NECC STRATEGIC THEME: 1, 2. NECC Key Performance Indicator: 6

NECC STRATEGIC THEME: 1, 2. NECC Key Performance Indicator: 6 DIVISION: Information Technology Department 1: IT NOC (Network Operations Ctr.) FISCAL YEAR: NECC STRATEGIC THEME: 1, 2 Department 2: Note: there may be no Department 1 or 2 Strategic Initiative Upgrade

More information

Office of Information Technology IT Plan:

Office of Information Technology IT Plan: Office of Information Technology IT Plan: 2017-2020 Strategic Context Mission of OIT The Office of Information Technology (OIT) provides technology-based solutions and services that support the academic,

More information

Langara College. Information Technology. IT Info-Session May 2016 INFORMATION TECHNOLOGY

Langara College. Information Technology. IT Info-Session May 2016 INFORMATION TECHNOLOGY Langara College Information Technology IT Info-Session May 2016 Agenda 1 2 3 4 5 6 7 8 9 10 IT Strategic Plan IT Governance IT Service Desk New Building Update A/V Updates Project Updates ESSSE & Telephone

More information

IT Services Fiscal Year 2008 Report

IT Services Fiscal Year 2008 Report IT Fiscal Year 2008 Report The IT fiscal year 2008 (FY2008) report covers activities between July 1, 2007 and June 30, 2008. In November 2007 a change of IT leadership was made when CampusWorks began a

More information

IT Service Catalog College of Arts & Sciences

IT Service Catalog College of Arts & Sciences IT Service Catalog College of Arts & Sciences Backups and Storage (Enterprise) Backups and Storage End User A&S IT helps users backup and store data using UNM-approved storage methods and services including

More information

Office of Technology Services IT Strategy

Office of Technology Services IT Strategy Office of Technology Services IT Strategy Purpose The purpose of this Information Technology Strategy document is to describe how the Office of Technology Services (OTS) supports Lone Star College s vision

More information

LIBRARIES OF MIDDLESEX AUTOMATION CONSORTIUM TECHNOLOGY PLAN,

LIBRARIES OF MIDDLESEX AUTOMATION CONSORTIUM TECHNOLOGY PLAN, LIBRARIES OF MIDDLESEX AUTOMATION CONSORTIUM TECHNOLOGY PLAN, 2007-2010 VISION: The Libraries of Middlesex Automation Consortium (LMxAC) provides cutting edge electronic library services to the patrons

More information

Administrative Services Annual Program Review Report 2009

Administrative Services Annual Program Review Report 2009 Administrative Services Annual Program Review Report 2009 I. Mission and Vision of the Program: Computing Services is a service-oriented department that provides high quality technical support, computing

More information

IT Strategic Plan Portland Community College 2017 Office of the CIO

IT Strategic Plan Portland Community College 2017 Office of the CIO IT Strategic Plan Portland Community College 2017 Office of the CIO 1 Our Vision Information Technology To be a nationally recognized standard for Higher Education Information Technology organizations

More information

Goal 1: Continue to Pursue ITAPP Growth Opportunities

Goal 1: Continue to Pursue ITAPP Growth Opportunities INFORMATION TECHNOLOGY SERVICES University Technology Administration, Infrastructure and Support ITAPP Goals and Accomplishments Fiscal Year 2015-2016 Overview The primary mission of ITAPP is to provide

More information

Infrastructure, Systems, and Support Annual Report

Infrastructure, Systems, and Support Annual Report Infrastructure, Systems, and Support Annual Report 2006-2007 The College s core infrastructure, computer systems, and community support functions have achieved significant objectives set forth over the

More information

IT Strategic Plan. Executive Summary. Introduction

IT Strategic Plan. Executive Summary. Introduction IT Strategic Plan Supporting the Mission of the University with Planned and Managed Information Technology Resources and Services Executive Summary Introduction The Information Systems Security Policy

More information

Tasks Timelines Who Outcomes Costs

Tasks Timelines Who Outcomes Costs Goal # 1: Provide quality academic programs to enhance student Objective 1.1 Provide and maintain up to date computer learning, and to attract, retain, and develop a diverse software and hardware in student

More information

Report By: Ben Seaberry District Technology Plan Project List (Select Fields) Last Updated: 5/23/16. Page 1

Report By: Ben Seaberry District Technology Plan Project List (Select Fields) Last Updated: 5/23/16. Page 1 ID PROJECT NAME Project Description Project Status Percent Due Date Completion Date Accreditation Location Impact 52 District Technology Plan update for 2012-2013 Update District wide technology plan project

More information

Strategic Plan. The College of New Jersey Information Technology

Strategic Plan. The College of New Jersey Information Technology Strategic Plan The College of New Jersey Information Technology Information Technology The College of New Jersey Introduction Information Technology at The College of New Jersey is comprised of four separate

More information

Administrative & Student Information Systems Refresh: Phase I Project Update

Administrative & Student Information Systems Refresh: Phase I Project Update Administrative & Student Information Systems Refresh: Phase I Project Update Treasurer s Town Hall @ Rutgers University New Brunswick J. Michael Gower, SVP for Finance and Treasurer September 21, 2015

More information

IT Strategic Plan Portland Community College 2017 Office of the CIO

IT Strategic Plan Portland Community College 2017 Office of the CIO IT Strategic Plan Portland Community College 2017 Office of the CIO 1 Our Vision Information Technology To be a nationally recognized standard for Higher Education Information Technology organizations

More information

Tom Hoover September 11, 2013

Tom Hoover September 11, 2013 Tom Hoover September 11, 2013 Our commitment to you Academically focused but understands that the administrative side has to function smoothly in order for academics to work well. An IT group that is

More information

INFORMATION SERVICES FY 2018 FY 2020

INFORMATION SERVICES FY 2018 FY 2020 INFORMATION SERVICES FY 2018 FY 2020 3-Year Strategic Plan Technology Roadmap Page 0 of 14 Table of Contents Strategic Plan Executive Summary... 2 Mission, Vision & Values... 3 Strategic Planning Process...

More information

7P2. How do you select, manage, and distribute data and performance information to support your planning and improvement efforts?

7P2. How do you select, manage, and distribute data and performance information to support your planning and improvement efforts? AQIP Category Seven, MEASURING EFFECTIVENESS examines how your organization collects, analyzes, distributes, and uses data, information, and knowledge to manage itself and to drive performance improvement.

More information

Information Technology

Information Technology Program Review - 2015-2016 Department Purpose Describe the purpose of the Discipline/Program/Service. IT department plans, designs, implements, and coordinates a variety of information technologies to

More information

2017 ANNUAL REPORT. Our core purpose is to move ideas to solutions

2017 ANNUAL REPORT. Our core purpose is to move ideas to solutions 2017 ANNUAL REPORT Our core purpose is to move ideas to solutions Our goal is to align with University enrollment, student success, and research goals, and to be a catalyst for reaching those goals FROM

More information

Information Technology Major Accomplishments FY 16-17

Information Technology Major Accomplishments FY 16-17 Information Technology Major Accomplishments FY 16-17 ENTERPRISE SYSTEMS GROUP Enterprise Systems Completed 3234 Work Orders this year. (Note: We processed 2.4% (75) more work orders despite losing two

More information

Achieving the Dream Goal:

Achieving the Dream Goal: DI VISION: Information Technology FISCAL YEAR: 2009 Results 1. Engage Students As Active Learners 1a. Continue to improve computer labs & smart classrooms Add smart classrooms, replace & enhance labs Annual

More information

OKLAHOMA STATE UNIVERSITY INSTITUTE OF TECHNOLOGY. Technology Plan

OKLAHOMA STATE UNIVERSITY INSTITUTE OF TECHNOLOGY. Technology Plan OKLAHOMA STATE UNIVERSITY INSTITUTE OF TECHNOLOGY Technology Plan 2016-2021 Table of Contents OSUIT MISSION STATEMENT... 3 OSUIT TECHNOLOGY SERVICES VALUES... 3 ASSUMPTIONS... 3 TECHNOLOGY BACKGROUND...

More information

Committee on Information Technology

Committee on Information Technology Committee on Information Technology Regular Meeting October 18, 2018 1 Dr. Carlton B. Goodlett Place, City Hall, Room 305 San Francisco, CA 94102 1 Agenda Call to Order by Chair Roll Call Approval of Meeting

More information

ITS STRATEGIC PLAN. ITS Strategic Plan

ITS STRATEGIC PLAN. ITS Strategic Plan 2017 2020 ITS STRATEGIC PLAN ITS Strategic Plan 2017 2020 p. 1 ITS Strategic Plan 2017 2020 p. 2 TABLE OF CONTENTS Letter Of Introduction... 4 Who We Are... 6 Our Vision... 6 Our Mission... 6 Our Principles...

More information

Information Technology Strategic Plan /13/2012

Information Technology Strategic Plan /13/2012 Information Technology Strategic Plan 2012 7/13/2012 Unit Mission Statement: Information Technology Shared Services is dedicated to providing unparalleled service and support to the UC Davis College of

More information

State: Original. July 2015 June Status: Planned. State: Original. July 2015 June 2018

State: Original. July 2015 June Status: Planned. State: Original. July 2015 June 2018 GOAL 4: Infrastructure: Provide a high-performance infrastructure that takes advantage of innovative technologies that can reduce costs, promote ready access, and improve communication and collaboration

More information

University Information Technology Steering Committee Information Update on Activities Within Information Services

University Information Technology Steering Committee Information Update on Activities Within Information Services University Information Technology Steering Committee Information Update on 2006-07 Activities Within Information Services # Activity Item Description / Status 1 University governance of information technology

More information

PAIGE FRANCIS. Strategic User-First Planning Higher Ed IT Leadership Change Leadership Personnel Management Security Management

PAIGE FRANCIS. Strategic User-First Planning Higher Ed IT Leadership Change Leadership Personnel Management Security Management PROFILE STRENGTHS CAREER PROGRESSION An award-winning industry and higher education information technology (IT) leader, with over 15+ years proven leadership, managerial, strategic, planning, operational,

More information

Office of Information Technology (OIT) Strategic Plan FY

Office of Information Technology (OIT) Strategic Plan FY Office of Information Technology (OIT) Strategic Plan FY 2015 2020 Office of Information Technology - Vision, Mission, Pillars, and Values Vision Statement We believe in the promise and capacity of information

More information

FY17-FY18 Audit Plan. Office of Internal Auditing

FY17-FY18 Audit Plan. Office of Internal Auditing FY17-FY18 Audit Plan Office of Internal Auditing -Page Intentionally Blank- TABLE OF CONTENTS Executive Summary... 4 Audit Plan Details... 6 Budgeted Hours... 7 Risk Assessment... 8 Allocation of Resources...

More information

Information Technology Services (ITS)

Information Technology Services (ITS) Information Technology Services (ITS) District ITS staff is responsible for centralized information systems and services that provide technology solutions for the College and District operations. The services

More information

IT Council Minutes Cheek 108 September 1, :00 p.m. 4:30 p.m.

IT Council Minutes Cheek 108 September 1, :00 p.m. 4:30 p.m. IT Council Minutes Cheek 108 September 1, 2015 3:00 p.m. 4:30 p.m. Members Present: Jeff Morrissey, Greg Rainwater, Sarah Caldwell, Mark Putman, Kevin Piercy, Matthew Morris, Victor Matthews, Scott Schneider,

More information

Information Technology STRATEGIC PLAN

Information Technology STRATEGIC PLAN Information Technology 2018 2022 STRATEGIC PLAN October 30 th, 2017 IT Strategic Plan 2018-2022 Table of Contents Introduction... 3 Mission of IT... 3 Primary Service Delivery Objectives... 3 Availability

More information

ITS Strategic Plan San Jacinto College

ITS Strategic Plan San Jacinto College ITS Strategic Plan San Jacinto College 2015-2016 Purpose The purpose of the ITS Strategic Plan is to define the technology and support needed for the College to achieve its vision, mission and strategy.

More information

Troy University Office of Information Technology Technology Plan. Using Technology as a Strategic Enabler

Troy University Office of Information Technology Technology Plan. Using Technology as a Strategic Enabler Troy University Office of Information Technology 2013-2014 Technology Plan Using Technology as a Strategic Enabler The best way to predict the future is to create it. -Peter Drucker Technology Planning

More information

IS&T s Strategic Projects

IS&T s Strategic Projects IS&T s Strategic Projects The following are IS&T s current major projects that support BU s Technology Plan Strategic Capabilities. Learning Quality & Innovation General Education Projects These projects

More information

Institutional Data Improvement and Utilization Allen County Community College. Process: Open Pathway Quality Initiative Proposal

Institutional Data Improvement and Utilization Allen County Community College. Process: Open Pathway Quality Initiative Proposal Open Pathway Quality Initiative Proposal Institutional Template The enclosed Quality Initiative proposal represents the work that the institution will undertake to fulfill the Improvement Process of the

More information

ETS Moran Technology Consulting Report Updates

ETS Moran Technology Consulting Report Updates Project List/Objectives 1.1 Update the IPEDS, Educause and SUNY comparative metrics reports and start an annual file. Sum 2011 Fall 2011 Spr Sum 2012 2012 Comments The IPEDS comparative metrics report

More information

Goal 1: Improve communication and collaboration with ITS partners and customers

Goal 1: Improve communication and collaboration with ITS partners and customers INFORMATION TECHNOLOGY SERVICES University Technology Administration, Infrastructure and Support Microsoft Enterprise Applications and Systems Goals Year 2018 Overview Microsoft Enterprise Applications

More information

FY 2017 FY 2026 Proposed Capital Improvement Plan. Department of Technology Services CIP pg D-3 D-7

FY 2017 FY 2026 Proposed Capital Improvement Plan. Department of Technology Services CIP pg D-3 D-7 FY 2017 FY 2026 Proposed Capital Improvement Plan Department of Technology Services CIP pg D-3 D-7 June 28, 2016 The Changing World of Technology Source: http://www.sherpalo.com/resources/internet_trends_ri_041210[1].pdf

More information

Comprehensive Program Plan

Comprehensive Program Plan Administrative Unit Comprehensive Program Plan Name of Unit: Planning and Research Office Date: 1/26/2017 1. College Mission Statement: Cabrillo College is a dynamic, diverse, and responsive educational

More information

COMPUTING TECHNOLOGY SUPPORT GOALS & OBJECTIVES ACCOMPLISHMENTS. Information Technology Services AND MAY 1, 2013 SUBMITTED BY:

COMPUTING TECHNOLOGY SUPPORT GOALS & OBJECTIVES ACCOMPLISHMENTS. Information Technology Services AND MAY 1, 2013 SUBMITTED BY: Information Technology Services COMPUTING TECHNOLOGY SUPPORT GOALS & OBJECTIVES AND ACCOMPLISHMENTS 2012-2013 MAY 1, 2013 SUBMITTED BY: ALEXIS A. MORALES ASSISTANT DIRECTOR, COMPUTING TECHNOLOGY SUPPORT

More information

Major Goals for Vice Chancellor Plan Performance & Info Systems FY19

Major Goals for Vice Chancellor Plan Performance & Info Systems FY19 Major Goals for Vice Chancellor Plan Performance & Info Systems FY19 VC Planning, Performance & Info Systems (VCPPIS) major goals for 2018-2019 advance progress on the Strategic Plan s three areas: Student

More information

South Texas College. Detailed Assessment Report Mid-Bi 2010 Information Systems

South Texas College. Detailed Assessment Report Mid-Bi 2010 Information Systems Page 1 of 7 Open Email List Print this report Detailed Assessment Report Mid-Bi 2010 Information Systems Mission/Purpose Goals The Department of Information Systems is dedicated to improving the College's

More information

Digital Strategic Plan (DSP) and Enterprise Resource Planning Annual Update

Digital Strategic Plan (DSP) and Enterprise Resource Planning Annual Update Digital Strategic Plan (DSP) and Enterprise Resource Planning Annual Update SEPTEMBER 19, 2017 CITY COUNCIL WORK SESSION PRESENTERS: JOVAN GROGAN SAVITA CHAUDHARY TASHA TERVALON 1 AGENDA / Slides Summary

More information

Information Technology Services Project Management Office Operations Guide

Information Technology Services Project Management Office Operations Guide Information Technology Services Project Management Office Operations Guide Revised 3/31/2015 Table of Contents ABOUT US... 4 WORKFLOW... 5 PROJECT LIFECYCLE... 6 PROJECT INITIATION... 6 PROJECT PLANNING...

More information

ITS Strategic Plan San Jacinto College

ITS Strategic Plan San Jacinto College ITS Strategic Plan San Jacinto College 2016-2017 Purpose The purpose of the ITS Strategic Plan is to define the technology and support needed for the College to achieve its vision, mission and strategy.

More information

Administration and Finance Quarterly Leadership Meeting

Administration and Finance Quarterly Leadership Meeting Administration and Finance Quarterly Leadership Meeting 1 MEETING AGENDA Administration and Finance Quarterly Leadership Meeting 1. Welcome Joan Nelson 2. Division FY14 Accomplishments and FY15 Goals Associate

More information

Information Technology NIPR

Information Technology NIPR LASSEN COMMUNITY COLLEGE David Corley Director of Information Technology Logan Merchant Information Technology Specialist II Jacob Freitas - Information Technology Specialist II Mathew Montgomery - Information

More information

PD, CC&E, & Planning. Created Tuesday, September 25, 2012 By Kale Braden

PD, CC&E, & Planning. Created Tuesday, September 25, 2012 By Kale Braden CC&E PD, CC&E, & Provide support for the development of sexual harassment and equity training materials and processes. Make recommendations that enhance college processes and practices with respect to

More information

NORTH ORANGE COUNTY COMMUNITY COLLEGE DISTRICT DISTRICT INFORMATION SERVICES TECHNOLOGY PLAN

NORTH ORANGE COUNTY COMMUNITY COLLEGE DISTRICT DISTRICT INFORMATION SERVICES TECHNOLOGY PLAN NORTH ORANGE COUNTY COMMUNITY COLLEGE DISTRICT DISTRICT INFORMATION SERVICES TECHNOLOGY PLAN 2011-2015 Reviewed by Technology Advisory Committee 12-14-2010, 6-19-12, 6-18-13, 6-17-14; Updated Status 12-13-2011,

More information

OKLAHOMA STATE UNIVERSITY INSTITUTE OF TECHNOLOGY. Technology Plan

OKLAHOMA STATE UNIVERSITY INSTITUTE OF TECHNOLOGY. Technology Plan OKLAHOMA STATE UNIVERSITY INSTITUTE OF TECHNOLOGY Technology Plan 2018-2023 Table of Contents OSUIT MISSION STATEMENT... 3 OSUIT TECHNOLOGY SERVICES VALUES... 3 ASSUMPTIONS... 3 TECHNOLOGY BACKGROUND...

More information

Coast Community College District Strategic Technology Plan December 5, 2016

Coast Community College District Strategic Technology Plan December 5, 2016 Coast Community College District Strategic Technology Plan 2016 2019 December 5, 2016 Contents I. Overview, Mission, and Vision... 3 Overview... 3 District Vision Statement... 3 District Mission Statement...

More information

Liberal Arts Information Technology Operational Plan Goals and Objectives July June 2019

Liberal Arts Information Technology Operational Plan Goals and Objectives July June 2019 Information Technology In Liberal Arts (ITLA) 2020 Vision To be a trusted partner (customer-centric) To focus on value-added services (service focused) To enable data-based decision making (data driven)

More information

South Texas College. Detailed Assessment Report Mid-Bi 2010 Finance & Administrative Services

South Texas College. Detailed Assessment Report Mid-Bi 2010 Finance & Administrative Services Page 1 of 8 Open Email List Print this report Detailed Assessment Report Mid-Bi 2010 Finance & Administrative Services Mission/Purpose Goals The Office of the Vice President for Finance and Administrative

More information

Deployment Policy. Higher Education Management Information System (HEMIS) Released January 01, 2014 Version 1.0

Deployment Policy. Higher Education Management Information System (HEMIS) Released January 01, 2014 Version 1.0 Deployment Policy Higher Education Management Information System (HEMIS) Released January 01, 2014 Version 1.0 1 GENERAL The Higher Education Management Information System (HEMIS) relates to the automation

More information

Fayetteville Technical Community College

Fayetteville Technical Community College Page 1 of 6 Open Email List Print this report Fayetteville Technical Community College Detailed Assessment Report 2008-2009 Print Shop Mission/Purpose To provide a full range of printing and duplicating

More information

Francis Howell School District Strategic Plan Update January 21, 2016

Francis Howell School District Strategic Plan Update January 21, 2016 Francis Howell School District 2011-2016 Strategic Plan Update January 21, 2016 Mission Preparing students today for success tomorrow Vision Every student will graduate with college and career readiness

More information

Kansas State University Information Technology Strategic Plan January 7, 2019

Kansas State University Information Technology Strategic Plan January 7, 2019 Kansas State University Information Technology Strategic Plan January 7, 2019 Data collected in November and December 2018 from the Financial Information System (FIS), the Human Resource Information System

More information

IT Board Update Portland Community College 2017 Office of the CIO

IT Board Update Portland Community College 2017 Office of the CIO IT Board Update Portland Community College 2017 Office of the CIO 1 Agenda 1. IT Strategy 2. InfoSec: Defense in Depth (DiD) 3. Portfolio Management Appendix: IT Strategy Additional Slides 1 IT Strategy

More information

Information Services Technology Infrastructure Strategic Goals to Support the Action Plan for

Information Services Technology Infrastructure Strategic Goals to Support the Action Plan for Information Services Technology Infrastructure Strategic Goals to Support the Action Plan for 2016-17 1. Optimize the use of technology in teaching and learning in collaboration with academic leadership,

More information

Office of Information Technology (OIT) Strategic Plan FY

Office of Information Technology (OIT) Strategic Plan FY Office of Information Technology (OIT) Strategic Plan FY 2018 2022 Office of Information Technology - Vision, Mission, Pillars, and Values Vision Statement Boise State is a center for innovation, learning

More information

Internet Protocol Voice Service (IPVS)

Internet Protocol Voice Service (IPVS) Internet Protocol Voice Service (IPVS) Internet Protocol Voice Service (IPVS) allows users to make phone calls using a high-speed IP transport connection instead of a traditional, circuit-switched phone

More information

Division of Administration & Finance Strategic Plan

Division of Administration & Finance Strategic Plan Division of Administration & Finance 2017-2022 Strategic Plan Mission: The Administration & Finance Division s mission is to provide efficient, effective, value-added service that contributes to the achievement

More information

Planning, Assessment, and Accreditation Documentation

Planning, Assessment, and Accreditation Documentation DIVISION OF BUSINESS AFFAIRS Office of Information Resource Management Planning, Assessment, Accreditation Documentation 2017-2018 Fiscal Year SECTION ONE-General A. Executive Summary Office of Information

More information

Institutional Effectiveness and Assessment Plan

Institutional Effectiveness and Assessment Plan Institutional Effectiveness and Assessment Plan 1 Table of Contents College of Southern Nevada Institutional Effectiveness and Assessment Plan Vision Statement... 5 Introduction... 5 Institutional Effectiveness

More information

Information Technology Services (ITS) Strategic and Operation Plan

Information Technology Services (ITS) Strategic and Operation Plan Information Technology Services (ITS) Strategic and Operation Plan Fiscal Year 2012-2013 Table of Contents 1.0 Introduction... 3 2.0 ITS Organization Overview... 3 3.0 ITS Mission... 7 4.0 ITS Core Functions...

More information

COMPUTING TECHNOLOGY SUPPORT GOALS & OBJECTIVES ACCOMPLISHMENTS. Information Technology Services AND AUGUST 1, 2014 SUBMITTED BY:

COMPUTING TECHNOLOGY SUPPORT GOALS & OBJECTIVES ACCOMPLISHMENTS. Information Technology Services AND AUGUST 1, 2014 SUBMITTED BY: Information Technology Services COMPUTING TECHNOLOGY SUPPORT GOALS & OBJECTIVES AND ACCOMPLISHMENTS 2013-2014 AUGUST 1, 2014 SUBMITTED BY: ALEXIS A. MORALES ASSISTANT DIRECTOR, UNIVERSITY TECHNOLOGY ADMINISTRATION

More information

Information Technology Policy and Procedure Manual

Information Technology Policy and Procedure Manual UNIVERSITY OF NORTH CAROLINA School of Information & Library Science Information Technology Policy and Manual Table of Contents Introduction... 3 Desktop and Laptop Computers... 4 Desktop and Laptop Computers:

More information

NU ITS STRATEGIC PLAN

NU ITS STRATEGIC PLAN FALL 2018 THE UNIVERSITY OF NEBRASKA NU ITS STRATEGIC PLAN NU MISSION The University of Nebraska is one university comprised of four campuses: the University of Nebraska-Lincoln (UNL), the University of

More information

Information Technology Services Department End of Year Report Application Services

Information Technology Services Department End of Year Report Application Services Information Technology Services Department End of Year Report 2012-2013 This report will detail achievements of the Information Technology Services department at the Oregon Institute of Technology for

More information

IT Service Management with System Center Service Manager

IT Service Management with System Center Service Manager IT Service Management with System Center Service Manager Course # Exam: Prerequisites Technology: Delivery Method: Length: 10965 Microsoft System Center Service Manager Instructor-led (classroom) 5 Days

More information

Pinellas County Business Technology Services

Pinellas County Business Technology Services Pinellas County Business Technology Services Strategic Business Plan 2010 and BTS Budget Executive Overview Version 1.0 Aligning resources to what is most important to our Customers Business BCC Budget

More information

BT Master Services Agreement BT Managed Microsoft Lync Service Annex to the General Service Schedule BT MSA Reference No.

BT Master Services Agreement BT Managed Microsoft Lync Service Annex to the General Service Schedule BT MSA Reference No. 1 Definitions BT Master Services Agreement The following definitions apply to the provision of the service, in addition to those in the General Terms and Conditions and the General Services Schedule of

More information

BROCHURE. KenCampus TM ERP. Brochure- KenCampus TM ERP. Swash Convergence Technologies Limited

BROCHURE. KenCampus TM ERP. Brochure- KenCampus TM ERP. Swash Convergence Technologies Limited BROCHURE KenCampus TM ERP Swash Convergence Technologies Limited 1 KenCampus TM ERP Campus Management Software Social, technological, and economic drivers are transforming education and training around

More information

Technology Replacement Plan. Riverside City College: Addendum to the Technology Plan

Technology Replacement Plan. Riverside City College: Addendum to the Technology Plan Technology Replacement Plan Riverside City College: Addendum to the Technology Plan In 2010 the college established a Technology Plan which identified goals, objectives, and replacement guidelines for

More information

Classified and Administrative Personnel Prioritization Request

Classified and Administrative Personnel Prioritization Request Classified and Administrative Personnel Outline Process: Classified and Administrative Personnel s are submitted annually in the fall semester. Due Date: 16 February 2017 Requests may only be submitted

More information

Stat Production Services for Oracle E-Business Suite (Onsite and Remote)

Stat Production Services for Oracle E-Business Suite (Onsite and Remote) Stat Production Services for Oracle E-Business Suite (Onsite and Remote) Description The Stat Production Services for Oracle E-Business Suite is designed to assist the customer with the implementation

More information

Administering System Center Configuration Manager and Intune (NI114) 40 Hours

Administering System Center Configuration Manager and Intune (NI114) 40 Hours Administering System Center Configuration Manager and Intune (NI114) 40 Hours Outline Get expert instruction and hands-on practice configuring and managing clients and devices by using Microsoft System

More information

SSL ClearView Reporter Data Sheet

SSL ClearView Reporter Data Sheet SSL ClearView Reporter Data Sheet Written expressly for the Juniper Networks SSL VPN, the SSL ClearView Reporter application takes log data from one or more SSL VPN devices and generates feature-rich reports

More information

Office of Internal Audit Status Report BOARD OF TRUSTEES

Office of Internal Audit Status Report BOARD OF TRUSTEES Office of Internal Audit Status Report BOARD OF TRUSTEES OFFICE OF INTERNAL AUDIT Date: To: From: Subject: Board of Trustees Audit and Compliance Committee Members Trevor Williams, Chief Audit Executive

More information

California State University, Chico. Common Management System Implementation Report

California State University, Chico. Common Management System Implementation Report California State University, Chico Common Management System 2000-2006 Implementation Report Version 1.0 May 24, 2006 Table of Contents Introduction... 3 CSU, Chico Vision... 3 Implementation Overview...

More information

Administering Microsoft System Center Configuration Manager and Cloud Services Integration (beta) (703)

Administering Microsoft System Center Configuration Manager and Cloud Services Integration (beta) (703) Administering Microsoft System Center Configuration Manager and Cloud Services Integration (beta) (703) Configure and Maintain a Configuration Manager Management Infrastructure Configure the management

More information

UW-IT Metrics. Fiscal Year July 2013

UW-IT Metrics. Fiscal Year July 2013 UW-IT Metrics Fiscal Year 2013 July 2013 Table of Contents OVERVIEW 1 UW-IT SERVICE AREAS 2 1. FINANCES 3 INTRODUCTION... 3 METRICS... 3 UW-IT ANNUAL BUDGET BY SERVICE COSTS... 3 UW-IT FY 2013 FUNDING

More information

The Career Center. The Career Center 1

The Career Center. The Career Center 1 The Career Center GOAL 1: ENGAGE EMORY COLLEGE UNDERGRAUATES IN CAREER EXPLORATION AND DECISION MAKING TO EXPLORE THE VARIETY OF EDUCATIONAL AND CAREER INTERESTS CONSISTENT WITH THEIR INTERESTS, SKILLS,

More information

Richland Community College May 2009

Richland Community College May 2009 Criterion 8: Planning Continuous Improvement Core Values: Commitment, Excellence, Accountability Strategic Plan Goals 1, 2, and 3: Enhance, Strengthen, and Advance Teaching and Learning, Collaborative

More information

An Overview of the AWS Cloud Adoption Framework

An Overview of the AWS Cloud Adoption Framework An Overview of the AWS Cloud Adoption Framework Version 2 February 2017 2017, Amazon Web Services, Inc. or its affiliates. All rights reserved. Notices This document is provided for informational purposes

More information

Strategic Plan

Strategic Plan 2013-2018 Strategic Plan Vision The Florida State University Career Center strives to be the preeminent career center model for designing and delivering comprehensive, innovative, and inclusive career

More information

SUBJECT: SEE BELOW DATE: Information Technology Projects Status and Future Technology Investment Strategies Semi-Annual Report

SUBJECT: SEE BELOW DATE: Information Technology Projects Status and Future Technology Investment Strategies Semi-Annual Report CITY OF. SAN JOSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL COUNCIL AGENDA: 10-06-15 ITEM: 3.7 Memorandum FROM: Toni J. Taber, CM' City Clerk SUBJECT: SEE BELOW DATE: 9-24-2015 SUBJECT:

More information