1 STATEMENT OF WORK Troy Armoury Generator System Replacement April 2019
2 TABLE OF CONTENTS 1. GENERAL SITE DESCRIPTION AND BACKGROUND SCOPE OF WORK REFERENCES
3 1. GENERAL This (SOW) is intended to identify the requirements and provide project information for the Tenderer. The aim of this SOW is to define scope of services in order for the Tenderer to understand the scope of services required and develop a proposal. 2. SITE DESCRIPTION AND BACKGROUND The project site is located at 540 Chippewa St West, North Bay, ON. The standby generator is located in the boiler room and used to provide power to the storm-water sump pumps in the event of a power failure. The existing aboveground diesel tank is a single wall steel tank with an approximate volume of 140 L. The Department of National Defence (DND) intends on removing the existing generator system and replacing it with an indoor self-contained unit. 3. SCOPE OF WORK 3.1. All fuel related work is to be carried out by by a Technical Standards & Safety Authority (TSSA) trained and certified installer by the Province of Ontario, in accordance with SOR/ Storage Tank Systems for Petroleum Products and Allied Petroleum Products Regulations. Submit certificate of licensed installer to DCC Representative All generator associated work is to be carried out as per C standards All electrical work is to be carried out as per the 2018 Canadian Electrical Code All natural gas work is to be carried out by a Technical Standards & Safety Authority (TSSA) registered contractor. Contractor is to use a licensed gas technician for all work Contractor to provide temporary standby power for any lapse in service during the construction process to ensure continuous power to the sump pumps in the event of a power failure Removal of the existing storage tank and generator system will include the following: Drain fuel from tank and fuel lines. Waste fuel and fuel contaminated sediment is to be disposed as per the Environmental Protection Act (EPA) and R.R.O. 1990, Reg 347. DND/DCC must be given a minimum of 2 days notice prior to the removal of the waste from site to ensure that a TDG trained DND staff member is available to sign off on the waste manifest Remove and dispose of existing fuel tank, supply and return fuel lines as well as the secondary containment (See Photo 1). Repair wall penetrations to match surrounding materials. Provide fume escape mitigation procedure for review prior to tank removal. Affix DND provided tag on decommissioned tank to identify that it is out of service. Tank must be completely decommissioned to ensure it is not re-used. Provide certificate of tank removal indicating date of removal, contractor name and TSSA #, address of existing tank, method of disposal and location of disposal Ensure vapour levels are within provincial regulations prior to transporting any decommissioned fuel components. 3
4 Remove and dispose of existing generator, metal secondary containment and transfer switch as well as all wiring associated with all components. Sump pump control panel is to remain and be reused. Provide disposal manifest to DCC Rep Installation of new generator system will include the following: Supply & install new 20 Kw self-contained indoor generator within the same footprint of the existing generator system. Generator is to be powered by natural gas. Provide 150mm thick concrete housekeeping pad. Concrete is to be 20 MPa with 100 mm slump and 6% air entrainment. Concrete pad dimensions must accommodate new generator footprint Generator shall be tested and certified per the latest EPA, UL and CSA standards. Unit shall meet NFPA The generator shall control up to 4 electrical loads and be able to monitor power demand independently for each load. Monitoring capabilities shall be located in the generator panel Exercise modes are to include settings for time, date and frequency Sound is to be limited to 70 db (A) at normal load measured at 25ft Engine is to be equipped with low oil pressure shutdown as well as visual and audible low oil level warning Alternator shall be 60 Hz, 1 phase Controls shall be displayed in English Generator unit shall have a 5 year / 2000 hours warranty Replace existing insulated exhaust pipe from new generator to ceiling penetration in Boiler Room 6 including all necessary fittings (+/ linear metres). Exhaust shall be 50mm Schedule 40 black iron pipe. Supply & install new high temperature insulation on new 2 pipe. Discarded pipe is to be recycled and insulation to be disposed Supply & install 50 mm flexible, seamless corrugated stainless steel exhaust tubing at least 610 mm long to the engine exhaust outlet to allow for thermal expansion and generator movement Supply and install all required fittings and ducting to connect to existing 200 mm x 250 mm combustion air ducting Supply & install new Automatic Transfer Switch (ATS) in same location as existing ATS. Switch shall be UL 1008 listed and matched to the generator unit as per manufacturer s recommendation. Switch is to monitor utility power continuously. When utility power fails, the generator set is to be signalled to start and automatically transfer the load. When stable utility voltage returns, the switch is to automatically return the load from the generator to the utility. Dispose of existing ATS Supply and install all electrical wiring including power, controls and data necessary for the operation of the generator i.e. generator to transfer switch, transfer switch to sump pump control panel, combustion air controls etc Supply and install new natural gas line from main gas service adjacent to building main entrance as noted on the drawing. Gas line size and type shall maintain an operating pressure between 1.5 and 3.2 kpa. Natural gas line shall be installed as per Clause Off-site natural gas and B.13 of C
5 3.14. The equipment is to be placed in the boiler room via a floor hatch located at the front entrance of the armoury. The access has been taped and mudded on the interior of the boiler room (see photos). Return interior of boiler room access to condition before the replacement occurred Contractor to supply as-built record drawings (1 electronic AutoCAD & PDF version) for new generator system including: Outline of all generator components; Centreline of all piping; Generator base; All gauges and alarms; Label all piping, gauges, conduits, all parts of the system Draft as-built record drawings to be submitted to the DCC Representative minimum 2 weeks prior to Commissioning of the system for review by client Run and test generator to ensure sump pumps function during power outages. Simulate a power outage to ensure proper functioning of the generator. Tests are to be conducted in the presence of a DCC Representative Submit following shop drawings for review prior to installation and within 15 days of contract award. Allow 10 days for submittals review: generator, venting, switching and all associated components Cummins is the approved manufacturer. Applicants must submit all Requests for Acceptance of Alternative Materials on the Defence Construction Canada form DCL 242 at least ten (10) working days prior to the tender closing date. If the alternative material or equipment is accepted for the purposes of the tender then all tenderers will be advised with an amendment to the tender documents. Requests submitted too late to permit a review and subsequent issue of an amendment will be returned to the applicant. 4. REFERENCES.1 American Petroleum Institute (API)..1 API RP 651, Cathodic Protection of Aboveground Petroleum Storage Tanks..2 API STD 653, Tank Inspection, Repair, Alteration, and Reconstruction..2 Canadian Council of Ministers of the Environment (CCME)..1 CCME-PN1326-[2004], Environmental Code of Practice for Aboveground and Underground Storage Tank Systems Containing Petroleum and Allied Petroleum Products..3 Department of Justice Canada (Jus)..1 Canadian Environmental Protection Act, 1999 (CEPA)..4 The Master Painters Institute (MPI)..1 Architectural Painting Specification Manual..5 National Research Council/Institute for Research in Construction..1 National Fire Code of Canada (NFCC), current edition..6 Transport Canada (TC)..1 Transportation of Dangerous Goods Act, 1992 (TDGA)..7 Underwriters' Laboratories of Canada (ULC)..1 ULC/ORD-C58.9, Secondary Containment Liners for Underground and Aboveground Tanks..2 ULC-S601, Aboveground Horizontal Shop Fabricated Steel Tanks. 5
6 .8 SOR/ Storage Tank Systems and Petroleum Products and Allied Petroleum Products Regulations..9 National Building Code, Canadian Electrical Safety Code, Fire Protection and Prevention Act, 1997 and associated codes/regulations.12 Technical Standards and Safety Act, 2000 and associated codes/regulations 6
7 Photo #1: Existing Fuel Tank and Containment To Be Removed
8 Combustion Air Duct Exhaust Pipe Photo #2: Existing Generator System and Transfer Switch New Generator is to be located in same area 8
9 Photo #3: Floor hatch at entrance of building measuring 70 x 70 Photo #4: Floor hatch in boiler room taped and mudded 9
10
SECTION CONCRETE ABOVE GROUND FUEL STORAGE
SECTION 23 13 23 CONCRETE ABOVE GROUND FUEL STORAGE SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or
More informationAdam Sweet 2KGAL DW AST DUAL FUEL STORAGE TANK FOR A GENERATOR - NO DRAWINGS 5/9/2017 False
Above Ground Concrete Encased Fuel Storage Tank System Category: Tanks Project ID #: 1004373561 Street Address: To Be Announced Woodstock CT Staff Estimate Value $60,000.00 06281 County: Windham Stage:
More information1.1 SUMMARY.1 Comply with requirements of this Section when performing following work:
Page 1 of 6 Part 1 General 1.1 SUMMARY.1 Comply with requirements of this Section when performing following work:.1 Removing roofing materials that are suspected of containing asbestos using wet material
More informationSTORAGE OF PCB MATERIAL REGULATIONS [FEDERAL] [Repealed by SOR/ ]
PDF Version [Printer-friendly - ideal for printing entire document] STORAGE OF PCB MATERIAL REGULATIONS [FEDERAL] [Repealed by SOR/2008-273] Published by Quickscribe Services Ltd. Updated To: [includes
More informationCIVIC CENTER NORTH PUMP STATION AND JOHN DUCKETT PUMP STATION STANDBY GENERATOR REPLACEMENT PROJECT
FOR BIDDING ONLY MARIN COUNTY, CALIFORNIA CIVIC CENTER NORTH PUMP STATION AND JOHN DUCKETT PUMP STATION STANDBY GENERATOR REPLACEMENT PROJECT JOB NO. 10300-11/-09 VOLUME 4: DRAWINGS NOVEMBER 2011 DISTRICT
More information344 Edmonton Street, Winnipeg, Manitoba, Transport Canada Accommodation Fit-Up. Project No.: R September 13, 2016
Public Works and Government Services Canada 344 Edmonton Street, Winnipeg, Manitoba, Transport Canada Accommodation Fit-Up Addendum No. 6 Page 1 of 2 Project No.: R.055495.003 September 13, 2016 The following
More informationSANDBORN INTERNAL FLOATING ROOF SPECIFICATION
1. GENERAL SANDBORN INTERNAL FLOATING ROOF SPECIFICATION This specification defines the minimum requirements for the design, materials, fabrication, inspection, testing and documentation of a Sandborn
More informationNATIONAL BUILDING CODE OF CANADA 1985
NATIONAL BUILDING CODE OF CANADA 1985 FIRST REVISIONS Issued by the Associate Committee on the National Building Code National Research Council of Canada Ottawa January 1986 Revisions to the National Building
More informationSpray Booth Guideline
Department of Development Service 135 North D Street, Perris CA. 92570 Phone: (951) 443-1029 Fax: (951) 943-3293 2016 CODES PURPOSE The intent of this guideline is to provide the information necessary
More informationExterior Door & PA System Replacement, Domestic Water Piping System and B/F Access Upgrades
Addendum 1 Page 1 ADDENDUM NO. 1 Domestic Water Piping System and B/F Access Upgrades Sundridge Centennial Public School Sundridge, Ontario The following Addendum shall be part of the Tendering Documents
More informationUBC Technical Guidelines Section Edition Fume Hoods Page 1 of 5
Page 1 of 5 1.0 GENERAL 1.1 Related UBC Guidelines.1 Section 12 35 53 Laboratory Casework.2 Section 23 38 16 Fume Hood Exhaust Systems.3 Section 20 00 08 Mechanical Identification for the details for fume
More informationBuilding Permit Application
Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: ARCHITECT/ENGINEER ADDRESS:
More informationPERMIT SUBMITTAL GUIDE FOR COMMERCIAL PROJECTS
Collier Township 2418 Hilltop Road, Suite 100, Presto, PA 15142 Ph. 412-279-9998 PERMIT SUBMITTAL GUIDE FOR COMMERCIAL PROJECTS This guide applies to all projects except 1 & 2 family dwellings and townhouses
More informationSection 70 Airport Transformer Vault and Vault Equipment (FAA L-109)
Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION 1. This item
More informationCity Of Mendota Construction Procedures
City Of Mendota Construction Procedures Building Permit Application: A permit shall be obtained prior to commencing work of any type. Failure to do so may result in doubling the permit fees. At the time
More informationSECTION SANITARY WASTE INTERCEPTORS
SECTION 22 13 23 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable in the section
More informationGuideline for In-Service Assessment of Ammonia Refrigeration Plants
Guideline for In-Service Assessment of Ammonia Refrigeration Plants This communication is intended to be used by plant owners and operators to provide guidance in preparation for an assessment of the plant
More informationSECTION UNDERGROUND STORAGE TANK REMOVAL
SECTION 02 65 00 UNDERGROUND STORAGE TANK REMOVAL SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Consider including unit prices for additional
More informationNew Jersey Home Inspection - Standards of Practice
New Jersey Home Inspection - Standards of Practice 13:40-15.16 Standards of Practice (a) All NJ home inspectors and associate NJ home inspectors shall comply with the standards of practice contained in
More information1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information:
SECTION 260500 - GENERAL REQUIREMENTS FOR ELECTRICAL 1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information: A. Codes, Laws,
More information1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:
125 Syndicate Avenue, Thunder Bay, Ontario Page 1 of 5 Part 1 General 1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:.1 Removing asbestos-containing transite
More informationSPECIFICATION SECTION : GLASS FLOORING & FRAMING GPX FireFloor System (Patented)
Welcome to the SAFTIFIRST TM Guide Specification System prepared as an aid to specifiers in preparing written construction documents. For specification assistance with specific product applications, please
More informationSUPPLEMENTARY SECTION: STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018
STANDARD SPECIFICATIONS PAGE 1 STORMWATER MAINS & CULVERTS MAY 2018 PART 1 - GENERAL... 2 1.1 Work Included... 2 1.2 Related Sections... 2 1.3 Reference Standards... 2 1.4 Shop Drawings... 3 1.5 Certificates...
More informationPresented to the IAPMO Standards Review Committee on December 10, 2018
Summary of Substantive Changes between the 2013 and the 2018 editions of ASME A112.3.4/CSA B45.9 Macerating Toilet Systems and Waste Pumping Systems for Plumbing Fixtures Presented to the IAPMO Standards
More informationREGULATION OF THE MINISTER OF COMMUNITY, ABORIGINAL AND WOMEN S SERVICES. Safety Standards Act M 62
PROVINCE OF BRITISH COLUMBIA REGULATION OF THE MINISTER OF COMMUNITY, ABORIGINAL AND WOMEN S SERVICES Safety Standards Act M 62 I, Murray Coell, Minister of Community, Aboriginal and Women s Services,
More informationIf a new residence s electrical service is not located within 200 feet of existing
Primary Line Extensions CHAPTER 4 If a new residence s electrical service is not located within 200 feet of existing primary electrical facilities, a primary line extension is required to place a close
More informationSECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:
SECTION 13 05 41 SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED 1-25-13 PART 1 GENERAL 1.1 DESCRIPTION: A. Provide seismic restraint in accordance with the requirements of this section
More informationCONSTRUCTION SPECIFICATION FOR TUNNELLING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 415 FEBRUARY 1990 CONSTRUCTION SPECIFICATION FOR TUNNELLING 415.01 SCOPE 415.02 REFERENCES 415.03 DEFINITIONS TABLE OF CONTENTS 415.04 SUBMISSION AND
More informationThe following is required for a complete permit submittal for each unit.
P: (847)810-3502 OR (847)810-3503/3521, F: (847)615-4383 MULTI-FAMILY OR COMMERCIAL ADDITION OR ALTERATION PERMIT REQUIREMENTS The following is required for a complete permit submittal for each unit. MULTI-FAMILY
More informationNational Master Specification (NMS) Section Publisher: Spex.ca Page 1. Approved: RELATED REQUIREMENTS.1 Section [ ].
National Master Specification (NMS) Section 07 21 16 BLANKET INSULATION Publisher: Spex.ca Page 1 Approved: 2014-12-31 Part 1 General 1.1 RELATED REQUIREMENTS.1 Section [ ]. 1.2 REFERENCES.1 CSA Group.1
More informationSECTION GROUND STORAGE TANK
SECTION 13210 GROUND STORAGE TANK PART 1 GENERAL 1.01 Summary A. Section Includes: Provision for welded steel storage tank design, fabrication, construction and erection, including tank accessories. B.
More informationADDENDUM NO. 1. Addendum 1. Page 1. Barrier Free Accessibility Upgrades. F.J. McElligott Secondary School. Mattawa, Ontario
Addendum 1 Page 1 ADDENDUM NO. 1 F.J. McElligott Secondary School Mattawa, Ontario The following Addendum shall be part of the Tendering Documents and shall supersede the drawings and/or Specifications
More informationCOMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION
COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION OFFICIAL USE ONLY Date: Permit #: Received by: For Staff Use Only: OFD ELEC Planning SITE LOCATION Site Address: Tax Parcel Number: TYPE OF WORK Building
More informationTitle: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards
Change History Date Description of Change Pages / Sections Modified Change Approver Initials 8/1/17 Update sections Materials and Special Requirements 3 F. 2. 4 H. 2.; 10. & 11(added) 6/15/16 Updated division
More informationSECTION SANITARY WASTE INTERCEPTORS
SECTION 22 13 23 SANITARY WASTE INTERCEPTORS PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable
More informationPLUMBING BUILDING SCOPE OF WORK
PLUMBING BUILDING SCOPE OF WORK 1. The Contractor shall furnish all supervision, materials, labor, equipment, tools, supplies, incidental items, including construction cleanup, etc for accomplishing the
More informationSection Asbestos Containment Procedures
Section Cover Page Section 02 82 05 2017-10-01 Use this Section where full containment will be required, or if a Contractor option, may be required, depending on the removal method(s) selected by the Contractor.
More informationROCKWOOL Blanket (and Batt) Insulation Section Master Guide Specification (AFB evo ) Page 1 January 2018
Master Guide Specification (AFB evo ) Page 1 Click on the pilcrow in the MS Word Toolbar to toggle ROCKWOOL GUIDE NOTES on and off. Delete this text before incorporating the section into a Project Manual.
More informationWORKING DRAFT OF COMMITTEE MEETING OUTPUT
WORKING DRAFT OF COMMITTEE MEETING OUTPUT CONTENT NOT FINAL SUBJECT TO REVISION PRIOR TO LETTER BALLOT AND PUBLICATION OF SECOND DRAFT REPORT Document: NFPA 30A Revision Cycle: A2017 Meeting Dates: August
More informationSection Standards of Practice. a) The following are terms commonly used in the writing of home inspection reports.
Follow the link below to view the latest Illinois General Assembly document or view a saved copy below which was last downloaded 01/25/2018. http://www.ilga.gov/commission/jcar/admincode/068/068014100c02000r.html
More informationCOMPANY: CERTIFIED HOME INSPECTIONS ADDRESS: 92 NORTH RD. CITY, STATE, ZIP: NUTLEY NJ PHONE:
COMPANY: CERTIFIED HOME INSPECTIONS ADDRESS: 92 NORTH RD. CITY, STATE, ZIP: NUTLEY NJ 07110 PHONE: 973-667-3747 New Jersey Home Inspector-Standards of Practice - NJ ADC 13:40-15.16 (a) All home inspectors
More informationHEALTH AND SAFETY MANUAL
HEALTH AND SAFETY MANUAL Title: Spray Finishing Approved by: Greg Savoy Rev. 1/108 1 Purpose/Scope: The Company is firmly committed to providing each of its employees a safe and healthy work environment.
More informationVOLUME 4 DIVISION SPECIFICATIONS
Page 1 Section Title Consultant Pages VOLUME 4 DIVISION 00-01 SPECIFICATIONS Division 00 - Procurement and Contracting Requirements 00 01 07 SEALS PAGE All 5 00 01 11r6 TABLE OF CONTENTS All 7 00 21 13r1
More informationDANGEROUS GOODS PETRO INDUSTRIAL TANK COMPLIANCE CHECKLIST FORM
DANGEROUS GOODS PETRO INDUSTRIAL TANK COMPLIANCE CHECKLIST FORM Tank Manufacturer : Consultant Ref No. File No. PETRO Industrial Pty Ltd Kelvin Cooper - Accreditation Number 6IM055 KGC 150213 Proposed
More informationDIVISION 22 PLUMBING SECTION INTERIOR SANITARY WASTE AND VENT PIPING SYSTEM
DIVISION 22 PLUMBING PART 1 GENERAL 1.01 DESCRIPTION A. Provide a complete system of soil, waste, and vent piping to fixtures and equipment, including traps, floor drains and cleanouts, extending to a
More informationDIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders
More informationA. This Section includes exterior piping for vertical, direct-buried, ground-loop, heat-pump systems that operate between 23 and 104 deg F.
SECTION 23 21 16 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationOctober 1, 2012 Revisions of TSSA Fuels Safety Code Adoption Documents, Codes and the Environmental Management Protocol
October 1, 2012 Revisions of TSSA Fuels Safety Code Adoption Documents, Codes and the Environmental Management Protocol On October 1, 2012, the Technical Standards and Safety Authority published and revised
More informationInspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.
Purpose 355 West Queens Road Single Family New Construction Required Inspection Stages Master Requirement GEN 110 Building Department: 604-990-2480, building@dnv.org, fax: 604-984-9683 The following procedure
More informationAugust 2015 INTERIM No. 180 (I)
SPECIFICATIONS FOR FIELD LABORATORIES 180. 1. SCOPE These Specifications govern all requirements for supplying and maintaining a field laboratory for the exclusive use of the Engineer. 2. SUPPLY The Contractor
More information11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...
Contents 11. Construction processes and materials... 11-2 11.1 Power House... 11-2 11.2 Maintenance Building... 11-2 11.3 Fuel Treatment Building... 11-3 11.4 Roads & Paths... 11-3 11.5 Fencing... 11-3
More informationTown of East Haven Bid Fire Department Standby Generator Fire Department Station 4
Town of East Haven Bid 19-03 Fire Department Standby Generator Fire Department Station 4 SEALED BIDS MAY BE SUBMITTED TO THE OFFICE OF THE DIRECTOR OF FINANCE, 250 MAIN STREET, EAST HAVEN, CONNECTICUT
More informationBUILDING DIVISION 120 Malabar Road, S.E., Palm Bay, FL Phone: (321) Fax: (321)
BUILDING DIVISION 120 Malabar Road, S.E., Palm Bay, FL 32907 Phone: (321) 953-8924 Fax: (321) 953-8925 CUSTOMER SERVICE INFORMATION ON COMMERCIAL PLAN REVIEW REQUIRED DOCUMENTS MUST BE SUBMITTED AT TIME
More informationSECTION LOOSE-FILL INSULATION. 1.1 SUMMARY A. Section Includes: 1. Loose-fill insulation // with vapor barrier // at attic floors.
SECTION 07 21 23 LOOSE-FILL INSULATION SPEC WRITER NOTE: Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Loose-fill
More informationSPRAY BOOTH REQUIREMENTS
SPRAY BOOTH REQUIREMENTS Submittal Requirements: 4 sets of plans 2 sets of calculations 2 sets of manufacture specifications and/or cut sheets Plans shall be a minimum size of 11x17 Calculations shall
More informationSPRAY BOOTH REQUIREMENTS
SPRAY BOOTH REQUIREMENTS Submittal Requirements: 4 sets of plans 2 sets of calculations 2 sets of manufacture specifications and/or cut sheets Plans shall be a minimum size of 11x17 Calculations shall
More informationCapital Projects Group Gas Fired Warm Air Furnace Specification
Capital Projects Group Gas Fired Warm Air Furnace Specification Specification 23 54 16 Revision 1 Date: September 2018 Gas Fired Warm Air Furnace Specification Specification 23 54 16 Publication Date:
More informationSection ARMORED MEDIUM VOLTAGE CABLES SHIELDED 3 CONDUCTOR POWER CABLE - INTERLOCKED ARMOR
PART 1 - GENERAL Section 26 05 15 SHIELDED 3 CONDUCTOR POWER CABLE - INTERLOCKED ARMOR 1.1 Cable shall be 15 kv, shielded, three conductor with ground, stranded copper, with continuously welded and corrugated
More informationIssued for Bid West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS
669.7403.001 West Alexandria, OH 05/2018 WWTP Improvements Contract 2 TABLE OF CONTENTS Page C-111 Advertisement for Bids 1-2 C-200 Instruction to Bidders 1-10 C-410 Bid Form for Construction Projects
More informationPetroleum Production and Disposal Facility Static and Lightning Mitigation
Overview Petroleum Production and Disposal Facility Static and Lightning Mitigation Over the years, there have been an inordinately high number of ignitions caused by lightning and static at petroleum
More informationROCKWOOL Board Insulation Section Master Guide Specification Page 1 Jan 2017
Master Guide Specification Page 1 Click on the pilcrow in the MS Word Toolbar to toggle ROCKWOOL GUIDE NOTES on and off. Delete this text before incorporating the section into a Project Manual. 1 GENERAL
More informationPROCUREMENT AND CONTRACTING DOCUMENTS GROUP
PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 11 00 Notice To Bidders 00 21 00 Instructions To Bidders 00 22 00 Supplementary Instructions To Bidders
More informationSECTION GROUND WATER STORAGE TANKS
SECTION 33 16 13 GROUND WATER STORAGE TANKS PART 1: GENERAL 1.01 SCOPE A. Section includes requirements for designing, fabricating, and erecting a welded steel ground storage tank. 1.02 SYSTEM DESCRIPTION
More informationSECTION LOW-VOLTAGE TRANSFORMERS
PART 1 GENERAL 1.1 DESCRIPTION SECTION 26 22 00 SPEC WRITER NOTE: Use this section only for NCA projects. Delete between // // if not applicable to project. Also, delete any other item or paragraph not
More information9) Home Inspection: As defined in Section 1-10 of the Act.
TITLE 68: PROFESSIONS AND OCCUPATIONS CHAPTER VIII: DEPARTMENT OF FINANCIAL AND PROFESSIONAL REGULATION PART 1410 HOME INSPECTOR LICENSE ACT SECTION 1410.200 STANDARDS OF PRACTICE Section 1410.200 Standards
More informationTITLE 68: PROFESSIONS AND OCCUPATIONS CHAPTER VIII: DEPARTMENT OF FINANCIAL AND PROFESSIONAL REGULATION
TITLE 68: PROFESSIONS AND OCCUPATIONS CHAPTER VIII: DEPARTMENT OF FINANCIAL AND PROFESSIONAL REGULATION PART 1410 HOME INSPECTOR LICENSE ACT SECTION 1410.200 STANDARDS OF PRACTICE a) The following are
More informationN.J.A.C. 13: NEW JERSEY ADMINISTRATIVE CODE Copyright (c) 2015 by the New Jersey Office of Administrative Law
N.J.A.C. 13:40-15.16 NEW JERSEY ADMINISTRATIVE CODE Copyright (c) 2015 by the New Jersey Office of Administrative Law *** This file includes all Regulations adopted and published through the *** *** New
More informationPIKES PEAK PARKING RESTORATION TABLE OF CONTENTS
23 HEATING, VENTILATING AND AIR CONDITIONING TABLE OF CONTENTS TABLE OF CONTENTS DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING - Basic HVAC Requirements 238239.19 - Wall and Ceiling Unit Heaters
More informationSECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION
SECTION 21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION PART 1 - GENERAL 1.1 SUMMARY A. This section supplements all sections in this division, including pipe, fittings, valves, and connections for sprinkler
More informationANNEX A.1 TECHNICAL SPECIFICATIONS. Open Call for Tender. No F/SE/10/05. Provision of Building Inspection, Maintenance, Alteration and Repair services
ANNEX A.1 TECHNICAL SPECIFICATIONS Open Call for Tender No F/SE/10/05 Provision of Building Inspection, Maintenance, Alteration and Repair services Building Inspection, Maintenance, Alteration and Repair
More informationDIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS
PART 1 - GENERAL 01.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this Section.
More informationPrice Flat Faced Displacement Diffusers
Price Flat Faced Displacement Diffusers Division 23 Heating, Ventilating, and Air Conditioning Section 23 37 13 Diffusers, Registers, and Grilles PART 1 GENERAL 1.01 Section includes: A. Flat Faced Displacement
More informationInstallation Instructions
Installation Instructions SAVE THESE INSTRUCTIONS Please read this entire manual before you install and use your room heater. Failure to follow instructions may result in property damage, bodily injury,
More informationSECTION FIRESTOPPING
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 84 00 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph
More informationRESIDENTIAL ADDITION OR ALTERATION PERMIT REQUIREMENTS
P: (847)810-3502 OR (847)810-3503/3521, F: (847)615-4383 RESIDENTIAL ADDITION OR ALTERATION PERMIT REQUIREMENTS The following is required for a complete permit submittal. RESIDENTIAL BUILDING PERMIT, ELECTRIC
More information.1 All equipment, controls and accessories to be compatible with system design, and matched to the steam boiler(s) by the boiler Manufacturer.
Construction of Sodium Hypochlorite and Chemical Storage Buildings Page 1 of 7 1. GENERAL 1.1 Scope.1 Boiler feed tank and pumps..2 Blowdown tanks..3 Water Softener System 1.2 Quality Assurance.1 All equipment,
More informationA. The work consists of furnishing a Chiller Noise Reduction System as listed in the specifications.
SECTION 32 31 14 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply
More informationSECTION GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL
1.01 DESCRIPTION SECTION 16000 GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL A. This Section includes the general provisions applicable to electrical work and testing of the completed electrical systems.
More informationDIVISION LOW VOLTAGE DE-ICING / SNOW MELTING SYSTEM UNDER METAL ROOFING
DIVISION 23 8313 LOW VOLTAGE DE-ICING / SNOW MELTING SYSTEM UNDER METAL ROOFING PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install low voltage de-icing / snow melting cable
More informationBoilers and Pressure Vessels Safety Program CODE ADOPTION DOCUMENT AMENDMENT
Boilers and Pressure Vessels Safety Program CODE ADOPTION DOCUMENT AMENDMENT Ref. No.: Rev. No.: BPV-13-01 0 Date: Date: January 21, 2013 January 21, 2013 IN THE MATTER OF: THE TECHNICAL STANDARDS AND
More informationKIPLING SCHOOL RENOVATION AND EXPANSION PHASE 2 KIPLING, SASKATCHEWAN
2012-07-26 00 91 14 31/2011 ADDENDUM NO. 2 Kipling School Renov. & Expansion Phase 2, Kipling, SK. Page 1 of 2 ADDENDUM NUMBER: ISSUED BY: PROJECT: TWO SEPW Architecture Inc. 109 3725 Pasqua St., Regina,
More informationADDENDUM NUMBER TWO (2) DATE: May 1, 2015
ADDENDUM NUMBER TWO (2) DATE: May 1, 2015 PROJECT: FROM: TO: Tenant Improvements for: RELOCATION OF TIME INC. LIFESTYLE GROUP KPS GROUP, INC. 2101 First Avenue North Birmingham, Alabama 35203 All Bidders
More informationSPARTANBURG COUNTY BUILDING CODES DEPARTMENT
SPARTANBURG COUNTY BUILDING CODES DEPARTMENT PLAN REVIEW CHECK LIST REQUIREMENTS FOR COMMERCIAL BUILDING PERMITS Plan Review Coordinator Kris Brannon 864-596-3180 366 N. Church St Room 500 Spartanburg,
More informationAsbestos Abatement Standard Procedures Indoor Environment Group, Inc.
The following work procedures are specified on all full containment asbestos abatement projects that we design. A. Preliminary Air Sampling: Many buildings contain background fiber levels prior to, or
More informationAddendum No. 1. City of Chicago Department of Water Management Bureau of Engineering Services
Addendum No. 1 City of Chicago Department of Water Management Bureau of Engineering Services South Water Purification Plant Filter Backwash Controls Replacement DWM PROJECT NO. 13-202 SPECIFICATION NO.
More informationREQUEST FOR PROPOSALS March 4, 2010 PROJECT OVERVIEW:
Police Headquarters Project REQUEST FOR PROPOSALS March 4, 2010 PROJECT OVERVIEW: General description The objective is to renovate an approximately 18 x 24 section of the two-bay attached garage at Town
More informationSECTION STEEL DECKING
SECTION 05 31 00 STEEL DECKING SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Refer to Section 05 36 00, COMPOSITE METAL DECKING for floor
More informationThe City of Winnipeg Section Replacement of Boilers and Pool Water Heat Exchangers at Pan Am Pool Page 1
The City of Winnipeg Section 22 05 00 COMMON WORK RESULTS FOR PLUMBING Replacement of Boilers and Pool Water Heat Exchangers at Pan Am Pool Page 1 Part 1 General 1.1 RELATED SECTIONS 1.2 SUBMITTALS.1 Submittals:
More informationTechnical Committee on Highway Tanks and TC Portable Tanks for the Transportation of Dangerous Goods ix
Canadian Standards Association Highway tanks and TC portable tanks for the transportation of dangerous goods Contents Technical Committee on Highway Tanks and TC Portable Tanks for the Transportation of
More informationSummary of Modifications/Changes in this Update
Summary of Modifications/Changes in this Update This Summary of Changes is for information only. It is not a part of the referenced document, and should not be used for project documentation. U.S. Department
More informationMATERIAL SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 1821 APRIL 2004 MATERIAL SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS AND BOX SEWERS TABLE OF CONTENTS 1821.01 SCOPE 1821.02 REFERENCES
More informationCRYOGENIC FLUIDS CHAPTER 32
CHAPTER 32 CRYOGENIC FLUIDS SECTION 3201 GENERAL 3201.1 Scope. Storage, use and handling of cryogenic fluids shall comply with this chapter. Cryogenic fluids classified as hazardous materials shall also
More informationROCKWOOL Blanket (and Batt) Insulation Section Master Guide Specification Page 1 Jan 2017
Master Guide Specification Page 1 Click on the pilcrow in the MS Word Toolbar to toggle ROCKWOOL GUIDE NOTES on and off. Delete this text before incorporating the section into a Project Manual. 1 GENERAL
More informationSPECIFICATION SECTION : FIRE RATED GLASS PYRAN Platinum min. Fire Rated Ceramic Glass
This GGI Specification was prepared as an aid to specifiers preparing written construction documents. For specification assistance with specific product applications, please contact GGI. To download an
More informationARCHITECTURAL SPECIFICATION
THERMO-SORB ARCHITECTURAL SPECIFICATION PART 1 GENERAL 1.1 SECTION INCLUDES Spray applied, subliming / thin film intumescent, fire resistive coating for interior structural steel framing. Fire resistive
More information/ADF BuyLine 1632 FIREBARRIER FIRESTOP SYSTEMS
07 84 00/ADF BuyLine 1632 FIREBARRIER FIRESTOP SYSTEMS FIREBARRIER FIRESTOP SYSTEMS A/D Fire Protection Systems provides a complete system of PRODUCTS products required for firestopping. All are independently
More informationSupplementary Standard SB-12. Energy Efficiency For Housing
OBC Excerpt: SB 12 Ministry of Municipal Affairs and Housing Building and Development Branch 2006 Building Code - Supplementary Standards Supplementary Standard SB-12 Energy Efficiency For Housing November
More informationSPECIAL SPECIFICATION 8783 Border Safety Inspection Facility Transponder Reader System
2004 Specifications CSJ 0921-02-173 SPECIAL SPECIFICATION 8783 Border Safety Inspection Facility Transponder Reader System 1. Description. Furnish, install and test Transponder Reader System consisting
More informationSECTION CONDUITS AND BOXES PART 1- GENERAL. A. Work covered by this section includes the furnishing and installation of conduits and boxes.
SECTION 16111 CONDUITS AND BOXES 1.01 DESCRIPTION PART 1- GENERAL A. Work covered by this section includes the furnishing and installation of conduits and boxes. 1.02 SUBMITTALS A. The Contractor shall
More informationCity of Westerville Guide to Commercial Inspections
City of Westerville Guide to Commercial Inspections FOOTINGS - After the excavation, with the form work and any required reinforcing steel in place. All footings shall have loose soil removed, reinforcing
More information