Mandatory Building Inspection Scheme (MBIS) and Mandatory Window Inspection Scheme (MWIS)

Size: px
Start display at page:

Download "Mandatory Building Inspection Scheme (MBIS) and Mandatory Window Inspection Scheme (MWIS)"

Transcription

1 1 Mandatory Building Inspection Scheme (MBIS) and Mandatory Window Inspection Scheme (MWIS)

2 2 Content Purpose Legislation Key Features of MBIS & MWIS Duties of Registered Inspector Code of Practice for MBIS and MWIS Implementation Timetable

3 3 Purpose "Prevention is better than cure" If owners can regularly inspect their buildings, identify problems at an early stage and carry out remedial works timely, accidents can be avoided.

4 Legislation Buildings (Amendment) Ordinance 2011 [B(A)O 2011] introducing MBIS & MWIS Building (Inspection and Repair) Regulation [B(I&R)R] setting the scopes, standards and procedural requirements for carrying out prescribed building/window inspections and repair Building (Administration)(Amendment) Regulation 2011 establishing a new inspectors register under the BO & stipulating the qualification and experience requirements for RI 4

5 5 Key Features of MBIS and MWIS B(A)O 2011 MBIS applies to private buildings* aged 30 years or above owners are required to appoint registered inspector (RI) to carry out prescribed building inspection and supervise prescribed repair in every 10 years * except domestic building not exceeding 3 storeys in height MWIS applies to private buildings* aged 10 years or above owners are required to appoint qualified person (QP) to carry out prescribed window inspection and supervise prescribed repair in every 5 years

6 Key Features of MBIS and MWIS 6 Selection of target buildings Annual Target 2,000 MBIS buildings 5,800 MWIS buildings (of which 2,000 are synchronized with MBIS buildings) Target buildings to be selected at quarterly intervals

7 Key Features of MBIS and MWIS Registered Inspector (RI) A person whose name is in the inspectors register under the BO. They include: Authorized Persons Registered Structural Engineers Registered Architects Registered Professional Engineers (Building, Building Services (Building), Civil, Materials (Building) & Structural) Registered Professional Surveyors (Building Surveying & Quantity Surveying) 7

8 8 Key Features of MBIS and MWIS Qualified Person (QP) A person whose name is in one of the registers under the BO. They include: Authorized Persons Register Structural Engineers Register Inspectors Register General Building Contractors Register Minor Works Contractors Register (registered for the class, type and item of minor works in respect of windows)

9 9 Key Features of MBIS and MWIS B(A)O 2011 Scope of Prescribed Inspection Prescribed inspection under MBIS & MWIS covers the following elements of a building: Common parts External walls Projections Signboards Windows

10 Time Frame of MBIS Notices 10 Pre-notification letter 6 months advance notice to all owners of the building before MBIS Notices MBIS Notices 3 months* for appointment of RI 3 months for completion of building inspection 6 months for completion of building repair * extra 3 months will be given for building without OC

11 Time Frame of MWIS Notices 11 Pre-notification letter 1 month advance notice to OC or Management Office or post on conspicuous part of the building prior to MWIS Notice MWIS Notices 3 months* for appointment of QP 2 months for completion of window inspection 1 month for completion of window repair * an extra 3 months will be given for building without OC

12 12 Duties of Registered Inspector (RI) Carry out the prescribed inspection personally and provide proper supervision of the carrying out of the prescribed repair Comply with the BO Notify BA of any case of emergency during the prescribed inspection and prescribed repair Record any unauthorized building works in the common parts and exterior of the building

13 Code of Practice for MBIS and MWIS Code of Practice for MBIS and MWIS Draft version of CoP uploaded in BD website in August 2011 The CoP mainly covers: Inspection and Assessment Detailed Investigation Rectification and Repair Supervision and Control 13 Specifies the technical standards and procedural requirements for the RI and QP to carry out prescribed inspection and to supervise the necessary prescribed repair of buildings and windows Provides guidance to comply with the requirements of BO and B(I&R)R

14 Code of Practice for MBIS and MWIS 14 Scope of Inspection Inspection shall cover the following building elements:- Under MBIS - External elements and other physical elements - Structural elements - Fire safety elements - Drainage system Under MWIS -Windows

15 Code of Practice for MBIS and MWIS 15 Scope of Inspection External elements and other physical elements External Elements and Other Physical Elements - External finishes such as tiling, rendering and cladding - Fins, grilles, and metal louvers - Protective barriers, railings, parapets and balustrades - Fencing and associated fixings - Curtain wall - Appendages - Manually or electrically operated metal gates

16 16 Code of Practice for MBIS and MWIS Scope of Inspection Structural elements - Columns, walls, beams, slabs, staircases, etc. - Cantilevered projecting structures - Transfer structures - Hanging structures - Other structural elements exposed in the building

17 17 Code of Practice for MBIS and MWIS Scope of Inspection Fire safety elements - Means of escape - Means of access for fire fighting and rescue - Fire resisting construction

18 Code of Practice for MBIS and MWIS 18 Scope of Inspection Drainage system Drainage system - at external walls of building - in common parts - within common pipe ducts Underground and above-ground common drainage system Any other common drainage system for the building under inspection that may, if defective, choked or misconnected, affect the sanitary or hygienic condition of the building

19 19 Code of Practice for MBIS and MWIS Inspection and Assessment Step 1: Pre-inspection preparation - Retrieve all relevant approved/accepted plans, details and documents to gain a clear understanding of the overall building design and construction including subsequent A&A works. - Review all available information to determine the design standards and CoPs that were in force when building was constructed and A&A works that had been carried out. - Formulate an appropriate method statement for the inspection of the building.

20 20 Code of Practice for MBIS and MWIS Inspection and Assessment Step 2: Carrying out of inspection by - Visual inspection - Hammer-tapping - Infrared thermography - Cover meter survey - Crack width measurement - Opening up of concrete cover at root of cantilevered slab canopy - Closed circuit television survey (CCTV)

21 21 Code of Practice for MBIS and MWIS Inspection and Assessment Step 3: Assessment and follow up action - Assess the conditions of elements inspected. - Make recommendations on the follow-up action based on the inspection findings and professional judgment. - Provide proposals for the rectification and repair works in the Inspection Report submitted to the BD.

22 Code of Practice for MBIS and MWIS Detailed Investigation (DI) Serious defects, abnormal deterioration constituting structural instability or serious health hazard Extent or cause of defect cannot be ascertained during inspection Serious structural defects To detect defective underground drains/pipes, source of leakage, etc RI shall consider conducting an DI where Serious corrosion of main bar at the root of CSC after opening up inspection Misconnection of drain pipes Uncertainty in Fire Resistance Rating of Fire Resisting Construction 22

23 23 Code of Practice for MBIS and MWIS Detailed Investigation (DI) Investigation methods For condition of concrete: - may be assessed by hammer-tapping, carbonation test, test on chloride and cement content, coring and rebound hammer test, crack survey or other feasible means For condition of reinforcement: - may be assessed by covermeter survey, measurement of section loss, electrochemical (half-call) potential measurement or other feasible means

24 24 Code of Practice for MBIS and MWIS Detailed Investigation (DI) Investigation methods For structural assessment: - Based on the DI results, evaluate safety level of the structural elements by determining its Factor of Structural Performance (FSP) For drainage elements: - Dye test, CCTV survey, smoke or water test, or other feasible means

25 25 Code of Practice for MBIS and MWIS Rectification and Repair (MBIS) General principles - Based on the inspection findings, the RI shall adopt the most appropriate repair methods. - Carry out appropriate proof tests to ensure the standard and quality of the repair works. - The RI shall ensure that the repair works are carried out to meet the standards stipulated in the BO and B(I&R)R.

26 26 Code of Practice for MBIS and MWIS Rectification and Repair (MBIS) Intended use and esign life of structure Severity of exposure, condition of existing structure, cause of defect Impact of repair proposa to the occupants and public, access to repair Required performance f repair works, durability When formulating a repair proposal, the RI shall consider the following factors Effects of repair works on building and environment Compatibility of repair materials with the substrate and the parent structure Other aspects relevant to the safety and health standards of building under repair

27 27 Code of Practice for MBIS and MWIS Inspection and Repair under MWIS Scope of Inspection:- Rivets, screws, hinges, sliding tracks, shoes and window stays Glass panes, sealant and putty, window frames Other elements that QP considers may affect safety of window under inspection General Requirement and Standard of Repair:- - All windows shall remain safe until next cycle of inspection in 5 years - All defective window components shall be replaced - The renewed components shall be of such material or size not inferio to that of the original design - Windows of specified fire resistance rating shall be maintained after rectification

28 Code of Practice for MBIS and MWIS Supervision and Control during Repair: Supervision and control during repair Adequate measures to ensure a safe working environment Adequate control on the sequence of rectification and repair works, the erection and maintenance of scaffolds Adequate measures to ensure the rectification and repair works are carried out in accordance with the inspection findings & recommendation of RI/QP 28

29 29 Thank you

CHAPTER 1 Introduction

CHAPTER 1 Introduction CHAPTER 1 Introduction Mandatory Building Inspection An Independent Study on Aged Private Buildings and Professional Workforce in Hong Kong 1.1 Background Hong Kong is a tiny city with a total land area

More information

HKIS Annual Conference Care for the Aged Buildings. Director of Buildings Dr CHEUNG Tin-cheung, JP

HKIS Annual Conference Care for the Aged Buildings. Director of Buildings Dr CHEUNG Tin-cheung, JP HKIS Annual Conference 2017 - Care for the Aged Buildings Director of Buildings Dr CHEUNG Tin-cheung, JP Age Group of Private Buildings 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 10% 14% 17% 26% 20% 13%

More information

SECTION FIBER REINFORCED CEMENTITIOUS PANEL CLADDING

SECTION FIBER REINFORCED CEMENTITIOUS PANEL CLADDING SECTION 07450 FIBER REINFORCED CEMENTITIOUS PANEL CLADDING 1.0 GENERAL 1.1 DOCUMENTS This section of the specification forms part of the contract documents and is to be coordinated with all other parts.

More information

OPERATIONAL POLICY AND PROCEDURE

OPERATIONAL POLICY AND PROCEDURE OPERATIONAL POLICY AND PROCEDURE Overv iew Building & Environment Asbestos Policy Cleaning Policy Passenger and Goods Lifts Ladders and Access Equipment Policy Sanitary Bins Policy Waste Management Policy

More information

Determination 2011/056

Determination 2011/056 Determination 2011/056 Regarding compliance of brick veneer and proposed remedial work to windows to a house at 50 Karner Drive, RD6, Te Puke (to be read in conjunction with Determination 2008/100) 1.

More information

UNIT 9 INSPECTION AND QUALITY CONTROL

UNIT 9 INSPECTION AND QUALITY CONTROL UNIT 9 INSPECTION AND QUALITY CONTROL Inspection and Quality Control Structure 9.1 Introduction Objectives 9.2 Need for Inspection and Quality Control 9.3 Principles of Inspection 9.4 Major Items in Construction

More information

Exterior Elevated Elements Inspection Guidelines

Exterior Elevated Elements Inspection Guidelines Exterior Elevated Elements Inspection Guidelines Planning and Development 1. Guideline Purpose These guidelines are intended to assist practicing professionals in complying with Berkeley Municipal Code

More information

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS

SECTION GENERAL REQUIREMENTS PART 1 - GENERAL I 1 GENERAL REQUIRMENTS SECTION 01 00 00 GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 SECTION INCLUDES A. Summary of Work: 1. General 2. Contract. B. Contract Considerations: 1. Schedule of values. 2. Applications for payment. 3.

More information

Professional Guide to Building Inspections

Professional Guide to Building Inspections Building Surveying Division Professional Guide to Building Inspections Volume 1: Pre-1980 Residential & Composite Buildings in Hong Kong Prepared by Building Surveying Division, HKIS www.hkis.org.hk Professional

More information

Subdivision 1 Responsibility of the Owner

Subdivision 1 Responsibility of the Owner Subdivision 1 Responsibility of the Owner 13.3.1. 1. Owner Liability Neither the issuance of a permit under this Part nor the acceptance or review of plans, drawings, specifications or supporting documents,

More information

INDUSTRY OVERVIEW SOURCE OF INFORMATION

INDUSTRY OVERVIEW SOURCE OF INFORMATION The information set forth in this section has been derived from the Ipsos Report. We believe that the sources of the information are appropriate sources for such information, and we have taken reasonable

More information

Appendix 3. POLICY & PROCEDURE No

Appendix 3. POLICY & PROCEDURE No DEPARTMENT OF PUBLIC WORKS DIVISION: ENGINEERING SERVICES SECTION: ADMINISTRATIVE PAGE NO: 1 OF 10 REVISION NO: 3 DATE: 1995 05 01 ESTABLISHED: 1986 03 03 Appendix 3 POLICY & PROCEDURE No. 2.3.1-020 TITLE:

More information

BUILDING CONSTRUCTION

BUILDING CONSTRUCTION BUILDING CONSTRUCTION Chapter 66 From the CODE of the TOWN OF WINDHAM COUNTY OF CUMBERLAND STATE OF MAINE 66-1. Purpose. The Town of Windham enforces the Maine Uniform Building and Energy Code ( M.U.B.E.C.

More information

City of Roanoke. Commercial Permit Submittal Guidelines

City of Roanoke. Commercial Permit Submittal Guidelines City of Roanoke Commercial Permit Submittal Guidelines These guidelines are for information purposes only. The contractor is obligated to comply with all adopted codes and ordinances BUILDING INSPECTIONS

More information

CHAPTER 34 EXISTING BUILDINGS

CHAPTER 34 EXISTING BUILDINGS CHAPTER 34 EXISTING BUILDINGS SECTION 3401 GENERAL 3401.1 Scope. Provisions of this chapter shall govern the application of this code to existing buildings. Exception: Buildings and structures located

More information

Corium Brick Rainscreen System Specifications

Corium Brick Rainscreen System Specifications CORIUM BRICK RAINSCREEN SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. Work Included: The Work of this Section shall include but not be limited to the following: 1. Corium brick plates 2. Galvanized and coated

More information

C. Requirements of this Section relate to customized fabrication and installation procedures, not production of standard products.

C. Requirements of this Section relate to customized fabrication and installation procedures, not production of standard products. SECTION 01400 QUALITY CONTROL SERVICES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification

More information

What you need to know about. Maintenance of Balconies

What you need to know about. Maintenance of Balconies What you need to know about Maintenance of Balconies 2 Inspection statistics have revealed numerous rotting balconies that could cause severe injury or death in the event of a collapse. Why is there a

More information

WALLTITE ECO Air Barrier System. Welcome

WALLTITE ECO Air Barrier System. Welcome WALLTITE ECO Air Barrier System Welcome Program WALLTITE ECO air barrier system Assembly and installation Evaluation and compliance Program and support 2 Design System components sealant WALLTITE ECO spray

More information

INFORMATIONAL PACKAGE ACCESSORY RESIDENTIAL BUILDINGS (INCLUDING DETACHED GARAGES, STORAGE BUILDINGS & WORKSHOPS)

INFORMATIONAL PACKAGE ACCESSORY RESIDENTIAL BUILDINGS (INCLUDING DETACHED GARAGES, STORAGE BUILDINGS & WORKSHOPS) 1102 4 th Street Telephone: 306-634-1819 Estevan, Saskatchewan, Canada Fax: 306-636-2199 S4A 0W7 INFORMATIONAL PACKAGE ACCESSORY RESIDENTIAL BUILDINGS (INCLUDING DETACHED GARAGES, STORAGE BUILDINGS & WORKSHOPS)

More information

HOUSE BUILDING DIGEST

HOUSE BUILDING DIGEST HOUSE BUILDING DIGEST (Procedures and Terminologies) Creating Enabling Environment for Affordable Housing for All This is an attempt by BMTPC to provide useful but often ignored information about multifarious

More information

Shatin to Central Link Contract Incident Report on the Construction of the Internal and Parapet Walls at TKW Station

Shatin to Central Link Contract Incident Report on the Construction of the Internal and Parapet Walls at TKW Station Shatin to Central Link Contract 1109 Incident Report on the Construction of the Internal and Parapet Walls at TKW Station 1 Table of Content 1. Executive summary 2. SCL Contract 1109 3. Structural design

More information

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) EHS Regulatory Instrument Code of Practice EHS RI - CoP 40.0 False Work (Formwork) Version 2.0 February 2012 ACKNOWLEDGEMENTS With gratitude Abu Dhabi

More information

Trade Licensing Guide Victoria. Use this guide to verify which licensed trade you need for your home improvement job

Trade Licensing Guide Victoria. Use this guide to verify which licensed trade you need for your home improvement job Trade Licensing Guide Victoria Use this guide to verify which licensed trade you need for your home improvement job Is Your Tradesperson Licensed? Have you ever asked a tradesperson for their licence?

More information

Building Design Data

Building Design Data Building Design Data.. 1. Building Design The KORE ICF System is designed to meet the requirements of the Building Regulations 1997-2006, in the case of two storeys, single occupancy dwellings. If the

More information

OWNER USER INTEGRITY MANAGEMENT SYSTEM WRITTEN DESCRIPTION CHECKLIST AB-512(b)

OWNER USER INTEGRITY MANAGEMENT SYSTEM WRITTEN DESCRIPTION CHECKLIST AB-512(b) Company Name: Written Description of QMS Title and Rev. Status: Person who is responsible for preparing the owner s QMS written description: Name: Title: Telephone No.: ( ) Fax No.: ( ) Cell No.: ( ) E-Mail:

More information

Building Consent COMMERCIAL

Building Consent COMMERCIAL Building Consent COMMERCIAL About this checklist This checklist is required for all BC applications. The applicant should identify if, and where, information is shown on the plan drawings. This is to help

More information

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT STRUCTURAL FOR CUSTOMS HOUSE JULY 2014 i P a g e Table of Contents 1. INTRODUCTION 3 1.1 Design Criteria and Specifications..

More information

SECTION FLUID-APPLIED MEMBRANE AIR BARRIERS, VAPOR PERMEABLE

SECTION FLUID-APPLIED MEMBRANE AIR BARRIERS, VAPOR PERMEABLE PART 1 - GENERAL 1.1 SUMMARY SECTION 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS, VAPOR PERMEABLE SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit

More information

DIVISION 02 SELECTIVE DEMOLITION

DIVISION 02 SELECTIVE DEMOLITION DIVISION 02 SELECTIVE DEMOLITION SECTION 02 41 19 - SELECTIVE DEMOLITION PART 1 - GENERAL 1.01 SUMMARY A. This Section includes the following: 1. Demolition and removal of selected portions of a building.

More information

SECTION WATER DISTRIBUTION SYSTEM

SECTION WATER DISTRIBUTION SYSTEM Conditions of Use/ Responsibility of Data Montgomery County Public Schools Facilities Guide DIVISION 2 - SITE WORK These guideline specifications are to be used by the A/E as a base document in the development

More information

Joint Structural Division. Standard for. Structural Engineering Services. 2nd Edition

Joint Structural Division. Standard for. Structural Engineering Services. 2nd Edition Joint Structural Division Standard for Structural Engineering Services 2nd Edition SSES2.indd 1 7/20/16 9:39:16 AM Joint Structural Division Second Edition June 2016 Preface The Institution of Structural

More information

MLC MASONRY AND BRICK PLASTER SYSTEM. Product. Scope. Appraisal No. 839 [2013] Appraisal No. 839 (2013) BRANZ Appraisals

MLC MASONRY AND BRICK PLASTER SYSTEM. Product. Scope. Appraisal No. 839 [2013] Appraisal No. 839 (2013) BRANZ Appraisals MLC MASONRY AND BRICK PLASTER SYSTEM BRANZ Appraisals Technical Assessments of products for building and construction. Specialized Construction Products Ltd PO Box 101 127 North Shore Mail Centre Auckland

More information

MUNICIPALITY OF MIDDLESEX CENTRE BY-LAW NUMBER

MUNICIPALITY OF MIDDLESEX CENTRE BY-LAW NUMBER 1 MUNICIPALITY OF MIDDLESEX CENTRE BY-LAW NUMBER 2012-008 BEING A BY-LAW RESPECTING CONSTRUCTION, DEMOLITION, CHANGE OF USE AND SWIMMING POOL PERMITS AND INSPECTIONS WITHIN THE MUNICIPALITY OF MIDDLESEX

More information

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 07 Thermal and Moisture Protection 8400 Firestopping

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 07 Thermal and Moisture Protection 8400 Firestopping 1 General 1.1 The bidding requirements, contracting requirements, and applicable parts of Division 1 - General Requirements, as listed in the Table of Contents, shall be included in and made a part of

More information

BULLETIN 34: BUILDING ENVELOPE SERVICES APPROPRIATE PROFESSIONAL PRACTICE

BULLETIN 34: BUILDING ENVELOPE SERVICES APPROPRIATE PROFESSIONAL PRACTICE 200-4010 Regent Street Burnaby BC V5C 6N2 Canada Telephone: (604) 430-8035 Toll Free Canada-wide: 1-888-430-8035 Facsimile: (604) 430-8085 BULLETIN 34: BUILDING ENVELOPE SERVICES APPROPRIATE PROFESSIONAL

More information

Refusal of a code compliance certificate for a building with a monolithic cladding system: House 9

Refusal of a code compliance certificate for a building with a monolithic cladding system: House 9 Refusal of a code compliance certificate for a building with a monolithic cladding system: House 9 1 THE DISPUTE TO BE DETERMINED 1.1 This is a determination of a dispute referred to the Chief Executive

More information

SPECIAL INSPECTION AGREEMENT

SPECIAL INSPECTION AGREEMENT DEVELOPMENT SERVICES DEPARTMENT BUILDING AND SAFETY DIVISION 156 S. BROADWAY, SUITE 130 TURLOCK, CALIFORNIA 95380 PHONE 209-668-5560 FAX 209-668-5107 SPECIAL INSPECTION AGREEMENT PERMIT NUMBER: DATE: OWNER:

More information

Commercial Structures

Commercial Structures Commercial Structures Structural Components Footing Piles Foundation Beams Joists Column Substructure Superstructure Reinforced concrete Re-bar Pre-cast concrete panel Deflection Cantilever Footings A

More information

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6 PROJECT MANUAL for: FRANKLIN VILLAGE APARTMENTS Building I Morristown, NJ 07960 Block: 3901 Lots: 4,5,6 Owner: Atlantic Health Investment Corp. 200 American Road Morris Plains, NJ 07950 Architect NETTA

More information

SECTION LIGHTNING PROTECTION SYSTEM

SECTION LIGHTNING PROTECTION SYSTEM SECTION 16670 - LIGHTNING PROTECTION SYSTEM PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) Code of Practice

Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) Code of Practice Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) Code of Practice CoP 20.0 Safety in Design (Construction) Version 3.0 July 2016 Table of Contents 1. Introduction... 3 2. Training and

More information

Plan Check No. Checked by: An Appointment Is Required for Verification

Plan Check No. Checked by: An Appointment Is Required for Verification SUPPLEMENTAL CORRECTION SHEET UNREINFORCED MASONRY (URM) RETROFIT ( 2002 LABC ) Plan Check No. Checked by: Permit Appl. # An Appointment Is Required for Verification Job Address: For appt. call: APPLICATION

More information

THE FIRE RESEARCH DEPARTMENT

THE FIRE RESEARCH DEPARTMENT HOMEPAGE OFFER BUILDINGS EXPERTISE BUILDINGS EXPERTISE Fire safety Acoustics Protection against water Windows, doors, gates Buildings (structures) Fire alarm system Thermal physics, thermal insulation

More information

[Project Name] Section [ ]

[Project Name] Section [ ] Page 1 PART 1 - GENERAL 1.1 SECTION INCLUDES 1.1.1 Design, labor, products, equipment and services necessary for interior/exterior Aluminum Facade System (AFS) work, in accordance with the Contract Documents.

More information

PROCEDURE FOR REQUESTING A BUILDING PERMIT

PROCEDURE FOR REQUESTING A BUILDING PERMIT PROCEDURE FOR REQUESTING A BUILDING PERMIT A. CHECKLIST OF REQUIREMENTS FOR BUILDING PERMIT APPLICATION: The following checklist indicates the requirements based on the type of Building Permit being requested.

More information

SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE. Product. Scope. Appraisal No. 811 [2013] Appraisal No. 811 (2013) Amended 28 August 2017

SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE. Product. Scope. Appraisal No. 811 [2013] Appraisal No. 811 (2013) Amended 28 August 2017 SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE Amended 28 August 2017 BRANZ Appraisals Technical Assessments of products for building and construction. Sika (NZ) Ltd PO Box 19 192 Avondale Auckland 1746

More information

TERRACE FACTORY - TYPE A1

TERRACE FACTORY - TYPE A1 TERRACE FACTORY - TYPE A1 Total Built-up Size: 3,401 sq ft No. of Units: 24 TERRACE FACTORY - TYPE A1 Total Built-up Size: 3,401 sq ft No. of Units: 24 SPECIFICATION FACTORY HEIGHT Approximately 6.6 meters

More information

Construction Regulations 2014 vs Construction Regulations 2003

Construction Regulations 2014 vs Construction Regulations 2003 Construction Regulations 2014 vs Construction Regulations 2003 By Mark Winter Safe Working Practice Tel: 071 6032213 / 021 7121643 mwinter@safepractice.co.za Why the new Construction Regulations? What

More information

1 P a g e w w w. s m o k e c o n t r o l. c o m. a u

1 P a g e w w w. s m o k e c o n t r o l. c o m. a u PROPRIETARY ITEM: STOPLINE AND AUTOFIRE E60 FIRE WINDOWS AND DOORS FIRE RESISTANT GLASS WINDOWS AND DOORS PROTECTING OPENINGS CLOSE TO BOUNDARIES (BOUNDARY CONTROL TM ) PART 1 - GENERAL 1.01 SUMMARY A.

More information

2/16/17. Copyright Material. A Repair Technician s Guide to the ACI Chapter 10 Quality Assurance. The Big Picture. Who is a Repair Technician?

2/16/17. Copyright Material. A Repair Technician s Guide to the ACI Chapter 10 Quality Assurance. The Big Picture. Who is a Repair Technician? Copyright Material This presentation is protected by US and International copyright laws. Reproduction, distribution, display and use of the presentation without permission of the speaker is prohibited.

More information

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested. Purpose 355 West Queens Road Single Family New Construction Required Inspection Stages Master Requirement GEN 110 Building Department: 604-990-2480, building@dnv.org, fax: 604-984-9683 The following procedure

More information

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017 Premier Inn, Wilson Street, Middlesbrough, TS1 1AE Site progress report February 2017 Site set up Currently 4 weeks in to the build the site has been cleared and hoardings have been erected. Welfare cabins

More information

KEVIN BURNS BUILDING INSPECTIONS REGISTERED BUILDER PRE-PURCHASE VISUAL STRUCTURAL INSPECTION REPORT No. 822

KEVIN BURNS BUILDING INSPECTIONS REGISTERED BUILDER PRE-PURCHASE VISUAL STRUCTURAL INSPECTION REPORT No. 822 KEVIN BURNS BUILDING INSPECTIONS REGISTERED BUILDER 6163 PRE-PURCHASE VISUAL STRUCTURAL INSPECTION REPORT No. 822 CLIENT: Talavera PROPERTY ADDRESS: Mindarie DATE: 20 April 2017 TIME: 9.00am WEATHER: Fine

More information

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) EHS Regulatory Instrument Code of Practice EHS RI - CoP 41.0 Steel Erection Version 2.0 February 2012 ACKNOWLEDGEMENTS With gratitude Abu Dhabi EHS Center

More information

CITY OF DANA POINT WINDOW REPLACEMENTS FOR R-3 B030 WINDOWS

CITY OF DANA POINT WINDOW REPLACEMENTS FOR R-3 B030 WINDOWS CITY OF DANA POINT COMMUNITY DEVELOPMENT BUILDING AND SAFETY 33282 Golden Lantern, Suite 209 Dana Point, CA 92629 949 248-3594 www.danapoint.org WINDOW REPLACEMENTS FOR R-3 B030 WINDOWS 2016 CALIFORNIA

More information

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF)

Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) Abu Dhabi EHSMS Regulatory Framework (AD EHSMS RF) EHS Regulatory Instrument Code of Practice EHS RI - CoP 20.0 Safety in Design (Construction) Version 2.0 February 2012 ACKNOWLEDGEMENTS With gratitude

More information

SECTION ALUMINUM WINDOWS

SECTION ALUMINUM WINDOWS SECTION 08520 ALUMINUM WINDOWS PART 1 - GENERAL 1.01 SUMMARY A. Section includes: 1. Storefront systems and aluminum framed glass doors. 2. Hardware, fasteners, accessories, filler pieces, etc., required

More information

HEALTH AND SAFETY CONTRACT BETWEEN EMPLOYER AND MANDATORY (CONTRACTOR) SECTION 37(2) OF THE OHS ACT, ACT 85 OF 1993

HEALTH AND SAFETY CONTRACT BETWEEN EMPLOYER AND MANDATORY (CONTRACTOR) SECTION 37(2) OF THE OHS ACT, ACT 85 OF 1993 P a g e 1 SUBJECT ISSUED BY APPROVED BY CONTRACT CONTRACT BETWEEN EMPLOYER AND MANDATORY SAFETY MANAGER: SUN CITY RESORT DIRECTOR OF OPERATIONS PAGE 1 OF 15 EFFECTIVE: REVISION NO: 1 HEALTH AND SAFETY

More information

National Roads Authority

National Roads Authority Project nr 2008-1/049 Belfast: 22-23 June 2009 Presentation to Trans-national Workshop NRA: Maintenance and repair of bridges Albert Daly National Roads Authority, IRELAND Investing in our common future

More information

Edgewater Service Ltd

Edgewater Service Ltd C/- BBC Strata Management Suite 42, 738 Burke Road CAMBERWELL 3124 GUIDELINES FOR THE ENCLOSURE OF A BALCONY Attached are the following documents: 1. Attachment 1: Requirements and Conditions for Enclosure

More information

BUILDING A NEW HOME. Construction Permit Tips For Home Owners

BUILDING A NEW HOME. Construction Permit Tips For Home Owners BUILDING A NEW HOME Construction Permit Tips For Home Owners This publication provides guidelines for constructing a detached singlefamily home. The code requirements herein are not all inclusive and should

More information

Determination 2013/061

Determination 2013/061 Determination 2013/061 Regarding the issuing of two notices to fix in respect of the code-compliance of a two-coat plaster cladding system to an 11-year-old motel complex at 23/25 Havelock Road, Havelock

More information

SafeDeck Supported Scaffold System

SafeDeck Supported Scaffold System SafeDeck Supported Scaffold System Table of Contents Origination 1 Range of Motion 1 Installation Efficiency 2 Third-Party Testimonial 2 SafeDeck Specifications 3 Competent Person 4 Tools Required 4 Components

More information

EXECUTION REQUIREMENTS

EXECUTION REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: Execution requirements. B. Related Requirements: 1. Specification Sections 2 through 49. PART 2 - PRODUCTS (Not Used). PART 3 - EXECUTION 3.1 SAFETY 01

More information

HALIFAX REGIONAL MUNICIPALITY BY-LAW NUMBER B-201 RESPECTING THE BUILDING CODE

HALIFAX REGIONAL MUNICIPALITY BY-LAW NUMBER B-201 RESPECTING THE BUILDING CODE HALIFAX REGIONAL MUNICIPALITY BY-LAW NUMBER B-201 RESPECTING THE BUILDING CODE BE IT ENACTED by the Council of the Halifax Regional Municipality under the authority of the Building Code Act as follows:

More information

City of Pekin- Zoning and Inspections Department 111 S. Capitol Street, Pekin, Illinois (309)

City of Pekin- Zoning and Inspections Department 111 S. Capitol Street, Pekin, Illinois (309) COMMERCIAL, INDUSTRIAL & MULTI-FAMILY RESIDENTIAL PROJECTS GENERAL INFORMATION The provisions of the International Building Code, 2006 Edition as amended by the City of Pekin adopting ordinance, shall

More information

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER THE CORPORATION OF THE MUNICIPALITY OF SOUTH HURON 322 Main Street South, P.O. Box 759, Exeter, Ontario N0M 1S6 PHONE: (519) 235-0310 FAX: (519) 235-3304 TOLL FREE: 1-877-204-0747 WEBSITE: www.southhuron.ca

More information

A. Section includes fluid applied, vapor permeable membrane air barriers.

A. Section includes fluid applied, vapor permeable membrane air barriers. Master Construction Specifications Insert Project Name SECTION 072726 FLUID APPLIED MEMBRANE AIR BARRIERS PART 1 GENERAL 1.1 SUMMARY A. Section includes fluid applied, vapor permeable membrane air barriers.

More information

Structural Assessment and NDT Procedures

Structural Assessment and NDT Procedures Structural Assessment and NDT Procedures Mohd. Saleh Jaafar Seminar on Concrete Repair and Rehabilitation of Concrete Structures Pusat Kecemerlangan Kejuruteraan & Teknologi JKR (CREaTE), Alor Gajah, Melaka

More information

INSPECTOR GROUP PTY LTD

INSPECTOR GROUP PTY LTD Website: http://www.inspectorgroup.com.au Inspector's email: peter@inspectorgroup.com.au Inspector: Peter Hopfinger Building Surveyor & Timber Pest Inspector Registration Number: 2194 Mob: 0414 607 240

More information

Evaluation Report CCMC R Icynene ProSeal Air Barrier System

Evaluation Report CCMC R Icynene ProSeal Air Barrier System Evaluation Report CCMC 14052-R Icynene ProSeal Air Barrier System MasterFormat: 07 27 09.01 Evaluation issued: 2016-12-23 Re-evaluation due: 2019-12-23 1. Opinion It is the opinion of the Canadian Construction

More information

INTERNSHIP REPORT GOUTHAM.J

INTERNSHIP REPORT GOUTHAM.J INTERNSHIP REPORT GOUTHAM.J M.E Structural Engineering SNS College of Technology, Coimbatore Mail : tcegoutham@gmail.com TEEMAGE PRECAST IN College Road, 1st Cross Street, Tirupur 641602. TamilNadu, India.

More information

Scale Drawing This drawing will need to show the full lot and location of the proposed

Scale Drawing This drawing will need to show the full lot and location of the proposed Fence & Hedge Agreement This document is required to install a fence on your property line or within three feet from the property line. Your abutting neighbors will need to agree to the fence placement.

More information

MCMI RIBA MRICS MBIFM FCIOB

MCMI RIBA MRICS MBIFM FCIOB Building Maintenance Brian Wood, DipArch MCMI RIBA MRICS MBIFM FCIOB Department of Real Estate and Construction School of the Built Environment Oxford Brookes University )WILEY-BLACKWELL A John Wiley &

More information

Guideline for Building Envelope Commissioning: New Buildings

Guideline for Building Envelope Commissioning: New Buildings Guideline for Building Envelope Commissioning: New Buildings Introduction Building envelope failures may arise from inadequacies in the design, construction and operation of buildings and appear to be

More information

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT STRUCTURAL FOR CORNER HOUSE AUG 2014 i P a g e Table of Contents 1. INTRODUCTION... 3 1.1 Design Criteria and Specifications...

More information

Mondol Fabrics Ltd. Nayapara,kasimpur, Gazipur ( N, E0) 8th March 2014

Mondol Fabrics Ltd. Nayapara,kasimpur, Gazipur ( N, E0) 8th March 2014 Mondol Fabrics Ltd Nayapara,kasimpur, Gazipur (23.990028N, 90.317336E0) 8th March 2014 1 2 Observations 3 Column Stresses in Toilet Area North of Building Cursory calculations indicate that column size

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 014000 - QUALITY REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes administrative and procedural requirements for quality assurance and quality control. B. Testing and inspecting services

More information

Regarding the refusal to issue a code compliance certificate for a 13-year-old house at 14 Patsy O Hara Place, Swanson, Auckland

Regarding the refusal to issue a code compliance certificate for a 13-year-old house at 14 Patsy O Hara Place, Swanson, Auckland Determination 2011/077 Regarding the refusal to issue a code compliance certificate for a 13-year-old house at 14 Patsy O Hara Place, Swanson, Auckland 1. The matter to be determined 1.1 This is a determination

More information

BLOCKWORK All reinforced concrete blockwork is be constructed in accordance with AS 3700 and a relevant engineers report. A damp proof course ( DPC ) is to be provided 150mm above ground. BRICKWORK All

More information

AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7

AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7 AIRWAYS CROSSING PHASE II BUILDING INFORMATION 5305 McCall Way N.E. T2E 7N7 www.airwayscrossing.ca Excellent access to Barlow Trail/McKnight Blvd. Bays starting at 4,000 sq. ft. Surface loading T5 lighting

More information

CERTIFICATE OF CONFORMITY This product Certificate is issued under Section 269 of the Building Act 2004 for:

CERTIFICATE OF CONFORMITY This product Certificate is issued under Section 269 of the Building Act 2004 for: Product Description Page 1 of 6 1. The is a cavity-based external wall cladding system for residential and light commercial type buildings where domestic construction techniques are used. 2. The system

More information

Gensler 2014/06/16 Hertz Global Headquarters ISSUE FOR BUILDING PERMIT Estero, Florida SECTION

Gensler 2014/06/16 Hertz Global Headquarters ISSUE FOR BUILDING PERMIT Estero, Florida SECTION SECTION 072700 VAPOR PERMEABLE AIR BARRIER LIQUID MEMBRANE PART 1 GENERAL 1.1 GENERAL REQUIREMENTS A. The Work of this Section, as shown or specified, shall be in accordance with the requirements of the

More information

Minimum Standards for Construction of Aircraft Hangars MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS

Minimum Standards for Construction of Aircraft Hangars MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS Minimum Standards for Construction of Aircraft Hangars ARTICLE 1. MINIMUM STANDARDS FOR CONSTRUCTION OF AIRCRAFT HANGARS Section 1. - Purpose Section 2. - Goals Section 3. General Provisions Section 4.

More information

SIMULATED OFFICE PROJECT 2008 TECHNICAL REPORT

SIMULATED OFFICE PROJECT 2008 TECHNICAL REPORT SIMULATED OFFICE PROJECT 2008 TECHNICAL REPORT NEW FACILITY FOR ADULT BASIC EDUCATION AND VOCATIONAL TRAINING By Leigh Hartl Student Number: 207514952 A Report Submitted in Partial Fulfilment of the Requirements

More information

Uncovered Decks & Porches

Uncovered Decks & Porches Uncovered Decks & Porches Building Guides for Homeowners Why Do I need a Permit? D I D Y O U K N O W? As owner-builder you are the responsible party of record on such a permit. If your work is being performed

More information

THE CONSTRUCTION SUPERVISOR

THE CONSTRUCTION SUPERVISOR City of Aurora Building Inspections 15151 E Alameda Pkwy Aurora, CO 80012 (303) 739-7420 THE CONSTRUCTION SUPERVISOR When a building permit has been issued for any construction within the City, the Supervisor

More information

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT Revised 04-19-2016 ST. TAMMANY PARISH REQUIRED INSPECTION STANDARDS AND PROCEDURES Permit Number I acknowledge receipt of and understand the below inspection requirements. I also acknowledge that by acting

More information

2016 Port of San Francisco Building Code

2016 Port of San Francisco Building Code PORT CODE PROCEDURE NO. : DATE : December 5, 2012 SUBJECT : Permit Process; Inspection TITLE : Special Inspection and Structural Observation Procedures PURPOSE : The purpose of this Port Code Procedure

More information

Oil and Gas Contractor QA/QC Plan Sample Selected pages (not a complete plan)

Oil and Gas Contractor QA/QC Plan Sample Selected pages (not a complete plan) Oil and Gas Contractor QA/QC Plan Sample Selected pages (not a complete plan) Part 1: Project Specific Quality Plan Part 2: Quality Manual Part 3: Submittal Forms Part 4: Inspection Checklist Forms Contact:

More information

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT

EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT Plot No.: 74-77, Sector -02, Karnaphuli EPZ North Patenga, Chittagong Chittagong Chittagong Bangladesh The Alliance for Bangladesh Worker Safety Page 1/11

More information

DryScan Limited was engaged to complete a Pre-Purchase Scan only moisture ingress thermal imaging inspection for Joe Blogs at 8 Anywhere, Auckland.

DryScan Limited was engaged to complete a Pre-Purchase Scan only moisture ingress thermal imaging inspection for Joe Blogs at 8 Anywhere, Auckland. Infrared Inspections DryScan Limited PO Box 869, Whangaparoa, Auckland 0943 Free phone: 0800-DRYSCAN ~ Mobile: 021 892 056 ~ Fax: 0064 9 421 1792 Email: bryce@dryscan.co.nz 6 th March 2012 Joe Blogs 8

More information

Introduction of a Japan Concrete Institute Guideline: Practical Guideline for Investigation, Repair and Strengthening of Cracked Concrete Structures

Introduction of a Japan Concrete Institute Guideline: Practical Guideline for Investigation, Repair and Strengthening of Cracked Concrete Structures Journal of Civil Engineering and Architecture 9 (2015) 213-224 doi: 10.17265/1934-7359/2015.02.010 D DAVID PUBLISHING Introduction of a Japan Concrete Institute Guideline: Practical Guideline for Investigation,

More information

Building Standards Customer Journey

Building Standards Customer Journey Building Standards Customer Journey Are you doing building work or home improvements? If so, this guide is for you. Building Standards Customer Journey Contents 2 Contents Building Standards Customer Journey

More information

Proud of its Heritage, Preparing for its Future

Proud of its Heritage, Preparing for its Future TUSTIN Proud of its Heritage, Preparing for its Future USER GUIDE FOR THE REROOFING OF BUILDINGS Revised August 2013 PURPOSE This user guide describes the City of Tustin s requirements regarding reroofing

More information

SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION. Project Address:

SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION. Project Address: SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION Permit Application #: Project Address: Purpose: To meet the requirements of CBC Section 1704.3 this form may be used as a statement

More information

HOW TO OBTAIN A BUILDING PERMIT

HOW TO OBTAIN A BUILDING PERMIT HOW TO OBTAIN A BUILDING PERMIT A GUIDE TO THE HOMEOWNER Copies of this Guide can be obtained from the Building Department upon request THE CORPORATION OF THE TOWNSHIP OF GEORGIAN BAY BUILDING DEPARTMENT

More information

Home Inspection Report. Home Inspection Report DRAFT ONLY

Home Inspection Report. Home Inspection Report DRAFT ONLY Cover Page Home Inspection Report Home Inspection Report Inspection prepared for: Date of Inspection: 26/1/2017 Time: 10.00am-12.01pm Age of Home: 1980's Size: Approx 90sqm Inspector: Phone: 021 064 8604

More information

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings

ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings ACCESSORY STRUCTURE Building permit information For 1 & 2-family dwellings Building Safety Department 400-2 nd Street South St. Cloud, MN 56301 (320) 255-7239 A building permit is required for any accessory

More information