1 Addendum 1 Page 1 ADDENDUM NO. 1 F.J. McElligott Secondary School Mattawa, Ontario The following Addendum shall be part of the Tendering Documents and shall supersede the drawings and/or Specifications and previously issued Addenda where applicable. This Addendum consists of 1 page plus the listed attachments. Attachments: (3 pages) Electrical Drawing E Table of Contents.1 Division 15 Mechanical: delete all specification Sections listed..2 Division 16 Electrical: add Division Electrical (3 pages). Delete all previously referenced specification Sections. 2. Section List of Drawings.1 Replace drawing listed under Mechanical / Electrical with the following: E101 Electrical Power Floor Plan, Notes and Details End of Addendum #1. Project No F.J. McElligott Secondary School Near North District School Board January 4, 2018

2 Page 1 ELECTRICAL: 1.1. General 1. The General Conditions of the stipulated price contract shall be considered as an integral part of this contract. 2. Should this work be done during normal hours, the Contractor shall advise and coordinate any systems shutdown with the Owner's representative. 3. Only commercial grade equipment and materials shall be installed. 4. Before tendering, examine the conditions at the site, the drawings, and become familiar with the mechanics, architectural finishes, etc., in order that the price shall include everything necessary for a complete installation. 5. All equipment shall be installed in accordance with the Ontario Building Code 2012 and all applicable local Codes Workmanship and Materials 1. All equipment shall bear CSA and ULC approved labels. 2. Use only specified materials and equipment except where designated "or approved equivalent". 3. All alternates to specified materials must be approved prior to award of contract Drawings 1. Consult all construction drawings and become familiar with all conditions affecting the work. 2. Where job conditions require minor changes to indicated locations there shall be no extra charge to the Owner. 3. All dimensions must be checked and verified on the job site. 4. Submit shop drawings for approval before ordering materials. 5. Submit as-built drawings upon completion Codes and Regulations 1. Execute the work in strict accordance with the requirements of the Ontario Building Code, Ontario Electrical Safety Code, Local Municipality Hydro Utility requirements and all other applicable local codes.

3 Page 2 2. In the event that any deviations from the Electrical Drawings are necessary, consult with the Consultant and obtain written approval before proceeding Certificates and Fees 1. Provide all necessary notices and obtain all necessary permits and pay all fees. Furnish all usual certificates needed as evidence that the work installed conforms with the laws and regulations of the authorities having jurisdiction, before final payment of Contract is made. 2. Make application to Electrical Safety Authority, Local Inspection Branch, with three sets of drawings for approval and return one set signed to the Consultant and pay all costs. The Contractor shall arrange for inspections at critical periods and furnish an inspection. Copy of Certificate of final inspection to be provided to the Owner upon completion of work Guarantee 1. All equipment, material and workmanship shall be unconditionally guaranteed for a minimum period of one year from the date of acceptance. Where longer guarantee periods are applicable by manufacturers, these shall be borne by this Division Identification 1. Clearly indicate all electrical equipment. All panel directories shall be typewritten and all other equipment shall be permanently identified with etched lamacoid plates secured to clean surfaces Wiring Devices 1. Single pole light switches shall be Pass & Seymour 20AC-1WH White complete with stainless steel cover plate (or approved equivalent). 2. Duplex receptacles shall be Pass & Seymour 5260 Series WH White complete with stainless steel cover plate (or approved equivalent). 3. All cover plates shall be stainless steel, unless otherwise noted Method of Wiring 1. All wiring shall be concealed in walls, ceiling and furred spaces. In dropped ceilings and when concealed in furred walls, etc., AC90 armoured cable may be used maximum length 3 m in concealed ceiling spaces, or drops to receptacles in GWB partitions, maximum length 4.5 m. Otherwise cables shall be in EMT conduit. All conductors for wire and cable shall be copper min. #12 gauge. 2. Where concealment is not possible, surface raceway to be used, upon approval of Engineer Conduit and Cable Installation

4 Page 3 1. Install cables, conduits and fittings to be embedded or plasters over, neatly and close to building structure so furring can be kept to minimum. 2. Protect alarm and emergency system wiring from fire for the required length of time Cutting, Patching and Finishing 1. All cutting, patching and finishing for electrical work shall be by this Section. Obtain approval before cutting any structural members. Upon removal of all conduit, wiring, light fixtures, equipment, etc., patch all holes and match existing finishes. 2. Floor tiles damaged during the construction or conduit openings, where conduit was removed shall be replaced with matching size and pattern currently available Fireproofing 1. Where cables or conduits pass through floors and fire rated walls, pack space between wiring and sleeve full with firestopping system to CAN 4-S Existing Systems 1. Before submitting tender price verify on job site location of all accessible existing electrical systems affecting execution of this contract. Difficulties arising during construction will not be considered as grounds for additional payment. 2. Where unknown services are encountered, immediately advise Consultant and confirm findings in writing Owner Occupancy Schedule 1. The existing building will remain occupied during normal occupancy hours. 2. Provide temporary protection for all finishes, appliances or equipment in the existing building. 3. Protect and maintain existing boiler room and electrical room operations during the work.

5 This drawing and the design it represents are protected by copyright law and are the property of the author. Do not reproduce or use in any fashion without written consent. Graphic accuracy of the drawing cannot be assured. Do not rely on scaled dimensions. PROJECT NORTH: Barrier Free Accessibility Upgrades F.J. McElligott Secondary School Mattawa, ON. BCIN # PROJECT NO: 6126 LIBRARY NO: DRAWN BY:. NGA SCALE: as noted NO. ISSUE DATE 1 Issued for Tender January 4, 2018 Electrical Power Floor Plan, Notes and Details DRAWING NO: E101

Exterior Door & PA System Replacement, Domestic Water Piping System and B/F Access Upgrades

Exterior Door & PA System Replacement, Domestic Water Piping System and B/F Access Upgrades Addendum 1 Page 1 ADDENDUM NO. 1 Domestic Water Piping System and B/F Access Upgrades Sundridge Centennial Public School Sundridge, Ontario The following Addendum shall be part of the Tendering Documents

More information

LIGHTING PROJECT SPECIFICATIONS

LIGHTING PROJECT SPECIFICATIONS Page 1 of 6 LIGHTING PROJECT SPECIFICATIONS 1. Clarification: The Scope of Work is provided in Outline Form only. Bidders finding discrepancies, ambiguities, or omissions in the Outline Scope of Work,

More information

NOVADYNE 365 Lansdowne St. E., Unit 1, Peterborough, ON K9L 2A3

NOVADYNE 365 Lansdowne St. E., Unit 1, Peterborough, ON K9L 2A3 SYMBOL MODEL NUMBER LIGHTING CONTROLS SCHEDULE MANUFACTURER DESCRIPTION EMERGENCY LIGHTING & EXIT SCHEDULE SYMBOL MODEL NUMBER MANUFACTURER DESCRIPTION RECEPTACLE LEGEND LIGHTING LEGEND 15 Lansdowne Street

More information

Dayton Metropolitan Housing Authority Rosemont/Hoch Electrical Upgrades

Dayton Metropolitan Housing Authority Rosemont/Hoch Electrical Upgrades Dayton Metropolitan Housing Authority 111071 Rosemont/Hoch Electrical Upgrades Addendum No. 3 August 10, 2011 DMHA 400 Wayne Ave. Dayton, OH 45410 Re: 1432-1438 Rosemont oh5-12b 261 Hoch Street oh5-18d

More information

STEPPING STONES DAYCARE NEW LISKEARD PUBLIC SCHOOL

STEPPING STONES DAYCARE NEW LISKEARD PUBLIC SCHOOL STEPPING STONES DAYCARE NEW LISKEARD PUBLIC SCHOOL JLR JOB NO. 26662-19 ISSUED FOR TENDER DECEMBER 22, 2014 COVERS AND DRAWING LISTS STRUCTURAL 000 COVER SHEET S100 GENERAL NOTES, FLOOR PLAN & DETAILS

More information

LIGHTING PROJECT SPECIFICATIONS

LIGHTING PROJECT SPECIFICATIONS Page 1 of 7 LIGHTING PROJECT SPECIFICATIONS 1. Clarification: The Scope of Work is provided in Outline Form only. Bidders finding discrepancies, ambiguities, or omissions in the Outline Scope of Work,

More information

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1

INDEX. Page SECTION 1.0: SCOPE Toronto Hydro Requirements Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1 INDEX Page SECTION 1.0: SCOPE 1 1.1 Toronto Hydro Requirements 1 1.2 Ontario Electrical Safety Code 1 SECTION 2.0: PURPOSE 1 SECTION 3.0: DEFINITIONS AND THE INTERNATIONAL SYSTEM OF UNITS 1 3.1 Definitions

More information

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION CODE

DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION CODE DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS DIRECTOR S OFFICE CONSTRUCTION CODE (By authority conferred on the director of the department of licensing and regulatory affairs by section 4 of 1972 PA

More information

DIVISION 16. Electrical Specifications

DIVISION 16. Electrical Specifications DIVISION 16 Electrical Specifications 16.1 General - Provide all electrical materials and methods as shown on the Drawings, as specified herein, and as needed for a complete and proper installation, including

More information

UPGRADES TO WATER TREATMENT SYSTEMS AT CITY OF GUELPH SPLASH PADS PART A HANLON CREEK PARK AND PART B NORM JARY PARK Reference Number: 12-088 A D D E N D U M NO.1 The following shall form part of the tender

More information

City Of Mendota Construction Procedures

City Of Mendota Construction Procedures City Of Mendota Construction Procedures Building Permit Application: A permit shall be obtained prior to commencing work of any type. Failure to do so may result in doubling the permit fees. At the time

More information

Building Permit Application

Building Permit Application Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: ARCHITECT/ENGINEER ADDRESS:

More information

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 CANADIAN ELECTRICAL CODE 1 The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999 Repealed by Chapter E-6.3 Reg 8 (effective June 24, 2003). Formerly Chapter E-6.3 Reg 6 (effective March

More information

SECTION GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL

SECTION GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL 1.01 DESCRIPTION SECTION 16000 GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL A. This Section includes the general provisions applicable to electrical work and testing of the completed electrical systems.

More information

SECTION A. ASTM B3 - Standard Specification for Soft or Annealed Copper Wire; 2013.

SECTION A. ASTM B3 - Standard Specification for Soft or Annealed Copper Wire; 2013. PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 26 0519 A. Single conductor building wire. B. Metal-clad cable. C. Wiring connectors. D. Electrical tape. E. Wire pulling lubricant. F. Cable ties. 1.2 RELATED

More information

Section 70 Airport Transformer Vault and Vault Equipment (FAA L-109)

Section 70 Airport Transformer Vault and Vault Equipment (FAA L-109) Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION 1. This item

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

SECTION COMMON WORK RESULTS FOR ELECTRICAL

SECTION COMMON WORK RESULTS FOR ELECTRICAL PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

More information

SECTION OUTLET, PULL, AND JUNCTION BOXES

SECTION OUTLET, PULL, AND JUNCTION BOXES SECTION 16131 OUTLET, PULL, AND JUNCTION BOXES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16112 - Raceways and Conduits. 1.02 SYSTEM DESCRIPTION A. Performance Requirements:

More information

WOOD FLOORING WOOD FLOORING

WOOD FLOORING WOOD FLOORING 09550 - WOOD FLOORING 09550-1 PART ONE: GENERAL 1.1 Description WOOD FLOORING 1.1.1 Work in this Section, as shown or specified, shall be provided by the Interior Contractor and shall be in accordance

More information

Attachment 1 Architectural Services

Attachment 1 Architectural Services A. Phase 1, Programming and Schematic Design: 1. Ascertain the requirements for each project through a meeting with the COUNTY, and a review of an existing schematic layout of each project, if such layout

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF UNDERPASS LUMINAIRES

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF UNDERPASS LUMINAIRES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 611 NOVEMBER 2013 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF UNDERPASS LUMINAIRES TABLE OF CONTENTS 611.01 SCOPE 611.02 REFERENCES 611.03 DEFINITIONS

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 614 NOVEMBER 2012 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POWER SUPPLY EQUIPMENT TABLE OF CONTENTS 614.01 SCOPE 614.02 REFERENCES 614.03 DEFINITIONS

More information

Ex AC. Examination for Architects in Canada Examen des architectes du Canada

Ex AC. Examination for Architects in Canada Examen des architectes du Canada Ex AC Examination for Architects in Canada Examen des architectes du Canada General and Specific Objectives Theme 1 general objective specific objectives rogramming 1.1 Understand the process for the preparation

More information

A. Hazardous Areas: Hazardous areas as defined by the NEC as Class I, Division 1, Group D, or Class I, Division 2, Group D hazardous are as follows:

A. Hazardous Areas: Hazardous areas as defined by the NEC as Class I, Division 1, Group D, or Class I, Division 2, Group D hazardous are as follows: SECTION 16050 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: General requirements for providing basic electrical materials and methods. B. Related Work Specified in Other Sections Includes: 1. Certain

More information

IMPORTANT CODE UPDATE ENFORCEMENT DATE FOR NEW NATIONAL ELECTRIC CODE IS SET FOR MAY 1, 2013

IMPORTANT CODE UPDATE ENFORCEMENT DATE FOR NEW NATIONAL ELECTRIC CODE IS SET FOR MAY 1, 2013 IMPORTANT CODE UPDATE ENFORCEMENT DATE FOR NEW NATIONAL ELECTRIC CODE IS SET FOR MAY 1, 2013 2011 National Electrical Code (NEC) Update Statement The National Electrical Code, 2011 Edition, with Appendices,

More information

Sections through of Chapter 5 of the Victoria City Code are amended to read as follows: ARTICLE IX. NATIONAL ELECTRICAL CODE

Sections through of Chapter 5 of the Victoria City Code are amended to read as follows: ARTICLE IX. NATIONAL ELECTRICAL CODE Sections 5-100 through 5-105 of Chapter 5 of the Victoria City Code are amended to read as follows: ARTICLE IX. NATIONAL ELECTRICAL CODE Sec. 5-100. Adoption of published code. There is hereby adopted

More information

ADDENDUM NO. 1. Kapuskasing District High School Interior Upgrades. ADDENDUM NO. 1 November 9, 2018

ADDENDUM NO. 1. Kapuskasing District High School Interior Upgrades. ADDENDUM NO. 1 November 9, 2018 Kapuskasing District High School Kapuskasing District High School JLR No.: 27729-032 Owner No.: 7587 Page 1 of 4 This Addendum forms part of the Contract Documents and amends the original drawings and

More information

B. Sections and all references contained therein form a part of this Section of the Specifications.

B. Sections and all references contained therein form a part of this Section of the Specifications. KARGES-FAULCONBRIDGE, INC. KFI: 14-044.00 SEWARD MONTESSORI SCHOOL ADDITION & REMODELING SECTION 260010 - PART 1 - GENERAL 1.01 SCOPE OF WORK A. Drawings and general provisions of the Contract, including

More information

Technical Guideline for. Section 8. Inspection and Approval of Construction

Technical Guideline for. Section 8. Inspection and Approval of Construction Technical Guideline for Section 8. Inspection and Approval of Construction Ontario Regulation 22/04 Electrical Distribution Safety January 12, 2005 Technical Guideline Section 8 General Legal Disclaimer

More information

The following chapters or articles of the New Jersey electrical subcode are amended as follows:

The following chapters or articles of the New Jersey electrical subcode are amended as follows: The following chapters or articles of the New Jersey electrical subcode are amended as follows: 90.4 Enforcement. This Code is intended to be suitable for mandatory application by governmental bodies that

More information

SECTION FIRESTOPPING

SECTION FIRESTOPPING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 84 00 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph

More information

ELECTRICAL INSPECTION BULLETIN B Installation and Inspection Requirements for Street and Roadway Lighting Systems. (Effective 2015/11/15 )

ELECTRICAL INSPECTION BULLETIN B Installation and Inspection Requirements for Street and Roadway Lighting Systems. (Effective 2015/11/15 ) Scope This document covers the installation and inspection requirements for Street and that are installed and maintained within the jurisdiction of the Nova Scotia Power Incorporated (NSPI) inspection

More information

ALL DIMENSIONS FROM FINISHED FACE OF PARTITION TO FINISHED FACE OF PARTITION UNLESS OTHERWISE NOTED.

ALL DIMENSIONS FROM FINISHED FACE OF PARTITION TO FINISHED FACE OF PARTITION UNLESS OTHERWISE NOTED. ALL DIMENSIONS FROM FINISHED FACE OF PARTITION TO FINISHED FACE OF PARTITION UNLESS OTHERWISE NOTED. PARTITION CONSTRUCTION TO BE 3 5/8 METAL STUDS 24 ON CENTER WITH 5/8 TYPE X GYPSUM BOARDS BOTH SIDES.

More information

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

SECTION GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY PART 1 - GENERAL 1.1 DESCRIPTION SECTION 28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY SPEC WRITER NOTE: Delete // // if not applicable to project. Also delete any other item or paragraph

More information

SPECIFICATION DIVISION 7 NUMBER SECTION DESCRIPTION DIVISION 07 THERMAL AND MOISTURE PROTECTION SECTION THROUGH-PENETRATION FIRESTOP SYSTEMS

SPECIFICATION DIVISION 7 NUMBER SECTION DESCRIPTION DIVISION 07 THERMAL AND MOISTURE PROTECTION SECTION THROUGH-PENETRATION FIRESTOP SYSTEMS BuildingName The Description of the Project P00000000 0000 DOCUMENTS Title Page Table of Contents Instruction to Bidders Form of Proposal Equal Opportunity Statement Form of Guarantee Supplemental General

More information

Design Standard Basic Electrical Requirements

Design Standard Basic Electrical Requirements Design Standard Purpose: This design standard has the purpose of maintaining a consistent application of the basic requirements for electrical systems throughout the East Side Union High School District,

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

CONTENTS. B. System Design and Performance Requirements

CONTENTS. B. System Design and Performance Requirements 16060 Grounding and Bonding This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or

More information

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features DESIGN CRITERIA FOR STANDARD CONSTRUCTION: These standard design elements of the P.E.I. Power Equipment Center are utilized to meet the following design criteria per ASCE 7-05 as adopted by the IBC (International

More information

legend. #1 is a gas relief valve? If so does Enbridge supply with station?

legend. #1 is a gas relief valve? If so does Enbridge supply with station? Michael Pacholok, Director Purchasing and Materials Management Division City Hall, 8 th Floor, West Tower 00 Queen Street West Toronto, Ontario M5H N Joanne Kehoe Manager Construction Services May 4, 06

More information

Replace 210.8(a)(7) with: Sinks. Where receptacles are installed within 6 feet of the outside edge of a sink. Page 1 of 5

Replace 210.8(a)(7) with: Sinks. Where receptacles are installed within 6 feet of the outside edge of a sink. Page 1 of 5 CHAPTER 23.30 LOCAL AMENDMENTS TO THE NATIONAL ELECTRICAL CODE 2002 EDITION SECTIONS: 23.30.010 Local Amendments to the National Electrical Code 2002 Edition 23.30.020 Certificate of Fitness - Right to

More information

Addendum # 1 to Bid LSUHSC Seton 1 st floor Interior Renovation

Addendum # 1 to Bid LSUHSC Seton 1 st floor Interior Renovation Date 06/11/18 Addendum # 1 to Bid 002179 LSUHSC Seton 1 st floor Interior Renovation Change the above referenced Bid to agree with this addendum. LSU Health Sciences Center will reject any proposal which

More information

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following:

1. This Section includes administrative and procedural requirements for contract closeout including, but not limited to, the following: SECTION 01700 - CONTRACT CLOSEOUT PART 1 - GENERAL 1.01 RELATED DOCUMENTS 1. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification

More information

CONTRACT ADDENDUM # 1

CONTRACT ADDENDUM # 1 date: January 5, 09 project: Bear River Bleachers CONTRACT ADDENDUM # by: Design West Architects subject: Revisions The Work shall be carried out in accordance with the following supplemental instructions

More information

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS SECTION 01 00 00 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Summary of Work: 1. General 2. Contract. B. Contract Considerations: 1. Schedule of values. 2. Applications for payment. 3.

More information

PORT OF SAN FRANCISCO ELECTRICAL CODE. Based on the 2016 California Electrical Code

PORT OF SAN FRANCISCO ELECTRICAL CODE. Based on the 2016 California Electrical Code 2016 PORT OF SAN FRANCISCO ELECTRICAL CODE Based on the 2016 California Electrical Code The complete 2016 Port of San Francisco Electrical Code adopts and amends the 2013 edition of the California Electrical

More information

SECTION FACILITY LIGHTNING PROTECTION

SECTION FACILITY LIGHTNING PROTECTION PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 41 00 FACILITY LIGHTNING PROTECTION SPEC WRITER NOTE: Delete between //----//if not applicable to project. Also delete any other item or paragraph not applicable

More information

PIKES PEAK PARKING RESTORATION TABLE OF CONTENTS

PIKES PEAK PARKING RESTORATION TABLE OF CONTENTS 23 HEATING, VENTILATING AND AIR CONDITIONING TABLE OF CONTENTS TABLE OF CONTENTS DIVISION 23 HEATING, VENTILATING AND AIR CONDITIONING - Basic HVAC Requirements 238239.19 - Wall and Ceiling Unit Heaters

More information

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department

Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department Peralta Community College District 501 5 th Avenue Oakland, California 94606 Phone (510) 466-7225 Fax (510) 587-7873 Purchasing Department ADDENDUM No. 2 DATED JULY 2, 2013 TO THE PROJECT MANUAL and PLANS

More information

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp,

EFFECTIVE DATE: November 1, 2011, unless a later date is cited at the end of a section. [ NMAC - Rp, TITLE 14 CHAPTER 10 PART 4 HOUSING AND CONSTRUCTION ELECTRICAL CODES 2011 NEW MEXICO ELECTRICAL CODE 14.10.4.1 ISSUING AGENCY: The Construction Industries Division of the Regulation and Licensing Department.

More information

TENOCHCA HALL - FAN COIL UNITS, RESTROOM AND FINISH RENOVATION PROJECT NO

TENOCHCA HALL - FAN COIL UNITS, RESTROOM AND FINISH RENOVATION PROJECT NO SECTION 26 05 00 - BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL REQUIREMENTS 1.1 RELATED DOCUMENTS A. The general conditions and Division 1 are part of this section and the contract for this work and

More information

INSPECTION REQUIREMENTS Page 1 of 5. JOB SITE ADDRESS posted during entire construction process.

INSPECTION REQUIREMENTS Page 1 of 5. JOB SITE ADDRESS posted during entire construction process. INSPECTION REQUIREMENTS Page 1 of 5 JOB SITE ADDRESS posted during entire construction process. JOB PLACARD POSTED IN PLAIN SIGHT: GREEN Placard - Building, ORANGE Placard Electrical, BLUE Placard - HVAC,

More information

FORMAT Technical specifications content and numbering system shall be based on 2004 CSI MasterFormat.

FORMAT Technical specifications content and numbering system shall be based on 2004 CSI MasterFormat. DIVISION 27 00 00 COMMUNICATIONS FORMAT Technical specifications content and numbering system shall be based on 2004 CSI MasterFormat. BASIS OF DESIGN Design guidelines supplement building, fire, and other

More information

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested. Purpose 355 West Queens Road Single Family New Construction Required Inspection Stages Master Requirement GEN 110 Building Department: 604-990-2480, building@dnv.org, fax: 604-984-9683 The following procedure

More information

TABLE OF CONTENTS Public Safety Building

TABLE OF CONTENTS Public Safety Building DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary

More information

LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA Phone (916) FAX (916) Purchasing Department

LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA Phone (916) FAX (916) Purchasing Department LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA 95825 Phone (916) 568-3071 FAX (916) 568-3145 Purchasing Department Sacramento City College American River College Cosumnes River College

More information

EXHIBIT B TO AGREEMENT BETWEEN PENSACOLA HABITAT FOR HUMANITY AND SUBCONTRACTOR. Scope of Work. Electrical. Division 155 Electrical Rough

EXHIBIT B TO AGREEMENT BETWEEN PENSACOLA HABITAT FOR HUMANITY AND SUBCONTRACTOR. Scope of Work. Electrical. Division 155 Electrical Rough EXHIBIT B TO AGREEMENT BETWEEN PENSACOLA HABITAT FOR HUMANITY AND SUBCONTRACTOR Scope of Work Electrical Division 155 Electrical Rough Division 235 Electrical Trim General Requirements 1. All Work shall

More information

GENERAL REQUIREMENTS

GENERAL REQUIREMENTS CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 01001-1 PART 1 GENERAL 1.1 Work Covered By Contract Documents.1 Work covers, in general terms: demolition, removals, site preparation and complete construction

More information

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION Permit No. 175 Beaver Drive, P.O. Box 486 DuBois, PA 15801 Phone: 814-375-1111 Fax: 814-375-1117 Toll Free: 855-PENNSAF LOCATION OF PROPOSED

More information

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II SECTION 052100 - STEEL JOISTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections

More information

CHAPTER LOCAL AMENDMENTS TO THE NATIONAL ELECTRICAL CODE 2011 EDITION

CHAPTER LOCAL AMENDMENTS TO THE NATIONAL ELECTRICAL CODE 2011 EDITION CHAPTER 23.30 LOCAL AMENDMENTS TO THE NATIONAL ELECTRICAL CODE 2011 EDITION Sections 23.30.010 Local amendments to the National Electrical Code 2011 Edition.... 1 23.30.020 Certificate of fitness - right

More information

ADDENDUM TO THE CONTRACT. for the. Eaglecrest Learning Center Contract No. E ADDENDUM NO.: ONE CURRENT DEADLINE FOR BIDS: December 17, 2013

ADDENDUM TO THE CONTRACT. for the. Eaglecrest Learning Center Contract No. E ADDENDUM NO.: ONE CURRENT DEADLINE FOR BIDS: December 17, 2013 ADDENDUM TO THE CONTRACT for the ENGINEERING DEPARTMENT Eaglecrest Learning Center Contract No. E14 076 ADDENDUM NO.: ONE CURRENT DEADLINE FOR BIDS: December 17, 2013 PREVIOUS ADDENDA: NONE ISSUED BY:

More information

The University of Alabama General Requirements for Purchase Orders Involving Public Works

The University of Alabama General Requirements for Purchase Orders Involving Public Works The University of Alabama General Requirements for Purchase Orders Involving Public Works Revised January, 2011 The following items are to be included in the scope of each Purchase Order individually,

More information

Watercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS

Watercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS Watercrest - Sand Hill - Columbia, SC 00 0110-1 TABLE OF CONTENTS DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS INTRODUCTORY INFORMATION Document 00 0101 Document 00 0110 Project Title Page CONTRACTING

More information

DIVISION STRUCTURED CABLE

DIVISION STRUCTURED CABLE FORMAT 1. Technical specifications content and numbering system shall be based on the most current CSI Master Format. BASIS OF DESIGN 1. Design guidelines supplement building, fire, and other health, safety

More information

15. EVERY BRANCH CIRCUIT SHALL BE PROVIDED WITH A SEPARATE, DEDICATED NEUTRAL IN ACCORDANCE WITH NEC, WETHER SHOWN ON DRAWINGS OR NOT.

15. EVERY BRANCH CIRCUIT SHALL BE PROVIDED WITH A SEPARATE, DEDICATED NEUTRAL IN ACCORDANCE WITH NEC, WETHER SHOWN ON DRAWINGS OR NOT. ELECTRICAL LEGEND ELECTRICAL NOTES DEMOLITION NOTES: J NF US E.C. EM T NL WP - 20 AMP, 120 VOLT DUPLEX RECEPTACLE - DUPLEX RECEPTACLE WITH (2) USB PORTS - MANUAL MOTOR STARTER - VOICE/DATA OUTLET WITH

More information

Municipality For the purpose of this bulletin, municipality means: a town, village, county, district or a regional municipality.

Municipality For the purpose of this bulletin, municipality means: a town, village, county, district or a regional municipality. ELECTRICAL INSPECTION BULLETIN (Effective 2012-10-01) Rule 30-1000 Installation and Inspection Requirements for Street and Roadway Lighting Systems Scope This document covers the installation and inspection

More information

COMMON WORK RESULTS FOR ELECTRICAL

COMMON WORK RESULTS FOR ELECTRICAL PART 1 GENERAL 1.01 DESCRIPTION A. The provisions of the General Requirements, Supplementary Requirements, and Division 1 apply to the electrical work specified in this Section. B. The requirements of

More information

April 11, 2017 INVITATION TO TENDER ITT No. PS CONTRACTOR FOR MARPOLE PLACE RESTORATION. ADDENDUM No. 5

April 11, 2017 INVITATION TO TENDER ITT No. PS CONTRACTOR FOR MARPOLE PLACE RESTORATION. ADDENDUM No. 5 FINANCE, RISK AND SUPPLY CHAIN MANAGEMENT Supply Chain Management April 11, 2017 INVITATION TO TENDER ITT No. PS20170312 CONTRACTOR FOR MARPOLE PLACE RESTORATION ADDENDUM No. 5 RE: ADDITION TO APPENDIX

More information

ADDENDUM NO. 1. TO SCOPE OF WORK: Section 0220, Form 01004/5

ADDENDUM NO. 1. TO SCOPE OF WORK: Section 0220, Form 01004/5 ADDENDUM NO. 1 TO SCOPE OF WORK: Section 0220, Form 01004/5 PROJECT: Tankless Water Heaters Installation Glenn Edge and Rich Martin Apartments and Main Office Water Heater Replacement New Memorial Community

More information

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT

TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT TECHNICAL SPECIFICATIONS & SPECIAL CONDITIONS OF CONTRACT FOR ELECTRICAL WORKS CHAPTER 1 SPECIAL CONDITIONS OF CONTRACT 1.1 General 1.1.1 These Special Conditions of Contract supplement the General Instructions.

More information

Appendix C - International NEC Electric Code Amendments

Appendix C - International NEC Electric Code Amendments - International NEC Electric Code Amendments The International NEC Electric Code shall be amended as follows: (Revised Ord 2016-52) Section 220.14(A) Specific Appliances or Loads. At the end of this Sub-Section,

More information

Addendum Number Two Page 1 of 2

Addendum Number Two Page 1 of 2 ADDENDUM NUMBER TWO University of South Carolina, Strom Thurmond Pool Deck Repairs on Outdoor Pool Architect s Project Number: U 747 12 1 State Project Number: H27 Z087 Columbia, South Carolina PREPARED

More information

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL).

A. All materials shall be tested and listed by an OSHA approved Nationally Recognized Testing Laboratory (NRTL). 16450 GROUNDING ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 05 26 An optional keynote to the

More information

SECTION PATIENT BED SERVICE WALLS

SECTION PATIENT BED SERVICE WALLS PART 1 GENERAL 1.1 DESCRIPTION: SECTION 10 25 13 PATIENT BED SERVICE WALLS SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. 2. Due to the very specialized nature of Patient Wall

More information

Summary of Modifications/Changes in this Update

Summary of Modifications/Changes in this Update Summary of Modifications/Changes in this Update This Summary of Changes is for information only. It is not a part of the referenced document, and should not be used for project documentation. U.S. Department

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT ALIF GARMENTS Ltd, Dhaka, Bangladesh Prepared for: JANUARY 14, 2014 Alif Garments Ltd. PAGE 1 SUMMARY The seven-story factory housing Alif Textiles Ltd. & Hexa Garments

More information

SECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS

SECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS SECTION 16711-27 05 28.33 PART 1 - GENERAL 1.01 SUMMARY A. This section includes Labor, materials and equipment necessary to complete the installation required for the items specified under this Section,

More information

CONSTRUCTION SPECIFICATION FOR CONCRETE FOOTINGS AND MAINTENANCE PLATFORMS FOR HIGH MAST LIGHTING POLES

CONSTRUCTION SPECIFICATION FOR CONCRETE FOOTINGS AND MAINTENANCE PLATFORMS FOR HIGH MAST LIGHTING POLES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 631 NOVEMBER 2011 CONSTRUCTION SPECIFICATION FOR CONCRETE FOOTINGS AND MAINTENANCE PLATFORMS FOR HIGH MAST LIGHTING POLES TABLE OF CONTENTS 631.01

More information

CONCRETE FORMWORK. .2 CSA , Supplement No.1 to CAN/CSA , Engineering Design in Wood. .4 CSA O151, Canadian Softwood Plywood.

CONCRETE FORMWORK. .2 CSA , Supplement No.1 to CAN/CSA , Engineering Design in Wood. .4 CSA O151, Canadian Softwood Plywood. CITY OF BRAMPTON LANDSCAPE SPECIFICATIONS SECTION 03100-1 PART 1 GENERAL 1.1 Related Work.1 All Division 1 Specification Sections.2 Section 02233 Granular Base.3 Section 02311 Site Grading.4 Section 03200

More information

NYC Technical Bulletin

NYC Technical Bulletin Building Owners Architects Engineers Quality Managers Safety Professionals Construction Industry NYC Technical Bulletin 2010-020 Special Inspection Requirements for Fire Resistant Rated Construction Life

More information

Addendum #2 B14/9830. East Campus Student Life/Business Services/DSR Renovation

Addendum #2 B14/9830. East Campus Student Life/Business Services/DSR Renovation September 25, 2013 Addendum #2 B14/9830 East Campus Student Life/Business Services/DSR Renovation SPECIFICATIONS for East Campus Student Life/Business Services/DSR Renovation Dated: September 5, 2013 This

More information

APPLICATION FOR FINISHED BASEMENT PERMIT

APPLICATION FOR FINISHED BASEMENT PERMIT APPLICATION FOR FINISHED BASEMENT PERMIT REAL ESTATE TAX I.D. #: - - _ - _ 7607 W College Drive Ph: (708) 361-1804 Fax: (708) 923-7112 building@palosheights.org APPLICANTS: COMPLETE ALL ITEMS AND SUBMIT

More information

Questions & Answers. Amendments to Ontario Electrical Safety Code 23 rd Edition/2002

Questions & Answers. Amendments to Ontario Electrical Safety Code 23 rd Edition/2002 Questions & Answers Amendments to Ontario Electrical Safety Code 23 rd Edition/2002 When do the new rules become effective? Ontario amendments to the Ontario Electrical Safety Code 23 rd Edition/2002 comes

More information

SECTION DRYWALL GRID LINEAR LIGHTING INTEGRATION

SECTION DRYWALL GRID LINEAR LIGHTING INTEGRATION SECTION 09 22 26 DRYWALL GRID LINEAR LIGHTING INTEGRATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general conditions of Contract, including General and Supplementary Conditions and Divisions-1

More information

METERING INSTALLATION

METERING INSTALLATION 4.01 METERING SPECIFICATIONS METERING INSTALLATION Metering specifications will be issued to the customer by OPPD. Metering specifications are required before any work is started on all new wiring or additions

More information

BID # Bookstore & Gateway HVAC Controls Upgrade SECTION "C" TECHNICAL SPECIFICATIONS OWNER

BID # Bookstore & Gateway HVAC Controls Upgrade SECTION C TECHNICAL SPECIFICATIONS OWNER BID # 18 20 Bookstore & Gateway HVAC Controls Upgrade SECTION "C" TECHNICAL SPECIFICATIONS OWNER Board of Trustees Middlesex County College 2600 Woodbridge Avenue P.O. Box 3050 Edison, New Jersey 08818

More information

Village of Carol Stream

Village of Carol Stream FEE SCHEDULE for DEVELOPMENT SERVICES SCHEDULE E: COMMERCIAL, INDUSTRIAL, INSTITUTIONAL, AND MULTIPLE-FAMILY RESIDENTIAL MISCELLANEOUS CONSTRUCTION Community Development Department (630) 871-6230 communitydevelopment@carolstream.org

More information

Division 00 Procurement and Contracting Requirements

Division 00 Procurement and Contracting Requirements SECTION 00 01 10 TABLE OF CONTENTS Division SECTION NO. VOLUME ONE Title SECTION TITLE Division 00 Procurement and Contracting Requirements 00 11 00 Invitation to Bidders 00 21 00 Instructions to Bidders

More information

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION: SECTION 13 05 41 SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED 1-25-13 PART 1 GENERAL 1.1 DESCRIPTION: A. Provide seismic restraint in accordance with the requirements of this section

More information

SECTION GROUNDING AND BONDING

SECTION GROUNDING AND BONDING SECTION 16060 PART 1 GENERAL 1.01 DESCRIPTION A. Section includes requirements for an electrical grounding system, including electrodes, grounding rods, connectors, insulators, equipment grounding and

More information

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE II RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING

More information

SECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES

SECTION PROTECTION AND RESTORATION OF EXISTING FACILITIES PART 1 - GENERAL 1.1 GENERAL A. The CONTRACTOR shall protect all existing utilities and improvements not designated for removal and shall restore damaged or temporarily relocated utilities and improvements

More information

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF SIGN LUMINAIRES

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF SIGN LUMINAIRES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 612 SEPTEMBER 1984 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF SIGN LUMINAIRES 612.01 SCOPE 612.02 REFERENCES 612.03 Not Used 612.04 Not Used

More information

Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE

Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE STAFF USE ONLY RECEIVED BY: DATE: Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE Applicant must complete numbered items

More information

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING

2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING 2003 International Residential Code ELECTRICAL PROVISIONS ONLY October 2005 EDITORIAL CHANGES SEVENTH PRINTING E3305.3: now reads The space equal to the width and depth of the panelboard and extending

More information

SCHEDULE G REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE INSTALLATION OF STREET LIGHTING

SCHEDULE G REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE INSTALLATION OF STREET LIGHTING SCHEDULE G REGULATIONS, STANDARDS AND SPECIFICATIONS FOR THE INSTALLATION OF STREET LIGHTING This is Schedule G of the District of Peachland Subdivision and Development Servicing Bylaw No. 1230, July,

More information

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION

SECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION Page 210500-1 SECTION 210500 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

CONSTRUCTION SPECIFICATION FOR REMOVAL OF ELECTRICAL EQUIPMENT AND MATERIALS

CONSTRUCTION SPECIFICATION FOR REMOVAL OF ELECTRICAL EQUIPMENT AND MATERIALS ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 610 NOVEMBER 2008 CONSTRUCTION SPECIFICATION FOR REMOVAL OF ELECTRICAL EQUIPMENT AND MATERIALS TABLE OF CONTENTS 610.01 SCOPE 610.02 REFERENCES 610.03

More information