Cryogenic Pipe Support Systems
|
|
- Joella Burns
- 6 years ago
- Views:
Transcription
1 Cryogenic Pipe Support Systems Overview Rilco cryogenic pipe supports are developed to support cold piping in various applications ranging from chilled water to liquefied natural gas. The qualified service temperature is from -425º F (-253º C) to 275º F (35º C). Rilco cryogenic supports are the latest technology in cold pipe support systems. These supports are an innovative design that utilizes the most efficient and cost effective materials that provide long-term energy savings. Since the supports are pre-insulated the expensive process of welding to pipe is eliminated and leads to labor cost savings since our installation process has been completely streamlined. Furthermore, the threat of CUI (corrosion under insulation), or any associated field corrosion problem, has also been eliminated with the implementation of Rilco s latest cryogenic support technology. Each support is individually packaged and is shipped completely assembled and ready for installation. Cryogenic Product Lines Pre-Insulated Pipe Shoes Anchors and Guide Isolation blocks Micarta blocks, sleeves, and washers Ployurethane foams ( lbs, 8 lbs, lbs, 2 lbs, 3 lbs density) Foam Glass Insulation Mascoat (insulation paint for personnel protection) Benefits of Rilco Cryogenic Pipe Supports Prevents the formation of condensation on/around the piping system Prevents moisture ingress into the piping insulation Preserves the process temperature of the fluid in the pipe Prevents the chilling of the supporting structure Eliminates welding high-cost alloy supports to alloy piping Eliminates galvanic corrosion due non compatible materials between pipe and support Significant energy savings Each unit is shipped completely assembled and ready for installation reducing the installation costs General Information Insulation is molded to the thickness and layering of process line insulation to ensure proper field fit per ASTM C585 Rilco polyurethane foam is a carbon dioxide blown system and contains no environmentally hazardous materials Each unit is individually bagged to protect against damage in shipping and storage Design temperature ranges: -425º F (-253º C) to 275º F (35º C) 5% closed cell content Water absorption:.5 lb./cubic ft Test results accurate to within +/- %
2 Support Designs Design Drawing Description Resting Pre- Insulated supports that restrain the pipe vertically, but allow axial and lateral movement. Guided Insulated supports that restrain the pipe vertically and laterally, but allow axial movement. Anchor Clamp Hanger Guide clips or vertical guide members are provided with these designs which are attached to the supporting structure and restrain the lateral movement of the support. Insulated supports that restrain the pipe vertically, laterally, and axially. Anchor supports are provided with guide clips that prevent lateral movement. Insulated supports that restrain the pipe vertically by using an insulated pipe clamp. The pipe is supported by the clamp and the insulation is located between the clamp and the pipe. Support Components Type Photo Description High Density Polyurethane Foam One of the best materials for cold insulation. Rilco produces various density supports and can also customize the density to specific project needs. The foam section can be stepped both radically and longitudinally to tie in with the same layering thickness as the line insulation to prevent straight heat path to the pipe. Vapor Barriers Protective Mastic Outer Sheet Metal Jacket Steel Housing with For alternative insulation options contact a Rilco sales representative. A paper or plastic back sheet that wraps 3 around the foam section that protects against moisture ingress. The vapor barrier is glued to the foam and overlaps the joint between the two insulation halves by at least in/25 mm. If pipe supports are installed before the insulation is installed, we will apply protective mastic on the exposed surfaces of the supports to protect from the weather conditions until the insulation installation is completed. The metal jacket is typically wrapped around the foam section and outside the vapor barrier and is a typical feature on most Rilco designs. Designed to provide adequate support for the insulation section
3 Base Components while properly transferring the load to be restrained to the supporting structure. Selecting the Correct Support º RADIAL SINGLE LAYER IS- IG--SLR IG--SLS INSUL-GUIDE DOUBLE LAYER IG--DLR 8º RADIAL SINGLE LAYER DOUBLE LAYER IG-8-SLR IG-8-DLR FLAT SURFACE 3º RADIAL CF- CF-2 CF-4 CF-4 RESTING 8º RADIAL CF-3 CF-3 ROLLER 3º RADIAL 8º RADIAL CR-4 CR-4 CR-3 CR-3 BASE TYPE SLIDING LATERAL TRAVEL + - 2" LATERAL TRAVEL VARIABLE AXIAL TRAVEL + -.5" AXIAL TRAVEL + -.5" CS- CS- CS-2 CS-2 CS-5 CS-5 CS- CS- BOLTED ANCHOR CA- CA-2 ANCHOR WITH GAP CA- CA-2 ANCHOR ANCHOR CLIPS STRUCTURAL GUIDE CA-4 CA-4 CA-4 CA-4 INSUL-CERT ANCHOR CA-5 VERTICAL RESTRAINT CA- GUIDED GUIDE CLIPS AXIAL TRAVEL + -.5" CG-3 CG-3 CG-4 CG-4
4 STRUCTURAL GUIDE ANGLE GUIDE INSULATION BLOCK AXIAL TRAVEL + -.5" AXIAL TRAVEL + -.5" BLOCK ASSEMBLY CG-3 CG-3 CG-4 CG-4 CG-7 CG-7 CG-8 CG-8 CB- CB-2 RISER CLAMP CV-2 CV-2 HALF CLAMP CH-2 CH-2 HANGER TYPE BOLTED CLAMP CLEVIS 3º RADIAL CH- CH- CC- CC-2 CC-4 CC-4 8º RADIAL CC-3 CC-3 Test Results Sampl e Density lb/ft kg/m ³ ³ Temperatu re Deformati Compressive stren on in % of Compressiv e 2% deformatio n thickness kg/c Fº Cº lb. kg. psi kg/cm² psi m² Compressiv e strength w/5: safety factor kg/c psi m² lb. pe r cu. ft % % % %
5 % A % % lb. pe r cu. ft % % % % A % % lb. pe r cu. ft % % % % A % lb. pe r cu. ft. 2A A A % % % A %
6 - 3 2A % A % Specifications A. Scope i. This specification covers the requirements for design, fabrication, and use of load bearing low temperature insulated pipe supports. [Applicable temperature range of - 475º F (-28º C) to 275ºF (35º C)] B. General Requirements i. All insulated piping will be supported with insulated pipe supports ii. Insulated pipe supports will comply with the latest edition of the following: iii. iv. ANSI/ASME B3. & B3.3 Manufactures Standardization Society (MSC) SP- 58,, & 8 Considerations will be given to the following criteria in the selection of insulated pipe supports: Vertical, lateral, and axial support design load limits Vertical, lateral, and axial support design travel limits Support temperature design limit both at the pipe and support outside ambient temperature Any test or installation loadings or displacements that may exceed normal system operating conditions Required dimensional clearances needed during installation and system operation should be specified Localized lugs and pipe stresses for insulated pipe supports requiring lugs or welded attachments welded to the pipe o Material of the welded attachments should be compatible with the pipe Consideration should be given to loadings and displacement resulting from seismic, water hammer, and similar conditions At the request of the owner or his/her designee, calculations and other related documentation that demonstrate adequacy and compliance with the design requirements will be made available for his/her review v. At the request of the owner or his/her designee, localized stress calculations for lugs vi. C. Design Criteria or other welded pipe attachments shall be made available for his/her review Any special requirements, such as material test reports, or certified mill test reports, need to be specified in advance
7 i. The load bearing insulating material used in the supplied insulated support should be of the same material that was used to load rate the support ii. At the request of the owner or his/her designee, supplier will make available compressive strength and thermal conductivity testing results of high density polyurethane by an independent laboratory in a format provided for in MSS SP-8. [Testing of material shall take place at a maximum temperature of -2º F (-7º C)] iii. At the request of the owner or his/her designee, a description of the basis used to load rate the insulated pipe support should be provided for evaluation iv. A minimum safety factor of 5 at the system design temperature will be used to determine the insulate pipe support load rating v. The testing used to establish load bearing insulation compressive properties will comply with ASTM D 2: Standard Test Method for Compressive Properties of Rigid Cellular Plastics vi. The testing used to establish thermal conductivity properties of high density polyurethane will comply with ASTM C 77-85: Steady State Heat Flux Measurement and Thermal Transmission Properties by Means of the Guard Hot Plate Apparatus vii. The load bearing element load capacity shall be demonstrated at the piping system design temperature and load viii. The insulated pipe support assembly should exert a minimum clamping force on the pipe to assure that the assembly will move axially with the pipe and not slip relative to the pipe when subjected to the design conditions ix. All sliding surfaces will be designed in such a manner as to limit the coefficient of friction to. for the system design life without requiring lubrication x. Care shall be exercised in the selection of the sliding surface material to assure that corrosion of the sliding surface will not adversely affect the coefficient of friction over time xi. Any friction reducing material used that requires bonding shall be bonded to the backing structure prior to shipment & lb/ft 3 foam:. BTU-in/hr-ft²-º F (.23 W/meter*K) 5 lb/ft 3 foam:.2 BTU-in/hr-ft²-º F (.238W/meter*K) 2 lb/ft 3 foam:.25 BTU-in/hr-ft²-º F (.35 W/meter*K) xii. High density polyurethane will not contain (or use during fabrication) environmentally hazardous CFCs D. Fabrications i. Insulated pipe supports Requirements: Pre-assembled with sufficient insulation extending beyond the support outer metal jacket to allow the pipe insulator to make a standard insulation butt joint Exposed surfaces should be coated with a mastic to protect the foam from moisture and ultraviolet light degradation [mastic perm rating <=.2 (ASTM E-)]
8 A vapor barrier between the jacket and the insulating material with [Vapor barrier perm rating <=.2] Insulation ID and OD dimensions per ASTM Specification C585 unless otherwise specified ii. Designs with sliding surfaces will incorporate two slide plates at each sliding surface Each slide plate shall be composed of a 3/32" (2.5 mm) thick glass-filled reinforced Teflon that is bonded to a GA. carbon steel backing plate On these to be welded plates, the Teflon should be recessed /4" (.5 mm) from the edge iii. All welding shall comply with the requirements Section IX of the ASME Boiler and Pressure Vessel code and AWS D. iv. The following items will be in accordance with the following (unless otherwise noted on contract drawings): Structure shape and plate: ASTM A-3 Bolts/studs greater than /4": ASTM A-3 Grade B7 Bolts and nuts less than or equal to /4": ASTM A-37 E. Shipping and Handling i. Each insulated support assembled should be clearly and permanently marketing with the support identification number ii. The identification number should be placed in a location that is visible before and after installation iii. Supports should be shipped in either reinforced cardboard or strap board crated with a cover iv. Each container should be clearly marked with a unique number and each support should individually wrapped by plastic sheets v. Each container will have two copies of the packing slip [one copy packed inside and another taped on the outside] vi. Prior to installation the supports will be stored in a dry, covered area to avoid exposure to sunlight, rain, and moisture F. Extent of Work i. Work included: Furnish the insulated pipe support assembly Encompass the insulating materials, metal jacket, fabricating steel housing, guide clips, associated hardware including clamps, bolts and nuts, screws, slide plates and other components required for complete assembly ii. Work not included: Structural steel parts which are not integral parts of the insulated pipe support assembly Receiving, unloading and installing of the insulated pipe supports.
Suggested Insulation Layering Chart
Insulation Layering At Piping Technology and Products, we recommend multiple layers for cold shoe supports that have a total insulation thickness of four inches or greater. In the field, cold shoes are
More information. SECTION HANGERS AND SUPPORTS
. SECTION 230529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division I Specification
More informationSECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
SECTION 220529 - HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The General Conditions, Special Conditions and Division 1 through Division 22 as set forth in
More informationSECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
SECTION 220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationSUPERIOR CAL-SHIELDS Features & Benefits FAST
SUPERIOR CAL-SHIELDS Features & Benefits FAST One-piece hinged construction Insulation, vapor barrier and G-90 galvanized steel shield in one unit. Butt-and-go Insulation extends beyond the steel shield
More informationSECTION HANGERS AND SUPPORTS PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section.
1.01 RELATED DOCUMENTS SECTION 15060 HANGERS AND SUPPORTS PART 1 - GENERAL A. Drawings and Division 1 Specification Sections, apply to this Section. 1.02 SUMMARY A. This Section includes hangers and supports
More informationSECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
SECTION 220529 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Steel pipe hangers and supports. 2. Metal framing systems. 3. Thermal-hanger shield inserts. 4. Fastener systems.
More informationSECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
PART 1 GENERAL SECTION 22 0553 - IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 1.01 SECTION INCLUDES A. Pipe markers. 1.02 REFERENCE STANDARDS A. ASME A13.1 - Scheme for the Identification of Piping
More informationNORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS
PART 1 GENERAL 1.01 SUMMARY Section 15140 PIPE HANGERS, This Section includes the furnishing and subsequent installation of: A. Pipe and equipment hangers, supports, and associated anchors B. Equipment
More informationSECTION HANGERS AND SUPPORTS FOR PLUMBING
SECTION 22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationCRYOGENIC SUPPORTS INTRODUCTION
1 2 3 4 INTRODUCTION Pipe Supports Group has developed a range of cryogenic products to meet the varying requirements of both the Piping and the Pipe Supporting Engineers. Our solutions provide options
More information.1 ANSI/ASME B31.1, Power Piping, (SI Edition)..2 American Society for Testing and Materials (ASTM)
Fitness Facility Addition Page 1 PART 1 GENERAL 1.1 RELATED SECTIONS.1 Section 03300 - Cast-in-Place Concrete.2 Section 05121 - Structural Steel for Buildings.3 Section 05500 - Metal Fabrications 1.2 REFERENCES.1
More informationCRYOGENIC SUPPORTS INTRODUCTION
1 2 3 INTRODUCTION Pipe Supports Group has developed a range of cryogenic products to meet the varying requirements of both the Piping and the Pipe Supporting Engineers. Our solutions provide options that
More informationIsolation vs Insulation:
PIPE SUPPORTS ASIA CRYOGENIC FACTORY 260 Introduction Pipe Supports Group has developed a range of cryogenic products to meet the varying requirements of both the Piping and the Pipe Supporting Engineers.
More informationUBC Technical Guidelines Section Edition Insulation of Tanks, Steam and Condensate Piping Page 1 of 6
Page 1 of 6 1.0 GENERAL 1.1 Related UBC Guidelines.1 Refer to Division 33 and Division 23 - Underground Steam and Condensate Piping.2 Refer to Division 23 - Steam and Condensate Piping Above Grade.3 Section
More informationHANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
13686.00 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 230529-1 SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT 1.1 SUMMARY A. Section Includes: 1. Metal pipe hangers and supports.
More informationNORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section PIPE AND EQUIPMENT INSULATION
PART 1 GENERAL 1.01 SUMMARY Section 15145 This Section includes insulation for piping and equipment as called out on the Plans. 1.02 MEASUREMENT AND PAYMENT No separate payment will be provided for the
More informationDaytona Beach Pier Building Renovation Jun 2010
SECTION 15060 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationSECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
Page 220529-1 SECTION 220529 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationA. Section Fire Procection, HVAC & Plumbing Penetration Firestopping. B. Section Interior Painting: Painting insulation jacket.
SECTION 230719 - HVAC PIPING INSULATION PART 1 GENERAL 1.1 SECTION INCLUDES A. Piping insulation. B. Jackets and accessories. 1.2 RELATED REQUIREMENTS A. Section 07813 - Fire Procection, HVAC & Plumbing
More informationSECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
SECTION 220529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationA. Deliver material to job site in original, nonbroken, factory packaging, labeled with manufacturer's density and thickness.
SECTION 15250 PIPING AND EQUIPMENT INSULATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract including General and Supplementary Conditions, Division 1 Specification
More informationDavid Baker Piping Technology & Products. NIA s 62nd Annual Convention Sheraton Grand at Wild Horse Pass March 29 April 1, 2017
David Baker Piping Technology & Products NIA s 62nd Annual Convention Sheraton Grand at Wild Horse Pass March 29 April 1, 2017 Piping Technology & Products, Inc. Piping Technology & Products, Inc. (PT&P)
More informationA. Compatibility: Products shall be suitable for piping service fluids, materials, working pressures, and temperatures.
SECTION 23 05 16 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationValue Engineered Products
Value Engineered Products VEP Continuously Strives For Excellence In Our People, Product, Process And Service 756 S. Jason Street, Suite 17 Denver, Colorado 80223 Phone (303) 715-9990 Fax (303) 715-9991
More informationEast Central College HANSEN HALL LEVEL 300/400 RENOVATIONS CONSTRUCTION PACKAGE
SECTION 220529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationPIP PNC00001 Pipe Support Criteria for ASME B31.3 Metallic Piping
July 2017 Piping PIP PNC00001 Pipe Support Criteria for ASME B31.3 Metallic Piping PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities, this Practice
More information1.2 ACTION AND INFORMATIONAL SUBMITTALS.1 Provide submittals in accordance with Section Submittal Procedures.
BID OPPORTUNITY NO. 253-2011 PAGE 1 OF 7 PART 1 GENERAL 1.1 REFERENCES.1 American Society of Mechanical Engineers (ASME).1 ASME B31.1, Power Piping, B31.3 Process Piping, B31.9 Building Services Piping..2
More informationPolycrete Big Block Standard Specification
Polycrete Big Block Standard Specification SECTION 03 11 19 INSULATED CONCRETE FORMING 10/13 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent
More informationThis specification describes the minimum requirements for industrial thermal insulation.
016/09/7 1/7 1.0 PURPOSE This specification describes the minimum requirements for industrial thermal insulation. Read it in conjunction with the applicable insulation and insulation finish specifications
More informationSECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
SECTION 230529 - HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and other Division 1 Specification Sections,
More informationUNIVERSITY SERVICES ANNEX James Madison University Harrisonburg, Virginia State Project Code: Architect s Project Number:
SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Provisions of the Contract and of the Contract Documents apply to this Section. 1.2 DEFINITIONS
More informationHANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
SECTION 23 05 29 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply
More informationINSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS
INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS Dyplast Products Copyright 2014 1 Rev 0414 DYPLAST PRODUCTS INSTALLATION GUIDELINES ISO-C1 POLYISOCYANURATE
More informationINSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS
INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS Dyplast Products Copyright 2018 1 Rev 0618 DYPLAST PRODUCTS INSTALLATION GUIDELINES ISO-C1 POLYISOCYANURATE
More informationITW INSULATION SYSTEMS
ITW INSULATION SYSTEMS 1SCOPE TRYMER RIGID POLYISOCYANURATE INSULATION IN LIQUEFIED NATURAL GAS APPLICATIONS (Cryogenic to -70 F) 1.1 This guideline covers the installation of TRYMER Rigid Polyisocyanurate
More informationENVIROBEAM SECTION ENVIRO-ROOF CURBS
SECTION 077213 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: Manufactured, structurally engineered, thermally-insulated, thermally-broken, cold-formed patented roof curbs, all of which can be insulated
More information05510: TAPERED STEEL TROLLEY POLES AND ACCESSORIES
PART 1 GENERAL 1.01 DESCRIPTION A. The Vendor shall fabricate, furnish, test and deliver tapered steel trolley poles, including base plates, reinforced hand holes, anchor bolts, nuts and washers, and accessories
More informationSECTION HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationFIRE STATION 55 June 14, 2010
SECTION 15250 MECHANICAL INSULATION PART 1 - GENERAL 1.01 DESCRIPTION A. Work Includes 1. Insulation of Domestic Water Piping. 2. Pipe Insulation of refrigerant piping. 3. Insulation of ductwork. 4. Aluminum
More informationInsulating Cellular Concrete Steel Joists Painting. A. America Society for Testing and Materials (ASTM):
SECTION 05120 STRUCTURAL STEEL PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03342 - Insulating Cellular Concrete. 2. 05210 - Steel Joists. 3. 09900 - Painting. 1.02 REFERENCES A. America Society
More informationSept 30, 2004 Page 1
Sept 30, 2004 Page 1 This section includes a manufacturer's guide specification for TERRAFOAM EPS building insulation. Refer also to Product Description for detailed product properties, options, and other
More information(Rev. 2000) STANDARD
202-96 (Rev. 2000) STANDARD For Flexible Fiber Glass Insulation to be Laminated for Use in Metal Buildings www.naima.org NAIMA 202-96 STANDARD (Rev. 2000) For Flexible Fiber Glass Insulation to be Laminated
More informationITW INSULATION SYSTEMS
ITW INSULATION SYSTEMS 1SCOPE TRYMER RIGID POLYISOCYANURATE INSULATION IN LIQUEFIED NATURAL GAS APPLICATIONS (-260 F) 1.1 This guideline covers the installation of Trymer* Rigid Polyisocyanurate Insulation
More informationSECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
SECTION 22 0529 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions
More informationSECTION HVAC INSULATION
PART 1 GENERAL 1.1 SUMMARY SECTION 23 07 00 HVAC INSULATION A. Section Includes: 1. Ductwork insulation. 2. Duct liner. 3. Insulation jackets. 4. Equipment insulation 5. Piping system insulation. 6. Insulation
More informationACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT
ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT Specification for Acoustical Insulation (Lagging) for Piping and Equipment 1 of 5 TABLE OF CONTENTS 1.0SCOPE..... 3 2.0REFERENCED PUBLICATIONS...
More informationPRICES: DESIGN: TAXES:
CLICK HERE TO START TERMS AND CONDITIONS AGREEMENTS: All agreements are subject to strikes, accidents or other causes beyond our control. GUARANTEE: We guarantee for one year from date of delivery our
More informationINSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER
INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER Dyplast Products Copyright 2012 1 Rev 0112 DYPLAST PRODUCTS
More informationSECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION
Page 210500-1 SECTION 210500 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationPTFE Pipe Slide Assemblies
PTFE Slide Assemblies Overview Application Anvil PTFE pipe slide assemblies are designed to support the pipe and provide for lateral and axial movement due to thermal expansion and contraction of the piping
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB #
SECTION 26 0529 - HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
More informationPERMATHERM PIPE INSULATION PRODUCTS
PERMATHERM PIPE INSULATION PRODUCTS PERMATHERM, INC. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.pipe-insulation.net September 2012 This Specification Guideline in the 3-Part Format
More informationCommission No Section
Commission No. 1511 Section 05120-1 PART ONE - GENERAL 1.1 DESCRIPTION A. Work Included: Structural steel and grout. Furnish, fabricate, mark for erection identification, pack, crate, or otherwise properly
More informationSECTION VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT
Page 220548-1 SECTION 220548 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationSECTION VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT
SECTION 230548 - VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary
More informationSECTION METAL FLOOR PLATE STAIRS
SECTION 05513 - METAL FLOOR PLATE STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More information1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.
SECTION 05500- METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationCONTENTS - THERMAL, COLD & CRYOGENIC SUPPORTS... C-1 C-2 - PREINSULATED CLAMP BASE... C-3 - PREINSULATED CLAMP FOR HANGER... C-4
CONTENTS - THERMAL, COLD & CRYOGENIC SUPPORTS... C-1 - PREINSULATED SADDLE... - PREINSULATED CLAMP BASE... - PREINSULATED CLAMP FOR HANGER... - PREINSULATED AXIAL STOP... - HIGH STRENGTH AXIAL STOP...
More informationINSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS
INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS TRYMER RIGID POLYISOCYANURATE INSULATION IN HOT APPLICATIONS (80 F to 300 F) 1 SCOPE 1.1 This guideline covers the installation of TRYMER
More informationMechanical Insulation for Refrigeration Systems
Mechanical Insulation for Refrigeration Systems INDUSTRIAL REFRIGERATION CONSORTIUM RESEARCH & TECHNOLOGY FORUM MAY 2-3, 2012 Peter Gauchel, President/CEO L&C Insulation Inc. Overview Current trends in
More informationStructural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)
Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction
More information(Rev. 2000) STANDARD
202-96 MB311 v9:layout 11/21/08 4:06 PM Page 1 202-96 (Rev. 2000) STANDARD For Flexible Fiber Glass Insulation to be Laminated for Use in Metal Buildings www.naima.org 202-96 MB311 v9:layout 11/21/08 4:06
More informationINSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS
INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS TRYMER RIGID POLYISOCYANURATE INSULATION IN HOT APPLICATIONS (80 F to 300 F) 1 SCOPE 1.1 This guideline covers the installation of Trymer*
More informationDUO-THERM 505 Specification Guide
STANDARD SPECIFICATION 3.101 7.01.08 Part 1 - General Duo - Therm 505 Steel Piping Systems suitable for Steam, High Temperature Hot Water, Gravity and Pumped Condensate. 1.1 Pre-insulated Piping - Furnish
More informationDIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems.
PART 1 - GENERAL 1.01 SECTION INCLUDES A. Pipe and equipment support systems. B. Inserts. 1.02 RELATED SECTIONS A. Section 15890 - Ductwork Supports. 1.03 DEFINITIONS A. Supports: Attachments, hangers,
More informationPreassembled steel stairs with concrete-filled treads.
SECTION 055113 - PART 1 - GENERAL 1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this
More informationDesign & Construction Standards, Revised January
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationFig. 1 - Standard Clevis Hanger
Revision 10/24/2007 Fig. 1 - Standard Clevis Hanger Component of State of California OSHPD Approved Seismic Restraints System Size Range Size 1/2" thru 36" pipe. Function Recommended for the suspension
More informationPERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION
PermaTherm, Inc. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.insulate.pipe.com/ PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION The specification guideline in the three-part
More informationSECTION TAPPING SLEEVES AND VALVES
SECTION 33 12 16.17 TAPPING SLEEVES AND VALVES PART 1: GENERAL 1.01 SCOPE Furnish, install and test all tapping sleeves, tapping valves, and tapping saddles as shown on the Drawings. 1.02 RELATED WORK
More informationPERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION
PermaTherm, Inc. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.insulatepipe.com PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION The specification guideline in the three-part
More informationUnion County Vocational - Technical Schools Scotch Plains, New Jersey
SECTION 092216 - NON-STRUCTURAL METAL FRAMING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION METAL STAIRS
SECTION 05510 METAL STAIRS PART 1 GENERAL 1.01 SECTION INCLUDES A. Stairs with concrete treads. B. Stairs with metal treads. C. Structural steel stair framing and supports. D. Handrails and guards. 1.02
More informationDSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION
SECTION 230713 DUCT INSULATION PART 1 GENERAL 1.1 SUMMARY A. Related Sections: 1. 233113 Ductwork and Accessories 1.2 REFERENCES A. American Society for Testing and Materials (ASTM): 1. E84-96a Test Method
More informationSPECIFICATIONS FOR HONEYCOMB INTERNAL FLOATING ROOFS
PETREX SPECIFICATIONS FOR HONEYCOMB INTERNAL FLOATING ROOFS APPLICATION: REGULAR HYDROCARBONS SCOPE The roof shall be full-surface contact type designed to eliminate the presence of air-vapor mixture under
More informationHT-406 Specification Guide
2.101 Part 1 - General Pre-insulated HDPE-Jacketed Steel Piping Systems suitable for Steam, Condensate Return, and High Temperature Heating Water. 1.1 Pre-insulated Piping - Furnish a complete HDPE jacketed
More informationStructural. Lubron. Self-Lubricating PTFE Resin Slide Bearings. Lubron Bearing Systems. Bearings to move the world.
Structural Lubron TR Lubron Bearing Systems Bearings to move the world. LUBRON TR slide bearings offer a simple and economic solution for most moderate load bearing requirements. LUBRON TR slide bearings
More informationCUSH-A-THERM VAPOR BARRIER PROTECTION
CUSH-A-THERM VAPOR BARRIER PROTECTION www.zsi-inc.com Cush-A-Therm AIRTIGHT CRUSH-RESISTANT INSULATION CLAMP Cush-A-Therm Clamp is a perfect crush-resistant airtight seal for chilled refrigeration or mechanical
More informationITW INSULATION SYSTEMS
Installation Guidelines for TRYMER Insulation ITW INSULATION SYSTEMS TRYMER Rigid Polyisocyanurate Insulation in Refrigeration Applications (-70 F to 35 F) 1 SCOPE 1.1 This guideline covers the installation
More informationNORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017
SECTION 23 0529 - MECHANICAL SUPPORTING DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
More information1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.
SECTION 260529 - HANGERS AND SUPPORTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases. 1.2
More information1.02 RELATED SECTIONS: Water supply piping, water use piping, electrical, irrigation, foundations, site plans.
INC. ENGINEERING/CONSTRUCTION/MANUFACTURING /WWW.CONTAINWATER.COM SPRINGS, TEXAS. 78620 MODEL SPECIFICATION FOR CONTAIN WATER INC. 30 DEGREE ROOF CORRUGATED STEEL WATER STORAGE Part 1 GENERAL 1.01 SECTION
More informationSECTION PLUMBING INSULATION
SECTION 22 07 00 PLUMBING INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Section includes equipment insulation, covering, and thermal insulation for piping systems including vapor retarders, jackets and accessories.
More informationD. Provide UL-approved assemblies for pipes and ducts passing through fire-rated floors, walls, or partitions as required.
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More information1.02 RELATED SECTIONS: Water supply piping, water use piping, electrical, irrigation, foundations, site plans.
INC. ENGINEERING/CONSTRUCTION/MANUFACTURING /WWW.CONTAINWATER.COM SPRINGS, TEXAS. 78620 MODEL SPECIFICATION FOR CONTAIN WATER INC. DOME ROOF CORRUGATED STEEL WATER STORAGE TANKS. Part 1 GENERAL 1.01 SECTION
More informationAddendum to Specifications
Addendum to Specifications SOW #: Construction Specification #: Date: Additions to Specifications: Deletions to Specifications: Engineer Date Design Engineering Manager Date Page 2 of 7 PART 1 - GENERAL
More informationA. ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
More informationCity of Winnipeg BASES, HANGERS AND SUPPORTS Section NEWPCC - Pump Well Isolation Page 1 of 6 Tender No June 2003
NEWPCC - Pump Well Isolation Page 1 of 6 PART 1 General 1.1 RELATED SECTIONS.1 Section 01001 General Requirements..2 Section 03300 - Cast-in-Place Concrete..3 Section 05121 - Structural Steel for Buildings..4
More informationMaterials Carbon Steel is used in the manufacturing of riser and pipe clamps. Stainless Steel and other materials are available.
Pipe clamps offered in this section are designed for support and attachment of pipe to structural members. wide range of pipe clamps are available for various applications. Materials arbon Steel is used
More informationSEISMIC RESTRAINT SYSTEM
1. GENERAL 1.1. Description: SECTION 16012 SEISMIC RESTRAINT SYSTEM 1.1.1. This specification covers design and installation of seismic bracing and anchorage required for conduit, cable tray, bus duct,
More informationStudent Services & Classroom Addition
SECTION 055113 - METAL PAN STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationD-10 OUTLINE SPECIFICATION FOR PRE FAB Undergrd Piping System
D-10 OUTLINE SPECIFICATION FOR PRE FAB Undergrd Piping System PREFABRICATED CONDUIT PIPING SYSTEM PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General
More informationDIVISION 20 GENERAL SECTIONS FOR PLUMBING, FIRE SUPPRESSION & HVAC SECTION VIBRATION ISOLATORS
DIVISION 20 GENERAL SECTIONS FOR PLUMBING, FIRE SUPPRESSION & HVAC SECTION 20 05 80 PART 1 GENERAL 1.01 DESCRIPTION A. Provide a complete vibration isolation system to isolate motorized equipment, piping,
More informationPERMATHERM, INC. SPECIFICATION FOR CHILLED WATER PIPE INSULATION
PermaTherm, Inc. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.insulate.pipe.com/ PERMATHERM, INC. SPECIFICATION FOR CHILLED WATER PIPE INSULATION The specification guideline in the
More informationSECTION COLD-FORMED METAL TRUSSES
SECTION 054400 COLD-FORMED METAL TRUSSES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationDIVISION 5 - STRUCTURAL STEEL AND IRON WORK
DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete
More informationSPECIFICATION FOR PERMANENT BEAM GRANDSTAND WITH INTERLOCK WELDED DECK SYSTEM
E & D SPECIALTY STANDS, INC. MANUFACTURERS OF QUALITY STANDS AND SEATING 2081 FRANKLIN STREET - P.O. BOX 700 - NORTH COLLINS, NEW YORK 14111 716-337-0161-1-800-525-8515 FAX 716-337-2903 - SALES FAX 716-337-3436
More informationSECTION HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
SECTION 22 05 29 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationINSTALLATION GUIDELINES FOR CHILL WATER PIPE INSULATION
PermaTherm, Inc. 269 Industrial Park Road Monticello, GA 31064 (706) 468-7500 www.insulate.pipe.com/ Temperature Range 34 F to 167 F INSTALLATION GUIDELINES FOR CHILL WATER PIPE INSULATION PERMATHERM,