|
|
- Vanessa Eaton
- 6 years ago
- Views:
Transcription
1
2
3
4
5
6
7
8
9 TYP. SINGLE PLY ROOFING ROOF SHEETING BROAN VENT CAP #10 x 1" GASKETED SMS TYP. 4 SIDES 8" FRAMED CURB HVAC SYSTEMS "BASIS OF DESIGN" ROOF INSULATION R-19 WALL INSULATION R-13 LIGHTING EFFIECNCY PER STANDARDS / BY LIGHTING DESIGNER / SEE "E" SHEETS LIGHTING CONTROLS DESIGN PER C.E.C. T24 REQUIREMENTS MECHANICAL SYSTEMS GAS / ELECTRIC PACKAGE EQUIPMENT HVAC SYSTEM LEVEL OF QUALITY BASIC TO MEET MINIMUM STANDARDS CONTROLS T24 PROGRAMMABLE THERMOSTATS VENTILATION REQUIREMENTS PER T24 REQUIREMENTS HVAC SYSTEM AMBIENT DESIGN INDOOR OCCUPIED CONDITIONS INDOOR UNOCCUPIED CONDITIONS WATER HEATER TANKLESS HIGH EFFICIENCY FENESTRATION N/A LOAD CALCULATION METHOD(S) ASHRAE STANDARDS / C.E.C. ZONE 14 HVAC SYSTEM SELECTION TYPE BY OWNER ARCHITECT MECHANICAL DESIGNER END X USER SYMBOL ABBREV. HVAC LEGEND DUCT WITH EXTERNAL WRAP DUCT WITH INTERNAL LINER TYPICAL DUCT NO LINER OR WRAP FLEXIBLE DUCT EXTENSION TO RIGID DUCT WHEN SHOWN R/A DUCT, FLEX UNLESS NOTED OTHERWISE S/A DUCT, FLEX, UNLESS NOTED OTHERWISE E/A DUCT, UNLESS NOTED OTHERWISE MANUAL VOLUME DAMPER FIRE DAMPER & SMOKE DAMPER DESCRIPTION DWG.NO. DRAWING LIST M-0 DRAWING INDEX, HVAC LEGEND, HVAC SCHEDULES, GENERAL NOTES, AND DETAILS M-1 HVAC FLOOR PLAN M-2 DEMO & NEW EQUIPMENT ROOF PLANS T24-1 TITLE 24 COMPLIANCE REPORTS T24-2 TITLE 24 COMPLIANCE REPORTS DESCRIPTION 1 TYPICAL ROOF EXHAUST VENT DETAIL NTS CEILING REGISTER (RETURN OR OUTSIDE AIR) CEILING DIFFUSER (SUPPLY) GENERAL NOTES CEILING REGISTER (EXHAUST) CEILING REGISTER W/RA BOOT (SHORT LINE INDICATED BOOT DIRECTION) SUPPLY AIR DUCT SECTION 1. COORDINATE THE WORK OF THIS SECTION WITH THE WORK OF OTHER TRADES AND ALL JOB CONDITIONS. 2. UNLESS NOTED OTHERWISE ALL SYSTEMS, EQUIPMENT, MATERIALS, FABRICATION AND INSTALLATIONS SHALL COMPLY WITH ALL LOCAL, COUNTY, AND STATE CODES. 2 EA. - # 12 WIRES AT OPPOSING CORNERS T-BAR GRID 2 T-BAR REGISTER HANGING DETAIL NTS RETURN OR EXHAUST AIR DUCT SECTION DUCT SMOKE DETECTOR UNIT I.D. / UNIT # XX DETAIL # SHEET # X T LT THERMOSTAT RS AS HVAC EQUIPMENT SCHEDULE REMOTE SENSOR REMOTE AVERAGING SENSOR OUTSIDE AIR SUPPLY AIR RETURN AIR MARK MANUFACTURER MODEL TOTAL CAP. HEAT CAP. INPUT DESIGN CONDITION CFM / " W.C. VOLT / PHASE M.C.A. MAX FUSE SEER / *EER WEIGHT NOTES AC-1 CARRIER 48VL480606TF 48,000 90,000 BTUH 95/80/ / / / AC-2 CARRIER 48TCDD24H1M6_6V2G 242, ,000 BTUH 95/80/ / / ** / , 3 XX X OSA S/A R/A 3. UNLESS NOTED OTHERWISE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT, MATERIALS, LABOR, AND SERVICES AS REQUIRED FOR A COMPLETE INSTALLATION. ANY AND ALL ITEMS NOT SPECIFICALLY NOTED SHALL BE INCLUDED TO MAKE COMPLETE FUNCTIONING SYSTEMS. 4. PROVIDE SEISMIC RESTRAINTS TO ALL DUCT, PIPE AND EQUIPMENT SUPPORTS IN ACCORDANCE WITH "SMACNA" GUIDELINES FOR SEISMIC RESTRAINTS OF MECHANICAL SYSTEMS (2008). 5. EQUIPMENT ANCHORAGE: ALL MECHANICAL EQUIPMENT SHALL BE BRACED OR ANCHORED TO RESIST A HORIZONTAL FORCE ACTING IN ANY DIRECTION USING THE FOLLOWING CRITERIA: FIXED EQUIPMENT ON GRADE 33% OF OPERATING WEIGHT FIXED EQUIPMENT ON STRUCTURE 50% OF OPERATING WEIGHT FOR FLEXIBLY MOUNTED EQUIPMENT, USE 2 TIMES THE ABOVE VALUES. FOR SIMULTANEOUS VERTICAL FORCE, USE 1/3 TIMES THE HORIZONTAL FORCE. WHERE ANCHORAGE DETAILS ARE NOT INDICATED ON THE DRAWINGS, THE FIELD INSTALLATION SHALL BE SUBJECT TO THE APPROVAL OF THE ARCHITECT WHERE ANCHORAGE IS INDICATED ON THE CONTRACT DOCUMENTS, ANCHORAGE SHALL BE AS PER THE CONTRACT DOCUMENTS. 6. PENETRATIONS OF PIPES, CONDUITS, ETC., IN WALLS REQUIRING PROTECTED OPENING SHALL BE FIRE STOPPED. FIRE STOP MATERIAL SHALL BE A TESTED ASSEMBLY APPROVED BY THE STATE FIRE MARSHAL. 7. SEAL ALL DUCT AIR TIGHT WITH WATER BASED UL-181 SEALER. 8. FABRICATE AND INSTALL ALL DUCT WORK PER "SMACNA" DUCT CONSTRUCTION STANDARDS. ALL DUCT WORK UP STREAM OF DAMPERS SHALL BE DESIGNED AT 2" W.G. 9. PROVIDE COMPLETE SYSTEMS AIR BALANCE, SYSTEMS TESTING, AND ENERGY COMPLIANCE REPORTS FOR ALL HVAC SYSTEMS. AIR BALANCE CONTRACTOR TESTING SHALL COMPLY WITH "SMACNA" OR "AABC" STANDARDS. EF-1 BROAN L / / WATT 4, 5 EF-2 BROAN L / / WATT 4, 5, 6, T VENSTAR T8850 COLOR, TOUCH SCREEN, DIGITAL, PROGRAMMABLE THERMOSTAT AS VENSTAR ACCTSEN 10K REMOTE SENSOR FOR USE AS A SQUARE ROOT AVERAGING CONTROL SYSTEM 7 LT HONEYWELL T4150 LINE VOLTAGE THERMOSTAT FOR USE WITH EXHAUST FANS 10. ALL FABRICATED DUCT WORK SHOWN ON DRAWINGS SHALL BE LINED WITH 2" LINER. LINER SHALL BE SECURED WITH UL-181 APPROVED ADHESIVE AND SPOT WELD PINS. NO ADHESIVE STICKS OR PINCH NAILS WILL BE ALLOWED. 11. ALL EXTERNAL DUCT WRAP SHALL BE FOIL FACED R-4.2, SECURE WITH WIRE AND SEAL ALL SEAMS WITH TAPE. 12. HVAC SYSTEMS CIRCULATING FANS SHALL RUN ON AN CONTINUOUS BASIS DURING ALL OCCUPIED PERIODS. 13. CONTRACTOR SHALL MAINTAIN AND PROVIDE AS BUILT DRAWINGS. DELIVER TO OWNER UPON COMPLETION OF ALL WORK RELATED TO THIS TRADE. 3 NTS HVAC EQUIPMENT NOTES NOTE # NOTE DESCRIPTION 1 REPLACE EXISTING CURB WITH NEW FACTORY CURB / PROVIDE WITH FACTORY AUTOMATIC OUTSIDE AIR HOOD 2 PROVIDE WITH SPRING ISOLATION EARTHQUAKE APPROVED CURB. NEW CURB SHALL REPLACE EXISTING ROOF CURB 3 PROVIDE WITH THE FOLLOWING; 2 STG COOLING / RA + SA SMOKE DETECTORS / CO2 CONTROL / DIFF-TEMP ECONOMIZER / POWER EXHAUST / POWERED CONVENIENCE OUTLET 4 SWITCH INDEPENDENT FROM LIGHTS 5 PROVIDE WITH MODEL # 611CM ROOF VENT CAP (CURB BY FRAMING CONTRACTOR) 6 PROVIDE WITH LINE VOLT THEMOSTAT 7 WIRE SENSORS USING 22/3 SHIELDED CABLE AIR DISTRIBUTION SCHEDULE 14. UNLESS NOTED OTHERWISE ALL FABRICATED DUCT WORK DIMENSIONS AS SHOWN ON DRAWINGS ARE OUTSIDE DIMENSIONS OF SAME, WHETHER THE DUCT WORK IS LINED OR WRAPPED. 15. INITIALLY PROGRAM CONTROLS FOR OWNER AS REQUIRED. 16. ALL FLEXIBLE DUCT, RIGID DUCT WITH WRAP, AND LINER SHALL BE R-4.2 INSULATED TO MEET ENERGY CODE REQUIREMENTS. WORK BY OTHER TRADES: 1. PLUMBER TO PROVIDE: GAS PIPING, CONDENSATE DRAINS, AND FINAL CONNECTIONS FOR SAME. 2. ELECTRICIAN TO PROVIDE: LINE VOLTAGE SUPPLY & DISCONNECTS FOR HVAC EQUIPMENT, FANS, AND FINAL CONNECTION OF SAME. 4 NTS MANUFACTURER DESCRIPTION MODEL NOTES METAL AIRE HARD CEILING CEILING S/A REGISTER WITH OBD (SIZE PER DRAWING) METAL AIRE HARD CEILING R/A REGISTER RH NO OBD (SIZE PER DRAWING) METAL AIRE HARD CEILING RETURN FILTER GRILL RHFG NO OBD (SIZE PER DRAWING) METAL AIRE HARD CEILING EXHAUST REGISTER RH NO OBD (SIZE PER DRAWING) METAL AIRE SIDE WALL S/A REGISTER H4004 WITH OBD (SIZE PER DRAWING) METAL AIRE SIDE WALL R/A REGISTER RH NO OBD (SIZE PER DRAWING) 3. FRAMING CONTRACTOR: PROVIDE CUT OUTS, WALL AND ROOF HEAD OUTS OF OPENINGS, AND PLATFORMS OR STANDS WHERE NOTED. APPLICABLE CODES AND STANDARDS 2013 CALIFORNIA BUILDING CODE (CBC) CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART CALIFORNIA ELECTRICAL CODE (CEC) CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART CALIFORNIA MECHANICAL CODE CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART CALIFORNIA PLUMBING CODE CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART CALIFORNIA ENERGY CODE CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 6 DESERT AIR DESIGN GROUP 6763 SVL BOX, VICTORVILLE CA PHONE: CELL: CALIFORNIA FIRE CODE (CFC) CALIFORNIA CODE OF REGULATIONS (CCR) TITLE 24, PART 9 "SMACNA" HVAC DUCT CONSTRUCTION STANDARDS / METAL AND FLEXIBLE THIRD EDITION 2005 "SMACNA" SEISMIC RESTRAINT MANUAL FOR MECHANICAL SYSTEMS THIRD EDITION - MARCH, NTS "ASHRAE" DESIGN GUIDELINES
10 KEY NOTES 1 R/A DUCT MOUNT, CO2 SENSOR. LOCATE IN AN EASILY ACCESSIBLE LOCATION. 2 R/A and S/A PLENUMS SHALL BE LINED WITH 2" LINER. USE LINER ADHESIVE AND WELD PINS TO ATTACH LINER. 3 ALL SPIRO-PIPE AND FITTINGS SHALL BE WRAPPED WITH A MINIMUM OF R-4.2 FOIL FACE WRAP. GENERAL NOTES 1. FOR GENERAL NOTES RELATED TO ITEMS ON THIS SHEET (M-1) SEE GENERAL NOTES ON M-0 22"x22" 350 CFM 22"x22" 350 CFM 22"x22" 350 CFM 5 EA. EXHAUST FANS EF-1 EF-1 EF-2 EF-1 EF-2 12"x12" 320 CFM TYP. 8 EA. 22"x46" 950 CFM AS 175 CFM 175 CFM T 175 CFM 175 CFM AS 220 CFM 220 CFM 135 CFM 135 CFM LT LT 8"x8" 80 CFM EF-1 3 AS 22"x46" 950 CFM 3 12"x12" 250 CFM TYP. 12 EA. AS 250 CFM 22"x46" 950 CFM 22"x46" 950 CFM AS T 185 CFM 185 CFM AS 190 CFM 190 CFM 21"x44" UP TO 25-1/4"x63-1/4" 44"x24" 2 CO 1 21"x48" UP TO 21-1/2"x68-3/4" 205 CFM 205 CFM 200 CFM DESERT AIR DESIGN GROUP 6763 SVL BOX, VICTORVILLE CA PHONE: CELL: HVAC FLOOR PLAN SCALE: 1/8 " = 1'-0" N
11 KEY NOTES 1 PATCH EXISTING SINGLE PLY ROOF AS REQUIRED TO ACCEPT NEW EQUIPMENT 2 DEMO EXISTING TRANE AC UNIT'S. 1 EA. - MOD# BYC030, WEIGHING 690 lbs. AND 1 EA. - MOD# SAHB200, WEIGHING 2320 lbs. CONFIRM AND JUSTIFY WEIGHTS SHOWN ARE CORRECT. DEMO ALL DUCT WORK CONNECTED TO THESE EXISTING UNITS AS WELL AS ALL EXISTING DUCT WORK LOCATED IN ATTIC. EXISTING EX. FAN TO REMAIN KEY NOTES 3 COORDINATE NEW ELECTRICAL, GAS, AND DRAIN LOCATIONS WITH PLUMBING AND ELECTRICAL CONTRACTORS AS REQUIRED. 4 ROOFING PATCH, NEW FLASHING'S, AND ALTERATIONS OF ROOF SURFACE AS REQUIRED BY OTHERS. 5 NEW FRAMED ROOF EX. FAN CURBS AND ROOF PATCH BY OTHERS. PROVIDE NEW VENT CAP FOR EXHAUST FANS AS NOTED ON EQUIPMENT SCHEDULE. 6 EXISTING EQUIPMENT ENCLOSURE TO REMAIN. ROOF STRUCTURE COORDINATION NOTES REMOVE AND REPLACE WITH NEW 2 EA. - ROOF TOP HVAC UNITS. PROVIDE STRUCTURAL CALCS TO JUSTIFY NEW HVAC UNIT CURB CORNER LOADS ON (E) ROOF FRAMING. CONTRACTOR SHALL PROVIDE NEW CURBS WITH CERTIFIED DRAWINGS AND PRODUCT DATA AS WELL AS AS-BUILT ROOF FRAMING PLAN TO ARCHITECT FOR STRUCTURAL REVIEW AND SUPPORTING CALCULATIONS. SEE DRAWING A-1, DEFERRED APPROVAL NOTE. NO EQUIPMENT SHALL BE ORDERED UNTIL STRUCTURAL JUSTIFICATION IS APPROVED BY ARCHITECT. EXISTING EX. FAN 1 2 EXISTING ROOF HATCH TO REMAIN 3 4 AC-1 5 NEW EXHAUST FAN VENT TYP. 5 EA. 5 EXISTING ROOF HATCH AC DESERT AIR DESIGN GROUP 6763 SVL BOX, VICTORVILLE CA PHONE: CELL: DEMO HVAC ROOF PLAN SCALE: 1/16 " = 1'-0" NEW HVAC EQUIPMENT ROOF PLAN SCALE: 1/16 " = 1'-0" N N
12
13
14
County of Yolo Development Services Building Inspection Division
County of Yolo Development Services Building Inspection Division 292 W. Beamer Street Woodland, CA. 95695 www.yolocounty.org (530) 666-8775 Mechanical Plan Review Comments Plan Review No. Owners Name Job
More informationSPARTANBURG COUNTY BUILDING CODES DEPARTMENT
SPARTANBURG COUNTY BUILDING CODES DEPARTMENT PLAN REVIEW CHECK LIST REQUIREMENTS FOR COMMERCIAL BUILDING PERMITS Plan Review Coordinator Kris Brannon 864-596-3180 366 N. Church St Room 500 Spartanburg,
More informationCarter's Oshkosh (SIS) # The Center at Pearland Parkway - Pearland, TX Scope Of Work / Bid Qualifications
Carter's Oshkosh (SIS) #1185 - The Center at Pearland Parkway - Pearland, TX 77581 - Scope Of Work / Bid Qualifications Please fill out the blanks associated with your trade scope or work with the words
More informationSECTION DUCT INSULATION
SECTION 23 07 13 - DUCT INSULATION PART I - GENERAL 1.1 SECTION INCLUDES A. Ductwork Insulation B. Fan and Equipment Insulation C. Insulation Jackets D. Insulation Lagging 1.2 RELATED SECTIONS A. Section
More informationMeasure 1 Seal Ducts Components Inspected
WORK ORDER INFORMATION Work Order Type: Weatherization Audit Name: 1000049 CLIENT INFORMATION Client ID: 1002275 AGENCY INFORMATION Agency: Upper East Tennessee Human Development Agency Address: 301 Louis
More informationWork Order (Bid Form) Upper East Tennessee Human Development Agency
Upper East Tennessee Human Development Agency WORK ORDER INFORMATION Work Order Type: Weatherization Audit Name: 18018UE10329 CLIENT INFORMATION Address: ERWIN, TN 37692 AGENCY INFORMATION Agency: Upper
More informationCity of Westerville Guide to Commercial Inspections
City of Westerville Guide to Commercial Inspections FOOTINGS - After the excavation, with the form work and any required reinforcing steel in place. All footings shall have loose soil removed, reinforcing
More informationCONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist
CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist This checklist is a convenient reference to the 2012 Michigan Building Code. The checklist
More informationArchitect s Project Number of 5 Decentralized HVAC Equipment District Master Specs 2013 Edition
PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 23 81 00 DECENTRALIZED HVAC EQUIPMENT A. The other Contract Documents complement the requirements of this section. The General requirements apply to the work
More informationDate Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection
Slab on Grade & Basements: A capillary break is installed on top of all footings Slab / Pre-Drywall / Thermal Inspection A minimum of 4" of clean or washed gravel (0.5" diameter or greater) is placed over
More informationTable of Contents... 1, 2. (EF) Equipment Floor... VISR EF 102 Water Heater VISR EF 104 Chiller VISR EF 105 End Suction Pump...
VISR Standard Details - TOC VISR-SD File No: T-VISR-SD-00 Supersedes: New Date: 6-Mar-204 Date: New VISR Standard Details: Table of Contents Table of Contents..., 2 (EF) Equipment Floor... VISR EF 0 Tank...
More informationPermit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE
STAFF USE ONLY RECEIVED BY: DATE: Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE Applicant must complete numbered items
More informationA. Section includes busway and fittings including plug-in units.
SECTION 26 25 00 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes busway and fittings including plug-in units. 1.2 REFERENCES A. Institute of Electrical and Electronics Engineers:
More informationWork Order (Bid Form) Upper East Tennessee Human Development Agency
Upper East Tennessee Human Development Agency WORK ORDER INFORMATION Work Order Type: Weatherization Audit Name: 18018UE10620 CLIENT INFORMATION Address: FALL BRANCH, TN 37656 AGENCY INFORMATION Agency:
More informationBuilding Permit Application
Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: ARCHITECT/ENGINEER ADDRESS:
More informationDesign & Construction Standards, Revised January
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationSECTION EXHAUST FANS PART 1 GENERAL
SECTION 15800 EXHAUST FANS PART 1 GENERAL 1.01 DESCRIPTION A. The Contractor shall furnish all labor, materials, accessories and all incidentals required to install wet well and control building ventilation
More informationDIVISION MEDIUM VOLTAGE VAULT DESIGN Contents MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION LIST OF FIGURES...
DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General Requirements
More informationPrice Fan Powered Terminal Units
Price Fan Powered Terminal Units Division 23 Heating, Ventilating, and Air Conditioning Section 23 3600 Air Terminal Units The following specification is for a defined application. Price would be pleased
More informationPermit Application Commercial / Industrial / Mutli-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE (Form #2)
STAFF USE ONLY RECEIVED BY: DATE: Permit Application Commercial / Industrial / Mutli-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE (Form #2) Applicant must complete
More informationDIVISION MEDIUM VOLTAGE VAULT DESIGN Contents
DIVISION 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN Contents 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN... 2 DIVISION 13 00 60 LIST OF FIGURES... 6 Page 1 of 6 13 00 60 - MEDIUM VOLTAGE VAULT DESIGN 1. General
More informationD. Provide UL-approved assemblies for pipes and ducts passing through fire-rated floors, walls, or partitions as required.
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More information2009 IECC with St Louis Amendments. Fenestration U-factor Skylight U-factor Glazed fenestration SHGC NR 0.
Comparison Between Residential 2009 IECC with St Louis amendments, the 2015 IECC, and 2015 IECC w/ Building Codes Review Committee (BCRC) proposals: Climate Zone 4 Note: This document does not contain
More informationSECTION FUEL-FIRED UNIT HEATERS
SECTION 23 55 33 PART 1 - GENERAL 1.1 DESCRIPTION A. This Section includes gas-fired unit heaters. SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable
More informationSECTION AIR OUTLETS AND INLETS
PART 1 - GENERAL 1.1 DESCRIPTION A. Roof Curbs SECTION 23 37 00 AIR OUTLETS AND INLETS SPEC WRITER NOTE: 1. Delete between //----// if not applicable to project. Also delete any other item or paragraph
More informationA. ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationSECTION CONVECTORS
SECTION 23 82 33 PART 1 - GENERAL 1.1 DESCRIPTION SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph
More informationIndoor Air Quality and Mechanical Ventilation (Page 1 of 5)
Indoor Air Quality and Mechanical Ventilation (Page 1 of 5) Title 24, Part 6, Section 150.0(o) Ventilation for Indoor Air Quality. All dwelling units shall meet the requirements of ANSI/ASHRAE Standard62.2.
More informationA Closer Look Inspection Service 2015 IECC Residential DFW area handout
103.2 Information required on construction documents 1. Designation of the Thermal Building Envelope on the plans 2. Insulation Material and their R Value 3. Fenestration U and SHGC values 4. Area weighted
More informationGENERAL MECHANICAL SYSTEM REQUIREMENTS
CHAPTER 13 GENERAL MECHANICAL SYSTEM REQUIREMENTS SECTION M1301 GENERAL M1301.1 Scope. The provisionsof thischapter shall governthe installation of mechanical systems not specifically covered in other
More informationIMC 2012 WORKBOOK Equipment and Appliances on Roofs or Elevated Structures
IMC 2012 WORKBOOK 102.3 Maintenance Mechanical systems, both existing and new, and parts thereof shall be maintained in proper condition in accordance with the original design and in a safe and sanitary
More informationOur Shop is Your Shop
Our Shop is Your Shop Company Number: Company Name: Address: 294 Lee Company 311 Mallory Station Road City: Franklin State: TN Zip: 3767 Company Phone: Fax: 615-567-126 Company Contact: Brad Gipson Job
More informationCONSTRUCTION DOCUMENTS NECESSARY FOR PLAN REVIEW
2012 International Residential Code 2012 International Building Code 2012 International Fire Code 2014 NFPA 70 National Electrical Code 2012 International Existing Building Code 2012 International Plumbing
More informationBid Package 15A Mechanical
Bid Package 23A Mechanical & HVAC The successful Subcontractor acknowledges and agrees to the requirements set forth by this bid package and its descriptions and in conjunction with all other Construction
More informationCONTACT LIST DOORS IN THE PATH OF EGRESS TRAVEL SHALL MEET THE REQUIREMENTS OF ICC / ANSI A117.1 : SECTION MANEUVERING CLEARANCES AT DOORS
DOORS TO EXTERIOR HAVE CLOSURES & LATCHES AND MEET THE REQUIREMENTS OF ICC / ANSI A7. : SECTION 404.2.7 DOOR HARDWARE SECTION 404.2.8 CLOSING SPEED SECTION 404.2.9 DOOR OPENING FORCE SECTION 404.2.5 TRESHOLDS
More informationWork Order (Bid Form) Blount County Community Action Agency, Inc.
Blount County Community Action Agency, Inc. WORK ORDER INFORMATION Work Order Type: Weatherization Audit Name: 10001BL10082 CLIENT INFORMATION Address: MARYVILLE, TN 37804 AGENCY INFORMATION Agency: Blount
More informationCity of Omaha Plans and Permits Commercial Alterations and Conversions Building Permit Submittal Checklist
City of Omaha Plans and Permits Commercial Alterations and Conversions Building Permit Submittal Checklist This checklist contains the standard information required on submittals for commercial construction
More informationSECTION AIR DISTRIBUTION
SECTION 15880 AIR DISTRIBUTION PART 1 GENERAL 1.1 SUMMARY A. This section describes minimum requirements, products and methods of execution relating to the project air distribution systems. PART 2 PRODUCTS
More informationCompliance Certificate
REScheck Software Version 4.6.2 Compliance Certificate Project Sample Energy Code: 2012 IECC Location: Coeur d'alene, Idaho Construction Type: Single-family Project Type: New Construction Conditioned Floor
More informationBoulder City NV Prepared by (Print Name) Signature Date
City of Boulder City Community Development Department Building & Safety Division 401 California Avenue Boulder City, NV 89005-2600 702-293-9282 (Main Line) 702-293-9392 (Fax) 2009 International Energy
More informationCERTIFICATE OF FIELD VERIFICATION & DIAGNOSTIC TESTING (Page 1 of 8)
CERTIFICATE OF FIELD VERIFICATION & DIAGNOSTIC TESTING (Page 1 of 8) Builder or Installer Name Builder or Installer Contact Telephone Plan/Permit (Additions or Alterations) Number Compliance Method (Prescriptive)
More informationNew Construction Procurement Guidelines for the Pacific Northwest
Northwest Portable Classroom Project New Construction Procurement Guidelines for the Pacific Northwest March 31, 2003 WSUCEEP03_063 Washington State University Extension Energy Program 925 Plum Street
More information2012 Fiscal Impact International Mechanical Code
2012 Section No. 306.5 Item 2 2012 Code Information - bold text = new text found in 2012 strike out = text deleted and not found in the 2012 Equipment and appliances on roofs or elevated structures: Item
More informationCOMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION
COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION OFFICIAL USE ONLY Date: Permit #: Received by: For Staff Use Only: OFD ELEC Planning SITE LOCATION Site Address: Tax Parcel Number: TYPE OF WORK Building
More informationHardin County Planning and Development Commission
Location by Climate Zone: Hardin County (per Table N1101.2), and the entire state of Kentucky is located in Climate Zone 4, the HDD is 4000 to 4999. Building Requirements; Building Thermal Envelope The
More informationPermit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE
STAFF USE ONLY RECEIVED BY: DATE: Permit Application Commercial / Industrial / Multi-Family BUILDING, ELECTRICAL, MECHANICAL, PLUMBING, BUILDING SEWER & WATER SERVICE Applicant must complete numbered items
More informationMechanically Fasten Duct Sections. Code Reference: 2013 Title 24, Part 6 Standards 120.4(a) Sealed Openings. Drawbands
DUCTS - SEALING R-H-DS1 Mechanically Fasten Duct Sections Sections of metal duct should be mechanically fastened together after taping seams with UL 181 duct tape. Use sheet metal screws for rigid duct
More informationFIELD COPY ATTACHMENT
FIELD COPY ATTACHMENT The released plans for the project must be on site and available to the inspectors at all times. No inspection will be done without the released field plans. If you have any questions,
More informationVillage of Gurnee Construction Documents Submittal Requirements
Commercial New Construction 4 sets of complete plans Commercial Alterations 2 sets of complete plans Residential New Construction, Remodel and/or Addition 2 sets of complete plans DETAILED PLAN REQUIREMENTS
More informationStandards for Jackson EMC s Right Choice Program Revised: June 2011
Standards for Jackson EMC s Right Choice Program Revised: June 2011 All homes in the program must meet the requirements of the Georgia Energy Code, which is the International Energy Conservation Code (IECC)
More informationWeatherSmart Air Barrier Installation Guide
WeatherSmart Air Barrier Installation Guide 1 The intent of this document is to provide a guide for the installation of WeatherSmart as both a Weather Resistive Barrier (W.R.B.) and an Air Barrier Material
More information2005 BUILDING ENERGY EFFICIENCY STANDARDS
CALIFORNIA ENERGY COMMISSION 2005 BUILDING ENERGY EFFICIENCY STANDARDS FOR RESIDENTIAL AND NONRESIDENTIAL BUILDINGS S T A N D A R D S / R E G U L A T I O N S Effective Date October 1, 2005 September 2004
More informationA. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building Materials
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationDESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED
DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED EVERY ITEM WILL BE REVIEWED AND NOTED FOR COMPLIANCE (C), OR NON- APPLICABILITY (NA). 1. HEATING SYSTEMS: A. GENERAL
More informationCONSTRUCTION REQUIREMENTS
CONSTRUCTION REQUIREMENTS Note: The buildings on the UCCS campus are divided into two categories: General Fund and Auxiliaries. General Fund Buildings include academic and administrative functions. Auxiliary
More informationUNDP / PAPP OFFICE BUILDING RAMALLAH HVAC WORKS
UNDP / PAPP OFFICE BUILDING RAMALLAH WORKS Bill of Quantities July 2008 ENGINEERING UNIT Project: system The contractor shall, when pricing the rates of this bill take into consideration including and
More informationSECTION AIR-TO-AIR ENERGY RECOVERY EQUIPMENT
SECTION 23 72 00 AIR-TO-AIR ENERGY RECOVERY EQUIPMENT PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationENERGY STAR Qualified Homes National Program Requirements, Version 3.0
Qualifying Homes The following homes are eligible to earn the ENERGY STAR: Single-family homes; Units in multi-family buildings that are three stories or less; Units in multi-family buildings that are
More informationGENERAL MECHANICAL SYSTEM REQUIREMENTS
CHAPTER 13 GENERAL MECHANICAL SYSTEM REQUIREMENTS SECTION M1301 GENERAL M1301.1 Scope. The provisions of this chapter shall govern the installation of mechanical systems not specifically covered in other
More informationSECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS
SECTION 23 74 13 PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section )
8-1200. International Residential Code. ARTICLE 12 INTERNATIONAL RESIDENTIAL CODE 2012 International Residential Code Modification Summary (Statutory Authority: 1976 Code Section 6-9-40) NOTE-This article
More informationREScheck Software Version Compliance Certificate
REScheck Software Version 4.3.0 Compliance Certificate Project Title: Breen Sample Residence Energy Code: 2006 IRC Location: Denver, Colorado Construction Type: Single Family Glazing Area Percentage: 14%
More informationB. Provide equipment complying with this specification and manufactured by one of the following:
SECTION 230910 PAINT SPRAY BOOTH PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Provide Paint Spray Booth, Prep Booth and Paint Mix Room, and associated ventilation equipment, complying with the
More informationProject Number BID NO. CAG 18 2 ROOF REPLACEMENT FOR HARFORD COUNTY PUBLIC SCHOOLS NORTH HARFORD ELEMENTARY. Addendum # 2
Project Number.0 BID NO. CAG ROOF REPLACEMENT FOR HARFO COUNTY PUBLIC SCHOOLS NORTH HARFO ELEMENTARY Addendum # This addendum is to be attached to the North Harford Elementary School Roof Replacement bid
More informationB. Refer to Section : Air Distribution for lined ductwork requirements.
SECTION 230700 MECHANICAL INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification
More informationUBC Technical Guidelines Section Edition Fume Hoods Page 1 of 5
Page 1 of 5 1.0 GENERAL 1.1 Related UBC Guidelines.1 Section 12 35 53 Laboratory Casework.2 Section 23 38 16 Fume Hood Exhaust Systems.3 Section 20 00 08 Mechanical Identification for the details for fume
More information4. Number of drawings required: ( ) Locations of nearest streets
CITY OF MANSFIELD BUREAU OF BUILDING AND CODES 30 NORTH DIAMOND STREET 3RD FLOOR MANSFIELD, OHIO 44902 Phone (419) 755-9688 Fax (419) 755-9453 www.ci.mansfield.oh.us COMMERCIAL BUILDING PLAN REQUIREMENTS
More informationSECTION HVAC GRAVITY VENTILATORS
SECTION 23 37 23 HVAC GRAVITY VENTILATORS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationINSTALLING WATER-RESISTIVE BARRIERS & FLASHING
INSTALLING WATER-RESISTIVE BARRIERS & FLASHING IN A TWO-LAYER STUCCO APPLICATION Fortifiber Building Systems Group provides this guide to assist installers by demonstrating a two-layer installation of
More informationELECTRON BEAM DUMP - ROOM DATA SHEET
ROOM DATA SHEETS WBS and System Managers: Eric Bong/R.Bionta/Dave Schultz FACILITY COMPONENT ELECTRON BEAM DUMP - ROOM DATA SHEET Name of Building Organization or Department SLAC, Stanford University Net
More informationINSPECTION GUIDELINES: JOIST AND UNDERFLOOR COMBO
Joist and Underfloor Combo Page 1 of 7 Revision Date: 10/02/2017 DEVELOPMENT SERVICES BUILDING INSPECTION INSPECTION GUIDELINES: JOIST AND UNDERFLOOR COMBO INSPECTION CODE: 212, 213 SCOPE: RESIDENTIAL
More informationSECTION ENCLOSED BUS ASSEMBLIES
SECTION 262500 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More information2015 MICHIGAN UNIFORM ENERGY CODE Effective: February 8, 2016
CHEBOYGAN COUNTY DEPARTMENT OF BUILDING SAFETY 870 South Main Street P.O. Box 70 Cheboygan, Michigan 49721 Phone: (231) 627-8813 Fax: (231) 627-8454 www.cheboygancounty.net 2015 MICHIGAN UNIFORM ENERGY
More informationSECTION DUCTS PART 1 GENERAL 1.01 SUMMARY
1 1 1 1 1 1 1 1 0 1 0 1 SECTION 1 DUCTS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Duct Materials.. Insulated flexible ducts.. Single wall spiral round ducts.. Ductwork fabrication.. Duct cleaning.
More informationMEP Seismic & Wind Provisions of ASCE Prepared for the 2017 Rochester Engineering Symposium Richard Sherren, P.E.
MEP Seismic & Wind Provisions of ASCE 7-10 Prepared for the 2017 Rochester Engineering Symposium Richard Sherren, P.E. 1 New York State Model Building Code The state of New York has adopted the 2015 International
More informationSECTION HVAC DUCTS AND CASINGS
SECTION 23 31 00 HVAC DUCTS AND CASINGS PART 1 -GENERAL 1.1 SUMMARY A. Section includes metal ductwork, nonmetallic ductwork, casing and plenums, buried ductwork, kitchen hood ductwork, duct cleaning.
More informationYORK UNITIZED ENERGY RECOVERY VENTILATOR (ERV) Superior air-flow 300 6,200 CFM
YORK UNITIZED ENERGY RECOVERY VENTILATOR (ERV) Superior air-flow 300 6,200 CFM YORK UNITIZED ENERGY RECOVERY VENTILATORS Regardless of building type or rating system, today s building must be as energy
More informationCompliance Certificate
REScheck Software Version 4.6.3 Compliance Certificate Project Energy Code: 2012 IECC Location: Frederick, Colorado Construction Type: Single-family Project Type: New Construction Conditioned Floor Area:
More informationSECTION 15A AIR CONDITIONING
SECTION 15A AIR CONDITIONING 1. SCOPE This Section covers the air conditioning (AC) system for the Electrical Room as indicated on the Contract Drawings and specified herein. 2. GENERAL The Contractor
More information2005 Seismic Bracing System. Superstrut Metal Framing
2005 Seismic Bracing System Superstrut Metal Framing What is Seismic Bracing? Seismic Bracing is support systems that account for forces generated by an earthquake Vertical Pipes or Duct hanging overhead
More informationA.ENVELOPE AIR SEALING
(Page 1 of 4) Note: The Energy Efficiency Standards Section 110.7 requires that all joints, penetrations and other openings in the building envelope that are potential sources of air leakage shall be caulked,
More informationKEARNEY REGIONAL AIRPORT NEW HANGAR KEARNEY, NEBRASKA 1238
ADDENDUM # KEARNEY REGIONAL AIRPORT NEW HANGAR KEARNEY, NEBRASKA Wilkins Hinrichs Stober Architects, L.L.C. Date Issued: March, 0 908 West 9 th Street, Suite A Kearney, Nebraska 88 Bid Date: April, 0 08--8
More informationMicroMetl ISOLATION CURB CATALOG. for York ZH,DH,DM,BP ; DF ; DJ 150; DR ;ZF,ZJ 150
MicroMetl ISOLATION CURB CATALOG for York ZH,DH,DM,BP 078-150; DF 078-120; DJ 150; DR 090-150;ZF,ZJ 150 Built-in seismic / earthquake restraints are pre-approved by State of California. for 0402-642A Isolation
More informationB. Shop Drawings: For air terminal units. Include plans, elevations, sections, details, and attachments to other work.
SECTION 233600 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Fan-powered air terminal units. 2. Shutoff, single-duct air terminal units. 1.2 PERFORMANCE REQUIREMENTS A. Structural Performance:
More informationCode Enforcement Division. Notice to Industry
Charlie A. Dooley County Executive Sheryl L. Hodges, D.E., P.E., L.P.G. Director Code Enforcement Division Notice to Industry Rules, Regulations and Interpretations On Earthquake Resistant Architectural,
More information2005 Seismic Bracing System. Kindorf Modular Metal Framing
2005 Seismic Bracing System Kindorf Modular Metal Framing What is Seismic Bracing? Seismic Bracing is support systems that account for forces generated by an earthquake Vertical Pipes or Duct hanging overhead
More informationWEST VIRGINIA UNIVERSITY ALUMNI CENTER Morgantown, West Virginia
TECHNICAL REPORT I ASHRAE STANDARDS 62.1 AND 90.1 COMPLIANCE EVALUATION 8/29/08 WEST VIRGINIA UNIVERSITY ALUMNI CENTER Morgantown, West Virginia GREGORY SMITHMYER PENN STATE UNIVERSITY ARCHITECTURAL ENGINEERING
More informationGENERAL PLAN REVIEW REQUIREMENTS
GENERAL PLAN REVIEW REQUIREMENTS Cover Letter A letter (or an authorized pre-printed form) authorizing CCIS to perform the Plan Review is required. CCIS performs plan reviews for the ICC International
More informationKITCHEN REMODELS CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA (949)
CITY OF MISSION VIEJO BUILDING SERVICES DIVISON 200 CIVIC CENTER, MISSION VIEJO, CA 92691 (949) 470-3054 KITCHEN REMODELS A permit is required for kitchen remodels that include removal and replacement
More informationA LOOK INTO THE 2015 IECC RESIDENTIAL PROVISIONS. Presented by: Shaunna Mozingo, Colorado Code Consulting
A LOOK INTO THE 2015 IECC RESIDENTIAL PROVISIONS Presented by: Shaunna Mozingo, Colorado Code Consulting WHAT CAN WE EXPECT TO SEE? Some consensus on enough is enough for now - No real roll backs, no real
More informationCITY OF CALABASAS RESIDENTIAL PLAN REQUIREMENTS 1 OF 5 8/2017 PLAN INFORMATION
1 PLAN INFORMATION Residential plans must be legible and capable of digital scanning. All sheets shall be the same size and distinctly labeled with a sheet title and number. The minimum dimension of the
More informationIECC 2006 with Hawaii Amendments
IECC 2006 with Hawaii Amendments COMMERCIAL PLAN REVIEW CHECKLIST ENVELOPE REQUIREMENTS Instructions This form is intended for use by energy code plan reviewers. Please see also a separate set of checklists
More informationCommissioning Agent s Guide for Inspecting & Testing Access Floor Air Plenums
Access F l o o rs Commissioning Agent s Guide for Inspecting & Testing Access Floor Air Plenums Access Floors to the Power of 1 Proper inspection and testing of the underfloor air plenum is the best way
More informationROUTT COUNTY REGIONAL BUILDING DEPARTMENT 136 * P.O.
ROUTT COUNTY REGIONAL BUILDING DEPARTMENT 136 6 th Street * P.O. Box 773840 * Steamboat Springs, CO 80477 (970)870-5566 * FAX (970)870-5489* Email: Building@co.routt.co.us INSPECTIONS POLICY SCHEDULING
More informationENERGY STAR Homes version 3 Designing and Building to Meet the 2011 Changes. Thursday, February 24, 2011
ENERGY STAR Homes version 3 Designing and Building to Meet the 2011 Changes Thursday, February 24, 2011 1 Efficiency Vermont is a Registered Provider with The American Institute of Architects Continuing
More informationWELD COUNTY SOUTHWEST BUILDING HVAC EVALUATION 4209 COUNTY ROAD 24 ½, FIRESTONE, COLORADO August 4, 2017
WELD COUNTY SOUTHWEST BUILDING HVAC EVALUATION 4209 COUNTY ROAD 24 ½, FIRESTONE, COLORADO August 4, 2017 We were contracted by Weld County to review the existing drawings and installed mechanical equipment
More informationSECTION FIELD PANELS
Stanford University Facilities Design Guidelines SECTION 25 14 23 FIELD PANELS PART 1 - GENERAL 1.1 SUMMARY A. This section includes control panel and enclosure requirements for building control systems.
More informationPrice High Performance Horizontal Fan Coil Units
Price High Performance Horizontal Fan Coil Units Division 23 Heating, Ventilating, and Air Conditioning Section 23 82 19 Fan Coil Units The following specification is for a defined application. Price would
More informationPermaShield Pipe. Fab-Tech, Inc. SECTION 1589X Specification for Coated Corrosive Fume Exhaust Duct
PermaShield Pipe Stainless Steel Corrosive Fume Exhaust Systems With PermaShield Fluoropolymer Barrier Coating SECTION 1589X Specification for Coated Corrosive Fume Exhaust Duct Catalog 10/12.8 A Critical
More informationSECTION SECONDARY UNIT SUBSTATIONS
SECTION 26 12 16 SECONDARY UNIT SUBSTATIONS PART 1 GENERAL 1.1 SUMMARY This section describes metal-clad, indoor or outdoor, secondary unit substations with integral primary fused disconnect switches,
More information