1 HOUSTON, TX, USA 5 8 NOVEMBER 2017 #PMOSym PMO17BR203 Agile Transformation: Real-World Innovative Adaptation Dr. Linda McIntosh, DBA, CSM, ITIL, PMP, Executive Director, IT PMO Sam Houston State University
2 Biography Dr. Linda McIntosh, Executive Director of the IT PMO at Sam Houston State University Doctorate D.B.A. in Project Management, CSM, ITIL, PM, certified 2
3 Abstract Imagine you work for the largest global retail company in the world and you are asked to deliver in 95 days a program that normally takes 15 months This interactive workshop will provide PMO leaders with strategic learning objectives for understanding when to use an agile or an agile hybrid approach in their organizations 3
4 Learning Objectives 4
5 Agenda Once upon a time The story June 2010 events July 2010 events August 2010 events September 2010 events October 2010 events Closure 5
6 6
7 Vice President Request in June 2010 Deliver annual enrollment and YE & YB to 1.4 million employees by 10 October 2010 and 1 January 2011 Include the federal and state government changes Incorporate new business requirements Create new user screens New rate plans New insurance vendors HMO changes 7
8 My Response Risk Time Planning Resources Money Applications Issues Vendors Hardware 8
9 Negotiation Challenges.My Need List Champion Signed executive scope commitment Autonomy People Budget Technology No waterfall delivery methodology Dedicated collaboration room 9
10 Negotiation Challenges.VP Need List Present business case justification proposal for new delivery methodology Executive summary Milestones Number of resources Cost Percentage complete Daily status updates 10
11 Negotiation Challenges Outcome Agreement on both sides with added features Two weeks to plan Sneak peak presentation More customer involvement 11
12 VP May 2010 executive meeting Discovery VP response Formulation of options Next steps 12
13 13
14 June
15 Brainstorm.Huddle Employee team assembly High-level scope and objectives Preliminary businesses deliverable request, timeline and milestones Preliminary WBS 15
16 Brainstorm. Work Breakdown Option 2 Business Proposal Customer Wish List Option 1 PMP 16
17 Brainstorm Work Streams AE YE&YB 17
18 Brainstorm. Methodology Hybrid 18
19 Brainstorm Milestones (AE, YE & YB) BRD 7/26/10 Design 8/13/10 Dev 9/10/10 Present 9/17/10 Dev Test 9/30/10 UAT 10/1/10 BR 10/3//10 Go Live 10/10/10 BRD 9/14/10 Design 10/15/10 Dev 11/23/10 Dev Test 12/21/10 UAT 12/28/10 BR 12/28/10 Go Live 1/1/11 19
20 Brainstorm Project Management Plan 20
21 Brainstorm. Identified Risk Accept the risk Program timeline Two projects with multiple work streams Resource need New delivery model Security Mitigate risk by: Manage schedule time Unforeseen circumstances 21
22 Brainstorm. Resources Seven employees 75 contractors 9 BAs 34 developers 25 QA/testers Three countries India Japan America 22
23 Brainstorm. Quality Requirements verification Design verification Development verification Testing Developer Quality team User acceptance 23
24 Communication Strategy Daily status to executives Daily status to project team Twice-daily team meeting 24
25 Brainstorm. Budget Estimation AE: US$5 million YE & YB: US$5 million Total: US$10 million 25
26 Business Justification Proposal Project delivery method High-level milestones Resource estimation Introduction to the quality team Communication plan Budget estimation 26
27 10 July
28 Schedule 24 Hours a Day, Five Days a Week Task Name Start Finish % Complete AE2011 Program (schedule based five days a week, day and night) Thu 6/10/10 Thu 1/3/13 3% AE 2011 project 10/10/10 Delivery Thu 6/10/10 Thu 1/3/13 4% Initiation Thu 6/10/10 Fri 6/11/10 100% Planning Thu 6/10/10 Thu 1/3/13 6% Design Thu 6/10/10 Fri 9/3/10 0% Construction Tue 7/27/10 Mon 9/13/10 0% Testing Tue 7/27/10 Mon 10/11/10 0% Implementation Fri 10/8/10 Thu 11/11/10 0% Post Implementation Thu 11/11/10 Tue 12/28/10 0% Year End and Year Begin 01/01/2011 Sub-project Tue 7/6/10 Wed 2/16/11 2% Planning Tue 7/6/10 Wed 2/16/11 2% Construction Fri 10/15/10 Tue 11/23/10 0% Testing Wed 10/20/10 Tue 12/28/10 0% Implementation Tue 12/28/10 Mon 1/31/11 0% Post Implementation Wed 12/29/10 Mon 2/14/11 0% 28
29 July 2010 Daily Status Reports Annual Enrollment Daily Status Update Process % Complete Status Original Targeted Completion Date Work Stream 1 Dependent remains eligible up to 26th birthday 15% Green 7/21/2010 Work Stream 2 Life-change to administration of effective dates 75% Red 7/2/2010 Work Stream 3 Disability-change to administration of effective dates 100% Green Complete Work Stream 4 HMO additions or deletions 30% Green 7/23/2010 Work Stream 5 Screens and flows ( verbiage) 0% Red 7/7/2010 Work Stream 6 Rates for all plans 0% Green 7/23/2010 Work Stream 7 Puerto Rico 75% Green 7/20/2010 Legend: Green - On Track Yellow - Late but will meet target date Red - Behind schedule Work Stream 8 % complete report 0% Green 7/23/2010 Work Stream 9 Health Plan Changes-CDH 15% Green 7/23/
30 August
31 AE and YE & YB Teams 31
32 The Project Champion 32
33 The Pep Talk 33
34 August 2010 Daily Status Reports Process Dependent remains eligible up to 26th birthday % Complete Status Original Targeted Completion Date 50% Red 7/28/2010 % Complete Of ISD Requirements Verification (Target Completion Date 8/06/10) Work Stream 1 Not ready for verification % Complete of ISD Design (Target Completion Date 8/13/10) 7% % Complete of ISD Design Verification (Target Completion Date 9/27/10) % Complete of ISD Development (Target Completion Date 9/10/10) % Complete of ISD Testing (Target Completion Date 10/1/10) % Complete of Business UAT (Target Completion 10/6/10) Life-change to administration of effective dates Disability-change to administration of effective dates Work Stream 2 100% Green Complete 100% 90% Work Stream 3 100% Green Complete 100% 90% Work Stream 4 HMO additions or deletions 100% Green Complete 100% 0% Screens and flows ( verbiage) 30% Red 7/28/2010 Rates for all plans 15% Red 7/30/2010 Puerto Rico 100% Green Complete % complete report 50% Red 7/27/2010 Health Plan Changes-CDH 75% Red 7/28/2010 Work Stream 5 Not ready for verification Work Stream 6 Not ready for verification Work Stream 7 Verification completed in spreadsheets. Will upload to HP QC on Aug 02. Work Stream 8 Not ready for verification Work Stream 9 Schedule verification 8/3 36% 0% 35% 0% 0% 34
35 September
36 2 September 2010 Daily Status Reports Work Stream 1 Process % Complete of BRD (Target Completion Date 7/26/10) % Complete Of ISD Requirements Verification (Target Completion Date 8/06/10) % Complete of ISD Design (Target Completion Date 8/13/10) % Complete of ISD Design Verification (Target Completion Date 8/27/10) % Complete of ISD Development (Target Completion Date 9/10/10) Development Completion Date Customer Walkthrough % Complete of ISD Testing (Target Completion Date 10/1/10) Dependent remains eligible up to 26th birthday 100% 100% 100% 100% 54% 9/10/2010 9/11/2010 Work Stream 2 Life-change to administration of effective dates 100% 100% 100% 100% 60% 9/7/2010 9/11/2010 Work Stream 3 Disability-change to administration of effective dates 100% 100% 100% 100% 60% 9/7/2010 9/11/2010 Work Stream 4 HMO additions or deletions 100% 100% 100% 100% 96% 9/7/2010 9/11/2010 Work Stream 5 Screens and flows ( verbiage) 100% 100% 100% 100% 68% 9/8/2010 9/11/2010 Work Stream 6 Rates for all plans 98% (Target date is 8/13/2010) 98% 70% 0% 0% 9/10/2010 NA Work Stream 7 Puerto Rico 100% 100% 100% 100% 56% 9/10/2010 9/11/2010 Work Stream 8 % complete report 100% 100% 100% 100% 100% 8/20/2010 9/11/ % Work Stream 9 Health Plan Changes-CDH 100% 100% 100% 100% 84% 9/10/2010 9/11/
37 Issues Data Center Power Loss 37
38 Sneak Peak 38
39 October
40 1 October 2010 Daily Status Report Process Work Stream 1 Dependent remains eligible up to 26th birthday % Complete of BRD (Target Completion Date 7/26/10) % Complete Of ISD Requirements Verification (Target Completion Date 8/06/10) % Complete of ISD Design (Target Completion Date 8/13/10) % Complete of ISD Design Verification (Target Completion Date 8/27/10) % Complete of ISD Development (Target Completion Date 9/10/10) Development Completion Date Customer Walkthrough % Complete of ISD Testing (Target Completion Date 10/1/10) 100% 100% 100% 100% 100% 9/17/2010 9/17/ % Action/ Issues/ Remarks Work Stream 2 Life-change to administration of effective dates 100% 100% 100% 100% 100% 09/10/10 9/17/ % Work Stream 3 Disability-change to administration of effective dates 100% 100% 100% 100% 100% 09/10/10 9/17/ % Work Stream 4 HMO additions or deletions 100% 100% 100% 100% 100% 09/10/10 9/17/ % Work Stream 5 Screens and flows ( verbiage) 100% 100% 100% 100% 100% 09/10/10 9/17/ % Work Stream 6 Rates for all plans 100% 100% 100% 100% 100% 09/10/10 9/17/ % Work Stream 7 Puerto Rico 100% 100% 100% 100% 100% 09/10/10 9/17/ % Work Stream 8 % complete report 100% 100% 100% 100% 100% 8/20/2010 9/17/ % Work Stream 9 Health Plan Changes-CDH 100% 100% 100% 100% 100% 09/10/10 9/17/ % Business Readiness % Complete Test Plan (9/1/10) % Complete Test Scenarios (9/1/10) % Complete Regression Test Scenarios (9/1/10) Business User Acceptance Testing 100% 100% 100% Business Readiness Communicatio n Plan Training Plan Implementation Planning 100% 100% % Complete Testing (10/3/10) 40
41 Issues Servers End of Life 41
42 Closure 42
43 Closure Never Been Done Before Provided a sneak peak Only a 2% defect rate Provided a soft launch five days early Go Live three days early Lessons learned Award 43
44 Homework Your Action Plan Your mission next week: Identify qualities in your project managers Collaborate, communicate and trust 44
45 Homework Your Action Plan Next 90 days and continuous service improvement Send project managers to agile training Agile training types Scrum Iterative (RUP) (PMLC) Dynamic Systems Development (DSDM) Adaptive Software Development (ASD) 45
46 Award Presentation AE and YE & YB VP presents award 46
47 Award Seven Associates, My Manager and Me 47
48 Award Onsite Contractor Leads 48
49 The Innovation Award 49
50 50
51 Contact Information Dr. Linda McIntosh, DBA, CSM, ITIL, PMP Executive Director, IT PMO, Sam Houston State University, Huntsville, Texas USA or A leader is always in the moment of being or strives to be uplifting others. Dr. Linda McIntosh 51
The Agile PMP Teaching an Old Dog New Tricks
The Agile PMP Teaching an Old Dog New Tricks Why are we here today? What is Project Management? When will the project be done? How much will it cost? Do we all agree on what done looks like? What are the
More informationReference B Project Management Requirements
Reference B State of Alaska TABLE OF CONTENTS 1... 2 1.1 Project Life Cycle Methodology... 2 1.2 Preliminary Project Management Narrative and Work Plan... 2 2 Master Project Management Plan and Master
More informationWORKING IN DISTRIBUTED AGILE ACROSS THREE CONTINENTS
WORKING IN DISTRIBUTED AGILE ACROSS THREE CONTINENTS This paper talks about the deployment of Distributed Agile best practices on a large globally distributed project for a large telecom vendor and the
More informationPMO17BR201 Caterpillar s Next Step: Implementing Agile in a Waterfall World Seth J. Norburg, PMP, Portfolio Coordinator Caterpillar
HOUSTON, TX, USA 5 8 NOVEMBER 2017 #PMOSym PMO17BR201 Caterpillar s Next Step: Implementing Agile in a Waterfall World Seth J. Norburg, PMP, Portfolio Coordinator Caterpillar Agenda Safety and Introductions
More informationProject Management Documentation Templates
Project Management Documentation Templates Free Download PROJECT MANAGEMENT DOCUMENTATION TEMPLATES PROJECT MANAGEMENT - OFFICIAL SITE Sat, 16 Dec 2017 01:34:00 GMT free project management templates. download
More informationWaterfall Agile and the Adaptable PM. Tracy Alldridge
Waterfall Agile and the Adaptable PM Tracy Alldridge Tracy Alldridge I m a PMP and PRINCE2 Practitioner certified IT Project Manager, with more than twenty years of experience leading major IT projects
More informationDecomposing SAFe. Saturday, April 30th, 2016 at IIT Chicago Always FREE! Registration is OPEN!
Decomposing SAFe Saturday, April 30th, 2016 at IIT Chicago Always FREE! Registration is OPEN! http://www.chicagocodecamp.com/ I ll be at Manager s Workshop on Monday Half-Day Tutorial: Value Stream Mapping
More informationHOUSTON, TX, USA 5 8 NOVEMBER 2017 #PMOSym
HOUSTON, TX, USA 5 8 NOVEMBER 2017 #PMOSym PMO17BR213 Leading an Enterprise Portfolio Management Office in a Disruptive Environment: Lessons Learned at the US Postal Service Emil Dzuray, Director Office
More informationPMO17BR402 Promote Many Options: PMOs That Are Traditional, Hybrid, and Agile Friendly Mike Griffiths Chair of PMI s Agile Practice Guide
HOUSTON, TX, USA 5 8 NOVEMBER 2017 #PMOSym PMO17BR402 Promote Many Options: PMOs That Are Traditional, Hybrid, and Agile Friendly Mike Griffiths Chair of PMI s Agile Practice Guide Agenda Project Manager
More informationSenior Design Documentation Library
Project Charter Department of Computer Science and Engineering The University of Texas at Arlington Taekwondo Match Management System TK Force Team Members: Richard Sherrill Robert Castillo David Odhiambo
More informationBA Role or Skill: David Mantica ASPE Inc. IIBA Lexington, KY Wednesday, August 19 th
BA Role or Skill: David Mantica ASPE Inc. IIBA Lexington, KY Wednesday, August 19 th Agenda A look at the SDLC Crossing the Chasm Decisions in SDLC Overview and Roles in the SDLC The Challenge Model of
More informationProgram Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated
More informationHOUSTON, TX, USA 5 8 NOVEMBER 2017 #PMOSym
HOUSTON, TX, USA 5 8 NOVEMBER 2017 #PMOSym PMO17BR312 Agile Transformation Through Effective Leveraging of PMO Capabilities Dr. Edivandro Conforto, Researcher and Consultant Elaine Augusto, Head of PMO
More informationIIL s International Project Management Day, 2007 The Power of the Profession:
IIL s International Project Management Day, 2007 The Power of the Profession: A Lesson Learned and Solution Implemented Becomes a Best Practice in Project Management by Tresia Eaves, PMP IRS RGS Project
More informationHOUSTON, TX, USA 5 8 NOVEMBER 2017 #PMOSym
HOUSTON, TX, USA 5 8 NOVEMBER 2017 #PMOSym PMO17BR306 Delivering Strategy in a Changing Environment Through Effective Portfolio Management Tasha Sawchuk, Senior Manager, Group Programs & Projects Etihad
More informationDetails. Title: Region: District of Columbia. OCTO Sr. Project Manager Master. Req ID: Requisition Details. Req. Class: Region: District of Columbia
Title: OCTO Sr. Project Manager Master Region: District of Columbia Req ID: 573140 Details Requisition Details Req. Class: BSAV1 : 3-Senior Region: District of Columbia Title: OCTO Sr. Project Manager
More informationapproach to successful project
1 The NYS Forum, Inc. Using an Agile / Waterfall Hybrid approach to successful project delivery Presented by Matthew Carmichael Project Management Workgroup 2 When to use Waterfall Projects that require
More informationOrganizational Agility and How To Attain It
Organizational Agility and How To Attain It Introduction Course Agenda Why Agile? How Do We Create The Vison And Maintain It? How Can We Use Four Best Practices That Are Applicable Today? What is PMI-ACP
More informationAn Agile Projects Introduction Course #PMCurrent-1
An Agile Projects Introduction Course #PMCurrent-1 Aaron MacDaniel, PMP, CSM, MBA Lead Instructor - BetterPM.com An Innate Images, LLC Company 1 Course Agenda About BetterPM.com A typical Waterfall Project
More informationCS314 Software Engineering Project Management
CS314 Software Engineering Project Management Dave Matthews Software process movements Predictive 1970 Waterfall Iterative 1980s, 1990s Spiral, RAD, RUP Adaptive (Agile) late 1990s XP, Scrum, Crystal,
More informationThe ABC of Agile Business Change. James Yoxall BCS 17 September, 2013
The ABC of Agile Business Change James Yoxall BCS 17 September, 2013 Introduction Purpose is to explore the concept of Agile Business Change What does it mean? Why might it be a good thing? Where and when
More informationSYSTEM MODERNIZATION BEST PRACTICES
tl SYSTEM MODERNIZATION BEST PRACTICES SYSTEM MODERNIZATION WORKING GROUP C1 5912-C aamva_systemmodernization_dvd_insert.indd 1 6/7/17 11:01 AM System Modernization Best Practices provides a roadmap to
More informationRIGHTNOW A C E
RIGHTNOW A C E 2 0 1 4 2014 Aras 1 aras.com A C E 2 0 1 4 An Agile Approach to Implementing Aras Innovator Implementation Methodology 2014 Aras aras.com Agenda The Challenge The Aras Approach Real World
More informationWATERFALL & SCRUM THE RIGHT TOOL FOR THE RIGHT JOB. Robin Brandenburg, PMP, CSM, SCPM
WATERFALL & SCRUM & THE RIGHT TOOL FOR THE RIGHT JOB Robin Brandenburg, PMP, CSM, SCPM 4/16/2013 2 Agenda Introduction The Frameworks SCRUM Differences in Waterfall and SCRUM Comparing the Frameworks Key
More informationUnit 8 Project Implementation and Closure
UNIT OVERVIEW Description of the Unit In this unit, you will learn how to execute the project plan, and upon completion, close out the project. You will learn how to develop a role-responsibility matrix,
More informationInformation Technology Services Project Management Office Operations Guide
Information Technology Services Project Management Office Operations Guide Revised 3/31/2015 Table of Contents ABOUT US... 4 WORKFLOW... 5 PROJECT LIFECYCLE... 6 PROJECT INITIATION... 6 PROJECT PLANNING...
More information2017 Spectranetics July POA Meeting
2017 July POA Meeting RFP Details RFP Name Response Due Date Decision Date RFP Type RFP Code 2017 July POA Meeting Thu, 09-Mar-2017 Fri, 28-Apr-2017 Meeting Space and Sleeping Rooms L8NT7N6FG9M Description
More informationMaureen Weverka & Kathy Burnham Mutual of Omaha. November 9, Mutual of Omaha Insurance Company. All Rights Reserved.
Maureen Weverka & Kathy Burnham Mutual of Omaha November 9, 2017 1 Company. All Rights Reserved. Fortune 500 company which strives to help their customers protect what they care about and achieve their
More informationGuerilla Agile: Taking a Project from Worst to First
Guerilla Agile: Taking a Project from Worst to First Kori S. Mendonsa, CBAP, CSPO, CBPMP Principal Business Analyst Agenda About Why Agile? Learning to Change Learning to Adapt Learning to Prioritize Learning
More informationCollabNet Trends, Challenges, and Success with Agile ALM
Agile ALM for Distributed Development CollabNet Trends, Challenges, and Success with Agile ALM Victoria Griggs Sr. Director of Marketing, CollabNet Chris Clarke VP Product Management & Strategy, CollabNet
More informationMike Cottmeyer blog.versionone.net
Adopting Agile Mike Cottmeyer mike.cottmeyer@versionone.com www.linkedin.com/in/cottmeyer www.versionone.com blog.versionone.net www.leadingagile.com Ideal Agile Team Ideal Agile Team Developers Ideal
More informationLearning From The Trenches SCRUM4HW The Gathering
Learning From The Trenches SCRUM4HW The Gathering Jeanne Bradford TCGen, Inc. Cupertino, CA August 2016 Product Development & Strategy Architected Apple s product development process (ANPP) to gain scalability
More informationInstructor s Guide. 1 A companion to Agile Project Management: Making it Work in the Enterprise, Second Edition John Goodpasture, PMP
Instructor s Guide 1 A companion to Agile Project Management: Making it Work in the Enterprise, Second Edition John Goodpasture, PMP 2 Module 1 Outline A Short History Provides Context t Early thinkers
More informationCourse Title: Agile for Business Analysts
Course Title: Agile for Business Analysts 2 Day Workshop AG-BA08 Agile for Business Analysts Course ID: AG-BA08 Credits: 14 PDUs Course Duration: 2 days Course Level: Basic/Intermediate Prerequisites:
More informationSOFTWARE ENGINEERING SOFTWARE-LIFE CYCLE AND PROCESS MODELS. Saulius Ragaišis.
SOFTWARE ENGINEERING SOFTWARE-LIFE CYCLE AND PROCESS MODELS Saulius Ragaišis saulius.ragaisis@mif.vu.lt CSC2008 SE Software Processes Learning Objectives: Explain the concept of a software life cycle and
More informationLife Cycle Success Factors That Reduce the Failure Rate of IT Projects and Programs
Life Cycle Success Factors That Reduce the Failure Rate of IT Projects and Programs Eddie Williams With over 25 years of managing and overseeing successful projects and programs spanning aerospace, DOD,
More informationLean ALM Managing Flow Rather Than Disciplines
Lean ALM Managing Flow Rather Than Disciplines Dave West Forrester Research March, 2012 1 2009 2011 Forrester Research, Inc. Reproduction Prohibited Hello and welcome to today s talk To help people deliver
More informationWaterfall Vs. Agile PM
Waterfall Vs. Agile PM Winning the Battle Between Two Worlds Presented by: Simone Brown Knight, PMP StockTheMind LLC www.stockthemind.com info@stockthemind.com Presenter Profile: Founder and Principal
More informationCase Study: How to Eliminate Flaws of Waterfall and Agile Development Processes Using a Hybrid Model
Case Study: How to Eliminate Flaws of Waterfall and Agile Development Processes Using a Hybrid Model Agile Waterfall Hybrid Model The Waterfall Model has been the ideal choice for software development.
More informationAgenda. PMBOK Guide Third Edition. PMI Standards Background. PMI Life Cycle Plan for Standards. Presented by Kevin Chui, PMP. How Did We Get Here?
Agenda PMBOK Guide Third Edition Presented by Kevin Chui, PMP Vice President, PMI Hong Kong Chapter Background PMBOK Guide 2004 Update Project Structural Changes to the Standard Process Group Changes Knowledge
More informationCourse Title: Agile for Business Analysts
Course Title: Agile for Business Analysts 2 Day Workshop AG-BA08 Agile for Business Analysts Course ID: AG-BA08 Credits: 14: PMI-PDUs, IIBA-CDUs (Professional Development Hours) Course Duration: 2 days
More informationHow do you measure success rate of large scale agile process? [BHAGEERATHI BAI]
How do you measure success rate of large scale agile process? [BHAGEERATHI BAI] About me.. Bhageerathi Bai, Software Quality Engineer at Intel India Pvt Ltd. 2 Our teams Quality reviews and releases Challenges
More informationCreating an Agile PMO via Scrum
Creating an Agile PMO via Scrum Deliver PMO Value Early and Often Utilize Scrum to be Operationally Effective and Efficient Paul Thomas Gilchrest; CSM, ITIL v3, PMP COO & Principal PMO Managing Director
More informationEvents. Artifacts. Roles. Product Owner Scrum Master Development Team. Sprint Sprint Planning Daily Scrum Sprint Review Sprint Retrospective
Scrum Lecture 2 1 Roles Product Owner Scrum Master Development Team Events Sprint Sprint Planning Daily Scrum Sprint Review Sprint Retrospective Artifacts Project Charter Product Backlog Sprint Backlog
More informationScrumWorks Pro and TeamForge. The First Complete Solution for Agile ALM
ScrumWorks Pro and TeamForge The First Complete Solution for Agile ALM Today s Speakers Victor Szalvay CTO, Scrum Business Unit CollabNet Chris Clarke VP, Product Mgmt & Strategy CollabNet 2 Copyright
More informationWORK PLAN AND IV&V METHODOLOGY Information Technology - Independent Verification and Validation RFP No IVV-B
1. Work Plan & IV&V Methodology 1.1 Compass Solutions IV&V Approach The Compass Solutions Independent Verification and Validation approach is based on the Enterprise Performance Life Cycle (EPLC) framework
More informationLean Agile Community of Practice Implementing Scaled Agile
Lean Agile Community of Practice Implementing Scaled Agile February 19, 2018 The Lean Agile Community of Practice focuses on delivering knowledge and providing a virtual networking forum for lean agile
More informationTutorial Project Planning & Design with IT in Mind IT METHODOLOGY WEBINAR
Tutorial Project Planning & Design with IT in Mind IT METHODOLOGY WEBINAR Things to know All participants will be on mute Questions are welcome Use the question box to ask questions We DO NOT send out
More informationLeading Practice: Test Strategy and Approach in Agile Projects
Leading Practice: Abstract This document provides best practices on how to strategize testing CA Project and Portfolio Management (CA PPM) in an agile project. The document does not include specific test
More informationPMO17BR303 The Big Bang Cerner s Approach to Agile Transformation Matt Anderson, PMO Director Cerner Corporation
HOUSTON, TX, USA 5 8 NOVEMBER 2017 #PMOSym PMO17BR303 The Big Bang Cerner s Approach to Agile Transformation Matt Anderson, PMO Director Cerner Corporation Objectives Provide strategies for doing a Big
More informationServiceNow Custom Training and Adoption
ServiceNow Custom Training and Adoption Overview... 3 Adoption Toolkit Deliverables... 3 Change Enablement Deliverables... 4 Custom Training Deliverables... 5 Custom Training Applications by Business Function...
More informationUse Cases and User Stories for Agile Requirements
Use Cases and User Stories for Agile Peter Schmidt, PMP, PMI-ACP, CPL VP, Client Services, ESI International pschmidt@esi-intl.com www.esi-intl.com Agenda 1 2 3 Principles Identify the principles that
More informationLITERA MICROSYSTEMS CUSTOMER EXPERIENCE OVERVIEW ONBOARDING & IMPLEMENTATION ADOPTION & TRAINING CUSTOMER SUPPORT SOFTWARE UPDATES & LONG-TERM SUCCESS
LITERA MICROSYSTEMS CUSTOMER EXPERIENCE OVERVIEW ONBOARDING & IMPLEMENTATION ADOPTION & TRAINING CUSTOMER SUPPORT SOFTWARE UPDATES & LONG-TERM SUCCESS 1 This guide walks through your journey as a customer,
More informationMonthly Independent Verification and Validation Assessment Report
Monthly Independent Verification and Validation Assessment Report Florida Planning, Accounting, and Ledger Management (PALM) Project October 2017 Date: 11/13/2017 Version 1.0 Table of Contents Executive
More informationThe Importance of Business Architecture and IT Architecture in Successful Agile Project Management
The Importance of Business Architecture and IT Architecture in Successful Agile Project Management Francis S. Fons (Frank), PMP, CBA (Certified Business Architect), ACP (Agile Certified Practitioner),
More informationMD Accelerated Switching RM54
MD Accelerated Switching RM54 Potomac Edison December 12, 2016 Accelerated Switching: General Information For any enrollment or drop received, day one will be the day that we get the EDI into our billing
More informationSage North America, Mid-Market R&D. One Team s Agile Journey
Sage North America, Mid-Market R&D One Team s Agile Journey Darrick Coles Director, R&D Sage 500 ERP darrick.coles@sage.com twitter: @dbc_ca Education BS Computer Science, University of Illinois MBA, finance,
More informationPA Accelerated Switching Phase II
PA Accelerated Switching Phase II Met-Ed, Penelec, Penn Power, West Penn Power August 10, 2015 Accelerated Switching: Metered Overview Phase I (12/15/2014) One off cycle switch per billing period Next
More informationHow to Utilize Agile Project Management for GIS Projects. Lana Tylka and Jennifer Prather
How to Utilize Agile Project Management for GIS Projects Lana Tylka and Jennifer Prather How to Start Conduct kickoff meeting Discuss similar industries Assess workflows Prioritize workflows Create a plan
More informationAcademic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation. University Managers Work Group November 2, 2017
Academic & Event Scheduling Tool & Integrated Workplace Management System Program Implementation University Managers Work Group November 2, 2017 Topics Academic & Event Scheduling (AES) Tool Implementation
More informationPriorities, Process & Perseverance
PMO Panel Business Operations Project Management Office An overview Priorities, Process & Perseverance dd th MMM 2012 Ciaran Lacey PMP, PgMP Global PMO Manager Microsoft Operations Maximizing Business
More informationRequest For Proposal for a Hosted, Pension Administration System with Enterprise Content Management and Optional Provisions for Workflow
Request For Proposal for a Hosted, Pension Administration System with Enterprise Content Management and Optional Provisions for Workflow Vendor Pre Bid Questions and Answers 3/20/2017 The responses to
More informationBasics of Project Management. Nadia Circelli June 1, 2016
Basics of Project Management Nadia Circelli June 1, 2016 techniques tools skills Project Management processes Deliver products that meet stakeholders requirements in a timely and efficient way 2 What is
More informationNYS Forum Project Management Work Group Presents
NYS Forum Project Management Work Group Presents PROJECT ESTIMATING BEST PRACTICES December 7, 2015 Agenda: Welcome & Introductions Presentations Questions and Answers 2 Presenters: Jonathan Blake, PMP
More informationState of Florida Department of Financial Services. Invitation to Negotiate DFS RM ITN 13/14-07 For Insurance Management System
State of Florida Department of Financial Services Invitation to Negotiate DFS RM ITN 13/14-07 For Insurance Management System Addendum #2 Modifications to the ITN documentation ITN, Section 2.2, Schedule
More informationLeadership Lessons from Agile and PMI s PM-2. Tim Kloppenborg, PhD, PMP Marcie Lensges, PhD
Leadership Lessons from Agile and PMI s PM-2 Tim Kloppenborg, PhD, PMP Marcie Lensges, PhD Agenda 1. Agile Behaviors 2. PM-2 Leadership Behaviors 3. Common Themes to Agile and PM-2 4. Breakout Session
More informationAgile BA (including IIBA AAC exam prep)
Agile BA (including IIBA AAC exam prep) What benefits does a PMO deliver? Setting up a separate PMO has the advantage of being able to allocate fulltime resources to projects. Specifically, a PMO delivers:
More informationPresented by. H. Wynnlee Crisp
Presented by H. Wynnlee Crisp Presented by H. Wynnlee Crisp 3213 W. Main Ste. 218 Rapid City, SD 57702-2314 hwcrisp@aol.com (425) 681-7887 CONTENTS Managing Project Schedules Part 1: Schedule Management
More informationITBraindumps. Latest IT Braindumps study guide
ITBraindumps http://www.itbraindumps.com Latest IT Braindumps study guide Exam : PK0-004 Title : CompTIA Project+ Exam Vendor : CompTIA Version : DEMO Get Latest & Valid PK0-004 Exam's Question and Answers
More informationBRIAN WAWRYK PMP. PROJECT MANAGER
52 Duncan Norrie Drive Winnipeg, MB R3P 2K1 BRIAN WAWRYK PMP Brian.Wawryk@WawrykConsultingServices.com Residence: 204-261-5531 Cellular: 204-955-9694 Brian Wawryk is an experienced IT professional with
More informationCS360. Business Information Systems Analysis and Modeling. Project Management, JAD, Agile. LJ Waguespack, Ph.D Unit 09: 1
CS360 Business Information Systems Analysis and Modeling Project Management, JAD, Agile LJ Waguespack, Ph.D. 2017 Unit 09: 1 Risk = Stress Projects are Complex in themselves requirement discovery client
More information@AgileAndBeyond Elizabeth Henderson
Joseph Hershey www.linkedin.com/in/jhershey @jhershey @AgileAndBeyond Elizabeth Henderson @elizhender @MMAgile Mei Lim @emwhyng www.linkedin.com/emwhyng emwhyng@gmail.com Brendon Thiede whatbrendonthinks.com
More informationAn Agile PRINCE? Successful project delivery with PRINCE2 and Agile
An Agile PRINCE? Successful project delivery with PRINCE2 and Agile Guy Hancock in an AP nutshell Project Manager / Business Analyst / Product Designer & Owner / Service Designer / Techie (dev) I like
More informationILGS & LGSS. Department of General Service on behalf of Department of Revenue PA Lottery
ILGS & LGSS Department of General Service on behalf of Department of Revenue PA Lottery Instant Lottery Game Services and Lottery Gaming System Services (ILGS and LGSS) RFP # 6100042856 Wednesday August
More informationProject Management Life Cycle (PMLC)
Project Management Life Cycle (PMLC) Section 1 Outline PMLC Background PMLC Overview Phases In Depth Page 2 PMLC Purpose Employ a project management life cycle intended to enable standardization of methodology,
More informationCan Your Proposal Process Be More Agile?
Can Your Proposal Process Be More Agile? 11.21.14 Maryann Lesnick Principal Consultant Lohfeld Consulting Questions to Explore Shipley and other proposal industry best practices have been around for 30
More informationM3 Playbook Guidance. 1.1 Establish Initial Customer PMO and Processes. Human Resources (HR)/Staffing Plan
M3 Playbook Guidance Phase 1: Readiness This guidance is intended for use by organizations to confirm and validate that their plans are comprehensive and have adequate level of detail for proper migration
More informationPMO17BR405 Life After PMO of the Year Finalist Where Do We Go Next? Kevin Dixon, PMP, PgMP, PfMP, Director of Program Management Parker Aerospace
HOUSTON, TX, USA 5 8 NOVEMBER 2017 #PMOSym PMO17BR405 Life After PMO of the Year Finalist Where Do We Go Next? Kevin Dixon, PMP, PgMP, PfMP, Director of Program Management Parker Aerospace Parker Aerospace
More informationAbout Whirlpool Corporation
Quality and Speed for PTC Windchill Deployments through Dedicated PLM Testing Team Yogesh Khanzode Lead Enterprise PLM Testing, GIS GPO, Whirlpool Corporation 06/10/2015 About Whirlpool Corporation #1
More informationApplying the Right Project Management Methodology to the Right Project: Traditional or Agile. Scott Major, PMP
Applying the Right Project Management Methodology to the Right Project: Traditional or Agile Scott Major, PMP April 25, 2018 1 Agenda Context» What is Traditional Project Management» Why is there something
More informationBlatant Commercialism
Do you really think that s the answer to our SCM problems Blatant Commercialism The Westfall Team: Promotes the advancement of software excellence by helping our clients achieve effective & efficient software
More information2017 Contact Center Overflow Vendor Request for Proposals Responses to RFP Questions
2017 Contact Center Overflow Vendor Request for Proposals Responses to RFP Questions May 5, 2017 All questions are addressed below: Q1: Will the vendor s geographic location(s) or potential location(s)
More informationVendor: GAQM. Exam Code: CSM-001. Exam Name: Certified Scrum Master (CSM) Version: Demo
Vendor: GAQM Exam Code: CSM-001 Exam Name: Certified Scrum Master (CSM) Version: Demo QUESTION 1 What is the maximum amount of time that the team should spend in the daily scrum? A. As long as it takes
More informationSPOK PROFESSIONAL SERVICES. Smarter Clinical Communications. Better Outcomes.
SM SPOK PROFESSIONAL SERVICES Smarter Clinical Communications. Better Outcomes. SPOK VALUE ALIGNMENT, IMPLEMENTATION, AND SOLUTIONS CENTER WE HELP YOU WORK SMARTER AND REACH YOUR GOALS SOONER Business
More informationA Continuous Delivery Journey SHOBHA SUBRAMONIAN APRIL 05, 2018
A Continuous Delivery Journey SHOBHA SUBRAMONIAN APRIL 05, 2018 Picture source: QuizzClub.com Copy r i g ht S A S I nst i t ut e I nc. A l l r i g ht s r e se r v e d. INTRODUCTION A Case Study in moving
More informationConcepts Explore the Software Testing Lifecycle IT METHODOLOGY WEBINAR
Concepts Explore the Software Testing Lifecycle IT METHODOLOGY WEBINAR Things to know All participants will be on mute Questions are welcome Ask questions in the question box We DO NOT send out PDU certificates
More informationRESKILL. Be Future Ready. PMP Course Agenda. Globally Trusted Education Provider
Globally Trusted Education Provider PMP Course Agenda RESKILL. Be Future Ready. P R O J E C T M A N A G E M E N T ITSM INTERNET SECURITY NETW ORKING CLOUD COMPUTING Course Description PMP training program
More informationPMBOK on Steroids: The Integrated Project Delivery. Development of a Continuing Care Retirement Community
PMBOK on Steroids: The Integrated Project Delivery Development of a Continuing Care Retirement Community The Product: Ashby Ponds 3NHD 1,500 Unit Campus The Product: Ashby Ponds 3NHD 1,500 Unit Campus
More informationBoston University Metropolitan College. MET CS634 Agile Software Development
Boston University Metropolitan College MET CS634 Agile Software Development Rachel Alt-Simmons Adjunct Lecturer Summer EL 2017 Quick Guide Welcome to Agile Software Development!...3 Meet Your Instructor...4
More informationSix Sigma/PM Integration Rules of Engagement
Six Sigma/PM Integration Rules of Engagement Prepared By: Dr. Abhay V. Trivedi, Ph.D., PMP, CSSBB, PMI-RMP trivediabhay@gmail.com Phone: 770-315-0139 Dr. Trivedi and Associates October 20, 2011 Because
More informationTutorial Executing Projects with IT Methodologies IT METHODOLOGY WEBINAR
Tutorial Executing Projects with IT Methodologies IT METHODOLOGY WEBINAR Things to know All participants will be on mute Questions are welcome Ask questions in the question box We DO NOT send out PDU certificates
More informationBraindumpsVCE. Best vce braindumps-exam vce pdf free download
BraindumpsVCE http://www.braindumpsvce.com Best vce braindumps-exam vce pdf free download Exam : PK0-004 Title : CompTIA Project+ Exam Vendor : CompTIA Version : DEMO Get Latest & Valid PK0-004 Exam's
More informationManage Projects Effectively
White Paper Application Development, Test & Delivery Manage Projects Effectively Table of Contents page Executive Summary... 1 The Micro Focus Solution Invest in What Matters Most then Manage It... 2 Strategic
More informationPMI Agile Certified Practitioner (PMI-ACP) Duration: 48 Hours
PMI Agile Certified Practitioner (PMI-ACP) Duration: 48 Hours Organizations that are highly agile & responsive to market dynamics complete more of their projects successfully than their slower-moving counterparts.
More informationAgilitate.com. From Mountain To Molehill. Saving Millions With Agile Programme Management. Bill Nicholas - 8 th September 2011
Agilitate.com From Mountain To Molehill Saving Millions With Agile Programme Management Bill Nicholas - 8 th September 2011 1 Agilitate.com About The Scrum Chef Title E-mail Address : Director Of Agile
More informationProject Planning and Management (PPM) V2.0. WBS Dictionary
Project Planning and Management (PPM) V2.0 WBS Dictionary Software as a Service (SaaS) Version 1.0 August 2014 1 Table of Contents PPM V2.0 Work Breakdown Structure (WBS) Dictionary 1 Project Type: Software
More informationV3 Pension Administration System Solution April 2013 First Quarter Board Update
V3 Pension Administration System Solution April 2013 First Quarter Board Update Agenda Project Overall Status Update PASS V3 Project Status Gantt Chart PASS V3 Project Milestones Project First Quarter
More informationImproving the Test Process
14 June 2011 ISSN 1866-5705 www.testingexperience.com free digital version print version 8,00 printed in Germany istockphoto.com/ jgroup Improving the Test Process Stefan Häuselmann - Fotolia.com Testing
More informationMicrosoft s New Vision for Modern Work Management. Presented by: Jacques Goupil October 4 th, 2018
Microsoft s New Vision for Modern Work Management Presented by: Jacques Goupil October 4 th, 2018 Introductions Agenda Microsoft s Vision Modern Work Management Project Home Roadmap New Project Management
More informationThe Practice of using a WBS - reading between the lines
The Practice of using a WBS - reading between the lines By, PMP, SCPM, Certified OPM3 Professional Using a WBS - Is it so simple? Various project management standards for example PMI, NASA and DOD have
More information