1 CEILING & WALL SYSTEMS TECHNICAL GUIDE DrywallSystem QUIKSTIX WALL LINER Drywall System (Patent Pending) FASTER: Eliminate measuring and marking with QuikStix EASIER: Keep both feet on the floor while simply clicking QuikStix s into BETTER: Time saving integrated system with Roll and s

2 DrywallSystem QUIKSTIX WALL LINER COMPONENTS TM QuikStix Walls Item Details Item Number Length/ Item Description Face Dimensions Profile Height Perspective QSWFT /2 1-5/8 QSWFT /2 1-5/8 QSWFT /2 1-5/8 QSWFT /2 1-5/8 QSWLT10 10 (ing Tabs 8 On Center) 1-1/4 Tall Face 1-3/8 Wide Base 1-3/4 Tall Back QSWSB TM Roll 50 3/8 7/8 QSUTC (Screw Holes 1 On Center) 2 Wide Note: All components are available with G90 hot dipped galvanized coating as special order. Just add G90 suffix to end of item number. Cavity Insulation 16 o.c.) (Ceiling) joint 10 QSUTC cables can run along QSWSB Roll Box Gypsum Board Rigid Insulation directly on concrete wall Rigid Insulation in s Roll Insulation s Fi-Foil Insulation (Adhere on face of and must be installed with air space) QSUTC QSWSB Roll (Floor) Optional space between concrete and System For more information call ARMSTRONG 2

3 QUIKSTIX WALL LINER Corner and Extra Weight Loads 2 x 8 Wood block screwed inside s for cabinet mounting Recommend QSUTC at Gypsum Board joints positive attachment 16 o.c. Gypsum Board Hole Pan Head Screw Cabinets must be supported to structure. required on every at cabinets, etc. (Positively attached to structure.) QSWSB Roll Two s 8 Hole Cut ing to form 90 corner Pan Head Screw 10 Using s and Roll 1-5/ QSUTC s typically installed 4 o.c. and at Gypsum Board joints QSUTC screwed to web of Condition: Screw short side of QSUTC to Bottom positive attachment Flange 1-5/8 QSWSB Roll Bulb For wide air space: Screw long side of QSUTC to. (Cut to length as necessary.) QSWSB Roll (Overlap and screw together as necessary.) Bottom Bottom Inside Corner Detail 1 Insert Support Bar into electrical knockout as shown 2 Twist bar toward living space Bottom Bottom Outside Corner Detail QSWSB Roll 3 Bar locked into position 3

4 QUIKSTIX WALL LINER DrywallSystem Methods of Construction Uneven Concrete Walls Wall ing (shot to deck) QSWSB Roll Concrete Block Knockout at Mid-point Wall ing can run along and through hole (grommets supplied by electrician) QSWSB Roll Concrete Wall Condition Wall ing (shot to floor) QSUTC (Fasten to and wall to provide lateral support) Hole for Wall ing For more information call ARMSTRONG 4

5 DrywallSystem QUIKSTIX WALL LINER Installation Instructions NOTE: WEAR APPROPRIATE SAFETY EQUIPMENT WHEN INSTALLING OUR PRODUCT END VIEW Face Back Face Side (Drywall Side) 16 or 24 o.c. 1-3/4 Slide Steel into lock position 7/8 Weep Hole 8 o.c. Bulb Back Side TOP VIEW Step 1 To determine proper location for, string a chalk line on ceiling and on the floor. Chalk line Cut s 1/4 shorter than actual inside dimensions of track. Ceiling ing Ceiling Straight vertical alignment between top and bottom locks. Step 2 Measure and cut proper length of and. Cut with snips or chop saw. Cut s 1/2 shorter than actual inside dimension of track. Step 3 Install in straight vertical alignment to receive s. (Ceiling) or 24 o.c. or 24 o.c. First, insert in top of ing. Next, slide bottom of into position until it locks. Can cut bundles with chop saw. (Floor) Chalk line Floor ing joint Start at left of lock. (Insert top of first.) Step 4 Position into top then into bottom until locked in place. 10 Turn clockwise to lock into top and bottom of track. (Do not twist.) Optional wood block for baseboard attachment. Start at right of lock. (Slide bottom in last.) For more information call ARMSTRONG 5

6 AWI Licensing Company, 2008 Printed in United States of America CS Please Recycle

SHORTSPAN. Features. Components

SHORTSPAN. Features. Components Armstrong DGS ShortSpan is a fast and easy solution for framing short spans and an economical alternative to TCR and Furring Channel constructions. Features ShortSpan enables framing without suspension

More information

METALWORKS RH215 Faceted Custom Hook-on Panels

METALWORKS RH215 Faceted Custom Hook-on Panels METALWORKS RH215 Faceted Custom Hook-on Panels Assembly and Installation Instructions 1. GENERAL 1.1 Product Description MetalWorks RH215 Faceted Custom Hook-on panel system is a downward accessible, custom

More information

METALWorkS. RH200 Custom Hook-on Panels. General Installation Instructions. Ceiling 1.0 GENERAL Site Conditions Product Description

METALWorkS. RH200 Custom Hook-on Panels. General Installation Instructions. Ceiling 1.0 GENERAL Site Conditions Product Description Ceiling Systems Between us, ideas become reality METALWorkS General Installation Instructions RH200 Custom Hook-on Panels 1.0 GENERAL 1.1. Product Description RH200 system is a downward accessible, metal

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 092216 - NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION NON-STRUCTURAL METAL FRAMING

SECTION NON-STRUCTURAL METAL FRAMING SECTION 09 22 16 PART 1 - GENERAL 1.1 DESCRIPTION A. This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories

More information

Important: Before You Start

Important: Before You Start Advantage ICF System Advantage ICF System TM Field Guide Important: Before You Start Does Your Building Inspector Know You Are Building with the Advantage ICF System? You are required to check with your

More information

SECTION NON-STRUCTURAL METAL FRAMING

SECTION NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 22 16 1. Use this section only for NCA projects. 2. Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

ShortSpan Brochure1 6/14/05 4:39 PM Page 1 CEILING SYSTEMS

ShortSpan Brochure1 6/14/05 4:39 PM Page 1 CEILING SYSTEMS CEILING SYSTEMS Armstrong Short Drywall Grid System was introduced to the North American commercial building market early in 2005. Many of its properties are similar to other framing systems commonly

More information

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1 16 May 2014 Page 1 PART 1 GENERAL 1.1 DESCRIPTION This section specifies steel studs wall systems, shaft wall systems, ceiling or soffit suspended or furred framing, wall furring, fasteners, and accessories

More information

AXIOM Indirect Field Light Coves

AXIOM Indirect Field Light Coves AXIOM Indirect Field Light Coves Assembly and Installation Instructions 1. GENERAL 1.1 Description The Axiom Indirect Field Light Cove system is a pre-engineered lighting solution designed to be used at

More information

DIVISION: FINISHES SECTION: SUSPENSION SYSTEMS REPORT HOLDER: WORTHINGTON ARMSTRONG VENTURE (WAVE)

DIVISION: FINISHES SECTION: SUSPENSION SYSTEMS REPORT HOLDER: WORTHINGTON ARMSTRONG VENTURE (WAVE) 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 2311 Reissued 09/2017 This report is subject to renewal 09/2018. DIVISION: 09 00

More information

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights 1 Exam Prep Application and Finishing of Gypsum Board GA-216-2013 Tabs and s These 1 Exam Prep Tabs are based on the Gypsum Association GA-216-2013 Application and Finishing of Gypsum Panel Products. Each

More information

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:

UNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number: SECTION 092216 - COLD FORMED STEEL FRAMING - NON-STRUCTURAL (CFSF-NS) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 ACTION

More information

Shortspan. Framing Systems

Shortspan. Framing Systems Shortspan Framing Systems faster. easier. better. Armstrong Drywall Framing Systems install faster than traditional methods, which helps you complete jobs under cost and ahead of schedule. Our Drywall

More information

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights

1 Exam Prep Application and Finishing of Gypsum Board GA Tabs and Highlights 1 Exam Prep Application and Finishing of Gypsum Board GA-216-2016 Tabs and s These 1 Exam Prep Tabs are based on the Gypsum Association GA-216-2016 Application and Finishing of Gypsum Panel Products. Each

More information

AXIOM Indirect Light Coves

AXIOM Indirect Light Coves AXIOM Indirect Light Coves Assembly and Installation Instructions 1. GENERAL 1.1 Description The Axiom Indirect Light Cove system is a pre-engineered lighting solution designed to be used at a ceiling-to-wall

More information

ESR-1812 Reissued October 1, 2012 This report is subject to renewal November 1, 2013.

ESR-1812 Reissued October 1, 2012 This report is subject to renewal November 1, 2013. ICC-ES Evaluation Report www.icc-es.org (800) 423-6587 (562) 699-0543 ESR-1812 Reissued October 1, 2012 This report is subject to renewal November 1, 2013. A Subsidiary of the International Code Council

More information

SpotClip. Downlight covers for safe lighting installation in suspended ceilings

SpotClip. Downlight covers for safe lighting installation in suspended ceilings SpotClip Downlight covers for safe lighting installation in suspended ceilings SpotClip is a unique and innovative range products for the safe and easy installation Our inhouse team of developers at HellermannTyton

More information

AXIOM Direct Light Coves Assembly and Installation Instructions

AXIOM Direct Light Coves Assembly and Installation Instructions AXIOM Direct s Assembly and Installation Instructions 1. GENERAL 1.1 Description The Axiom Direct system is a pre-engineered lighting solution designed to be used at a wall condition and integrate with

More information

BASICS Direct-Attach Ceiling Panels

BASICS Direct-Attach Ceiling Panels INVISACOUSTICS Assembly and Installation Instructions BASICS Direct-Attach Ceiling Panels CEILING PANELS STANDARD ITEMS: Item No. 1212FP Item Name 23-3/4 x 47-3/4 x 3/ No Finish Included w/panels Sold

More information

SHORTSPAN FRAMING SYSTEMS

SHORTSPAN FRAMING SYSTEMS SHORTSPAN FRAMING SYSTEMS FASTER. EASIER. BETTER. Armstrong Drywall Framing Systems install faster than traditional methods, which helps you complete jobs under cost and ahead of schedule. Our Drywall

More information

Basic Suspension Systems

Basic Suspension Systems CEILING & WALL SYSTEMS Commercial Ceilings and Walls Solutions Guide Installing Armstrong Suspended Ceilings The ceiling system is made up of Armstrong panels which are supported by a suspension system

More information

SpotClip. Downlight covers for safe lighting installation in suspended ceilings

SpotClip. Downlight covers for safe lighting installation in suspended ceilings SpotClip Downlight covers for safe lighting installation in suspended ceilings SpotClip is a unique and innovative range products for the safe and easy installation Our in house team of developers at HellermannTyton

More information

stucco/ plaster GrId systems HanGInG and FramInG stucco/plaster CeIlInGs

stucco/ plaster GrId systems HanGInG and FramInG stucco/plaster CeIlInGs Stucco/ Plaster Grid SystemS Hanging and Framing Stucco/Plaster Ceilings faster. easier. better. Armstrong Drywall Framing Systems install faster than traditional methods, which helps you complete jobs

More information

interior finishes 2 l

interior finishes 2 l interior finishes 2 l 2.1 Gypsum Board (Drywall ) The most common interior finishing material used in construction today is gypsum board, also known by the trademark Drywall. Gypsum board can be applied

More information

Galvanized Steel Bead Accessories for Stucco and Plaster Installations ALABAMA METAL INDUSTRIES CORPORATION. Contract Number:

Galvanized Steel Bead Accessories for Stucco and Plaster Installations ALABAMA METAL INDUSTRIES CORPORATION. Contract Number: SUBMITTAL SUBMITTAL TRANSMITTAL DETAILS AMICO Galvanized Steel Bead Accessories for Stucco and Plaster Installations Project Submittals as manufactured by Submittal Date: Contract : Project Name: Section

More information

INSTALLATION GUIDE GUIDE TO ASC ISO-WALL CONSTRUCTION SYSTEM APPLICATION ISO-WALL SYSTEM. ASC Iso-Wall System Includes: Materials Required:

INSTALLATION GUIDE GUIDE TO ASC ISO-WALL CONSTRUCTION SYSTEM APPLICATION ISO-WALL SYSTEM. ASC Iso-Wall System Includes: Materials Required: ISO-WALL SYSTEM ACOUSTIC SCIENCES CORPORATION INSTALLATION GUIDE ASC Iso-Wall System Includes: 4" x 4" WallDamp Squares 1-1/2" x 48" WallDamp Strips 1-1/2" x 3" WallDamp RC Pads (optional) drc-1 (Damped

More information

Duct Wrap Flexible Wraps

Duct Wrap Flexible Wraps Design No. 3MU/ 60-01 December 23, 2010 VENTILATION DUCT PROTECTION 3M Company 3M Fire Barrier Duct Wraps: 615 and 615+ 3M Fire Barrier Sealants: Water-Tight 1000-NS Silicone, Water-Tight 1003-SL Silicone

More information

Standard Installation Fire Damper Models: 119, 119(F), 119(SS), D19

Standard Installation Fire Damper Models: 119, 119(F), 119(SS), D19 Standard Installation Fire Damper Models: 119, 119(F), 119(SS), D19 Page 1 or 8 APPLICATION This fi re damper is intended to restrict the passage of fl ame. The standard installation requires that the

More information

CONNECTOR S T U D S H E A R. Design for Composite Structural Action STUD SHEAR CONNECTOR APPLICATION

CONNECTOR S T U D S H E A R. Design for Composite Structural Action STUD SHEAR CONNECTOR APPLICATION S T U D S H E A R CONNECTOR STUD SHEAR CONNECTOR APPLICATION Design for Composite Structural Action Exterior ashlar-type masonry veneer, typically of clay brick or concrete block masonry, are commonly

More information

Super-Compact Ceiling Hanger Model KSCH Patent Pending Ceiling Isolation Theory: Resiliently suspended ceiling systems are designed to minimize floor impact noise and airborne sound transmissions through

More information

STEEL STUD, TRIMS AND ACCESSORIES FOR DRYWALL CONSTRUCTION MONTREAL TORONTO CALGARY EDMONTON VANCOUVER THE STRENGTH WITHIN

STEEL STUD, TRIMS AND ACCESSORIES FOR DRYWALL CONSTRUCTION MONTREAL TORONTO CALGARY EDMONTON VANCOUVER THE STRENGTH WITHIN STEEL STUD, TRIMS AND ACCESSORIES FOR DRYWALL CONSTRUCTION MONTREAL TORONTO CALGARY EDMONTON VANCOUVER THE STRENGTH WITHIN STEEL STUD AND TRACK FOR DRYWALL PARTITIONS TAKE ADVANTAGE OF THE SAVINGS IN TIME

More information

METALWORKS Torsion Spring

METALWORKS Torsion Spring METALWORKS Torsion Spring Assembly and Installation Instructions 1. GENERAL 1.1 Product Description MetalWorks Torsion Spring is a downward accessible aluminum ceiling panel available in standard 2' x

More information

WHATEVER THE CHALLENGE, PHILLIPS HAS YOU COVERED.

WHATEVER THE CHALLENGE, PHILLIPS HAS YOU COVERED. WHATEVER THE CHALLENGE, PHILLIPS HAS YOU COVERED. Build walls and ceilings with a strong base, sturdy reinforcements and much more with Phillips extensive line of high quality products. As a single source

More information

Installation. Resilmount A237R. Installation Instructions. Furring channel sound isolation clip

Installation. Resilmount A237R. Installation Instructions. Furring channel sound isolation clip Resilmount A237R Furring channel sound isolation clip Installation Instructions Another Quality Building Product Installation A237R SPECIFICATIONS Width: 1-3/8 eight (including rubber): 1-1/16 Length:

More information

LIGHTWEIGHT AND ECONOMICAL

LIGHTWEIGHT AND ECONOMICAL SYSTEMS LIGHTWEIGHT AND ECONOMICAL FRAMING SYSTEM Lightweight fire and sound-resistant assemblies provide an economical solution for single, double and multilayer drywall partitions in commercial, residential

More information

2.7 LOGIX WALL CONSTRUCTION

2.7 LOGIX WALL CONSTRUCTION 2.7 LOGIX WALL CONSTRUCTION INTERLOCK The mechanism that holds successive courses of forms together. BARS The spaces between the lines. LINES The lines between the bars allow cuts to be easily made that

More information

NATIONAL GYPSUM COMPANY 3-Hour Area Separation Wall System

NATIONAL GYPSUM COMPANY 3-Hour Area Separation Wall System -Hour Wall System The -hour Wall System is a -hour fire wall consisting of two layers of in. (. mm) shaftliner panels friction-fit between in. (0. mm) light-gauge steel H-Studs and a layer of /" Fire-Shield

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

AXIOM Building Perimeter System Assembly and Installation Instructions

AXIOM Building Perimeter System Assembly and Installation Instructions CEILING SYSTEMS AXIOM Building Perimeter System Assembly and Installation Instructions 1 GENERAL 1.1 Description Axiom Building Perimeter Systems (ABPS) is a pre-engineered perimeter solution to accomplish

More information

THE QUICKEST WAY AROUND. Containment Wall Set-up Presentation

THE QUICKEST WAY AROUND. Containment Wall Set-up Presentation THE QUICKEST WAY AROUND Containment Wall Set-up Presentation Galvanized Wall & Accessories Suretuf Containments new galvanized wall packages utilize patented drop pin connecting panels and patented slide

More information

Before You Get Started, You Will Need

Before You Get Started, You Will Need LiteForm forming components should only be assembled by workers who have been properly trained. It is the installer s responsibility to make sure that training is done before construction begins. Serious

More information

METALWORKS, OPTIMA. and SPECTRA Capz. Installation Instructions /15/08 Patent No For best installation results:

METALWORKS, OPTIMA. and SPECTRA Capz. Installation Instructions /15/08 Patent No For best installation results: METALWORKS, OPTIMA Installation Instructions and SPECTRA Capz For best installation results: 3931 4/15/08 Patent No. 6.103.360 Optima and Spectra panels are installation directional (refer to arrow on

More information

SOUNDGUARD INSTALLATION MANUAL

SOUNDGUARD INSTALLATION MANUAL SOUNDGUARD INSTALLATION MANUAL WWW.ROOFSCREEN.COM 831 421 9230 Introduction... 2 This manual... 2 Application... 2 System Overview... 2 Components... 2 Face Panels... 3 Insulation... 3 Perforated Liner

More information

1. Non-load-bearing steel framing systems for interior gypsum board assemblies. 2. Suspension systems for interior gypsum ceilings and soffits.

1. Non-load-bearing steel framing systems for interior gypsum board assemblies. 2. Suspension systems for interior gypsum ceilings and soffits. SECTION 09 2216 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Non-load-bearing steel framing systems for interior gypsum board assemblies. 2. Suspension systems for interior gypsum ceilings and

More information

DIVISION: FINISHES SECTION: GYPSUM BOARD ACCESSORIES REPORT HOLDER: CONLAB, INC. dba PREST ON CO.

DIVISION: FINISHES SECTION: GYPSUM BOARD ACCESSORIES REPORT HOLDER: CONLAB, INC. dba PREST ON CO. 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 1812 Reissued 11/2017 This report is subject to renewal 11/2018. DIVISION: 09 00

More information

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco

More information

HOW TO: CREATE METAL PARTITIONS WALL LININGS AND CEILINGS GTEC FRAMES

HOW TO: CREATE METAL PARTITIONS WALL LININGS AND CEILINGS GTEC FRAMES HOW TO: CREATE METAL PARTITIONS WALL LININGS AND CEILINGS GTEC FRAMES 1 METAL OR TIMBER? When creating stud partitions, wall linings and suspended ceilings the traditional method of installation has been

More information

ThermaSteel Corporation ASSEMBLY MANUAL

ThermaSteel Corporation ASSEMBLY MANUAL ThermaSteel Corporation ASSEMBLY MANUAL TABLE OF CONTENTS 1- INTRODUCTION 1.1 THERMASTEEL TM WALL PANELS 1.2 Drawing and Element Numbers 2- ASSEMBLY 2.1 Sequence of Assembly 2.2 Preparation of Foundation

More information

AND ACCESSORIES FOR DRYWALL CONSTRUCTION

AND ACCESSORIES FOR DRYWALL CONSTRUCTION STEEL TRIMS AND ACCESSORIES FOR DRYWALL CONSTRUCTION Quality in your corner. THE STRENGTH WITHIN MONTREAL TORONTO CALGARY EDMONTON VANCOUVER STEEL TRIMS AND ACCESSORIES for Construction BAILEY HAS YOUR

More information

Construction Standards PAGE

Construction Standards PAGE Construction Standards PAGE 083113-1 SECTION 083113 - PART 1 - GENERAL 1.1 M.S.U ISSUES A. M.S.U. avoids access doors whenever possible by using lay-in type ceilings, but all valves and equipment requiring

More information

SECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS

SECTION CONDUITS AND BACKBOXES FOR COMMUNICATIONS SYSTEMS SECTION 16711-27 05 28.33 PART 1 - GENERAL 1.01 SUMMARY A. This section includes Labor, materials and equipment necessary to complete the installation required for the items specified under this Section,

More information

Construction Standards PAGE

Construction Standards PAGE Construction Standards PAGE 092613-1 SECTION 092613 - PART 1 - GENERAL 1.1 M.S.U. ISSUES A. It is the intent of MSU that all gypsum veneer plaster used on its projects will comply with LEED NC 3 Credit

More information

Basics Direct-Attach Ceiling Panels

Basics Direct-Attach Ceiling Panels InvisAcoustics Assembly and Installation Instructions Basics Direct-Attach Ceiling Panels ceiling panels Standard items: Name 1212FP 23-3/4 x 47-3/4 x 3/ No Finish 1212BL 23-3/4 x 47-3/4 x 3/ Black 1212WH

More information

MASONRY ANCHORS AND CONNECTORS May 6, 2014

MASONRY ANCHORS AND CONNECTORS May 6, 2014 Page - 1 This section includes specification text to assist in describing a variety of masonry anchors, connectors, and accessories intended for masonry construction. This document contains prepared master

More information

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 ) SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 ) WARNING - When unpacking SpaVault, DO NOT discard styrofoam pieces, these are not packaging materials. Step 1 Excavation Important:

More information

NATIONAL GYPSUM COMPANY 2-Hour Area Separation Wall System

NATIONAL GYPSUM COMPANY 2-Hour Area Separation Wall System 0 00/NGC NATIONAL GYPSUM COMPANY -Hour Wall System The -Hour is a -hour fire wall consisting of in. (0. mm) light-gauge steel H-Studs that secure two layers of in. (. mm) shaftliner panels friction-fit

More information

KAM KNURLED ANGLE MOLDING ANGLE MOLDINGS " LAM-12 LOCKING ANGLE MOLDING DRYWALL CEILING GRID MBAC MAIN BEAM ADAPTER CLIP

KAM KNURLED ANGLE MOLDING ANGLE MOLDINGS  LAM-12 LOCKING ANGLE MOLDING DRYWALL CEILING GRID MBAC MAIN BEAM ADAPTER CLIP HD80 8" TYP HD806 8" TYP KAM-020 KNURLED ANGLE KAM-2020 KNURLED ANGLE KNURLED ANGLE ANGLE S HD806 F08 8" 8" TYP 4 2 " S ATTACHMENT CLIP HD806 F6 8" TYP 3 3 4 (XL84P) PROFILES 8" QSUTC QUIKSTIX UP TIGHT

More information

BASICS Direct-Attach Ceiling Panels

BASICS Direct-Attach Ceiling Panels INVISACOUSTICS Assembly and Installation Instructions BASICS Direct-Attach Ceiling Panels CEILING PANELS STANDARD ITEMS: Name 1212FP 23-3/4 x 47-3/4 x 3/ No Finish 1212BL 23-3/4 x 47-3/4 x 3/ Black 1212WH

More information

Concrete Formwork Systems

Concrete Formwork Systems Concrete Formwork Systems Victory Bear is proud to introduce K-FORM North America Proven by a decade of use in the United Kingdom, K-FORM is an all-in-one screed rail and concrete forming system. Simple

More information

1.52mm 1.52mm. Exterior Siding Sheet: Fabricated from Z275 steel material conforming to ASTM A653M grade 230 steel

1.52mm 1.52mm. Exterior Siding Sheet: Fabricated from Z275 steel material conforming to ASTM A653M grade 230 steel .0 EXTERIOR SKIN PROFILES: A. SHADOWLINE - 68mm (46") PANEL MODULE.0 EXTERIOR SKIN PROFILES: B. MICRORIB - 68mm (46") PANEL MODULE 02mm 25mm 02mm EXPOSED SURFACE 38.mm 38.mm 38.mm EXPOSED SURFACE.52mm.52mm

More information

DIVISION 5 METALS SECTION COLD-FORMED METAL FRAMING

DIVISION 5 METALS SECTION COLD-FORMED METAL FRAMING DIVISION 5 METALS SECTION 05 40 00 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1 SECTION SUPPORTING DEVICES

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION PAGE 1 SECTION SUPPORTING DEVICES KNOXVILLE, TENNESSEE SECTION 26 05 29 PAGE 1 PART 1 - GENERAL: 1.01 DESCRIPTION OF WORK: SECTION 26 05 29 A. Extent of supports, anchors, sleeves and seals is indicated by drawings and schedules and/or

More information

Drywall Grid Suspension System with custom Axiom trim; NOAA, Tuscaloosa, AL Gould Evans Architects, New Orleans, LA.

Drywall Grid Suspension System with custom Axiom trim; NOAA, Tuscaloosa, AL Gould Evans Architects, New Orleans, LA. Drywall Grid Suspension System with custom Axiom trim; NOAA, Tuscaloosa, AL Gould Evans Architects, New Orleans, LA drywall systems DRYWALL INSTALLATION SYSTEMS At-a-Glance helping to bring your one-of-a-kind

More information

CEILING & WALL SYSTEMS

CEILING & WALL SYSTEMS CEILING & WALL SYSTEMS Axiom Perimeter Trim Commercial Ceilings and Walls Solutions Guide Axiom Perimeter Trim AXIOM Trim The Axiom family of products provide functional and visual options in ceiling design.

More information

Construction Standards PAGE

Construction Standards PAGE Construction Standards PAGE 095113-1 SECTION 095113 - PART 1 - GENERAL 1.1 M.S.U. ISSUES 1. It the intent of MSU that all joint sealants used on its projects will comply with LEED NC 3 Credit Requirements

More information

Appendix D. -Weyerhaeuser Fire Rated Assembly Listings-

Appendix D. -Weyerhaeuser Fire Rated Assembly Listings- Appendix D -Weyerhaeuser Fire Rated Assembly Listings- Table of Contents Assembly Description Reference Standard/Criteria FJ-1 TJI Joist 1 hour fire resistance rated floor and roof assembly. ASTM-E119

More information

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL SECTION 09511 - ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION ACOUSTICAL PANEL CEILINGS

SECTION ACOUSTICAL PANEL CEILINGS SECTION 095113 ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

JASPER. PAGE 2: 2x2 T-GRID INSTALLATION. PAGE 3: 2x2 SRI SHEETROCK INSTALLATION. PAGE 4: 2x2 IEM INSTALLATION

JASPER. PAGE 2: 2x2 T-GRID INSTALLATION. PAGE 3: 2x2 SRI SHEETROCK INSTALLATION. PAGE 4: 2x2 IEM INSTALLATION 2016 JASPER CM2082 (2x2) PAGE 2: 2x2 T-GRID INSTALLATION PAGE 3: 2x2 SRI SHEETROCK INSTALLATION PAGE 4: 2x2 IEM INSTALLATION PAGE 5: INSTALLATION OF THE EARTHQUAKE CLIPS Drawing: 762300XX_2x2 Rev: A Sheet:

More information

Wall studs. Wall Studs

Wall studs. Wall Studs 15 Box To Stud Fastener Attaches with screws to metal studs. BB1 supports electrical box. BG series features Guide-Rite design. BP series features push-type design. 78101118145 BB1 Electrical Box 100 Support

More information

Adjustable Suspension Hanger Technical Datasheet

Adjustable Suspension Hanger Technical Datasheet Adjustable Suspension Hanger sheet The Adjustable Suspension Hangers Clip are a component of the Keylock Ceiling System. The upper vertical side of the hanger allows the Suspension Rod that goes through

More information

LISTING INFORMATION OF International Fireproof Technology Inc. - Joint Systems SPEC ID: 43848

LISTING INFORMATION OF International Fireproof Technology Inc. - Joint Systems SPEC ID: 43848 LISTING INFORMATION OF International Fireproof Technology Inc. - Joint Systems SPEC ID: 43848 International Fireproof Technology Inc. 17528 Von Karman Avenue Irvine, CA 92614 This report is for the exclusive

More information

Solutions Railing Overview ACTUAL FREIGHT CHARGES APPLY TO ALL SOLUTIONS RAIL ORDERS

Solutions Railing Overview ACTUAL FREIGHT CHARGES APPLY TO ALL SOLUTIONS RAIL ORDERS 60 Aluminum Railing Systems SOLUTIONSTM Solutions Railing Overview Post to Post - PTP Solutions PTP application method is the traditional surface mount installation method with the rail terminating into

More information

SECTION GYPSUM BOARD ASSEMBLIES

SECTION GYPSUM BOARD ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY SECTION 09 21 16 A. Provide gypsum board assemblies as shown and specified. Work includes: 1. Walls, partitions, and soffits, including metal framing systems. 2. Acoustical

More information

Division 07 Thermal and Moisture Protection Thermal Protection Blanket Insulation Page 1 of 11

Division 07 Thermal and Moisture Protection Thermal Protection Blanket Insulation Page 1 of 11 07 21 16 Blanket Insulation Page 1 of 11 Unifrax I LLC Design No. UNI/BI 120-14 FIRE RESISTANT GREASE DUCT FyreWrap Elite 1.5 Duct Insulation ASTM E 2336-16 and ICC-ES Acceptance Criteria for Grease Duct

More information

NUDURA ESTIMATOR. User Guide Guest Login

NUDURA ESTIMATOR. User Guide Guest Login NUDURA ESTIMATOR User Guide Guest Login 1.0 Estimates Starting a New Estimate 1.1 Contact Info: Enter contact information to be included on estimate 2. Click the NEXT when complete Order Page 1. Enter

More information

Installation Instructions DEKO PV 1090

Installation Instructions DEKO PV 1090 Installation Instructions DEKO PV 1090 art. no. 871002 1 Ceiling Profile The first step is to draw lines on the floor and ceiling, marking up the position of the partition according to the architect s

More information

Single frame acoustic separating wall system

Single frame acoustic separating wall system GypWall QUIET SF GypWall QUIET SF Single frame acoustic separating wall system GypWall QUIET SF metal stud partition is a lightweight, non-loadbearing, single frame wall system. Subject to Local Authority

More information

Assemblies Evaluated For 1. Non Axial Load Bearing Wall 2. Transverse Load Capacity 3. Fire Resistance 4. Abuse Resistance

Assemblies Evaluated For 1. Non Axial Load Bearing Wall 2. Transverse Load Capacity 3. Fire Resistance 4. Abuse Resistance Pei Evaluation Service is an accredited ISO Standard 17065 Product Certifier, accredited by the IAS. This Assembly Evaluation Report represents a product that Pei ES has Evaluated. This Assembly Evaluation

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB #

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # SECTION 26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Mbrico Tile Rooftop/Raised Floor Installation Guidelines

Mbrico Tile Rooftop/Raised Floor Installation Guidelines Mbrico Tile Rooftop/Raised Floor Installation Guidelines *The following information is the installation guidelines Mbrico recommends when installing the Mbrico Tile Rooftop system. Installation guidelines

More information

5.0 NUDURA PRODUCTS ON SITE STORAGE PACKAGING, UNIT ASSEMBLY, USAGE

5.0 NUDURA PRODUCTS ON SITE STORAGE PACKAGING, UNIT ASSEMBLY, USAGE 5.0 NUDURA PRODUCTS ON SITE STORAGE PACKAGING, UNIT ASSEMBLY, USAGE NUDURA Inc. has one of the most complete lineups of products and accessories available today in the construction industry. NUDURA s Integrated

More information

CEILING SYSTEMS. DRYWALL GRID and FRAMING SYSTEM. Between us, ideas become reality

CEILING SYSTEMS. DRYWALL GRID and FRAMING SYSTEM. Between us, ideas become reality CEILING SYSTEMS Between us, ideas become reality DRYWALL GRID and FRAMING SYSTEM Pre-engineered systems from Armstrong are designed so you know what the details of finished installations will look like

More information

INSTALLATION CHECKLIST 2 ND EDITION. Fox Blocks Abbott Drive Omaha, NE

INSTALLATION CHECKLIST 2 ND EDITION. Fox Blocks Abbott Drive Omaha, NE Fox Blocks INSTALLATION CHECKLIST ND EDITION Fox Blocks Installation Checklist: ND Edition 6110 Abbott Drive Omaha, NE 6110-69-6 WWW.FOXBLOCKS.COM INSTALLATION CHECKLISTS The Checklists on the following

More information

Chapter 13 - Finish Framing

Chapter 13 - Finish Framing Chapter 13 - Finish Framing Contents Chapter 13 - Finish Framing... 13-1 Timing & Prerequisites... 13-2 Remove Bottom Plates in Doorways... 13-2 Post LVLs and Girder Trusses... 13-2 Install Framing for

More information

Vertigo Cladding Board

Vertigo Cladding Board Installation guide Vertigo Cladding Board Geolam: a stunning alternative to wood cladding Vertigo is a composite wood cladding board requiring minimum maintenance. Durable and fade resistant, it will not

More information

ROOF MOUNT KIT OWNERS MANUAL

ROOF MOUNT KIT OWNERS MANUAL ROOF MOUNT KIT OWNERS MANUAL Made in the USA by: Primus Wind Power, Inc. 938 Quail St. Lakewood, CO 80215 Phone: (303) 242-5820 www.primuswindpower.com AIR is a trademark of Primus Wind Power, Inc. ROOF

More information

Store No MAY 13 Addendum No. 1 SECTION ACOUSTICAL PANEL CEILINGS

Store No MAY 13 Addendum No. 1 SECTION ACOUSTICAL PANEL CEILINGS SECTION 09511 ACOUSTICAL PANEL CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

Pre-Fabricated Roof Curbs

Pre-Fabricated Roof Curbs TC-1, TC-2, TC-3, TC-5 Table of Contents General Information 4-5 Specifications 6-9 Assembly Instructions 10-16 Pitch Information 17 Submittal 18-21 54 years of excellence... www.thybar.com 3 Insulated

More information

XHBN.HW-D Joint Systems. Design/System/Construction/Assembly Usage Disclaimer. Joint Systems. System No. HW-D-0631

XHBN.HW-D Joint Systems. Design/System/Construction/Assembly Usage Disclaimer. Joint Systems. System No. HW-D-0631 Page Bottom XHBN.HW-D-0631 Joint Systems Design/System/Construction/Assembly Usage Disclaimer Authorities Having Jurisdiction should be consulted in all cases as to the particular requirements covering

More information

Code Compliance Research Report CCRR-0238

Code Compliance Research Report CCRR-0238 Code Compliance Research Report CCRR-0238 Issued: 11-09-2016 Renewal Due: 11-09-2018 Revised: 11-10-2017 DIVISION: 05 00 00 METALS Section: 05 52 00 Metal Railings CPG Building Products LLC 894 Prairie

More information

Virtually Invisible Access Panels

Virtually Invisible Access Panels Virtually Invisible Access Panels 14 Standard sizes from 6 x 6 to 24 x 36 Custom Sizes in increments of 1/16 Minimum dimension of length or width is 6. Door sizes can be in increments of 1/16. Larger access

More information

by VICTORY BEAR Concrete Formwork Systems VICTORY BEAR Construction Products

by VICTORY BEAR Concrete Formwork Systems VICTORY BEAR Construction Products by Concrete Formwork Systems Victory Bear is proud to introduce K-FORM to North America. Proven by a decade of use in the United Kingdom, K-FORM is an all-in-one screed rail and concrete forming system.

More information

Trench Duct Class Catalog 5230CT9601R10/08

Trench Duct Class Catalog 5230CT9601R10/08 5230CT9601R10/08 2009 Class 5230 CONTENTS Application.................................................5 Unassembled Trench Duct Components.........................6 Factory Assembled Trench Duct..............................11

More information

IMPORTANT: Levelness of the walk-in floor is critical. If the floor is not level, vertical panels cannot be aligned properly.

IMPORTANT: Levelness of the walk-in floor is critical. If the floor is not level, vertical panels cannot be aligned properly. Floor panels INSTALLATION This section is applicable only if your walk-in has a floor. If not, proceed with next section. These are probably the most important panels you will install. To install the floor

More information

WHY I SHOULD SPECIFY AND USE FAS TRACK 1000?

WHY I SHOULD SPECIFY AND USE FAS TRACK 1000? TRACK 1000 FIRE MANAGEMENT PRODUCTS TECHNICAL PRODUCT GUIDE www.cemcosteel.com WHY I SHOULD SPECIFY AND USE FAS TRACK 1000? SOUND BENEFITS: Whether the protection you need is Fire, Air (Smoke), or Sound

More information

Uni-Just & Stak-Cap Pedestal System

Uni-Just & Stak-Cap Pedestal System Tile Tech Pedestal Uni-Just & Stak-Cap Pedestal System Single Model Design PVC Pipe Adjustable Screw Adjustable Self-Leveling Pat. # 8,453,39 & Pat. Pen Stackable HYBRID PEDESTAL SYSTEM - TECHNICAL DETAILS

More information

Specifying metal studs for interior and exterior walls can be simple.

Specifying metal studs for interior and exterior walls can be simple. by Thomas Castle, SE Specifying metal studs for interior and exterior walls can be simple. However, openings in the walls for doors, windows, and HVAC ducts require headers, jambs, and sills around them.

More information

Code Compliance Research Report CCRR-0238

Code Compliance Research Report CCRR-0238 Code Compliance Research Report CCRR-0238 Issue Date: 11-09-2016 Revision Date: 11-29-2018 Renewal Date: 11-09-2019 DIVISION: 05 00 00 METALS Section: 05 52 00 Metal Railings CPG Building Products LLC

More information