1 BENEFITS RELATED TO THE APPLICATION OF MASS BLASTS IN OPEN CUT MINING José Vergara, Carlos Muñoz, Natalia Ortega. Advanced Technology Solutions, Orica Mining Services Latin America August 2015 Document reference David Avilés Drill & Blasting Manager, CAP Minería Mina Los Colorados.
2 MASS BLAST OBJECTIVES LOS COLORADOS CASE STUDY TECHNICAL SOLUTIONS RESULTS FOR WALL CONTROL FRAGMENTATION RESULTS CONCLUSIONS 2 CONFIDENTIAL: Information contained in this document is strictly confidential.
3 THE OBJECTIVES OF MASS BLASTING Traditional Blasting Included a Production blast plus a separate wall control blast. Mass Blasting Blasting the entire bench cutback width toe crest. Traditional Blast Mass Blast Mass Blast
4 ADVANTAGES OF MASS BLASTING The benefits of Mass Blasting for mine productivity are: Reduce the number of blast events Reduce blast delays and evacuations. Reduce damage to walls. Larger drilling and excavation areas Better distribution of explosive energy Improved fragmentation. Increased excavation rates. P&H <3500 tph P&H <4500 tph P&H >5500 tph 5 4
5 CASE STUDY CAP LOS COLORADOS Is a Kiruna Iron Ore type deposit in the Atacama Region of Northern Chile. 84M tons / Year open-cut operation producing 10.4M ton of Magnetite Iron Ore 5
6 MASS BLAST - TECHNICAL SOLUTION Two trials were designed, fired and monitored using: Trial Tonnes Description Computer based blast designs Electronic timing was used to manage energy distribution Advanced finite vibration prediction modeling. Near field vibration monitoring Separate production & trim blast. Blasting entire cutback width toe crest Bore hole camera inspections were conducted before and after blasts to determine rock mass damage 850 Kth Production Trim 950 Kth Production Trim 6
7 TIMING DESIGN TO MANAGE GEOTECHNICAL ISSUES A presplit blast is fired 1000 ms before initiating the combined production and trim blast. Blasts were split into 300 k/tonne panels to reduce peak vibration levels. 500ms timing breaks are used to prevent superposition Blast sequencing is made possible by using electronic timing. Mass blast 500 ms Presplit Buffer 500 ms 500 ms 7
8 VIBRATION PREDICTION MODELLING Traditional Blast Small narrow blast dimensions in the trim area designed to channel vibrations away from wall structures. Traditional Blast High impact in the rock mass, generate cracking in the failure zones. 8 Mass blast Novel timing designed to channel vibrations away from walls. Mass blast Mass blast minimizes generation of new fractures in the failure zones.
9 DRILL & BLAST DESIGN PARAMETERS : Measurement Trial 1 Trial 2 TRIAL 1 Hole Diameter 26 cm 31 cm Bench height 15 m 16 m Burden 7.5 m 7.5 m Spacing 10.5 m 10.5 m Charge factor 200 gr/tonne 200 gr/tonne Total Energy 3.53 MJ/tonne 3.53 MJ/tonne Bulk Product Fortan Extra 50 Fortan Extra 50 Priming per hole 3 x EBS 3 X EBS TRIAL 2 9
10 WALL CONTROL MEASUREMENT TRIALS 1 & 2 Application of presplit and buffer row. Maintained the trim blast to a width of 35m. Near field vibration monitors (GT, GT2) (disposable triaxle geophones). Borehole camera inspections for near-field damage (BH1, BH2, BH3,, BH9). GT Borehole Inspection Holes GT2 Borehole Inspection Holes 10
11 MEASUREMENT RESULTS FOR WALL CONTROL BLAST TRIAL 1 & 2 Presplit filters reduced near field vibrations (ppv) by 47 & 50% before and after presplit. Borehole camera inspections indicated no damage inside all monitoring holes. PPV in front of PPv forward presplit 50% PPv PPV back behind presplit BH 6 (10m) Before mass blast BH 6 (10m) After mass blast 11 11
12 FRAGMENTATION RESULTS Photo fragmentation image analysis of trial shots. Both trial shots reduced the P80.distribution P80 (inch) Baseline 7.4 Trial Trial
13 CONCLUSIONS Blast size has increased from approx. 250,000 to 950,000 tonnes No adverse effects to wall stability. Near field vibration (ppv) remained below 500 mm/sec, well below the geotechnical design limit of 720 mm/sec The borehole examinations showed no difference in damage behind the presplit line. Fragmentation improved. The mass blasts replaced three or more standard blasts Drilling & the Truck / Shovel productivity increased. The mine owner estimates the total productivity benefits to be valued over US $ 2M per annum Consequently a combined mass Production + Trim blast has been adopted as standard practice 13
14 14
Electronic vs Pyrotechnic Detonators. Presented by Philipa Lamb RedBull Powder Company Ltd
Electronic vs Pyrotechnic Detonators Presented by Philipa Lamb RedBull Powder Company Ltd Overview Background Electronic Delay Detonator Capacitor Fuse Head Primary Charge Methodology Lead Wire Earth Spike
More informationMUCKPILE SHAPING FOR DRAGLINES AND DOZERS AT SURFACE COAL MINES
MUCKPILE SHAPING FOR DRAGLINES AND DOZERS AT SURFACE COAL MINES 26 August 2015 Sedat Esen Specialist Technical Services Engineer, Orica Document reference: FRAGBLAST11 INTRODUCTION 3 CASE STUDY 1 MUCKPILE
More information2005 National Quarry Academy. Golden, Colorado October 31 to November 3, Blast Management
2005 National Quarry Academy Golden, Colorado October 31 to November 3, 2005 Blast Management L. Mirabelli Senior Technical Consultant DynoConsult A Service Division of Dyno Nobel Inc. Blast Management
More information301 Part A The Chemical Crusher: Drilling and Blasting. Bill Hissem & Larry Mirabelli
301 Part A The Chemical Crusher: Drilling and Blasting Bill Hissem & Larry Mirabelli How to Create Value and Maximize Profit in the New Economy Answer: 1. Provide exactly the right amount of energy to
More informationBlast It Global Pty Ltd PO Box 210, Cloverdale WA 6985 ACN: ABN: Ph:
Blast It Global Pty Ltd PO Box 210, Cloverdale WA 6985 ACN: 168 728 596 ABN: 13 168 728 596 drew@blastitglobal.com Ph: 0477 339 648 Drew Martin Principal Drill & Blast Engineer BEng (Mining Engineer) (Hons)
More informationBlast Dynamics POWER DECK OPTIMIZATION POWER DECK COMPANY MAY, 2004 PREPARED BY: improving productivity wi th the use of efficient blast designs
POWER DECK OPTIMIZATION POWER DECK COMPANY MAY, 2004 PREPARED BY: Blast Dynamics improving productivity wi th the use of efficient blast designs 01001010 01001100 010001 10 jfloyd@ blas tdynamics.com TABLE
More informationOptimisation of Overburden Blasts at Glencore Ulan Surface Coal Operations
University of Wollongong Research Online Coal Operators' Conference Faculty of Engineering and Information Sciences 2014 Optimisation of Overburden Blasts at Glencore Ulan Surface Coal Operations Daniel
More information301 Part B The Chemical Crusher: Drilling and Blasting. Bill Hissem & Larry Mirabelli
301 Part B The Chemical Crusher: Drilling and Blasting Bill Hissem & Larry Mirabelli Blast Dynamics Stress / Pressure Dissipation H d = Hole Diameter UCS = Unconfined compressive Strength of rock Step
More informationDESIGN AND APPLICATION OF AIR DECKS IN SURFACE BLASTING OPERATIONS 2 MODERN APPLICATIONS 2 PRODUCTION HOLES 2 DESIGN CRITERIA 3
DESIGN AND APPLICATION OF AIR DECKS IN SURFACE BLASTING OPERATIONS 2 MODERN APPLICATIONS 2 PRODUCTION HOLES 2 DESIGN CRITERIA 3 PRESHEARING 4 DEWATERING LARGE BLOCKS OF GROUND 4 DESIGN CRITERIA 5 VIBRATION
More informationMonitoring and analysis of production waste blasts at the Cadia Hill Gold Mine
Monitoring and analysis of production waste blasts at the Cadia Hill Gold Mine Dr. Sedat Esen Metso Minerals Process Technology (Asia-Pacific) Dr Italo Onederra Senior Research Engineer - Mining Research
More informationRecent Innovations in Perimeter Blasting. Ontario Mining Health and Safety Conference Sudbury April 18, 2013
Recent Innovations in Perimeter Blasting Ontario Mining Health and Safety Conference Sudbury April 18, 2013 Development Blasting Perimeter Control Context Perimeter control refers to additional measures
More information202 The Chemical Crusher: Drilling and Blasting. Bill Hissem & Larry Mirabelli
202 The Chemical Crusher: Drilling and Blasting Bill Hissem & Larry Mirabelli How to Create Value and Maximize Profit in the New Economy Answer: 1. Provide exactly the right amount of energy to each rock
More information302 Blast and Drill A Single Value Chain Process. Bill Hissem & Larry Mirabelli
302 Blast and Drill A Single Value Chain Process Bill Hissem & Larry Mirabelli The lowest cost crushing is???? Where did this approach come from? Since 2003 Dyno Nobel and Sandvik have been working in
More informationINTRODUCTION SUMMARY. misclassification, resulting in increased ore recovery.
Minimizing Mining Dilution, Ore Loss, and Misclassification by Accounting for Blast Movement in South American Porphyry-Skarn and Manto Copper Mines Jeff Loeb, Principal Consultant Marcell Silveira, Consultant
More informationMacraes Phase III Vibration and Air Blast Assessment Oceana Gold (New Zealand) Limited March 30 th 2010
Macraes Phase III Vibration and Air Blast Assessment Oceana Gold (New Zealand) Limited March 30 th 2010 Prepared by: Richard Taylor Basic Overview Name: Oceana Gold (New Zealand) Limited (referred to as
More information320 Linking the FULL Value Chain Chemical Crushing and Mechanical Crushing. Scott Giltner & Charles Hillmann
320 Linking the FULL Value Chain Chemical Crushing and Mechanical Crushing Scott Giltner & Charles Hillmann 321 Linking the FULL Value Chain Chemical Crushing and Mechanical Crushing Comminution or Breakage
More informationCAUTIOUS BLASTING IN CRITICAL AREAS AT RAMAGUNDAM SUPER THERMAL POWER STATION
CAUTIOUS BLASTING IN CRITICAL AREAS AT RAMAGUNDAM SUPER THERMAL POWER STATION A. Radhakrishna 1, V. Srikant 2 and N. Jayaraman 3 ABSTRACT: Addition of a 500 MW unit to the existing units at Ramagundum
More informationRegression Models of the Impact of Rockmass and Blast Design Variations on the Effectiveness of Iron Ore Surface Blasting
Engineering, 2011, 3, 55-62 doi:10.4236/eng.2011.31007 Published Online January 2011 (http://www.scirp.org/journal/eng) Regression Models of the Impact of Rockmass and Blast Design Variations on the Effectiveness
More informationCharacterising the Blasting Properties of Iron Ore. Andrew Scott Scott Mine Consulting Services Pty Ltd 14 th July, 2015
Characterising the Blasting Properties of Iron Ore Andrew Scott Scott Mine Consulting Services Pty Ltd 14 th July, 2015 What is it all about? Why predict blast fragmentation? How to predict blast fragmentation
More informationwater-powered drilling in mining
1 water-powered drilling in mining When I came to LKAB from mining school, I had the prejudice that straight drilling was linked to air ITH. I soon learnt that the alternative is Wassara. Today, drilling
More informationwater-powered drilling in mining
water-powered drilling in mining STRAIGHT FORWARD DRILLING The Wassara technology uses water to power the hammer. This gives unrivalled benefits and possibilities in mining. Wassara meets the need for
More informationRing Blasting Mine to Mill Optimization
Ring Blasting Mine to Mill Optimization Benjamin Cebrian, Blast Consult S.L. & Roberto Laredo, MATSA mine Mubadala-Trafigura Group Joel Chipana, MATSA mine Mubadala-Trafigura Group Abstract Ring blasting
More informationA newly developed plaster stemming method for blasting
A newly developed plaster stemming method for blasting by H. Cevizci* Synopsis In this study, a newly developed plaster stemming method is studied and compared with the usual dry drill cuttings stemming
More informationPOTENTIAL IMPACTS TO GROUNDWATER FLOW AND NYANZA SUPERFUND LINER AND CAP SYSTEM
File No. 116066-000 Community Health and Development Department 101 Main Street Ashland, MA 01721 Attention: Mr. Nathaniel Strosberg Subject: Blasting Impacts on Nyanza Cap and Groundwater Flow Proposed
More informationNew blasting methods to a efficiency in economics and environmental
New blasting methods to a efficiency in economics and environmental João Gonçalves Cardoso (October 2015) joaocardoso3@gmail.com Master Thesis Abstract The blasting operation in open pit, causes environmental
More informationSECTION 2xx BLASTING FOR ROCK CUT SLOPE EXCAVATION
SECTION 2xx BLASTING FOR ROCK CUT SLOPE EXCAVATION 2xx.1 DESCRIPTION This work is excavation of rock using controlled blasting and production blasting to achieve a uniform face in the rock along the plane
More informationThis section describes blasting procedures for excavation.
SECTION 312310 BLASTING PART 1 - GENERAL 1.01 DESCRIPTION This section describes blasting procedures for excavation. 1.02 RELATED WORK SPECIFIED ELSEWHERE A. Earthwork: 312300. B. Trenching, Backfilling,
More informationQuarry Management. Saleable Rock Products. Solid Rock. Shotrock. Stages of downsizing rock
Stages of downsizing rock Solid Rock Shotrock Saleable Rock Products property location and relationship to neighbours rock mass properties versus potential aggregate quality and waste percentage pit planning
More informationINVESTIGATION ON TECHNIQUES TO CONTROL STRUCTURAL DAMAGE DUE TO BLASTING ACTIVITIES
INVESTIGATION ON TECHNIQUES TO CONTROL STRUCTURAL DAMAGE DUE TO BLASTING ACTIVITIES P.V.R Ranasinghe Department of Civil and Environmental Engineering, University of Ruhuna vranasinghe145@gmail.com H.P.P
More informationROCK SUPPORT SYSTEM IN INTERACTION WITH THE ROCK
ROCK SUPPORT SYSTEM IN INTERACTION WITH THE ROCK Boliden P-I. Marklund, D. Sandström LKAB L. Malmgren, A Nordqvist Luleå University of Technology E. Nordlund, U. Nyberg, D. Saiang, P. Zhang, H. Basarir,
More informationIntegration and Optimisation of Blasting, Crushing and Grinding at the Newmont Ahafo Operation
Integration and Optimisation of Blasting, Crushing and Grinding at the Newmont Ahafo Operation S. Mwansa 1, A. Dance 1, D. Annandale 2, D. Kok 2 and B. Bisiaux 2 1 Metso Process Technology & Innovation,
More informationMining Services Low Density WALA Post blast fume resistant
Mining Services Low Density WALA Post blast fume resistant Case study - July 2013 Introduction WALA was proposed to be used at a coal mine in Bowen Basin QLD with the potential to replace Emulsion heavy
More information1 st Edition. Western Canada Chapter of the International Society of Explosives Engineers Best Practices Guide for Urban Blasting Operations
Western Canada Chapter of the International Society of Explosives Engineers Best Practices Guide for Urban Blasting Operations 1 st Edition Best Practices Guide for Urban Blasting Operations Draft Document
More informationAbo Canyon Second Main Track
Abo Canyon Second Main Track Thomas Schmidt Director Engineering Services BNSF Railway David Miller Manager Engineering BNSF Railway Abo Canyon Second Main Track Building 5 miles of a second track through
More informationElectronic detonators and the Gautrain rapid rail project
Electronic detonators and the Gautrain rapid rail project C.G. Goncalves DetNet South Africa (Pty) Ltd, South Africa V. Naidoo African Explosives Limited, South Africa Abstract The Gautrain rapid rail
More informationTECHNICAL REPORT BLAST-INDUCED DAMAGE
TECHNICAL REPORT 2008:21 BLAST-INDUCED DAMAGE A SUMMARY OF SVEBEFO INVESTIGATIONS David Saiang Luleå University of Technology Technical Report Department of Civil and Environmental Engineering Division
More information301 Managing the Chemical Crusher. Bill Hissem & Larry Mirabelli
301 Managing the Chemical Crusher Bill Hissem & Larry Mirabelli Recap of the Brutal Facts Normal has changed! Old Normal Want to control our product cost. New Normal Need to control our product cost. The
More informationFace to Surface Task 1
RESEARCH REPORT Face to Surface Task 1 Baseline Mapping of the Mining Operation in Aitik Ali Beyglou Håkan Schunnesson Daniel Johansson Face to Surface Task 1 Baseline Mapping of the Mining Operation
More informationNOTE COVER PAGE GENERAL
ANNEXURE-I SCRUNITY COMMENTS ON MINING PLAN OF M/S TUMKUR MINERALS, JANAHAR IRON & MANGANESE APPLIED MINING LEASE AREA OF IRON AND MANGANESE ORE, OVER AN AREA 259 HA.( 178.00 HA IN FOREST AREA, 81.00HA
More informationEffect of Blast Design on Crack Response
Effect of Blast Design on Crack Response C.H. Dowding Professor of Civil & Environmental Engineering, Northwestern University C. Aimone-Martin Professor of Mineral Engineering, New Mexico Institute of
More informationCROWN PILLAR ON VENTILATION DRIFT AT DEEP MILL LEVEL ZONE (DMLZ) PT FREEPORT INDONESIA
CROWN PILLAR ON VENTILATION DRIFT AT DEEP MILL LEVEL ZONE (DMLZ) PT FREEPORT INDONESIA Rian Nugroho, PT Freeport Indonesia, DMLZ Engineering, Papua, Indonesia Andrew Parhusip, PT Freeport Indonesia, DMLZ
More informationTiming Effects on Fragmentation by Blasting
Timing Effects on Fragmentation by Blasting by Omid Omidi A thesis submitted to the Department of Mining In conformity with the requirements for the degree of Masters of Applied Science Queen s University
More informationCIVILS QUARRING MINING high pressure rock/concrete breaking system
CIVILS QUARRING MINING high pressure rock/concrete breaking system P.O. Box 2519 Bridgeview, IL 60455 Fax: (708) 974-9429 CIVILS Rock Excavation Newry Bypass - Excavation of rock adjacent to busy road.
More informationG&P GEOTECHNICS SDN BHD CHECKLIST FOR EARTHWORKS (ROCK EXCAVATION AND ROCK SLOPE STRENGTHENING WORKS) WORK INSTRUCTIONS FOR ENGINEERS KYW.
Page 1 of 4 WORK INSTRUCTIONS FOR ENGINEERS Compiled by Checked by Approved by KYW : : TYC : LSS OP-3-57. (ROCK EXCAVATION) Page 2 of 4 NO. CHECKLIST ITEMS PROJECT Project Name : Project No.: Checked By
More informationOn-Line Mine Improving mining economy through on-line mineral analysis
US$/ton On-Line Mine Improving mining economy through on-line mineral analysis Mr. Ilpo O. Auranen, CEO, Mine On-Line Service Oy Background: Mines of today are moving ever increasing tonnages of rock.
More informationCONSTRUCTION SPECIFICATION FOR GRADING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 206 DECEMBER 1993 CONSTRUCTION SPECIFICATION FOR GRADING 206.01 SCOPE 206.02 REFERENCES 206.03 DEFINITIONS 206.04 Not Used 206.05 Not Used 206.06 Not
More informationMine Development and Operations Plan Area 2 Stage 3 Pit Design Change
Area 2 Stage 3 Pit Design Change 2017-01 Prepared by: Minto Explorations Ltd., Minto Mine July 2017 Contents 1 Introduction... 1 1.1 Ore Quantities... 2 1.2 Slope Stability and Geotechnical Assessments...
More informationKoka Project Stands to be a Highly Profitable Gold Mine: Scoping Study
Koka Project Stands to be a Highly Profitable Gold Mine: Scoping Study Chalice Gold Mines Limited ABN 47 116 648 956 30 October 2009 Highlights Scoping Study finds Koka deposit at the Zara Project in Eritrea
More informationPRE-FEASIBILITY REPORT
PRE-FEASIBILITY REPORT EXCUTIVE SUMMARY Project : Mining Lease of Iron Ore (Ari Dongri Iron Ore Mine) Name of Company / Mine Owner : Godawari Power and Ispat Limited Location Village : Tehsil : District
More informationReduction of Blast Induced Ground Vibrations with Open Trenches in Surface Mines
The 12 th International Conference of International Association for Computer Methods and Advances in Geomechanics (IACMAG) 1-6 October, 2008 Goa, India Reduction of Blast Induced Ground Vibrations with
More informationBlasting in Hong Kong, A Review of Current Blasting Assessment Requirements
Blasting in Hong Kong, A Review of Current Blasting Assessment Requirements 19 June 2008 Guy Bridges Maunsell Geotechnical Services 1 Brief Introduction to the control of explosives in Hong Kong Basic
More informationKumtor Gold Company 2018
Kumtor Gold Company 2018 Kumtor Gold Company Kumtor is one of the highest gold deposits in the world. The deposit was discovered in the Central Tien Shan at an altitude of 4,200 meters in 1978. The Kumtor
More information204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)
SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the
More informationInstallation and Monitoring of Shotcrete Pillars at Newmont Canada s Golden Giant Mine
Installation and Monitoring of Shotcrete Pillars at Newmont Canada s Golden Giant Mine W.F. Bawden 1, J.D. Tod 2, J. McMullan 3, and J. Chew 3 1 Lassonde Mineral Engineering Program, U. of Toronto, Canada
More informationSECTION ROCK REMOVAL
SECTION 31 23 16.26 ROCK REMOVAL PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required to perform rock
More informationBlast Impact Prediction Studies at Ghana Manganese Company (GMC) Limited, Nsuta, Ghana*
Blast Impact Prediction Studies at Ghana Manganese Company (GMC) Limited, Nsuta, Ghana* N. Amegbey and B. O. Afum Amegbey, N. and Afum, B. O. (2015), Blast Impact Prediction Studies at Ghana Manganese
More information204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES
SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the
More informationAnnexure-I
Annexure-I Annexure-II NOAMUNDI G TATA IRON OF M/S TATA STEEL LIMITED (Lease area: 1160.060 Ha.) MINING PLAN FROM 01.01.2012 TO 2016-17 (SUBMITTED UNDER RULE 24A OF MeR 1960) (i) Name of the
More informationOptimisation of Drill and Blast Parameters Using Emperical Fragmentation Modelling
Optimisation of Drill and Blast Parameters Using Emperical Fragmentation Modelling J. B. Ninepence, E. J. A. Appianing, B. A. Kansake and R. Amoako Ninepence, J. B, Appianing, E. J. A., Kansake, B. A.,
More informationControlling high risk blasting in an urban environment The Airport Link Story
Controlling high risk blasting in an urban environment The Airport Link Story International Society of Explosives Engineers Annual Conference on Explosives and Blasting Technique Nashville, Tennessee USA
More informationVibration Reduced Rock Excavation Using Waterjet Technology
The 2012 World Congress on Advances in Civil, Environmental, and Materials Research (ACEM 12) Seoul, Korea, August 26-30, 2012 Vibration Reduced Rock Excavation Using Waterjet Technology *Tae-Min Oh 1),
More informationBlast optimisation at limestone quarry operations good fragmentation, less fines
Abstract Blast optimisation at limestone quarry operations good fragmentation, less fines Benjamin Cebrian Rock blasting at quarries represents multiple challenges not easy to see at first sight. Aggregate
More informationGeotechnical Investigation Reports and Foundation Recommendations -Present status in India -Examples
Geotechnical Investigation Reports and Foundation Recommendations -Present status in India -Examples Prof. V.S.Raju (Formerly: Director, IIT Delhi & Professor and Dean, IIT Madras) Email: rajuvs_b@yahoo.com
More informationExplosive Selection. Techniques to Select the Most Economic Solution. Drew Martin Principal Drill and Blast Engineer Blast It Global
Explosive Selection Techniques to Select the Most Economic Solution By: Drew Martin Principal Drill and Blast Engineer Blast It Global Presentation Overview Topics Presenter Introduction Explosive properties
More informationDunmore Quarry. Blast Management Plan
Dunmore Quarry Blast Management Plan Document Control Rev. Author Date Approval Reason for Change Next Review 1 Rod Wallace (E & C Advisor Quarries NSW) 2. N. Constantine (OHS Advisor) 3. R. Lawton (Env.
More informationStudy on Control of Crack- Propagation in Blasting
Study on Control of Crack- Propagation in Blasting S.H. Cho Lassonde Institute and Department of Civil Engineering, University of Toronto, Toronto, Canada Y. Nakamura Yatsushiro National College of Technology,
More informationBlasting Risk Assessment
Blasting Risk Assessment for Gunns Limited Proposed Pulp Mill Development Site, Tasmania Revision 5 March 2006 Angelo Labriola Orica Quarry & Construction Services Contents 1. Introduction 3 2. Geology
More informationBlast Hole Sampling validation at Mantoverde. Antoni Magri, Eduardo Magri and Cristian Neira
Blast Hole Sampling validation at Mantoverde Antoni Magri, Eduardo Magri and Cristian Neira Mantoverde Mantoverde is an iron ore, copper and gold deposit. It produces 62,000 tons of fine copper a year
More informationMining Under Fill Standards
Page 1 of 7 Date Created: July 16, 2014 Document Type (Please Highlight Yellow) Latest Revision: July 16, 2014 POLICY PROCEDURE Originally Prepared By: Engineering Approval Stage (Please Highlight Yellow)
More informationConstruction. Blasting Solutions for the Construction Market
Construction Blasting Solutions for the Construction Market August 2011 CONSTRUCTION 1 Contents 02 Research and Development 03 Construction 04 Technical Services 06 Blast Based Services 11 Bulk Systems
More informationS33 Opening Statement Workplace Rules
S33 Opening Statement Workplace Rules Having a small number of clear, concise rules is important and it helps to set the standards that you require people to work to. The Workplace Rules Procedure covers
More informationBengalla Mining Company Pty Limited. Post Blast Fume Generation Mitigation and Management Plan
Bengalla Mining Company Pty Limited Post Blast Fume Generation Mitigation and Management Plan Revision Date Description Author Reviewer Approved 0 30/01/12 Update for Section 96(2) Modification P Neely
More informationINDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION. MCDR inspection REPORT. Bangalore regional office
1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION KNT/BLR/FE/12/BNG (ii) Designation : (iii) Accompaning mine : Official
More informationGEOVIA GEMS Course Catalog Africa
GEOVIA GEMS Course Catalog Africa Contents GEMS Foundation.3 GEMS Geology Modelling 4 GEMS Open Pit Mine Design.5 GEMS Underground Mine Desing 6 2 Llll GEMS Foundation 3 days / 24 Hours Foundation New
More informationMINISTRY OF ENERGY AND MINES Mines and Mineral Resources Division. REPORT OF GEOTECHNICAL INSPECTOR (Issued pursuant to Section 15 of the Mines Act)
MINISTRY OF ENERGY AND MINES Mines and Mineral Resources Division REPORT OF GEOTECHNICAL INSPECTOR (Issued pursuant to Section 15 of the Mines Act) Name of Property: Permit No.: M-29 Mine Manager: Don
More informationMining Services Low Density WALA Deep hole blasting
Mining Services Low Density WALA Deep hole blasting Case study - December 2013 Introduction WALA was proposed to be used at a coal mine in Bowen Basin QLD with the potential to replace Emulsion heavy ANFOs
More informationCAT COMMAND FOR DRILLING
CAT COMMAND FOR MAKING EVERY SHOT WORTH MORE Cost-effective, high-precision drilling gets your whole mining value chain off to a good start. Cat Command for drilling, a capability of the Cat MineStar technology
More informationMeasuring Blast Movement to Reduce Ore Loss And Dilution
Measuring Blast Movement to Reduce Ore Loss And Dilution Darren Thornton, Senior Research Officer, Julius Kruttschnitt Mineral Research Centre, University of Queensland, Indooroopilly, Australia David
More informationPASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017
PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 02201 BLASTING & ROCK REMOVAL REQUIREMENTS PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the
More informationComparison of Empirical Fragmentation Models at the Gol-Gohar Iron Ore Mine
In te Name of God Comparison of Empirical Fragmentation Models at te Gol-Goar Iron Ore Mine Dr. Moammad Taji 24-26 August 2015 Sydney, Australia Contents 2 Introduction Fragmentation surely is one of te
More informationCut and fill productivity. Operating procedures. Introduction. 1. Approach of the model
Model: Level: Cut and fill productivity Micro Operating procedures Introduction The goal of the model is to calculate realistic productivity from data collected on site and to estimate the effect when
More informationDRI & Mini-mills Conference September 10-11, 2013 Royal Sonesta Hotel, New Orleans, LA
Country Breakdown s The Environmental and Raw Material Factors Associated with HBI and DRI Production This white paper has been created in conjunction with American Metal Market and Metal Bulletin Events
More informationWelcome to a world class operation
Boliden Garpenberg Welcome to a world class operation Boliden Garpenberg in Hedemora municipality is now one of the world s most modern mines. At the same time, it is Sweden s oldest mining area that
More informationisure a Revolution in precision Tunneling project management software
isure a Revolution in precision Tunneling project management software a revolution in accuracy offers a competitive edge Optimal accuracy Easy to use isure is a new, revolutionary tunneling project management
More informationMETHOD STATEMENT FOR TRENCHING/EXCAVTION FOR CONSTRUCTION OF
METHOD STATEMENT FOR TRENCHING/EXCAVTION FOR CONSTRUCTION OF Rev. No. Date REVISION HISTORY SUB-CONTRACTOR-DELCO Prepared Reviewed Approved Revision History MANAGER Status of Approval CONTENTS 1.0 Purpose
More informationTHE INTRODUCTION OF ELECTRONIC DETONATORS AT OPTIMUM COLLIERY JD BOTES MINE MANAGER - EXPOSURE OPTIMUM COLLIERY PRIVATE BAG X1201 PULLENSHOPE 1096
THE INTRODUCTION OF ELECTRONIC DETONATORS AT OPTIMUM COLLIERY JD BOTES MINE MANAGER - EXPOSURE OPTIMUM COLLIERY PRIVATE BAG X1201 PULLENSHOPE 1096 TEL: 013 296 5122 CELL: 082 901 9690 FAX: 013 296 5121
More informationGroundbreaking Performance Through Practical Innovation
Groundbreaking Performance Through Practical Innovation REAL PRODUCTS REAL PEOPLE REAL RESULTS Dyno Nobel is the global leader in commercial explosives, aimed at solving the industry s toughest challenges
More informationChapter 19 BLAST DESIGN. Introduction
Chapter 19 BLAST DESIGN Introduction This chapter is an introduction to blasting techniques based primarily on the Explosives and Blasting Procedures Manual (Dick et al., 1987) and the Blaster s Handbook
More informationCONSTRUCTION SPECIFICATION FOR GRADING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 206 NOVEMBER 2000 CONSTRUCTION SPECIFICATION FOR GRADING TABLE OF CONTENTS 206.01 SCOPE 206.02 REFERENCES 206.03 DEFINITIONS 206.04 SUBMISSION AND
More informationCF50/100 KW TURBINE ACCESS ROAD, CRANE PLATFORM, CONCRETE, AND LIFTING SPECIFICATIONS C&F GREEN ENERGY REVISION PREPARED BY APPROVED BY DATE
CF50/100 KW TURBINE ACCESS ROAD, CRANE PLATFORM, CONCRETE, AND LIFTING SPECIFICATIONS C&F GREEN ENERGY REVISION PREPARED BY APPROVED BY DATE 001 First Draft W Hession 12.02.2014 Introduction This document
More informationABM Hits 3000 Ounce Target from Trial Mining
ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 12 th December 2013 ABM Hits 3000 Ounce Target from Trial Mining ABM Resources NL ( ABM or The Company ) presents an update on the Trial Mining and Processing at
More informationROCK SALT TODAY IQUIQUE CHILE MINE PURE DRY CHILEAN ROCK SALT
MARCH 2016 ROCK SALT TODAY IQUIQUE CHILE MINE PURE DRY CHILEAN ROCK SALT THE SOURCE Located near Iquique, Chile s first region is one of the worlds most abundant sources of high grade salt. The deposit
More information1. Draft Blast Plan for approval by Ashland Fire Chief submitted to MassDEP, EPA and Ashland Board of Selectmen for comment.
New England Research, Inc. 331 Olcott Drive, Suite L1 White River Junction, VT 05001 USA +1 802.296.2401 www.ner.com 27 April 2016 Ashland Fire Prevention 70 Cedar Street Ashland, MA 01721 Attn: Captain
More informationBlast Optimization of Hard Ores at Phu Kham Open Pit
Blast Optimization of Hard Ores at Phu Kham Open Pit Wayne Rogers, Phu Bia Mining, Laos & Arthur Pacunana, Phu Bia Mining, Laos & Kell Monro, Phu Bia Mining, Laos Abstract The Phu Kham Copper-Gold Operation
More informationEstimation of Open Cut Mining Recovery and Mining Dilution. Summary. Introduction. Estimation Techniques. AusIMM JORC Code Edition.
Estimation of Open Cut Mining Recovery and Mining Dilution By Kent Bannister, ARMIT, FAusIMM (CP), CEO Kent Bannister Pty Ltd, (KBPL) Summary Loss and dilution of Mineral Resource grade occurs during mining
More informationTHE FALL AND RISE DRAGLINES
THE FALL AND RISE OF DRAGLINES Neil Tyson, Deswik, Australia, details ways to improve dragline engineering and in turn improve planning cycle time and mitigate complex risks. L arge walking draglines are
More informationCBC Aids WVDEP with Fresh Water Reservoir - Chief Logan State Park
CBC Case Study-1212 1 of 5 CBC Aids WVDEP with Fresh Water Reservoir - Chief Logan State Park More Than Geotechnical Engineering DAYTON 125 Westpark Road Centerville, OH 45459 Phone: 937-428-6150 HAZARD
More informationPOUR n CRACK. A simple solution for non explosive demolition.
P1 INDEX INDEX COMPANY PROFILE PRODUCTS ADVANTAGES APPLICATION VISUALS WHICH PRODUCT? USER INSTRUCTIONS HOLE DISTRIBUTION CONTROLLED CRACKING HOLE SPECIFICATION DRILL PATTERNS PROPERTIES WARNING PACKAGING
More informationAspects of Mining in Newfoundland & Labrador
Aspects of Mining in Newfoundland & Labrador Production Underground Mining This mine at Buchans, central Newfoundland, produced over 16,000,000 tonnes of lead, zinc, copper, silver and gold between 1928
More informationTechnology Initiatives for Efficient Blasting Operations and Improved Environmental Control
Technology Initiatives for fficient Blasting Operations and Improved nvironmental Control Professor ushil Bhandari, Formerly Dean, Faculty of ngineering, JNV University, Jodhpur Director, arth Resource
More information